Date post: | 14-Sep-2014 |
Category: |
Business |
View: | 1,970 times |
Download: | 0 times |
COMPANY PRESENTATIONCOMPANY PRESENTATION
20092009
Maximum Value –Unique Service
We offer you...
• Excellent quality following North American and European engineering standards.
• Short lead times.
• Confidentiality and design protection.
• Easy communication in English and German.
• Complete, real-time project control.
• A state-of-the-art design department.
• Mould testing and sample production.
• An international staff.
• And Competitive Prices!
Your premier tool maker worldwide
Our Market
Our Market 2008 Sales: 12.8 Million Dollars
PresidentPresident
Human ResourceHuman Resource
ISO CentreISO Centre
AccountingAccounting
Training CenterTraining Center
ShippingShipping
Vice President of North American Market
Vice President of North American MarketEngineering DirectorEngineering DirectorVice President of
European Market
Vice President of European Market
Project ManagersProject Managers
Project AssistantsProject Assistants
Project EngineersProject Engineers
Project ManagersProject Managers
Project AssistantsProject Assistants
Project EngineersProject Engineers
Manufacture PlanningManufacture Planning
CNC ProgrammingCNC Programming
CNC/ EDM/ Wire Cutting/Machining/ Polishing/Mould Assembly/ Trial
CNC/ EDM/ Wire Cutting/Machining/ Polishing/Mould Assembly/ Trial
Quality ControlQuality Control
DesignDesign
Machining ProcessMachining Process
IQCIQC
IPQCIPQC
FQCFQC
QuotationQuotation
• Members from Europe, North America and China
• Communication in English, German and Chinese
• Multi-national experience and understanding
International Team
• University graduate engineers
• European trained and experienceddesign and tool-making managers
• International marketing team
• Qualified and experienced manufacturing staff
• Ongoing in-house training and development of skills
Qualified Personnel
• Mould design and engineering• Software applications• Mould construction techniques• Project management• Quality control• Office management• English
Continuous employee training in:
In-house training center
Committed to personnel improvement
Training by equipment vendors
Ongoing Training
President and CEO: Mr. John CheMain activities: Thermoplastic injection mould manufactureNumber of Employees: 270
Marketing & Project Management: 16
Design & Technology Engineers: 80
QC Engineers: 10
Planning Engineers: 4
Mould Trial Engineers: 4
Purchasing Engineers: 6
Toolmakers: 120
Office Personnel: 20
Logistics Employees: 10
Number of Shifts: 3Size of Shenzhen Facility: 3600 m²Quality System Certificate: ISO 9001 2000
Company Details
• Mould Size Capabilitites: Up to 20 ton• Small, high precision parts
• Complex moulds• Unscrewing moulds• Cam action: Angle
Pin, Hydraulic motor, etc.
What We Can Do
• In-house Design• In-house Machining
• In-house Polishing
What We Can Do
• In-house Assembly
• In-house Testing• Heat treatment
What We Can Do
Quotation
Approval& P.O.
Design &Engineering
Design Check& Revision
DesignApproval
MouldConstruction
Mould Testing& Refinement
MouldApproval
FinalMould Test
PartSamples
DELIVERY
Project Flow Chart
• Quotations prepared by qualified engineers
• Mould Specification Sheet for accurate information
• International marketing staff provides easy communication
in English and German
• Quick quotation turnaround
• Very competitive pricing
Quotations
Maxuni uses an ERP manufacturing planning software controlled manufacturing system
Mafacture Planning System
Software
• Automatic scheduling • Manufacturing plan updated automatically every 30
minutes
Mould Tonnage
Project Finished Time
1 TON 7-8 Weeks
3 TON 8-10 Weeks
5 TON 12-14 Weeks
Mould Tonnage
Project Finished Time
1 TON 8-9 Weeks
3 TON 10-11 Weeks
5 TON 14-16 Weeks
Mould Manufacturing Lead Time Reference
Complex Mould
General Mould
• Bar code tracking for every part of every mould• Bar code controlling
manufacturing time & process for every part of every mould
• Project manager in charge of your project
• Weekly progress updates for mould manufacturing
• Real-time electronic job status• Support to customers in English,
German and Chinese
Project Management
• North American engineering standards• European engineering standards• Complete in-house design facility• CAD/CAM Software: Solidworks/Pro-E/Work-NC /UniGraphics/AutoCAD/Catia/etc.• Mold Flow analysis software• Preliminary designs provided with quotations• Quotations provided within 3 working days• Drawings updated and confirmed before the design stage
Engineering System
We use the steel that suits the tool:ASSAB (UDDEHOLM) IMPAX 718HASSAB (UDDEHOLM) ORVAR 8407ASSAB (UDDEHOLM) STAVAX S136DAIDO NAK80P20 / H13 / 420s.s. / etc.
We have experience with most types of plastic: PP, PC, Nylon+GF, Lexan, ABS, POM, Ultem, PEEK, etc.
We are familiar with all major hot runner systems: DME, HASCO, YUDO, HUSKY, EWIKON, MOLD MASTER, etc.
Engineering System
MORI-SEIKI NVD4000 DCG 1 Japan(Purchased 2006)
MORI-SEIKI NVD5000 Alpha 1(High speed milling – up to 20,000 RPM)
2 Japan(Purchased 2005)
HARDINGE VMC800II 6 USA (3 Purchased 2005)
HARDINGE VMC1250II 1 USA (Purchased 2006)
Extrem DH1000 Gun Drill 1 Hong Kong (Purchased 2007)
CNC Milling Machines Qty. Origin
Manufacturing System
CHARMILLES ROBOFORM 35PWith EROWA tool changing system
2 Switzerland(Purchased 2006)
ACTSPARK SE1 1 Switzerland
DE-650 1 Taiwan
DE-432 6 Taiwan
EDM Machines Qty. Origin
Manufacturing System
CHARMILLES ROBOFIL380
1 Switzerland
SuSanGuang 7725 2 China
HuaFang 7732 1 China
HuaFang 7740 2 China
HuaFang 7750 1 China
Wire Cutting Machines Qty. Origin
Machining Centers Qty. Origin
YSG-614 Precision Grinding Machine
4 Japan
M7312H Automatic Surface Grinding Machine
5 China
Okamoto OGM-250UEXB Cylindrical Grinder
1 Japan(Purchased 2006)
Manufacturing System
Mould Fitting Machines Qty. Origin
AQUAmate LS-120t 1 Hong Kong(Purchased 2005)
AQUAmate LS-200t 1 Hong Kong(Purchased 2006)
Manufacturing System
• In-house mould testing
• First trial dimension report provided
• 4 hours continuous test on request
• Sample parts provided
• Sampling video provided on request
Mould TestingHai Tian 86T Injection Machine
1 China
Hai Tian 160T Injection Machine
1 China
Hai Tian 300T Injection Machine
1 China
Toshiba 650T Injection Machine
1 Japan
OrfoRobert 2 China
Injection Machines Qty. Origin
TESA CMM MICRO-HITE 3D Measuring Equipment
1 Switzerland
Profile Project Equipment CM300-D 1 Taiwan
WILSON Hardness Instrument HT500 1 USA
Linear Measuring Equipment LH-600B 1 Japan
Profile Project Equipment LJ-A3000 1 Japan
Quality Control Equipment Qty. Origin
Manufacturing System
• ISO 9001 2000 Certified• DIN (Deutsche Industrie Norm) standards• IQC, IPQC and FQC procedures• In-house 2D and 3D Coordinate Measuring Machines (CMM)• Climate controlled QC Center• In-house hardness testing• Optical projector• QC reports
Quality System
New Machines Coming August, 2009
DEPO HC 2012 (5-Axis's CNC) 1 German
Gantry EAGLE 500 (EDM) 1 German OPS-ingersoll
Gantry EAGLE 1200 (EDM) 1 German OPS-ingersoll
HSC-machine SPEEDHAWK 550 (5-Axis's CNC)
1 German OPS-ingersoll
HSC-machine SPEEDHAWK 750 (5-Axis's CNC)
2 German OPS-ingersoll
Machines Qty. Origin
• Annual mould manufacturing capability: 2000 sets
• Capability of building moulds up to 60 tons
•Automatic mould manufacturing and logistics system
• Number of engineers: 400 Number of workers: 200
• Land Area – 40,000 m2 / 430,550 ft2
• Floor Area – 37,223 m2 / 400,665 ft2
• Plant Area – 15,887 m2 / 171,000 ft2
• Office Area – 4,782 m2 / 41,470 ft2
• Training Center Area – 3,300 m2 / 35,520 ft2
• Hotel Area – 3,512 m2 / 37,800 ft2• Part Design Center – 5,000 m2 /
53,800 ft2
New Zhu Hai Factory Will Open For Production September, 2009
Yang Gang Industrial AreaRen Tian, Fu Yong, Bao An DistrictShenzhen, 518103China
Phone: +86-755-2996-7108Fax: +86-755-2996-7708Email: [email protected]
Main Office located inShenzhen, China
North American Office
to open in 2010
German Office serving EuropeEmsteker Str. 13A49661 CloppenburgGermany
Phone: +49-4471-88-271-0Fax: +49-4471-88-271-
17Email: [email protected]