+ All Categories
Home > Documents > MATAWINIE GRAPHITE PROJECT - Nouveau Monde...

MATAWINIE GRAPHITE PROJECT - Nouveau Monde...

Date post: 29-Jun-2020
Category:
Upload: others
View: 2 times
Download: 0 times
Share this document with a friend
25
High Purity Flake Graphite Deposit in North America Investor Presentation – November 2018 MATAWINIE GRAPHITE PROJECT WWW.NOUVEAUMONDE.CA :: TSXV:NOU :: OTCQX:NMGRF :: FSE:NM9
Transcript
Page 1: MATAWINIE GRAPHITE PROJECT - Nouveau Monde Graphitenouveaumonde.ca/wp-content/uploads/2018/11/2018-11...• Financial Controller from 2011 to 2016 for Imerys Graphite & Carbon ...

High Purity Flake Graphite Depositin North America

Investor Presentation – November 2018

MATAWINIE GRAPHITE PROJECT

WWW.NOUVEAUMONDE.CA :: TSXV:NOU :: OTCQX:NMGRF :: FSE:NM9

Page 2: MATAWINIE GRAPHITE PROJECT - Nouveau Monde Graphitenouveaumonde.ca/wp-content/uploads/2018/11/2018-11...• Financial Controller from 2011 to 2016 for Imerys Graphite & Carbon ...

CAUTIONARY STATEMENTS

Cautionary Statements Regarding Forward Looking InformationThis presentation contains "forward-looking information" within the meaning of the applicable securities legislation. All information containedherein that is not clearly historical in nature may constitute forward-looking information. Generally, such forward-looking information can beidentified notably by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled","estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state thatcertain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". Forward-looking information issubject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance orachievements of the Company to be materially different from those expressed or implied by such forward-looking information, including but notlimited to: (i) volatile stock prices; (ii) the general global markets and economic conditions; (iii) the possibility of write-downs and impairments; (iv)the risk associated with exploration, development and operations of graphite; (v) the risk associated with establishing title to mineral properties andassets; (vi) the risks associated with entering into joint ventures; (vii) fluctuations in graphite prices; (viii) the risks associated with uninsurable risksarising during the course of exploration, development and production; (ix) competition faced by the resulting issuer in securing experiencedpersonnel and financing; * (x) access to adequate infrastructure to support mining, processing, development and exploration activities; (xi) the risksassociated with changes in the mining regulatory regime governing the Company; (xii) the risks associated with the various environmentalregulations the Company is subject to; (xiii) risks related to regulatory and permitting delays; (xiv) the reliance on key personnel; (xv) liquidity risks;;(xvi) the risk of litigation; and (xvii) risk management.

Forward-looking information is based on assumptions management believes to be reasonable at the time such statements are made, including butnot limited to, continued exploration activities, no material adverse change in graphite prices, exploration and development plans to proceed inaccordance with plans and such plans to achieve their stated expected outcomes, receipt of required regulatory approvals, and such otherassumptions and factors as set out herein. Although the Company has attempted to identify important factors that could cause actual results todiffer materially from those contained in the forward-looking information, there may be other factors that cause results not to be as anticipated,estimated or intended. There can be no assurance that such forward-looking information will prove to be accurate, as actual results and futureevents could differ materially from those anticipated in such forward-looking information. Such forward-looking information has been provided forthe purpose of assisting investors in understanding the Company's business, operations and exploration plans and may not be appropriate for otherpurposes. Accordingly, readers should not place undue reliance on forward-looking information. Forward-looking information is made as of the dateof this press release, and the Company does not undertake to update such forward-looking information except in accordance with applicablesecurities laws.

WWW.NOUVEAUMONDE.CA :: TSXV:NOU :: OTCQX:NMGRF :: FSE:NM9 2

Page 3: MATAWINIE GRAPHITE PROJECT - Nouveau Monde Graphitenouveaumonde.ca/wp-content/uploads/2018/11/2018-11...• Financial Controller from 2011 to 2016 for Imerys Graphite & Carbon ...

SERVING TOMORROW’S ECONOMYWITH THE SUSTAINABLE DEVELOPMENT OF OUR NATURAL RESOURCES

▪ Reliable, low cost player in thetraditional graphite market

▪ Innovation in the value-addedgraphite markets

▪ Walking the talk : aiming at beingthe world’s first all-electric open-pit mine

Our mission is to produce, transform and distribute differenttypes of natural graphite flakes, in a profitable and sustainableway, while meeting the growing needs of the industrialmarkets motivated by the revolution of renewable energy andelectric vehicles.

NMG PRESENTATION

WWW.NOUVEAUMONDE.CA :: TSXV:NOU :: OTCQX:NMGRF :: FSE:NM9 3

Page 4: MATAWINIE GRAPHITE PROJECT - Nouveau Monde Graphitenouveaumonde.ca/wp-content/uploads/2018/11/2018-11...• Financial Controller from 2011 to 2016 for Imerys Graphite & Carbon ...

COMPANY OVERVIEWSUCCESSFUL TRANSITION FROM EXPLORATION TO DEVELOPMENT / NEAR-TERM PRODUCTION

• NMG started exploration in 2012, utilizing advanced geophysics technology. The Tony Block Deposit was discovered in 2015.

• Explored over 10,000 km of untapped territories

o Only new discovery of graphite in North America since Lac Guéret deposit (Mason Graphite) in 2001

• Same geological setting as the only significant graphite mine in N.A. (the one owned by Imerys Graphite & Carbon)

✓ Summer 2018:To commission Demo Plant✓ Sept 2018:2,000t production starts✓ Q4 2018:Bankable Feasibility Study (BFS)❑ H2 2018: Marketing & Sales Agreement❑ Q1 2019: Start Spherical Graphite (SG) plant construction❑ Q1 2019: IBA filing for permit ❑ H1 2019: BFS update including value-added❑ Summer 2019: Commissioning Demo SG plant❑ Q1 2020: Project Financing❑ Q2 2020: Mine & Concentrator Construction Starts

WWW.NOUVEAUMONDE.CA :: TSXV:NOU :: OTCQX:NMGRF :: FSE:NM9 4

Page 5: MATAWINIE GRAPHITE PROJECT - Nouveau Monde Graphitenouveaumonde.ca/wp-content/uploads/2018/11/2018-11...• Financial Controller from 2011 to 2016 for Imerys Graphite & Carbon ...

NMG’S MATAWINIE PROJECT STRATEGICALLY LOCATED

NORTH AMERICA’S GRAPHITE TRIANGLE

IMERYS(Euronext: NK, Market Cap: ~€5B)

Imerys disclosed that Lac-des-Îles mine isnearly depleted, with enough ore through

2020(Source : Graphite and Graphene Conference, F. Corti, Berlin, Dec

2014)

Major industrial French conglomerate with a market value of around 5B euros

With output varying between 20K to 25K tons per year, it represents 25% to 30% of North

American demand

Proven track record of producing and sellinghigh quality graphite concentrate since 1989

WWW.NOUVEAUMONDE.CA :: TSXV:NOU :: OTCQX:NMGRF :: FSE:NM9 5

Page 6: MATAWINIE GRAPHITE PROJECT - Nouveau Monde Graphitenouveaumonde.ca/wp-content/uploads/2018/11/2018-11...• Financial Controller from 2011 to 2016 for Imerys Graphite & Carbon ...

AN EXCEPTIONAL TEAM

TO GRAPHITE EXPERTS

ERIC DESAULNIERS, MSc, P. GeoFounder, President, Chief Executive Officer (CEO), Director• 12 years of experience as a Professional Geologist with a Masters degree

in Geophysics• Executed mandates for international companies such as Aramco, Shell,

NASA, BRGM and GSC• 7 years as an Infantry Officer with Canadian Forces

CHARLES-OLIVIER TARTE, CPA, CMAChief Financial Officer (CFO)• Financial Controller from 2011 to 2016 for Imerys Graphite & Carbon • Responsible of the financial management of 3 sites and 2 corporations

(Canada & USA): Open pit mining site, value-added processing plant and sales office.

KARL TRUDEAU Chief Operating Officer (COO)• Natural graphite operations leader and Mine site manager at Lac-des-

Iles from 2011 to 2017 for Imerys Graphite & Carbon• Experience worldwide developing mineral deposits into producing assets

TRISTAN C. MENARDExecutive Vice-President (EVP), Capital Markets• Formerly Portfolio Manager and Associate at Jarislowsky Fraser, a firm

managing over $40 billions in assets for private and institutional clients.• Holds the Chartered Investment Manager designation

ZHENGLI (Andrew) TANMSc Eng – Technical Director• Over 20 years of experience in Graphite & Carbon industry• Former General Manager of a Value-Added graphite plant in China for

SGL Group

ARMANDO FARHATEB.Eng, MBA – Market Leader• Former COO for Nationale de Grafite in Brazil in charge of 3 graphite

mining and processing plants • Former Natural Graphite Product Director at Imerys Graphite & Carbon

PATRICE BOULANGERIng, MBA – Director• 20 years of experience in R&D and Sales in the graphite business with

SGL Carbon

BENOIT BRIEREPlant Manager• 25 years operation and customer service experience in graphite at Lac-

des-Iles Imerys mine

FROM SENIOR MANAGEMENT

WWW.NOUVEAUMONDE.CA :: TSXV:NOU :: OTCQX:NMGRF :: FSE:NM9 6

Page 7: MATAWINIE GRAPHITE PROJECT - Nouveau Monde Graphitenouveaumonde.ca/wp-content/uploads/2018/11/2018-11...• Financial Controller from 2011 to 2016 for Imerys Graphite & Carbon ...

GLOBAL PRODUCTION PER LOCATION

67%

15%

9%

2%

7%

China India Brazil Canada Other

A LANDSCAPE DOMINATED BY CHINA AND THE REFRACTORIESMARKET OVERVIEW

~70% of the offer comes from China

Global yearly consumption: 1,1 million tons

Typical mine production: ~10k-20k tpy

The steel industry is the #1 buyer

Current North American Market StatusConsumed: 80k tpy vs Produced : 20k tpy

For LiB expected growth : 150k tpy

Refractories35%

Batteries25%

Lubricants and crucibles

10%

Metallurgy7%

Pencils4%

Others19%

MAIN USES FOR GRAPHITE

WWW.NOUVEAUMONDE.CA :: TSXV:NOU :: OTCQX:NMGRF :: FSE:NM9 7

Page 8: MATAWINIE GRAPHITE PROJECT - Nouveau Monde Graphitenouveaumonde.ca/wp-content/uploads/2018/11/2018-11...• Financial Controller from 2011 to 2016 for Imerys Graphite & Carbon ...

GRAPHITE PRICING (SEP 2018)Lithium Ion Battery (LiB) market has a significant impact since Sept 2017

Source: Benchmark Mineral Intelligence

WWW.NOUVEAUMONDE.CA :: TSXV:NOU :: OTCQX:NMGRF :: FSE:NM9 8

Page 9: MATAWINIE GRAPHITE PROJECT - Nouveau Monde Graphitenouveaumonde.ca/wp-content/uploads/2018/11/2018-11...• Financial Controller from 2011 to 2016 for Imerys Graphite & Carbon ...

LI-ION BATTERY MEGAFACTORIESIN CONSTRUCTION

An increased graphite demand of 530,000 tpy by 2023

of 1,323,000 tpy by 2028

WWW.NOUVEAUMONDE.CA :: TSXV:NOU :: OTCQX:NMGRF :: FSE:NM9 9

Capacity 2028: 1102.5 GWh

Page 10: MATAWINIE GRAPHITE PROJECT - Nouveau Monde Graphitenouveaumonde.ca/wp-content/uploads/2018/11/2018-11...• Financial Controller from 2011 to 2016 for Imerys Graphite & Carbon ...

NORTH-AMERICAN LI-ION BATTERY MARKET

EXPECTED SHORT TERM DEMAND OF 150,000 TPY

NE

TX

AL

TENC

IN

MI

ON

QC

= Offer

= Demand

Production capacity: 52k tpaUntil: 2045

Production capacity: ~ 20k tpa

WWW.NOUVEAUMONDE.CA :: TSXV:NOU :: OTCQX:NMGRF :: FSE:NM9 10

Page 11: MATAWINIE GRAPHITE PROJECT - Nouveau Monde Graphitenouveaumonde.ca/wp-content/uploads/2018/11/2018-11...• Financial Controller from 2011 to 2016 for Imerys Graphite & Carbon ...

All $ in CAD unless indicated otherwise*NMG results based on NI 43-101 Pre-Feasibility Study for the West Zone

ROBUST PROJECT ECONOMICSMINING PROJECT (NO VALUE-ADDED PROCESSING)

**(source: https://mwne.ws/2ArUOQR)

WWW.NOUVEAUMONDE.CA :: TSXV:NOU :: OTCQX:NMGRF :: FSE:NM9 11

Economic Highlights Feasibility study (2018) Prefeasibility study (2017) Variation

Yearly graphite concentrate production 100,000 tonnes 52,000 tonnes +92%

Pre-tax NPV (8%) 1,287 M $ 499 M $ +158%

Post-tax NPV (8%) 751 M $ 297 M $ +153%

Pre-tax IRR 40.6 % 32.4 % +25%

Post-tax IRR 32.2 % 25.9 % +24%

Life of mine 25.5 years 27 years -6%

Pre-tax Payback 2.6 years 2.6 years 0%

Post-tax Payback 2.2 years 2.3 years -4%

CAPEX 276 M $(incl. 12.4% - 31 M $ contingency)

181 M $(incl. 12.5% - 22 M $ contingency)

+52%

First 5 years average sales price 1,532 $ US / tonnes 1,429 $ US / tonnes +7%

Life of mine average sales price 1,730 $ US / tonnes 1 429 $ US / tonnes +21%

OPEX 499 $ / tonnes 539 $ / tonnes -7%

Page 12: MATAWINIE GRAPHITE PROJECT - Nouveau Monde Graphitenouveaumonde.ca/wp-content/uploads/2018/11/2018-11...• Financial Controller from 2011 to 2016 for Imerys Graphite & Carbon ...

SENSITIVITY ANALYSIS

WWW.NOUVEAUMONDE.CA :: TSXV:NOU :: OTCQX:NMGRF :: FSE:NM9

0

200

400

600

800

1000

-30 -20 -10 0 10 20 30

Aft

er-

Tax

NP

V @

8%

(M

CA

D)

RELATIVE VARIATION (%)

CAPEX OPEX PRICE

10,0

20,0

30,0

40,0

50,0

-30 -20 -10 0 10 20 30

Aft

er-

Tax

IRR

(%

)

RELATIVE VARIATION (%)

CAPEX OPEX PRICE

12

Page 13: MATAWINIE GRAPHITE PROJECT - Nouveau Monde Graphitenouveaumonde.ca/wp-content/uploads/2018/11/2018-11...• Financial Controller from 2011 to 2016 for Imerys Graphite & Carbon ...

COMPARABLES & PRODUCT

WWW.NOUVEAUMONDE.CA :: TSXV:NOU :: OTCQX:NMGRF :: FSE:NM9

NMG ROW NA

0

500

1 000

C1 Cost Curve per tonne

0

750

1 500

EBIDTA Curve per tonne

NMG ROW NA

ProductsNMG

DistributionTarget market

Jumbo

(+48 mesh)15%

Expandable , Fuel Cell

& Traditional

Large

(+80 mesh)33% Traditional

Medium

(+150 mesh)28% Battery & Traditional

Fines

(-150 mesh)24% Battery & Traditional

13

▪ Based on NMG internal studies of 12

graphite Feasibility Studies

▪ NMG expect to be in first decile

EBIDTA per tonnes

▪ NMG is ready to tackle all markets

Page 14: MATAWINIE GRAPHITE PROJECT - Nouveau Monde Graphitenouveaumonde.ca/wp-content/uploads/2018/11/2018-11...• Financial Controller from 2011 to 2016 for Imerys Graphite & Carbon ...

ProductsJumbo Flakes

(+50 mesh)

Large Flakes

(+80 mesh)

Medium Flakes

(+100 mesh)

Fine Flakes

(-100 mesh)

VALUE-ADDED TARGETED MARKETSPRICE RANGE OF PRODUCTS

Purification to >99,9% Cg

Micronization

ShapingElectrochemical

Treatment

Price Range

ExpandableGraphite

Purified Graphite Concentrate

Purified MicronizedGraphite

Spherical GraphiteProducts :

$3,000 - $15,000 USD / ton

WWW.NOUVEAUMONDE.CA :: TSXV:NOU :: OTCQX:NMGRF :: FSE:NM9 14

Page 15: MATAWINIE GRAPHITE PROJECT - Nouveau Monde Graphitenouveaumonde.ca/wp-content/uploads/2018/11/2018-11...• Financial Controller from 2011 to 2016 for Imerys Graphite & Carbon ...

NOUVEAU MONDE GRAPHITE’S

MATAWINIE PROJECT

LOCATION ADVANTAGES

Many options available to minimize Capex and Opex and maximize

economics

Town of St-Michel-des-Saints, with an industrial history, is located 5 km from potential mine sites with skilled labor

& all needed infrastructure

Only 150km north of Montreal with

all-year access to public

roads.

St-Michel-des-Saintsis strategically located

for low transportation cost to end-users in North America

20,000 m2 industrial complex currently leased for Phase 1 Demonstration Plant

No need for campsite. Access to low cost green hydroelectricity

Proximity to infrastructures and potential customers provides strong advantages for building operations with a low environmental footprint

WWW.NOUVEAUMONDE.CA :: TSXV:NOU :: OTCQX:NMGRF :: FSE:NM9 15

Page 16: MATAWINIE GRAPHITE PROJECT - Nouveau Monde Graphitenouveaumonde.ca/wp-content/uploads/2018/11/2018-11...• Financial Controller from 2011 to 2016 for Imerys Graphite & Carbon ...

MATAWINIE GRAPHITE PROJECTLARGE & QUALITY RESOURCE AT SURFACE

June 2018West Zone

Resource Estimate• Indicated : 95.8M tons @ 4.28% Cg*

• Inferred : 14M tons @ 4.19% Cg

• 4.69M tons of Graphite Content

South Zone

Resource Estimate• Indicated : 26.3M tons @ 3.73% Cg

• Inferred : 19.2M tons @ 3.67% Cg

• 1.7M tons of Graphite Content

* Cut-off Grade

WWW.NOUVEAUMONDE.CA :: TSXV:NOU :: OTCQX:NMGRF :: FSE:NM9 16

Page 17: MATAWINIE GRAPHITE PROJECT - Nouveau Monde Graphitenouveaumonde.ca/wp-content/uploads/2018/11/2018-11...• Financial Controller from 2011 to 2016 for Imerys Graphite & Carbon ...

WWW.NOUVEAUMONDE.CA :: TSXV:NOU :: OTCQX:NMGRF :: FSE:NM9

MATAWINIE GRAPHITE PROJECTGENERAL SITE LAYOUT

17

Page 18: MATAWINIE GRAPHITE PROJECT - Nouveau Monde Graphitenouveaumonde.ca/wp-content/uploads/2018/11/2018-11...• Financial Controller from 2011 to 2016 for Imerys Graphite & Carbon ...

MATAWINIE GRAPHITE PROJECTPROCESS FLOWSHEET

WWW.NOUVEAUMONDE.CA :: TSXV:NOU :: OTCQX:NMGRF :: FSE:NM9

ProductsJumbo Flakes

(+50 mesh)

Large Flakes

(+80 mesh)

Medium Flakes

(+150 mesh)

Fine Flakes

(-150 mesh)

18

Page 19: MATAWINIE GRAPHITE PROJECT - Nouveau Monde Graphitenouveaumonde.ca/wp-content/uploads/2018/11/2018-11...• Financial Controller from 2011 to 2016 for Imerys Graphite & Carbon ...

DEMONSTRATION PLANT – 1000 tpy 2019-2020

WWW.NOUVEAUMONDE.CA :: TSXV:NOU :: OTCQX:NMGRF :: FSE:NM9

De-risking the marketing & processing of our graphite products

19

Page 20: MATAWINIE GRAPHITE PROJECT - Nouveau Monde Graphitenouveaumonde.ca/wp-content/uploads/2018/11/2018-11...• Financial Controller from 2011 to 2016 for Imerys Graphite & Carbon ...

FIRST ALL-ELECTRIC OPEN-PIT MINE

WWW.NOUVEAUMONDE.CA :: TSXV:NOU :: OTCQX:NMGRF :: FSE:NM9 20

Page 21: MATAWINIE GRAPHITE PROJECT - Nouveau Monde Graphitenouveaumonde.ca/wp-content/uploads/2018/11/2018-11...• Financial Controller from 2011 to 2016 for Imerys Graphite & Carbon ...

HYDRO QUÉBEC PARTNERSHIP

A WORLD LEADER IN BATTERY MATERIALS

▪ Research center of the state owned power utilitycompany Hydro-Québec (HQ)

▪ Over 800 patents especially in Li-ion, Li-Sulfur andLi-Air battery technologies

▪ 70 employees including 27 researchers

▪ $20M revenues yearly sourced externallyreinvested in R&D

▪ HQ is lead by Dr Karim Zaghib, named one of themost influential scientific minds in the world’ byClarivate Analytics for 3 years in a row

PARTNERSHIP AT A GLANCE▪ Licensing agreement on all HQ existing

technologies used for LiB anode materialproduction.

▪ Exclusive R&D collaboration to develop new IP ona 50/50 basis and industrialization.

▪ HQ to assist NMG in setting up a small-scale process inits demonstration plant in Saint-Michel-des-Saints,starting by the end of 2018.

▪ The success of this small-scale process will lead NMG toeventually building an anode material fabrication plantwith a capacity of up to 100k tons per year. The anodematerial fabrication plant would be in addition to andcomplementary to NMG’s mining project.

AGREEMENT HIGHLIGHTS

WWW.NOUVEAUMONDE.CA :: TSXV:NOU :: OTCQX:NMGRF :: FSE:NM9 21

Page 22: MATAWINIE GRAPHITE PROJECT - Nouveau Monde Graphitenouveaumonde.ca/wp-content/uploads/2018/11/2018-11...• Financial Controller from 2011 to 2016 for Imerys Graphite & Carbon ...

✓ Summer 2018: Commission Demo concentrate plant✓ September 2018: 2,000t production starts✓ Q4 2018: Bankable Feasibility Study (BFS)❑ H2 2018: Marketing and sales agreement (off-take)❑ Q1 2019: Start Spherical Graphite (SG) plant construction❑ Q1 2019: IBA filing for permit❑ H1 2019: BFS update including value-added❑ Summer 2019: Commissioning Demo SG plant❑ Q1 2020: Project Financing❑ Q2 2020: Mine & Concentrator Construction Starts

RECENT AND UPCOMING MILESTONES2018-2019

WWW.NOUVEAUMONDE.CA :: TSXV:NOU :: OTCQX:NMGRF :: FSE:NM9 22

Page 23: MATAWINIE GRAPHITE PROJECT - Nouveau Monde Graphitenouveaumonde.ca/wp-content/uploads/2018/11/2018-11...• Financial Controller from 2011 to 2016 for Imerys Graphite & Carbon ...

CORPORATE STRUCTURE

*All currency in Canadian Dollars (CAD). Market data and financial data as of Oct 1st 2018.

52-Week Price Chart ($0.25 - 0.54 CAD)

TSXV:NOU OTCQX:NMGRF FSE:NM9

Share Price (CAD) as of Sept 25, 2018 $0.28

Market Cap (CAD) as of Sept 25, 2018 $43M

Shares Outstanding as of Sept 25, 2018 172M

Warrants 53M

Options / broker warrants 14M

Fully Diluted Shares 239M

Cash / Debt (CAD) as of Oct 1st 2018 ~$5M / $0

Management & Insiders Ownership ~25%

WWW.NOUVEAUMONDE.CA :: TSXV:NOU :: OTCQX:NMGRF :: FSE:NM9 23

Page 24: MATAWINIE GRAPHITE PROJECT - Nouveau Monde Graphitenouveaumonde.ca/wp-content/uploads/2018/11/2018-11...• Financial Controller from 2011 to 2016 for Imerys Graphite & Carbon ...

INSTITUTIONAL SHAREHOLDERS

Strong Institutional Support(collectively holding about 30% of shares)

Largest association of credit unions in North America

Major Québec Government fund to invest in Québec mineral exploration companies

Québec’s largest central labor body

Largest pension fund in Canada

Québec government development fund

Investment Management and Technical Research for Institutional and Professional Investors based

in Switzerland

Registered portfolio manager and exempt market dealer across

Canada

Worldwide well established and innovative specialist in the sector of precious metals and commodities

WWW.NOUVEAUMONDE.CA :: TSXV:NOU :: OTCQX:NMGRF :: FSE:NM9 24

Page 25: MATAWINIE GRAPHITE PROJECT - Nouveau Monde Graphitenouveaumonde.ca/wp-content/uploads/2018/11/2018-11...• Financial Controller from 2011 to 2016 for Imerys Graphite & Carbon ...

Head Office331 BrassardSt-Michel-des-Saints, QCJ0K 3B0 Canada

Montreal Office410 St. Nicolas Street, Suite 236Montreal, QCH2Y 2P5 Canada

TSXV – NOU

OTCQX – NMGRF

FSE – NM9

CONTACT INFORMATION

ContactEric Desaulniers, President and CEOMobile: 1-819-923-0333Email: [email protected]

Tristan C. Menard, Executive Vice-President, Capital MarketsMobile: 1-514-296-6339Email: [email protected]