May 2015 Company Profile CPM Consulting doo Makenzijeva 23/5, second floor 11000 Belgrade Serbia Tel ++381112438748 ++381112438580 www.cpmconsulting.rs
Transcript

May 2015

Company Profile

CPM Consulting dooMakenzijeva 23/5, second floor11000 BelgradeSerbia

Tel ++381112438748 ++381112438580

www.cpmconsulting.rs

Managing the implementation of investment projects Project administration Contract management Expertise in arbitration proceedings at the Arbitration Court of the Chamber of

Commerce of Serbia and international arbitrations Design of technological and production processes in construction Optimizing the use of construction machinery and equipment Measurement and evaluation of works during the implementation of investment

projects Planning and control of the implementation of the works in the investment projects Reliability optimization of production systems in construction Design of organizational structures in the construction enterprises Design of organizational structures for implementation of investment projects Human resource management Design and implementation of information systems at the company level and at the

project level Design and implementation of databases Designing construction technology and organization

Our core areas of expertise are:

CPM CONSULTING d.o.o. was founded in the year 2010

2015 - present

Key project references of CPM Consulting doo and our resident associates:

2014 - 2015 Conducting specialization of internal staff for the company

Energotehnika - Južna Bačka in area of Project Management and application of General and Special Terms - FIDIC

Study for Contractor Kolubara doo Mionica - Analysis of delays and additional costs claimable towards the Investor - Belgrade Land Development Agency

2014 - 2015 TENT - Preliminary design of performance management of works

and Preliminary design of construction technology and organization

Comparative analysis of the price of the works for the construction of the South Stream pipeline through Serbia, including the construction of two compressor stations

NAAR - Training courses ARRA and JLS for the preparation of infrastructural projects

Development of the Contractor’s Claim - GP Hidrotehnika - Hidroenergetika for the project: Construction of the sewer interceptor tunnel -Višnjica (section from km 5 + 867.00 to km 12 + 638.30)

2013 - present

Key project references of CPM Consulting doo and our resident associates:

Contract Management - Protection of contractual position of the Investor Koridori Srbije on all LOT’s - Corridor X - E-80 (Nis - Bulgarian border) and E-75 (Nis - Macedonian border). The scope of work includes the analysis and assessment of the Variations and Compensation Claims submitted by all of the Contractors towards Investor, implemented through Sub-consultancy agreement with Egis International

2013 - present

Key project references of CPM Consulting doo and our resident associates:

Contract Management on the Project of Reconstruction of the Copper Smelter and construction of Sulfuric acid plant - RTB Bor, including the analysis of submitted Variations and Compensation Claims on behalf of Contractor SNC Lavalin, as well as development Compensation Claims for the Investor to be submitted to the Contractor

2012 - 2013

Key project references of CPM Consulting doo and our resident associates:

Expertise in arbitration proceedings before the Arbitration Court of the Chamber of Commerce in Serbia in regard with dispute claims for ATLAS facility in Block 41, Belgrade

Expertise in arbitration proceedings before the Arbitration Court of the Chamber of Commerce in Serbia in regard with dispute claims for a facility GTC in Block 19A, Belgrade

2012 Techno-economic analysis of the solutions including three types

of pavements: flexible, semi-rigid and rigid  for part of the highway from Pirot to the border with Bulgaria

Editing design solution by replacing tunnel variant in accordance with Value Engineering - total value of 2.5 million euros in the section Sukovo-Dimitrovgrad bypass

2011

2010 - 2012

Key project references of CPM Consulting doo and our resident associates:

Contract Management including development of Variation Order and Claim’s on section Sukovo bypass

Contract Management including development of Variation Order and Claim’s for LOT 1, section Pirot East – Sukovo

Contract Management including development of Variation Order and Claim’s for LOT 1 and LOT 2 on the bypass around Dimitrovgrad

Management of implementation of works on the construction of the petrochemical complex (Hydrocracker Complex) for deep oil refining worth approximately $ 4,500.000.000, in the city of Kirishi, Russia

Key project references of CPM Consulting doo and our resident associates: