+ All Categories
Home > Documents > McAteer Thesis Book

McAteer Thesis Book

Date post: 25-May-2015
Category:
Upload: immfxnd
View: 188 times
Download: 0 times
Share this document with a friend
Popular Tags:
136
a study for the purposeful integration of mass production for use in meaningful architecture 2009 Design Thesis Ian McAteer R ECONSTITUTION R EINVENTION & R EADAPTATION
Transcript
  • 1. RECONSTITUTION REINVENTION & READAPTATIONIan McAteer 2009 Design Thesisa study forthe purposefuli ntegratio nofmassp r o d u ctio nfor use inm ea n i n g fu larchitecture

2. i 3. R ECONSTITUTION EINVENTION & EADAPTATION A Design Thesis Submitted to the Department of Architecture and Landscape Architecture of North Dakota State UniversityBy Ian McAteerIn Partial Fulfillment of the Requirements for the Degree ofMaster of Architecture Mark M. Barnhouse Primary Thesis Advisor Mark M. Barnhouse Thesis Committee Chair May 2009 Fargo, North Dakotaii 4. P ERMISSION RIGHTSI, Ian McAteer, grant permission to North Dakota State University, The College of Engineering and Architecture, and the Department of Architecture and Landscape Architecture to reproduce any portion of this thesis for any purpose they deem proper. iii 5. T COVERCOVER ABLE OF CONTENTS iiii iii iii iv iv 3 4 5 9 1010 1111 1313 1616 1717 2020 2323 3333 4747 5353 5757 6161 7777 7979 8383 103 103 117 117 125 125 127 127 128 128 129 129 BACK BACK iv 6. S TATEMENT OF INTENT 7. A BSTRACT 3 8. P ROBLEM STATEMENT 4 9. S TATEMENT OF INTENTTYPOLOGY UNIFYING IDEA PROJECT JUSTIFICATION 5 10. 6 11. P ROPOSAL 12. N ARRATIVE 9 13. USER/CLIENT DESCRIPTION 10 14. M AJOR PROGRAM ELEMENTS 11 15. 12 16. S ITE INFORMATION 13 17. SITE INFORMATION 14 18. 15 19. P ROJECT EMPHASIS 16 20. P LAN FOR PROCEEDING 17 21. PLAN FOR PROCEEDING 18 22. 19 23. P REVIOUS STUDIO EXPERIENCE 20 24. R ESEARCH 25. U NIFYING IDEA RESEARCH RESULTS 23 26. U NIFYING IDEA RESEARCH RESULTS 24 27. U NIFYING IDEA RESEARCH RESULTS 25 28. UNIFYING IDEA RESEARCH RESULTS 26 29. U NIFYING IDEA RESEARCH RESULTS 27 30. UNIFYING IDEA RESEARCH RESULTS 28 31. UNIFYING IDEA RESEARCH RESULTS 29 32. U NIFYING IDEA RESEARCH RESULTS 30 33. U NIFYING IDEA RESEARCH RESULTS 31 34. U NIFYING IDEA RESEARCH RESULTS 32 35. T YPOLOGICAL RESEARCH RESULTS UNITED STATES COURTHOUSE 33 36. T YPOLOGICAL RESEARCH RESULTS 34 37. T YPOLOGICAL RESEARCH RESULTS 35 38. TYPOLOGICAL RESEARCH RESULTS 36 39. T YPOLOGICAL RESEARCH RESULTS ROBERT C. BYRD UNITED STATES COURTHOUSE & FEDERAL BUILDING 37 40. T YPOLOGICAL RESEARCH RESULTS 38 41. T YPOLOGICAL RESEARCH RESULTS 39 42. T YPOLOGICAL RESEARCH RESULTS 40 43. T YPOLOGICAL RESEARCH RESULTS WILLIAM B. BRYANT UNITED STATES COURTHOUSE ANNEX 41 44. T YPOLOGICAL RESEARCH RESULTS 42 45. T YPOLOGICAL RESEARCH RESULTS 43 46. TYPOLOGICAL RESEARCH RESULTS TYPOLOGICAL RESEARCH SUMMARY 44 47. T YPOLOGICAL RESEARCH RESULTS 45 48. T YPOLOGICAL RESEARCH RESULTS 46 49. H ISTORICAL CONTEXT MILESTONES OF MASS PRODUCTION 47 50. H ISTORICAL CONTEXT 48 51. H ISTORICAL CONTEXT 49 52. H ISTORICAL CONTEXT 50 53. H ISTORICAL CONTEXT 51 54. H ISTORICAL CONTEXT 52 55. G OALS FOR THESIS PROJECT OVERALL ACADEMIC 53 56. GOALS FOR THESIS PROJECT PROFESSIONAL PERSONAL 54 57. S ITE ANALYSIS 58. Q UALITATIVE SITE ANALYSIS 57 59. Q UALITATIVE SITE ANALYSIS 58 60. Q UALITATIVE SITE ANALYSIS 59 61. Q UALITATIVE SITE ANALYSIS 60 62. QUANTITATIVE SITE ANALYSIS SITE LOCATION 2 1341 - STATE ROUTE 60 BUCKINGHAM COURTHOUSE2 - EXISTING COUNTY GOVERNMENT FACILITIES(FORMERLY MAYSVILLE)3 - EXISTING HISTORIC COURTHOUSE & EXPANSION 61 4 - SITE LOCATION 63. Q 62UANTITATIVE SITE ANALYSIS 64. QUANTITATIVE SITE ANALYSIS GENERAL SITE INFORMATION 63 65. Q UANTITATIVE SITE ANALYSIS CLIMATE INFORMATION 64 66. QUANTITATIVE SITE ANALYSIS 65 67. Q UANTITATIVE SITE ANALYSIS 66 68. Q UANTITATIVE SITE ANALYSIS 67 69. QUANTITATIVE SITE ANALYSIS 68 70. Q UANTITATIVE SITE ANALYSIS 69 71. Q UANTITATIVE SITE ANALYSIS 70 72. Q UANTITATIVE SITE ANALYSIS 71 73. Q UANTITATIVE SITE ANALYSIS 72 74. Q UANTITATIVE SITE ANALYSIS 73 75. QUANTITATIVE SITE ANALYSIS 74 76. P ROGRAMMATIC REQUIREMENTS 77. P ROGRAMMATIC REQUIREMENTS SPATIAL REQUIREMENTS 77 78. P ROGRAMMATIC REQUIREMENTS 78 79. P ROGRAMMATIC DETAILS HOURS OF OPERATION CIRCULATION 79 80. PROGRAMMATIC DETAILS DESIGN CONSIDERATIONS 80 81. P ROGRAM APPENDIX 82. P ROGRAM APPENDIX 83 83. PROGRAM APPENDIX84 84. P ROGRAM APPENDIX 85 85. P ROGRAM APPENDIX 86 86. P ROGRAM APPENDIX 87 87. PROGRAM APPENDIX88 88. P ROGRAM APPENDIX 89 89. PROGRAM APPENDIX90 90. P ROGRAM APPENDIX 91 91. P ROGRAM APPENDIX 92 92. P ROGRAM APPENDIX 93 93. P 94ROGRAM APPENDIX 94. P ROGRAM APPENDIX 95 95. PROGRAM APPENDIX96 96. P ROGRAM APPENDIX 97 97. P ROGRAM APPENDIX 98 98. P ROGRAM APPENDIX 99 99. PROGRAM APPENDIX 100 100. D ESIGN DOCUMENTATION 101. P ROCESS DOCUMENTATIONEXISTING AntechamberSecure HallsAtrium CourtroomSecurity Courtroom/Desk Offices103 102. P FIRST LOOKROCESS DOCUMENTATION 104 103. P ROCESS DOCUMENTATIONROUGH IDEAS 105 104. P DEVELOPMENT OF THE ROTUNDA ROCESS DOCUMENTATION 106 105. P ROCESS DOCUMENTATION 107 106. P REFINEMENT OF THE ROTUNDA ROCESS DOCUMENTATION 108 107. P ROCESS DOCUMENTATIONPublic Staff Securityy PLANNING THE SPACES 109 108. P SOLIDIFICATIONROCESS DOCUMENTATION 110 109. P ROCESS DOCUMENTATIONINITIAL DETAILING 111 110. PROCESS DOCUMENTATION ALONG THE WAY 112 111. P ROCESS DOCUMENTATION 113 112. PROCESS DOCUMENTATION Section @ Mid-Term114 113. P ROCESS DOCUMENTATION 115 114. P 116 ROCESS DOCUMENTATION 115. P ROJECT SOLUTION DOCUMENTATION 117 116. P118 ROJECT SOLUTION DOCUMENTATION 117. P ROJECT SOLUTION DOCUMENTATION 119 118. P ROJECT SOLUTION DOCUMENTATION 120 119. P ROJECT SOLUTION DOCUMENTATION 121 120. P ROJECT SOLUTION DOCUMENTATION 122 121. P ROJECT SOLUTION DOCUMENTATION 123 122. EMPLOYEE OUTDOORPUBLIC CAFETERIAPAPATIO STAFF CAFETERIA SAL PORT LLY R RT MECHANIMECHANICALROOM 2 JURY DELIBERATIONCIRCCIRCUIT CO OURTJUVENILE &GENERRAL DISTRICTRJUDGES CHAMBERS (3)UD SSSSSECURE R REPRPRPROPROCESSINGDOMESTIC COURT COURT CPRISONERPONN JUDGE S SECURE ES SELEVATOE VATORVAVAPARKIN ARKIRKKKING RECORDS ARCHI EORDS RCHIVCHIV HI HHOHOLDHOLDING O OL OLD SECUREECUECURECUR C CU CEL CELLSPRISONER RISONEISON SOELEVATOR RSECURESECURE ECURCURCURCURADMINISTRATION INISTRAT PR SONERRISONE ONO IC OFFICE ELEVATORLEVATOR 3 LEVELSHERIFFSDUMBWAITER OFFICESPUBLIC RECORRDS MECHANICAL ROOM 1ATTORNEY Y/CLIENT ROOMS YPAYMENT OFFICE FICELAW LIBRARYNO RTHSECCURITY ITTYPuPublic ublicStaffStaffJu gJudge udge CIVIC LO VIC LOBBY PrisonePrisonerROJECT SOLUTION DOCUMENTATION 124 P 123. STEP 1: INSERT KEYED PILASTERS INTO STEP 2: INSTALL PREFAB HOLLOW CORESTEP 3: SLIDE PREFAB CONCRETE SIP STEP 4: LAY LOWER BRICK BINDING PREFORMED SLOTS IN FOUNDATION CONCRETE SLABS. PANELS BETWEEN PILASTERSBAND. WALL. MASONRY & CONCRETE INSULATED WALL ASSEMBLY EMPLOYEE OUTDOOR PATIO JURY DELIBERATION CIRCUIT COURTSECUREJUDGESS CHAMBERS (3) PRISONER ELEVATOR SECOND FLOOR PLANLAW LIBRARY ROTUNDA DETAILS 1/16 = 1-0NORT THCOMPOSITE BRICK LOAD-BEARING WALL.BOTTOM COURSING CONSISTING OF THREE-WYTHE INTERIOR, MORTAR MESH, 3 RIGIDINSULATION, MORTAR MESH, AND TWO-WYTHEEXTERIOR. AT TWO HIGHER COURSINGS,REMOVE ONE INTERIOR WYTHE THANCOURSING BELOW.PUBLIC CAFETERIA STAFF CAFETERIA PRECAST CONCRETE LINTELS. PRECAST CONCRETE PILASTER TWO-WYTHE BRICK BINDING BANDINLAID HVAC DUCTWORK.FULL BRICK ROTUNDA WALL WITH MORTAR MESH BACKING 12 CONCRETE SIP PANELS MAIN COMPOSITE WALLPRECAST CONCRETE PILASTER GENERAL DISTRICTFOR ADDED STABILITY. JUVENILE & DOMESTIC COURT COURT SECURE ADMINISTRATIONPRISONEROFFICEELEVATORPUBLIC RECORDS ATTORNEY/CLIENT ROOMS PAYMENT OFFICE SECURITY GROUND FLOOR PLANCIVIC LOBBYNO 1/16 = 1-0RTHEAST CORRIDORTHE COURTHOUSE WAS ONCE THE THE RETURN OF THIS ONCE NOBLECENTER OF MANYAMERICAN TOWNS. ARCHITECTURAL FORM TO AIT WAS A SOURCE OF CIVIC PRIDECOMMUNITY ANCHOR IS A DRIVINGAND SYMBOL OF THE CLARITY AND FORCE BEHIND THIS THESIS. INABSOLUTENESS OF THE LAW.CHOOSING THIS TYPOLOGY, ANEXPLORATION INTO THE CREATION SALLYPORTMECHANICALROOM 2SOMEWHERE ALONG THE WAY, THEOF A ONE OF A KIND BUILDINGCOURTHOUSE HAS LOST THIS HIGH USING MASS PRODUCED ANDPLACE IN OUR SOCIETY. THEY HAVE PREFABRICATED COMPONENTS CANBECOME SYNONYMOUS WITH THEBRING THIS BUILDING INTO MODERN PROCESSING JUDGES SECURE PARKINGUBIQUITOUS DOLLING OF SUMMARY TIMES WHERE THE MONOLITHIC HOLDING SECURE RECORDS ARCHIVEPUNISHMENTS TARNISHING THIS STEREOTYPE CAN BE SHED AND THEONCE POINT OF PRIDE AND TRUTH OF THE BUILDING CAN BECELLS PRISONERELEVATORAUTHORITY.BROUGHT FORTH. LOWER LEVEL FLOOR PLAN3 LEVELSHERIFFS DUMBWAITER OFFICES MECHANICAL ROOM 1 1/16 = 1-0NO RT H LOOKING EAST 125 124. FINAL PRESENTATION BOARDS STEP 5: SLIDE ON FIRST PRECAST STEP 6: SLIDE ON UPPER PRECAST STEP 7: LAY UPPER BRICK BINDING STEP 8: INSTALL PRECAST CONCRETE CONCRETE CAP BAND ON TOP OFCONCRETE CAP BAND WITH PRECAST BAND. WALL CAP. INSTALL HOLLOW CORES FOR LOWER BRICK BAND.COLLAR SUPPORTS. FLOOR ABOVE OR GLULAM TRUSSES FOR ROOF.MANY BUILDING MATERIALS ARE TAKEN FOR GRANTED TODAY. THIS CAN LEAD TO MISUSE AND TO THE IMPROPER IMPLEMENTATION OF THOSE MATERIALS IN A WAY THAT COUNTERACTS THEIR NATURAL INTENT.IN USING MATERIALS IN THIS COUNTERACTIVE NATURE THIS BRINGS ABOUT QUESTIONS TO THE MATERIALS INTEGRITY AND HONESTY, AND OF THOSE WHO WOULD ALLOW THIS.IT CAN BE SAID THAT MUCH OF THIS HAP-HAZZARD USE IS BECAUSE OF OUR CURRENT HIGH- PACED LIFESTYLE, BUT THERE IS A DEEP CAUSE TO THE MATERIALS MISUSEANDSUBSEQUENTLY THE PRODUCTION OF SUB-PAR ARCHITECTURE THAT IS PLAGUING THE UNITED STATES.THIS PROJECT IS AN EXPLORATION PUBLIC ENTRY OF HOW MATERIALS CAN BE USED IN AN HONEST WAY WHILE IMBUING THE PROPERTIES OF MASS PRODUCTION AND PREFABRICATION TO PRODUCE MEANINGFUL ARCHITECTURE. PUBLIC CAFETERIA READAPTATION, REINVENTION, & RECONSTITUTION SECTIONAL PERSPECTIVE 126 125. MODEL PHOTOGRAPHY 127 126. P128 ROJECT INSTALLATION 127. REFERENCE LIST 129 128. REFERENCE LIST 130 129. P ERSONAL IDENTIFICATION 82


Recommended