© ABB Group March 1, 2010 | Slide 1 Matching NeSSI™ System Solutions to Process Criticality: Realizing the Value Proposition Tracy Dye P.E., IFPAC NeSSI™ Sessions, Winter 2010
Transcript
Page 1: Matching NeSSI™ System Solutions to Process Criticality ... · AV1 AV4 AV5 AV6 STREAM 1 SAMPLE RETURN Stream Switch Vent INSTRUMENT AIR ATM VENT. H O K E. G Y R O L O K 1 / 8 "

© ABB Group March 1, 2010 | Slide 1

Matching NeSSI™ System Solutions to Process Criticality: Realizing the Value Proposition

Tracy Dye P.E., IFPAC NeSSI™ Sessions, Winter 2010

Page 2: Matching NeSSI™ System Solutions to Process Criticality ... · AV1 AV4 AV5 AV6 STREAM 1 SAMPLE RETURN Stream Switch Vent INSTRUMENT AIR ATM VENT. H O K E. G Y R O L O K 1 / 8 "

© ABB Group March 1, 2010 | Slide 2

IntroductionNeSSI Technology Status

The word (and some product) continues to get out but …

The challenge of gaining market adoption for Gen 1 and especially Gen 2 technology remains.

The Market drivers still remain …

Retiring technician workforce

Relatively inexperienced replacement technicians

Standard vs costly custom engineering

Readily available, actionable data needed

Page 3: Matching NeSSI™ System Solutions to Process Criticality ... · AV1 AV4 AV5 AV6 STREAM 1 SAMPLE RETURN Stream Switch Vent INSTRUMENT AIR ATM VENT. H O K E. G Y R O L O K 1 / 8 "

© ABB Group March 1, 2010 | Slide 3

Analytical Systems integrated via NeSSITM

Technology will provide the infrastructure for anadvanced, reliability centered maintenance systemfrom sample tap to DCS (“pipe to pixel”)

Insurance for high risk factory processes

Environmental

Safety

Off specification product

On demand versus Scheduled Maintenance

Fewer and fewer maintenance personnel available

More efficient use of limited personnel

More conducive to entry level technician experience

IntroductionVision

Page 4: Matching NeSSI™ System Solutions to Process Criticality ... · AV1 AV4 AV5 AV6 STREAM 1 SAMPLE RETURN Stream Switch Vent INSTRUMENT AIR ATM VENT. H O K E. G Y R O L O K 1 / 8 "

© ABB Group March 1, 2010 | Slide 4

IntroductionTechnology Adoption Lifecycle

* Moore, Geoffrey (1991), Crossing the Chasm, Marketing and Selling High‐Tech Products to Mainstream Customers, Harper Business Essentials

Page 5: Matching NeSSI™ System Solutions to Process Criticality ... · AV1 AV4 AV5 AV6 STREAM 1 SAMPLE RETURN Stream Switch Vent INSTRUMENT AIR ATM VENT. H O K E. G Y R O L O K 1 / 8 "

© ABB Group March 1, 2010 | Slide 5

IntroductionMore Questions Than Answers

Is the overall NeSSI value proposition too broad and not application specific enough?

Is NeSSI a continuous or discontinuous technology?

If discontinuous, are we successfully creating the “bandwagon effect” to cross the chasm?

Is system visualization (Gen 1 driven) needed sooner than later?

Should we just go back to what we were doing before?

Do these systems make sense for certain applications and not for others (sledge hammer on a nail)?

Page 6: Matching NeSSI™ System Solutions to Process Criticality ... · AV1 AV4 AV5 AV6 STREAM 1 SAMPLE RETURN Stream Switch Vent INSTRUMENT AIR ATM VENT. H O K E. G Y R O L O K 1 / 8 "

© ABB Group March 1, 2010 | Slide 6

PROCESS RISK(Environmental, Safety, Off Specification Product)

LOW HIGH

NeSSI™ TechnologyProcess Criticality Spectrum

Basic Modular

ModularLocal Indication

Generation 2

IS CommunicationRemote Alarms

Generation 3

Visualization and ControlMicro‐AnalyticalWireless

When we put capital at higher risk, we in turn expect higher returns on that capital

Cost Reduction

Page 7: Matching NeSSI™ System Solutions to Process Criticality ... · AV1 AV4 AV5 AV6 STREAM 1 SAMPLE RETURN Stream Switch Vent INSTRUMENT AIR ATM VENT. H O K E. G Y R O L O K 1 / 8 "

© ABB Group March 1, 2010 | Slide 7

Generation 1Compact Design

Per end users, the compact system became somewhat invisible …

Where to start troubleshooting?

How does the system flow?

Need system visualization

Page 8: Matching NeSSI™ System Solutions to Process Criticality ... · AV1 AV4 AV5 AV6 STREAM 1 SAMPLE RETURN Stream Switch Vent INSTRUMENT AIR ATM VENT. H O K E. G Y R O L O K 1 / 8 "

© ABB Group March 1, 2010 | Slide 8

3.340 3.340

NO OUT

IN

VENT

OUT

IN

VENT

Air Signal

Air Signal

3.340

Stream SwitchVent

CALSTREAM

NC

STREAM1

1/4"

SS0AV1 AV4

AV5

STREAM1

SAMPLERETURN

Stream SwitchVent

HOKE

GYRO

LOK

1/8"Elbow

1/8" npt

HOKE

GYROLOK

1/8"

Elbo

w 1/8"

npt

HOKE

GYRO

LOK

1/8"Elbow

1/8" npt

FLOW TOANALYZER

FLOW FROMANALYZER

ATMVENT

1/4" NPT

MV

Air Signal

HOKE

GYRO

LOK

1/8"

Elbow

1/8" npt

AV6

ARV

AV1

AV2

AV3

AV4

AV5

AV6

GY

RO

LOK

1/8"

GY

RO

LOK

1/8"

GYR

OLO

K

1/8"

GY

RO

LOK

1/8"

GYROLOKGYROLOK

GYROLOK

1/8"

¼” O

D

GYR

OLO

K

1/4"

GY

RO

LOK

1/4"

GYR

OLO

K

1/4"

GY

RO

LOK

1/4"

GY

RO

LOK

1/4"

GY

RO

LOK

1/4"

GY

RO

LOK

1/8"

GYR

OLO

K

1/8"

GYROLOK

1/8"

¼” O

D

GYR

OLO

K

GYROLOK

GYR

OLO

K

1/4"

GY

RO

LOK

1/4"

GY

RO

LOK

1/4"

GYR

OLO

K

1/4"

GY

RO

LOK

1/4"

GY

RO

LOK

1/4"

GYR

OLO

K

1/4"

GY

RO

LOK 1/4"

GY

RO

LOK

GY

RO

LOK

GYROLOK

GY

RO

LOK

GYR

OLO

K

GYR

OLO

K

1/8"

GY

RO

LOK

1/8"

GY

RO

LOK

1/8"

GY

RO

LOK

1/8"

GYR

OLO

K

1/8"

GYR

OLO

K

1/8"

GY

RO

LOK

1/8"

GY

RO

LOK

1/8"

GY

RO

LOK

1/8"

GY

RO

LOK

1/8"

GY

RO

LOK

1/8"

GY

RO

LOK

1/8"

GY

RO

LOK

HOKE

1/4"GYROLOK

ANALYZERFLOW CONTROL

Generation 1Visual Design

Stream Switching Module

Sample Bypass Module

Atmospheric Reference 

Vent Module

Collateral Benefits

• Serviceability

• Maintenance

Page 9: Matching NeSSI™ System Solutions to Process Criticality ... · AV1 AV4 AV5 AV6 STREAM 1 SAMPLE RETURN Stream Switch Vent INSTRUMENT AIR ATM VENT. H O K E. G Y R O L O K 1 / 8 "

© ABB Group March 1, 2010 | Slide 9

Generation 1Increasing Complexity

FPDTCD

Page 10: Matching NeSSI™ System Solutions to Process Criticality ... · AV1 AV4 AV5 AV6 STREAM 1 SAMPLE RETURN Stream Switch Vent INSTRUMENT AIR ATM VENT. H O K E. G Y R O L O K 1 / 8 "

© ABB Group March 1, 2010 | Slide 10

Generation 1

Page 11: Matching NeSSI™ System Solutions to Process Criticality ... · AV1 AV4 AV5 AV6 STREAM 1 SAMPLE RETURN Stream Switch Vent INSTRUMENT AIR ATM VENT. H O K E. G Y R O L O K 1 / 8 "

© ABB Group March 1, 2010 | Slide 11

Generation 1Hot Spare Modules

Page 12: Matching NeSSI™ System Solutions to Process Criticality ... · AV1 AV4 AV5 AV6 STREAM 1 SAMPLE RETURN Stream Switch Vent INSTRUMENT AIR ATM VENT. H O K E. G Y R O L O K 1 / 8 "

© ABB Group March 1, 2010 | Slide 12

Generation 1Gains and Remaining Challenges

GainsReduction in engineering time and cost

Reducing in the assembly costs

Reduction in the overall ownership costs

Maintenance and Serviceability

Remaining Challenges! System not so compact

! Added tubing and fittings

! Low economies of scale inhibit material cost savings

! Standardization

! Component Interchangeability on mechanical substrate

Page 13: Matching NeSSI™ System Solutions to Process Criticality ... · AV1 AV4 AV5 AV6 STREAM 1 SAMPLE RETURN Stream Switch Vent INSTRUMENT AIR ATM VENT. H O K E. G Y R O L O K 1 / 8 "

© ABB Group March 1, 2010 | Slide 13

PROCESS RISK(Environmental, Safety, Off Specification Product)

LOW HIGH

NeSSI™ Process Criticality Spectrum

Basic Modular

ModularLocal Indication

Generation 2

IS CommunicationRemote Alarms

Generation 3

Visualization and ControlMicro‐AnalyticalWireless

Actionable Data

Page 14: Matching NeSSI™ System Solutions to Process Criticality ... · AV1 AV4 AV5 AV6 STREAM 1 SAMPLE RETURN Stream Switch Vent INSTRUMENT AIR ATM VENT. H O K E. G Y R O L O K 1 / 8 "

© ABB Group March 1, 2010 | Slide 14

Generation 2Actionable Data, Mechanical Visualization and Control

3.3403.340

NO OUT

IN

VENT

OUT

IN

VENT

Air Signal

Air Signal

Stream SwitchVent

CALSTREAM

Air Signal

FT DPTTT

PT

ARV

SS0AV1 AV4

AV5

AV6

STREAM1

SAMPLERETURN

Stream SwitchVent

INSTRUMENTAIR

ATMVENT

HOKE

GYRO

LOK

1/8"Elbow

1/8" npt

HOKE

GYROLOK

1/8"

Elbo

w

1/8"

npt

HOKE

GY

RO

LOK

1/8"Elbow

1/8" npt

HOKEG

YROLO

K

1/8"Elbow

1/8" npt

FLOW TOANALYZER

FLOW FROMANALYZER

MV

c

ncno

c

ncno

c

ncno

c

ncno

c

ncno

c

ncno

V1

V2

V3

V4

V5

V6

IAVENT

FT DPTTT

PT

NC

NV

STREAM1

1/4"

GY

RO

LOK

1/8"

GY

RO

LOK

1/8"

GY

RO

LOK

1/8"

GY

RO

LOK

1/8"

GYROLOKGYROLOK

GYROLOK

1/8"

¼” O

D

GY

RO

LOK

GYROLOK

GY

RO

LOK

1/4"

GY

RO

LOK

1/4"

GY

RO

LOK

1/4"

GY

RO

LOK

1/4"

GY

RO

LOK

1/4"

GY

RO

LOK

1/4"

GY

RO

LOK

1/8"

GY

RO

LOK

1/8"

GY

RO

LOK

1/4"

GY

RO

LOK

1/4"

GY

RO

LOK

GY

RO

LOK

1/4"

GY

RO

LOK

1/4"

GY

RO

LOK

1/4"

GY

RO

LOK

1/4"

GYROLOK

GY

RO

LOK

1/4"

GY

RO

LOK 1/4"

HOKE

1/4"GYROLOK

GY

RO

LOK

GYROLOK

1/4"

GYROLOK

GY

RO

LOK

1/8"

GY

RO

LOK

1/8"

GY

RO

LOK

1/8"

GY

RO

LOK

1/8"

GY

RO

LOK

1/8"

GY

RO

LOK

1/8"

GYROLOK

1/4"GYROLOK

GYROLOK

1/8"

¼” O

D

GY

RO

LOK

GYROLOK

GY

RO

LOK

Bypass Flow Indicator

Representative Sample

Analyzer Sample Flow Indicator

Valid Analyzer Data

∆P Measurement

Filter Blockage

Digital IS CAN Solenoids

Stream Switch Status

Page 15: Matching NeSSI™ System Solutions to Process Criticality ... · AV1 AV4 AV5 AV6 STREAM 1 SAMPLE RETURN Stream Switch Vent INSTRUMENT AIR ATM VENT. H O K E. G Y R O L O K 1 / 8 "

© ABB Group March 1, 2010 | Slide 15

One Gateway/SAM and 6 DVMs eliminated 36 expensive pneumatic tubing runs

The Gateway/SAM allows for expanding to digital flow indicators in the future.

Page 16: Matching NeSSI™ System Solutions to Process Criticality ... · AV1 AV4 AV5 AV6 STREAM 1 SAMPLE RETURN Stream Switch Vent INSTRUMENT AIR ATM VENT. H O K E. G Y R O L O K 1 / 8 "

System VisualizationOptions

Schematic and Network ViewTop Level View

Schematic and Modular Hardware

Fluid Schematic Only

System Visualization:• System level status/ alarms

(visual)

• Color coded visual (same as HMI on GC)

• Bore down into functional area of interest to see data

• See detailed data and settings at component level

45P1 Alarm Point High

25P1 Alarm Point Low

100Flow Alarm Point High

40Flow Alarm Point Low

30Temp Alarm Point High

20Temp Alarm Point Low

Inlet Pressure (psig)

Analyzer Flow (ccm)

Fluid Temp (degC)

Analyzer Backpressure (psig)

20P2 Alarm Point High

10P2 Alarm Point Low

0.920

1.519

FT DPTTT

PT

MV

MV

GYR

OLO

K

Node Address:

011

Full Scale Range (ccm)

150

Page 17: Matching NeSSI™ System Solutions to Process Criticality ... · AV1 AV4 AV5 AV6 STREAM 1 SAMPLE RETURN Stream Switch Vent INSTRUMENT AIR ATM VENT. H O K E. G Y R O L O K 1 / 8 "

© ABB Group March 1, 2010 | Slide 17

Generation 2Gen 2 Gains and Remaining Challenges

GainsActionable Data

Sample and Bypass Flow

Stream Solenoid Status

Filter Health

Digital Visualization Makes Compact Design Possible

Remote valve control significantly reduces tubing costs

Remaining Challenges! Standardization

! Still no agreement on communication bus

! Definition of SAM

! Low economies of scale inhibit material cost savings

Page 18: Matching NeSSI™ System Solutions to Process Criticality ... · AV1 AV4 AV5 AV6 STREAM 1 SAMPLE RETURN Stream Switch Vent INSTRUMENT AIR ATM VENT. H O K E. G Y R O L O K 1 / 8 "

© ABB Group March 1, 2010 | Slide 18

NeSSITM TechnologyMatching Solutions to Process Criticality

CostValue

1.0

2.2

ConventionalBasic Modular

Smart

3.5Pure analog monitored solution

1.2

PROCESS RISK(Environmental, Safety, Off Specification Product)

LOW HIGH

Page 19: Matching NeSSI™ System Solutions to Process Criticality ... · AV1 AV4 AV5 AV6 STREAM 1 SAMPLE RETURN Stream Switch Vent INSTRUMENT AIR ATM VENT. H O K E. G Y R O L O K 1 / 8 "

© ABB Group March 1, 2010 | Slide 19

ConclusionMatching NeSSITM Technology Solutions to Process Criticality

The challenge of gaining market adoption for Gen 1 and especially Gen 2 technology remains (Crossing the Chasm)

System visualization is needed sooner than later (Gen 2 not Gen 3)

Paybacks are there for Generation 2 Systems

EPA Fines ($10K to $12K per event)

Off Spec Product ($$$)

Cost Reduction (elimination of expensive tubing runs)

Employee Safety (Priceless)

Technician Time ($200K annually)

Focus: What problem(s) are we trying to solve with the technology?

Cost reduction? Standard engineering? Ease of Maintenance?

Avoiding costly off spec product, EPA fines and employee accidents?

Making more efficient use of limited technician time?

Gen 1 and Gen 2 are scalable and modular enough to match value with cost

Page 20: Matching NeSSI™ System Solutions to Process Criticality ... · AV1 AV4 AV5 AV6 STREAM 1 SAMPLE RETURN Stream Switch Vent INSTRUMENT AIR ATM VENT. H O K E. G Y R O L O K 1 / 8 "

© ABB Group March 1, 2010 | Slide 20


Recommended