KLEINFELDER CONFIDENTIAL
MBTA SOUTH SHORE GARAGESREPAIR PROJECT
Braintree GarageMarch 16, 2017
Kleinfelder, Inc.Walker Parking Consultants | Architectural Engineers, Inc.
Keville Enterprises, Inc. | Vertical Transportation Excellence | WSP Group
KLEINFELDER CONFIDENTIAL
AGENDA:Introduction
Proposed Repairs and Improvements
Safety and Accessibility
Schedule
Phasing
Estimated Construction Cost
Questions and Comments
KLEINFELDER CONFIDENTIAL
INTRODUCTION – PROJECT OBJECTIVES
Maintain the Garages in a “State of Good Repair” by focusingon long-term maintenance, rehabilitation or replacement ofexisting infrastructure.
Provide continued reliable service to the public.
Improve garage function and accessibility for applicablebuilding code and ADA compliance.
Increased parking with improved traffic circulation andwayfinding.
KLEINFELDER CONFIDENTIAL
GARAGE SITES
Braintree Parking Garage
KLEINFELDER CONFIDENTIAL
GARAGE SITES
MBTA South Shore Garages Improvements 60% Design
Quincy Adams Garage
KLEINFELDER CONFIDENTIAL
Proposed Repairs - Braintree Garage :Parking Layout Improvements.
Traffic Circulation Improvements.
New Lobby with Redundant Elevators and Stairwell.
Accessibility Improvements.
Stairwell Code Compliance Upgrades.
New Parking Service Office.
Garage System Repairs and Improvements.
KLEINFELDER CONFIDENTIAL
Braintree Garage Parking Layout Improvements
Increased number of parking spaces.
53 spaces gained
1162 1215
0
200
400
600
800
1000
1200
1400
Overall Spaces
Total Garage Parking Capacity
Existing Proposed
KLEINFELDER CONFIDENTIAL
Braintree Garage Parking Layout Improvements
Accessible parking spaces provided on all garagelevels.
Six (6) accessible spaces gained overall.
Increased “prime” and “short-term” parking spaceson Level 2 of the Garage.
KLEINFELDER CONFIDENTIAL
Braintree Garage Parking Layout Improvements
20
04
40
26
45
7
45
0
5
10
15
20
25
30
35
40
45
50
Accessible Parking Short Term Parking Van Parking Prime Parking
Number of Parking Spaces
Existing Proposed
KLEINFELDER CONFIDENTIAL
Braintree GarageTraffic Circulation Improvements within Garage
DROP-OFF & PICK-UP
DROP-OFF
KLEINFELDER CONFIDENTIAL
Braintree GarageTraffic Circulation Improvements – Prime Parking Area
KLEINFELDER CONFIDENTIAL
Braintree GarageTraffic Circulation Improvements – Drop Off Area
Drop-off /Pick-upDROP-OFF & PICK-UP
DROP-OFF & PICK-UP
KLEINFELDER CONFIDENTIAL
Braintree Garage
Current Busway
Current Drive Lane
Current Traffic Circulation at Station Entrance
KLEINFELDER CONFIDENTIAL
Braintree GarageTraffic Circulation Improvements at Station Entrance
DROP-OFF /
PICK-UPDROP-OFF & PICK-UP /
DROP-OFF
KLEINFELDER CONFIDENTIAL
Braintree Garage Traffic Circulation Improvements
Improved Drop Off / Short-Term parking layout toreduce traffic congestion.
New wayfinding and traffic signage at all levels.
Angled parking spaces provided for Prime Parkingand Drop Off areas. Parallel-oriented parkingspaces eliminated within Drop Off Area.
New busway and station entrance canopy roofs.
KLEINFELDER CONFIDENTIAL
Braintree Pedestrian Bridge
2008 Condition
2016 Condition
Bridge will be demolished aspart of this repair projectand replaced with a canopy.
Bridge closed February 2017due to deteriorated condition.
KLEINFELDER CONFIDENTIAL
Braintree Garage Accessibility Improvements:Proposed Garage Lobby
Weather protection for all customer circulationpathways and waiting areas.
Covered at-gradecrossing to stationand commuter railramp connection.
Raised pedestrianconnection to Station(no curb ramps).
KLEINFELDER CONFIDENTIAL
Braintree Garage Accessibility Improvements:Proposed Garage Lobby
Universal path oftravel that is equal forall user groups.Centralized redundantelevators.New aluminumtread/riser stairsystem with codecompliant railings.
KLEINFELDER CONFIDENTIAL
Braintree Garage Accessibility Improvements:Accessible parking spaces provided on each level
KLEINFELDER CONFIDENTIAL
Braintree Garage Accessibility Improvements:Improved universal path of travel to commuter rail
DROP-OFF & PICK-UP
KLEINFELDER CONFIDENTIAL
Braintree Garage Accessibility Improvements:Improved universal path of travel to commuter rail
New Canopyover Ramp
KLEINFELDER CONFIDENTIAL
Braintree Garage Architectural Improvements:Stairwell code compliance upgrades
New stainlesssteel mesh infill
KLEINFELDER CONFIDENTIAL
Braintree Garage Structural Repairs:Concrete Repairs
BeamsColumnsFloor DecksPrecast TeesWalls
KLEINFELDER CONFIDENTIAL
Braintree Garage Structural Repairs:
Expansion Joint ReplacementSealant Joint ReplacementOpen Parking Decks toReceive a PolyurethaneWaterproofing TrafficMembrane CoatingCovered Parking Decks toReceive a Penetrating-Corrosion Inhibiting Sealer
KLEINFELDER CONFIDENTIAL
Braintree Garage Plumbing Repairs:
Remove and replace allgarage drains, sanitary wastepiping and storm water pipingsystems within the garage.
Proposed repairs incombination with continuedmaintenance will minimizeponding water on parkinglevels.
KLEINFELDER CONFIDENTIAL
Braintree Garage Electrical Improvements:New LED light fixtures andsurface mounted circuiting.
Improved lighting increasesvisibility and safety forgarage users.
New emergency generatorand distribution toemergency lighting systems.
New fire alarm system.
KLEINFELDER CONFIDENTIAL
Braintree Garage Security & CCTV System:
Cameras at each vehicle entrance and exit. Willprovide front and rear view of the vehicle.
Cameras at each pedestrian entrance into theStairwells. This is from each parking level and theexterior of the stairwell.
Approximately 25 cameras will be added.
KLEINFELDER CONFIDENTIAL
Braintree Garage Fire Protection Improvements:
Remove and replace all fire protection standpipesdown to finished grade and connect to newdistribution system installed on the underside of the2nd floor parking levels.
Remove and replace all fire department hose valveconnections on all standpipes at each floor level.
KLEINFELDER CONFIDENTIAL
Contract Schedule Milestones:
Public Meetings……………………. April 2017Advertise for Bids…………………………...April 2017Contract Award……………………………..June 2017Construction Start (NTP)………….....September 2017Completion of Work at Braintree Garage….July 2019*
(*Anticipated)
Construction Duration – Braintree Garage23 months *
KLEINFELDER CONFIDENTIAL
CONSTRUCTION PHASING APPROACH
KLEINFELDER CONFIDENTIAL
Construction Phasing Approach:
Maintain parking supply as well as pedestrian andvehicle flow thru and around work/protection zonesso that the garages and the station(s) they serveremain functional for the duration of the project.
Construction to adhere to the Town of BraintreeNoise Level Ordinances.
Allow for the efficient progression of work to facilitatecost efficiency and adherence to a schedule.
KLEINFELDER CONFIDENTIAL
Construction Phasing:
Phasing based on limiting the total project parkingspace impact to taking 300 spaces (total project) outof service at any one time with no more than 300 ofthese spaces taken out of service in a single garage.
KLEINFELDER CONFIDENTIAL
Parking Mitigation during Construction:Temporary parking lot tobe constructed within theBraintree Transfer StationProperty.
Public pay-by-phone lotwill be capable ofaccommodatingbetween100 to 120vehicles.
Offset loss of parkingduring garageconstruction.
KLEINFELDER CONFIDENTIAL
Estimated Construction Cost
Single construction contract to repair and improvethe Quincy Adams and Braintree Garages.
Anticipated Contract Award Date - June 2017
Estimated Overall Construction Cost = $92M
KLEINFELDER CONFIDENTIAL
Thank You.Questions and Comments