Date post: | 06-Mar-2018 |
Category: |
Documents |
Upload: | nguyentruc |
View: | 216 times |
Download: | 4 times |
1 Municipal Corporation Amritsar e-News
MCA e-News
Municipal Corporation, Amritsar.
January, 2017
Clean City Green City
Municipal Corporation,
Amritsar
Publication of E-newsletter
2 Municipal Corporation Amritsar e-News
"Heritage Building"
And
Old Office of
Municipal Corporation Amritsar
3 Municipal Corporation Amritsar e-News
Sh. Bakshi Ram Arora,
Hon’ble Mayor,
Municipal Corporation, Amritsar. Mrs. Sonali Giri, I.A.S.
Commissioner,
Municipal Corporation, Amritsar.
Releasing of monthly E-news letter is an
endeavour of the Municipal Corporation,
Amritsar to make the people of Amritsar City
aware about the activities being undertaken by it.
It will increase their familiarity with the
administration of the Municipal Corporation,
Amritsar.
4 Municipal Corporation Amritsar e-News
Activities of Municipal Corporation, Amritsar during the
month of December, 2016 and in the coming near future.
I) CIVIL ENGINEERING DEPTT. :-
Smart City :- ;wkoN f;Nh u?b/Ai d/ d{;o/ uoB ftZu nzfwqs;o B{z 27 PfjoK ftu' gfjb/
;EkB s/ u[fDnk frnk. ;wkoN f;Nh d/ nXhB ezwK B{z eotkT[D bJh n?;HghHth fsnko
ehsh rJh j?, fi; ftu 15 vkfJo?eNo, 12 ;oekoh ns/ 3 gqkJht/N w?Apo Bkwiad ehs/
rJ/ jB. n?;HghHth B{z ubkT[D d/ bJh nzfwqs;o ;wkoN f;Nh fbfwNv (ASCL) Bkw dh
ezgBh pDkJh ik u[Zeh j?. ;qhwsh ;'Bkbh froh, nkJhHJ/Hn?;, efwPBo, Bro fBrw ih B{z
;wkoN f;Nh d/ ;hHJhHU dh o?r[bo Appointment j'D sZe ;hHJhHU dk ukoi fwfbnk j?.
HRIDAY :- fjod/ ;ehw nXhB nzfwqs;o Pfjo B{z Gkos d/ 12 PfjoK ftu'A u[fDnk frnk
j?. fjod/ ;ehw nXhB gq'i?eN; dhnK vhHghHnkoI nkJhH;hHNh tZb' fsnko ehshnK
rJhnK jB. fJj vhHghHnkoI gfjbK ;hHghHvpfbT{Hvh tZb' ns/ d[pkok n?wHUH:{Hvh Gkos
;oeko tZb' 69H31 eo'V o[gJ/ dhnK gqtkB ehshnK rJhnK jB. fiBQK d/ d' N?Avo fJZe
50H50 eo'V o[gJ/, i' fe w?;L dhge fpbvoI B{z ns/ d{;ok 1H17 eo'V o[gJ/ w?;L
ezghN?AN ez;NoePB B{z nbkN ehsk frnk ns/ ezw gqrsh nXhB uZb fojk j?.
Punjab Urban Development Mission :- nfwqs;o Pfjo d/ ftek; bJh 100%
Development (DUIC) d/ ;ko/ ezwK d/ N?Avo bZr u[Ze/ jB ns/ brkJ/ rJ/ ;ko/ jh N?Avo
(jbek gZSwh, dZyDh ns/ ;?ANo) gqkgs j' u[Ze/ jB. fijBK ftu' nB[wkBs bkrs Rs.
194.73 eo'V d/ toe nkovo ikoh eo fdZs/ rJ/ jB, ikoh ehs/ rJ/ toe nkovoK d/ ezw
gqrsh nXhB uZb oj/ jB.
Night Shelter (Govt. of India Scheme):- NIT No.46 okjhA fwsh 04.11.2016 B{z Night
Shelter d/ j/m fby/ N?Avo gqkgs j' u[Ze/ jB.
1. Construction of Night Shelter at Goal Bagh. (85.10 Lacs)
2. Repair of Existing Municipal Corporation Building into Night Shelter at Goal
Bagh. (21.61 Lacs).
fJjBK N?AvoK d/ toe nkovo ikoh eo fdZs/ rJ/ jB Aqy mOky qy auswrI dw kMm c`l irhw
hY[
5 Municipal Corporation Amritsar e-News
Development Works:- gzikp nopB fvt?bgw?AN fwPB okjhA ikoh ehsh NIT No.47 d/
;ko/ ezwK d/ toe nkovo 976H00 bZy o[gJ/ d/ ikoh eo fdZs/ rJ/ jB.
II) OPERATION & MAINTENANCE CELL :-
1. Under JICA (Japan International Cooperation Agency) assisted Amritsar
Sewerage Project amounting to Rs. 600.60 Cr., the work for the construction
of Interceptor/Trunk and lateral sewer in South & North Zone is in progress.
In South zone area against the scope of work for laying lateral sewer 101.04
Km., Trunk sewer(RCC NP3) 25.48 Km., CIS/RCC HDPE 6.34 Km & house
connection 12000 nos. In the South Zone, Approx. 100.60 Km. lateral sewer,
25.28 Km. Trunk sewer(RCC NP3), CIS/RCC HDPE 6.34 Km. sewer has
been laid and 11800 nos. houses are connected with the sewer. Similarly in
North zone area against the scope of work for laying lateral sewer 270.02
Km., Trunk sewer(RCC NP3) 22.53 Km., Cast in situ 16.66 Km. and house
connection 27500 nos. In the North, Approx. 132.13 Km. lateral sewer, 24.49
Km. Trunk sewer(RCC NP3),7.98 Km. Cast in situ sewer has been laid and
4625 nos. houses are connected with the sewer. The remaining work of
North zone shall be completed upto March,2017 and total progress of work-
67.14%.
2. Under JICA (Japan International Cooperation Agency) assisted Amritsar
Sewerage Project, the work for the construction of 2 No.s STPs & MPS of 95
MLD each (Sewage Treatment Plant, Main Pumping Station) at Basarke
Bhaini near Khapper Kheri in South zone amounting to Rs. 80.30 Cr. and at
Wadala Bhittewad near Village Gausabad in North amounting to Rs. 84.70
Cr. has been allotted and the work is in progress. In the South Zone, 95% of
Civil Work completed. Work of Aeration Tank, Primary Clarifier &
Security Guard Room is completed. Construction of units such as MPS,
Secondary Clarifier, Digester, Sludge Thickener & Staff Quarters, Primary
Sludge Pump, Biological Sludge Pump is in progress. Excavation & RCC
of Supernatant Sump & Air Blower is in progress. At present in North zone,
96% of Civil Work completed. Work of Secondary, Primary & Aeration
Tank is in completed. Construction of units such as MPS, Digester, Sludge
Thickener & Staff Quarters, Primary Sludge Pump, Biological Sludge
Pump is in progress. Excavation & RCC of Supernatant Sump & Air
Blower is in progress. Work shall be completed upto 15 Feb,2017.
3. The Project of Rehabilitation of existing Water Scheme in walled city area at
Amritsar (Under JNNURM) with a Project cost of Rs. 12.98 Cr. has been
approved by the GoI. As per the scope of work 65.12 Km. of Water Supply
6 Municipal Corporation Amritsar e-News
line (G.I./D.I. pipe lines) is to be laid, 9 No’s. OHSRs (Over Head Service
Reservoir) are to be repaired, 39 Nos. Chlorinator & Flow Meter including
17500 nos. house connections. At present, 37.80 Km D.I. & 26.50 Km G.I.
Water Supply line laid, Repair of OHSR pending and 17000 nos. houses
are connected with water supply system.
4. The Project for Rehabilitation of existing Sewerage system in walled city
area at Amritsar (Under JNNURM) with a Project cost of Rs. 9.98 Cr. has
been approved by the GoI. As per the scope of work 18.60 Km. lateral
sewer,0.42 Km. RCC Pipe Sewer and 6134 nos. house connections are to be
made.At present, work completed at site.
5. The project amounting to Rs. 202.34 Cr. in South-East zone of Amritsar
Sewerage Project with a scope for providing Water Supply, Sewerage,
Sewage Treatment Plants, Roads, Street Light, O&M for 10 years has been
approved and the funding agency of this project is JNNURM/GoP/ULBs. The
work has been allotted to the M/s. Shapoorji Pallonji & Co. Pvt. Ltd, SP
Centre,41/44,Minoo Desai Marg,Colaba,Mumbai agency for Rs. 183.59 Cr.
and the scope of work includes 47 Km. Water Supply line, 4 Nos. T/wells, 4
Nos. OHSRs, 7500 nos. house connection, 107.30 Km. Lateral sewer,17.50
Km. main sewer,20000 nos. house connection,1 No. MPS (90 MLD), 1 No.
IPS (15 MLD),1 No. STPs (27.50 MLD), 173970 Sq.mtr CC. road, 218750
Sq. mtr metalled road and 3520 nos. street light points with O&M for 10
years. Presently, 4 Nos. bore completed, 28.50 Km Water Supply line laid, 3
Nos. OHSR completed(Civil work),4th
work done up to fourth brace
completed and 500 nos. houses connected with water supply line and work
shall be completed upto Feb, 2017. 56 Km Lateral Sewer, 12.50 Km Main
Sewer and 1800 houses connected with Sewer line and 77 Km Sewer
cleaned and further in progress.
6. In order to transform service delivery of potable water supply system based
on Surface Water in Amritsar City, the Govt. of Punjab requested the World
Bank for providing Non-Lending Technical Assistance (NLTA). The World
Bank awarded this feasibility study to consultancy agency M/s. Royal
Haskoning DHV Company Pvt. Ltd. The Consulting agency finalized the
feasibility report with an estimated cost Rs.1358 Cr. which is submitted to the
Govt. of Punjab of its final decision and approval.
7. Under Urban Mission,2016, various water supply & sewerage works have
been approved (vetted) by the PMIDC amounting for Rs.720.87 lacs. Out of
these 66 works,26 works has been completed at site & remaining works are
in progress.
7 Municipal Corporation Amritsar e-News
JICA assisted Amritsar Sewerage Project (ID-P186): Turnkey Design and Construction of
95 MLD Sewage Treatment Plant, Main Pumping Station at WadalaBhittewad (Near
VillageGhausabad) and Intermediate Pumping Stations in North Zone on International
Competitive Bidding for JICA-ASP-002
BATALA IPS
MAKHUMPURA IPS
10 Municipal Corporation Amritsar e-News
PRE-TREATMENT UNIT:-
PST TO AERATION TANK CONNECTING CHANNEL:-
13 Municipal Corporation Amritsar e-News
PRIMARY SLUDGE PUMP HOUSE:-
BIOLOGICAL SLUDGE SUMP AND PUMP HOUSE:-
14 Municipal Corporation Amritsar e-News
AIR BLOWER ROOM:-
SUPERNATANT SUMP,DIGESTED STOREG SUMP, SLUDGE
THICKENED PUMP HOUSE:-
18 Municipal Corporation Amritsar e-News
III) Health Department
In the month of December 2016, Municipal Corporation, Amritsar
organized special campaign for the Sanitation in walled during this time period massive
sanitation drive was conducted to clean construction material and Electric polls lying on
all main roads under the jurisdiction of Municipal Corporation, Amritsar. Review
meetings regarding Swachh Bharat Mission were also organized under the Chairmanship
of Honb'le Commissioner, Municipal Corporation, Amritsar. Another cleanliness drive
was organized w.e.f. 16th December, 2016 to 31st December, 2016 regarding to make
the people aware regarding the use of community toilets.
Micro plan of Integrated Municipal Solid Waste Management Project for Amritsar
cluster was also approved by the Government. Now the consortium of M/s. Essel Infra
projects limited & M/s Hitachi Zosen India Pvt. Limited, Mumbai has been started the
work of collection & transportation of garbage from the outer city of Municipal
Corporation, Amritsar w.e.f. 14th August, 2016. All the Sanitary Inspectors has been
directed to inspect the working of company and make sure that 100% lifting of garbage
from the concerned areas is going on. Amritsar Municipal Solid Waste Limited has
started the garbage. Now the said company is lifting garbage in 52 wards of the city. The
company has been directed for the lifting of 100% garbage from all the wards of the
outer city.
Ld. Commissioner, Municipal Corporation, Amritsar holds meetings with
sanitation staff along with the representatives of the Amritsar Municipal Solid Waste
Limited regarding the sanitation of the city. A random checking of the roads was done
by the Ld. Commissioner, Joint Commissioner and the necessary directions were issued
to the Chief Sanitary Inspectors and Sanitary Inspectors to ensure 100% lifting of the
garbage and cleaning of the roads.
Special Night checking of Mechanical Sweeping work was done by Ld.
Commissioner, M.C. Amritsar on some roads the work of the company was found
unsatisfactory and the concerned company as well as Sanitary Inspectors of the area
were directed to submit their checking reports regarding the performance of company.
19 Municipal Corporation Amritsar e-News
The company was directed to ensure 100% cleaning and washing of the roads /
footpaths as per agreement. A special checking of the night sanitation of the roads from
Airport road to G.T.Road was also made by the Ld. Commissioner.
IV) MTP DEPARTMENT :-
Total number of Building Plans submitted and sanctioned in the MTP
Department during the Month of December, 2016:-
Sr.
No.
Detail Nos.
1. Total cases 62
2. Residential 59
3. Commercial 3
4. Sanction cases 35
5. Objection -
6. Rejected -
7. Under process 27
V) LAND DEPARTMENT:-
The Land department of Municipal Corporation, Amritsar has constituted two
teams under the supervision of inspectors for the removal of temporary encroachments
from foot paths and roads. Other than dealing with the complaints received in the
department, these teams remove temporary encroachments in the different parts of the
city. Removal of encroachments is an ongoing process and is being under taken on daily
basis.
Other then this Enforcement Monitoring Committees have been constituted
which conduct weekly meetings and are regularly removing permanent encroachments in
different parts of the city at regular intervals.
Also, shopkeepers in the markets are being regularly requested through public
address systems to keep their merchandise/goods within their shops/premises and not to
display them on roads/footpaths. Other than regular removal of temporary encroachments
from roads and footpaths from different parts of the city, major anti encroachments drives
20 Municipal Corporation Amritsar e-News
were carried out by the sub-enforcement committee's at O/s Lohgarh Gate, Hakima Gate,
Sultanwind Road, Goal Bagh & Lahori Gate. Also Land Department collected around Rs.
4.13 Lacs against Rent of shops and Rs. 1.46 Lacs against Tehbazari during the month.
O/S LOHGARH GATE & HAKIMA GATE
SULTANWIND ROAD, GOAL BAGH & LAHORI GATE
VI) ADVERTISEMENT DEPARTMENT:-
ivigAwpn ivBwg ngr ingm AMimRqsr v`loN 31 d; Mbr, 2016
q`k 5 kroV 71 l`K 16 hzwr o[gJ/ Awmdn pRwpq kIqI Aqy ies smyN
dOrwn 384 gYrkwƒnI qOr qy l`gy hoey borf/horifMg auqwr ky ngr ingm
dy Ahwqy ivc jmW krwey gey[
21 Municipal Corporation Amritsar e-News
VII) STREET LIGHT DEPARTMENT:-
;EkBe ;oeko ftGkr d/ gZso fgZmnzeD Bzpo
5$111$2016$4884$506^508 fwsh 16^09^2016 oKjh nzfwqs;o Pfjo ftZu bZrhnk
;NohN bkJhNK Bz{ pdb e/ LED Based Energy Efficient ;NohN bkJhNK brkT[D d/
j[ew ehs/ rJ/ jB. fJ; ;pzXh Bro fBrw, nzfwqs;o tZb' fwsh 22^09^2016 Bz{
M/S Energy Efficiency Services Limited (EESL), Nodia Bkb fJeokoBkwk ehsk
frnk. fi; d/ ;Bw[Zy fwsh 30^11^2016 sZe nzfwqs;o Pfjo ftu brGr 2600
LED bkJhNk brkJhnk rJhnk jB.
*****
22 Municipal Corporation Amritsar e-News
Phone : 0183-2505450
Fax : 0183-2502339
Email : [email protected]
Website : www.amritsarcorp.com
Complaint Cell : 1800 1802 103
***********