Bernie RudellMRP Chairman, Exelon
Anne DemmaMRP Program Manager, EPRI
Technical Exchange Meeting on Materials, June 2-4, 2015
Materials Reliability Program Overview
2© 2015 Electric Power Research Institute, Inc. All rights reserved.
Contents
MRP History and Organization
Deliverables & Guidelines
Recent Issues & Research
Recent Research Areas
MRP/NRC Cooperative Research
2016 International Conference
3© 2015 Electric Power Research Institute, Inc. All rights reserved.
Brief History
PWR specific materials issues in the late 1990s led to the formation of the EPRI Materials Reliability Program (MRP) within the Nuclear SectorThe objective of the MRP is to
resolve existing and emerging PWR materials issuesKey legacy deliverables:
Doc Number(EPRI PID) Document Title
MRP-126 Rev 0(1009561)
Generic Guidance for an Alloy 600 Management Plan
MRP-227-A(1022863)
Pressurized Water Reactors Internals Inspection and Evaluation Guidelines
4© 2015 Electric Power Research Institute, Inc. All rights reserved.
MRP Membership
New members & participants since 2013: EDF Energy, Vattenfall and IHI
Rejoined in 2014: JAPC
5© 2015 Electric Power Research Institute, Inc. All rights reserved.
Program Leadership
Materials Reliability Program (IC)
Rudell, ExelonHoehn-AmerenDemma, EPRI
Regulatory InterfaceRichter, NEIDyle, EPRI
Technical Support TACHoehn, Ameren
Childress, Duke EnergyMcDevitt, EPRI
Inspection TACFernandez, APS
Cordes, Southern NuclearSpanner, EPRI
Mitigation/Testing TAC
Gobell, EntergyEfsing, Ringhals
Smith, EPRI
Assessment TACSims, EntergyDeBoo, ExelonAmberge, EPRI
Technical Advisory Group
Hoehn-AmerenDemma, EPRIMaterials Review Visits
Crane, INPO
6© 2015 Electric Power Research Institute, Inc. All rights reserved.
MRP Technical Advisory Committees
Assessment -- What needs to be inspected, when it needs to be inspected,
inspection options, how to disposition observed
degradation
Inspection -- How to inspect, what equipment
and techniques are available, what are the
associated uncertainties
Technical Support – Fatigue and reactor pressure vessel integrity, review and maintain guidelines, compile inspection results
Mitigation and Testing -- How can degradation be prevented or reduced, irradiated and non-irradiated material testing
7© 2015 Electric Power Research Institute, Inc. All rights reserved.
ID Gap Description
P-AS-22Steam Generator Tubes & Internals Wear & High-Cycle Fatigue
P-AS-24Denting & SCC in Steam Generator Top of Tubesheet(TTS) Region
P-AS-26Steam Generator Tube Damage due to Loose Parts or Foreign Objects
P-AS-30ODSCC of Thermally Treated Alloy 600 Steam Generator Tubing
P-AS-31Safety Significance of Cracks in Steam Generator Divider Plate
P-AS-35 Steam Generator Sludge Deposits and Scale Buildup
P-I&E-15Steam Generator Tubing Eddy Current Technology Improvements
P-I&E-16NDE - Tools for Steam Generator Tubing Integrity Assessments
P-I&E-18Steam Generator Tube Eddy Current Data Analysis Software Improvements
P-I&E-20Steam Generator Foreign Object Detection and Evaluation Improvements
2013 PWR IMT High Priority GapsID Gap Description
P-AS-02Environmental Effects on Fatigue Life: Pressure Boundary Components
P-AS-09 SCC of Stainless Steels Exposed to Primary Water
P-AS-11PWSCC Crack Growth Rates for Alloys 600, 82, and 182
P-AS-12PWSCC Factors of Improvement for Alloys 690, 52, and 152
P-AS-13aThermal & Irradiation Embrittlement Synergistic Effects on CASS
P-AS-13bThermal & Irradiation Embrittlement Synergistic Effects on SS Welds
P-AS-14a IASCC Characterization: Generic Data NeedsP-AS-14b IASCC Characterization: Baffle Bolting
P-AS-17 Flow-Induced Vibration and Wear of Reactor Internals
P-AS-19 PWSCC Management for Ni-Alloy Reactor Internals
P-AS-27 Alternative ASME Section XI Appendix G Methodology
P-AS-28Neutron Embrittlement of Nozzle Forgings and Upper Shell Course
P-AS-38Fluence Impact on Stainless Steel Mechanical Properties (Fracture Toughness, Tensile Strength)
P-AS-46CASS Piping Component Thermal Aging Embrittlement & Long-Term Integrity Assess.
P-I&E-03 NDE Technology for J-Groove Weld LocationsP-I&E-12 NDE Technology for Examination of CASSP-I&E-21 Reactor Internals Generic Acceptance Criteria
P-RG-06NDE Qualification for Reactor Internals Inspection (VT Evaluation)
P-RG-09 Pipe Rupture Probability Re-Assessment (xLPR)
8© 2015 Electric Power Research Institute, Inc. All rights reserved.
2014 Key Deliverables
1. Technical Basis for Reexamination Interval Extension for Alloy 690 PWR Reactor Vessel Top Head Penetration Nozzles (MRP-375)
2. T-cold Reactor Vessel Upper Head Re-inspection Interval Technical Basis Re-evaluation (MRP-395)
3. Palo Verde #3 Bottom Mounted Nozzle Leak Boat Sample Destructive Examination Report (MRP-394)
4. Guideline for Nondestructive Evaluation of Reactor Vessel Upper Head Penetrations (MRP-384)
5. Irradiated Materials Welding Guideline (MRP-379)6. Damage-Based Modeling and Analysis of Reactor Vessels
with Numerous Base Metal Quasi-Laminar Indications (MRP-388)
9© 2015 Electric Power Research Institute, Inc. All rights reserved.
MRP Inspection Results DatabaseAn Annual Publication
10© 2015 Electric Power Research Institute, Inc. All rights reserved.
MRP Guidelines Active RequirementsDoc Number(EPRI PID) Document Title Date
Highest Requireme
nt LevelMRP-126 Rev 0(1009561)
Generic Guidance for an Alloy 600 Management Plan Nov 2004
Mandatory
MRP-146 Rev 1 (1022564)
Management of Thermal Fatigue in Normally Stagnant Non-Isolable Reactor Coolant System Branch Lines
Jun 2011
Needed
MRP-146S Rev 0(1018330)
Management of Thermal Fatigue in Normally Stagnant Non-Isolable Reactor Coolant System Branch Lines – Supplemental Guidance
Jan 2009
Needed
MRP-192 Rev 2(1024994)
Assessment of RHR Mixing Tee Thermal Fatigue in PWR Plants Aug 2012
Good Practice
MRP-227-A (R-A)(1022863)
MRP 227-A, Pressurized Water Reactors Internals Inspection and Evaluation Guidelines
Dec 2011
Mandatory
MRP 2014-006Rev 0
MRP-227-A Interim Guidance to inspection requirements of Westinghouse Control Rod Guide Tubes
Feb 2014
Needed
MRP-228 Rev 1 (1025147)
MRP-228 Inspection Standard for PWR Internals Dec 2012
Needed
MRP 2013-023Rev 0
MRP-228 Interim Guidance for Ultrasonic Examinations ofReactor Internal Baffle-Former Bolting
Oct 2013
Needed
11© 2015 Electric Power Research Institute, Inc. All rights reserved.
Recent Industry Issues
Non-conservatism of BTP 5-3 for initial RTNDT and USE (MRP-401)*Thermal fatigue Operating Experience and in some cases
not in locations prescribed by the thermal fatigue guidelines*Topical report for peening mitigation of PWSCC (MRP-335)*
Reactor internals guidelines (MRP-227) revision*
*Details being presented today
12© 2015 Electric Power Research Institute, Inc. All rights reserved.
Benefits of MRP-227, Rev. 1
Maintaining guidance current with lessons learned and research developmentsEnhancing nomenclature and detail of internal component
sketchesAdding specificity to coverage requirements/acceptability of
limitations Incorporating latest WCAP requirements for guide card wearAddressing lower support clevis/snubber OE Incorporate generic acceptance guidanceAddressing NRC SE A/LAIsAdding technical bases and associated exam scope
specifically for Core Barrel welds Incorporating new CASS criteria (if available – pending NRC
approval)
13© 2015 Electric Power Research Institute, Inc. All rights reserved.
Mitigation of PWSCC by Peening
Benefits
– Mitigates PWSCC in alloy 600/82/182 components
– Reduces nuclear safety and leakage risks from PWSCC
– Proactive asset management solution
– Stress improvement for remaining operating life of plants
– Proven technologies with decades of implementation
14© 2015 Electric Power Research Institute, Inc. All rights reserved.
Benefits of Thermal Fatigue Interim Guidance
Improving Thermal Fatigue Management Guidelines under Industry Initiative NEI 03-08– MRP-146, Management of Thermal Fatigue in Normally Stagnant Branch Lines,
Revision 1, June 2011– MRP-192, Assessment of RHR Mixing Tee Thermal Fatigue, Revision 2, August
2012Management through NEI 03-08 provides for streamlined response to
emergent events and actionable improvement opportunities– Operating Experience reporting and monitoring identified trend– PMMP created action to address apparent issue for PWR fleet (relevance was
considered for BWRs)– Thermal Fatigue Focus Group formed to assess experience against current
guidance and create interim guidance to address issuesOperating Experience has identified Thermal Fatigue Management
Guideline gaps that Interim Guidance will close– Adding emphasis on attention to and effects of transient stratification– Adding examination performance emphasis where OE identified weaknesses– Adding expanded pipe size range and examination zones for certain situations
15© 2015 Electric Power Research Institute, Inc. All rights reserved.
Recent Research Areas
PWSCC of Alloy 690 and weld metals*xLPRWeld Residual Stress*Environmental Fatigue Irradiated material testing Inspection
*Details being presented today
16© 2015 Electric Power Research Institute, Inc. All rights reserved.
MRP Research Area: Extremely Low Probability of Rupture (xLPR)
• Fully cooperative program with NRC Research to develop a probabilistic fracture mechanics approach to address GDC 4 regarding presence of PWSCC in piping previously approved for leak-before-break
• Further development could more broadly apply probabilistic tools to
• Evaluate reduction in risk with mitigation
• Other degradation mechanisms and materials
• Broader range of components
Modular ProbabilisticFramework
Stress intensityfactor
Crack Stability
Crack Initiation and growth
Inspection
Leak detection
Crack Coalescence
Frequency of failure
Geometry and Loads
17© 2015 Electric Power Research Institute, Inc. All rights reserved.
MRP Research Area: Reactor Pressure Vessel
Extending research to address RPV integrity issues through a second license renewal– Generate high-fluence surveillance data to
support PWR operations to high fluence (PSSP)
Degradation modeling– Atom probe tomography on high-fluence
RPV surveillance specimens (w/ CRIEPI)– Support testing of PWR surveillance
materials in ATR-2 (Planned for 2015)– Develop embrittlement trend correlation for
Upper Shelf Energy (USE) decrease (2016)
Resolution of Current Issues– Appendix G “small flaw issue”: Work will
resume after FAVOR clad stress model improvements are completed by NRC
– BTP 5-3 (separate presentation)
18© 2015 Electric Power Research Institute, Inc. All rights reserved.
MRP Research Area: Irradiated Materials Testing – Zorita Research Project (ZIRP)
Current Status Mechanical testing
– Tensile testing complete 10, 30, & 50 dpa @ RT & 320⁰
– CGR testing 10, 30, & 50 dpa complete Fractography in progress
– Fracture Toughness 10 dpa in air and PWR water
complete– Crack initiation testing to begin in
2015 Microstructural testing to begin in
2015
Jose Cabrera NPP “Zorita”Westinghouse design
1968 – 2006 (~26 EFPY)
Objective: Characterize the effects of neutron irradiation on mechanical and microscopic properties of stainless steel materials irradiated under service conditions to increase the understanding of fluence effects at end of service life (40, 60 years and beyond)
ParticipantsEPRI MRP, U.S. NRC, CSN, SSM, Tractebel, AXPOJapanese utilities/MHI (in-kind contribution)
19© 2015 Electric Power Research Institute, Inc. All rights reserved.
MRP Research Area: Irradiated Materials Testing
Zorita Weld Testing Program• Specimen maching, material characterization, & tensile testing in 2015• CGR and fracture toughness testing of Zorita weld and HAZ materials
• CGR: 2 K levels and 3 temperatures as for ZIRP plate material • FT: air and PWR water; RT and 320⁰C
Effect of Lithium on IASCC Initiation• Flux thimble tubes from Ringhals 2: max. doses of 65 and ~100 dpa• Li levels of 2 and 8 ppm at 340 ºC with constant pH300C = 7.2• Preliminary results: high Li content increases susceptibility to IASCC
Gondole Void Swelling Program• Final irradiation cycle underway (total accumulated dose ~30 dpa)• TEM analyses to be conducted on irradiated specimen foils and from density
specimens• Preliminary results: only pre-irradiated specimens show swelling greater
than 0.5%; several specimens show negative swelling greater than -0.5%
20© 2015 Electric Power Research Institute, Inc. All rights reserved.
PWR In-Vessel Inspection Course Project Snapshot
– Address requirements from the I&E Guidelines, ASME Section XI, and the three OEM PWR designs.
– Hands-on use of remote inspection devices – Course for NRC staff scheduled for August 17-19 and 19-21, 2015 at
AREVA NP, Lynchburg, VA Course Outline
– MRP-228 and MRP-227– B&W Internals Components– CE Internals Components– Westinghouse Internals Components– Lessons Learned– Inspection Results
21© 2015 Electric Power Research Institute, Inc. All rights reserved.
EPRI MRP/U.S. NRC - Cooperative Research
CurrentA690 PWSCC Initiation & Crack Growth Testing Extremely Low Probability of Rupture (xLPR) Welding Residual Stress (WRS) FEA Model Validation Irradiation Material Testing: Zorita Internals Research Project
(ZIRP) Additional testing on Additional Zorita materials (weld and
HAZ)
22© 2015 Electric Power Research Institute, Inc. All rights reserved.
Program Key Take-Aways
• MRP is focused on the resolution of materials issues for PWR primary components
• MRP has made significant contributions to the industry in nickel-base alloys, reactor internals, RPV integrity and fatigue areas
• Generating data, assessments, guidelines and closing gaps
• Continued proactive research is needed
23© 2015 Electric Power Research Institute, Inc. All rights reserved.
2016 International LWR Materials ConferenceInternational Light Water Reactors
Material Reliability Conference & Exhibition 2016 August 1-4, 2016
Save The Date and Call for Abstracts Coming Soon
Hyatt Regency McCormick Place
Chicago, Illinois, USA
24© 2015 Electric Power Research Institute, Inc. All rights reserved.
MRP Key Contact Information
Anne Demma, EPRI – Program Manager– (650) 855-2026, [email protected]
Bernard Rudell, Exelon – Chairman– (410) 495-4815, [email protected]
Elliott Flick, Exelon – Executive Sponsor– (302) 559-2287, [email protected]
25© 2015 Electric Power Research Institute, Inc. All rights reserved.
Questions
26© 2015 Electric Power Research Institute, Inc. All rights reserved.
Together…Shaping the Future of Electricity