KLEINFELDER CONFIDENTIAL MBTA SOUTH SHORE GARAGES REPAIR PROJECT Braintree Garage March 16, 2017 Kleinfelder, Inc. Walker Parking Consultants | Architectural Engineers, Inc. Keville Enterprises, Inc. | Vertical Transportation Excellence | WSP Group
Transcript
Page 1: MBTA SOUTH SHORE GARAGES REPAIR PROJECT · PDF fileMBTA SOUTH SHORE GARAGES REPAIR PROJECT Braintree Garage ... Universal path of ... New LED light fixtures and

KLEINFELDER CONFIDENTIAL

MBTA SOUTH SHORE GARAGESREPAIR PROJECT

Braintree GarageMarch 16, 2017

Kleinfelder, Inc.Walker Parking Consultants | Architectural Engineers, Inc.

Keville Enterprises, Inc. | Vertical Transportation Excellence | WSP Group

Page 2: MBTA SOUTH SHORE GARAGES REPAIR PROJECT · PDF fileMBTA SOUTH SHORE GARAGES REPAIR PROJECT Braintree Garage ... Universal path of ... New LED light fixtures and

KLEINFELDER CONFIDENTIAL

AGENDA:Introduction

Proposed Repairs and Improvements

Safety and Accessibility

Schedule

Phasing

Estimated Construction Cost

Questions and Comments

Page 3: MBTA SOUTH SHORE GARAGES REPAIR PROJECT · PDF fileMBTA SOUTH SHORE GARAGES REPAIR PROJECT Braintree Garage ... Universal path of ... New LED light fixtures and

KLEINFELDER CONFIDENTIAL

INTRODUCTION – PROJECT OBJECTIVES

Maintain the Garages in a “State of Good Repair” by focusingon long-term maintenance, rehabilitation or replacement ofexisting infrastructure.

Provide continued reliable service to the public.

Improve garage function and accessibility for applicablebuilding code and ADA compliance.

Increased parking with improved traffic circulation andwayfinding.

Page 4: MBTA SOUTH SHORE GARAGES REPAIR PROJECT · PDF fileMBTA SOUTH SHORE GARAGES REPAIR PROJECT Braintree Garage ... Universal path of ... New LED light fixtures and

KLEINFELDER CONFIDENTIAL

GARAGE SITES

Braintree Parking Garage

Page 5: MBTA SOUTH SHORE GARAGES REPAIR PROJECT · PDF fileMBTA SOUTH SHORE GARAGES REPAIR PROJECT Braintree Garage ... Universal path of ... New LED light fixtures and

KLEINFELDER CONFIDENTIAL

GARAGE SITES

MBTA South Shore Garages Improvements 60% Design

Quincy Adams Garage

Page 6: MBTA SOUTH SHORE GARAGES REPAIR PROJECT · PDF fileMBTA SOUTH SHORE GARAGES REPAIR PROJECT Braintree Garage ... Universal path of ... New LED light fixtures and

KLEINFELDER CONFIDENTIAL

Proposed Repairs - Braintree Garage :Parking Layout Improvements.

Traffic Circulation Improvements.

New Lobby with Redundant Elevators and Stairwell.

Accessibility Improvements.

Stairwell Code Compliance Upgrades.

New Parking Service Office.

Garage System Repairs and Improvements.

Page 7: MBTA SOUTH SHORE GARAGES REPAIR PROJECT · PDF fileMBTA SOUTH SHORE GARAGES REPAIR PROJECT Braintree Garage ... Universal path of ... New LED light fixtures and

KLEINFELDER CONFIDENTIAL

Braintree Garage Parking Layout Improvements

Increased number of parking spaces.

53 spaces gained

1162 1215

0

200

400

600

800

1000

1200

1400

Overall Spaces

Total Garage Parking Capacity

Existing Proposed

Page 8: MBTA SOUTH SHORE GARAGES REPAIR PROJECT · PDF fileMBTA SOUTH SHORE GARAGES REPAIR PROJECT Braintree Garage ... Universal path of ... New LED light fixtures and

KLEINFELDER CONFIDENTIAL

Braintree Garage Parking Layout Improvements

Accessible parking spaces provided on all garagelevels.

Six (6) accessible spaces gained overall.

Increased “prime” and “short-term” parking spaceson Level 2 of the Garage.

Page 9: MBTA SOUTH SHORE GARAGES REPAIR PROJECT · PDF fileMBTA SOUTH SHORE GARAGES REPAIR PROJECT Braintree Garage ... Universal path of ... New LED light fixtures and

KLEINFELDER CONFIDENTIAL

Braintree Garage Parking Layout Improvements

20

04

40

26

45

7

45

0

5

10

15

20

25

30

35

40

45

50

Accessible Parking Short Term Parking Van Parking Prime Parking

Number of Parking Spaces

Existing Proposed

Page 10: MBTA SOUTH SHORE GARAGES REPAIR PROJECT · PDF fileMBTA SOUTH SHORE GARAGES REPAIR PROJECT Braintree Garage ... Universal path of ... New LED light fixtures and

KLEINFELDER CONFIDENTIAL

Braintree GarageTraffic Circulation Improvements within Garage

DROP-OFF & PICK-UP

DROP-OFF

Page 11: MBTA SOUTH SHORE GARAGES REPAIR PROJECT · PDF fileMBTA SOUTH SHORE GARAGES REPAIR PROJECT Braintree Garage ... Universal path of ... New LED light fixtures and

KLEINFELDER CONFIDENTIAL

Braintree GarageTraffic Circulation Improvements – Prime Parking Area

Page 12: MBTA SOUTH SHORE GARAGES REPAIR PROJECT · PDF fileMBTA SOUTH SHORE GARAGES REPAIR PROJECT Braintree Garage ... Universal path of ... New LED light fixtures and

KLEINFELDER CONFIDENTIAL

Braintree GarageTraffic Circulation Improvements – Drop Off Area

Drop-off /Pick-upDROP-OFF & PICK-UP

DROP-OFF & PICK-UP

Page 13: MBTA SOUTH SHORE GARAGES REPAIR PROJECT · PDF fileMBTA SOUTH SHORE GARAGES REPAIR PROJECT Braintree Garage ... Universal path of ... New LED light fixtures and

KLEINFELDER CONFIDENTIAL

Braintree Garage

Current Busway

Current Drive Lane

Current Traffic Circulation at Station Entrance

Page 14: MBTA SOUTH SHORE GARAGES REPAIR PROJECT · PDF fileMBTA SOUTH SHORE GARAGES REPAIR PROJECT Braintree Garage ... Universal path of ... New LED light fixtures and

KLEINFELDER CONFIDENTIAL

Braintree GarageTraffic Circulation Improvements at Station Entrance

DROP-OFF /

PICK-UPDROP-OFF & PICK-UP /

DROP-OFF

Page 15: MBTA SOUTH SHORE GARAGES REPAIR PROJECT · PDF fileMBTA SOUTH SHORE GARAGES REPAIR PROJECT Braintree Garage ... Universal path of ... New LED light fixtures and

KLEINFELDER CONFIDENTIAL

Braintree Garage Traffic Circulation Improvements

Improved Drop Off / Short-Term parking layout toreduce traffic congestion.

New wayfinding and traffic signage at all levels.

Angled parking spaces provided for Prime Parkingand Drop Off areas. Parallel-oriented parkingspaces eliminated within Drop Off Area.

New busway and station entrance canopy roofs.

Page 16: MBTA SOUTH SHORE GARAGES REPAIR PROJECT · PDF fileMBTA SOUTH SHORE GARAGES REPAIR PROJECT Braintree Garage ... Universal path of ... New LED light fixtures and

KLEINFELDER CONFIDENTIAL

Braintree Pedestrian Bridge

2008 Condition

2016 Condition

Bridge will be demolished aspart of this repair projectand replaced with a canopy.

Bridge closed February 2017due to deteriorated condition.

Page 17: MBTA SOUTH SHORE GARAGES REPAIR PROJECT · PDF fileMBTA SOUTH SHORE GARAGES REPAIR PROJECT Braintree Garage ... Universal path of ... New LED light fixtures and

KLEINFELDER CONFIDENTIAL

Braintree Garage Accessibility Improvements:Proposed Garage Lobby

Weather protection for all customer circulationpathways and waiting areas.

Covered at-gradecrossing to stationand commuter railramp connection.

Raised pedestrianconnection to Station(no curb ramps).

Page 18: MBTA SOUTH SHORE GARAGES REPAIR PROJECT · PDF fileMBTA SOUTH SHORE GARAGES REPAIR PROJECT Braintree Garage ... Universal path of ... New LED light fixtures and

KLEINFELDER CONFIDENTIAL

Braintree Garage Accessibility Improvements:Proposed Garage Lobby

Universal path oftravel that is equal forall user groups.Centralized redundantelevators.New aluminumtread/riser stairsystem with codecompliant railings.

Page 19: MBTA SOUTH SHORE GARAGES REPAIR PROJECT · PDF fileMBTA SOUTH SHORE GARAGES REPAIR PROJECT Braintree Garage ... Universal path of ... New LED light fixtures and

KLEINFELDER CONFIDENTIAL

Braintree Garage Accessibility Improvements:Accessible parking spaces provided on each level

Page 20: MBTA SOUTH SHORE GARAGES REPAIR PROJECT · PDF fileMBTA SOUTH SHORE GARAGES REPAIR PROJECT Braintree Garage ... Universal path of ... New LED light fixtures and

KLEINFELDER CONFIDENTIAL

Braintree Garage Accessibility Improvements:Improved universal path of travel to commuter rail

DROP-OFF & PICK-UP

Page 21: MBTA SOUTH SHORE GARAGES REPAIR PROJECT · PDF fileMBTA SOUTH SHORE GARAGES REPAIR PROJECT Braintree Garage ... Universal path of ... New LED light fixtures and

KLEINFELDER CONFIDENTIAL

Braintree Garage Accessibility Improvements:Improved universal path of travel to commuter rail

New Canopyover Ramp

Page 22: MBTA SOUTH SHORE GARAGES REPAIR PROJECT · PDF fileMBTA SOUTH SHORE GARAGES REPAIR PROJECT Braintree Garage ... Universal path of ... New LED light fixtures and

KLEINFELDER CONFIDENTIAL

Braintree Garage Architectural Improvements:Stairwell code compliance upgrades

New stainlesssteel mesh infill

Page 23: MBTA SOUTH SHORE GARAGES REPAIR PROJECT · PDF fileMBTA SOUTH SHORE GARAGES REPAIR PROJECT Braintree Garage ... Universal path of ... New LED light fixtures and

KLEINFELDER CONFIDENTIAL

Braintree Garage Structural Repairs:Concrete Repairs

BeamsColumnsFloor DecksPrecast TeesWalls

Page 24: MBTA SOUTH SHORE GARAGES REPAIR PROJECT · PDF fileMBTA SOUTH SHORE GARAGES REPAIR PROJECT Braintree Garage ... Universal path of ... New LED light fixtures and

KLEINFELDER CONFIDENTIAL

Braintree Garage Structural Repairs:

Expansion Joint ReplacementSealant Joint ReplacementOpen Parking Decks toReceive a PolyurethaneWaterproofing TrafficMembrane CoatingCovered Parking Decks toReceive a Penetrating-Corrosion Inhibiting Sealer

Page 25: MBTA SOUTH SHORE GARAGES REPAIR PROJECT · PDF fileMBTA SOUTH SHORE GARAGES REPAIR PROJECT Braintree Garage ... Universal path of ... New LED light fixtures and

KLEINFELDER CONFIDENTIAL

Braintree Garage Plumbing Repairs:

Remove and replace allgarage drains, sanitary wastepiping and storm water pipingsystems within the garage.

Proposed repairs incombination with continuedmaintenance will minimizeponding water on parkinglevels.

Page 26: MBTA SOUTH SHORE GARAGES REPAIR PROJECT · PDF fileMBTA SOUTH SHORE GARAGES REPAIR PROJECT Braintree Garage ... Universal path of ... New LED light fixtures and

KLEINFELDER CONFIDENTIAL

Braintree Garage Electrical Improvements:New LED light fixtures andsurface mounted circuiting.

Improved lighting increasesvisibility and safety forgarage users.

New emergency generatorand distribution toemergency lighting systems.

New fire alarm system.

Page 27: MBTA SOUTH SHORE GARAGES REPAIR PROJECT · PDF fileMBTA SOUTH SHORE GARAGES REPAIR PROJECT Braintree Garage ... Universal path of ... New LED light fixtures and

KLEINFELDER CONFIDENTIAL

Braintree Garage Security & CCTV System:

Cameras at each vehicle entrance and exit. Willprovide front and rear view of the vehicle.

Cameras at each pedestrian entrance into theStairwells. This is from each parking level and theexterior of the stairwell.

Approximately 25 cameras will be added.

Page 28: MBTA SOUTH SHORE GARAGES REPAIR PROJECT · PDF fileMBTA SOUTH SHORE GARAGES REPAIR PROJECT Braintree Garage ... Universal path of ... New LED light fixtures and

KLEINFELDER CONFIDENTIAL

Braintree Garage Fire Protection Improvements:

Remove and replace all fire protection standpipesdown to finished grade and connect to newdistribution system installed on the underside of the2nd floor parking levels.

Remove and replace all fire department hose valveconnections on all standpipes at each floor level.

Page 29: MBTA SOUTH SHORE GARAGES REPAIR PROJECT · PDF fileMBTA SOUTH SHORE GARAGES REPAIR PROJECT Braintree Garage ... Universal path of ... New LED light fixtures and

KLEINFELDER CONFIDENTIAL

Contract Schedule Milestones:

Public Meetings……………………. April 2017Advertise for Bids…………………………...April 2017Contract Award……………………………..June 2017Construction Start (NTP)………….....September 2017Completion of Work at Braintree Garage….July 2019*

(*Anticipated)

Construction Duration – Braintree Garage23 months *

Page 30: MBTA SOUTH SHORE GARAGES REPAIR PROJECT · PDF fileMBTA SOUTH SHORE GARAGES REPAIR PROJECT Braintree Garage ... Universal path of ... New LED light fixtures and

KLEINFELDER CONFIDENTIAL

CONSTRUCTION PHASING APPROACH

Page 31: MBTA SOUTH SHORE GARAGES REPAIR PROJECT · PDF fileMBTA SOUTH SHORE GARAGES REPAIR PROJECT Braintree Garage ... Universal path of ... New LED light fixtures and

KLEINFELDER CONFIDENTIAL

Construction Phasing Approach:

Maintain parking supply as well as pedestrian andvehicle flow thru and around work/protection zonesso that the garages and the station(s) they serveremain functional for the duration of the project.

Construction to adhere to the Town of BraintreeNoise Level Ordinances.

Allow for the efficient progression of work to facilitatecost efficiency and adherence to a schedule.

Page 32: MBTA SOUTH SHORE GARAGES REPAIR PROJECT · PDF fileMBTA SOUTH SHORE GARAGES REPAIR PROJECT Braintree Garage ... Universal path of ... New LED light fixtures and

KLEINFELDER CONFIDENTIAL

Construction Phasing:

Phasing based on limiting the total project parkingspace impact to taking 300 spaces (total project) outof service at any one time with no more than 300 ofthese spaces taken out of service in a single garage.

Page 33: MBTA SOUTH SHORE GARAGES REPAIR PROJECT · PDF fileMBTA SOUTH SHORE GARAGES REPAIR PROJECT Braintree Garage ... Universal path of ... New LED light fixtures and

KLEINFELDER CONFIDENTIAL

Parking Mitigation during Construction:Temporary parking lot tobe constructed within theBraintree Transfer StationProperty.

Public pay-by-phone lotwill be capable ofaccommodatingbetween100 to 120vehicles.

Offset loss of parkingduring garageconstruction.

Page 34: MBTA SOUTH SHORE GARAGES REPAIR PROJECT · PDF fileMBTA SOUTH SHORE GARAGES REPAIR PROJECT Braintree Garage ... Universal path of ... New LED light fixtures and

KLEINFELDER CONFIDENTIAL

Estimated Construction Cost

Single construction contract to repair and improvethe Quincy Adams and Braintree Garages.

Anticipated Contract Award Date - June 2017

Estimated Overall Construction Cost = $92M

Page 35: MBTA SOUTH SHORE GARAGES REPAIR PROJECT · PDF fileMBTA SOUTH SHORE GARAGES REPAIR PROJECT Braintree Garage ... Universal path of ... New LED light fixtures and

KLEINFELDER CONFIDENTIAL

Thank You.Questions and Comments