Hook Up :

Hook Up sangatlah penting untuk merakit suatu aliran process dari process line, instrument air supply , signal line yang melalui tubing dan signal electrical ke instrument-instrument sehingga dapat menghasilkan suatu loop instument .

Hook Up Instrument

Page 3: Materi 04 - Hook Up

Hook Up Instrument (PI)

Page 4: Materi 04 - Hook Up

Hook Up Instrument (PT)

Page 5: Materi 04 - Hook Up

Hook Up Instrument (PDT)

Page 6: Materi 04 - Hook Up

Hook Up Instrument (PDI)

Page 7: Materi 04 - Hook Up

Hook Up Instrument (FT)

Page 8: Materi 04 - Hook Up

Hook Up Instrument (TI)

Page 9: Materi 04 - Hook Up

Hook Up Instrument (TE)

Page 10: Materi 04 - Hook Up

Hook Up Instrument (TT)

Page 11: Materi 04 - Hook Up

Hook Up Instrument (LT)

Page 12: Materi 04 - Hook Up

Hook Up Instrument (LI)

Page 13: Materi 04 - Hook Up

Hook Up Instrument (TUBING SLOPE)

Page 14: Materi 04 - Hook Up

FLOW TRANSMITTER

ELECTRICAL SIGNAL

5 WAY MANIFOLD

PLUG MALE CONNECTOR

TUBING

TUBE CLAMP

Hook Up Instrument (Flow Transmitter )

Page 15: Materi 04 - Hook Up

Hook Up Pressure Indicating Transmitter :

PRESSURE TRANSMITTER

ELECTRICAL CABLE

3 WAY NEEDLE VALVE

½’ TUBING CONNECTOR

½’ PROCESS TUBING

INSTRUMENT STAND

INSTR.MOUNTING BRAKET

¾” PLUG

Hook Up Instrument (Indicating Transmitter )

Page 16: Materi 04 - Hook Up

Requirement on the specification Hook Up Drawing Instrument Support Drawing Termination Drawing & Loop Drawing Vendor Instruction Manual

Hook Up Drawing