Date post: | 03-Apr-2018 |
Category: |
Documents |
Upload: | ramesh-kancherla |
View: | 213 times |
Download: | 0 times |
of 53
7/28/2019 Material_Master_-_Views.doc
1/53
Material Master Views
Basic Data 1 View:
General Data Tab:
Division
A way of grouping materials, products, or services. The system uses divisions to determine thesales areas and the business areasfor a material, product, or service.
Use
A product or service is always assigned to just one division. From the point of view of sales and distribution, the use of divisions lets youorganize your sales structure around groups of similar products or product lines. This allows the people in a division who processorders and service customers to specialize within a manageable area of expertise.
7/28/2019 Material_Master_-_Views.doc
2/53
Example
If a sales organizationsells food and non-food products through both retail and wholesaledistribution channels, each distributionchannel could then be further split into food and non-food divisions.
Laboratory/design office
Key for the design office, laboratory, or laboratory worker responsible.
Dependencies
You define the keys in Customizing (for the Material Master).
Product allocation determination procedure
The product allocation determination procedure determines how product allocation is carried out.
Use
The product allocation determination procedure should be entered in the basic data screen in the material master record.
Certain allocations to the product allocation determination procedure strongly influence how product allocations can be created with theapplication menu:
1. You assign an info structure to the product allocation determination procedure. This info structure influences which criteriaare used when product allocations are stored in the planning hierarchy.2. You can assign several objects to the product allocation determination procedure. Each object has its own validity period.On the basis of the delivery date in the order, the system determines the relevant object. The system then uses this object todetermine the corresponding planning hierarchy which contains product allocations.
Product hierarchy
Alphanumeric character string for grouping together materials by combining different characteristics. It is used for analyses and price
determination.
Use
The product hierarchy on the Basic Data screen is used to depict the competitive materials of competitor 1 in relation to those ofcompetitor 2. Here, your own company and its materials are also regarded as a competitor and as competitive materials respectively.You can use this representation as a basis for market analyses.
Procedure
You normally enter competitive materials using material type WETT. When entering your own materials as competitive materials, youcan, however, display the product hierarchy on the Basic Data screen for other material types too.
Dependencies
In the above instance, please note the following points:
If you have created materials at sales organization level, the system warns you on the Basic Data screen that the product
hierarchy may differ at sales organization level.
When you create new records at sales organization level, the system proposes the product hierarchy from the Basic Data
screen.
7/28/2019 Material_Master_-_Views.doc
3/53
Cross-Plant Material Status
Indicates whether the material may be used in the following areas for all plants:
Materials management (for example, in purchasing and in inventory management)
Production planning and control
Plant maintenance
Warehouse management
Costing with a quantity structure
Use
The cross-plant material status restricts the usability of the material for all plants, that is, it defines whether a warning or error messageis displayed if you include the material in a particular function.
Example
The material may be a part under development or one to be discontinued.
Date from which the cross-plant material status is valid
Dependencies
Materials planning
The valid-from date of the material status is considered only if it precedes or is the same as the planning date; that is, if thevalid-from date is later than the planning date, it is not considered, even if it is within the planning horizon.
Example
II-----I--------------------I-----------------------I-->
Planning date Valid-from date TimeIn this case, the valid-from date is not considered in materials planning since it is later than the planning date.
Purchasing
The valid-from date of the material status is checked against the current date.ExampleYou block the material for purchasing from May 1, xxxx. A purchase order is created for the material on April 28, xxxx with adelivery date of May 10, xxxx. In this case, the valid-from date May 1, xxxx is checked against the purchase order date April28, xxxx and the purchase order is allowed. Had you created the purchase order on May 3, xxxx, an error message wouldhave been issued.
Assign effectivity parameter values/ override change numbers
Indicates whether you can assign values to theeffectivity parametersor override the date, when you explode an assembly or afinished product.
Use
If you set the indicator, the following applies:
If you only use date validity, you can override the date that the system uses to determine the components. To do this, you set certainchange numbers as valid or invalid.
7/28/2019 Material_Master_-_Views.doc
4/53
If you useparameter effectivity, you can assign values to the effectivity parameters. As well as this you can set certain changenumbers to valid or invalid and thus override the parameter variant (the values you previously assigned).
General item category group
Materials grouping that helps the system to determine item categories during sales document processing.
If a group is configured specific to distribution channel, it has priority if the corresponding activity is distribution channel-dependent.
Procedure
The system automatically suggests an item type in the document depending on the item category group you assign and the salesdocument type you are processing.
Example
In the standard system, there are normal items, items that signify services (and therefore need no delivery processing) and items thatsignify packing material, for example.
Dimensions/EAN Tab
International Article Number (EAN/UPC)
Glossary definition
Use
The EAN on the Basic Data screen always relates to the base unit of measure.
Procedure
An EAN must fulfil several criteria, for example, it must belong to a valid number range interval, it must normally have a valid EAN
prefix, and it must satisfy a predefined check digit algorithm. For this reason, an EAN should only be assigned externally if it is specifiedby an external source such as the vendor, or if you are familiar with the configuration of EANs in Customizing. It is otherwise best forEANs to be assigned internally.
Dependencies
With internal number assignment, you enter the EAN category but not an EAN. With external number assignment, you enter the EANbut not an EAN category. In this case, the EAN category is determined by the system automatically.
Category of International Article Number (EAN)
Defines how the system determines an International Article Number(EAN) to be assigned internally, and which check criteria (check
digit, prefix, and so on) an EAN of this category must fulfil.
Procedure
You do not need to enter the EAN category if you assign the International Article Number (EAN) externally. In this case, the systemdetermines the correct EAN category automatically.
If you want the system to assign the EAN (internal assignment), you enter an EAN category, but leave the EAN field blank.
If both the EAN field and the EAN category field contain values, the system assumes that you want to enter the EAN externally and thatyou have possibly entered an incorrect EAN category.
7/28/2019 Material_Master_-_Views.doc
5/53
You can find out which EAN categories are suitable for internal number assignment by pressing F4.
Packaging Material Data Tab
Material Group: Packaging Materials
Groups together materials that require similar packaging materials.
Example
For example, you could use the term 'liquids' to group together all materials that need to be packed in packaging materials suitable forliquids.
Reference material for materials packed in same way
Material master record that serves as a template for packing with packing instructions for materials that can be packed in the sameway.
Use
The material, for which the reference material is entered in the material master record, can be packed with special packinginstructions for the reference material.
Dependencies
There must be a material master record for the reference material.
Examples
The materials 4711-01 and 4711-02 can be packed in the same way. For both materials, the reference material 4711 is entered in thematerial master record.
If you now create a packing instruction containing the reference material 4711 as an item of item type "R", both material 4711-01 andmaterial 4711-02 can be packed automatically using this packing instruction.
7/28/2019 Material_Master_-_Views.doc
6/53
Basic Data 2 Screen
Other Data Tab
Production/inspection memo
Number under which you have stored a production or inspection memo for thematerial.
Use
This field is purely for information.
7/28/2019 Material_Master_-_Views.doc
7/53
Industry Standard Description (such as ANSI or ISO)
Description of thematerial in accordance with the appropriate industry standard (such as ANSI or ISO).
Use
This field is purely for information.
Page Format of Production Memo
Page format of thematerial'sproduction or inspection memo. .
The ANSI paper size standards are 8 1/2 x 11 inches and 8 1/2 x 14 inches (also known as legal size paper).
The recommended ISO series has a basic size of 1 square meter. Each size is obtained by halving the one above along the longerside, for example, A0 = 841 x 1189 mm, A1 = 594 x 841 mm, and so on.
Use
This field is purely for information.
CAD Indicator
This indicator shows that the object (such as BOM or document) was created or changed in a CAD system. Data transfer in the SAPsystem via CAD interface.
Use
This indicator is only for information.However you can use it as search criteria for a document search. You can restrict the documentsearch as follows:
Entry Description
X find documents with a CAD indicatorfind documents without a CAD indicator
* find documents with or without a CAD indicator
Dependencies
This indicator is set using the CAD interface.
Basic Material
Basic constituent of thematerial.
Use
When you maintain a material master record, any basic material that you specify on the Basic Data screen in the standard R/3 Systemis checked against a table of basic materials that you can specify in Customizing. For more information, see the documentation for theactivity Define basic materials in Customizing for the Material Master.
Environment Tab
Dangerous Goods Indicator Profile
7/28/2019 Material_Master_-_Views.doc
8/53
Alphanumeric key that uniquely identifies the dangerous goods profile.
Use
You usedangerous goods indicator profilesto control applications for dangerous goods.
A dangerous goods indicator profile for the material master consists of a combination of indicators, for example:
Relevant for dangerous goods
Execute dangerous goods check
Output dangerous goods documents
Environmentally Relevant
Specifies that this is an environmentally relevant material.
Dependencies
When you save a delivery in the SAP component Sales and Distribution (SD), the system checks whether the delivery contains amaterial for which the Environmentally relevantindicator is set. If it does, anoutputof output type SDB is selected via an SD conditionschema. The output selected is used to forward the data for the delivery (material, recipient, sales organization, and so on) to theProduct Safetycomponent, where additional checks and functions are triggered.
A report is shipped automatically if:
The environmentally relevant material is assigned to a substance
If this substance is subject to a material safety data sheet in the jurisdiction to which the recipient is in turn subject
Customizing forProduct Safetyis configured accordingly underReport Shippingand the system can select a suitable report.
Dangerous Goods Packaging Status
Describes the packaging status for dangerous goods.
Use
The dangerous goods packaging status is evaluated in dangerous goods packaging processes provided that dangerous goodsintegration with handling unit processing is activated.
In this case, the dangerous goods check for product release takes into account only the document items that are identified as
a dangerous goods package in the material master.
Dangerous goods integration with handling unit processing checks whether the selected packaging material is identified as
dangerous goods packaging or dangerous goods packaging (LQ).
Indicator: In Bulk/Liquid
Indicator that shows if the dangerous goods are to be transported in bulk.
Use
You use this indicator to control data output (hazard identification number, for example) on transport documents.
7/28/2019 Material_Master_-_Views.doc
9/53
Packaging Code
Specifies the code for enclosure of dangerous goods comprising a combination of packaging type and material.
Example
4G
Indicator: Highly Viscous
Indicator that shows if the material is a highly viscous substance.
Procedure
You use this indicator to control data output on transport documents.
Client-specific Configuration
Cross-Plant Configurable Material
Alphanumeric key uniquely identifying theconfigurable material.
Unlike the plant-specific configurable material, the cross-plant configurable material is valid for all plants.
Configurable Material
Indicator that determines whether the material is configurable.
Use
If this indicator is set, you can assign a variant class to the material, making it possible to use it as a configurable material.
This indicator can be set in one of the following ways:
Manually in the material master record, irrespective of the material type
In Customizing for the Material Masterin the activityDefine Attributes of Material Types
In this case, the indicator is set automatically whenever you create a material of the corresponding material type. It is notpossible to cancel the indicator manually in the material master record.
Material Is a Variant
Specifies that the material is avariant of aconfigurable material. This makes it possible, for example, to prefabricate frequentlyrequired variants and to place them in stock.
Dependencies
The variant is assigned to the configurable material, the characteristicsof which describe the variant.
Global Data Synchronization Tab
Indicator: Global Data Synchronization-Relevant
7/28/2019 Material_Master_-_Views.doc
10/53
Classification View:
Class number
Name used to uniquely identify aclass within aclass type.
7/28/2019 Material_Master_-_Views.doc
11/53
Purchasing View
General Data Tab
Purchase Order Unit of Measure
Specifies the unit of measure in which the material is ordered.
Procedure
Enter a value in this field only if you want to use a unit of measure differing from thebase unit of measure.
If the field does not contain an entry, the system will assume that the unit of measure is the base unit of measure.
7/28/2019 Material_Master_-_Views.doc
12/53
Variable Purchase Order Unit Active
Activation of the variable purchaseorder unit.
Use
The information from the field in the material master record is adopted in the purchasing info record. In the purchase order and in thesource list, you can enter an order unit that differs from the one in the purchasing info record.
If you wish to specify a different order unit for a requisition, you must assign a source with a different order unit to the requisition.
The field also determines whether you work with conditions for each order unit.
Plant-Specific Material Status
Indicates whether, for a specific plant, the material may be used in the following areas:
Materials management (for example, in purchasing and in inventory management)
Production planning and control
Plant maintenance
Warehouse management
Costing with a quantity structure
Use
The plant-specific material status restricts the usability of the material for the plant concerned, that is, it defines whether a warning orerror message is displayed if you include the material in a particular function.
Example
The material may be a part under development or one to be discontinued.
Tax indicator for material (Purchasing)
Tax indicator for material.
Use
The tax indicator is used in the automatic determination of the tax code in Purchasing.
The tax code can be determined automatically within the framework of price determination (via the conditions).Tax indicators are used to facilitate this process. They can be derived from the material master record, Customizing, or the purchasingdocument. The system determines the tax code from the combination of these tax indicators.
Example
Automatic determination of the tax code is useful, for example, if different tax rates apply depending on whether a material is placed instock or consumed directly.
Dependencies
7/28/2019 Material_Master_-_Views.doc
13/53
If the tax code can be determined automatically via conditions, it takes precedence over the tax code that has been maintained in thepurchasing info record.
Material qualifies for discount in kind
Specifies whether and for what areas the material qualifies for a discount in kind.
Use
This indicator is presently used only in Purchasing.
Material freight group
The material freight group is used to group materials so that they can be classifed according to freight code and class.
Use
Freight codes and classes in a freight code set are determined by the material freight group. The freight code set is used to determinefreight costs and for communication with service agents.
Procedure
Maintain the corresponding group for the material.
Indicator: "automatic purchase order allowed"
Defines that purchase orders are generated automatically when purchase requsisitions are converted into purchase orders.
Use
If this indicator is flagged, the system does not display the purchase orders on the screen before they are saved.
Dependencies
In the master record for the vendor with whom the material is ordered, the field "Automatic purchase order" must be flagged in thecontrol data for the purchasing data.
Indicator for Original Batch Management
Specifies whetheroriginal batchesmay be created for this material.
Batch management requirement indicator
Specifies whether the material is managed in batches.
Use
This indicator can be set in the material master record manually or, if batches are valuated individually, it is set automatically for theplants concerned, in which case it cannot be changed.
The indicator cannot be changed if stocks exist in either the current period or in the previous period. The reason for checking theprevious period is because stocks can be posted to this period when goods movements are entered.
Reference Material for Original Batches
7/28/2019 Material_Master_-_Views.doc
14/53
Material for which an original batch is created.
Use
If you do not enter an original batch reference material (OB reference material), the system creates the original batch for the material inthe production order item or the PO item.
If you enter an OB reference material, the system creates the original batch for the OB reference material.
If you are working with WIP batches, you can specify the reference material for a WIP batch in this field.
Dependencies
The OB reference material must be a non-valuated material. In Customizing for the material masterunderBasic Settings -> MaterialTypes -> Define Attributes of Material Types, you must make settings forno value updating for this material type.
You can enter the OB reference material at plant level (views Purchasing, Plant Data/Storage 1, orWork Scheduling), or at productionversion level (view MRP 4). If you enter different OB reference materials at each of the two levels, the system creates the original batchfor the OB reference material entered in the production version.
Purchasing Values Tab
Purchasing Value Key
Key defining the reminder days and tolerance limits valid, as well as the shipping instructions and order acknowledgment requirementof the materialfor Purchasing.
Procedure
If you have chosen a purchasing value key, the system enters the values defined in Customizing (for Purchasing) in the fields.
Dependencies
In the purchasing documents, this data is proposed from the information record or, in its absence, from the material master record.
Indicator: Unlimited Overdelivery Allowed
Indicator that specifies whether unlimited overdelivery can be accepted for the item.
Use
When entering a purchasing info record, the system proposes the indicator that you define in the material master record.
If no purchasing info record exists, the system also copies the indicator defined in the material master record to the purchase order,
contract, or scheduling agreement.
Order Acknowledgment Requirement
Determines whether the purchasing document (purchase order, outline purchase agreement, etc.) is to be acknowledged by thevendor.
Other Data/ manufacturer data tab
Goods Receipt Processing Time in Days
7/28/2019 Material_Master_-_Views.doc
15/53
Number of workdays required after receiving the material for inspection and placement into storage.
Post to Inspection Stock
Specifies whether the material is subject to quality inspection (without inspection lot processing) and whether a goods receipt is postedto inspection stock. The indicator is copied to purchase order items and goods receipt items as a default value.
Dependencies
You can select this indicator, if no stock-relevant inspection type has been selected in the inspection setup, and therefore no stock-relevant inspection lots can be created.
If you activate a stock-relevant inspection type, the entry in this field is deselected and can no longer be maintained. In this case, acorresponding indicator in the inspection type controls whether goods are posted to inspection stock.
Indicator: Critical part
Specifies whether thematerial is a critical part, that is, a particularly important part.
Use
In inventory sampling, critical parts are included in the complete-count area. The indicator is otherwise for your information only.
Quota arrangement usage
Key that specifies which business functions use a quota arrangement.
Use
The entry you make here controls how the total order quantity is calculated in the quota arrangement, and thus which source of supplyis determined for the material at a particular point in time. You can enter a quota arrangement for the following field combinations:
purchase ordersThe quantity of the material already ordered is included in the quota arrangement.
purchase requisitions
The total quantity requested in purchase requisitions for this material is included in the quota arrangement.
scheduling agreement
The total quantity scheduled in delivery schedules for this material is included in the quota arrangement.
planned orders
The total quantity planned in planned orders for this material is included in the quota arrangement.
materials planning (MRP)
The quota arrangement mechanism is also used in materials planning; that is, the planned orders and purchase requisitionscreated by materials planning are included in the quota arrangement.
production orders
The total quantity of all production orders for this material is included in the quota arrangement.
Indicator: Source list requirement
Specifies that thesource listmust have been maintained in the case of external procurement for a certain plant.
Use
7/28/2019 Material_Master_-_Views.doc
16/53
If the indicator has been set for a plant, a source of supply must be entered in the source list before a purchase ordercan be createdfor issue to the source for the plant.
Indicator: Item Relevant to JIT Delivery Schedules
Determines whether it is possible to generate JIT delivery schedules in addition to forecast schedulesfor a material specified in apurchase scheduling agreement.
Dependencies
If you set this indicator, it will be copied into the additional data for the item when a scheduling agreement is created.
Manufacturer Part Profile
Defines how you can work with MPN materials in the procurement process.
Use
If you wish to work with MPN materials, enter a profile. The profile then applies to all MPN materials that are assigned to this firm's owninventory-managed material.
Examples
In the profile, you can specify that:
Entry of the MPN material in the purchase order is mandatory
Info records may only be created for the MPN material
The system checks theapproved manufacturer parts listwhen you enter an MPN material.
Dependencies
In Customizing for the Material master, the indicatorManufacturer part numbermust be set. You can check this in the activityMakeGlobal Settings.
Manufacturer Part Number
Specifies the number used by the manufacturer, or also by the vendor, to manage a material.
Use
If there is just one manufacturer part number for your firm's own inventory-managed material, enter the manufacturer. You do not thenneed to create anMPN material.
Dependencies
In this case, also enter the manufacturer.
Number of a Manufacturer
Specifies the manufacturer of theMPN material or the manufacturer's plant for which a manufacturer master record has been created.
Procedure
7/28/2019 Material_Master_-_Views.doc
17/53
If there is exactly one manufacturer part for your firm's own material that is subject to inventory management, enter the manufacturerand the manufacturer part number.
If there are several manufacturer parts for your firm's own material that is subject to inventory management, you need to createindividual material master records with material type HERS.
Dependencies
If you do not enter a manufacturer, you cannot use the following functions from the Quality Management component:
Selection of inspection plan for manufacturer
Dynamization with manufacturer as additional criterion
7/28/2019 Material_Master_-_Views.doc
18/53
MRP1 View
General Data Tab
MRP Group
The MRP group contains all the materials from the point of view of MRP for assigning special control parameters for the total planningrun. These control parameters include, for example, the strategy group, the consumption mode, and the planning horizon.
Use
For each MRP group, control parameters can be created for total planning in Customizing for MRP which deviate from the plantparameters.
7/28/2019 Material_Master_-_Views.doc
19/53
Note
If this field has not been maintained, the system uses the material type instead of the MRP group. In this case, the material type has tobe maintained as the MRP group in Customizing.
ABC Indicator
Indicator that classifies a material as an A, B, or C part according to its consumption value. This classification process is known as theABC analysis.
The three indicators have the following meanings:
A - important part, high consumption value
B - less important part, medium consumption value
C - relatively unimportant part, low consumption value
Use
You use this indicator to determine how the material is treated in the case ofstratificationforinventory sampling.
Plant-Specific Material Status
Indicates whether, for a specific plant, the material may be used in the following areas:
Materials management (for example, in purchasing and in inventory management)
Production planning and control
Plant maintenance
Warehouse management
Costing with a quantity structure
Use
The plant-specific material status restricts the usability of the material for the plant concerned, that is, it defines whether a warning orerror message is displayed if you include the material in a particular function.
Example
The material may be a part under development or one to be discontinued.
MRP Procedure Tab
MRP Type
Key that determines whether and how the material is planned. You have the following options:
Manual reorder point planning
Automatic reorder point planning
7/28/2019 Material_Master_-_Views.doc
20/53
Forecast-based planning
Material requirements planning with forecasts for unplanned consumption
Master production scheduling (MPS)
Reorder Point
If the stock falls below this quantity, the system flags the material forrequirements planning by creating aplanning file entry.
Use
The reorder point is important only for reorder point planning.
Procedure
With manual reorder point planning, you enter the reorder point manually. With automatic reorder point planning, the systemdetermines the reorder point automatically for forecasting purposes.
If you are creating a material master record, you must always enter the reorder point manually, even if it is later overwritten by the
system. This makes it possible to plan material requirements, even before forecasting.
Planning time fence
The planning time fence specifies a period within which no automatic changes are to be made to the master plan.
The planning time fence is maintained in workdays.
Note
It is only used for materials that are planned using an MRP type which includes a firming type.The firming type determines how order proposlas are to be created or scheduled within the planning time fence.
Planning cycle
Key that determines the day on which the material is planned and ordered. The planning cycle is a planning calendar that is defined inCustomizing for MRP.
Procedure
In addition to the planning cycle, you can enter a delivery cycle which is defined in the planning calendar field.
Examples
It makes sense to enter a delivery cycle for the following situation:
You carry out the planning run and place orders every Monday and Tuesday. The materials that are ordered on Monday are deliveredon Wednesday and the materials that are ordered on Tuesday are not delivered until Friday.
The system interprets an additionally specified planned delivery time as the minimum delivery time, which means that at least thisnumber of days pass between the planning run or the order and delivery.
Dependencies Before a material can be planned with the time-phased planningprocedure, it must be assigned the MRP type that allows time-phasedplanning.
7/28/2019 Material_Master_-_Views.doc
21/53
MRP Controller (Materials Planner)
Specifies the number of the MRP controlleror group of MRP controllers responsible formaterial planningfor the material.
Lotsize Data Tab
Lot size (materials planning)
Key that determines which lot-sizing procedure the system uses within materials planning to calculate the quantity to be procured orproduced.
Maximum stock level
Quantity of the material in thisplant that may not be exceeded.
Use
In materials planning, the maximum stock level is used only if you have chosen Replenish to maximum stock levelas thelot-sizingprocedure; that is, you have entered HB as the lot size key.
Procedure
Enter a value if you have chosen Replenish to maximum stock levelas the lot-sizing procedure.
Fixed lot size
Quantity that will be ordered or produced in the event of a shortage.
Procedure
If the amount of the shortage is less than the fixed lot size, it is the fixed lot size that is ordered or produced (and not the lesser
quantity that is actually required).
If the amount of the shortage is greater than the fixed lot size, a multiple of the fixed lot size is procured. The system creates severalpurchase order proposals for this purpose.
Ordering costs
Costs that are incurred, irrespective oflot size, for eachpurchase orderorproduction orderover and above the purchase orderprice or production costs.
Use
The ordering costs are used only for calculating the lot size in optimum lot-sizing procedures. You must specify the ordering costs inthe currency of the company code belonging to the plant.
Storage costs indicator
Indicator that specifies the storage costs percentage the system uses when calculating thelot size to determine storage costs.
The storage costs percentage is based on the quantity stored and the unit price, and refers to the average value of the materials stored
The percentage is considered constant for the stocking-up period. It normally lies between 15 and 35%.
Use
7/28/2019 Material_Master_-_Views.doc
22/53
The storage costs percentage is used by optimizing lot-sizing procedures to calculate the lot size, but not for any other purpose.
Assembly scrap in percent
Percentage scrap that occurs during production of the material if the material is anassembly.
Use
The assembly scrap is used in materials planning to calculate thelot size of the assembly. The system increases the quantity to beproduced by the scrap quantity calculated.
Procedure
If the material is an assembly, specify the percentage scrap as required.
Examples
If the quantity to be produced is 200 pieces and you specify an assembly scrap of 10%, you are reckoning with a scrap quantity of 20pieces. As a result, 220 pieces are produced.
Dependencies
The system increases the quantity to be produced for all of the assembly's components accordingly.
Takt time
If a requirement quantity (for example, for capacity reasons) cannot be procured in a single lot, you have to schedule several receipts.In conjunction with the overlap indicator in the lot size (set in Customizing for the lot size), you can use the takt time to specify thatthese receipts are offset, that is, that they are delayed by the takt time.
You enter the takt time in workdays.
Use
The system uses the takt time if a requirement is covered by several receipt elements due to restrictions on lot size such as maximumlot size (with all lot-sizing procedures) or rounding value (with fixed lot size with splitting).
Rounding Profile
Key that the system uses to adjust the order proposal quantity to deliverable units.
Procedure
In Customizing, enter a threshold value from which the system should round up to the next value per deliverable unit:
If the requirements value exceeds the first threshold value, the system always rounds up to the next multiple of the level found
If the requirements value falls below the first threshold value, the system copies the original requirements value.
Two other types of rounding exist:
Dynamic rounding profile:
These profiles are used to round up quantities to logistical units of measure (for example, layers). The contents of a logisticalunit of measure does not have to be know when creating the rounding profile. It is determined by the master data from thematerial master.
7/28/2019 Material_Master_-_Views.doc
23/53
Rounding profile with quantity to be added/subtracted
With these profiles, the given quantity is changed either by adding a percentage or subtracting a percentage.
Only static rounding profiles are taken into account in requirements planning. Neither dynamic rounding profiles not quantity addition/subtraction are taken into account.
Examples
A material's base unit of measure is 1 unit; the purchase order is to be delivered in layers (1 layer corresponds to 5 units) or in pallets (1
pallet corresponds to 8 layers which contains 40 units).
You maintain the profile as follows:From a requirements of 2 units, the system is to round up to 5; from a requirement of 32 units, the system is to round up to 40.
This results in the following order proposal quantities:Requirement from 1 -> 1 requirement from 31 -> 30Requirement from 2 -> 5 requirement from 32 -> 40Requirement from 6 -> 10 requirement from 74 -> 80Requirement from 7 -> 10
Dependencies
If no rounding profile has been entered, the system uses the rounding value entered in the material master record for the planning run.
Rounding value for purchase order quantity
Value to a multiple of which the system rounds up the procurement quantity.
Dependencies
The rounding value is used in the planning run if no rounding profile has been specified in the material master record.
Unit of Measure Group
Key that you can use for grouping several units of measure.
Use
You can use the unit of measure group, for example, to define allowed units of measure for a particular material for a vendor or areceiver. This is of significance for when rounding with the dynamic rounding profile if 'check vendor' or 'check customer' is selected inthe rounding profiles. In this case, only those units of measure are included in rounding that are defined in the unit of measure group.
MRP areas Tab
Indicator: MRP area exists
States whether the specific MRP parameters have been maintained for this material.
7/28/2019 Material_Master_-_Views.doc
24/53
7/28/2019 Material_Master_-_Views.doc
25/53
MRP2 View
Procurement Tab
Procurement Type
Indicator that defines how the material is procured. The following procurements types are possible:
The material is produced in-house.
The material is procured externally.
The material can be both produced in-house and procured externally.
7/28/2019 Material_Master_-_Views.doc
26/53
Use
The procurement type is defined by the material type you have chosen.
Determination of batch entry in the production/process order
Defines when batches have to be determined when using the PP/WM interface.
Use
This indicator refers to the components of an order, not to the finished product to be manufactured. You have the following options:
The batches can be determined when the goods issue is posted.
The batches must be entered in the order before it is released.
The batches must be entered in the order before the goods issue is posted, but not necessarily before the order is released.
If you usepick parts, the batches are determined in the transfer orderand then confirmed to the order. If there is no directlink between the transfer order and the production order/process order (for example, with release order parts or crate parts),you must enter the batches in the production order/process order manually.
The batches are determined automatically when the order is released.
Special procurement type
Allows you to define theprocurement type more exactly. The system determines the procurement type from thematerial type.
Use
You use special procurement when you want to be able to override the procurement type in the material master or define theprocurement type more precisely.
If the procurement type is in-house, you can nevertheless force the system to ignore the BOM and routing, and process the material asif it were externally procured, by specifying the special procurement as external.
Procedure
7/28/2019 Material_Master_-_Views.doc
27/53
Enter the special procurement type to which you want to restrict the selection.
Example
If you procure a material externally, you may want to choose the special procurement type Consignment. If you produce the material in-house, it may be appropriate to choose Production in other plant.
Dependencies
If a material has a routing but no BOM, it is treated as an externally procured material even if the procurement type is in-house. Boththe BOM and the routing are ignored.
However, if you specify the special procurement type as in-house, the routing is included even if the material has no BOM.
Issue (Production) Storage Location
In the case of a material produced in-house, this is the key of thestorage location that is copied to the planned order, productionorder, orrun schedule quantity.
If the material is a component, it is the issuing storage location to which a backflush is posted.
If the material is produced, it is the receiving storage location to which the receipt of the material is posted.
Procedure
You specify the receiving storage location for repetitive manufacturing in the production version for the material master record.
Quota arrangement usage
Key that specifies which business functions use a quota arrangement.
7/28/2019 Material_Master_-_Views.doc
28/53
Use
The entry you make here controls how the total order quantity is calculated in the quota arrangement, and thus which source of supplyis determined for the material at a particular point in time. You can enter a quota arrangement for the following field combinations:
purchase orders
The quantity of the material already ordered is included in the quota arrangement.
purchase requisitions
The total quantity requested in purchase requisitions for this material is included in the quota arrangement.
scheduling agreement
The total quantity scheduled in delivery schedules for this material is included in the quota arrangement.
planned orders
The total quantity planned in planned orders for this material is included in the quota arrangement.
materials planning (MRP)
The quota arrangement mechanism is also used in materials planning; that is, the planned orders and purchase requisitionscreated by materials planning are included in the quota arrangement.
production ordersThe total quantity of all production orders for this material is included in the quota arrangement.
Proposed Supply Area in Material Master Record (Default)
The supply area is used as an interim storage area on the shop floor which is used to provide materials directly at the production line.
The proposed supply area is mainly used for KANBAN materials that are only or usually provided at one supply area in a plant. Here,this supply area can be easily saved in the system.
The proposed supply area is used, for example, to determine the supply area for the dependent requirements of a material.The supply area in the dependent requirements of a material is required:
to enable the system to calculate the KANBAN control cycles automatically
to enable you to select requirements in the pull list with reference to a supply area
Indicator: Backflush
Determines whether the backflush indicator is set in the production order. Here, a 3-level hierarchical logic is applied:
1. In the routing, the backflush indicator is set in the component assignment.
7/28/2019 Material_Master_-_Views.doc
29/53
2. In the material master record, the backflush indicator has the characteristic "Always backflush".3. In the material master record, the backflush indicator has the characteristic "Work center decides", the indicator being set inthe work center.
Use
Each material component is assigned to an operation in the production order. If a material component is backflushed, the systemposts the withdrawal only uponconfirmation of the operation. The withdrawal is then posted automatically.
Default storage location for external procurement
Key of the storage locationthat is proposed in the purchase requisition in materials planning for subsequent storage of the material. Inthe case of a material procured externally, this storage location is proposed in theplanned orderin materials planning.
Indicator: Item Relevant to JIT Delivery Schedules
Determines whether it is possible to generate JIT delivery schedules in addition to forecast schedulesfor a material specified in apurchase scheduling agreement.
Dependencies
If you set this indicator, it will be copied into the additional data for the item when a scheduling agreement is created.
Stock determination group
Specifies the stock determination group.
The stock determination group combined with thestock determination rule at plant level create a key for the stock determinationstrategy.
You enter the stock determination group in the material master recordat plant level and it controls a stock determination based onmaterial.
Indicator: Material can be co-product
Indicator you can use to specify that the material can also be used as a co-product.
7/28/2019 Material_Master_-_Views.doc
30/53
Indicator: Bulk Material
This indicator defines a BOM item as a bulk material, which is available directly at the work center (for example, washers or grease).
The dependent requirements of bulk materials are not relevant to materials planning. This means they are not taken into account for nerequirements calculation. Therefore planning for bulk materials should be consumption-based.
If bulk materials are subject to material requirements planning, you must create planned independent requirements for them.
Use
Dependent requirements are only created in the planned order for information purposes and they can be displayed there. Dependentrequirements for bulk material are not shown in the MRP list or the stock/req. list.
You can maintain this indicator in both the material master record an the BOM item. The indicator in the material master record hashigher priority.
If a material is always used as a bulk material, set the indicator in the material master record.
In this case, the Bulk material indicator in material master recordis automatically set in the BOM item.
If a material is only used as a bulk material in individual cases, set the indicator in the BOM item.
Dependencies
To improve system performance, you can define in the IMG for MRP that no dependent requirements are to be created for bulk materiaitems. However, this also means that you see no information on bulk material components in the planned order or production order.
Scheduling Tab
In-house production time
Specifies the time in workdays needed to produce the material in-house.
In-house production time is independent of the order quantity.
Use
The system requires the in-house production time to determine the planned dates for planned orders in materials planning.
Procedure
You can define work scheduling times in the material master record in one of two ways:
Either you enter the in-house production time. If required, you can get the system to update this value from the routing.
Or you enter the setup, teardown, processing, and interoperation times. If you maintain these values, the system determines
the in-house production time on the basis of lot size.
Planned Delivery Time in Days
Number of calendar days needed to obtain the material or service if it is procured externally.
Procedure
7/28/2019 Material_Master_-_Views.doc
31/53
If you have different vendors for a material, you must specify an average value. The same applies if you order the material from a fixedvendor that has varying delivery times.
Dependencies
If you use the SAP Retail System, the planned delivery time can be suggested from the vendor sub-range in the vendor master record.
Goods Receipt Processing Time in Days
Number of workdays required after receiving the material for inspection and placement into storage.
PPC planning calendar
Three character number (numeric or using letters) that specifically identifies aPPS-planning calendar.
Use
There are two uses:
If you have selected the MRP type "MRP" and have set a period lot-sizing procedure according to planning calendar, you ente
here which planning calendar is to be used.
If you selected the "time-phased planning" MRP type, the planning calendar that you specify here defines the delivery cycle.
This specifies the days on which the vendor delivers the material. You can enter the planning cyclein addition to the deliverycycle.
Examples
The following example refers to the use in connection with the "time-phased planning" MRP type.
It makes sense to enter a delivery cycle for the following situation, for example:
The planning run is carried out and orders are placed every Monday and Tuesday. The materials that are ordered on Monday aredelivered on Wednesday but the materials that are ordered on Tuesday are not delivered until Friday.
The system interprets an additional planned delivery time as a minumum delivery time, that is, as many days pass between theplanning run or the purchase order and delivery.
Scheduling Margin Key for Floats
Key that the system uses to determine the floats required for scheduling an order. You define the following floats with the schedulingmargin key:
opening period
float after production(only in the case of in-house production)
float before production(only in the case of in-house production)
release period (only in the case of production order management)
Floats are maintained in workdays.
Dependencies
You maintain the floats grouped together in the scheduling margin key in "Requirements Planning" Customizing.
7/28/2019 Material_Master_-_Views.doc
32/53
Net requirements Calculation Tab
Safety Stock
Specifies the quantity whose purpose is to satisfy unexpectedly high demand in the coverage period.
The risk of shortfalls is reduced by having a safety stock.
Procedure
With manual reorder point planning, you can enter a value in the material master record. However, it is merely for information.
With automatic reorder point planning and forecast-based planning, the system determines and adjusts the value automatically forforecasting purposes.
Safety Stock
Specifies the quantity whose purpose is to satisfy unexpectedly high demand in the coverage period.
The risk of shortfalls is reduced by having a safety stock.
Procedure
With manual reorder point planning, you can enter a value in the material master record. However, it is merely for information.
With automatic reorder point planning and forecast-based planning, the system determines and adjusts the value automatically forforecasting purposes.
Service level
Percentage specifying what proportion of the requirement is to be covered by the warehouse stock.
Use
The system uses the service level to calculate the safety stock.
The higher the service level, the higher will be the safety stock calculated by the system to compensate for additional consumption ordelays in delivery.
7/28/2019 Material_Master_-_Views.doc
33/53
Minimum Safety Stock
The quantity that defines the lower limit for safety stock. This value cannot be exceeded.
Use
Defining a lower limit can influence the following:
material master data maintenance
The safety is checked to see if it is greater or equal to this lower limit.
forecasting
The lower limit is checked if you use an availability indicator which shows, according to customizing settings, if the safety stockis to be calculated again in a forecast.If the safety stock is lower than this level in forecasting, the safety stock is automatically increased to the value of the lowerlevel.
Dependencies
The safety stock must always be greater or equal to this lower level.
Range of coverage profile
The range of coverage profile contains the parameters for calculating the dynamic safety stock. This is a statistical calculation on thebasis of average daily requirements.
Use
The dynamic safety stock is calculated depending on the requirements within a specified period and the range of coverage.
Dependencies
The range of coverage profiles (period length for calculating the average consumption, range of coverage, and so on) are maintained inCustomizing in the MRP screen.
Safety time indicator (with or without safety time)
You use this indicator to switch on the safety time actual range of coverage for a material in MRP.
If you define a safety time, the requirements in MRP are brought forward on the time axis by the number of workdays you define here.The actual range of coverage corresponds to the number of days, by which the requirements are brought forward.
7/28/2019 Material_Master_-_Views.doc
34/53
Using this indicator you can activate the safety time and you can set whether all requirements or only independent requirements (salesorder, planned independent requirements, and so on) are to be brought forward.
The actual requirements dates are not changed.
Safety time (in workdays)
In this field, you define the number of workdays for the safety time/actual range of coverage.
If you define a safety time, the requirements in MRP are brought forward on the time axis by the number of workdays you define here.
This does not change the actual requirements dates. However, as the requirements have technically been brought forward,receipts are created for the earlier dates in MRP.
Dependencies
Time-phased materials planning is based on the interval between the MRP date and the availabilty date of the next MRP date. By usingthe safety time/ actual range of coverage, the number of days to the interval are included in the calculation.
Period Profile for Safety Time
The period profile for thesafety time / actual range of coveragecontains the periods (stating to/from date) with the safety time/actualrange of coverage that is valid for each period. You define the period profile in Customizing for MRP.
Use
In order to smooth out seasonal fluctuations, for any definable period you can define a safety time/actual range of coverage that variesfrom what you have maintained in the material master in the field safety time/actual range of coverage. If, for example, a higher actualrange of coverage than usual is required due to higher demand during the Christmas period, you can define the period with the desiredactual range of coverage in the period profile.
You can also use the period profile to represent a safety time of less than one day. You do this by entering a safety time %in
addition to the safety time.
7/28/2019 Material_Master_-_Views.doc
35/53
MRP3 View
Forecast Requirements Tab
Period Indicator
Indicator specifying the periods in which the material'sconsumption valuesandforecast values are managed.
7/28/2019 Material_Master_-_Views.doc
36/53
Fiscal Year Variant
The fiscal year variant is used to define the fiscal year.
Use
You can define the following using a fiscal year variant:
How many posting periodsare in a fiscal year
How many special periodsyou require
How the system determines the posting periods when posting.
In the definition, you allocate your posting periods to the calendar year.
Allocation control requires the same number of posting periods in the company code and in the assigned controlling area.
This means that the number ofposting periods in the fiscal year variants must be the same in the company code and in the controlling
area. The period limits for the two fiscal year variants must also coincide.
You must define which fiscal year variant is to be used for each company code. To do this, you must define the appropriate fiscal yearvariant (to contain no more than 16 periods).
Note:
The company codes delivered with the standard system are allocated to the fiscal year variant that corresponds to the calendar yearand which also uses four special periods.
You maintain fiscal year variants as well as the allocation of fiscal year variant to the company code in Financial AccountingCustomizing.
Maintain fiscal year variantsProceed.
Allocation of fiscal year variant to the company code Proceed.
7/28/2019 Material_Master_-_Views.doc
37/53
Splitting Indicator
Indicator that defines how the system splits forecast requirements into smaller time intervals where the MRP type is forecast-basedplanning and the period indicatoris not "day".
Use
If you enter a splitting indicator, the system will take only a limited number of periods into account when planning the material and splitthem into smaller time intervals.
If you choose "day" as your splitting indicator, the system will spread forecast requirements minus actual consumption values over theremaining workdays in the month.
Planning Tab
7/28/2019 Material_Master_-_Views.doc
38/53
Planning strategy group
The strategy group groups all the planning strategies that can be used for a particular material. The planning strategy represents theprocedure used for planning a material and is (technically speaking) controlled by the MRP types.
Dependencies
You define planning strategies and strategy groups in Customizing for demand management. For more information on this please referto Planning strategies.
Consumption mode
The consumption mode controls the direction on the time axis in which the system consumes requirements.
Use
In backward consumption, sales orders, dependent requirements or material reservations consume planned independent requirementsthat lie before the requirements date.
In forward consumption, sales orders, dependent requirements, or material reservations consume planned independent requirementsthat lie after the requirements date.
7/28/2019 Material_Master_-_Views.doc
39/53
Consumption period: backward
Determines the consumption period (in workdays) for backward consumption.
Using backward consumption, sales orders, dependent requirements, or material reservations are assigned to and consume plannedindependent requirement quantities which lie within the consumption period and before the requirements date.
Procedure
The consumption period is specified in days and is valid from the current date.
Enter a period between 1 and 999 days.
Consumption period: forward
Determines the consumption period (in workdays) for forward consumption.
In forward consumption, sales orders, dependent requirements or material reservations consume planned independent requirementsthat lie within the consumption period after the requirements date.
ProcedureThe consumption period is specified in days and is valid from the current date.
Enter a period between 1 and 999 days.
Dependencies
This field controls the reduction of the planned independent requirements by a goods issue for the strategy "make-to-stock production".With this planning strategy, the system reduces the planned independent requirements that lie in the past first. If a period is specified inthis field, the system also reduces the planned independent requirements in the future that lie within this period.
Mixed MRP indicatorDefines whether the material is available for:
Subassembly planning with final assembly
Gross requirements planning
Subassembly planning without final assembly
7/28/2019 Material_Master_-_Views.doc
40/53
Planning material
Material number whose planned independent requirements the system uses to consume the sales order of the material in question ifyou use the planning strategy, "planning with planning material".
The strategy, "planning with planning material" is used if the BOM of a finished product contains variable and non-variant parts. Thenon-variant parts can be planned using the planning material.
Use
You maintain planned independent requirements for the planning material entered here. If a sales order/customer requirement isposted for the material in question, the sales order quantity consumes the planned independent requirements of the planning material.The planning material is not actually produced itself. If is only used for planning non-variant parts and for consuming the plannedindependent requirements.
Note
In this planning strategy, the system uses the consumption mode maintained for the planning material to determine how many days intothe future or the past consumption is to be carried out. The means that you must maintain the consumption mode for this strategy mustbe maintained in the material master record.
Example
The material master record 4711 contains the material 4712 as a planning material. The planning material contains the BOM with thenon-variant parts. You create planned independent requirements for material 4712. When creating a sales order for material 4711, thesystem realizes that material 4712 is the planning material for material 4711. Then the sales order for material 4711 consumes theplanned independent requirements of material 4712.
Dependencies
A valid material master record must exist for the planning material in the planning plant. The material master record of the planningmaterial cannot contain a planning material as this procedure can only be carried out at single-level.
Planning plant
Key which specifically identifies the plant from which the planned independent requirements of the reference material comes from.
Use
You maintain planned independent requirements for the planning material entered here. If a sales order/customer requirement isposted for the material in question, the sales order quantity consumes the planned independent requirements of the planning material.The planning material is not actually produced itself. If is only used for planning non-variant parts and for consuming the plannedindependent requirements.
Note
7/28/2019 Material_Master_-_Views.doc
41/53
In this planning strategy, the system uses the consumption mode maintained for the planning material to determine how many days intothe future or the past consumption is to be carried out. The means that you must maintain the consumption mode for this strategy mustbe maintained in the material master record.
Example
The material master record 4711 contains the material 4712 as a planning material. The planning material contains the BOM with thenon-variant parts. You create planned independent requirements for material 4712. When creating a sales order for material 4711, thesystem realizes that material 4712 is the planning material for material 4711. Then the sales order for material 4711 consumes theplanned independent requirements of material 4712.
Dependencies
A valid material master record must exist for the planning material in the planning plant. The material master record of the planningmaterial cannot contain a planning material as this procedure can only be carried out at single-level.
Conv. factor f. plng material
Factor that the system uses to convert the quantity of the current material, measured in the base unit of measure, to the base unitquantity of the planning material.
Example
Material Base unit of measure
Planning material to
Current material kg
--> Conversion factor = 0.001 because 1 kg = 0.001 to
Procedure
Either you enter a factor or the system determines one as follows:
1. The system checks the alternative units of measure maintained for the planning material. If an alternative unit is the sameas the base unit of the current material, the conversion factor is proposed immediately. Otherwise, the system continues withpoint 2.2. The system attempts to find a conversion factor using the standard units of measure table. If it finds one, it proposes thisvalue. Otherwise, it continues with point 3.3. The system proposes "1" as the conversion factor.
Examples
Material Base unit of measure
Planning material to
Current material kg
--> Conversion factor = 0,001, as 1 kg = 0,001 to
Base unit of measure of the planning material
Unit of measure in which stocks of the planning material are managed.
Procedure
The base unit of measure of the planning material is copied from the master record of the planning material automatically.
Plant Specific Configuration Tab
7/28/2019 Material_Master_-_Views.doc
42/53
Configurable material
Number uniquely identifying the configurable material.
Procedure
Enter aconfigurable materialto which amaterial variant or planning variant is assigned.
Material Is a Variant
Specifies that the material is avariant of aconfigurable material. This makes it possible, for example, to prefabricate frequentlyrequired variants and to place them in stock.
Dependencies
The variant is assigned to the configurable material, the characteristicsof which describe the variant.
Planning Variant
Specifies that the material is used to plan frequently required bill of material (BOM) components or BOM components that are critical for
materials planning.
Dependencies
The planning variant is assigned to aconfigurable material, thecharacteristics of which describe the planning variant.
The strategy group determines whether the system checks in the sales order if a planning variant exists
7/28/2019 Material_Master_-_Views.doc
43/53
MRP 4 View
BOM Explosion/dependant requirements Tab
Method for Selecting Alternative Bills of Material
Indicator determining the selection of the alternative BOMwhen requirements are exploded in material requirements planning.
Use
With Selection by order quantity, the system chooses the alternative BOM into whose lot size range the order quantity falls.
The lot size range and area of validity of the BOM apply.
With Selection by explosion date, the system chooses the alternative BOM into whose area of validity the date falls according
to the setting BOM via dates.
With Selection byproduction version, the system chooses the alternative BOM defined in the valid production version. The
lot size range and area of validity of the production version apply.
7/28/2019 Material_Master_-_Views.doc
44/53
With Selection only by production version, the system chooses the alternative BOM defined in the valid production version.
The lot size range and area of validity of the production version apply.If no production version is found, no production orders or process orders can be created.
Component scrap in percent
Percentage of scrap that occurs during production of the material if the material is acomponent.
Use
Component scrap is used in material requirements planning (MRP) to determine the quantities of components required. Whenexploding the bill of material (BOM), the system increases the required quantities of the components by the calculated scrap quantity.
Example
Required quantity 200 pieces
Component scrap 10%
Scrap quantity 20 pieces
Therefore, 220 pieces are required.
For examples of calculation in connection with the indicator for net scrap, see the documentationfor this indicator.
Dependencies
If there is also assembly scrap for a higher-level assembly, the system adds together the two types of scrap.
If component scrap has been entered in the BOM, this value applies. Otherwise, the value specified in the material master record isused.
Dependent requirements ind. for individual and coll. reqmts
Indicator determining whether the following requirements are allowed for thedependent requirementsof the material:
Individual requirements
Requirement quantities of the dependent material are stated individually.
Collective requirements
Requirement quantities of the dependent material are grouped together.
Use
You can maintain this indicator in the following places:
In the material master record
7/28/2019 Material_Master_-_Views.doc
45/53
For the explosion type of the BOM item (in Customizing forBasic Data in Define Explosion Types)
The setting for the explosion type overrides that in the material master record.
Dependencies
If the material is assigned to a material type that does not allow quantity-based inventory management in this plant, you can set theindicator to individual requirements only.
If the stock is to be managed in sales order stock orproject stock, the indicator must be set to one of the following options:
Individual and collective requirements
Individual requirements only
If a material managed in project stock is to be procured from another plant using a cross-company-code stock transport order, theindicator must be set to 2(collective requirements) in the issuing plant because, in this specific context, individual project stockmanagement is not possible in both plants.
Indicator for Requirements Grouping
Use
Defines whether the system groups togetherdependent requirementsfor the material on a daily basis when analyzingrequirements planning.
If you set this indicator, the display in the MRP listandstock/requirements list is preset as follows:If several dependent requirements are scheduled on one day, they are grouped together in a single line showing how manydependent requirements have been grouped together.You can also expand the grouping in the MRP list and in the stock/requirements list.
Defines whether additional individual/dependent requirements are written for components whose assembly is set such that
total dependent requirements are created.
Version Indicator
Indicator which specifies whether production versions exist for this material.
MRP relevancy for dependent requirements
This indicator controls whether dependent requirements are relevant to MRP or not. Dependent requirements include dependentreservations and stock transfer requirements.
Use
You only use this indicator in connection with planning strategies for make-to-stock production, assembly planning. Note that theindicatorDependent requirements not relevant to MRP should only be used when, for example, planned independent requirementsexist for an assembly. In this case, no receipt elements for the dependent requirements in MRP should be created as receipts havealready been created for the planned independent requirements.
7/28/2019 Material_Master_-_Views.doc
46/53
Discontinued Parts Tab
Discontinuation indicator
Identifies the material as a part to be discontinued and includes it in the discontinued parts procedure in materials planning.
Use
If this indicator is set, the system transfers the dependent requirements in materials planning to the follow-up material if they are nolonger covered by warehouse stocks. However, this requires:
The part to be discontinued and the follow-up material to be planned usingmaterial requirements planning(MRP)
The base unit of measure of the follow-up material to be the same as that of the part to be discontinued
Note
In subcontracting, uncovered requirements are not switched to the follow-up material after the effective-out date. This is indicated by acorresponding exception message (58) in the MRP list.
7/28/2019 Material_Master_-_Views.doc
47/53
Effective-Out Date
Date from which the stocks of the material are to be used up. As soon as no more stock exists for this material, it is to be replaced bythe follow-up material.
Use
From this date, the system reassigns the dependent requirements that are no longer covered by warehouse stock of the discontinuedmaterial to the follow-up material. This is done as part of material requirements planning.
Procedure
Enter a date if you want to plan the discontinuation of a material for the long term.
Follow-Up Material
Number of the material that the system uses in materials planning to replace the material to be discontinued once its warehouse stockis depleted.
Use
In the material master record and also in the bill of material (BOM), you can define a follow-up material for a material to bediscontinued. The follow-up material defined in the BOM has a higher priority than that in the material master record.
ProcedureYou must always specify a follow-up material in the material master record for the system to know a follow-up material if none has beenspecified in the BOM.
Dependencies
Simple discontinuationA component to be discontinued is replaced with a follow-up component at a particular date.
In the material master record of the component to be discontinued, you must set discontinuation indicator 1, enter a follow-upcomponent, and specify an effective-out date.
Dependent parallel discontinuationA group of materials is replaced with a group of materials; that is, if one component is to be discontinued (the main component),another component must also be discontinued (the subordinate component).
In the material master record of the main component to be discontinued, you must set discontinuation indicator 1, enter a follow-upcomponent, and specify an effective-out date. In the material master record of the subordinate component, you must set discontinuationindicator 3.
Repetitive manufacturing/assembly/deployment strategy Tab
Ind.: Repetitive mfg allowed
7/28/2019 Material_Master_-_Views.doc
48/53
Authorizes the material forrepetitive manufacturing.
Use
You can only backflush in repetitive manufacturing if you have set this indicator.
Dependencies
If you set this indicator, you must also specify a repetitive manufacturing profile for this material.
Repetitive manufacturing profile
Controls, via order type, whether you are working with make-to-order repetitive manufacturing, based on sales orders, or with make-to-stock repetitive manufacturing, based on no specific orders.
Use
The repetitive manufacturing profile also determines;
how the system deals with activities when backflushing
which movement type is used to post goods receipts and goods issues
how planned order and run schedule quantities are reduced in the backflush transaction
how BOM corrections are made - if errors should occur when posting quantities to be backflushed
Dependencies
Repetitive manufacturing profiles are defined in Customizing for Repetitive Manufacturing.
Action control: planned order processing
This key is used for the function "Actions in the planned order" and defines the sequence of the actions that can be carried out for theplanned order.
7/28/2019 Material_Master_-_Views.doc
49/53
Use
Using the function, "actions in the planned order", an interface is provided to external assembly control systems. Thus, work progresson the assembly line as well as activities independent of the assembly line can be transferred to the SAP System via a standardinterface or a customized interface.
Using this function, one or more actions can be carried out for a large number of planned orders in one step that, if carried out online,could only be carried out individually per planned order. Moreover, it is possible to carry out customer-specific actions. In Customizingfor MRP, you use the action control to define which actions are allowed and the sequence in which they are to be carried out.
An action may be, for example;
explode BOM
check material availability
schedule planned order, and so on...
Fair share rule
If demand exceeds supply, DRP uses fair share logic to calculate deployment based on on the available to deploy (ATD) quantity, theopen sales orders, the safety stock, and the forecast.
Procedure
Specify the fair share distribution method you want the system to use:
Select A to distribute stock proportionally to all DCs according to demand.
Select B to raise the stock levels of all DCs to approximately the same percentage of their target stock.
Fair share rule
If demand exceeds supply, DRP uses fair share logic to calculate deployment based on on the available to deploy (ATD) quantity, theopen sales orders, the safety stock, and the forecast.
Procedure
Specify the fair share distribution method you want the system to use:
Select A to distribute stock proportionally to all DCs according to demand.
Select B to raise the stock levels of all DCs to approximately the same percentage of their target stock.
7/28/2019 Material_Master_-_Views.doc
50/53
Indicator: push distribution
If there is excess inventory, surplus stock is retained at its place of origin or is distributed according to push logic.
Procedure
You have three options:
If you leave the field blank, the system uses pull distribution; the demand of the current day is met through deployment, butexcess stock is not distributed.
If you select P, the system uses pull/push distribution; excess stock is distributed to meet the demand existing within the
demand horizon according to the forecast in the DCs. Distribution begins on the first day for which requirements exist in thesystem and ends with the last day of the demand horizon.
If you select X, all the requirements defined in the system are met through deployment. Distribution begins on the first day
when requirements exist and continues until all the requirements defined in the system are met.
Deployment horizon in days
Indicates the number of days for which the system considers the ATD quantity and any additional quantity produced. Any quantity
produced beyond the supply horizon is not considered in the deployment calculation.
Procedure
Specify the number of days in the supply horizon in the material master record.
Storage location Tab
Storage location MRP indicator
Indicator that you use to exclude storage locations from material requirements planning at plant level.
7/28/2019 Material_Master_-_Views.doc
51/53
If you do not set this indicator, stock, requirements, and receipts are included in MRP at plant level.
Use
You can exclude storage locations from MRP at plant level in one of two ways:
By excluding storage location stock from MRP
If storage location stock is excluded from MRP at plant level, no receipts for this storage location will be created in the planningrun.
By planning storage location stock separately
If storage location stock is planned separately, the storage location is replenished with goods if the stock falls below thereorder point.
Special procurement type at storage location level
Defines the procurement type for the material more precisely at storage location level. The procurement type is predetermined by thematerial type.
Reorder point for storage location MRP
7/28/2019 Material_Master_-_Views.doc
52/53
If this quantity cannot be met, the system enters the material in the planning file at storage location level, given that storage locationMRP is active.
Replenishment quantity for storage location MRP
Quantity that must be ordered or produced in the case of a storage locationshortage if storage location MRP is active.
Procedure
If you specify areplenishment quantityat storage location level, this leads to a stock transfer reservation within the plantwhen aplanning run is carried out; that is, the replenishment quantity is transferred from the plant to the storage location. The system interpretsthe replenishment quantity as a requirement at plant level, and as a goods inward movement at storage location level.
7/28/2019 Material_Master_-_Views.doc
53/53