Industry & Facilities Division 3° Party Shop Inspection Services Inspection Report N°: SOF/16/8703 Date of issuance: 30/05/2016 Page 1 of 11
Initial Initial
Interim Interim
Final Final
Rev. n°: n/a Reason of revision: n/a
This template is intended exclusively when BV is acting as 3° party inspection body. The use of present template is forbidden in the frame of 2° party services where Client specification and templates must be used.
GM SI 101 - INSP 002 rev.1 August 2015
Inspection requested by: Institute of Metal Science, Equipment and Technolog ies “Akad. A. Balevski” with Hydroarodynamics Centre – BAS (IMSETHC-BAS)
BV Inspection performed as Recognized Authority: (….specify what recognition…)
P/o nr: (client to BV)
P/o nr: E-mail from 16/05/2016 (client to Manufacturer)
Inspection performed on: 26/05/2016 Location: Tehnopol LTD technical laboratory and field polygon near to Stara Zagora, Bulgaria.
Previous Inspection: n/a Next Inspection: n/a
MATERIAL / SUPPLY / SUBJECT OF INSPECTION ITEM / TAG Nr QTY Radio communication module BEEHIVE CELL TD01 TRS 805 1
REFERENCE DOCUMENTS: See continuation sheet for additional documents: Yes No Title Reference n° Rev. Approved by Date
RCM BEEHIVE TD 01 - Technical requirements
05 BC 00.00.00.00 ТИ n/a Prof. d-r Stoychev 05/19/16
RCM BEEHIVE TD 01 – Functionality testing program 05 BC 00.00.00.00 ПИ n/a Prof. d-r Stoychev 05/19/16
RCM BEEHIVE TD 01 - Functionality testing
methodology 05 BC 00.00.00.00 МИ n/a Prof. d-r Stoychev 05/19/16
INSPECTION RESULT
Satisfactory Unsatisfactory: Non Conformities Raised (Total number of NCR - 0.)
BV Inspector: Aleksandar Pandov BV Coordinator: Tane Tanev
BV Office: BV SOF Attachments: Yes (Total number of pages: 40) No
Distribution: CLIENT MANUFACTURER BV OTHER …… ( specify)
No Yes
Industry & Facilities Division 3° Party Shop Inspection Services Inspection Report N°: SOF/16/8703 Date of issuance: 30/05/2016 Page 2 of 11
Initial Initial
Interim Interim
Final Final
Rev. n°: n/a Reason of revision: n/a
This template is intended exclusively when BV is acting as 3° party inspection body. The use of present template is forbidden in the frame of 2° party services where Client specification and templates must be used.
GM SI 101 - INSP 002 rev.1 August 2015
Stage of inspection :
Before manufacturing During manufacturing Final Packing
Type of inspection :
Pre-inspection meeting Document and QC record review Visual examination, checks Witnessing tests Manufacturing progress status Vendor assessment Final inspection Packing
Stamping :
No
Results of inspection : Satisfactory Unsatisfactory Non Conformities Reports (NCR): ❏ NCR’s issued during reported period : NO ❏ List of outstanding NCR’s : n/a Main Conclusions & Remarks: (for details see continuation sheet) Next visit scheduled: n/a
INSPECTION DETAILS:
ATTENDEES : See continuation sheet for additional documents: Yes No Name Company Title (*) Note
Vencislav Pehlivanski IMSETHC-BAS Gl. As., d-r, M. Sc. Stiliyan Goergiev IMSETHC-BAS mag Nikola Obreshkov IMSETHC-BAS mag
Stanimir Minev Tehnopol LTD M Sc. (*) specify if BV inspector has role as supervisor or mentor (e.g. “BV Inspector – supervisor –”)
MEASURING EQUIPMENT USED: See continuation sheet for additional documents: Yes No
Industry & Facilities Division 3° Party Shop Inspection Services Inspection Report N°: SOF/16/8703 Date of issuance: 30/05/2016 Page 3 of 11
Initial Initial
Interim Interim
Final Final
Rev. n°: n/a Reason of revision: n/a
This template is intended exclusively when BV is acting as 3° party inspection body. The use of present template is forbidden in the frame of 2° party services where Client specification and templates must be used.
GM SI 101 - INSP 002 rev.1 August 2015
MEASURING EQUIPMENT USED: See continuation sheet for additional documents: Yes No Equipment Type Equipment Identity n° Last Calibration date Expiry date
FLUKE 23 47910359 07/30/2012 07/29/2017 Anritsu MS 2711D Spectrum
Master S129836 06/06/2014 06/05/2019
LIST OF NON CONFORMITIES ISSUED: NC
identification n° Description of the Anomaly
NC01 n/a NC02 n/a
LIST OF NON CONFORMITIES CLOSED: NC id number Ref report n° Issued on Description
n/a
LIST OF ATTACHEMENTS Type of document Identification number Description
testing program Attachment 1 RCM BEEHIVE TD 01 – Functionality
testing program
testing methodology Attachment 2 RCM BEEHIVE TD 01 - Functionality testing methodology
Technical requirements Attachment 3 RCM BEEHIVE TD 01 - Technical requirements
Calibration Certificate Attachment 4 Calibration Certificate of FLUKE 23
Order Attachment 5 Order of IMETHAC manager for conducting the test
Communication test Attachment 6 Successful communication window Test protocol Attachment 7 Receive mode power consumption Test protocol Attachment 8 Transmitter frequency band and channels Test protocol Attachment 9 Working distance Test protocol Attachment 10 Transmitter mode power consumption Test protocol Attachment 11 Test of power supply voltage
Industry & Facilities Division 3° Party Shop Inspection Services Inspection Report N°: SOF/16/8703 Date of issuance: 30/05/2016 Page 4 of 11
Initial Initial
Interim Interim
Final Final
Rev. n°: n/a Reason of revision: n/a
This template is intended exclusively when BV is acting as 3° party inspection body. The use of present template is forbidden in the frame of 2° party services where Client specification and templates must be used.
GM SI 101 - INSP 002 rev.1 August 2015
Description of the inspections carried out :
1. Health and safety comments. All safety rules when working with electrical equipment are complied. There are no remarks or obstructions.
2. Manufacturing Progress Status (Quantities). The tested device was provided from IMSETHC-BAS (see pic 2)
3. Details of inspection activities carried out with respect to scope of work The inspection was carried out in accordance with the technical requirements (att 3) test
methodology (att 2) test programs (att 1) provided by the client. The team performed the test is determined by order of the client, as follows: - Chairman Head
Ass, d-r, M.Sc.Vencislav Pehlivanski, mag. Stiliyan Goergiev, mag. Nikola Obreshkov from IMSETHC-BAS and M.Sc. Stanimir Minev from Tehnopol LTD (see pic. 1).
The test was carried out in two successive stages. Stage 1 - measuring electrical characteristics of RCM BEEHIVE TD 01. They were performed in
the laboratory of Technopol Ltd. with calibrated measuring devices, as shown in the section MEASURING EQUIPMENT USED to this report. The results of measurements are shown in pic. 5 to 10. They are documented in protocols att. 7, 8, 10 and 11. The measured values correspond to those of the technical requirements (att. 3).
Stage 2 - measuring the distance of liaison urban distance up to 600 meters in terms of direct
sight distance up to 3500 meters. Measurements were made with two antennas provided by customers - small and big, urban and ground with direct visibility in vehicles provided by the company Technopol Ltd. The results of measurements are shown in pic. 11 to 40 and are documented in a report (att. 9). The measured values match those of technical requirements (att. 3).
4. Surveillance with reference to ITP. Inspection was conducted in the full range of client technical requirements (att.3). Results are
documented according client requirements in 5 protocols (att. 7 to 11).
5. Results of Inspection The result of inspection is positive. The measured values correspond to those of the technical requirements (att. 3). They were made with calibrated measuring devices, as shown in the section MEASURING EQUIPMENT USED to this report.
6. Problems pending. No problems were observed during the inspection.
Digital Pictures (with Legend)
Industry & Facilities Division 3° Party Shop Inspection Services Inspection Report N°: SOF/16/8703 Date of issuance: 30/05/2016 Page 5 of 11
Initial Initial
Interim Interim
Final Final
Rev. n°: n/a Reason of revision: n/a
This template is intended exclusively when BV is acting as 3° party inspection body. The use of present template is forbidden in the frame of 2° party services where Client specification and templates must be used.
GM SI 101 - INSP 002 rev.1 August 2015
Pic 1 - The testing team Pic 2 - Tested device BEEHIVE TD 01
Pic 3 - Supporting device TD 03 Pic 4 - The device is working – successful communication
Pic 5 - Measuring device FLUKE 23 Pic 6 - Receive mode power consumption (scope 300 mA)
Industry & Facilities Division 3° Party Shop Inspection Services Inspection Report N°: SOF/16/8703 Date of issuance: 30/05/2016 Page 6 of 11
Initial Initial
Interim Interim
Final Final
Rev. n°: n/a Reason of revision: n/a
This template is intended exclusively when BV is acting as 3° party inspection body. The use of present template is forbidden in the frame of 2° party services where Client specification and templates must be used.
GM SI 101 - INSP 002 rev.1 August 2015
Pic 7 - Transmitter mode power consumption (scope 10A) Pic 8 - Transmitting on 1 channel
Pic 9 - Transmitting on 20 channel Pic 10 - Transmitting on 40 channel
Industry & Facilities Division 3° Party Shop Inspection Services Inspection Report N°: SOF/16/8703 Date of issuance: 30/05/2016 Page 7 of 11
Initial Initial
Interim Interim
Final Final
Rev. n°: n/a Reason of revision: n/a
This template is intended exclusively when BV is acting as 3° party inspection body. The use of present template is forbidden in the frame of 2° party services where Client specification and templates must be used.
GM SI 101 - INSP 002 rev.1 August 2015
Pic 11 - Start the communication City mode DT 01 Pic 12 - Start the communication City mode DT 03
Pic 13 - Small antenna – 100 meters distance Pic 14 - Small antenna – 200 meters distance
Pic 15 - Small antenna – 300 meters distance Pic 16 - Small antenna – 400 meters distance
Pic 17 - Small antenna – 500 meters distance Pic 18 - Small antenna – 580 meters distance – bad signal
Industry & Facilities Division 3° Party Shop Inspection Services Inspection Report N°: SOF/16/8703 Date of issuance: 30/05/2016 Page 8 of 11
Initial Initial
Interim Interim
Final Final
Rev. n°: n/a Reason of revision: n/a
This template is intended exclusively when BV is acting as 3° party inspection body. The use of present template is forbidden in the frame of 2° party services where Client specification and templates must be used.
GM SI 101 - INSP 002 rev.1 August 2015
Pic 19 - Big antenna – 580 meters distance Pic 20 - Big antenna – 500 meters distance
Pic 21 - Big antenna – 400 meters distance Pic 22 - Big antenna – 300 meters distance
Pic 23 - Big antenna – 200 meters distance Pic 24 - Big antenna – 100 meters distance
Industry & Facilities Division 3° Party Shop Inspection Services Inspection Report N°: SOF/16/8703 Date of issuance: 30/05/2016 Page 9 of 11
Initial Initial
Interim Interim
Final Final
Rev. n°: n/a Reason of revision: n/a
This template is intended exclusively when BV is acting as 3° party inspection body. The use of present template is forbidden in the frame of 2° party services where Client specification and templates must be used.
GM SI 101 - INSP 002 rev.1 August 2015
Pic 25 - Big antenna – 0 meters distance Pic 26 - Point “0” in the field mode
Pic 27 - Big antenna – 500 meters Pic 28 - Big antenna – 1000 meters
Pic 29 - Big antenna – 1500 meters Pic 30 - Big antenna – 2000 meters
Industry & Facilities Division 3° Party Shop Inspection Services Inspection Report N°: SOF/16/8703 Date of issuance: 30/05/2016 Page 10 of 11
Initial Initial
Interim Interim
Final Final
Rev. n°: n/a Reason of revision: n/a
This template is intended exclusively when BV is acting as 3° party inspection body. The use of present template is forbidden in the frame of 2° party services where Client specification and templates must be used.
GM SI 101 - INSP 002 rev.1 August 2015
Pic 31 - Big antenna – 2500 meters Pic 32 - Big antenna – 3000 meters
Pic 33 - Big antenna – 3500 meters Pic 34 - Small antenna 2900 meters
Pic 35 - Small antenna 2500 meters Pic 36 - Small antenna 2000 meters
Industry & Facilities Division 3° Party Shop Inspection Services Inspection Report N°: SOF/16/8703 Date of issuance: 30/05/2016 Page 11 of 11
Initial Initial
Interim Interim
Final Final
Rev. n°: n/a Reason of revision: n/a
This template is intended exclusively when BV is acting as 3° party inspection body. The use of present template is forbidden in the frame of 2° party services where Client specification and templates must be used.
GM SI 101 - INSP 002 rev.1 August 2015
Pic 37 - Small antenna 1500 meters Pic 38 - Small antenna 1000 meters
Pic 39 - Small antenna 500 meters Pic 40 - Small antenna 0 meters
Punch List Items n/a
END OF REPORT
Inspected by: Inspector Industrial Services Name: Alexander Pandov Signature:
Checked by: Bureau Veritas Bulgaria (IND) Industry and Facility Development Manager Name: Tane Tanev
Inspection Office: BV SOF Supervision during performance No Yes