Energy
Symposium on International Safeguards Linking Strategy, Implementation and People
IAEA CN-220, 20-24 October 2014
Material Balance Evaluation
Solid, transparent and scientifically sound practice
in the European Union
R.Bencardino, O.Alique, W.Kilb, P.Klumpp, W.Köhne, L.Persson, S.Vaccaro
Euratom Safeguards Directorate - European Commission
Outline
Euratom Safeguards
MBE
Legal
Framework
Integrated
Management
System
Nuclear
Inspection
Activities
MBE
Practice
MBE
Audit
elements
ReviewConsultation
Conclusion
- 4 legal dimensions- Control of Nuclear Material
- Conformityassessment
- Compliancewith standards
- Flow Inspections
- InventoryInspections
- MBE
- Facility specific, σMUF provided?- Use of uncertainty in BTC & ITV
- Verification resultstransmission
- Bilateral- Trilateral- Member States
- Operator declarations- Inspector validation- Inspector verification
Euratom Safeguards
MBE
Legal
Framework
Integrated
Management
System
Nuclear
Inspection
Activities
MBE
Practice
MBE
Audit
elements
ReviewConsultation
Conclusion
- 4 legal dimensions- Control of Nuclear Material
Four Legal Dimensions
Supranational relation with
Member States
International relation with
third countries
Cooperation relation with
IAEA
Supervision relation with
nuclear operators
European Commission
Bilateral EURATOMAgreements
Art. 77b
MultilateralAgreements
Art. 77b
INFCIRC/193ADD Protocol
INFCIRC/263-UKINFCIRC/290-FR
Control ofNuclear Materials
Art. 77a, 81, 83
SupranationalCooperation
Art. 81, 82, 192
EURATOM Control of Nuclear Materials
Secondary LawPrimary
Law
EURATOM
Treaty
Commission
Regulation
(Euratom)
302/2005
Particular Safeguards Provisions
(Commission Decisions)
Commission Recommendations
(soft Law)
Guidelines for the application of
302/2005
Implementation of NMAC system
IAEA:Facility Attachments
Euratom Safeguards
MBE
Legal
Framework
Integrated
Management
System
Nuclear
Inspection
Activities
MBE
Practice
MBE
Audit
elements
ReviewConsultation
Conclusion
- Conformityassessment
- Compliancewith standards
Integrated Management System
•ISO/IEC 17020:2012 – Requirements for the operation of various types of bodies performing inspection
INSPECTION
•ISO/IEC 17025:2005 – General requirements for the competence of testing and calibration laboratories
MEASUREMENT
•ISO/IEC 17021:2011 – Requirements for bodies providing audit and certification of management systems
AUDIT
Established concrete measures
• Perform Conformity Assessment
• Integrate EC Internal Control Standards
• International Standards forming the basis of our IMS
Euratom Safeguards
MBE
Legal
Framework
Integrated
Management
System
Nuclear
Inspection
Activities
MBE
Practice
MBE
Audit
elements
ReviewConsultation
Conclusion
- Flow Inspections
- InventoryInspections
- MBE
IAEA: Design Information
Nuclear Inspection Activities
First Layer Assessments
• Verification of BTCBasic Technical Characteristics declared by Nuclear Operator
• Check Nuclear Material DeclarationsAccountancy declarations are correct, consistent and 302/2005 compliant
• Check Imports/Exports & Transit MatchingShipper Receiver Difference Analysis
• Verification of RecordsConsistency between Accountancy declarations, declared accounting records
and Operating Records
• Verification of Measurement SystemAssessment of Operator measurement system compliancy to LIS
Physical Verification of Nuclear Material
• Verification of FlowsConsistency between declared operating records and EURATOM measurement results
• Inventory VerificationsConsistency between declared NM at PIT and EURATOM PIV
MBE
PhysicalVerification
First
Layer
Nuclear Inspection Activities
Justified by legitimate measurement uncertainties?
Justified by legitimate
measurement uncertainties?
TW, TE, GA,
LA, NM
correlated to MUF or duly justified?
Not justified MUF trend?
MUF/σMUF
assessment
CUMUF
assessment
SRD evaluation
Special IC codes
MBE
PhysicalVerification
First
Layer
Euratom Safeguards
MBE
Legal
Framework
Integrated
Management
System
Nuclear
Inspection
Activities
MBE
Practice
MBE
Audit
elements
ReviewConsultation
Conclusion
- Facility specific, σMUF provided?- Use of uncertainty in BTC & ITV
EURATOM Safeguards MBE
MBE responsibility
• Lies with inspection units, HoS and Facility Officers
• Harmonised by dedicated MBE working group
Focus on facility-specific aspects
• Profound knowledge of BTC info & main NM flows
• Close examination of all potential contributors to the uncertainty budget
Development of VARO (Verification of Accountancy Records of Operators)
• Powerful IT tool for NMAC assessment
• Implement and harmonise the MBE practice consistently over all inspected installations
MBE practice – facility specific
Verify inventories (Ii, If) by Inventory Inspections
Verify flows in (R) and out (S) by Flow Inspectionsregard to measurements established in another MBA
Apply acceptance criteria to declared MUF = PE–BA = If + S – R – Ii
if(σMUF provided) {
Compare σMUF with σIMUF obtained by BTC & ITV;
Test H0 = MUF = 0 against σMUF }else if{
if (Detailed BTC) {
Obtain σIMUF by BTC;
}else{
Obtain σIMUF by ITV;
}
Test H0 = MUF = 0 against σIMUF
}
Euratom Safeguards
MBE
Legal
Framework
Integrated
Management
System
Nuclear
Inspection
Activities
MBE
Practice
MBE
Audit
elements
ReviewConsultation
Conclusion
- Operator declarations- Inspector validation- Inspector verification
MBE Audit Criteria
• Regulation 302/2005, Nuclear Operators
• Obligation to record and report measurements & uncertainties for accountancy purposes
• Recommendation 2009/120/Euratom on
Implementation of NMAC System
• Further requirements for a high quality NMAC
• Nuclear Operators shall perform Material Balance Tests using MUF and σMUF
• No guidance on how to perform MBT
MBE by Audit elements
NM Flow
Operator vs. Inspector measurements
Paired results
Grouped pairs
UncertaintyEstimators
σMUF
Validated results
Validated methods
Uncertainty budget
Audit elements:
Validation of NO measurement systemand uncertainties
Identification of lowlevel contributions
Bottom-up propagation
Top-downapproach
Euratom Safeguards
MBE
Legal
Framework
Integrated
Management
System
Nuclear
Inspection
Activities
MBE
Practice
MBE
Audit
elements
ReviewConsultation
Conclusion
- Verification resultstransmission
- Bilateral- Trilateral- Member States
Review, consultation, SG conclusion
• PIV preliminary results discussed with NO• Closing meeting
• Flow and inventory verification results • Integrated and communicated in writing to NO and MS
• Evaluate and comment IAEA conclusion
• Large sites, multiple MBAs• Annual safeguards performance feedback event
Review, consultation, SG conclusion
• Bilateral meetings• State-specific safeguards measures discussed with NO
• Best safeguards practices outlined
• Trilateral meetings• EC-IAEA cooperation during SG implementation
• Logistics and communication
• Member States representatives meetings• High level discussion of SG evolutions and projects
• Encourage best practice for harmonizing MBE
Conclusions
• EC and IAEA continuously promote MBE cooperation
• Involving Nuclear Operators and Scientific Community
• Series of workshops and technical meetings
• Harmonized approach to the expression of uncertainty in measurement (CN-220 S15)
• EC and IAEA apply similar MBE decisional processes
• Harmonizing or complementing uncertainty propagation processes
• EURATOM has the potential to apply bottom-up to MBE
• Assessing the quality of NO measurement system
• Close cooperation inspector-operator
• Thank you
• Acknowledgments
•
Antonio Medeiros
Yves Lahogue
Oscar Alique
Yetunde Aregbe
Jean Coadou
Dario Lodi
Wolfgang Kilb
Cedric De Walsche
Alexandre Isebaert
Maria Incerti-Lahogue
Stefano Ciccarello
Peter Schwalbach
Jolanta Svedkauskaite
extras
Installation Types by MBE practice
Operator
• Provides σMUF
Inspectors
• audit MUF and σMUF calculation method
• Compare σMUF with σI
MUF obtained by BTC & ITV
1
Operator
• Provides σMUF
• But does not allow Audit
Inspectors
• Compare σMUF with σI
MUF obtained by BTC & ITV
2
Operator
• Does not provide σMUF
Inspectors
• Obtain σIMUF using
BTC & ITV
3