MASTER DELIVERY DOCUMENT REGISTER (MDDR) Item Description of Document Document No. Originator Document Status Submission to MMHE A Submission to MMHE B Submission to MMHE C Submission to MMHE 0 Submission to MMHE 1 Submission to MMHE 2 Submission to MMHE 3 Remarks Date Submit Date Return Date Submit Date Return Date Submit Date Return Date Submit Date Return Date Submit Date Return Date Submit Date Return Date Submit Date Return A GENERAL 1 Master Delivery Document Register HUC-1223-A-001 0 Syidien A Approved 0012 & 0030 16.08.12 17.09.12 0085 18.09.12 0092 19.09.12 B PROJECT MANAGEMENT 1 PMT & HUC Organisation Chart HUC-1223-B-001 0 Rizal E 0009 & 0030 16.08.12 27.09.12 0119 2 Project Execution Plan HUC-1223-B-002 0 Ruben E 0016 & 0030 19.09.12 0093 06.10.12 0082 3 Planning Package HUC-1223-B-003 0 Saiful A Approved 12.10.12 0101 4 Change Order Procedure HUC-1223-B-004 A Sook Yen E 0014 & 0030 16.08.12 Onshore Logistic Procedure HUC-1223-B-005 A Colin E deleted Procurement Procedure HUC-1223-B-006 A Colin E 0024 & 0030 08.08.12 deleted C HEALTH, SAFETY & ENVIRONMENT HSE Manual HUC-1223-C-001 A Suresh/Ezuan E 09/07/12 0008 08.08.12 deleted 1 HSE Plan 0 Suresh/Ezuan A Approved 0002 & 0006 23.07.12 0002 06.08.12 0025 14.10.12 0102 PCSB / MMHE 2 General Safety Rules Procedure HUC-1223-C-003 B Suresh/Ezuan E 04/07/12 0007 0011 & 0030 16.08.12 PCSB / MMHE 3 HUC-1223-C-004 A Suresh/Ezuan E 0007 & 0030 16.08.12 PCSB / MMHE 4 Permit to Work Procedure HUC-1223-C-005 A Suresh/Ezuan E 0007 & 0030 16.08.12 PCSB / MMHE 5 Protection of Environment Procedure HUC-1223-C-006 A Suresh/Ezuan E 0007 & 0030 16.08.12 PCSB / MMHE 6 Electrical Safety HUC-1223-C-007 A Suresh/Ezuan E 0007 & 0030 16.08.12 PCSB / MMHE 7 Hand & Power Tools Procedure HUC-1223-C-008 A Suresh/Ezuan E 0007 & 0030 16.08.12 PCSB / MMHE 8 Mechanical handling Safety Procedure HUC-1223-C-009 A Suresh/Ezuan E 0007 & 0030 16.08.12 PCSB / MMHE 9 Scaffolding Safety Procedure HUC-1223-C-010 A Suresh/Ezuan E 0007 & 0030 16.08.12 PCSB / MMHE 10 Material Handling & Storage Procedure HUC-1223-C-011 A Suresh/Ezuan E 0007 & 0030 16.08.12 PCSB / MMHE 11 Construction Plan & Machineries Procedure HUC-1223-C-012 A Suresh/Ezuan E 0007 & 0030 16.08.12 PCSB / MMHE 12 Manual Handling Procedure HUC-1223-C-013 A Suresh/Ezuan E 0007 & 0030 16.08.12 PCSB / MMHE 13 Welding & Gas Cutting Procedure HUC-1223-C-014 A Suresh/Ezuan E 0007 & 0030 16.08.12 PCSB / MMHE 14 Lifting & Rigging Procedure HUC-1223-C-015 A Suresh/Ezuan E 0007 & 0030 16.08.12 PCSB / MMHE 15 Confined Space Procedure HUC-1223-C-016 A Suresh/Ezuan E 0007 & 0030 16.08.12 PCSB / MMHE 16 Emergency Response Plan HUC-1223-C-017 A Suresh/Ezuan E 0007 & 0030 16.08.12 PCSB / MMHE D QUALITY ASSURANCE & QUALITY CONTROL KHL 1 Project Quality Plan HUC-1223-D-001 0 Syidien B 25-06-12 0003 02-07-12 0001 0012 & 0030 16.08.12 22.09.12 0100 PCSB 2 Inspection & Test Plan HUC-1223-D-002 0 Syidien A Approved 25-06-12 0003 02-07-12 0001 0012 & 0030 16.08.12 17.09.12 0085 19.09.12 3 Welder Qualification Test Procedure HUC-1223-D-003 0 Syidien A Approved 25-06-12 0003 02-07-12 0001 0012 & 0030 16.08.12 12.09.12 0065 24.09.12 4 Document Control Procedure HUC-1223-D-004 0 Syidien A Approved 25-06-12 0003 02-07-12 0001 0012 & 0030 16.08.12 17.09.12 0085 18.09.12 0092 19.09.12 5 Material Control Procedure HUC-1223-D-005 0 Syidien A Approved 25-06-12 0003 02-07-12 0001 0012 & 0030 16.08.12 18.09.12 0087 19.09.12 6 Non-Conformance Control Procedure HUC-1223-D-006 0 Syidien A Approved 25-06-12 0003 02-07-12 0001 0012 & 0030 16.08.12 17.09.12 0085 18.09.12 0092 24.09.12 7 Welding Consumable Control Procedure HUC-1223-D-007 0 Syidien A Approved 25-06-12 0003 02-07-12 0001 0012 & 0030 16.08.12 18.09.12 0087 19.09.12 8 Bolt Tightening, Torguing Procedure HUC-1223-D-008 0 Syidien A Approved 25-06-12 0003 02-07-12 0001 0012 & 0030 16.08.12 12.09.12 0065 19.09.12 9 Final Document Procedure HUC-1223-D-009 0 Syidien A Approved 25-06-12 0003 02-07-12 0001 0012 & 0030 16.08.12 18.09.12 0087 19.09.12 10 Radiographic Examination Procedure HUC-1223-D-010 0 Syidien A Approved 0012 & 0030 16.08.12 23.09.12 0102 25.09.12 0058 11 Ultrasonic Testing Procedure HUC-1223-D-011 0 Syidien A Approved 0012 & 0030 16.08.12 12.09.12 0065 19.09.12 12 Magnetic Particle Procedure HUC-1223-D-012 0 Syidien A Approved 0012 & 0030 16.08.12 12.09.12 0065 24.09.12 13 Liquid Penetrant Testing Procedure HUC-1223-D-013 0 Syidien A Approved 0012 & 0030 16.08.12 12.09.12 0065 24.09.12 14 Instrument Calibration Procedure HUC-1223-D-014 1 Syidien B 25-06-12 0003 02-07-12 0001 0012 & 0030 16.08.12 15.09.12 0079 06.10.12 0082 11.10.12 0149 KHL 15 Weld Repair Procedure HUC-1223-D-015 0 Syidien A Approved 25-06-12 0003 02-07-12 0001 0012 & 0030 16.08.12 12.09.12 0065 24.09.12 16 Post Weld Heat Treatment HUC-1223-D-016 0 Syidien A Approved 25-06-12 0003 02-07-12 0001 0012 & 0030 16.08.12 12.09.12 0065 24.09.12 MMHE 17 Fairing Procedure PSP-KNPG-B-T06 0 Syidien Approved 25-06-12 0003 MMHE PROCEDURE 18 PSP-KNPG-B-T14 0 Syidien Approved 25-06-12 0003 MMHE PROCEDURE 19 Distortion Control Procedure PSP-KNPG-B-T15 0 Syidien Approved 25-06-12 0003 MMHE PROCEDURE 20 PSP-KNPG-B-T24 0 Syidien Approved 25-06-12 0003 MMHE PROCEDURE 21 PSP-KNPG-B-T25 0 Syidien Approved 25-06-12 0003 MMHE PROCEDURE 22 Preservation Procedure PSP-KNPG-B-T26 0 Syidien Approved 25-06-12 0003 MMHE PROCEDURE 23 Blasting, Painting and Surface Preparation PSP-KNPG-B-T35 0 Syidien Approved 25-06-12 0003 MMHE PROCEDURE 24 Repair Paint Procedure PSP-KNPG-B-T33 0 Syidien Approved 25-06-12 0003 MMHE PROCEDURE 25 Ferrite Count Procedure PSP-KNPG-B-T38 0 Syidien Approved 25-06-12 0003 MMHE PROCEDURE 26 NDT Matrix PSP-KNPG-B-T36 0 Syidien Approved 25-06-12 0003 MMHE PROCEDURE 27 Paint Matrix PSP-KNPG-B-T37 0 Syidien Approved 25-06-12 0003 MMHE PROCEDURE 28 Hardness Testing Procedure PSP-KNPG-B-T39 0 Syidien Approved 25-06-12 0003 MMHE PROCEDURE 29 Hydrotest and Pneumatic Testing Procedure PSP-KNPG-B-T40 0 Syidien Approved 25-06-12 0003 MMHE PROCEDURE 30 PSP-KNPG-B-T34-01 0 Syidien Approved 25-06-12 0003 MMHE PROCEDURE 31 Welding Procedure Specification (Piping) PSP-KNPG-B-T34-02 0 Syidien Approved 25-06-12 0003 MMHE PROCEDURE 32 Phase Array Ultrasonic Testing (NDE) PSP-KNPG-B-T44 0 Syidien Approved MMHE PROCEDURE 33 Re-Instatement Leak Test Procedure PSP-KNPG-B-T18-RLT 0 Syidien Approved 25-06-12 0003 MMHE PROCEDURE E OFFSHORE 1 Hook Up & Commissioning Workpack HUC-1223-E-XXX i) TLQ Panel Frames Support Lifting & Install HUC-1223-E-S-001 1 Shannon A Approved 03.08.12 0021 03.08.12 0022 & 0116 ii) Telecom Tower Installation Procedure HUC-1223-E-S-002 1 Shannon A Approved 05-08-12 T-0022 28.08.12 0037 & 0131 12.10.12 0100 26.09.12 0116 04.10.12 0077 2 Mechanical Equipment Installation Procedur HUC-1223-E-XXX i) Service Water Pump Installation Procedure HUC-1223-E-M-001 0 Nantha B 0042 & 0054 03.09.12 0003 ii) Sea Water Lift Pump Installation Procedure HUC-1223-E-M-002 A Nantha B 16-Sep-12 0081 iii) Firewater Pump Installation Procedure HUC-1223-E-M-003 0 Asyraf A Approved 20-Sep-12 0096 3 Telecom Equipment Installation Procedure HUC-1223-E-XXX i) DMR Antenna Installation Procedure HUC-1223-E-T-001 1 Wee E 08.10.12 0114 08.10.12 0084 08.10.12 0144 4 First Free Flow Gas Requirement HUC-1223-E-002 A Paul E 5 System Handover Procedure HUC-1223-E-003 0 Shamsul B 0011 & 0030 16.08.12 06.09.12 0049 6 LQ Habitation Procedure (Minimum Requireme HUC-1223-E-004 0 Shamsul B 0011 & 0030 16.08.12 12.09.12 0034 7 Sub-sub System Commissioning Procedure HUC-1223-E-005-XXX 1 Liquid Separation System HUC-1223-E-005-112 1 Zaki B 08-06-12 0018 & 0030 16.08.12 10.09.12 0054 20.09.12 007 27.09.12 0119 14.10.12 0103 DATE: 30 Sept 2012 REVISION: REV 0 Current Rev. Document Approved By PCSB Date MMHE Approved Transmittal No. Transmittal No. Transmittal No. Transmittal No. Transmittal No. Transmittal No. Transmittal No. Transmittal No. Transmittal No. Transmittal No. Transmittal No. Transmittal No. Transmittal No. Transmittal No. 23.07.12 & 12.08.12 send w/o transmittal send w/o transmittal 11/7/2012 & 12.08.12 send w/o transmittal 26.07.12 & 12.08.12 08.08.12 & 16.08.12 send w/o transmittal 27.07.12 / 15.09.12 0019 / '0079 24-07-12 & 12.08.12 send w/o transmittal 06-08-12 & 12.08.12 send w/o transmittal send w/o transmittal HUC-1223-C-002/PSP-KNPG-B- HUC-T10 19-06-12 & 2-7-2012 03.07.12 & 12.08.12 send w/o transmittal PPE - Personal Protective Equipment Procedure 7/4/2012 & 12.08.12 send w/o transmittal 7/4/2012 & 12.08.12 send w/o transmittal 7/4/2012 & 12.08.12 send w/o transmittal 7/4/2012 & 12.08.12 send w/o transmittal 7/4/2012 & 12.08.12 send w/o transmittal 7/4/2012 & 12.08.12 send w/o transmittal 7/4/2012 & 12.08.12 send w/o transmittal 7/4/2012 & 12.08.12 send w/o transmittal 7/4/2012 & 12.08.12 send w/o transmittal 7/4/2012 & 12.08.12 send w/o transmittal 7/4/2012 & 12.08.12 send w/o transmittal 7/4/2012 & 12.08.12 send w/o transmittal 7/4/2012 & 12.08.12 send w/o transmittal 7/4/2012 & 12.08.12 send w/o transmittal 23.07.12 & 12.08.12 send w/o transmittal 23.07.12 & 12.08.12 send w/o transmittal send w/o transmittal 23.07.12 & 12.08.12 send w/o transmittal send w/o transmittal 23.07.12 & 12.08.12 send w/o transmittal send w/o transmittal 23.07.12 & 12.08.12 send w/o transmittal send w/o transmittal 23.07.12 & 12.08.12 send w/o transmittal send w/o transmittal 23.07.12 & 12.08.12 send w/o transmittal send w/o transmittal 23.07.12 & 12.08.12 send w/o transmittal send w/o transmittal 23.07.12 & 12.08.12 send w/o transmittal send w/o transmittal 23.07.12 & 12.08.12 send w/o transmittal 23.07.12 & 12.08.12 send w/o transmittal send w/o transmittal 23.07.12 & 12.08.12 send w/o transmittal send w/o transmittal 23.07.12 & 12.08.12 send w/o transmittal send w/o transmittal 23.07.12 & 12.08.12 send w/o transmittal 23.07.12 & 12.08.12 send w/o transmittal send w/o transmittal 23.07.12 & 12.08.12 send w/o transmittal send w/o transmittal Lavelling and Dimensional Control Procedure Positive Material Identification Procedure Corrosion Resistance Alloys Handling Procedure Welding Procedure Specification (Structure) send w/o transmittal 05.08.12 & 26.09.12 08.08.12 & 09.10.12 send w/o transmittal & 0090 send w/o transmittal 28.08.12 / 03.10.12 01.09.12 & 10.09.12 13-07-12 & 12.08.12 send w/o transmittal 13-07-12 & 12.08.12 send w/o transmittal send w/o transmittal 27.07.12 & 12.08.12 send w/o transmittal
Transcript
Page 1: MDDR Kinabalu 16-10-12

MASTER DELIVERY DOCUMENT REGISTER (MDDR)

Item Description of Document Document No. Originator Document Status

Submission to MMHE A Submission to MMHE B Submission to MMHE C Submission to MMHE 0 Submission to MMHE 1 Submission to MMHE 2 Submission to MMHE 3

RemarksDate Submit Date Return Date Submit Date Return Date Submit Date Return Date Submit Date Return Date Submit Date Return Date Submit Date Return Date Submit Date Return

A GENERAL

1 Master Delivery Document Register HUC-1223-A-001 0 Syidien A Approved 0012 & 0030 16.08.12 17.09.12 0085 18.09.12 0092 19.09.12

B PROJECT MANAGEMENT

1 PMT & HUC Organisation Chart HUC-1223-B-001 0 Rizal E 0009 & 0030 16.08.12 27.09.12 0119

2 Project Execution Plan HUC-1223-B-002 0 Ruben E 0016 & 0030 19.09.12 0093 06.10.12 0082

3 Planning Package HUC-1223-B-003 0 Saiful A Approved 0019 / '0079 12.10.12 0101

4 Change Order Procedure HUC-1223-B-004 A Sook Yen E 0014 & 0030 16.08.12 Onshore

Logistic Procedure HUC-1223-B-005 A Colin E deleted

Procurement Procedure HUC-1223-B-006 A Colin E 0024 & 0030 08.08.12 deleted

C HEALTH, SAFETY & ENVIRONMENT

HSE Manual HUC-1223-C-001 A Suresh/Ezuan E 09/07/12 0008 08.08.12 deleted

1 HSE Plan 0 Suresh/Ezuan A Approved 0002 & 0006 23.07.12 0002 06.08.12 0025 14.10.12 0102 PCSB / MMHE

2 General Safety Rules Procedure HUC-1223-C-003 B Suresh/Ezuan E 04/07/12 0007 0011 & 0030 16.08.12 PCSB / MMHE

3 PPE - Personal Protective Equipment Procedure HUC-1223-C-004 A Suresh/Ezuan E 0007 & 0030 16.08.12 PCSB / MMHE

4 Permit to Work Procedure HUC-1223-C-005 A Suresh/Ezuan E 0007 & 0030 16.08.12 PCSB / MMHE

5 Protection of Environment Procedure HUC-1223-C-006 A Suresh/Ezuan E 0007 & 0030 16.08.12 PCSB / MMHE

6 Electrical Safety HUC-1223-C-007 A Suresh/Ezuan E 0007 & 0030 16.08.12 PCSB / MMHE

7 Hand & Power Tools Procedure HUC-1223-C-008 A Suresh/Ezuan E 0007 & 0030 16.08.12 PCSB / MMHE

8 Mechanical handling Safety Procedure HUC-1223-C-009 A Suresh/Ezuan E 0007 & 0030 16.08.12 PCSB / MMHE

9 Scaffolding Safety Procedure HUC-1223-C-010 A Suresh/Ezuan E 0007 & 0030 16.08.12 PCSB / MMHE

10 Material Handling & Storage Procedure HUC-1223-C-011 A Suresh/Ezuan E 0007 & 0030 16.08.12 PCSB / MMHE

11 Construction Plan & Machineries Procedure HUC-1223-C-012 A Suresh/Ezuan E 0007 & 0030 16.08.12 PCSB / MMHE

12 Manual Handling Procedure HUC-1223-C-013 A Suresh/Ezuan E 0007 & 0030 16.08.12 PCSB / MMHE

13 Welding & Gas Cutting Procedure HUC-1223-C-014 A Suresh/Ezuan E 0007 & 0030 16.08.12 PCSB / MMHE

14 Lifting & Rigging Procedure HUC-1223-C-015 A Suresh/Ezuan E 0007 & 0030 16.08.12 PCSB / MMHE

15 Confined Space Procedure HUC-1223-C-016 A Suresh/Ezuan E 0007 & 0030 16.08.12 PCSB / MMHE

16 Emergency Response Plan HUC-1223-C-017 A Suresh/Ezuan E 0007 & 0030 16.08.12 PCSB / MMHE

D QUALITY ASSURANCE & QUALITY CONTROL

KHL

1 Project Quality Plan HUC-1223-D-001 0 Syidien B 25-06-12 0003 02-07-12 0001 0012 & 0030 16.08.12 22.09.12 0100 PCSB

2 Inspection & Test Plan HUC-1223-D-002 0 Syidien A Approved 25-06-12 0003 02-07-12 0001 0012 & 0030 16.08.12 17.09.12 0085 19.09.12

3 Welder Qualification Test Procedure HUC-1223-D-003 0 Syidien A Approved 25-06-12 0003 02-07-12 0001 0012 & 0030 16.08.12 12.09.12 0065 24.09.12

4 Document Control Procedure HUC-1223-D-004 0 Syidien A Approved 25-06-12 0003 02-07-12 0001 0012 & 0030 16.08.12 17.09.12 0085 18.09.12 0092 19.09.12

5 Material Control Procedure HUC-1223-D-005 0 Syidien A Approved 25-06-12 0003 02-07-12 0001 0012 & 0030 16.08.12 18.09.12 0087 19.09.12

6 Non-Conformance Control Procedure HUC-1223-D-006 0 Syidien A Approved 25-06-12 0003 02-07-12 0001 0012 & 0030 16.08.12 17.09.12 0085 18.09.12 0092 24.09.12

7 Welding Consumable Control Procedure HUC-1223-D-007 0 Syidien A Approved 25-06-12 0003 02-07-12 0001 0012 & 0030 16.08.12 18.09.12 0087 19.09.12

8 Bolt Tightening, Torguing Procedure HUC-1223-D-008 0 Syidien A Approved 25-06-12 0003 02-07-12 0001 0012 & 0030 16.08.12 12.09.12 0065 19.09.12

9 Final Document Procedure HUC-1223-D-009 0 Syidien A Approved 25-06-12 0003 02-07-12 0001 0012 & 0030 16.08.12 18.09.12 0087 19.09.12

10 Radiographic Examination Procedure HUC-1223-D-010 0 Syidien A Approved 0012 & 0030 16.08.12 23.09.12 0102 25.09.12 0058

11 Ultrasonic Testing Procedure HUC-1223-D-011 0 Syidien A Approved 0012 & 0030 16.08.12 12.09.12 0065 19.09.12

12 Magnetic Particle Procedure HUC-1223-D-012 0 Syidien A Approved 0012 & 0030 16.08.12 12.09.12 0065 24.09.12

13 Liquid Penetrant Testing Procedure HUC-1223-D-013 0 Syidien A Approved 0012 & 0030 16.08.12 12.09.12 0065 24.09.12

14 Instrument Calibration Procedure HUC-1223-D-014 1 Syidien B 25-06-12 0003 02-07-12 0001 0012 & 0030 16.08.12 15.09.12 0079 06.10.12 0082 11.10.12 0149 KHL

15 Weld Repair Procedure HUC-1223-D-015 0 Syidien A Approved 25-06-12 0003 02-07-12 0001 0012 & 0030 16.08.12 12.09.12 0065 24.09.12

16 Post Weld Heat Treatment HUC-1223-D-016 0 Syidien A Approved 25-06-12 0003 02-07-12 0001 0012 & 0030 16.08.12 12.09.12 0065 24.09.12

MMHE

17 Fairing Procedure PSP-KNPG-B-T06 0 Syidien Approved 25-06-12 0003 MMHE PROCEDURE

18 Lavelling and Dimensional Control Procedure PSP-KNPG-B-T14 0 Syidien Approved 25-06-12 0003 MMHE PROCEDURE

19 Distortion Control Procedure PSP-KNPG-B-T15 0 Syidien Approved 25-06-12 0003 MMHE PROCEDURE

20 Positive Material Identification Procedure PSP-KNPG-B-T24 0 Syidien Approved 25-06-12 0003 MMHE PROCEDURE

21 Corrosion Resistance Alloys Handling Procedure PSP-KNPG-B-T25 0 Syidien Approved 25-06-12 0003 MMHE PROCEDURE

22 Preservation Procedure PSP-KNPG-B-T26 0 Syidien Approved 25-06-12 0003 MMHE PROCEDURE

23 Blasting, Painting and Surface Preparation Procedure PSP-KNPG-B-T35 0 Syidien Approved 25-06-12 0003 MMHE PROCEDURE

24 Repair Paint Procedure PSP-KNPG-B-T33 0 Syidien Approved 25-06-12 0003 MMHE PROCEDURE

25 Ferrite Count Procedure PSP-KNPG-B-T38 0 Syidien Approved 25-06-12 0003 MMHE PROCEDURE

26 NDT Matrix PSP-KNPG-B-T36 0 Syidien Approved 25-06-12 0003 MMHE PROCEDURE

27 Paint Matrix PSP-KNPG-B-T37 0 Syidien Approved 25-06-12 0003 MMHE PROCEDURE

28 Hardness Testing Procedure PSP-KNPG-B-T39 0 Syidien Approved 25-06-12 0003 MMHE PROCEDURE

29 Hydrotest and Pneumatic Testing Procedure PSP-KNPG-B-T40 0 Syidien Approved 25-06-12 0003 MMHE PROCEDURE

30 Welding Procedure Specification (Structure) PSP-KNPG-B-T34-01 0 Syidien Approved 25-06-12 0003 MMHE PROCEDURE

31 Welding Procedure Specification (Piping) PSP-KNPG-B-T34-02 0 Syidien Approved 25-06-12 0003 MMHE PROCEDURE

32 Phase Array Ultrasonic Testing (NDE) PSP-KNPG-B-T44 0 Syidien Approved MMHE PROCEDURE

33 Re-Instatement Leak Test Procedure PSP-KNPG-B-T18-RLT 0 Syidien Approved 25-06-12 0003 MMHE PROCEDURE

E OFFSHORE

1 Hook Up & Commissioning Workpack HUC-1223-E-XXX

i) TLQ Panel Frames Support Lifting & Installation Proc HUC-1223-E-S-001 1 Shannon A Approved 03.08.12 0021 03.08.12 0022 & 0116

ii) Telecom Tower Installation Procedure HUC-1223-E-S-002 1 Shannon A Approved 05-08-12 T-0022 28.08.12 0037 & 0131 12.10.12 0100 26.09.12 0116 04.10.12 0077

2 Mechanical Equipment Installation Procedure HUC-1223-E-XXX

i) Service Water Pump Installation Procedure HUC-1223-E-M-001 0 Nantha B 0042 & 0054 03.09.12 0003

ii) Sea Water Lift Pump Installation Procedure HUC-1223-E-M-002 A Nantha B 16-Sep-12 0081

iii) Firewater Pump Installation Procedure HUC-1223-E-M-003 0 Asyraf A Approved 20-Sep-12 0096

3 Telecom Equipment Installation Procedure HUC-1223-E-XXX

i) DMR Antenna Installation Procedure HUC-1223-E-T-001 1 Wee E 08.10.12 0114 08.10.12 0084 08.10.12 0144

4 First Free Flow Gas Requirement HUC-1223-E-002 A Paul E

5 System Handover Procedure HUC-1223-E-003 0 Shamsul B 0011 & 0030 16.08.12 06.09.12 0049

6 LQ Habitation Procedure (Minimum Requirement) HUC-1223-E-004 0 Shamsul B 0011 & 0030 16.08.12 12.09.12 0034

7 Sub-sub System Commissioning Procedure HUC-1223-E-005-XXX

1 Liquid Separation System HUC-1223-E-005-112 1 Zaki B 08-06-12 0018 & 0030 16.08.12 10.09.12 0054 20.09.12 007 27.09.12 0119 14.10.12 0103

DATE: 30 Sept 2012REVISION: REV 0

Current Rev.

Document Approved By

PCSB

Date MMHE ApprovedTransmittal

No.Transmittal

No.Transmittal

No.Transmittal

No.Transmittal

No.Transmittal

No.Transmittal

No.Transmittal

No.Transmittal

No.Transmittal

No.Transmittal

No.Transmittal

No.Transmittal

No.Transmittal

No.

23.07.12 & 12.08.12

send w/o transmittal

send w/o transmittal

11/7/2012 & 12.08.12

send w/o transmittal

26.07.12 & 12.08.12

08.08.12 & 16.08.12

send w/o transmittal

27.07.12 / 15.09.12

24-07-12 & 12.08.12

send w/o transmittal

06-08-12 & 12.08.12

send w/o transmittal

send w/o transmittal

HUC-1223-C-002/PSP-KNPG-B-HUC-T10

19-06-12 & 2-7-2012

03.07.12 & 12.08.12

send w/o transmittal

7/4/2012 & 12.08.12

send w/o transmittal

7/4/2012 & 12.08.12

send w/o transmittal

7/4/2012 & 12.08.12

send w/o transmittal

7/4/2012 & 12.08.12

send w/o transmittal

7/4/2012 & 12.08.12

send w/o transmittal

7/4/2012 & 12.08.12

send w/o transmittal

7/4/2012 & 12.08.12

send w/o transmittal

7/4/2012 & 12.08.12

send w/o transmittal

7/4/2012 & 12.08.12

send w/o transmittal

7/4/2012 & 12.08.12

send w/o transmittal

7/4/2012 & 12.08.12

send w/o transmittal

7/4/2012 & 12.08.12

send w/o transmittal

7/4/2012 & 12.08.12

send w/o transmittal

7/4/2012 & 12.08.12

send w/o transmittal

23.07.12 & 12.08.12

send w/o transmittal

23.07.12 & 12.08.12

send w/o transmittal

send w/o transmittal

23.07.12 & 12.08.12

send w/o transmittal

send w/o transmittal

23.07.12 & 12.08.12

send w/o transmittal

send w/o transmittal

23.07.12 & 12.08.12

send w/o transmittal

send w/o transmittal

23.07.12 & 12.08.12

send w/o transmittal

send w/o transmittal

23.07.12 & 12.08.12

send w/o transmittal

send w/o transmittal

23.07.12 & 12.08.12

send w/o transmittal

send w/o transmittal

23.07.12 & 12.08.12

send w/o transmittal

send w/o transmittal

23.07.12 & 12.08.12

send w/o transmittal

23.07.12 & 12.08.12

send w/o transmittal

send w/o transmittal

23.07.12 & 12.08.12

send w/o transmittal

send w/o transmittal

23.07.12 & 12.08.12

send w/o transmittal

send w/o transmittal

23.07.12 & 12.08.12

send w/o transmittal

23.07.12 & 12.08.12

send w/o transmittal

send w/o transmittal

23.07.12 & 12.08.12

send w/o transmittal

send w/o transmittal

send w/o transmittal

05.08.12 & 26.09.12

08.08.12 & 09.10.12

send w/o transmittal &

0090send w/o

transmittal28.08.12 / 03.10.12

01.09.12 & 10.09.12

13-07-12 & 12.08.12

send w/o transmittal

13-07-12 & 12.08.12

send w/o transmittal

send w/o transmittal

27.07.12 & 12.08.12

send w/o transmittal

Page 2: MDDR Kinabalu 16-10-12

2 Liquid Transfer and Metering System HUC-1223-E-005-113 0 Zaki B 08-06-12 8-Jun-12 0009 & 0030 16.08.12 11.09.12 0058

3 Gas Collection and Receiving System HUC-1223-E-005-121 0 Zaki B 08-06-12 0018 & 0030 16.08.12 13.09.12 0070

4 Gas Transfer and Metering System HUC-1223-E-005-123 0 Zaki B 08-06-12 8-Jun-12 0009 & 0030 16.08.12 14.09.12 0075

5 Glycol Contactors System HUC-1223-E-005-141 2 Zaki B 08-06-12 0018 & 0030 16.08.12 10.09.12 0056 20.09.12 007 27.09.12 0119 09.10.12 0090 11.10.12 0147

6 Glycol Regeneration System HUC-1223-E-005-142 0 Zaki B 08-06-12 0018 & 0030 16.08.12 11.09.12 0058

7 Produced Water Treatment Package System HUC-1223-E-005-151 0 Zaki B 08-06-12 0018 & 0030 16.08.12 10.09.12 0056

8 Fuel & Blanket Gas System HUC-1223-E-005-211 0 Zaki B 08-06-12 0018 & 0030 16.08.12 12.09.12 0064

9 Flare System HUC-1223-E-005-233 0 Zaki B 08-06-12 8-Jun-12 0009 & 0030 16.08.12 12.09.12 0064 14.10.12 0104

Open Drain System HUC-1223-E-005-241A 08-06-12 8-Jun-12 deleted

Open Drain System HUC-1223-E-005-241B 08-06-12 8-Jun-12 deleted

10 Open Drain System HUC-1223-E-005-241 3 Zaki B 0009 & 0030 16.08.12 12.09.12 0064 20.09.12 007 23.09.12 0102 01.10.12 0061 11.10.12 0094 13.10.12 0151

11 Closed Drain System HUC-1223-E-005-242 0 Zaki B 08-06-12 8-Jun-12 0009 & 0030 16.08.12 15.09.12 0079 14.10.12 0104

12 Chemical Injection System HUC-1223-E-005-263 0 Zaki B 08-06-12 0018 & 0030 16.08.12 12.09.12 0066

13 Nitrogen System HUC-1223-E-005-271 0 Zaki B 08-06-12 8-Jun-12 0009 & 0030 16.08.12 10.09.12 0056

14 Sea Water System HUC-1223-E-005-281 0 Zaki B 08-06-12 0018 & 0030 16.08.12 14.09.12 0072

15 Fresh Water System HUC-1223-E-005-282 1 Zaki A Approved 08-06-12 8-Jun-12 0009 & 0030 16.08.12 15.09.12 0077 20.09.12 007 24.09.12 0108 01.10.12 0061

16 Diesel Fuel System HUC-1223-E-005-311 0 Zaki B 08-06-12 0009 & 0030 16.08.12 11.09.12 0058

17 Instrument Air System HUC-1223-E-005-321 0 Zaki B 08-06-12 0018 & 0030 16.08.12 12.09.12 0066

18 Utility Air System HUC-1223-E-005-322 0 Zaki B 08-06-12 0018 & 0030 16.08.12 15.09.12 0079

19 Service Water System HUC-1223-E-005-331 0 Zaki B 08-06-12 0018 & 0030 16.08.12 10.09.12 0056 14.10.12 0104

20 Portable Water System HUC-1223-E-005-332 1 Zaki B 08-06-12 0018 & 0030 16.08.12 10.09.12 0054 20.09.12 007 23.09.12 0102 01.10.12 0061

Portable Wash Water System HUC-1223-E-005-332B B 08-06-12 0018 & 0030 16.08.12 deleted

21 HVAC System HUC-1223-E-005-342 1 Zaki A Approved 08-06-12 0018 & 0030 16.08.12 10.09.12 0054 20.09.12 007 25.09.12 0111 01.10.12 0061

22 Fire Water System HUC-1223-E-005-411 1 Zaki A Approved 08-06-12 0018 & 0030 16.08.12 10.09.12 0056 20.09.12 007 27.09.12 0119 09.10.12 0090

23 Fire Suppression & Extinguisher System HUC-1223-E-005-412 0 Zaki B 08-06-12 0018 & 0030 16.08.12 15.09.12 0079

24 Deluge & Sprinkler System HUC-1223-E-005-413 2 Zaki B 08-06-12 0018 & 0030 16.08.12 10.09.12 0054 20.09.12 007 25.09.12 0111 09.10.12 0090 11.10.12 0147

25 Survival Crafts System HUC-1223-E-005-422 0 Zaki B 08-06-12 8-Jun-12 0018 & 0030 16.08.12 10.09.12 0054 14.10.12 0103

26 Evacuation Equipment System HUC-1223-E-005-423 1 Zaki B 08-06-12 0018 & 0030 16.08.12 10.09.12 0054 25.09.12 0058 27.09.12 0119

27 Gas Turbine Generator System HUC-1223-E-005-511 0 Faizul B 08-06-12 0013 & 0018 16.08.12 0056 & 0144

28 Emergency Diesel Generator HUC-1223-E-005-512 1 Faizul B 08-06-12 0013 & 0018 16.08.12 10.09.12 0056 25.09.12 0058 11.10.12 0147

29 MV Switchgear System HUC-1223-E-005-521 1 Faizul B 08-06-12 0013 & 0018 16.08.12 13.08.12 0032 06.10.12 0083 11.10.12 0147

30 Low Voltage MCC & Switchboard System HUC-1223-E-005-522 0 Faizul A Approved 30-05-12 0009 & 0030 16.08.12 11.09.12 0060 11.10.12 0094

31 Transformers System HUC-1223-E-005-523 1 Faizul B 30-05-12 0013 & 0018 16.08.12 12.09.12 0064 06.10.12 0083 11.10.12 0147

32 IMCS & PMS System HUC-1223-E-005-524 1 Faizul B 30-05-12 0009 & 0030 16.08.12 15.09.12 0077 08.10.12 0085 11.10.12 0147

LB Busduct System HUC-1223-E-005-525 deleted

33 UPS-Uniteruptible Power Supply (UPS) System HUC-1223-E-005-532 0 Faizul B 30-05-12 0009 & 0030 16.08.12 10.09.12 0054 11.10.12 0094

34 HUC-1223-E-005-541 0 Faizul A Approved 30-05-12 0009 & 0030 16.08.12 11.09.12 0060 25.09.12 0058

35 Small Power & Lighting (Normal Circuits) System HUC-1223-E-005-542 0 Faizul A Approved 30-05-12 0009 & 0030 16.08.12 10.09.12 0056 25.09.12 0058

36 Earthing & Lighting Protection HUC-1223-E-005-543 0 Faizul A Approved 30-05-12 0009 & 0030 16.08.12 12.09.12 0064 11.10.12 0094

37 Navigation Aids System HUC-1223-E-005-533 0 Faizul B 30-05-12 0009 & 0030 16.08.12 14.09.12 0072 08.10.12 0085

38 Proces Monitoring & Control System HUC-1223-E-005-611 1 Maliki B 08-06-12 8-Jun-12 27-07-12 0018 16.08.12 10.09.12 0054 06.10.12 0083 11.10.12 0149

39 WHPC System HUC-1223-E-005-612 0 Maliki B 08-06-12 8-Jun-12 0018 & 0030 16.08.12 15.09.12 0079 12.10.12

40 Safety Instrument System HUC-1223-E-005-621 1 Maliki B 08-06-12 8-Jun-12 0018 & 0030 16.08.12 10.09.12 0054 06.10.12 0083 11.10.12 0149

41 Fire & Gas System (FGS) HUC-1223-E-005-631 1 Maliki B 08-06-12 8-Jun-12 0018 & 0030 16.08.12 10.09.12 0054 06.10.12 0083 11.10.12 0149

42 Pneumatic Fire Detection System HUC-1223-E-005-632 1 Maliki B 08-06-12 8-Jun-12 0018 & 0030 16.08.12 10.09.12 0054 06.10.12 0083 11.10.12 0149

43 Digital Microwave Radio System ( DMR) HUC-1223-E-005-711-1 0 Wee B 30-05-12 0009 & 0030 16.08.12 0033 & 0116 25.09.12 0058

44 HUC-1223-E-005-711-2 1 Wee B 30-05-12 0009 & 0030 16.08.12 22.08.2012 0033 08.10.12 0084 11.10.12 0147

45 Non-Directional Beacon System (NDB) HUC-1223-T-006-711-3 0 Wee A Approved 30-05-12 0009 & 0030 16.08.12 22.08.2012 0033 02.10.12 0071

46 PAGA System HUC-1223-E-005-712 1 Wee B 30-05-12 0009 & 0030 16.08.12 22.08.2012 0033 08.10.12 0084 11.10.12 0147

47 IP-PABX & LAN System HUC-1223-E-005-713 1 Wee B 30-05-12 0009 & 0030 16.08.12 22.08.2012 0033 08.10.12 0084 11.10.12 0147

48 Closed Circuit Television System HUC-1223-E-005-721 1 Wee B 30-05-12 0009 & 0030 16.08.12 22.08.2012 0033 08.10.12 0084 08.10.12 0144

49 WMS System HUC-1223-E-005-722 2 Wee B 30-05-12 0009 & 0030 16.08.12 22.08.2012 0033 08.10.12 0084 08.10.12 0144 08.10.12 0084 13.10.12 0151

50 Pedastal Crane System HUC-1223-E-005-811 0 Zaki B 08-06-12 8-Jun-12 0009 & 0030 16.08.12 10.09.12 0054

51 Monorail / Trolley Hoist System HUC-1223-E-005-813 0 Zaki B 08-06-12 8-Jun-12 0009 & 0030 16.08.12 10.09.12 0054 11.10.12 0094

52 Appliances System HUC-1223-E-005-821 1 Zaki A Approved 08-06-12 8-Jun-12 0009 & 0030 16.08.12 15.09.12 0077 23-Sep-12 0106 24-Sep-12

52 Coldroom HUC-1223-E-005-824 1 Zaki A Approved 14.09.2012 0075 23-Sep-12 0106 24-Sep-12

F ONSHORE

1 HUC-1223-F-001 A Tee E 06.10.12 0139

A APPROVEDB APPROVED WITH COMMENTC NOT APPROVED, CORRECT AND RESUBMIT FOR APPROVALD RECEIVED AS INFORMATION ONLYE REVIEWED/ ACTION

send w/o transmittal

send w/o transmittal

11-07-12 & 12.08.12

send w/o transmittal

send w/o transmittal

27.07.12 & 12.08.12

send w/o transmittal

send w/o transmittal

send w/o transmittal

11-07-12 & 12.08.12

send w/o transmittal

send w/o transmittal

27.07.12 & 12.08.12

send w/o transmittal

send w/o transmittal

27.07.12 & 12.08.13

send w/o transmittal

send w/o transmittal

27.07.12 & 12.08.14

send w/o transmittal

send w/o transmittal

27.07.12 & 12.08.15

send w/o transmittal

send w/o transmittal

send w/o transmittal

11-07-12 & 12.08.12

send w/o transmittal

send w/o transmittal

send w/o transmittal

send w/o transmittal

send w/o transmittal

11-07-12 & 12.08.12

send w/o transmittal

send w/o transmittal

send w/o transmittal

11-07-12 & 12.08.12

send w/o transmittal

send w/o transmittal

27.07.12 & 12.08.12

send w/o transmittal

send w/o transmittal

send w/o transmittal

11-07-12 & 12.08.12

send w/o transmittal

send w/o transmittal

27.07.12 & 12.08.12

send w/o transmittal

send w/o transmittal

send w/o transmittal

11-07-12 & 12.08.12

send w/o transmittal

send w/o transmittal

11-07-12 & 12.08.12

send w/o transmittal

send w/o transmittal

27.07.12 & 12.08.12

send w/o transmittal

send w/o transmittal

27.07.12 & 12.08.12

send w/o transmittal

send w/o transmittal

27.07.12 & 12.08.12

send w/o transmittal

send w/o transmittal

27.07.12 & 12.08.12

send w/o transmittal

send w/o transmittal

27.07.12 & 12.08.12

send w/o transmittal

send w/o transmittal

27.07.12 & 12.08.12

send w/o transmittal

send w/o transmittal

27.07.12 & 12.08.12

send w/o transmittal

send w/o transmittal

27.07.12 & 12.08.12

send w/o transmittal

send w/o transmittal

27.07.12 & 12.08.12

send w/o transmittal

send w/o transmittal

send w/o transmittal

27.07.12 & 12.08.12

send w/o transmittal

send w/o transmittal

27.07.12 & 12.08.12

send w/o transmittal

send w/o transmittal

23.07.12 & 27.07.12

send w/o transmittal

10.09.12 & 08.10.12

send w/o transmittal

23.07.12 & 27.07.12

send w/o transmittal

send w/o transmittal

23.07.12 & 27.07.12

send w/o transmittal

send w/o transmittal

11-07-12 & 12.08.12

send w/o transmittal

send w/o transmittal

23.07.12 & 27.07.12

send w/o transmittal

send w/o transmittal

11-07-12 & 12.08.12

send w/o transmittal

send w/o transmittal

11-07-12 & 12.08.12

send w/o transmittal

Small Power & Lighting (Emergency Circuits) System

send w/o transmittal

11-07-12 & 12.08.12

send w/o transmittal

send w/o transmittal

11-07-12 & 12.08.12

send w/o transmittal

send w/o transmittal

11-07-12 & 12.08.12

send w/o transmittal

send w/o transmittal

11-07-12 & 12.08.12

send w/o transmittal

send w/o transmittal

send w/o transmittal

send w/o transmittal

send w/o transmittal

send w/o transmittal

27.07.12 & 12.08.12

send w/o transmittal

send w/o transmittal

send w/o transmittal

27.07.12 & 12.08.12

send w/o transmittal

send w/o transmittal

send w/o transmittal

27.07.12 & 12.08.12

send w/o transmittal

send w/o transmittal

send w/o transmittal

27.07.12 & 12.08.12

send w/o transmittal

send w/o transmittal

11-07-12 & 12.08.12

send w/o transmittal

22.08.12 & 26.09.12

Very High Frenquency/HighFrenquency System (VHF/HF)

send w/o transmittal

11-07-12 & 12.08.12

send w/o transmittal

send w/o transmittal

11-07-12 & 12.08.12

send w/o transmittal

send w/o transmittal

11-07-12 & 12.08.12

send w/o transmittal

send w/o transmittal

11-07-12 & 12.08.12

send w/o transmittal

send w/o transmittal

11-07-12 & 12.08.12

send w/o transmittal

send w/o transmittal

11-07-12 & 12.08.12

send w/o transmittal

send w/o transmittal

send w/o transmittal

11-07-12 & 12.08.12

send w/o transmittal

send w/o transmittal

send w/o transmittal

11-07-12 & 12.08.12

send w/o transmittal

send w/o transmittal

send w/o transmittal

11-07-12 & 12.08.12

send w/o transmittal

send w/o transmittal

send w/o transmittal

LCOT & LGAST Project Exercution Plan (Mini Workpack)

Page 3: MDDR Kinabalu 16-10-12

DATE : 8-Apr-2023

PREPARED BY : Dhila Dzulkifli

No Date Source Document Description / Title Originator Updated By :

1 2/7/2012 MMHE 1223 KNPG-B HUC/QAQC-001 Norhidayu Roslan Hafiz V 1

2 23/07/12 MMHE 1223 MMHE/KNPG-B/HUC/T-0003 1. HUC-1223-C-002 : HSE PLAN En Amran Hafiz V 1

3 31/08/2012 MMHE 1223 OFF-FR-KNPG-B-S-003 1. RESPOND OF FAULTY REPORT : OFF-FR-KNPG-B-S-003 0003 Yusuf Kamal Hafiz V 1

4 3/9/2012 MMHE 1223 HUC/MMHE/KNPG-B/M/002 0004 Khairul Ridzuan Hafiz V 1

5 5/9/2012 MMHE 1223 HUC-MMHE-KNPG-B-T-001 0005 En Amran Dhila V 1

6 5/9/2012 MMHE 1223 HUC-MMHE-KNPG-B-I-001 0006 En Amran Dhila V 1

6 9/6/2012 MMHE 1223 HUC-MMHE-KNPG-B-P-001 0007 Ahmad Azri Hafiz V 1

TITLE : MASTER LIST Project Correspondence In

PROJECT : 1223

Project Code (if

any)

External Reference Number

Tracking

Number

File Number

1. HUC-1223-D-001 Project Quality Plan 2.HUC-1223-D-002 Inspection & Test Plan 3.HUC-1223-D-002 Welder Qualification and Test Procedure 4. HUC-1223-D-004 Document Control Procedure 5. HUC-1223-D-005 Material Control Procedure 6. HUC-1223-D-006 Non-Conformance Control procedure 7. HUC-1223-D-007 Hydrotest/Flushing Procedure 8. HUC-1223-D-008 Welding Consumable Control Procedure 9. HUC-1223-D-009 Bolt Tightening, Torquing Procedure 10. HUC-1223-D-010 Final Document Procedure 11. HUC-1223-D-015 Instrument Calibration Procedure 12. HUC-1223-D-016 Weld Repair Procedure 13. HUC-1223-D-017 Post Weld Procedure 14. HUC-1223-D-018 Fairing Procedure 15. HUC-1223-D-019 Levelling and Dimensional Control 16. HUC-1223-D-020 Distortion Control Procedure 17. HUC-1223-D-021 Positive Material Identification Procedure 18. HUC-1223-D-022 Corrosion Resistance Alloys Handling 19. HUC-1223-D-0023 Preservation Procedure 20. HUC-1223-D-024 Blasting, Painting and Surface Preparation 21. HUC-1223-D-025 Repait Paint Procedure 22. HUC-1223-D-026 Ferrite Count Procedure 23. HUC-1223-D-027 NDT Matrix

0001

0002

1. HUC-1223-M-001 : SERVIS WATER PUMP INSTALLATION PROCEDURE

1. HUC-T-STQ-003 : SHORT OF ADAPTOR FOR CABLE G;AND ENTRY

1. HUC-I-STQ-002 : INSTRUMENT EARTHING FROM PANELS TO DISPATCHER TO JACKET LEG2. HUC-I-STQ-003 : CABLE ENTRY FOR WELLHEAD CONTROL PANEL

1. HUC-P-STQ-010 : OFFSET OF TIE-IN POINT (350-VH-63060-13450X-MSFS-M5) 2.HUC-P-STQ-011 : OFFSET OF TIE-IN POINT (100-DN-65595-11430X-MSFN-M2) 3.HUC-P-STQ-005 : TIE-IN POINT TO T-6500 4.HUC-P-STQ-008 : CLASHING OF PIPE SPOOL 5.HUC-P-STQ-007 : RELOCATE OF CLOSED DRAIN TRANSFER PUMP.

Page 4: MDDR Kinabalu 16-10-12

7 9/7/2012 MMHE 1223 NO TRANSMITTAL 0008 Mr. GREG Hafiz V 1

8 9/7/2012 MMHE 1223 NO TRANSMITTAL HUC-P-STQ-002 : WELDING PROCEDURE SPECIFICATION 0009 Mr.Nizam Hafiz V 1

9 9/6/2012 MMHE 1223 HUC/MMHE/KNPG-B/T/002 0010 Saiful Azri Hafiz V 1

10 9/7/2012 MMHE 1223 HUC/MMHE/KNPG-B/T/003 0011 Saiful Azri Hafiz V 1

11 9/7/2012 MMHE 1223 HUC/MMHE/KNPG-B/I/005 0012 Saiful Azri Hafiz V 1

12 9/7/2012 MMHE 1223 HUC/MMHE/KNPG-B/M/004 0013 Khairul Ridzuan Hafiz V 1

13 9/7/2012 MMHE 1223 HUC/MMHE/KNPG-B/E/006 0014 Ahmad Rahman Hafiz V 1

14 9/7/2012 MMHE 1223 HUC/MMHE/KNPG-B/S/003 0015 Mohd Yusof Hafiz V 1

15 9/8/2012 MMHE 1223 HUC/MMHE/KNPG-B/S/008 0016 Abdul Rahman Hafiz V 1

16 9/10/2012 MMHE 1223 HUC/MMHE/KNPG-B/I/006 0017 Mohd Syazani Hafiz V 1

17 9/8/2012 MMHE 1223 HUC/MMHE/KNPG-B/T/004 1. HUC-T-STQ-006 : WEAK SUPPORT FOR HF/ANTENNA 0018 Saiful Azri Hafiz V 1

18 9/8/2012 MMHE 1223 HUC/MMHE/KNPG-B/M/005 0019 Khairul Ridzuan Hafiz V 1

19 9/5/2012 MMHE 1223 HUC/MMHE/KNPG-B/E/005 0020

20 9/11/2012 MMHE 1223 HUC/MMHE/KNPG-B/E/009 0021 Abdul Rahman Hafiz V 1

21 9/13/2012 MMHE 1223 HUC/MMHE/KNPG-B/I/007 0022 Mohd Syazani Hafiz V 1

1.HUC-S-STQ-016 : MAIN DECK WALKWAY BETWEEN MODULE 2 AND MODULE 3 2.HUC-S-STQ-015 : REMOVAL IF INSTALLATION GUIDE BENEATH MODULE 4, ABOVE DIESEL OIL TANK AT CELLER DECK.

HUC-T-STQ-004 : CABLE LADDER OBSTRUCTED BY BRACING AT TELECOM TOWER.

HUC-T-STQ-005 : DATA LOG UNIT (DLU-9300) BLOCK BY ELECTRICAL

HUC-I-STQ-005 : INSUFFICIENT CABLE ENTRY SPACE FOR MDF-8000A

1.HUC-M-STQ-003 : U-BOLT 3MM FOR BRACKET SUPPORT LIFE BUOY. 2.HUC-M-STQ-004 : DCT EQUIPMENT 3.HUC-M-STQ-009 : EQUIPMENT SEATING DETAILS SMOKE HOOD.

1.HUC-E-STQ-028 : CABLE PASS THROUGH GRATING WITHOUT COAMING FOR RCU-5220A AND SS-5220A 2.HUC-E-STQ-029 : CABLE FROM VOLTAGE REGULATOR TO NAVIGATIONAL AID LANTERN 3.HUC-E-STQ-030 : CABLE LADDER SUPPORT BLOCKING GRE FIRE WATER LINE (CELLAR DECK, EAST SIDE, BELOW MAIN DECK, MODULE3)

1.HUC-S-STQ-017 : MODIFY OF BEAMS AT FIRE WATER PUMPS.

1.OFF/FR/KNPG-B/E/012 : EXIT LIGHT DAMAGE 2.OFF/FR/KNPG-B/E/013 : DAMAGE VOLTAGE SELECTOR DB-7891A. 3.HUC-E-STQ-023 : SAND MONITORING PANEL SMP-0100

1.HUC-I-STQ-004 : WRONG INSTALLATION FOR LEVEL TRANSMITTER AT HEADER TANK (SERVICE WATER PUMP SYSTEM)

1.M3-KNPG-B-MS-80-119 : EQUIPMENT SEATING DETAILS FLAME FRONT GENERATOR ( PN-6220) 2.HUC-M-STQ-002 : FIREWATER HOSE REEL IN STORE ROOM M1-LQ 3.HUC-M-STQ-008 : EQUIPMENT SEATING DETAILS SMOKE HOOD.

1.HUC-E-STQ-012 : CABLE ENTRY FOR AIR COMPRESSOR AQ-5400A & B. 2.HUC-E-STQ-018 : PEDESTAL CRANE UPS SUPPLY 3.HUC-E-STQ-021 : SUMP PUMP DECK - LIGHTING POLE CLASHING WITH PIPING. 4.HUC-E-STQ-022 : SEAWATER LIFT PUMP PJB, RTD, AND PRESSURE TRANSMITTER JUNTION BOXES AND ROUTING.

1.HUC-E-STQ-005 : FIREWATER PUMP POWER CABLE ISSUE 2.OFF-FR-KNPG-B-E-010: SELECTOR SWICTH FOR DB PANEL DAMAGED 3.OFF-FR-KNPG-B-E-011 : ENGINE HOURS METER CRACKET (GLP-7530)

1.OFF/FR/KNPG-B/I/007 : CABLE GLANDING THREAD WAS BROKEN

Page 5: MDDR Kinabalu 16-10-12

22 9/13/2012 MMHE 1223 HUC/MMHE/KNPG-B/S/006 1.OFF/FR/KNPG-B/M/011 : DEFECT BED IN ROOM 305 0023 Hafiz Hashim Hafiz V 1

23 9/13/2012 MMHE 1223 HUC/MMHE/KNPG-B/M/006 0024 Mohd Khairul Ridzwan Hafiz V 1

24 9/13/2012 MMHE 1223 NO TRANSMITTAL 0025 Yusuf Kamal Hafiz V 1

25 9/13/2012 MMHE 1223 HUC/MMHE/KNPG-B/E/010 0026 Abdul Rahman Hafiz V 1

26 9/12/2012 MMHE 1223 HUC/MMHE/KNPG-B/E/005 0027 Saiful Azri Hafiz V 1

27 9/13/2012 MMHE 1223 HUC/MMHE/KNPG-B/S/007 0028 Mohd Yusof Hafiz V 1

28 9/13/2012 MMHE 1223 HUC/MMHE/KNPG-B/M/007 0029 Hafiz Hashim Hafiz V 1

29 9/13/2012 MMHE 1223 HUC/MMHE/KNPG-B/T/006 0030 Mohd Fadzly Hafiz V 1

30 9/13/2012 MMHE 1223 HANDOVER NOTE 003 0031 Mohd Fadzly Hafiz V 1

31 9/14/2012 MMHE 1223 HUC/MMHE/KNPG-B/E/011 0032 Mohd Fadzly Hafiz V 1

32 9/14/2012 MMHE 1223 HUC/MMHE/KNPG-B/S/001 0033 Mohd Yusof Hafiz V 1

33 9/14/2012 MMHE 1223 HUC/MMHE/KNPG-B/T/007 0034 Saiful Azri Hafiz V 1

34 9/15/2012 MMHE 1223 HUC/MMHE/KNPG-B/E/013 0035 Abdul Rahman Hafiz V 1

1.OFF/FR/KNPG-B/M/012 : SUPPORT CRACKED AT P-6510 SKID

1.OFF/FR/KNPG-B/S/002 REV 1 : CRUSHED MAIN BEAM BY INSTALLATION GUIDE

1. HUC-E-STQ-020 : FUEL GAS SUPER HEATER AND FUEL GAS PRE-HEATER POWER CABLE ROUTING & GLANDING ISSUES. 2. HUC-E-STQ-017 : REPLACEMENT OF UPS-77850 MAIN INCOMING CABLES 3. OFF/FR/KNPG-B/E/016 : CRANE BD-7310 MALFUNTION DUE TI SLIP RING UNIT SHORTED TO GROUND

1. HUC-T-STQ-007 : MODIFICATION PAGA STROBELIGHT POLE MOUNTED STAND AT JACKET

1.HUC-S-STQ-018 : ADDITIONAL BEAMS AND GRATING PANELS FOR M4 UPPER DECK MODIFICATION WORK. 2.HUC-S-STQ-019 : MEZZANINE DECK WALKWAY BETWEEN MODULE 2 AND MODULE 3. 3.HUC-S-STQ-020 : MODIFICATION OF STAIRWAY NO 22 - FROM FIXED STAIRWAY TO BOLTED REMOVABLE STAIRWAY.

1. OFF/FR/KNPG-B/M/003 : LIVING QUARTERS AT MODULE 1

1. HUC-T-STQ-008 : SHORT OF ADAPTOR FOR CCTV AND GPA BREAKGLASS CABLE GLAND ENTRY 2. HUC-T-STQ-009 : INSTALLATION TYPE FOR EARTH TAG AT M20 MALE X M25 FEMALE ADAPTER FOR LSU, CCTV, BREAKGLASS & STROBELIGHT.

1. GLAND REDUCER M25 X M20 C/W LOCKNUT, EARTH TAG AND IP WASHER.

1.HUC-E-STQ-016 : REMOVED 900MM CABLE LADDER AT MSF-SOUTH CAP BEAM FOR PRIORITY CABLE ROUTING

1. OFF/FR/KNPG-B/S/001 : BENDED BEAM BELOW MODULE 5.

1. HUC-T-STQ-010 : CABLE GLANDING DETAILS FOR CCTV

1. HUC-E-STQ-031 : CABLE GLAND DOES NOT SUITABLE WITH CABLE. 2. HUC-E-STQ-032 : CABLE GLAND DOES NOT SUITABLE WITH CABLE 3. HUC-E-STQ-033 : CABLE GLAND DOES NOT SUITABLE WITH CABLE 4. HUC-E-STQ-034 : CABLE DOES NOT AT SIDE.

Page 6: MDDR Kinabalu 16-10-12

35 9/15/2012 MMHE 1223 HUC/MMHE/KNPG-B/E/012 0036 Mohd Fadzly Hafiz V 1

36 9/16/2012 MMHE 1223 HUC/MMHE/KNPG-B/S/009 0037 Mohd Yusof Hafiz V 1

37 9/17/2012 MMHE 1223 HUC/MMHE/KNPG-B/E/017 0038 Mohd Fadzly Hafiz V 1

38 9/17/2012 MMHE 1223 HUC/MMHE/KNPG-B/M/010 0039 Mohd Khairul Ridzwan Hafiz V 1

39 9/17/2012 MMHE 1223 HUC/MMHE/KNPG-B/S/010 0040 Mohd Yusof Hafiz V 1

40 9/17/2012 MMHE 1223 HUC/MMHE/KNPG-B/E/015 0041 Mohd Fadzly Hafiz V 1

41 9/17/2012 MMHE 1223 HUC/MMHE/KNPG-B/I/008 0042 Mohd Syazani Hafiz V 1

42 9/18/2012 MMHE 1223 HUC/MMHE/KNPG-B/M/009 0043 Mohd Khairul Ridzwan Hafiz V 1

43 9/18/2012 MMHE 1223 KNPGB/MTQR/OFF/001 0044 M. Nazim Hamid Hafiz V 1

44 9/19/2012 MMHE 1223 HUC/MMHE/KNPG-B/S/011 0045 Mohd Yusof Hafiz V 1

45 9/18/2012 MMHE 1223 HUC/MMHE/KNPG-B/E/016 0046 Abdul Rahman Hafiz V 1

46 9/20/2012 MMHE 1223 HANDOVER NOTE 005 0047 Mohd Khairul Ridzwan Hafiz V 1

47 9/20/2012 MMHE 1223 HANDOVER NOTE 004 3" STAINLESS STEEL U-BOLT C/W 4 HEXAGONAL NUTS. 0048 Mohd Khairul Ridzwan Hafiz V 1

1. HUC-E-STQ-024 : WELLHEAD CONTROL PANEL INCOMING SUPPLY. 2. HUC-E-STQ-025 : FIREWATER PUMP POWER CABLE ISSUE. 3. HUC-E-STQ-026 : DISCREPANCY BETWEEN CABLE SCHEDULE AND SINGLE LINE DRAWING FOR PM-8830A & B. 4. HUC-E-STQ-027 : DISCREPANCY BETWEEN CABLE SCHEDULE AND SINGLE LINE DRAWING FOR PM-8850.

1. HUC-S-STQ-022 : PROVISION OF BEAM FOR STAIRWAY 22 BASE SUPPORT. 2. HUC-S-STQ-025 : REMOVAL OF PADEYE AND PROVISION OF FIXED HANDRAIL. 3. HUC-S-STQ-026 : MODIFICATION OF FIXED HANDRAIL AT INTERMEDIATE DECK & MEZZANINE DECK REMOVABLE WALKWAY.

1. OFF/FR/KNPG-B/E/017 : NO ISOLATOR SWICTH HANDLE IN FIRE WATER PUMP PANEL.

1. HUC-M-STQ-010 : INSTALLATION OF CLOSED DRAIN TRANSFER PUMP AND OPEN/DRAIN DRAIN CAISSON PUMP.

1. HUC-S-STQ-017 REV 1 : MODIFY OF BEAMS AT FIRE WATER PUMP.

1. HUC-E-STQ-035 : 1) WATER INGRESS INTO HELIDECK PERIMETER LIGHT VENDOR JUNCTION BOX. 2) WATER INGRESS INTO HELIDECK PERIMETER LIGHT JUNCTION BOX AND HELIDECK FLOODLIGHT.

1. OFF/FR/KNPG-B/I/010 : COTTON CLOTHES STUCKED IN THE PSV-5570B.

1. HUC-M-STQ-005 : EMERGENCY DIESEL ENGINE GENERATOR RADIATOR (GD-7700). 2. HUC-M-STQ-006 : EDG DUCTING INSTALLATION CLASHED WITH STRUCTURAL BRACING.

1. OFF/FR/KNPG-B/M/013 : RESPONE TO EDG FAULTY REPORT.

1. HUC-S-STQ-021 : MODIFICATION OF OVERLENGTH STAIRWAY (STAIRWAY NO 16) AT SUMP PUMP DECK. 2.HUC-S-STQ-023 : COLLISION OF BEAM WITH VERTICAL CABLE LADDER. 3. HUC-S-STQ-024 : HANDRAIL MODIFICATION - CLASHING OF FUEL DIESEL PIPELINE WITH DIESEL OIL TANK HANDRAILS.

1. HUC-E-STQ-020 : FUEL-GAS HEATER AND FUEL-GAS PRE-HEATER POWER CABLE ROUTING & GLANDING

1. STAINLESS STEEL SPRING WASHER M12 FOR HUC/M/STQ/005

Page 7: MDDR Kinabalu 16-10-12

48 9/20/2012 MMHE 1223 HUC/MMHE/KNPG-B/M/010 0049 Hafiz Hashim Hafiz V 1

49 9/20/2012 MMHE 1223 HUC/MMHE/KNPG-B/P/007 0050 Ahmad Rafi Hafiz V 1

50 9/21/2012 MMHE 1223 HANDOVER NOTE 007 0051 Mohd Khairul Ridzwan Hafiz V 1

51 9/21/2012 MMHE 1223 HANDOVER NOTE 006 0052 Ahmad Rafi Hafiz V 1

52 9/23/2012 MMHE 1223 HUC/MMHE/KNPG-B/T/009 1. HUC-T-STQ-012 : RELOCATION FOR NDB/ATU 9400. 0053 Mohd Fadzly Hafiz V 1

53 9/24/2012 MMHE 1223 HUC/MMHE/KNPG-B/E/018 0054 Mohd Fadzly Hafiz V 1

54 9/24/2012 MMHE 1223 HUC/MMHE/KNPG-B/I/012 0055 Mohd Fadzly Hafiz V 1

55 9/24/2012 MMHE 1223 HUC/MMHE/KNPG-B/E/019 0056 Mohd Fadzly Hafiz V 1

56 9/24/2012 MMHE 1223 HUC/MMHE/KNPG-B/S/013 0057 Mohd Yusof Hafiz V 1

1. HUC-M-STQ-007 : COOLING WATER EXPANSION TANK V-6950. 2. OFF/FR/KNPG-B/M/015 : MISSING WARDROBE PARTITION 3. OFF/FR/KNPG-B/M/016 : MISSING CEILING PANEL. 4. OFF/FR/KNPG-B/M/017 : DEFECT WATER MIXER NOT WORKING. 5. OFF/FR/KNPG-B/M/018 : WASHING MACHINE EXCESSI VELY VIBRATING

1. HUC-1223-E-005-282 : FRESH WATER SYSTEM 2. HUC-1223-E-005-141 : GLYCOL CONTACTORS SYSTEM 3. HUC-1223-E-005-411 : FIRE WATER SYSTEM 4. HUC-1223-E-005-112 : LIQUID SEPARATION SYSTEM 5. HUC-1223-E-005-332 : POTABLE WATER SYSTEM 6. HUC-1223-E-005-413 : DELUGE & SPRINKLER SYSTEM 7. HUC-1223-E-005-342 : HVAC SYSTEM 8. HUC-1223-E-005-241 : OPEN DRAIN SYSTEM

1. MANIFOLD KEY FOR AIR COMPRESSOR AND INSTRUMENT AIR DRYER PACKAGE. 2. PANEL KEY FOR AIR COMPRESSOR AND INSTRUMENT AIR DRYER PACKAGE. 3. RITAL KEY FOR AIR COMPRESSOR AND INSTRUMENT AIR DRYER PACKAGE PANEL USEBLE FOR RITAL PANEL INSIDE CCR ROOM.

1. STAINLESS STEEL SHACKLE FOR SURVIVAL CRAFT SAFETY CHAIN.

1. OFF/FR/KNPG-B/E/020 : EMERGENCY STOP SWITCH FOUND DAMAGE (SS-2352A, SS-2325B & SS-2325C)

1. OFF/FR/KNPG-B/I/011 : INTERMITTENT FUNCTIONALITY OF SMOKE DETECTOR 013-XZS-801C. 2. OFF/FR/KNPG-B/I/012 : TEMPRATURE TRANSMITTER FAULTY TT-9713B AT V-9710B. 3. OFF/FR/KNPG-B/I/013 : THERMOWELL TW-2063 BROKEN AT HP GAS COOLER E-2060 OUTLET.

1. HUC-E-STQ-040 : POWER CABLE SHORTAGE FOR E-6310 HP FLARE K.O. DRUM CONDENSATE HEATER. 2. HUC-E-STQ-042 : LOCAL CONTROL PANEL (LCP) FOR OPEN & CLOSED DRAIN CAISSON PUMP.

1. HUC-S-STQ-027 : NDT PLAN FOR THE DAMAGED MAIN BEAM AT MSF DRILLING. 2. HUC-S-STQ-027 REV 1 : NDT PLAN FOR THE DAMAGED MAIN BEAM AT MSF DRILLING.

Page 8: MDDR Kinabalu 16-10-12

57 9/25/2012 MMHE 1223 HUC/MMHE/KNPG-B/P/016 0058 Abdul Rahman Hafiz V 1

58 9/30/2012 MMHE 1223 HUC/MMHE/KNPG-B/M/011 0059 Wan Mohd Azwan Hafiz V 1

59 9/30/2012 MMHE 1223 HUC/MMHE/KNPG-B/E/019 0060 Mohd Fazly Hafiz V 1

60 01.10.12 MMHE 1223 HUC/MMHE/KNPG-B/E/022 0061 Wan Mohd Azwan Hafiz V 1

61 01.10.12 MMHE 1223 HUC/MMHE/KNPG-B/P/017 0062 Wan Mohd Azwan Hafiz V 1

62 01.10.12 MMHE 1223 HUC/MMHE/KNPG-B/S/014 0063 Greg D. Porcelo Hafiz V 1

63 02.10.12 MMHE 1223 HUC/MMHE/KNPG-B/S/023 0064 Wan Mohd Azwan Hafiz V 1

64 02.10.12 MMHE 1223 HUC/MMHE/KNPG-B/M/012 0065 Wan Mohd Azwan Hafiz V 1

65 03.10.12 MMHE 1223 HUC/MMHE/KNPG-B/E/021 0066 Wan Mohd Azwan Hafiz V 1

1. HUC-1223-E-005-711-1 : DIGITAL MICROWAVE RADIO (DMR) SYSTEM. 2. HUC-1223-E-005-423 : EVACUTION EQUIPMENT. 3. HUC-1223-E-005-512 : EMERGENCY DIESEL GENERATOR. 4. HUC-1223-D-010 : RADIOGRAPHIC EXAMINATION PROCEDURE. 5. HUC-1223-E-005-542 : SMALL POWER & LIGHTING (NORMAL CIRCUIT) SYSTEM. 6. HUC-1223-E-005-541 : SMALL POWER & LIGHTING (EMERGENCY CIRCUIT) SYSTEM.

1. HUC-M-STQ-011 : LIFE RAFT MODIFICATION - ADDITIONAL WORK.

1. OFF/FR/KNPG-B/E/022: POWER CABLE FOR MONORAIL MANAGED (BM-7321). 2. OFF/FR/KNPG-B/E/018 : CRANE BD-7300 MULFUNCTION DUE TO SLIPRING UNIT SHORTED TO GROUND. 3. OFF/FR/KNPG-B/E/021 : RCU SELECTOR SWITCH DAMAGED (RCU-EM5010B). 4. HUC-E-STQ-041 : A) CABLE TRAY OBSTRUCT PIPELINE INSTALLATION AT WELLHEAD SERVICE PLATFORM MSFD. B) CABLE TRAY OBSTRUCT PIPELINE INSTALLATION AT MODULE 5 BELOW MAIN DECK. 5. HUC-E-STQ-039 : ONSHORE INSTALL WRONG TYPE OF LIGHTING. 6. HUC-E-STQ-037 : FLOODLIGHT CAN'T BR INSTALL DUE TO STRUCTURE COLUMN 4A AT MODULE 3 INTERMEDIATE DECK DOES NOT EXIST.

1. HUC-1223-E-005-332 : PORTABLE WATER SYSTEM 2. HUC-1223-E-005-241 : OPEN DRAIN SYSTEM 3. HUC-1223-E-005-342 : HVAC SYSTEM 4. HUC-1223-E-005-282 : FRESH WATER SYSTEM

1. OFF/FR/KNPG-B/P/001 : FUEL GAS LINE AT FLARE BOOM DAMAGED.

1. HUC-S-STQ-028 : ADDITIONAL BASE SUPPORT FOR STAIRWAY NO 32 AT UPPER DECK WALKWAY. 2. HUC-S-STQ-032 : ADDITIONAL HANDRAIL UNDER THE FLARE BOOM STAIRWAY. 3. HUC-S-STQ-029 : ADDITIONAL SUPPORT FOR GRATING AT UPPER DECK WALKWAY. 4. HUC-S-STQ-030 : RELOCATED OF PIPE SUPPORT AT INTERMEDIATE DECK INTERMODULAR WALKWAY M2/M3/M4.

1. OFF/FR/KNPG-B/E/023 :WATER INGRESS INTO HEATER BOX AND POWER BOX FOR PM6790.

1. HUC-1223-M-001 : SERVICE WATER PUMP INSTALLATION PROCEDURE. 2. HUC-1223-M-003 : FIREWATER PUMP INSTALLATION PROCEDURE P-5310A/B/C.

1. HUC-E-STQ-044 : NITROGEN GENERATOR PANEL LCP-5900 NOT IN LAYOUT. 2. HUC-E-STQ-046 : MISSING CABLES FOR ACID RECIRCULATION PUMP PM8850. 3. HUC-E-STQ-045 : TELECOM TOWER ELECTRICAL CABLE ROUTING.

Page 9: MDDR Kinabalu 16-10-12

66 03.10.12 MMHE 1223 HUC/MMHE/KNPG-B/P/018 0067 Wan Mohd Azwan Hafiz V 1

67 03.10.12 MMHE 1223 HUC/MMHE/KNPG-B/T/011 0068 Wan Mohd Azwan Hafiz V 1

68 03.10.12 MMHE 1223 HUC/MMHE/KNPG-B/I/015 0069 Wan Mohd Azwan Hafiz V 1

69 03.10.12 MMHE 1223 HUC/MMHE/KNPG-B/M/013 0070 Wan Mohd Azwan Hafiz V 1

70 03.10.12 MMHE 1223 HUC/MMHE/KNPG-B/T/012 0071 Wan Mohd Azwan Hafiz V 1

71 03.10.12 MMHE 1223 HUC/MMHE/KNPG-B/E/027 0072 Wan Mohd Azwan Hafiz V 1

72 03.10.12 MMHE 1223 HUC/MMHE/KNPG-B/P/021 1. PR/PM/OFF/002 : PROVISION TO SUPPLY PIPE 0073 Wan Mohd Azwan Hafiz V 1

73 03.10.12 MMHE 1223 HUC/MMHE/KNPG-B/T/013 0074 Wan Mohd Azwan Hafiz V 1

74 03.10.12 MMHE 1223 HUC/MMHE/KNPG-B/S/014 0075 Wan Mohd Azwan Hafiz V 1

75 04.10.12 MMHE 1223 HUC/MMHE/KNPG-B/I/019 0076 Wan Mohd Azwan Hafiz V 1

76 04.10.12 MMHE 1223 HUC/MMHE/KNPG-B/E/025 0077 Wan Mohd Azwan Hafiz V 1

77 05.10.12 MMHE 1223 HUC/MMHE/KNPG-B/S/012 0078 Mohd Yusof Hafiz V 1

78 05.10.12 MMHE 1223 HUC/MMHE/KNPG-B/T/015 0079 Wan Mohd Azwan Hafiz V 1

79 05.10.12 MMHE 1223 HUC/MMHE/KNPG-B/P/022 0080 Wan Mohd Azwan Hafiz V 1

1. HUC-1223-D-001 REV C : Project Quality Plan

1. HUC-T-STQ-016 : TELECOM ROUTING FROM LCOT TELECOM EQUIPMENT ROOM TO LGAST FENCING

1. HUC-I-STQ-007 : INCOMING SUPPLY CABLE FOR QT-8820

1. HUC-M-STQ-012 : REMOVE AND WELDING BACK THE WING PLATE AFTER INSTALL THE EDG DUCT.

1. HUC-1223-T-006-711-3 : 711-3 NON-DIRECTIONAL BEACON (NDB) SYSTEM

1. HUC-E-STQ-038 : AERONAUTICAL OBSTRUCTION LIGHT CONTROL PANEL NOT IN IFC DRAWING. 2. HUC-E-STQ-048 : CABLE SHORT FOR RCU-PM2387A AT MODULE 3

1. HUC-T-STQ-015 : CCTV CABLE ENTRY NO SUIT FOR CCTV CABLE GLANDING.

1. HUC-S-STQ-031 : OBSTRUCTION IN RELOCATION OF SURVIVAL CRAFT DAVIT ARM STOOL. 2. HUC-S-STQ-035 : RELOCATION OF SURVIVAL CRAFT DAVIT ARM STOOL. 3. HUC-S-STQ-036 : MODIFICATION OF HANDRAILS AT VALVE ACCESS PLATFORM.

1. HUC-I-STQ-008 : CABLE PULLING ISSUE FOR 101-FJB-801. 2. HUC-I-FIR-001 : INSTALL OUTSTANDING INSTRUMENT EARTH CABLE.

1. HUC-1223-E-005-241 : OPEN DRAIN SYSTEM. 2. HUC-1223-E-005-123 : GAS TRANSFER AND METERING SYSTEM. 3. HUC-1223-E-005-332 : PORTABLE WATER SYSTEM. 4. HUC-1223-E-S-002 : TELECOM TOWER INSTALLATION PROCEDURE.

1. HUC-S-STQ-013 : MODIFICATION OF 2 NOS TUBULAR BEAMS OF SDV PLATFORM.

1. HUC-T-STQ-011 : CABLE FOR WMS-9303 SHORT IN LENGTH. 2. HUC-T-STQ-017 : HOOK-UP DRAWING FOR WMS-9301.

1. HUC-P-STQ-012 : RELOCATE PIPE SUPPORT. 2. HUC-P-STQ-014 : OUTSTANDING PIPE. 3. HUC-P-STQ-009 : CLASHING WITH MUDWALL. 4. HUC-P-STQ-016 : RE-ROUTING TIE IN OF 100-DH-65087-11430X-SPD. 5. HUC-P-STQ-015 : RE-ROUTING TIE IN OF 100-DH-65087-11430X-SPD.

Page 10: MDDR Kinabalu 16-10-12

80 05.10.12 MMHE 1223 HUC/MMHE/KNPG-B/S/015 0081 Wan Mohd Azwan Hafiz V 1

81 06.10.12 MMHE 1223 HUC/MMHE/KNPG-B/P/023 0082 Wan Mohd Azwan Hafiz V 1

82 06.10.12 MMHE 1223 HUC/MMHE/KNPG-B/E/031 0083 Wan Mohd Azwan Hafiz V 1

83 08.10.12 MMHE 1223 HUC/MMHE/KNPG-B/T/018 0084 Wan Mohd Azwan Hafiz V 1

84 08.10.12 MMHE 1223 HUC/MMHE/KNPG-B/E/034 0085 Wan Mohd Azwan Hafiz V 1

85 08.10.12 MMHE 1223 HUC/MMHE/KNPG-B/T/017 0086 Wan Mohd Azwan Hafiz V 1

86 08.10.12 MMHE 1223 HUC/MMHE/KNPG-B/E/033 0087 Wan Mohd Azwan Hafiz V 1

87 08.10.12 MMHE 1223 HUC/MMHE/KNPG-B/T/019 0088 Wan Mohd Azwan Hafiz V 1

88 08.10.12 MMHE 1223 HUC/MMHE/KNPG-B/E/035 0089 Wan Mohd Azwan Hafiz V 1

1. HUC-S-STQ-037 : MODIFICATION OF HANDRAIL AT HP GAS COOLER RAISED ACCESS PLATFORM. 2. HUC-S-STQ-038 : MODIFICATION UNDER INTERMEDIATE LANDING FRAMING OF STAIRWAY NO 31. 3. HUC-S-STQ-033 : CUTTING OF COLUMN GUSSET PLATE CLASHING WITH STAIRWAY AT M4 HP GAS COOLER PLATFORM. 4. HUC-S-FIR-004 : NDT SERVICES FOR CRUSHED MAIN BEAM OF MSFD. 5. HUC-S-FIR-005 : EXTENSION PLATFORM FOR WMS.

1. HUC-1223-B-002 : PROJECT EXERCUTION PLAN 2. HUC-1223-D-014 : INSTRUMENT CALIBRATION PROCEDURE.

1. HUC-1223-E-005-521 : MV SWITCHGEAR SYSTEM. 2. HUC-1223-E-005-523 : TRANSFOMER SYSTEM. 3. HUC-1223-E-005-611 : PMCS SYSTEM. 4. HUC-1223-E-005-621: SIS SYSTEM. 5. HUC-1223-E-005-631 : FIRE & GAS DETECTION SYSTEM. 6. HUC-1223-E-005-632 : PNEUMATIC DETECTION SYSTEM.

1. HUC-1223-T-001 : DMR INSTALATION PROCEDURE. 2. HUC-1223-E-005-713 : IP-PABX/LAN SYSTEM-713 3. HUC-1223-E-005-721 : CLOSED CIRCUIT TELEVISION (CCTV) SYSTEM-721. 4. HUC-1223-E-005-711-2 : VERY HIGH FREQUENCY AND HIGH FREQUENCY (VHF/HF) SYSTEM-711-2. 5. HUC-1223-E-005-712 : PUBLIC ADDRESS GENERAL ALARM (PAGA) SYSTEM-712. 6. HUC-1223-E-005-722 : WEATHER MONITORING SYSTEM-722.

1. HUC-1223-E-005-524 : IMCS & LSM SYSTEM-524. 2. HUC-1223-E-005-512 : EMERGENCY DIESEL GENERATOR SYSTEM. 3.HUC-1223-E-005-544 : NAVIGATION AIDS SYSTEM-544.

1. HUC-T-STQ-019 : CABLE SHORTAGE IN DRUM. 2. HUC-T-FIR-003 : RELOCATION STAND/SUPPORT FOR RAIN GAUGE SENSOR.

1. HUC-E-STQ-033 : CABLE GLAND DOES NOT SUITABLE WITH CABLE. 2. OFF/FR/KNPG-B/E/019 : WATER INGRESS INTO JB AT HELIDECK AREA.

1. HUC-T-FIR-001 : RELOCATION FOR NDB / ATU-9400. 2. HUC-T-FIR-002 : MODIFICATION STAND/SUPPORT. 3. OFF/FR/KNPG-B/T/008 : CABLE INSULATION DAMAGED IN CCTV

1. HUC-E-FIR-003 : FABRICATE & INSTALL NEW SUPPORT AND ADDITIONAL CABLE TRAY. 2. HUC-E-FIR-004 : CABLE LADDER AND CABLE TRAY MODIFICATION FOR FUEL GAS SKID.

Page 11: MDDR Kinabalu 16-10-12

89 09.10.12 MMHE 1223 HUC/MMHE/KNPG-B/E/036 0090 Wan Mohd Azwan Hafiz V 1

90 11.10.12 MMHE 1223 HUC/MMHE/KNPG-B/T/020 0091 Wan Mohd Azwan Hafiz V 1

91 11.10.12 MMHE 1223 HUC/MMHE/KNPG-B/E/039 0092 Wan Mohd Azwan Hafiz V 1

92 11.10.12 MMHE 1223 HUC/MMHE/KNPG-B/I/021 0093 Wan Mohd Azwan Hafiz V 1

93 11.10.12 MMHE 1223 HUC/MMHE/KNPG-B/E/041 0094 Wan Mohd Azwan Hafiz V 1

94 11.10.12 MMHE 1223 HUC/MMHE/KNPG-B/T/021 0095 Wan Mohd Azwan Hafiz V 1

95 12.10.12 MMHE 1223 - 0096 Wan Ahmad Faris Hafiz V 1

96 12.10.12 MMHE 1223 HUC/MMHE/KNPG-B/T/023 0097 Wan Mohd Azwan Hafiz V 1

97 12.10.12 MMHE 1223 HUC/MMHE/KNPG-B/I/022 0098 Wan Mohd Azwan Hafiz V 1

98 12.10.12 MMHE 1223 HUC/MMHE/KNPG-B/P/026 0099 Wan Mohd Azwan Hafiz V 1

99 12.10.12 MMHE 1223 HUC/MMHE/KNPG-B/E/027 0100 Wan Mohd Azwan Hafiz V 1

100 12.10.12 MMHE 1223 HUC/MMHE/KNPG-B/P/027 1. HUC-1223-B-003 : PLANNING PACKAGE 0101 Wan Mohd Azwan Hafiz V 1

101 14.10.12 MMHE 1223 HUC/MMHE/KNPG-B/P/029 1. PSP-KNPG-B-HUC-10T : HSE PLAN 0102 Wan Mohd Azwan Hafiz V 1

1. HUC-1223-E-S-001 : TLQ PANEL FRAMES SUPPORT-LIFTING & INSTALLATION PROCEDURE. 2. HUC-1223-E-005-141 : GLYCOL CONTACTOR SYSTEM-141. 3. HUC-1223-E-005-411 : FIRE WATER SYSTEM-411. 4. HUC-1223-E-005-413 : DELUGE & SPRINKLER SYSTEM.

1. HUC-T-STQ-021 : CABLE TERMINATION IN CCTV PANEL NOT CONSISTENT.

1. HUC-E-STQ-050 : CABLE FROM SS-PM6720A TO PM-6720A AND SS-PM6720B TO PM-6720B NOT LAYING PROPERLY.

1. HUC-I-STQ-011 : OUTSTANDING CABLES FOR LCP-8800 2. HUC-I-STQ-013 : NO CABLE FROM LCP TO LEVEL TRANSMITTER FOR FIRE WATER PUMP A,B & C.

1. HUC-1223-E-005-813 : MONORAIL/TROLLEY HOIST SYSTEM-813. 2. HUC-1223-E-005-241 : OPEN DRAIN SYSTEM-241. 3. HUC-1223-E-005-532 : UPS-UNINTERRUPTIBLE POWER SUPLY SYSTEM-532. 4. HUC-1223-E-005-522 : LOW VOLTAGE MCC & SWITCHBOARD SYSTEM-522. 5. HUC-1223-E-005-543 : EARTHING AND LIGHTING PROTECTION SYSTEM-543.

1. HUC-T-STQ-023 : OUTSTANDING MATERIAL FOR INSTALLATION ANTENNA ANT-9370. 2. HUC-T-STQ-018 : ADDITIONAL CABLE PULLING FOR MUTABLE SPEAKER IN LQ HABITATION.

1. HUC-M-FIR-001 : EQUIPMENT SEATING FOR CLOSED DRAIN TRANSFER PUMP ADDITIONAL SCOPE.

1. HUC-T-STQ-022 : PAGA AND CCTV PANEL TERMINATION DRAWING. 2. OFF/FR/KNPG-B/T/008 : CABLE INSULATION DAMAGED IN CCTV.

1. HUC-I-STQ-009 : DISCREPENCY BETWEEN CABLE SCHEDULE AND BLOCK DIAGRAM FOR FIBRE OPTIC CABLE. 2. HUC-1223-D-014 : INSTRUMENT CALIBRATION PROCEDURE.

1. HUC-P-STQ-006 : TIE IN POINT OFFSET. 2.HUC-P-STQ-017 : CLOSED AND OPEN DRAIN CAISSONS. 3. HUC-P-STQ-019 : DIFFERENT SIZE IF TIE IN POINT. 4. HUC-P-STQ-018 : OFFSET OF TIE IN POINT.

1. HUC-1223-E-005-612 : WHCP SYSTEM-612 2. HUC-1223-E-S-002 : TELECOM TOWER INSTALLATION PROCEDURE.

Page 12: MDDR Kinabalu 16-10-12

102 14.10.12 MMHE 1223 HUC/MMHE/KNPG-B/E/044 0103 Wan Mohd Azwan Hafiz V 1

103 15.10.12 MMHE 1223 HUC/MMHE/KNPG-B/E/045 0104 Wan Mohd Azwan Hafiz V 1

104 15.10.12 MMHE 1223 HUC/MMHE/KNPG-B/P/030 0105 Wan Mohd Azwan Hafiz V 1

105 15.10.12 MMHE 1223 HUC/MMHE/KNPG-B/E/046 0106 Wan Mohd Azwan Hafiz V 1

106 16.10.12 MMHE 1223 HUC/MMHE/KNPG-B/P/032 0107 Wan Mohd Azwan Hafiz V 1

107 16.10.12 MMHE 1223 HUC/MMHE/KNPG-B/I/025 0108 Wan Mohd Azwan Hafiz V 1

108 16.10.12 MMHE 1223 HUC/MMHE/KNPG-B/T/024 0109 Wan Mohd Azwan Hafiz V 1

109 16.10.12 MMHE 1223 0110 Wan Mohd Azwan Hafiz V 1

110 MMHE 1223 0111 Hafiz V 1

1. HUC-1223-E-005-112 : LIQUID SEPARATION SYSTEM-112-REV 1. 2. HUC-1223-E-005-422 : SURVIVAL CRAFT SYSTEM-422-REV 0. 3. HUC-1223-E-005-332 : POTABLE WATER SYSTEM-332-REV 0. 4. HUC-1223-E-005-311 : DIESEL FUEL SYSTEM-311-REV 0. 5. HUC-1223-E-005-281 : SEA WATER SYSTEM-281-REV 0.

1. HUC-1223-E-005-331 : SERVICE WATER SYSTEM-331. 2. HUC-1223-E-005-233 : FLARE SYSTEM-233. 3. HUC-1223-E-005-242 : CLOSED DRAIN SYSTEM-242.

1. PR/PM/OFF/004 : GOODS : 25mm EARTH CABLE (GREEN/YELLOW). 2. HUC-P-STQ-020 : DIFFERENT SIZE OFTIE IN POINT.

1. HUC-E-MDR-003 : DAMAGE ON OBERON ARC HELMET. 2. HUC-E-MDR-004 : DAMAGE ON GLYCOL REBOILER HERATER SAFETY SWICTH. 3. OFF/FR/KNPG-B/E/024 : LOW RESISTANCE FOR BOOSTER PUMP. 4. HUC-E-STQ-047 : LCOT-DEVIATION WITH THE DRAWING. 5. HUC-E-FIR-005 : MOFICIFATION & ADDITIONAL WORKS. 6. HUC-E-STQ-049 : EXISTING MOUNTED PLATE IS TOO SMALL TO INSTALL HELI STARTER SOCKET HSS-7866. 7. HUC-E-STQ-053 : NORMAL FLUORESCENT LIGHT TO BE RELOCATE. 8. HUC-E-STQ-052 : EMERGENCY LIGHT CLASH WITH GRE PIPE. 9. HUC-E-STQ-051 : WELDING SOCKET OUTLET CLASH BY POWER CABLE AT MODULE 1 BREEZE DECK.

1. WELD SUMMARY (PIPING). 2.KNPG-B/RFI/HT-DC-023-M10. 3. KNPG-B/RFI/HT-PL-001-SPD. 4. KNPG-B/RFI/HT-AU-002-M2. 5. KNPG-B/RFI/HT-FD-003-M2. 6. KNPG-B/RFI/HT-AI-001-M3-M10. 7. KNPG-B/RFI/HT-FD-006-M2. 8. KNPG-B/RFI/HT-WP-005-M2. 9.KNPG-B/RFI/HT-DC-004-SPD. 10. KNPG-B/RFI/HT-FD-002-M2.

1. HUC-I-STQ-014 : CABLE SHORTAGE FROM FAP-8201 A&B TO 021-HD-802.

1. HUC-T-STQ-020 : TELECOM ROUTING FROM MAIN CABLE LADDER ROUTING TO LCOT ENGINEERING.

1. HUC-1223-E-005-121 : GAS COLLECTION AND RECEIVING SYSTEM REV 0. 2. HUC-1223-E-005-321 : INSTRUMENT AIR SYSTEM REV 0.

Page 13: MDDR Kinabalu 16-10-12

111 MMHE 1223 0112 Hafiz V 1

112 MMHE 1223 0113 Hafiz V 1

Page 14: MDDR Kinabalu 16-10-12

DATE : 8-Apr-2023

PROJECT : 1223 PREPARED BY :Dhila Dzulkifli

No DateDocument Reference Number T

Running No. Document Description Originator Prepared By File Number 1 2 3 5 1

1 6-Jun-12 RUBEN.R HAFIZ V1

2 19-Jun-12 KLO 1223 MMHE - T 1.HUC-1223-C-002 : HSE PLAN Ezuan HAFIZ V1

3 25-Jun-12 KLO 1223 MMHE - T Rasyidien Hafiz V1

4 29-06-12 KLO 1223 MMHE - T HUC-P-STQ-001 : PIPING FARID HAFIZ V1

5 2/7/2012 KLO 1223 MMHE - T HUC-P-STQ-002 : PIPING WEI HAFIZ V1

6 2/7/2012 KLO 1223 MMHE - T HUC-1223-C-002 : HSE PLAN SURESH HAFIZ V1

7 4/7/2012 KLO 1223 MMHE - T SURESH HAFIZ V1

8 09.07.12 KLO 1223 MMHE - T Ezuan Azril V1

9 11.07.2012 KLO 1223 MMHE - T 1. WORKPACK. (reffer attachment) Zakiamani Dhila V1

10 12.07.2012 KLO 1223 MMHE - T Shannon HAFIZ V1

11 13.07.12 KLO 1223 MMHE - T Shamsul HAFIZ V1

12 23.07.12 KLO 1223 MMHE - T HAFIZ V1

13 23.07.12 KLO 1223 MMHE - T Florence HAFIZ V1

14 24.07.12 KLO 1223 MMHE - T 1.HUC-1223-B-004 : CHANGE ORDER PROCEDURE Chua Sook Yen HAFIZ V1

15 25.07.12 KLO 1223 MMHE - T 1.KNPG-B/001 : INVOICE Chua Sook Yen HAFIZ V1

16 26.07.12 KLO 1223 MMHE - T 1.HUC-1223-B-002_REV A : PROJECT EXECUTION PLAN RUBEN.R HAFIZ V1

17 27.07.12 KLO 1223 MMHE - T 1. HUC-1223-S-001 Shannon HAFIZ V1

TITLE : MASTER LIST Project Correspondence Out

0001 OFFSHORE HOOK UP COMISSIONING WORKPACK FOR KNPG-B VOLUME 1 TO 4

0002

0003

1.HUC-1223-D-001 : Project Quality Plan 2.HUC-1223-D-002 : Inspection & Test Plan 3.HUC-1223-D-003 : Welder Qualification Test Procedure 4.HUC-1223-D-004 : Document Control Procedure 5.HUC-1223-D-005 : Material Control Procedure 6.HUC-1223-D-006 : Non-Conformance Control Procedure 7.HUC-1223-D-007 : Hydrotest/Flushing Procedure 8.HUC-1223-D-008 : Welding Consumable Control 9.HUC-1223-D-009 : Bolt Tightening, Torguing Procedure 10.HUC-1223-D-010 : Final Document Procedure 11.HUC-1223-D-015 : Instrument Calibration Procedure 12.HUC-1223-D-016 : Weld Repair Procedure 13.HUC-1223-D-017 : Post Weld Heat Treatment 14.HUC-1223-D-018 : Fairing Procedure 15.HUC-1223-D-019 : Lavelling and Dimensional Control Procedure 16.HUC-1223-D-020 : Distortion Control Procedure 17.HUC-1223-D-021 : Positive Material Identification 18.HUC-1223-D-022 : Corrosion Resistance Alloys Handling Procedure 19.HUC-1223-D-023 : Preservation Procedure 20.HUC-1223-D-024 : Blasting, Painting and Surface 21.HUC-1223-D-025 : Repair Paint Procedure 22.HUC-1223-D-026 : Ferrite Count Procedure 23.HUC-1223-D-027 : NDT Matrix 24.HUC-1223-D-028 : Paint Matrix 25.HUC-1223-D-029 : Hardness Testing Procedure 26.HUC-1223-D-030 : Welding Procedure Spacification

0004

0005

0006

0007

1.HUC-1223-C-003 : GENERAL STATUS RULES PROCEDURE. 2.HUC-1223-C-004 : PRE-PERSONAL PROTECTIVE EQUIPMENT PROCEDURE. 3.HUC-1223-C-005 : PERMIT TO WORK PROCEDURE. 4.HUC-1223-C-006 : PROTECTION OF ENVIRONMENT PROCEDURE. 5.HUC-1223-C-007 : ELECTRICAL SAFETY PROCEDURE. 6.HUC-1223-C-008 : HAND & POWER TOOLS PROCEDURE. 7.HUC-1223-C-009 : MECHANICAL HANDLING SAFETY PROCEDURE. 8.HUC-1223-C-010 : SCAFFOLDING SAFETY PROCEDURE. 9.HUC-1223-C-011 : MATERIAL HANDLING AND STORAGE. 10.HUC-1223-C-012 : CONSTRUCTION PLANT & MACHINERIES. 11.HUC-1223-C-013 : MANUAL HANDLING PROCEDURE. 12.HUC-1223-C-014 : WELDING GAS CUTTING SAFETY. 13.HUC-1223-C-015 : GENERAL LIFTING PROCEDURE. 14.HUC-1223-C-016 : CONFINED SPACE PROCEDURE.

00081.HUC-1223-C-001 : HSE MANUAL 2.HUC-1233-C-017 : EMERGENCY RESPOND PROCEDURE

0009

0010 HUC/S/STQ/001 : LIFTHING FOR TLQ SUPPORT FRAME PANEL

00111.HUC-1223-E-004 : SYSTEM HANDOVER PROCEDURE 2.HUC-1223-E-003 : LQ HABITATION PROCEDURE (MINIMUM REQUIREMENT)

0012

1.HUC-1223-A-001 -MDDR 2.HUC-1223-D-001 -PROJECT QUALITY PLAN 3.HUC-1223-D-002 -INSPECTION & TEST PLAN 4.HUC-1223-D-003 -WELDER QUALIFICATION TEST PROCEDURE 5.HUC-1223-D-004 -DOCUMENT CONTROL PROCEDURE 6.HUC-1223-D-005 -MATERIAL CONTROL PROCEDURE 7.HUC-1223-D-006 -NON-CONFORMANCE CONTROL PROCEDURE 8.HUC-1223-D-007 -WELDING CONSUMABLE CONTROL PROCEDURE 9.HUC-1223-D-008 -BOLT TIGHTENING, TORQUING PROCEDURE 10.HUC-1223-D-009 -FINAL DOCUMENT PROCEDURE 11.HUC-1223-D-010 -RADIOGRAPHIC EXAMINATION PROCEDURE 12.HUC-1223-D-011 -ULTRASONIC TESTING PROCEDURE 13.HUC-1223-D-012 -MAGNETIC PARTICLE TESTING 14.HUC-1223-D-013 -LIQUID PENETRANT INSPECTION 15.HUC-1223-D-014 -INSTRUMENT CALIBRATION PROCEDURE 16.HUC-1223-D-015 -WELD REPAIR PROCEDURE 17.HUC-1223-D-016 -POST WELD HEAT TREATMENT PROCEDURE 18.Table Of Content

Hasinurrahman Rasyidien

(3980396836)

0013

1.HUC-1223-E-005-523 : TRANSFORMERS SYSTEM-523 2.HUC-1223-E-005-521 : MV SWITCHGEAR SYSTEM-521 3.HUC-1223-E-005-512 : EMERGENCY DIESEL GENERATOR SYSTEM-512 4.HUC-1223-E-005-511 : GAS TURBINE GENERATOR SYSTEM-511

0014

0015

0016

0017

Page 15: MDDR Kinabalu 16-10-12

18 27.07.12 KLO 1223 MMHE - T Zakiamani HAFIZ V1

19 27.07.12 KLO 1223 MMHE - T 1.HUC-1223-B-003 : PLANNING PACKAGE Saiful Adli HAFIZ V1

20 30.07.12 KLO 1223 MMHE - T Shannon HAFIZ V1

21 03.08.12 OFF 1223 MMHE - T 0021 Shannon HAFIZ V1

22 05.08.12 OFF 1223 MMHE - T 0022 Shannon HAFIZ V1

23 05.08.12 OFF 1223 MMHE - T 0023 1.HUC-S-FIR-001 2.HUC-S-FIR-002 Shannon HAFIZ V1

24 06.08.12 OFF 1223 MMHE - T 0024 1.HUC-1223-B-006 : Procument Procedure Collin HAFIZ V1

25 06.08.12 OFF 1223 MMHE - T 0025 1.HUC 1223-B-006 : HSE PLAN Ezuan HAFIZ V1

26 07.08.12 OFF 1223 MMHE - T 0026 Shannon HAFIZ V1

27 08.08.12 OFF 1223 MMHE - T 0027 Shannon HAFIZ V1

28 09.08.12 OFF 1223 MMHE - T 0028 Shannon HAFIZ V1

29 10.08.12 OFF 1223 MMHE - T 0029 Nanthakumar HAFIZ V1

30 12.08.12 OFF 1223 MMHE - T 0030 All Procedure Hafiz HAFIZ V1

31 12.08.12 OFF 1223 MMHE - T 0031 Tee chin siong HAFIZ V1

32 13.08.12 OFF 1223 MMHE - T 0032 Tee chin siong HAFIZ V1

33 22.08.12 OFF 1223 MMHE - T 0033 Tee chin siong HAFIZ V1

34 27.08.12 OFF 1223 MMHE - T 0034 Wee HAFIZ V1

35 27.08.12 OFF 1223 MMHE - T 0035 Shannon HAFIZ V1

36 27.08.12 OFF 1223 MMHE - T 0036 Ooi HAFIZ V1

37 28.08.12 OFF 1223 MMHE - T 0037 1.HUC-1223-S-002 : Telecom tower installation Shannon HAFIZ V1

38 29.08.12 OFF 1223 MMHE - T 0038 Tee chin siong HAFIZ V1

39 29.08.12 OFF 1223 MMHE - T 0039 1.OFF/FR/KNPG-B/S/003 : Faulty report Structural Shannon HAFIZ V1

40 29.08.12 OFF 1223 MMHE - T 0040 Oii wei jian HAFIZ V1

41 30.08.12 OFF 1223 MMHE - T 0041 Tee chin siong HAFIZ V1

42 01.09.12 OFF 1223 MMHE - T 0042 1.HUC-1223-M-001 Asyraf HAFIZ

43 03.09.12 OFF 1223 MMHE - T 0043 Azli HAFIZ V1

44 03.09.12 OFF 1223 MMHE - T 0044 Zakiamani HAFIZ V1

45 05.09.12 OFF 1223 MMHE - T 0045 Azli HAFIZ V1

46 05.09.12 OFF 1223 MMHE - T 0046 Wee HAFIZ V1

47 05.09.12 OFF 1223 MMHE - T 0047 Tee chin siong HAFIZ V1

48 05.09.2012 OFF 1223 MMHE - T 0048 Ooi / Latif HAFIZ V1

49 06.09.12 OFF 1223 MMHE - T 0049 Shamsul HAFIZ V1

50 07.09.12 OFF 1223 MMHE - T 0050 Wee HAFIZ V1

51 08.09.12 OFF 1223 MMHE - T 0051 Wee HAFIZ V1

52 09.09.12 OFF 1223 MMHE - T 0052 Faizol HAFIZ V1

53 09.09.12 OFF 1223 MMHE - T 0053 Walkie Talkie come with Charger (3 Pcs) Wee Hafiz V1

54 10.09.12 OFF 1223 MMHE - T 0054 Zaki / Nantha / Maliki HAFIZ V1

55 10.09.12 OFF 1223 MMHE - T 0055 Abdul Latif HAFIZ V1

0018

1.HUC-1223-E-005-112 : LIQUID SEPARATION SYSTEM – 112 2.HUC-1223-E-005-121 : GAS COLLECTION AND RECEIVING SYSTEM – 121 3.HUC-1223-E-005-141 : GLYCOL CONTACTORS SYSTEM – 141 4.HUC-1223-E-005-142 : GLYCOL REGENERATION SYSTEM – 142 5.HUC-1223-E-005-151 : PRODUCED WATER TREATMENT PACKAGE SYSTEM – 151 6.HUC-1223-E-005-211 : FUEL & BLANKET GAS SYSTEM – 211 7.HUC-1223-E-005-263 : CHEMICAL INEJECTION SYSTEM – 263 8.HUC-1223-E-005-281 : SEA WATER SYSTEM - 281 9.HUC-1223-E-005-321 : INSTRUMENT AIR SYSTEM - 321 10.HUC-1223-E-005-322 : UTILITY AIR SYSTEM – 322 11.HUC-1223-E-005-331 : SERVICE WATER SYSTEM – 331 12.HUC-1223-E-005-332 B : POTABLE WASH WATER SYSTEM - 332 B 13.HUC-1223-E-005-342 : HVAC SYSTEM – 342 14.HUC-1223-E-005-411 : FIRE WATER SYSTEM – 411 15.HUC-1223-E-005-412 : FIRE SUPPRESSION & EXTINGUISHER – 412 16.HUC-1223-E-005-413 : DELUGE & SPRINKLER SYSTEM – 413 17.HUC-1223-E-005-423 : EVACUATION EQUIPMENT – 423 18.HUC-1223-E-005-511 : GAS TURBINE GENERATOR SYSTEM – 51119.HUC-1223-E-005-512 : EMERGENCY DIESEL GENERATOR SYSTEM – 512 20.HUC-1223-E-005-521 : MV SWITCHGEAR SYSTEM – 521 21.HUC-1223-E-005-523 : TRANSFORMERS SYSTEM – 523 22.HUC-1223-E-005-611 : PMCS SYSTEM 611 23.HUC-1223-E-005-621 : SIS SYSTEM 621 24.HUC-1223-E-005-631 : FIRE & GAS DETECTION SYSTEM 631 25.HUC-1223-E-005-632 : PNEUMATIC FIRE DETECTION SYSTEM - 632

0019

0020

1.HUC-S-STQ-002 : MAIN ACCESS WAY - ADDITIONAL WORK 2.HUC-S-STQ-003 : CLASHING OF STAIRWAY NO. 14A TO 2 NOS. OF EXISTING HANDRAIL

HUC-1223-S-001 : TLQ Panel Frames Support Lifting & Installation Procedure rev 0

HUC-1223-S-001 : TLQ Panel Frames Support Lifting & Installation Procedure rev 1

1.HUC-S-STQ-004 : FOLDABLE BEAM CLASHING WITH ELECTRICAL POWER CABLE LADDER.

1.HUC-S-STQ-005 : STAIRWAY NO 14A & NO 14B - MODIFICATION OF SUPPORT BASE PLATE

HUC-S-STQ-006 : Overlength Grating Panel Require Modification In-Situ

HUC-M-FIR-001 : Equipment seating for closed drain transfer pump - additional scope

HUC-T-STQ-001 : Vertical telecom cable ladder at column A12

1. HUC-1223-E-005-521 : MV swicth system 2. HUC-1223-M-001 : Service water pump installation procedure

1. HUC-1223-E-005-711-1 2. HUC-1223-E-005-711-2 3. HUC-1223-E-005-711-3 4. HUC-1223-E-005-712 5. HUC-1223-E-005-713 6. HUC-1223-E-005-721 7.HUC-1223-E-005-722

1. HUC-I-STQ-005 2. HUC-E-STQ-016

1. HUC-S-STQ-015 2. HUC-S-STQ-016

1. HUC-P-STQ-005

1.HUC-E-STQ-017 2.HUC-P-STQ-006 3.HUC-E-STQ-018

1.HUC-P-STQ-008 2.HUC-P-STQ-007

1.HUC-E-STQ-019 2.HUC-E-STQ-020

1.HUC-E-STQ-021 2.HUC-E-STQ-022 3.HUC-E-STQ-023 4.HUC-E-STQ-024 5.HUC-E-STQ-025

1.HUC-M-STQ-002 2.HUC-M-STQ-003 3.HUC-M-STQ-004 4.HUC-M-STQ-005 5.HUC-M-STQ-006 6.HUC-M-STQ-008 7.HUC-M-STQ-009

1.HUC-E-STQ-028 2.HUC-E-STQ-029

1. HUC-E-STQ-026 : 2. HUC-E-STQ-027 :

1.HUC-T-STQ-004 : Cable ladder obstructed by bracing at telecom tower.

1. HUC-P-STQ-009 : 2. HUC-P-STQ-010 : 3. HUC-P-STQ-011 : 4. HUC-S-STQ-017 :

1.HUC-1223-E-003 : SYSTEM HANDOVER PROCEDURE REV 0

1.HUC-T-STQ-005 : DATA LOG UNIT (DLU-9300) UNABLE TO OPEN DUE TO BLOCKED BY ELECTRICAL CABLE LADDER AT BREEZE DECK. (PLEASE REFER ATTACHED PICTURE) 2.HUC-E-STQ-030 : CABLE LADDER SUPPORT BLOCKING GRE FIRE WATER LINE ( CELLAR DECK, EAST SIDE, BELOW MAIN DECK,MODULE 3)

1.HUC-T-STQ-006 : WEEK SUPPORT FOR HF/SSB ANTENNA. 2.HUC-P-STQ-012 : RELOCATED PIPE SUPPORT

1.HUC-I-STQ-006 : CABLE SHORT FOR THE FIRE & GAS JUNTION BOX.

1.HUC-1223-E-005-423. 2.HUC-1223-E-005-332. 3.HUC-1223-E-005-532 4.HUC-1223-E-005-413 5.HUC-1223-E-005-422 6.HUC-1223-E-005-112 7.HUC-1223-E-005-813 8.HUC-1223-E-005-811 9.HUC-1223-005-E-342 10.HUC-1223-E-005-621 11.HUC-1223-E-005-611 12.HUC-1223-E-005-632 13.HUC-1223-E-005-631 14.,HUC-1223-M-001

1.HUC-S-STQ-017 REV 1 : MODIFY OF BEAMS AT FIRE WATER PUMPS.

Page 16: MDDR Kinabalu 16-10-12

56 10.09.12 OFF 1223 MMHE - T 0056 Zaki / Nantha / Maliki HAFIZ V1

57 11.09.12 OFF 1223 MMHE - T 0057 Wee HAFIZ V1

58 11.09.12 OFF 1223 MMHE - T 0058 ZAKI & NANTHA HAFIZ V1

59 11.09.12 OFF 1223 MMHE - T 0059 Shannon HAFIZ V1

60 11.09.12 OFF 1223 MMHE - T 0060 Faizol HAFIZ V1

61 11.09.12 OFF 1223 MMHE - T 0061 Shannon HAFIZ V1

62 12.09.12 OFF 1223 MMHE - T 0062 OFF/FR/KNPG-B/M/013 : Faulty report Mechanical Asyraf HAFIZ V1

63 12.09.12 OFF 1223 MMHE - T 0063 Wee HAFIZ V1

64 12.09.12 OFF 1223 MMHE - T 0064 Zaki HAFIZ V1

65 12.09.12 OFF 1223 MMHE - T 0065 Rasyidien HAFIZ V1

66 12.09.12 OFF 1223 MMHE - T 0066 Zaki HAFIZ V1

67 12.09.12 OFF 1223 MMHE - T 0067 Wee HAFIZ V1

68 13.09.12 OFF 1223 MMHE - T 0068 Shannon HAFIZ V1

69 13.09.12 OFF 1223 MMHE - T 0069 Wee HAFIZ V1

70 13.09.12 OFF 1223 MMHE - T 0070 Zaki HAFIZ V1

71 14.09.12 OFF 1223 MMHE - T 0071 Shannon HAFIZ V1

72 14.09.12 OFF 1223 MMHE - T 0072 Faizol/Nantha HAFIZ V1

73 14.09.12 OFF 1223 MMHE - T 0073 Faizol HAFIZ V1

74 14.09.12 OFF 1223 MMHE - T 0074 Zaki HAFIZ V1

75 14.09.12 OFF 1223 MMHE - T 0075 Zaki HAFIZ V1

76 15.09.12 OFF 1223 MMHE - T 0076 Shannon HAFIZ V1

77 15.09.12 OFF 1223 MMHE - T 0077 Zaki HAFIZ V1

78 15.09.12 OFF 1223 MMHE - T 0078 Shannon HAFIZ V1 V

79 16.09.12 OFF 1223 MMHE - T 0079 HAFIZ V1

80 16.09.12 OFF 1223 MMHE - T 0080 Shannon HAFIZ V1

81 16.09.12 OFF 1223 MMHE - T 0081 Nanthakumar HAFIZ V1

82 16.09.12 OFF 1223 MMHE - T 0082 Asyraf HAFIZ V1

83 16.09.12 OFF 1223 MMHE - T 0083 Shannon HAFIZ V1

84 17.09.12 OFF 1223 MMHE - T 0084 Faizol HAFIZ V1

85 17.09.12 OFF 1223 MMHE - T 0085 Rasyidien HAFIZ V1

86 18.09.12 OFF 1223 MMHE - T 0086 Shannon HAFIZ V1

87 18.09.12 OFF 1223 MMHE - T 0087 Rasyidien HAFIZ V1

88 18.09.12 OFF 1223 MMHE - T 0088 Faizol HAFIZ V1

89 18.09.12 OFF 1223 MMHE - T 0089 sookyen Dhila V1

90 18.09.12 OFF 1223 MMHE - T 0090 sookyen Dhila V1

91 18.09.12 OFF 1223 MMHE - T 0091 1. ALL DISCIPLIN PROGRESS SUMMARY (1 SEPT 12) Saiful Adli HAFIZ V1

1.HUC-1223-E-005-151 : PRODUCED SYSTEM COMMISSIONING PROCEDURE 2.HUC-1223-E-005-271 : NITROGEN SYSTEM 3.HUC-1223-E-005-411 : FIRE WATER SYSTEM 4.HUC-1223-E-005-542 : SMALL POWER & LIGHTING (NORMAL CIRCUIT) SYSTEM 5.HUC-1223-E-005-512 : EMERGENCY DISEL GENERATOR SYSTEM 6.HUC-1223-E-005-511 : GAS TURBINE GENERATOR SYSTEM 7.HUC-1223-E-005-331 : SERVICE WATER SYSTEM 8.HUC-1223-E-005-141 : GLYCOL CONTACTORS SYSTEM

1.HUC-T-STQ-007 : MODIFICATION PAGA STROBELIGHT POLE MOUNTED STAND AT JACKET

1.HUC-1223-E-005-113 : LIQUID TRANSFER AND METERING SYSTEM 2.HUC-1223-E-005-142 : GLYCOL RENERATION SYSTEM 3.HUC-1223-E-005-311 : DIESEL FUEL SYSTEM

1.HUC-S-STQ-019 : MEZZANINE DECK WALKWAY BETWEEN MODULE 2 AND MODULE 3. 2.HUC-S-STQ-018 : ADDITIONAL BEAMS AND GRATING PANELS FOR M4 UPPER DECK MODIFICATION WORK.

1.HUC-1223-E-005-522 : LOW VOLTAGE MCC & SWICTHBOARD SYSTEM 2.HUC-1223-E-005-541 : SMALL POWER & LIGHTING (EMERGENCY CIRCUIT) SYSTEM1.HUC-S-STQ-020 : MODIFICATION OF STAIRWAY NO 22 FROM FIXED STAIRWAY TO BOLTED REMOVAL STAIRWAY.

1.HUC-T-STQ-008 : SHORT OF ADAPTOR FOR CCTV AND PGA BREAKGLASS GLAND ENTRY.

1.HUC-1223-E-005-543 : EARTHING AND LIGHTING PROTECTION SYSTEM 2.HUC-1223-E-005-523 :TRANSFOMER SYSTEM 3.HUC-1223-E-005-211 : FUEL & BLANKET GAS SYSTEM 4.HUC-1223-E-005-233 : FLARE SYSTEM 5.HUC-1223-E-005-241 : OPEN DRAIN SYSTEM

1.HUC-1223-D-008 : BOLT TIGHTENING, TORQUING PROCEDURE. 2.HUC-1223-D-016 : POST WELD HEAT TREATMENT PROCEDURE. 3.HUC-1223-D-015 : WELD REPAIR PROCEDURE 4.HUC-1223-D-003 : WELDER QUALIFICATION TEST PROCEDURE. 5.HUC-1223-D-012 : MAGNETIC PARTICLE TESTING. 6.HUC-1223-D-013 : LIQUID PENETRANT INSPECTION. 7.HUC-1223-D-011 : ULTRASONIC TESTING PROCEDURE.

1.HUC-1223-E-005-263 : CHEMICAL INJECTION SYSTEM 2.HUC-1223-E-005-321 : INSTRUMENT AIR SYSTEM

1.HUC-T-STQ-009 : INSTALLATION TYPE FOR EARTH TAG AT M20 MALE X M25 FEMALE ADAPTER FOR LSU, CCTV, BREAKGLASS & STROBELIGHT.

1.HUC-S-STQ-002 REV 1 : CRUSHED MAIN BEAM BY INSTALLATION GUIDE

1.HUC-T-STQ-010 : CABLE GLANDING DETAILS FOR CCTV CABLE.

1. HUC-1223-E-005-121 : GAS COLLECTION AND RECEIVING SYSTEM

1. HUC-S-STQ-021 : MODIFICATION OF OVERLENGTH STAIRWAY (STAIRWAY NO 16) AT SUMP PUMP DECK. 2.HUC-S-STQ-023 : COLLISION OF BEAM WITH VERTICAL CABLE LADDER.

1. HUC-1223-E-005-281 : SEA WATER SYSTEM - 281 2.HUC-1223-E-005-544 : NAVIGATION AIDS

1. HUC-E-STQ-031 : CABLE GLAND DOES NOT SUITABLE WITH CABLE. 2. HUC-E-STQ-032 : CABLE GLAND DOES NOT SUITABLE WITH CABLE. 3. HUC-E-STQ-033 : CABLE GLAND DOES NOT SUITABLE CABLE. 4. HUC-E-STQ-034 : CABLE DOES NOT AT SIDE

1.HUC-S-STQ-024 : HANDRAILS MODIFICATION - CLASHING OF FUEL DIESEL PIPELINE WITH DIESEL OIL TANK HANDRAILS. 2.HUC-M-STQ-007 : COOLING WATER EXPANSION TANK V-6950.

1.HUC-1223-E-005-123 : GAS TRANSFER AND METERING SYSTEM. 2.HUC-1223-E-005-824 : COOLDROOM

1. HUC-S-STQ-022 : PROVISION OF BEAM FOR STAIRWAY 22 BASE SUPPORT 2. HUC-S-STQ-025 : REMOVAL OF PAD EYE AND PROVISION OF FIXED HANDRAIL. 3. HUC-S-FIR-004 : NDT SERVICE FOR CRUSHED MAIN BEAM OF MSF DRILLING.

1. HUC-1223-E-005-524 : IMCS & LSM 2. HUC-1223-E-005-282 : FRESH WATER SYSTEM 3. HUC-1223-E-005-821 : APPLIANCES SYSTEM

1. HUC-S-STQ-026 : Modification of fixed handrail at intermediate deck & mezzanine deck removable walkway.

1. HUC-1223-E-005-612 : WHCP SYSTEM 2. HUC-1223-E-005-242 : CLOSED DRAIN SYSTEM 3. HUC-1223-E-005-322 : UTILITY AIR SYSTEM 4. HUC-1223-D-014 : INSTRUMENT CALIBRATION PROCEDURE. 5. HUC-1223-B-003 : PLANNING PACKAGE 6. HUC-1223-E-005-412 : FIRE SUPPESSION & EXTINGUISER

Zaki/Nantha/Saiful/Maliki

1.HUC-S-STQ-027 : NDT PLAN FOR THE DAMAGE MAIN BEAM AT MSF DRILLING.

1. HUC-1223-M-002 : SEA WATER LIFT PUMP INSTALLATION.

1.HUC-M-STQ-010 : INSTALLATION OF CLOSED DRAIN TRANSFER PUMP AND OPEN/CLOSED DRAIN CAISSON PUMP.

1. NDT PLAN FOR THE DAMAGE MAIN BEAM AT MSF DRILLING.

1. HUC-E-STQ-035 : 1) WATER INGRESS INTO HELIDECK PERIMETER LIGHT VENDOR JUNCTION BOX. 2) WATER INGRESS INTO HELIDECK PERIMETER LIGHT JUNCTION BOX AND HELIDECK FLOODLIGHT.

1. HUC-1223-A-001 : MASTER DELIVERY DOCUMENT REGISTER. 2. HUC-1223-D-002 : INSPECTION & TEST PLAN. 3. HUC-1223-D-006 : NON-CONFORMANCE CONTROL PROCEDURE. 4. HUC-1223-D-004 : DOCUMENT CONTROL PROCEDURE.

1. HUC-S-FIR-003 : RENTAL OF SCAFFOLDING MATERIAL FOR TEMPORARY LIVING QUARTERS (TLQ)

1. HUC-1223-D-007 : WELDING CONSUMABLE CONTROL PROCEDURE. 2.HUC-1223-D-005 : MATERIAL CONTROL PROCEDURE. 3. HUC-1223-D-009 : FINAL DOCUMENT PROCEDURE.

1. HUC-E-STQ-036 : NO CABLE LADDER PROVIDE FROM MAIN CABLE LADDER TO GLYCOL REBOILER HEATER

Page 17: MDDR Kinabalu 16-10-12

92 18.09.12 OFF 1223 MMHE - T 0092 Rasyidien HAFIZ V1

93 19.09.12 OFF 1223 MMHE - T 0093 1. HUC-1223-B-002 : PROJECT EXERCUTION PLAN Syadid HAFIZ V1

94 19.09.12 OFF 1223 MMHE - T 0094 Shannon HAFIZ V1

95 20.09.12 OFF 1223 MMHE - T 0095 Wee HAFIZ V1

96 20.09.12 OFF 1223 MMHE - T 0096 Asyraf HAFIZ V1

97 20.09.12 OFF 1223 MMHE - T 0097 Maliki HAFIZ V1

98 21.09.12 OFF 1223 MMHE - T 0098 Hafeezi HAFIZ V1

99 21.09.12 OFF 1223 MMHE - T 0099 1. HUC-1223-T-001 Wee HAFIZ V1

100 22.09.12 OFF 1223 MMHE - T 0100 1. HUC-1223-D-001 : PROJECT QUALITY PLAN Syidien HAFIZ V1

101 22.09.12 OFF 1223 MMHE - T 0101 Tee chin siong HAFIZ V1

102 23.09.12 OFF 1223 MMHE - T 0102 Zaki/Rasyidien HAFIZ V1

103 23.09.12 OFF 1223 MMHE - T 0103 Romio HAFIZ V1

104 23.09.12 OFF 1223 MMHE - T 0104 Ooi HAFIZ V1

105 23.09.12 OFF 1223 MMHE - T 0105 Wee HAFIZ V1

106 23.09.12 OFF 1223 MMHE - T 0106 Zaki HAFIZ V1

107 23.09.12 OFF 1223 MMHE - T 0107 Faizol HAFIZ V1

108 24.09.12 OFF 1223 MMHE - T 0108 Nanthakumar HAFIZ V1

109 24.09.12 OFF 1223 MMHE - T 0109 Faizol HAFIZ V1

110 24.09.12 OFF 1223 MMHE - T 0110 Romil HAFIZ V1

111 25.09.12 OFF 1223 MMHE - T 0111 Zaki HAFIZ V1

112 25.09.12 OFF 1223 MMHE - T 0112 Wee HAFIZ V1

113 25.09.12 OFF 1223 MMHE - T 0113 Tee chin siong / Wee HAFIZ V1

114 26.09.12 OFF 1223 MMHE - T 0114 1. HUC-T-STQ-017 : HOOK-UP DRAWING FOR WMS-9301 Wee HAFIZ V1

115 26.09.12 OFF 1223 MMHE - T 0115 SURESH HAFIZ V1

116 26.09.12 OFF 1223 MMHE - T 0116 Wee/Shannon HAFIZ V1

117 27.09.12 OFF 1223 MMHE - T 0117 Romil HAFIZ V1

118 27.09.12 OFF 1223 MMHE - T 0118 Change Oder Yati HAFIZ V1

119 27.09.12 OFF 1223 MMHE - T 0119 Zaki HAFIZ V1

120 29.09.12 OFF 1223 MMHE - T 0120 Faizol/Tee HAFIZ V1

121 29.09.12 OFF 1223 MMHE - T 0121 Nanthakumar HAFIZ V1

1. HUC-1223-A-001 : MASTER DELIVERY DOCUMENT REGISTER. 2. HUC-1223-D-004 : DOCUMENT CONTROL PROCEDURE 3. HUC-1223-D-006 : NON-CONFORMANCE CONTROL PROCEDURE

1. HUC/S/FIR/005 : EXTENSION PLATFORM FOR WEATHER MONITORING SYSTEM (WMS)

1. HUC-T-STQ-011: CABLE FOR WMS-9303 IN LENGTH. 2. HUC-T-STQ-012 : RELOCATED FOR NDB/ATU 9400

HUC-1223-M-003 : FIREWATER PUMP INSTALLATION PROCEDURE P-5310A/B/C

1. OFF/FR/KNPG-B/I/011 2. OFF/FR/KNPG-B/I/012 3. OFF/FR/KNPG-B/I/013

1. OFF/FR/KNPG-B/E/020 : EMERGENCY STOP SWITCH DAMAGED CSS -2325A, SS-2325B & SS-2325C) 2. OFF/FR/KNPG-B/E/021 : SELECTOR SWITCH DAMAGED (RCU-EM5010B)

1.HUC-E-STQ-038 : AERONAUTICAL OBSTRUCTION LIGHT CONTROL PANEL NOT IN IFC DRAWING

1. HUC-1223-E-005-241 : OPEN DRAIN SYSTEM-241. 2. HUC-1223-E-005-332 : PORTABLE WATER SYSTEM-332. 3. HUC-1223-D-010 : RADIOGRAPHIC EXAMINATION PROCEDURE.

1. HUC-S-STQ-030 : RELOCATION OF PIPE SUPPORT AT INTERMEDIATE DECK INTERMODULAR WALKWAY M2/M3/M4. 2. HUC-S-STQ-028 : ADDITIONAL BASE SUPPORT STAIRWAY NO 32 AT UPPER DECK WALKWAY. 3. HUC-S-STQ-029 : ADDITIONAL SUPPORT FOR GRATING AT UPPER DECK WALKWAY.

1. OFF/FR/KNPG-B/P/001 : FUEL GAS LINE AT FLARE BOOM DAMAGED.

1. HUC-T-STQ-013 : CABLE SHORTAGE IN LENGTH AT MSFN. 2. HUC-T-STQ-014 : CCTV CABLE WRONGLY PULL IN ELECTRICAL LV CABLE LADDER 3. HUC-T-STQ-015 : CCTV CABLE ENTRY NO SUIT FOR CCTV CABLE GLANDING. 4. OFF/FR/KNPG-B/T/008 : CABLE INSULATION DAMAGED IN CCTV.

1. HUC-1223-E-005-824 REV 1 : COLDROOM-824. 2. HUC-1223-E-005-821 REV 1 : APPLIANCES SYSTEM-821

1. HUC-E-STQ-037 : FLOODLIGHT CAN'T BE INSTALL DUE TO STRUCTURE COLUMN 4A AT MODULE 3 INTERMEDIATE DECK DOES NOT EXIST. 2. HUC-E-STQ-039 : ONSHORE INSTALL WRONG TYPE OF LIGHTING. 3. HUC-E-STQ-040 : POWER CABLE SHORTAGE FOR E-6310 HP FLARE K.O DRUM CONDENSATE HEATER. 4. HUC-E-STQ-042 : LOCAL CONTROL PANEL (LCP) FOR OPEN & CLOSE DRAIN CAISSON PUMP.

1. HUC-1223-E-005-282 REV 1 : FRESH WATER SYSTEM - 282

1. HUC-E-STQ-041 : 1. Cable tray obstruct pipeline installation at wellhead service platform MSFD. 2. Cable tray obstruct pipeline installation at module 5 below main deck.

1. HUC-S-STQ-032 : ADDITIONAL HANDRAIL UNDER THE FLARE BOOM STAIRWAY. 2. HUC-S-STQ-031 : OBSTRUCTION IN RELOCATION OF SURVIVAL CRAFT DAVIT ARM STOOL

1. HUC-1223-E-005-413 REV 1 : DELUGE & SPRINKLER SYSTEM 2. HUC-1223-E-005-342 REV 1 : HVAC SYSTEM

1. HUC-T-FIR-001 : RELOCATED FOR NDB/ATU-9400 2. HUC-T-FIR-002 : MODIFICATION STAND/SUPPORT.

1. HUC-E-FIR-004 : CABLE LADDER AND CABLE TRAY MODIFICATION FOR FUEL GAS SKID. 2. HUC-E-FIR-003 : FABRICATE & INSTALL NEW SUPPORT AND ADDITIONAL CABLE TRAYS. 3. HUC-E-STQ-043 : INSUFFICIENT SPACE INSIDE GLYCOL REBOILER HEATER PANEL FOR CABLE TERMINATION 4. HUC-T-STQ-016 : TELECOM ROUTING FROM LCOT TELECOM EQUIPMENT ROOM TO LGAST FENCING.

1. PSP-KNPG-B-HUC-T10 : HSE PLAN 2. 'HUC-1223-C-003 : GENERAL SAFETY RULES PROCEDURE 3. 'HUC-1223-C-004 : PERSONAL PROTECTIVE EQUIPMENT PROCEDURE 4. HUC-1223-C-005 : PERMIT TO WORK PROCEDURE 5. HUC-1223-C-006 : PROTECTION OF ENVIRONMENT PROCEDURE 6. HUC-1223-C-007 : ELECTRICAL SAFETY PROCEDURE 7. HUC-1223-C-008 : HAND & POWER TOOLS PROCEDURE 8. HUC-1223-C-009 : MECHANICAL HANDLING SAFETY PROCEDURE 9. HUC-1223-C-010 : SCAFFOLDING SAFETY PROCEDURE 10. HUC-1223-C-011 : MATERIAL HANDLING & STORAGE PROCEDURE 11. HUC-1223-C-012 : CONSTRUCTION PLANT & MACHINERIES 12. HUC-1223-C-013 : MANUAL HANDLING PROCEDURE 13. HUC-1223-C-014 : WELDING AND GAS CUTTING SAFETY 14. HUC-1223-C-015 : GENERAL LIFTING PROCEDURE 15. HUC-1223-C-016 : CONFINED SPACE PROCEDURE 16. HUC-1223-C-017 : EMERGENCY RESPONSE PROCEDURE

1. HUC-1223-E-005-711-1 : DIGITAL MICROWAVE RADIO (DMR) SYSTEM 2. HUC-1223-E-S-001 : TLQ PANEL FRAMES SUPPORT LIFTING & INSTALLATION PROCEDURE. 3. HUC-1223-E-S-002 : TELECOM TOWER INSTALLATION PROCEDURE.

1. HUC-S-STQ-033 : CUTTING OF COLUMN GUSSET PLATE CLASHING WITH STAIRWAY AT M4 HP GAS COOLER PLATFORM.

1. HUC-1223-E-005-423 : EVACUATION EQUIPMENT. 2. HUC-1223-E-005-411 : FIRE WATER SYSTEM. 3. HUC-1223-E-005-112 : LIQUID SEPARATION SYSTEM. 4. HUC-1223-E-005-141 : GLYCOL CONTACTORS SYSTEM. 5. HUC-1223-B-001 REV 0 : PMT & HUC ORGANIZATION CHART.

1. HUC-I-STQ-007 : INCOMING SUPPLY CABLE FOR QT-8820. 2. HUC-E-STQ-044 : NITROGEN GENERATOR PANEL LCP-5900 NOT IN LAYOUT. 3. HUC-E-STQ-045 : TELECOM TOWER ELECTRICAL CABLE ROUTING. 4. HUC-E-STQ-046 : MISSING CABLE FOR ACID RECIRCULATION PUMP PM8850.

1. HUC-M-STQ-011 : LIFE RAFT MODIFICATION - ADDITIONAL WORK

Page 18: MDDR Kinabalu 16-10-12

122 30.09.12 OFF 1223 MMHE - T 0122 Tee HAFIZ V1

123 30.09.12 OFF 1223 MMHE - T 0123 1. HUC-1223-E-002 : FIRST FLOW GAS Paul HAFIZ V1

124 01.10.12 OFF 1223 MMHE - T 0124 FARID HAFIZ V1

125 01.10.12 OFF 1223 MMHE - T 0125 Shannon HAFIZ V1

126 01.10.12 OFF 1223 MMHE - T 0126 FaIzol HAFIZ V1

127 01.10.12 OFF 1223 MMHE - T 0127 Romil HAFIZ V1

128 02.10.12 OFF 1223 MMHE - T 0128 Nanthakumar HAFIZ V1

129 02.10.12 OFF 1223 MMHE - T 0129 Nanthakumar HAFIZ V1

130 03.10.12 OFF 1223 MMHE - T 0130 Tee HAFIZ V1

131 03.10.12 OFF 1223 MMHE - T 0131 Nanthakumar HAFIZ V1

132 03.10.12 OFF 1223 MMHE - T 0132 Romil HAFIZ V1

133 03.10.12 OFF 1223 MMHE - T 0133 Oii wei jian HAFIZ V1

134 04.10.12 OFF 1223 MMHE - T 0134 Oii wei jian HAFIZ V1

135 05.10.12 OFF 1223 MMHE - T 0135 Wee HAFIZ V1

136 05.10.12 OFF 1223 MMHE - T 0136 Tee HAFIZ V1

137 06.10.12 OFF 1223 MMHE - T 0137 Ooi / Wee HAFIZ V1

138 07.10.12 OFF 1223 MMHE - T 0138 Tee HAFIZ V1

139 07.10.12 OFF 1223 MMHE - T 0139 Tee HAFIZ V1

140 08.10.12 OFF 1223 MMHE - T 0140 Wee / Faizol HAFIZ V1

141 08.10.12 OFF 1223 MMHE - T 0141 Invoice Dhila HAFIZ V1

142 08.10.12 OFF 1223 MMHE - T 0142 Tee HAFIZ V1

143 09.10.12 OFF 1223 MMHE - T 0143 Faizol HAFIZ V1

144 08.10.12 OFF 1223 MMHE - T 0144 Wee / Faizol HAFIZ V1

145 10.10.12 OFF 1223 MMHE - T 0145 Latif / Wee / Faizol HAFIZ V1

146 10.10.12 OFF 1223 MMHE - T 0146 Saiful Adli HAFIZ V1

147 11.10.12 OFF 1223 MMHE - T 0147 Wee / Faizol / Zaki HAFIZ V1

148 11.10.12 OFF 1223 MMHE - T 0148 Tee HAFIZ V1

149 11.10.12 OFF 1223 MMHE - T 0149 Helmi HAFIZ V1

1. HUC-I-FIR-001 : INSTALL OUTSTANDING INSTRUMENT EARTH CABLE.

1. PR-PM-OFF-002 : PROVISION TO SUPPLY PIPE. 2. HUC-P-STQ-014 : OUTSTANDING PIPE. 3. HUC-P-STQ-013 : DIFFERENT THICKNESS OF FLANGE & TRANSITION PIECE.

1. HUC-S-STQ-034 : HALF PIPE COAMING AT MODULE 3 MAIN DECK . 2. HUC-S-STQ-036 : MODIFICATION OF HANDRAILS AT VALVE ACCESS PLATFORM. 3. PSP-KNPG-B-T18-RLT : REINSTATEMENT LEAK TEST PACKAGE.

1. HUC-E-STQ-047 : LCOT - DEVIATION WITH THE DRAWING.

1. HUC-S-STQ-035 : RELOCATION OF SURVIVAL CRAFT DAVIT ARM STOOL.

1. HUC-1223-E-005-332 : POTABLE WATER SYSTEM. 2. HUC-1223-E-005-241 : OPEN DRAIN SYSTEM.

1. HUC-M-STQ-012 : REMOVE AND WELDING BACK THE WING PLATE AFTER INSTALL THE EDG DUCT.

1. HUC-I-STQ-008 : CABLE PULLING ISSUE FOR 101-FJBi-801 2. HUC-E-STQ-048 : CABLE SHORT FOR RCU-PM2387A AT MODULE 3

1. HUC-1223-E-M-001 : SERVICE WATER PUMP INSTALLATION PROCEDURE. 2. HUC-1223-E-005-123 : GAS TRANSFER AND METERING SYSTEM. 3. HUC-1223-E-005-332 : POTABLE WATER SYSTEM. 4. HUC-1223-E-005-241 : OPEN DRAIN SYSTEM. 5. HUC-1223-E-S-002 : TELECOM TOWER INSTALLATION PROCEDURE. 6. HUC-1223-D-001 : PROJECT QUALITY PLAN.

1. HUC-S-STQ-037 : MODIFICATION OF HANDRAIL AT HP GAS COOLER RAISED ACCESS PLATFORM. 2. HUC-S-STQ-038 : MODIFICATION UNDER INTERMEDIATE LANDING FRAMING OF STAIRWAY NO 31.

1. HUC-P-STQ-015 :RE-ROUTING TIE IN OF 100-DH-65087-11430X-SPD.

1. HUC-P-STQ-016 : :RE-ROUTING TIE IN OF 100-DH-65087-11430X-SPD

1. HUC-T-STQ-018 : ADDITIONAL CABLE PULLING FOR MUTABLE SPEAKER IN LQ HABITATION. 2. HUC-T-STQ-019 : CABLE SHORTAGE IN DRUM.

1. HUC-T-STQ-020 : TELECOM ROUTING FROM MAIN CABLE LADDER ROUTING TOLCOT FENCING.

1. HUC-P-STQ-017 : CLOSED AND OPEN DRAIN CAISSONS. 2. HUC-P-STQ-018 : OFFSET OF TIE IN POINT. 3. HUC-P-STQ-019 : DIFFERENT SIZE OF TIE IN POINT 4. HUC-P-STQ-020 : DIFFERENT SIZE OF TIE IN POINT 5. HUC/T/FIR/003 : RELOCATION STAND/SUPPORT FOR RAIN GAUGE SENSOR

1. HUC-I-STQ-009 : DISCREPENCY BETWEEN CABLE SCHEDULE AND BLOCK DIAGRAM FOR FIBRE OPTEC CABLE. 2. HUC-E-STQ-049 : EXISTING MOUNTED PLATE IS TO SMALL TO IINSTALL HELI STATER SOCKET HSS-7866.

1. HUC-1223-F-001 : LCOT & LGAST PROJECT EXERCUTION PLAN (MINI WORKPACK)

1. OFF/FR/KNPG-B/E/023 : LOW RESISTANCE FOR BOOSTER PUMP. 2. HUC-I-STQ-010 : INSTRUMENT CABLE DAMAGE. 3. HUC-T-STQ-022 : PAGA AND CCTV PANEL TERMINATION DRAWING. 4. HUC-T-STQ-021 : CABLE TERMINATION IN CCTV PANEL NOT CONSISTENT.

1. HUC-I-STQ-011 : OUTSTANDING CABLES FOR LCP-8800. 2. HUC-I-STQ-012 : DISCREPENCY BETWEEN CABLE SCHEDULE AND TERMINATION DRAWING.

1. HUC-I-STQ-013 : NO CABLE FROM LCP TO LEVEL TRANSMITTER FOR FIRE WATER PUMP A,B AND C. 2. HUC-E-STQ-050 : CABLE FROM SS-PM6720A TO PM-6720A AND SS-PM-6720B TO PM-6720B NOT LAYING PROPERLY.

1. HUC-1223-E-005-511 : GAS TURBINE GENERATOR SYSTEM-511. 2. HUC-1223-E-005-722 : WEATHER MONITORING SYSTEM-722. 3. HUC-1223-T-001 : DMR ANTENNA INSTALLATION PROCEDURE. 4. HUC-1223-E-005-721 : CLOSED CIRCUIT TELEVISION (CCTV) SYSTEM-721.

1. HUC-E-STQ-051 : WELDING SOCKET OUTLET CLASH BY POWER CABLE AT MODULE 1 BREEZE DECK. 2. HUC-E-STQ-052 : EMERGENCY LIGHT CLASH WITH GRE PIPE. 3. HUC-T-STQ-023 : OUTSTANDING MATERIAL FOR INSTALLATION ANTENNA ANT-9370. 4. HUC-S-STQ-039 : MODIFY RISER PLATFORM TO REMOVABLE BEAM. 5.HUC-S-STQ-040 : EXTENSION OF SURVIVAL CRAFT DAVIT PLATFORM. 6. 'HUC-M-STQ-013 : INSTALLATION OFLIFEBUOY LIGHT AT LIFE BUOY BRACKET.

1. 50% MILESTONE CLAIM PROGRESS MEASUREMENT (MECHANICAL,ELECTRICAL,TELECOM,PIPING,INSTRUMENT,LQ HABITATION, OFFSHORE GENERAL, COMMISSIONING,STRUCTURAL)

1. HUC-1223-E-005-512 : EMERGENCY DIESEL GENERATOR SYSTEM-512. 2. HUC-1223-E-005-521 : MV SWITCHGEAR SYSTEM-521. 3. HUC-1223-E-005-524 : IMCS & LSM SYSTEM-524. 4. HUC-1223-E-005-523 : TRANSFORMER SYSTEM-523. 5. HUC-1223-E-005-711-2 : VERY HIGH FREQUENCY & HIGH FREQUENCY (VHF/HF) SYSTEM-711-2. 6. HUC-1223-E-005-413 : DELUGE & SPRINKLER SYSTEM-413. 7. HUC-1223-E-005-712 : PUBLIC ADDRESS GENERAL (PAGA) SYSTEM-712. 8. HUC-1223-E-005-141 : GLYCOL CONTACTORS SYSTEM-141. 9. HUC-1223-E-005-713 : IP-PABX/LAN SYSTEM-713.

1. HUC-E-FIR-005 : MODIFICATION AND ADDITIONAL WORKS.

1. HUC-1223-E-005-611 : PMCS SYSTEM 611. 2. HUC-1223-E-005-621 : SIS SYSTEM 621. 3. HUC-1223-E-005-631 : FIRE & GAS DETECTION SYSTEM 631. 4. HUC-1223-E-005-632 : PNEUMATIC FIRE DETECTION SYSTEM 632. 5. HUC-1223-D-014 : INSTRUMENT CALIBRATION PROCEDURE.

Page 19: MDDR Kinabalu 16-10-12

150 11.10.12 OFF 1223 MMHE - T 0150 Faizol HAFIZ V1

151 13.10.12 OFF 1223 MMHE - T 0151 Wee / Nantha HAFIZ V1

152 13.10.12 OFF 1223 MMHE - T 0152 Ooi / Faizol / Tee HAFIZ V1

153 13.10.12 OFF 1223 MMHE - T 0153 Abdul Latif HAFIZ V1

154 14.10.12 OFF 1223 MMHE - T 0154 Faizol / Suresh HAFIZ V1

155 14.10.12 OFF 1223 MMHE - T 0155 Faizol HAFIZ V1

156 14.10.12 OFF 1223 MMHE - T 0156 Samsul HAFIZ V1

157 14.10.12 OFF 1223 MMHE - T 0157 Latif / Tee HAFIZ V1

158 16.10.12 OFF 1223 MMHE - T 0158 Azli HAFIZ V1

159 16.10.12 OFF 1223 MMHE - T 0159 Wee HAFIZ V1

160 OFF 1223 MMHE - T 0160 HAFIZ V1

161 OFF 1223 MMHE - T 0161 HAFIZ V1

162 OFF 1223 MMHE - T 0162 HAFIZ V1

163 OFF 1223 MMHE - T 0163 HAFIZ V1

164 OFF 1223 MMHE - T 0164 HAFIZ V1

1. HUC-I-STQ-014 : CABLE SHORTAGE FROM FAP-8201 A&B TO 021-HD-802. 2. HUC-E-STQ-053 : NORMAL FLUORESCENT LIGHT TO BE RELOCATE.

1. HUC-1223-E-005-241 : OPEN DRAIN SYSTEM-241. 2. HUC-1223-E-005-722 : WEATHER MONITORING SYSTEM-722.

1. HUC-T-STQ-024 : INSUFFICIENT SPACE FOR CABLE GLANDING AT JUNCTION BOX. 2. HUC-E-STQ-054 : ELECTRICAL CABLE FOR FUTURE MODULE 6 AND 7. 3. HUC-P-STQ-022 : NEW DH LINE FOR LAYDOWN AREA & CAISSON PUMP DECK DRAIN. 4. OFF/FR/KNPG-B/P/003 : PIPE SUPPORT AT FLARE BOOM & TIP DAMAGED.

1. OFF/FR/KNPG-B/T/009 : WATER INGRESSED IN CCTV. 2. HUC-S-STQ--041 : RELOCATION OF LIFE RAFT PLATFORM AT CELLAR DECK FLARE AREA.

1. HUC-1223-E-005-532 : UPS-UNINTERUPTIBLE POWER SUPPLY SYSTEM-532 REV 1. 2. HUC-1223-E-005-544 : NAVIGATION AIDS SYSTEM-544 REV 1. 3. HUC-1223-C-017 : EMERGENCY RESPONSE PROCEDURE REV 0.

1. HUC-E-STQ-056 : NO CABLE AND RCU FOR PROCESS CHEMICAL INJECTION PUMP. 2. HUC-E-STQ-055 : COMPACTOR AND SELECTOR SWICTH TO BE RELOCATE.

1. HANDOVER DOSSIER SUB-SUB SYSTEM COLDROOM. 2. HANDOVER DOSSIER SUB-SUB SYSTEM APPLIANCES.

1. HUC-T-STQ-025 : RELOCATION OF THE BOOM REST. 2. HUC-S-STQ-041 REV 1 : RELOCATION OF LIFE RAFT PLATFORM AT CELLAR DECK FLARE AREA. 3. HUC-S-STQ-042 : EXTENSION OF DECK AT M4 UPPER DECK. 4. HUC-S-STQ-043 : RELOCATE THE GTG VERTICAL LADDER.

1. OFF/FR/KNPG-B/E/025 : LOW RESISTANCE FOR HYPHOCHLORITE DOSING PUMP A.

1. HUC-T-STQ-026 : MCT NOT SUIT FOR DMR WAVE GUIDE CABLE. 2. HUC-T-STQ-027 : PAGA CABLE (023-PAGA-9050A) FROM PANEL TO JUNCTION BOX SHORTAGE. 3. OFF/FR/KNPG-B/T/010 : WATER INGRESSED IN CCTV (111-PTZ-902). 4. OFF/FR/KNPG-B/T/011 : PAGA SPEAKER WITHOUT CLAMP.(101-LSU-901B)

Page 20: MDDR Kinabalu 16-10-12

PROJECT : 1223

No DateDocument Reference Number T

1 2 3 5 1

1 KLO 1223 CAREION - T

2 31-May-12 KLO 1223 NCIS - T

3 31-May-12 KLO 1223 SEA LANE - T

4 KLO 1223 SJS - T

5 11.06.12 KLO 1223 UM - T

6 KLO 1223 - T

7 27.06.12 KLO 1223 PIONEER - T

8 11.07.12 KLO 1223 SEA LANE - T

9 12.07.12 KLO 1223 INTERGLAND - T

10 13.07.12 KLO 1223 SEA LANE - T

11 17.07.12 KLO 1223 SEA LANE - T

12 17.07.12 KLO 1223 RN LEOPART - T

13 17.07.12 KLO 1223 INTERGLAND - T

14 20.07.12 KLO 1223 SNS - T

15 26.07.12 KLO 1223 CHECK E&T - T

16 26.07.12 KLO 1223 OCP - T

17 27.07.12 KLO 1223 CAREION - T

18 27.07.12 KLO 1223 EMZEE - T

TITLE : MASTER LIST Project Correspondence Out

Page 21: MDDR Kinabalu 16-10-12

19 31.07.12 KLO 1223 JR - T

20 08.08.12 KLO 1223 LEOPAD - T

21 08.08.12 KLO 1223 TUV - T

22 08.08.12 KLO 1223 SYNZ - T

23 14.08.12 KLO 1223 LEOPAD - T

24 15.08.12 KLO 1223 SERBA MAHIR - T

25 29.08.12 KLO 1223 LABUAN - T

26 29.08.12 KLO 1223 NERA (M) - T

27 29.08.12 KLO 1223 JURUTERA UJI - T

28 06.09.12 KLO 1223 SEA LANE - T

29 06.09.12 KLO 1223 - T

30 OFF 1223 PCSB - T

31 09.09.13 OFF 1223 PCSB - T

32 09.09.13 OFF 1223 PCSB - T

33 11.09.12 OFF 1223 KENCANA - T

34 12.09.12 OFF 1223 SPO - T

35 14.09.12 KLO 1223 KENCANA - T

36 15.09.12 KLO 1223 PCSB - T

37 16.09.12 KLO 1223 KPW - T

38 18.09.12 KLO 1223 PCSB - T

39 19.09.12 KLO 1223 PCSB - T

Page 22: MDDR Kinabalu 16-10-12

40 01.10.12 KLO 1223 PCSB - T

41 03.10.12 KLO 1223 KPW - T

Page 23: MDDR Kinabalu 16-10-12

42 05.10.12 KLO 1223 KENCANA - T

43 06.10.12 KLO 1223 KENCANA - T

44 14.10.12 KLO 1223 PCSB - T

45 KLO 1223 - T

46 KLO 1223 - T

47 KLO 1223 - T

KLO 1223 - T

KLO 1223 - T

KLO 1223 - T

Page 24: MDDR Kinabalu 16-10-12

KLO 1223 - T

Page 25: MDDR Kinabalu 16-10-12
Page 26: MDDR Kinabalu 16-10-12
Page 27: MDDR Kinabalu 16-10-12

DATE : 8-Apr-2023

PREPARED BY :Dhila Dzulkifli

Running No. Document Description Originator

0001

Raja Norhayati

Raja Norhayati

0004 Service Order Raja Norhayati

0005 Service Order Raja Norhayati

0006 Service Order Raja Norhayati

0007 Service Order Raja Norhayati

0008 Service Order Raja Norhayati

0009 Service Order Raja Norhayati

0010 Service Order Raja Norhayati

0011 Service Order Raja Norhayati

0012 Service Order Raja Norhayati

0013 Service Order Raja Norhayati

0014 Service Order Raja Norhayati

0015 Service Order Raja Norhayati

0016 Service Order Raja Norhayati

0017 Service Order Raja Norhayati

0018 Service Order Raja Norhayati

0002Service Order (Prov. Of Manpower, Equipment & Consumables For RT)

0003Service Order (Prov. For Transpotation, Accomodation & miscellanneous Service at Labuan)

Page 28: MDDR Kinabalu 16-10-12

0019 Service Order Raja Norhayati

0020 Service Order Raja Norhayati

0021 Service Order Raja Norhayati

0022 Service Order Raja Norhayati

0023 Service Order Raja Norhayati

0024 Service Order Raja Norhayati

0025 Service Order Raja Norhayati

0026 Service Order Raja Norhayati

0027 Service Order Raja Norhayati

0028 Service Order Raja Norhayati

0029 Service Order Raja Norhayati

0030

0031 Syidien

0032 Walkie Talkie come with Charger (3 Pcs) Wee

0033 HAIKAL

0034 LQ HABITATION Samsul

0035 Glalvin

0036 Syidien

0037 Norasmah

0038 1. RISER DOCUMENT FOR 18" & 24" (1 FILE) Rasyidien

0039 1. RISER DOCUMENT FOR 18" & 24" (1 FILE) Ariffin(PCSB)

Welder Summary, Welder Pass & Welder Qualification Certificated (Piping)

BOSET CERTIFICATE : AMBAU ANAK BACHAN & BIDIN ANAK SIAM. (FOR RENIEW)

1. CURRICULUM VITAE. 2. AGREEMENT CONTRACT.

Welder Summary, Welder Pass & Welder Qualification Certificated (Structural)

1. Loop Calibrator -Altec 334A PWM # 192 2.Decode Resistance Box - Time Electronics PWN # 182 3. HV Inssulation Tester i) Icyoritsu 3123 ii) Pinewell # 55 4. LV Inssulation Tester i) icyoritsu 3321A ii) pinewell # 92 5. Beta Gauge KPW # I133 6. Beta Gauge KPW # I 163.

Page 29: MDDR Kinabalu 16-10-12

0040

0041 Helmi

1. COMP AIR. 2. INSTRUMENT AIR DRAYER. 3. AIR COMPRESSOR PACKAGE. 4. CABIN ROOM 8 PCS. 5. PRAYER ROOM 1 PCS. 6. CORRIDOR 1 PCS. 7. MODULE 2 MAIN PC ROOM 1PCS. 8. MEZZ. DECK UPS ROOM EXT. DOOR 1PCS. 9. MEZZ. DECK BATERY ROOM EXT. DOOR 1 PCS. 10. MODULE 2 MEZZ. DECK BATTERY ROOM 1 PCS. 11. LEVEL 4 AIR LOCK 1 PCS. 12. LEVEL 4 CORRIDOR 1 PCS. 13. LEVEL 4 PIPING ROOM 1 PCS. 14. LEVEL 4 STAIRWAY 1 PCS. 15. LEVEL 4 CABIN ROOM 3 PCS. 16. LEVEL 4 E&I DUCT ROOM 1 PCS. 17. LEVEL 4 AIRLOCK 1 PCS. 18. LEVEL 1 PIPING DUCT ROOM 1 PCS. 19. LEVEL 1 PLATFORM SUPT OFFICE 1 PCS. 20. LEVEL 1 A/ LOCKROOM 1PCS. 21. LEVEL 1 E&I DUCT ROOM 1 PCS. 22. LEVEL 1 DOCUMENT ROOM 1 PCS. 23. RADIO OPERATION ROOM 1 PCS. 24. LEVEL 1 CORRIDOR 1 PCS. 25. LEVEL 1 EXT. CENTER 1 PCS. 26. LEVEL 1 EXT ROW A 1 PCS. 27. LEVEL 1 MEETING ROOM 1 PCS. 28. LEVEL 1 TOILET 1PCS. 29. LEVEL 1 SUPV. OPERATION OFFICE 1 PCS. 30. LEVEL 1 CENTER CONTROL ROOM 1 PCS. 31. LEVEL 1 STAIRWAY 1PCS. 32. MEDICAL ROOM (INT) 2 PCS. 33. CABIN ROOM 1 PCS. 34. MODULE 2 MEZZ DECK TRANSFOMER ROOM 1 PCS. 35. MAIN DECK SWICTH GEAR 2PCS. 36. MEZZ DECK AIR LOCK 1 PCS. 37. LEVEL 2 TOILET 1 PCS. 38. LEVEL 2 KITCHEN EXT 2 PCS. 39. LEVEL 2 PIPING DUCT ROOM 1 PCS. 40. LEVEL 2 DRY STORE 1 PCS. 41. LEVEL 2 RECREATION ROOM 1 PCS. 42. LEVEL 2 LAUNDRY ROOM 1 PCS. 43. LEVEL 2 DINING ROOM EXT 1 PCS. 44. LEVEL 2 CORRIDOR 1 PCS. 45. LEVEL 2 STEAWARD OFFICE 1 PCS. 46. LEVEL 2 STAIRWAY 1 PCS. 47. LEVEL 2 E&I DUCT ROOM 1 PCS. 48. LEVEL 2 DINING HALL 1 PCS. 49. LEVEL 2 A/LOCK ROW A 1 PCS. 50. LEVEL 3 PIPING DUCT ROOM 1 PCS. 51. LEVEL 3 AIR LOCK 1 PCS. 52. LEVEL 3 STAIRWAY 1 PCS. 53. LEVEL 3 CABIN ROOM 10 PCS. 54. LEVEL 3 CARRIDE ROW B/A 2 PCS. 55. LEVEL 3 E&I DUCT ROOM 1 PCS. 56. LEVEL 3 GYM ROOM 1 PCS. 57. LEVEL 3 HOUSEKEEPING STORE 1 PCS.

1. 1 264 : DC VOLTAGE REGULATOR KPW. 2. 1 267 : DC VOLTAGE REGULATOR KPW. 3. 1 223 : HIGH PRESSURE HANDPUMP KPW. 4. LOW PRESSURE HANDPUMP SPARE PART.

Page 30: MDDR Kinabalu 16-10-12

0042 Galvin

0043 Galvin

0044 Walkie Talkie come with Charger (2 Pcs) Saiful

0045

0046

0047

0048

0049

0050

1. SERVICE AGREEMENT NICKAL SALANG AK LIANG. 2. SERVICE AGEEMENT MARCEL ANAK ABRAHAM. 3. SERVICE AGEEMENT SAGA ANAK BEJI. 4. SERVICE AGREEMENT SARIBAN ANAK BUDA. 5.SERVICE ARGEEMENT GUNONG ANAK AMPAS. 6. SERVICE ARGEEMENT TELLA ANAK GUNUT. 7. SERVICE AGREEMENT EVAN JOSPEH PITOS. 8. SERVICE AGREEMENT MATHEW ANAK BERANDI. 9. SERVICE AGREEMENT LORENZO MOE ANAK SALAM @ SELLEN. 10. SERVICE AGREEMENT TALIB BIN SAIDE. 11. SERVICE AGREEMENT PHILIP GAING ANAK ATING. 12. SERVICE AGREEMENT KIRUN BIN SAGGAP. 13. SERVICE AGREEMENT HABIR BIN EMBING. 14. SERVICE AGREEMENT KONG SENG HUAT. 15. SERVICE AGREEMENT ZAIN ABDULLAH MURAD. 16. SERVICE AGREEMENT KASMIN MANINI. 17. SERVICE AGEEMENT JUAS ANAK JABU. 18. SERVICE AGREEMENT SANDAH ANAK GENDI. 19. SERVICE AGREEMENT NINGKAN ANAK SAMPA. 20. SERVICE AGREEMENT ALDIN PARAS MELKIAS. 21. SERVICE AGREEMENT MOHD FAZLEE BIN YAHYA. 22. SERVICE AGREEMENT ADRIN BIN TAT. 23. SERIVECE AGREEMENT MELVYN AK LIANG. 24. SERVICE AGREEMENT BORDIE ANAK MAGIT. 25. SERVICE AGREEMENT SLYVESTER BILONG EDET. 26. SERVICE AGREEMENT ABD BAKAR BIN ASLIM. 27. SERVICE AGREEMENT DRAGAM ANAK LUNDA. 28. SERVICE AGREEMENT MUHAMMAD HANIFF BIN OSMAN. 29. SERVICE AGREEMENT MANGGAI ANAK EGING.

1. HARD COPY TIMESHEET (1 FILE). 2. MELIS ANAK ANGKAU, JUING ANAK MAOH, & JAMES BEDINDANG ANAK JANANG (BOSET & MEDICAL). 3.DAVID ANAK GENDI, MINGGU ANAK GENDI, FRANKY EMBUAS, STANLEY ANAK BATANG & JIMBAI ANAK MARINGAI (SERVICE AGGREEMENT).

Page 31: MDDR Kinabalu 16-10-12

0051

Page 32: MDDR Kinabalu 16-10-12
Page 33: MDDR Kinabalu 16-10-12
Page 34: MDDR Kinabalu 16-10-12

Prepared By File Number

Raja Norhayati V1

Raja Norhayati V1

Raja Norhayati V1

Raja Norhayati V1

Raja Norhayati V1

Raja Norhayati V1

Raja Norhayati V1

Raja Norhayati V1

Raja Norhayati V1

Raja Norhayati V1

Raja Norhayati V1

Raja Norhayati V1

Raja Norhayati V1

Raja Norhayati V1

Raja Norhayati V1

Raja Norhayati V1

Raja Norhayati V1

Page 35: MDDR Kinabalu 16-10-12

Raja Norhayati V1

Raja Norhayati V1

Raja Norhayati V1

Raja Norhayati V1

Raja Norhayati V1

Raja Norhayati V1

Raja Norhayati V1

Raja Norhayati V1

Raja Norhayati V1

Raja Norhayati V1

Raja Norhayati V1

Hafiz V1

Hafiz V1

Hafiz V1

Hafiz V1

HAFIZ V1

Hafiz V1

Hafiz V1

Hafiz V1

Hafiz V1

Page 36: MDDR Kinabalu 16-10-12

Hafiz V1

Hafiz V1

Page 37: MDDR Kinabalu 16-10-12

Hafiz V1

Hafiz V1

Hafiz V1

Hafiz V1

Hafiz V1

Hafiz V1

Hafiz V1

Hafiz V1

Hafiz V1

Page 38: MDDR Kinabalu 16-10-12

Hafiz V1

Page 39: MDDR Kinabalu 16-10-12
Page 40: MDDR Kinabalu 16-10-12
Page 41: MDDR Kinabalu 16-10-12

DATE :

PROJECT : 1223 PREPARED BY :

No DateDocument Reference Number L

Running No.1 2 3

1 KO 1233 - L 0001

2 KO 1233 - L 0002

3 6/12/2012 KLO 1223 - L

4 6/12/2012 KLO 1223 - L

5 13.06.2012 KLO 1223 - L 0005

6 22.06.12 KLO 1223 - L 0006

7 03.07.12 KLO 1223 - L 0007

8 09.07.12 KLO 1223 - L 0008

9 09.07.12 KLO 1223 - L 0009

10 25.07.12 KLO 1223 - L 0010

11 KLO 1223 - L 0011

12 06.07.12 KLO 1223 - L 0012

13 KLO 1223 - L 0013

14 09.08.12 KLO 1223 - L 0014

15 10.08.12 KLO 1223 - L 0015

16 13.08.12 KLO 1223 - L 0016

17 14.08.12 KLO 1223 - L 0017

18 30.08.12 KLO 1223 - L 0018

TITLE : MASTER LIST Project Correspondence Out

0003

0004

Page 42: MDDR Kinabalu 16-10-12

19 06.09.12 KLO 1223 - L 0019

20

Page 43: MDDR Kinabalu 16-10-12
Page 44: MDDR Kinabalu 16-10-12
Page 45: MDDR Kinabalu 16-10-12
Page 46: MDDR Kinabalu 16-10-12

8-Apr-2023

Dhila Dzulkifli

Document Description Originator Prepared By

LETTER OF AWARD CHUA SOOK YEN CHUA SOOK YEN

LETTER OF AWARD CHUA SOOK YEN CHUA SOOK YEN

LETTER OF INTENTION-CHARTER OF AHTS JUL SOFUS K ROHAIDI HAFIZ

LETTER OF INTENTION-CHARTER OF AHTS HARRIER K ROHAIDI HAFIZ

LETTER CHUA SOOK YEN CHUA SOOK YEN

LETTER CHUA SOOK YEN CHUA SOOK YEN

LETTER CHUA SOOK YEN CHUA SOOK YEN

LETTER CHUA SOOK YEN CHUA SOOK YEN

LETTER DARREN DARREN

LETTER DARREN DARREN

LETTER

LETTER DARREN DARREN

LETTER CHUA SOOK YEN CHUA SOOK YEN

LETTER CHUA SOOK YEN CHUA SOOK YEN

LETTER DARREN DARREN

LETTER DARREN DARREN

LETTER CHUA SOOK YEN CHUA SOOK YEN

LETTER CHUA SOOK YEN CHUA SOOK YEN

Page 47: MDDR Kinabalu 16-10-12

LETTER DARREN DARREN

Page 48: MDDR Kinabalu 16-10-12
Page 49: MDDR Kinabalu 16-10-12
Page 50: MDDR Kinabalu 16-10-12
Page 51: MDDR Kinabalu 16-10-12

File Number

V1

V1

Page 52: MDDR Kinabalu 16-10-12
Page 53: MDDR Kinabalu 16-10-12
Page 54: MDDR Kinabalu 16-10-12
Page 55: MDDR Kinabalu 16-10-12
Page 56: MDDR Kinabalu 16-10-12

SITE TECHNICAL QUERY (STQ) FOR -KNPG-BIssued

No. Reference No. Subject Date Issue Description Response Date Remarks

Commercial/Contract

1

2

3

STRUCTURAL

1 HUC-S-STQ-001 12.07.2012 02.08.2012

2 HUC-S-STQ-002 30.07.2012 04.08.2012 0020

2 HUC-S-STQ-003 30.07.2012 - 0020

3 HUC-S-STQ-004 07.08.2012 08.08.2012 0026

4 HUC-S-STQ-005 08.08.2012 0027

5 HUC/S/STQ/006

6 HUC/S/STQ/007

7 HUC/S/STQ/008

8 HUC/S/STQ/009 24.08.2012 25.08.2012

9 HUC/S/STQ/010 19.08.2012 20.08.2012 Follow IFC drawing

10 HUC/S/STQ/011 20.08.2012 20.08.2012 Proposal Accepted

11 HUC/S/STQ/012 23.08.2012 24.08.2012

12 HUC/S/STQ/013 24.08.2012 20.09.2012 approve / 0078

13 HUC/S/STQ/014 24.08.2012 25.08.2012 Proposal approved

14 HUC/S/STQ/015 24.08.2012 T-0035

15 HUC/S/STQ/016 25.08.2012 T-0035

16 HUC/S/STQ/017 05.09.2012 0048

17 HUC/S/STQ/017 REV 1 10.09.2012 12-Sep-12 T-0055 / 0040

18 HUC/S/STQ/018 11.09.2012

19 HUC/S/STQ/019 11.09.2012 12-Sep-12 0059 / 0028

20 HUC/S/STQ/020 11.09.2012 12-Sep-12 Proceed for section detail A only 0061 / 0028

TRANSMITTAL NO :

Lifting for TLQ support frame panel

Refer to drawing attached, it is indicated that shackel crosby G-2130 with 8.5 MT SWL is selected for the lifting of the TLQ support panel frame. However, based on KHL preliminiry checking, it is found that the selected shackel (SWL 8.5MT) does not meet the requirement of lifting for the center panel frame where fabricated structural load are given below:- Center Panel Frame = 20.8MT

The changes is acceptable as comment by MMHE design and PCSB Dep.

0010 /

MAIN ACCESS WAY - ADDITIONAL WORK

Based on the HUC scope of work and the latest redline marking drawing received by KHL from MMHE, it is found that some of the scope of the critical items have been change or are not included in the HUC based scope. These items formed part of the critical main access way that needed to be installed at the early HUC campaign. these item are :- 1.Main deck intermodule foldable & loose beams between M2 and M3/M4-10 Nos. 2.Main Deck intermodule FOldable & loose beams between M1 and M2-9Nos. 3.Stairway no 16-1 no.

Contractor to hold any activity related to item i,ii, and iii since it is originally fall under OIC scope of

work. No FI will be issued for the time being.

CLASHING OF STAIRWAY NO. 14A TO 2 NOS. OF EXISTING HANDRAIL

Mark-up drawing attached are referred. During the installation of stairway no 14A, it is found that the stairway are clashed with two number of handrail that are adjacent to the proposed stairway location.At the same time it is found that stairway location. attached herewith the photo taken at the proposed stairway installation location.

APPROVED - SUIT TO SITE MODIFICATION OF HANDRAILS APPROVED.

FOLDABLE BEAM CLASHING WITH

ELECTRICAL POWER CABLE LADDER

At level 1 east intemodule walkway between module 1 and module 2, the foldable rough panel is found hard clashing with the electrical power cable ladder which running through the area along the wall. During the site survey attended by PCSB,MMHE and KHL, site representives, it is advised by PCSB representative that the foldable beam and receiving beam to be shifted approximately 150mm away from the current location. with this arrangement, the following main beam and to be re-fitted and re-welded approximately 150mm away from current location. beam 2MI-5404-10 to be shorten approximately 150mm to adapt the adjustment.

APPROVED - PROPOSAL FOR SUIT TO SITE MODIFICATION OF BEAM ACCEPTED.

STAIRWAY NO.14A & NO.14B MODIFICATION OF

SUPPORT BASE PLATE

Support for grating panels - MSF north cellar deck

Follow additional ring plate & beam as per sketch given by MMHE

Obstruction of walkway at level 1 east intermodular

deck

Misalignment of loose beam tie-ins for intermodular between M3 and M5

Relocation of deck drains at sump pump deck near closed

drain transfer pump.

Proceed as per proposal. Mark changes on redline dwg.

Modification of 2 NOS. Turbular beams of SDV

service Platform.

Prefit-up survey found that 18' diameter riser is potentially clashed with the framing of the SDV service platform

located at the sump pump deck. Two numbers of tubular beam are found interfering with the riser installation.

Modification of 2 NOS. of handrails for stairway no 12

at sump pump deck.

Removal of installation guide beneath module 4, above

diesel oil tank at cellar deck.

Main deck walkway between module 2 and module 3.

Modify of beams at fire water pumps

3 Nos of fire water pump for caison installation are obstucted by platform beams.

Mechanical suit at site requirment. 3 Nos of beam at firewater service platform proposal to change

to bolted type acceptable by MMHE & PCSB dep. To properly cut the beam & change to bolted. To

protect the equipment nearby during hotwork

Modify of beams at fire water pumps

3 Nos of fire water pump for caison installation are obstucted by platform beams.

Other discipline to suit at site as discussion with KHL, MMHE and PCSB. Structural modification as per rev 0 and piperack. Related portion to cut as

agree during site discussion with PCSB and MMHE the pipe support to be remain.

Additional beams and grating panels for M4 upper deck

modification.

Refer to the markup drawing issued byMMHE S1-KNPG-M4-40-5012-SHT-1,rev 4) it is to confirm that the following works to be carried out by KHL as part of the additional/modification scope: 1)removal of 2 nos of handrail (HR-4) and make good of removed surface. 2)Relocation of 3 nos of handrail (HR-17x2 nos & HR-18x1 no) to new location. 3)Installation of 6 nos of new beam as per drawing attached. 4)installation of grating panels suit to suit.

Mezzanine deck walkway betweeen module 2 and

module 3.

refer to the drawing attached, it is found that the completed walkway at mezzanine deck intermodular M2 and M3 are not connected to each other. As shown in drawing no. S1-knpg-M2-40-5404-SHT 2, the walkway at the mentioned area should be connected as it is the promary escape route. at the same time no prefarbicated shiploose handrail as per drawing S1-KNPG-B-M3-40-5402-SHT-1 are found at the site.

Modification is part of suit at site requirement. 1) to proceed installation 2) surpuls supplied by

MMHE. To proceed installation.

Modification of stairway no 22 from fixed stairway to bolted

removable stairway.

As per PCSB instruction, the intermodular stairway from M3 to M2 at intermediate deck should not be a fixed stairway as currently installed, but a removable stairway.

Page 57: MDDR Kinabalu 16-10-12

SITE TECHNICAL QUERY (STQ) FOR -KNPG-B

21 HUC/S/STQ/021 13.09.2012 0071 /

22 HUC/S/STQ/022 14.09.12 0076

23 HUC/S/STQ/023 13.09.2012 0071 /

24 HUC/S/STQ/024 14.09.2012 0074

25 HUC/S/STQ/025 14.09.12 0076

26 HUC/S/STQ/026 15.09.12 0078

27 HUC/S/STQ/027 16.09.12 24-Sep-12 See Rev. 01 0080 / 0057

28 HUC/S/STQ/027 REV 1 16.09.12 16-Sep-12 KHL to proceed the NDT 0083 / 0057

29 HUC/S/STQ/028 23.09.12 28-Sep-12 Proposal Accepted. Follow as per PCSB instruction 0103 / 0063

30 HUC/S/STQ/029 23.09.12 28-Sep-12 Proceed as per PCSB instruction 0103 / 0063

31 HUC/S/STQ/030 23.09.12 28-Sep-12 0103 / 0063

32 HUC/S/STQ/031 24.09.12 2-Oct-12 0110 / 0075

33 HUC/S/STQ/032 24.09.12 28-Sep-12 0110 / 0063

34 HUC/S/STQ/033 26.09.12 5-Oct-12 0117 / 0081

35 HUC/S/STQ/034 28.09.12 T-0125 /

36 HUC/S/STQ/035 28.09.12 2-Oct-12 Proceed on relocation as per attached drawing. T-0127 / 0075

37 HUC/S/STQ/036 28.09.12 2-Oct-12 T-0125 / 0075

38 HUC/S/STQ/037 03.10.12 5-Oct-12 Proposal accepted. Please proceed. T-0132 / 0081

39 HUC/S/STQ/038 03.10.12 5-Oct-12 Proposal accepted. Please proceed. T-0132 / 0081

Modification of overlength stairway (Stairway No. 16) at

Sump Pump Deck.

KHL to modify the stairway no. 16 at sump pump deck so that the main access way is not obstructed by the overlength stairway. (see picture below) to modify the stairway, 400mm length bottom part of stairway legs with the deck handrails but the stair tread are thus inclined and not in horizontal as well as the handrail socket. KHL propose to cut 400mm length from bottom of stairway so that the final location of the bottom stairway will be aliigned with the consecutive handrails and not obstructing the main access way. take note that only 2 stair will be remove and also all grating stair treads by cutting the stair tread support and replacing the tread support with correct angle of inclination to maintain the horizontallity of all the stair treads. furthermore, the handrails socket and the handrails post should be modified also for verticaly. see attached drawing and picture.

Provision of beam for stairway 22 base support.

As per PCSB instruction, the angle bar L 100 x 100 previously installed beam at row 2-22 intermwdited deck should be removed and replaced by additional 1 no beam

UB254 to support stairway no 22 bolted base plate connection.

Collision of beam with vertical cable ladder.

Intermodular beam no.6 of drawing S1-KNPG-M1-40-5104 is not able to be installed as its intended tie-in location is obstructed by power cable installed at the same place, as shown in the photo attached below. MMHE to advice next

course of action.

Handrail modification -clashing of fuel diesel

pipeline with diesel oil tank handrails.

During the installation of fuel diesel pipeline, it is found that one of the intended tie-in location is obstructed by the existing handrails ontop of diesel oil tank at cellar deck of MSF drilling. the clashing of pipe with handrail is shown below in the photo taken at location.

Removal of pad eye and provision of fixed handrail.

The 2 nos of module 3 pad eye at grid 2-3A and grid 3-3A at intermediate deck will be removed. KHL proposal to

provide 2 nos fixed handrails at the line where pad eye was removed.

Modification of fixed handrail at intermediate deck & mezzanine deck

removable walkway.

The handrail at row 2-22 intermediate deck walkway were installed as fixed handrail as per dwg. No.S1-KNPG-M2-40-5409 but the walkway framing beams were installed bolted

and removal. the 7 nos handrails at row 2-22 mezzanine deck walkway were installed as fixed handrails as per drawing no. S1-KNPG-M2-40-5410 but the walkway

framing beams were installed bolted and removable.

NDT plan for the damage main beam at MSF drilling

As per instruction given by PCSB, KHL is to conduct NDT based on the dimension given (refer attachment) for the damaged main beam ontop pf diesel oil tank at MSF drilling, under additional scope of work (refer FIR No. HUC/S/FIR/004 and faulty report : OFF/FR/KNPG-B/S/002 (REV 1). the surface of the proposed location will be prepared bygrinding away the paint layers to expose the bare steel surface. After completing the NDT, thebare steel surface will be cleaned by power tooling and reapplied paint as per paint matrix approved.

NDT plan for the damaged main beam at MSF drilling.

As per instruction given by PCSB, KHL is to conduct NDT based on the dimension given (refer attachment) for the damaged main beam ontop of diesel oil tank at MSF drilling, under additional scope of work (refer FIR No. HUC/S/FIR/004 and faulty report : OFF/FR/KNPG-B/S/002 (REV 1). The surface of the proposed location will be prepare by grinding away the paint layers to expose the bare steel surface. After completing the NDT, the bare steel surface will be cleaned by power tooling and reapplied paint matrix appoved.

Additional base support for stairway no 32 at upper deck

walkway.

It was found out that there is no sufficient base support for stairway no 32 at upper deck walkway.

Additional support for grating at upper deck walkway.

It was found out that there is no sufficient support for grating at upper deck walkway.

Relocation of pipe support at intermediate deck

intermodular walkway M2/M3/M4

The 5 nos pipe support at intermodular walkway at row 2-22 intermediate deck is obstructing the walkway grating.

Proceed as per instruction given by PCSB. Left portion of cut beams to be grind smooth.

Obstruction in relocated of survival craft davit arm stool.

The 3 nos electrical floodlight with control gear and battery box are obstructing the relocateion of survival craft davit

arm stool at the main deck north side area.

Remove the floodlight together with the junction box and it's support and relocated suit to site after

the installation of davit arm stool.

Additional Handrail under the flare boom stairway.

It was found out that there is no handrail under the flare boom stairway.

Proposal Accepted. Utilize extra handrails supplied by MMHE.

Cutting of culumn gunsset plate clashing with stairway

at M4 HP gas cooler platform.

It was found out that the column gusset plate is clashing with 2 Nos stairway no. 43 at the east side and stairway no

42 at the west side at module 4 HR gas cooler platform.

Proposal accepted. As agreed during the meeting before TLO demob. KHL may proceed an removal

of some remote work left by TLO if it obstruct HUC installation works. Agreement between TLO &

KHL.

Half pipe coaming at module 3 main deck.

Half-pipe coaming is found not designed and installed at the full perimeter of the safety shower and eyewash

station at main deck of module 3 (refer attached). As per instruction from MMHE and PCSB, KHL to install additional half-pipe coaming to fully enclose the deck completed with

deck drain where the safety equipment is located.

Location of survival craft davit arm stool.

As for instruction from MMHE/PCSB KHLwill relocated survival craft davit arm stool as per attached revise

drawing

Modification of handrails at valve access platform.

It was found out that there is a big gap between two handrails at 6 location at valve access platform. (please see

attached pictures).

Proceed on modification work. This will eliminate safety hazards on wide openings/ gap. For

handrails, use bend pipe or elbows on corners.

Modification of handrails at HP Gas cooler Raised

Access Platform.

It was found out that 2 nos handrails (HR-2) at HP gas cooler raised access platform are clashing with existing pipe

wheel.

Modification Under intermediate landing framing

of stairway no 31.

KHL was found out that there are big openings under intermediate landing framing of stairway no 31 at Glycol Generation Deck, one at north side and one at east side.

Page 58: MDDR Kinabalu 16-10-12

SITE TECHNICAL QUERY (STQ) FOR -KNPG-B

40 HUC/S/STQ/039 09.10.12 T 0145 /

41 HUC/S/STQ/040 09.10.12 T 0145 /

42 HUC/S/STQ/041 13.10.12 T 0153 /

43 HUC/S/STQ/041 REV 1 14.10.12 T 0157 /

44 HUC/S/STQ/042 14.10.12 T 0157 /

45 HUC/S/STQ/043 14.10.12 T 0157 /

46

PIPING

1 HUC/P/STQ/001 Piping 26-Jun-12 1-Aug-10 0004

2 HUC/P/STQ/002 Piping 28-Jun-12 WELDING PROCEDURE SPECIFICATION 12-Jul-12 0005

3 HUC/P/STQ/003 Piping 29-Jul-12 Wrongly fabricate 80-AI-55030-18410-M1-MSFN 1-Aug-10

4 HUC/P/STQ/004 Piping

5 HUC/P/STQ/005 Piping 27-Jul-12 Tie in point toT6500

6 HUC/P/STQ/006 Tie in point riser offset. 27-Jul-12 12-Oct-12 / 0099

7 HUC/P/STQ/007

8 HUC/P/STQ/008

9 HUC/P/STQ/009 Clashing with mudwall. 5-Sep-12 3-Oct-12 / 0080

10 HUC/P/STQ/010

11 HUC/P/STQ/011

12 HUC/P/STQ/012 Relocated Pipe Support 7-Sep-12 7-Sep-12 proceed as per proposal. T-0051 / 0080

13 HUC/P/STQ/013 3-Oct-12 T-0133 /

14 HUC/P/STQ/014 Outstanding Pipe. 1-Oct-12 3-Oct-12 / 0080

15 HUC/P/STQ/015 3-Oct-12 3-Sep-12 Proceed with site to suite modification. T 0133 / 0080

16 HUC/P/STQ/016 3-Oct-12 4-Oct-12 T 0134 / 0080

17 HUC/P/STQ/017 5-Oct-12 12-Oct-12 T 0137 / 0099

18 HUC/P/STQ/018 Offset of tie in point. 5-Oct-12 12-Oct-12 T 0137 / 0099

19 HUC/P/STQ/019 Different size of tie in point. 5-Oct-12 12-Oct-12 T 0137 / 0099

20 HUC/P/STQ/020 Different size of tie in point. 5-Oct-12 13-Oct-12 T 0137 / 0105

21 HUC/P/STQ/021

Modify riser platform to removable beam.

At cellar deck east side riser area, currently there have a fixed platform beams where by obstruct the removal of this

riser pipes 24" and 18" for maintenance and testing purposed. See attach.

Exetnsion of survival craft davit platform.

At survival crafts area, currently 3 nos of craft davit relocate to north area about 500mm. Therefore at aft area

of the boats have a big gap for crew to go onboard.

Relocated of life raft platform at cellar deck flare area.

At main deck flare area, the life raft are obstructed by cellar deck raft below when the main deck raft launched.

Therefore the raft at celler deck need to relocate so main deck raft can free fall to the sea without any obstruction.

Relocated of life raft platform at cellar deck flare area.

At main deck flare area, the life raft are obstructed by cellar deck raft below when the main deck raft launched. Therefore the raft at celler deck need to relocate so main deck raft can free fall to the sea without any obstruction.

Extension of deck at M4 upper deck.

At M4 upper deck, cerrently they have no access to check the meter locating at pipe above the deck. See attached.

Relocate the GTG vertical ladder.

At GTG area, 3 Nos of vertical ladders currently obstruct the passageway on each generators.

TEMPORARY MITIGATION PLAN OF LOW PRESSURE COLD WATER SUPPLY TO LQ

KHL found that the tie in point of spool 450-PG-29002-99430X-HUC-MSFS is offset 75mm with the tie in point to

SDV valve (TP-007B) as shown in figure 1 & 2. The degree of the bend 5D 2.7 degree is not sufficient to cover the offset

of 75mm between tie in to SDV and the tie in to riser.

MMHE to submit this STQ to PCSB in order to further discuss regarding design issue with RN2

consultant.

KHL found out that line routing of 50-FD-67132-251430-MSFD is clashing with mudwall of the conductor as per

photo 1.

KHL have to come out with proposal as per discuss at site. Between MMHE,PCSB and KPW. Any cost

will be advise by QS MMHE.

KHL found out that pipe support PS-SPD-003 of line 80-PL-64040-31430-SPD & 150-PL-64032-11430X-SPD & 80-PL-64036-11430X-SPD is located at the walkway of sump pump deck as per photo 1. KHL found out that pipe support PS-SPD-057 of line 150-PL-64032-11432X-SPD is located at walkway of sump pump deck as per photo 2.

Re-routing tie in of 100-DH-65087-11430X-SPD.

KHL found out that the position of the N2A & NiA of T6500 at site is not as per attached drawing M3-KNPGB-SP-80-

131. The position of the N2A & N1A of the T6500 at site as per redline mark up of M3-KNPGB-SP-80-131

KHL found out that for spool 80-FG-60070-33831-MSFS-M5 is outstanding pipe smls ANSI B36.19 SCH 10S ASTM A790 UNS S31803. KHL found out that only 2 unit of 3

flange WN ANSI B16.5 300# RF SCH 10S ASTM A182 F51 shiploose as per photo.

Proceed as per proposal attached material already onboard.

Re-routing tie in of 100-DH-65087-11430X-SPD.

KHL found out that the position of the N2A & NiA of T6500 at site is not as per attached drawing M3-KNPGB-SP-80-

131. The position of the N2A & N1A of the T6500 at site as per redline mark up of M3-KNPGB-SP-80-131

Re-routing tie in of 100-DH-65087-11430X-SPD.

KHL found out that the position of the N2A & NiA of T6500 at site is not as per attached drawing M3-KNPGB-SP-80-

131. The position of the N2A & N1A of the T6500 at site as per redline mark up of M3-KNPGB-SP-80-131

Please proceed as per proposal, to suite site condition and the proposal accepted.

Closed And open drain caissons.

KHl found out that there is only one pipe routing of 25-DH-65050-11430X-SPD tie in TP4 of open drain caisson pump skid drain (P-6510). There is no pipe routing for skid drain of open drain caisson pump (P-6410). KHL found out that

there is no pipe routing connecting the deck drain of open drain caisson pump.

Proposal accepted. Please proceed as per proposal. Material will supply by MMHE.

KHL found out that tie in of 25-DH-65050-11430-SPD to 100-DH-65087-11430X-SPD is offset as per red line markup

drawing 1.Proposal accepted and proceed as per proposal.

MMHE will supply material.

KHL found that tie in of 50-DH-65083-11430X-SPD to deck drain-1/N1 of closed drain transfer pump are of different

size which are 4" & 2". KHL found that tie in of 50-DH-65085-11430X-SPD to deck drain-2/N1 of closed drain

transfer pump are different size which are 4" & 2".

Proposal accepted . Please proceed as per proposal. Material will supply by MMHE.

KHL found that tie in of 25-AU-54028-18410-SPD (TP 801) to 25-AU-54028-18410-MSFD are of different size which

are 1" & 2" respectively.

Please proceed as per proposal attached. (claritication from onshore) material will provided

by MMHE.

Page 59: MDDR Kinabalu 16-10-12

SITE TECHNICAL QUERY (STQ) FOR -KNPG-B

22 HUC/P/STQ/022 12-Oct-12 T 0151 /

Electrical

1 HUC/E/STQ/001 Electrical 27-Jul-12 MCC-7810 & MCC-7830 Cable Glanding issue 30-Jul-12

2 HUC/E/STQ/002 Electrical 27-Jul-12 Small size of Busbar at SB-7710 ACB-7712 1-Aug-12 Waiting MCC vendor mob.

3 HUC/E/STQ/003 Electrical 27-Jul-12 1-Aug-12 Some supports to be added

4 HUC/E/STQ/004 Electrical 28-Jul-12 Cable lug for 1C x 630mm Cable 1-Aug-12 Waiting MCC vendor mob.

5 HUC/E/STQ/005 Electrical 3-Aug-12 1-Aug-12

6 HUC/E/STQ/006 Electrical 3-Aug-12 3-Aug-12 Pending painting and repair damage insulation

7 HUC/E/STQ/007 Electrical 5-Aug-12 8-Aug-12 KHL to Proceed

8 HUC/E/STQ/008 Electrical 5-Aug-12 9-Aug-12 Include this in the STQ No HUC/E/STQ/006

9 HUC/E/STQ/009 Electrical 13-Aug-12

10 HUC/E/STQ/010 Electrical 17-Aug-12

11 HUC/E/STQ/011 Electrical 17-Aug-12

12 HUC/E/STQ/012 Electrical 20-Aug-12

13 HUC/E/STQ/013 Electrical 20-Aug-12

14 HUC/E/STQ/014 Electrical 20-Aug-12

15 HUC/E/STQ/015 Electrical 22-Aug-12

16 HUC/E/STQ/016 Electrical

17 HUC/E/STQ/017 28-Aug-12 11-Sep-12 Please utilize the cable. Refer attachment 0038 / 0026

18 HUC/E/STQ/018 11-Sep-12 12-Sep-12 0059 / 0028

19 HUC/E/STQ/019

New DH line for laydown area & caisson pump deck

drain.

KHL found out that there is one DH line connecting to the laydown area & closed drain caisson pump (P-6410) & open

drain caisson pump (P-6510) deck drain.

Congested cable ladder & wall to wall penetration cable entry inside LQ electrical room

UPS Vendor informed KHL that incoming cables and MCCBs from SB-7710 to UPS panels (UPS-7850 and UPS-7860) are under rating. Please refer to single line drawing for more details.

Waiting official reply for which routing and size of cables

KHL found out that shortage of 3 pieces 900mm W straight cable ladder and 2 pcs of 90 degree flat bend for Module 1 Breeze Deck. These cable ladders are required for LQ Habitation for 14 lgth of 1Cx630mm2 and 2 lgth of control cables.

Vendor requested KHL to enlarge SB-7710/Incoming temporary generator/ACB-7712/cubicle no 16's cable entry hole due to change of gland plate and extend of busbar. As informed by vendor , the cubicle's cable entry hole will be enlarge.

KHL discovered that 900mm cable ladders and supports on Module 1 Breeze Deck not yet install. It was not inclusive in HUC Based Scope. Due to the cable ladders will effect LQ Habitation, KHL has proceed with supports fabrication and installed supports on Module 1 Breeze Deck without welding because of those supports are direct mounted on Breeze Deck deck plate; if weld those supports, it will damage insulation beneath deck plate.

KHL discovered that support stand, RCU and safety switch for pump AQM-5200A not install yet. The stand and safety switch SS-AQM5200A also not in shiploose list.

KHL discovered that safety switches and supports for pump PM-6740A and PM-6740B not install yet. The safety switches and supports also not in shiploose list.

KHL discovered that floodlight FL02.7891A.4GY obstruct by cable ladder as shown in attached picture.

KHL would like to clarify the requirement of cable entry for enclosure of Air Compressor AQ-5400A & B. We discovered that some terminated cables are using rubber/PVC bushing. We would like to clarify what type of material to use for cable entry whether nickel plated through gland or rubber/PVC bushing.

KHL discovered that only one coaming for LV power cables, control cable and MV cable for each Cooling Water Circulation Pump PM-6940A, B & C and Condensate Export Pump PM-3020A, B & C . According to specification, MV cables should be segregated with LV cables and control cables.

KHL discovered that RCU stands for interstage pump motor PM-5200C & PM-5200D not yet install. No IFC support detail for these supports.

KHL discovered that PJB & RTD junction boxes for Service Water Pump PM-5110A & B not yet install. No IFC support detail for these supports. We also found out that PJB only come with four terminal blocks which just enough for power cable to motor, no terminal blocks for space heater cable.

Replacement of UPS-7850 and UPS-7860 main incoming cables

With reference to site technical query HUC/E/STQ/005 and MMHE e-mail dated 14th august 12, UPS-7850 main incoming cable from SB-7710(P2011PG) to be replace with 4Cx150mm2 cable and E-ALL-0075 to be used for 4Cx240mm2. type of these cable are CU/XLPE/PVC/SWA/PVC-FR, but both f incoming cable should be P2 - CU/XLPE/LSZH/SWA/LSZH as stated in cable schedule.

ADDITIONAL BEAMS AND GRATING

Refer to the mark-up drawing issued by MMHE drawing S1-KNPG-M4-40-5012-Sht 1 Rev 4) it is to confirm that the following works to be carried out by KHL as part of the additional/modification scope : 1) removal of 2 nos of handrail (HR-4) and make good of removal surface. 2) relocation of 3 nos of handrail (HR-17x2 nos & HR-18x1 no) to new location. 3)installation of 6 nos of new beam as per drawing attached. 4)installation of grating panel suit to site.

part of original scope as this drawing been issued on may 2011. proceed as per drawing S1-KNPG-

M4-40-5012-1 Rev 4

Page 60: MDDR Kinabalu 16-10-12

SITE TECHNICAL QUERY (STQ) FOR -KNPG-B

20 HUC/E/STQ/020 29-Sep-12 7-Sep-12 0041 / 0026

21 HUC/E/STQ/021

22 HUC/E/STQ/022

23 HUC/E/STQ/023

24 HUC/E/STQ/024 1-Sep-12 14-Sep-12 0043 /0036

25 HUC/E/STQ/025 03-sep-112 7-Sep-12 0043 / 0036

26 HUC/E/STQ/026 3-Sep-12 14-Sep-12 0046 / 0036

27 HUC/E/STQ/027 3-Sep-12 5-Sep-12 0046 / 0036

28 HUC/E/STQ/028 4-Sep-12 7-Sep-12 T-0045 / T-0014

29 HUC/E/STQ/029 4-Sep-12 7-Sep-12 T-0045 / T-0014

30 HUC/E/STQ/030 6-Aug-12 7-Sep-12 Proceed to design modification. T-0050 / T-0014

31 HUC/E/STQ/031 14-Sep-12 15-Sep-12 0073 / 0035

32 HUC/E/STQ/032 14-Sep-12 15-Sep-12 0073 / 0035

33 HUC/E/STQ/033 14-Sep-12 14-Sep-12 0073 / 0035 & 0087

34 HUC/E/STQ/034 Cable does not at side. 14-Sep-12 14-Sep-12 0073 / 0035

35 HUC/E/STQ/035 15-Sep-12 17-Sep-12 0084 / 0041

35 HUC/E/STQ/036 17-Sep-12 0088 /

36 HUC/E/STQ/037 22-Sep-12 29-Sep-12 0107 / 0060

Fuel gas super heater and fuel gas pre-heater power cable routing & glanding

issue.

KHL discovered that cable routing and space for cable bending are insufficientfor gas super heater and fuel gas pre-heater skid as listed below: 1) 300mm incoming cable ladder - more than 10 runs of cable already tie to the ladder. Additional 12 rns of 4c x 120mm2 cable and 4 run of 2C x 2.5mm2 to be lay on this cable ladder, it will overlap on top of those cables. 2) 300 x 50mmH incoming cable tray in skid. the overall diameter of 4C x 120mm2 cables is 47.5mm2. 3) Vertical tray to E-6040A & B the joint of 2 tray are too small about 45mm cable 4C x 120mm2 need more space to go through the joint. 4) space for cable entry of panel E-6040A & B the distance between panel E-6040A/B to gratting is 460mm, cable may touching grating. 5) cable rise up to E-6010A/B the distance between tray ti coaming is 300mm, bending radius is to small, cable may damage.

1.Please remain 300mm incoming cable ladder. 2.incoming

cable tray change to 600mm. 3.vertical tray to E-6040A&B to be remain. 4.panel E-6040A&B to be remain. 5. Cable tray to E-6010A/B to be cut. Refer attachment.

6. Cost impact will be verify by QS MMHE.

Wellhead control panel incoming supply.

KHL discovered that wellhead control panel, WHCP-0100 and WHCP-0105 require 240v AC power supply for WHCP internal lighting. But as we check with latest cable schedule, no incoming supply cable are stated in cable schedule.

Please use DB-7891B as incoming supply for wellhead control panel. Refer redline mark-up

attached. Proceed the work by using new cable.

Firewater pump power cable issue.

As show in vendor drawing, firewater pump require 3 phase incoming supply (4C x 16mm2) to each local control panel LCP-5310A/B/C but IFC drawing shown 3 single phase power cable for each firewatr pump as below

1) single phase power cable shall be delete as per DCN 121. 2) 3 phase incoming supply is provide from MCC7820 (cubilcle 10-C7, 11-C7) as per DCN 121 and cubicle 12-C7 as per mark up drawing. 3) power cable to be keep in drum if not pull yet. 4) cost impact will verify by QS MMHE.

Discrepency between cable schedule and single line

drawing for PM-8830A & B

As show in single line, only have 2 cable each Hypochlorite Dosing Pump. One from MCC-7840 to RCU and other one from RCU to Hypochlorite Dosing Pump. But cable schedule shown 4 cable, one from MCC-7840 direct to the motor, the second cable is from MCC 7840 to RCU, third is from MCC 7840 to safety swicth and the another one is from space heater to motor space heater.

cable from MCC 7840 direct to RCU and connected to motor. Safety switch not require anymore as

per SLD drawing No E1-KNPG-M2-60-1231 SHT 1 Rev 2. (PM-8830A)

discrepency between cable schedule and single line

drawing for PM-8850

As show in single line cable from MCC should go to RCU than to motor. But in cable schedule, cable is from MCC to safety swicth to motor. We would like clarify either RCU or safety swicth to be use.

RCU to be use for this motor PM-8850. RCU also mcluded in shiploose list COG/E/00861 ( MSL no E-M2-0068). Cable schedule to be redline. Refer to

SLD DWG No E1-KNPG-M2-60-1231 SHT 2/2 REV 2

Cable pass through grating without coaming for RCU-

5220A and SS-5220A

KHL discovered that power and control cable for RCU-5220A and SS-5220A pass through grating without grating

without coaming.Proceed to design modification. Cost impact will

verify by QS MMHE

Cabels from voltage regulation to navigational AID

lantern

KHL Discovered that cable from voltage regulator to navigational AID lantern are not in cable schedule

1.proceed to design propose. 2.MMHE will provide additional cable gland.

3.cost impact schedule impact and scope change are not

require.

Cable ladder support blocking GRE fire water line

(Cellar deck, East side, Below main deck, Module 3)

MMHE piping engineer inform that 1 no of cable ladder support installed by Onshore fabricator blocking theway of GRE fire water line that need to be relocated. the cable ladder support need to modify in order to relocated the GRE pipe.

Cable gland does not suitable with cable.

1) at SB7710 side : KHL found incoming cable entry not provided. Cable gland provided by MMHE (M50) also not

suitable for size of cable. The gland is to bigger than size of cable. 2) at air compressor side : KHL found cable gland

entry at air compressor (M63) already completed onshore. cable gland provided by MMHE (M50) also not suitable for

the cable.

1) Please proceed with design modification. 2) Cost impact will be verify by QS MMHE.

cable gland does not suitable with cable.

1) at SB7720 side : KHL found incoming cable entry size M63 already provided. Cable gland provided by MMHE

(M63) not suitable for size of cable. The gland is to bigger than size of cable. 2) at seawater lift pump : KHL found incoming cable entry size M63 already provided. cable gland provided by MMHE (M63) not suitable for size of

cable. the gland is to bigger than size of cable.

1) Please proceed with design modification. 2) Cost impact will be verify by QS MMHE.

cable gland does not suitable with cable.

1) At Heater Control Panel : KHL found that onshore fabricator already complete glanding and termination

incoming cable. however one of gland entry used is for outgoing cable. therefore KHL need to dismantle the

existing cable to suit at side to avoid cable clashing. cable gland M63 also is not suitable for size of outgoing cable. 2) at Glycol Reboiler Heater : KHL found that incoming cable

entry not provided to complete cable gland and termination at heater side panel. cable gland M63 also is

not suitable for size of incoming cable.

1) Please proceed with design modification. 2) Cost impact will be verify by QS mmhe. 3) Change the cable gland reducer from M63 diameter M50 to M75 -

M50 3Nos.

KHL found 1 no power cable and another one control cable no at side.regarding to the cable schedule the cable has

been terminated one side and coil at MSFN. Cable details as shown below.

1) Please proceed with proposal and material will provide by MMHE.

2) Cost impact will verify by QS MMHE.

1) water ingress into helideck perimeter light vendor juntion

box. 2) water ingress into helideck perimeter light

juntion box and hellideck floodlight.

i) KHL discover that IP washer are install between cable gland and reducer, but no IP washer for between reducer

and vendor junction box afected are H101.7817.9GY, HL02.7817.9GY, HL08.7817.9GY, HL02.7817.10BK,

HL04.7817.10BK, HL05.7818.10BK, HL08.7817.10BK, HL09.7817.10BK, HL01.7817.10BN, HL02.7817.10BN,

HL03.7817.10BN, HL06.7817.10BN, HL02.7817.10GY. ii) KHL also found water ingress into helideck perimeter light

juntion box and helideck floodlight juntion box. juntion box affected are HLJBOI.7817.9GY, HLJB05.7817.9GY,

HLJB04.7817.10BK, HLJB05.7817.10BK, HLJB01.7817.10BN, HLJB06.7817.10GY, HLJB01.7817.11BN, LJB03.7811E.4GY,

LJB01.7811E.5BK, ELJB01.7812E.5GY.

Proceed with the effected cable and juction box. KHL to supply and install IP washer and to clean

water inside juntion box.

No cable ladder provide from main cable ladder to Glycol

reboiler heater.

KHL found no cable ladder from module 3 intermediate deck to Glycol Reboiler heater cable ladder. These cable

ladders also not show in IFC drawing.please refer to attached cable schedule and cable routing drawing.

Floodlight need to relocate due to column has been

deleted.

KHL discovered that column 4A at module 3 from intermediate deck to upper deck has been deleted.

Therefore two floodlight mounted to this column are affected. Please refer to attached layout drawing. floodlight

Tag No. affected are FL02-7831-2BK and FL03-7831-2BK.

Proceed with theproposal. KHL to use and utilize the available material.

Page 61: MDDR Kinabalu 16-10-12

SITE TECHNICAL QUERY (STQ) FOR -KNPG-B

37 HUC/E/STQ/038 22-Sep-12 2-Oct-12 0107 / 0072

38 HUC/E/STQ/039 22-Sep-12 27-Sep-12 0107 / 0060

39 HUC/E/STQ/040 22-Sep-12 24-Sep-12 0107 / 0056

40 HUC/E/STQ/041 23-Sep-12 29-Sep-12 0109 / 0060

41 HUC/E/STQ/042 22-Sep-12 24-Sep-12 0107 / 0056

42 HUC/E/STQ/043 25-Sep-12

43 HUC/E/STQ/044 28-Sep-12 KHL discovered that nitrogen generator 29-Sep-12 / 0066

44 HUC/E/STQ/045 28-Sep-12 29-Sep-12 / 0066

45 HUC/E/STQ/046 28-Sep-12 29-Sep-12 / 0066

46 HUC/E/STQ/047 1-Oct-12 13-Oct-12 0126/ 0106

47 HUC/E/STQ/048 2-Oct-12 2-Oct-12 T-0130 / 0072

48 HUC/E/STQ/049 6-Oct-12 13-Oct-12 T 0138 / 0106

49 HUC/E/STQ/050 7-Oct-12 9-Oct-12 T 0143 / 0092

50 HUC/E/STQ/051 9-Oct-12 11-Oct-12 T 0145 / 0106

51 HUC/E/STQ/052 9-Oct-12 12-Oct-12 T 0145 / 0106

Aeronautical obstruction light control panel not in ifc

drawing.

KHL discovered that aeronautical obstruction light (AOL) control panel does not show in ifc single line drawing, loop

diagram and cable schedule. As shown in ifc drawing, incoming cable for AOL are directly from ups distribution

board DB-7820 which did not go though AOL control panel. But as shown in AOL vendor drawing SO5000072-607

revision 0, control panel provided following connection:

there are 2 types of AOL, Low intensity & medium intensity. No JB required for Low intensity, it is loop direct from DB 7820. While for medium

intensity, it has to be controlled from AOL control panel. Only terminate output at X 12 1,2 to AOL,

the rest of the funtion is not used. control panel to be installed as per site provided. KHL to pull 1

more cable for medium intensity AOL. Please fer to markup drawing as attached. Medium intensity

AOL is 250 Watt type.

Onshore install wrong type of lighting.

KHL discovered onshore has been installed wrong type of lighting. According to layout drawing, lighting should be

install is emergency light but onshore install normal light. Tag No of lighting affected is EL03-7892-2GY. Please find

attached layout drawing for your reference.

Please replace normal lighting to the emergency lighting type. MMHE will provide the material.

Power cable shortage for E-6310 HP Flare K.O Drum

Condensate Heater

Power cable shortage for E-6310 HP Flare K.O Drum Condensate Heater. KHL discovered that power cable

P3732PG from module 2 switchgear Room to E-6310 HP Flare K.O Drum Condensate Heater is short. Refer to cable

schedule, estimate length is 100 meters but actual length is 170 meters. Total length of cable in cable drum supplied by MMHE is 136 meters only. Please find attached file for your

reference.

Proeed with the proposed and please use available material to perform the work.

1. Cable tray obstruct pipeline installation at

wellhead service platform MSFD.

2. Cable tray obstruct pipeline

installation at module 5 below main deck.

1. KHL discovered that cable tray installed onshore obstruct pipeline installation at MSFD wellhead service platform.

Please refer to attached picture for your reference. 2. KHL discovered

that cable tray installed onshore obstruct pipeline installation at module 5 below main deck. Please refer to

attached picture for your reference.

Agreed with the proposal and please proceed. Attached figure 1 the cable tray need to modify

offset pipe with sufficient clearance. Figure 2 shown the cable tray need to be cut of area

clashed and subtitude with saddle type.

Local control panel (LCP) for open & close drain caisson

pump.

KHL discovered that no LCP for open & close drain caisson pump PM-6510 & PM-6410 as show in P&ID drawing but

IFC cable schedule show one power cable to LCP panel for each pump. Please advise.

LCP panel for open & closed drain Caisson not existed. No power cable for these LCP. KHL to

redline in the drawing cable schedule.

inssuficient space inside glycol reboiler heater panel

for cable termination.

KHL found that insufficient space inside two glycol reboiler heater juntion box (E-2325A and E-2325B) for incoming cable to terminate at bus bar. The distance between the

lower bus-bar to the gland plate is 100mm only as show in attached picture. Due to 2 length of 3Cx150mm2 cable and height of cable lug for 150mm is 70mm therefore the space between the gland plate and bus-bar for cable bending and

cable termination is insufficient. Please refer attached picture for your references.

Nitrogen generator panel LCP-5900 not in layout.

Nitrogen generator panel LCP-5900 is for future and the location still not confirm yet. Please do

not pull this cable.

Telecom tower electrical cable routing.

KHL discovered that no cable trays for 2 length of lighting cable from bottom of telecom tower to top of telecom

tower.Agreed with the proposed. MMHE will provide the

cable divider and accessories.

Missing cable for acid recirculation pump PM8850.

According to shiploose cable list, cable PC3765PG (P3-7Cx2.5mm) shall be coil at module 2. But actual we can't

found the cable.

PC 3765 PG ( P3-7C x 2.5 ) is for cable RCU-PM8850. Please redline the cable schedule SS-

PM8850 change to RCU-PM8850. for refference kindly refer to SLD E1-KNPG-M2-60-1231. please pull the cable by using cable from COG/I/01023 MSC, I-M2-0023 (P5.7Cx2.5mm) this drum is for

spare and contigency purpose.

Lcot - Devietion with the drawings.

KHL discovered that actual condition of the existing panels & equipment in the LCOT Telecom Equipment Room are different with drawing. Swicth Room - Extension of 415V swicthboard LCOT-AC-DP7 will obstruct by area lighting

panel and additional 42x20mm HDG unistructs & fitting are require. Battery Room - Battery bank B BT-7810B will be

obstruct existing socket outlet S002-Lib-02Y. New Control Room - Existing telecom panel (600Wx800Dx2000H) which

no showin drawing obstruct UPS panel UPS-7810 installation. Existing 2 Nos of conceal receptacles just leave it as new socket outlet will be install. No additional Air con

require.

As long as the deviation works involved in the same building as the AFC drawing, all construction will be suit to site condition and the cost already covered under lump sum contract. Based on the latest site visited by MMHE, PCSB and KPW, cost

impact will be applied if the deviation works involved at different location bulding.

Cable short for RCU-PM2387A at module 3

KHL discovered that cable PC3759PG is short about 4 meters, the cable is from MCC-7840 at module 2 to RCU-

PM2387A at module 3

Please pull new cable and find the drum cable COG/I/1023. This cable P5 can be use since the

spec is more higher then cable type P3. The cable we provided is for contigency and spare.

Existing mounnted plate is too small to install Heli

Starter Socket HSS-7866.

KHL found that existing mounted plate is to small to install Heli Stater Socket HSS-7866. Besides that the gap between mounting plate to handrail is 165mm but the thickness og

Heli Stater Socket is 170mm. Plate find attached picture for you refference.

KHL to proceed with proposed modification. Cost impact will be review and verify by QS MMHE.

cable from SS-PM6720A to PM-6720B and SS-6720B to

PM-6720B not laying properly.

KHL found that cable from SS-PM6720A to PM-6720B and SS-6720B to PM-6720B has been pulled from safety swicth to motor without through the coaming and cable already

terminated onshore.

Proceed with the proposal. Please use cable available at site.

Welding socket outlet clash by power cable at module 1

breeze deck.

KHL found that welding socket outlet WSO-7812 (installed onshore) at module 1 breeze deck was clashing with power cable comes from JB7705. Please refer to attached picture

for your reference.

KHL to proceed with the relocation proposal. Cost impact will be advise by QS MMHE.

Emergency light clash with GRE pipe.

KHL found that an Fluorescent Emergency Light EL03.7892A.1GY at sump pump deck was clashing with GRE

pipe. Please find attached picture for your referrence.Please proceed with the propose modification.

Cost impact will be advice by QS MMHE.

Page 62: MDDR Kinabalu 16-10-12

SITE TECHNICAL QUERY (STQ) FOR -KNPG-B

52 HUC/E/STQ/053 10-0ct-12 12-Oct-12 T 0150 / 0106

53 HUC/E/STQ/054 12-Oct-12 T 0151 /

54 HUC/E/STQ/055 13-Oct-12 T 0155 /

55 HUC/E/STQ/056 14-Oct-12 T 0155 /

Riser Guard

Mechanical Items

1 HUC/M/STQ/001 31.08.2012 Rope ladder support - incompatible padeye with shacle pin

2 HUC/M/STQ/002 Fire water hose reel in store room M1-LQ

3 HUC/M/STQ/003 7-Sep-12 7-Sep-12 MMHE will supply U-bolt 3 inches (22 pcs) T-0044 / T-0013

4 HUC/M/STQ/004 DCT equipment 3-Sep-12 7-Sep-12 MMHE will supply stud bolt M12 x 100mm (16pcs) T-0044 / T-0013

5 HUC/M/STQ/005 31-SEP-12 17-Sep-12 - / 0043

6 HUC/M/STQ/006 2-Sep-12 17-Sep-12 - / 0043

7 HUC/M/STQ/007 14-Sep-12 19-Sep-12 0074 / 0049

8 HUC/M/STQ/008

9 HUC/M/STQ/009 3-Sep-12 6-Sep-12 T-0044 / T-0013

10 HUC/M/STQ/010 15-Sep-12 16-Sep-12 0039

11 HUC/M/STQ/011 29-Sep-12 29-Sep-12 0121 / 0060

12 HUC/M/STQ/012 01.10.12 2-Oct-12 0129 / 0070

13 HUC/M/STQ/013 9-Oct-12 T 0145 /

COMMISSIONING

Normal fuorencent light to be relocated.

KHL found that a normal fluorencent light L04.7891C.3BK (installed onshore) at MSFS cellar deck need to relocate because of structural modification. Please find attached

pictures for your reference.

Proceed with the propose modification. Cost impact will advice by QS MMHE.

Electrical cables for future module 6 and 7.

KHL discovered that total 17 length of electrical cable are for module 6 and module 7 (future module). KHL would like

to confirm either the cable to be pull or coil in drum and keep on platform.

Compactor and selector swicth to be relocate.

KHL foundd that a compactor and selector swicth (both installed onshore) need to relocate because of to allocate the place for laydown area. Pleace refer attached picture

for your refference.

No cable and RCU for process chemical injection

pump.

KHL found that RCU not install for process injection chemical pump (P-9560A&B) at module 3 main deck. This RCU and cable from RCU to pump supposed to be pulled and installed onshore. Please refer attache picture and

cable for your refference.

Rope ladder support - incompatible padeye with

shacle pin

Fire water hose reel in store room M1-LQ

U-bolt 3mm for bracket support life buoy

U-bolt 3mm for bracket support life buoy. KHL findout that the bracket support for ring life buoy c/w 2 set U-bolt not

fit U bolt size 2mm because for installation of life bouy c/w 2 set U-bolt 3mm require at sump pump deck. (Total 11pcs)

KHL found out that the DCT equipment stud bolt is 80mm and stud bolt require is 100mm for install DCT equipment

(Firemens crash rescue equipment cabinets) at breeze deck

emergency diesel engine generator radiator ducting

(GD-77)

KHL found out that the emergency diesel engine generator radiator ducting (GD-7700) as below : Drawing M12 Hex

Bolt X 35mm length c/w flat washer and spring washer . B) COG-M-00840 SS316 hex bolt and nut c/w 1 flat washer. As

per drawing EDG ducting without gasket installation for EDG component.

MMHE will supply the spring washer as per drawing. MMHE to provide gasket and KHL need

to put silicon after installation.

EDG ducting installation clashed with structural

bracing

KHL found structural bracing for support between MD to LVL1 Lq restrict and limit the space for installation of EDG

ducting. Based on visual view and measurement taken, the EDG ducting cannot be installated due to bracing in that

area.

Proposal rejected. KHL to procced with trim/cutting the stiffener with plasma cutter to avoid clashing as

per discuss and agreed by all parties.

Colling water expansion tank V-6950.

KHL found out that the angle bar (L) obstruct with between PG-6950 (ANSI 2"CL 150#RF) and DBB valve of flange vessel

of cooling water expansion tank V-6950. DBB valveof PG-6950 unable to fully tighten (fully open or closed) due to

the clashing with angle bar (L).

Proceed with theproposal. KPW to loose the tubing clamp prior proceed trimming works to avoid the tubing damage. Any damages to the tubing and flange of vessel will be under KPW

responsibility.

Equipment seating details smoke hood

Equipment seating details smoke hood

KHL found out that the measurement and actual size of typical mounting seating details breathing apparatus

storage cointainer not fit at location. Base on equipment deails breathing apparatus, KHL need clarification from

MMHE to advise and modification measurement of support details.

MMHE advice to trim/grind the support at the clashing point to suit to site. There here no cost

impact, schedule impact and scope change.

Installation ofclosed drain transfer pump and

open/closed drain caisson pump.

A) As per mechanical drawing received from MMHE, additional support are required to install below the deck

drip quantity and spec of support as per below: 1-C-Channel C150 x 90 x 24kg/m x 22 unit for closed drain

transfer pump P-6430A/B 2- C-Channel C150 x 90 x 24kg/m x 6 unit for open/closed caisson pump AQ-6410 & AQ-6150. i) M3-KNPG-B-SP-80-131- SHEET 1 TO 3. ii) M3-KNPG-B-SP-

80-129-SHEET 1 TO 3. B) KHL found the final seating of closed drain transfer pump P-6430A/B clashing with deck

drain.

A. Procced the installation with available material C200 x 80. B. KHL to proceed with proposal. Cost impact will verify by QS MMHE.

Life Raft Modification - Additional Work.

As per mechanical drawing received from MMHE, the life raft cradle demension not as per drawing. Please refer to

attached drawing and photo. The life raft cradle which are supply by MMHE require additional modification to install the life raft support and cradle. Please refer to attached

drawing and photo . Total 10 nos life racts required modification work.

1) This EDS drawing given to KHL only for reference the location installation of life raft.

2) Proposal is acceptable and KHL to proceed modification to suit

at site for complete the installation at life raft.

Remove and welding back the wing plate after install the

EDG duct.

The component C of EDG ducting could't installed at location due to obstruction by wing plate. Please refer to

attached photo and drawing.

KHL can proceed remove and reweld back the wing plate after complete installation of EDG

ducting. Ensure apply the NDT and check strighness of the component (wing plate) after

complete welding.

Installation of livebuoy light at life buoy bracket.

As per mechanical drawing M3-KNPG-BX-80-159, the drawing did not show the installation of lifebuoy light. As per normal practice, installation of lifebuoy light required

plate and bolt nut. As per discussions with MMHE and PCSB, the lifebuoy light should be installed at midpoint of

lifebuoy bracket. KHL required 90 pcs M6 x 25mm hex bolt and nut c/w washer.

Page 63: MDDR Kinabalu 16-10-12

SITE TECHNICAL QUERY (STQ) FOR -KNPG-B

1

2

3

TELECOM

1 HUC/T/STQ/001 11-Aug-12 13-Aug-12

2 HUC/T/STQ/002 22-Aug-12

3 HUC/T/STQ/003 22-Aug-12

4 HUC/T/STQ/004 4-Sep-12 5-Sep-12 T-0047 / T-0010

5 HUC/T/STQ/005 7-Sep-12 7-Sep-12 T-0050 / T-0011

6 HUC-T-STQ-006 8-Sep-12 T-0051 /

7 HUC-T-STQ-007 11-Sep-12 11-Sep-12 0057 / 0027

8 HUC-T-STQ-008 11-Sep-12 13-Sep-12 0063 / 0030

9 HUC-T-STQ-009 12-Sep-12 13-Sep-12 0067 / 0030

10 HUC-T-STQ-010 13-Sep-12 13-Sep-12 0069 / 0034

11 HUC-T-STQ-011 18-Sep-12 0095 /

12 HUC-T-STQ-012 19-Sep-12 22-Sep-12 0095 / 0053

13 HUC-T-STQ-013 23-Sep-12 0105 /

14 HUC-T-STQ-014 23-Sep-12 0105 /

15 HUC-T-STQ-015 23-Sep-12 27-Sep-12 0105 / 0074

16 HUC-T-STQ-016 25-Sep-12 30-Sep-12 0113 / 0068

17 HUC-T-STQ-017 26-Sep-12 0114

18 HUC-T-STQ-018 4-Oct-12 10-Oct-12 Use this cable I2, (2PR x 1.0) COG/1/00788) T 0135 / 0095

19 HUC-T-STQ-019 Cable shortage in drum. 4-Oct-12 5-Oct-12 T 0135 / 0086

20 HUC-T-STQ-020 5-Oct-12 13-Oct-12 T 0136 / 0109

KHL discovered that 300mm width vertical cable ladder at column A12 not install yet and the support is not availaible in shiploose list. Also no support detail for this vertical cable ladder.

Proceed with mark-up.Pending structure installation

During Installation Stand & Support for PAGA Strobelight at Sump Pump Deck, KHL discovered the pole mounted stand cannot fix for install PAGA Strobelight & Junction Box :-1) witdh of mounting plate is 205mm but the diameter of the PAGA Strobelight is 230mm.2) size of steel backing plate is 210 x 210 mm but the length of Junction Box is 316 mm.

KHL discovered cable entry size of Junction box for Loud Speaker and Beacon are M20, but cable gland size for Loud Speaker and Beacon are M25.

Cable ladder obstructed by bracing at telecom tower

KHL discovered cable ladder unable to install straightaway with the support due to obstruct by the bracing of the telecom tower.

Please proceed with the proposal. To suit at site. Cost impact will be verified by QS MMHE.

Data log unit (DLU-9300) block by electrical cable

ladder.

KHL discored juction box for WMS data unit (DLU-9300) unable to open due to blocked by electrical cable ladder at

breeze deck. KHL Propose to increase the elevation of data log unit over the cable ladder by additing base support with

150mm C channel at the bottom. KHL seek MMHE to provide 2 meter of 15mm C channel for modification work.

Please proceed with the proposal. Cost impact will be verify by QS MMHE.

Week support for HF/SSB antenna

KHL discovered the support for HF/SSB antenna (ANT-9035A/B & ANT-9360A/B) are not stable when encounter

the strong wind. For secure the HF/SSB antenna, KHL propose to fabricated additional support with angle bar as

per attached mark up drawing.

Modification PAGA strobelinght pole mounted

stand at jacket

Due to the shiploose pole mounted stand from onshore fabricator not suit at site, PCSB request KHL to do

modification PAGA strobelight pole mounted stand to change the juntion box direction to facing to platform. KHL

have to extend the stand mounted with suitable lenght enough for open the juntion box without blocked by

handrail. 2 pole mounted stand have to be modified for PAGA strobelight (120-AU-901A/B & 120-AU-902A/B) and this require 2 meter 100 x 50 x 6mm C channel to perform

the task.

Please proceed the modification for the juntion box PAGA suit at site. All cost impact will be verify by

QS MMHE.

Short of adaptor for CCTV and GPA breakglass cable

gland entry.

KHL discovered cable entry size for CCTV and GPA breakglass are M20, but their cable gland size are M25.

KHL propose MMHE to provide 36 nos M20 male x female adaptor c/w M20 lock nut, M20 washer and M20 earth tag

for CCTV and GPA breakglass.

MMHE request KHL purchase the materia; as per mention above. All cost will be verify by QS MMHE.

Installation type for earth tag at m20 x m25 female adapter

for LSU, CCTV, BREAKGLASS & STROBELIGHT.

KHL discovered there are 2 diffrence type of installation earth tag for cable gland during onshore fabrication, some

earth tag installed at M20 male between juntion box/equipment and some installed at M25 female between cable gland. KHL request MMHE to advice the correct way

to install earth tag.

please riview attachment MMHE already put a figure 1 & figure 2. the correct method to install

earth tag figure 1.

Cable glanding details for CCTV cable

KHL discovered there are 2 difference type of cable glanding forCCTV cable during onshore construction, some of the cable gland connect with elbow and some glanding

directly with cable gland.

MMHE proposed KHL to follow existing CCTV that already complete during onshore fabrication. The elbow only used for CCTV that have obstacle and

need clearance.

cable for WMS-9303 short in length.

KHL discovered cable for rain gauge sensor WMS-9303 only 5 meter length, which is unableto reach datalog unit

DLU-9300

relocated for NDB/ATU-9400. MMHE request KHL to relocated the NDB/ATU-9400 due to existing location installed by onshore fabricator not suit for

commisioning

Please relocated the NDB/ATV-9400 near to helideck perimeter due to ANT-9400 can't

terminate/install in current condition.

CABLE SHORTAGE IN LENGTH AT MSFN

During cable pulling activity at MSFN, KHL discovered Outdoor phone cable (091-TUE-901 & 091-TUE-902)

unable to reach point due to cable shortage which coiled by onshore fabricator.

CCTV CABLE WRONGLY PULL IN ELECTRICAL LV

CABLE LADDER

KHL discovered CCTV(031-PTZ-901, 032-PTZ-901, 041-PTZ-901, 042-PTZ-901, 043-PTZ-901) coiled cable at Main deck Module 3 & module 4 were wrongly pulled in Electrical

LV cable ladder which are done by onshore fabricator. (Please refer to attached picture)

CCTV CABLE ENTRY NO SUIT FOR CCTV CABLE

GLANDING

KHL discovered CCTV cable entry (M20) too tight for incoming CCTV cable(M25) glanding, cable insulation will

cause damage if glanding perform by forcing. (Please refer to attach related Faulty Report(OFF/FR/KNPG-B/T/008)&

Picture)

MMHE already verify, there are 2 nos of core are not being used and become spare. As per

discussed with vendor CCTV and acknowledge to PCSB the spare cable 1 pair and 1 core black cable need to remove at CCTV side in oder to allow the

remaining core through the elbow without efecting the insulation.

Telecom routing from LCOT telecom equipment room to

LGAST fencing.

KHL discovered that existing HDG cable tray at LCOT telecom equipment room to LGAST fencing already full with existing cable, additional one length of fibre optic cable (cable OD-11.8mm) and one length of 20PR cable

(cable OD_48.2mm) can't lay in existing cable tray.

100mm wide should be enough. Proceed with the same material and elevation from the existing

cable tray

Hook-up drawing for WMS-9301.

IFC installation drawing for WMS -9301 received by KHL was deleted (refer to attached drawing) and vendor

drawing only show wave monitoring sensor, KHL request MMHE to provide the latest detail of installation drawing

for WMS-9301.

Additional cable pulling for mutable speaker in LQ

Habitation.

MMHE request KHL to pull 2 length additional cable for 2 nos PAGA speaker in prayer room and CCR. To change the functionality of the speaker to become mutable speaker.

KHL discovered insufficient P5 4C x 2.5mm cable in drum for cable pulling activity, only remain 30 meter in drum

after pulling cable 120-AU-901 and 120-UA-902.

Please proceed pull cable P5,7Cx2.5mm and find the cable drum with COG/I/01023 @ MSL I-M2-0023. Cable core only use 4 core and the 3 core

more is spare cable gland also change to M25 and gland adaptor to be applied M25/M20.

Telecom routing from main cable ladder routing to LCOT

fencing.

KHL discovered that existing HDG cable tray at LCOT fencing already full with existing cables, additional one

length of fibre optic cable (cable OD - 11.8mm ) and one length of 20PR cable ( cable OD - 48.2mm ) can't lay in

existing cable trays.

The scope of supply already stated in ITB attachment 3.1 and KHL has to supply the required

material.

Page 64: MDDR Kinabalu 16-10-12

SITE TECHNICAL QUERY (STQ) FOR -KNPG-B

21 HUC-T-STQ-021 7-Oct-12 Proposal accepted. Please remove pair 2 cable. T 0140 / 0091

22 HUC-T-STQ-022 7-Oct-12 12-Oct-12 T 0140 / 0097

23 HUC-T-STQ-023 10-Oct-12 10-Oct-12 T 0145 / 0095

24 HUC-T-STQ-024 11-Oct-12 T 0152 /

25 HUC-T-STQ-025 Relocation of the boom rest. 13-Oct-12 T 0157 /

26 HUC-T-STQ-026 15-Oct-12 T 0159 /

27 HUC-T-STQ-027 15-Oct-12 T 0159 /

INSTRUMENTATION

1 HUC/I/STQ/001 Instrumentation 31-Jul-12 1-Aug-12

2 HUC/I/STQ/002 Instrumentation 3-Aug-12 3-Aug-12

3 HUC/I/STQ/003 Instrumentation 17-Aug-12

4 HUC/I/STQ/004

5 HUC/I/STQ/005 7-Sep-12 9-Sep-12 T-0034 / T0012

6 HUC/I/STQ/006 9-Sep-12

7 HUC/I/STQ/007 29-Sep-12 29-Sep-12 T-0120 / 0069

8 HUC/I/STQ/008 2-Oct-12 3-Oct-12 T-0130 / 0076

9 HUC/I/STQ/009 6-Oct-12 12-Oct-12 T 0138 / 0098

10 HUC/I/STQ/010 Instrument cable damage. 7-Oct-12 T 0140 /

11 HUC/I/STQ/011 8-Oct-12 9-Oct-12 T 0142 / 0093

12 HUC/I/STQ/012 8-Oct-12 T 0142 /

Cable termination in CCTV panel not consistent.

As stated in STQ (HUC-T-STQ-015) MMHE comment to remove 1 pair spare cable in CCTV cable for cable glanding propose, but KHL discovered there are not consistent pair

cable termination in CCTV panel during onshore fabrication, some cable termination using pair 1 and some

cable temination using pair 2. it will be confusing for maintainence in future.

PAGA and CCTV panel termination drawing.

KHL request MMHE to provide IFC termination drawing of PAGA panel (PAGA-9050A & PAGA-9050B) and CCTV panel

(CCTV-9220A) for cable termination activity and final inspection. Currently KHL only refer to vendor drawing due

to haven't received any IFC drawing for PAGA and CCTV panel.

For cable termination activity and final inspection, please refer to vendor drawing first and for

inspection, invite MMHE personal to join. MMHE will provide the IFC drawing later. The drawing will

be same as the drawing vendor.

Outstanding material of installation Antenna ANT-

9370.

Antenna ANT-9370 still unable to install due to material received at offshore without clamp.

We will fabricate a new one according to vendor advise.

Insufficient space for cable glanding at juntion box.

KHL discovered cable unable to glanding at juction box (021-LJB-901A) due to junction box installed too near the

wall by onshore fabricator. (Please refer to attached picture)

As inform by structural team, boom rest at module 5 would be relocate to module 4, it will effect location of the PAGA

speaker (055-LSU-901B) which is located at boom rest.

MCT not suit for DMR wave guide cable.

KHL discovered shape of MCT (Circle) not suitable for DMR wave guide cable ANT-9261, ANT-9262B (Ellipse) transit

into radio operator room.

PAGA cable (023-PAGA-9050A) from panel to field

junction box shortage.

During cable pulling activity, KHL discovered PAGA cable (023-PAGA-9050A) shortage about 15 meter to reach point

which wascoiled by onshore fabricator.

KHL found out that Instrument Earth and Electrical Earth (safety earth) are shorted to each other within the panel and between the earth dispatchersfor all instrumentation Panels in CCR and RER (refer to Faulty Report OFF/FR/KNPG-B/I/001).

KHL found out that no specific / loop drawing and cable routing layout for Instrument Earthing from Earth Dispactcher to Jacket Leg. The only drawings available are typical schematic and too general. KHL also found out that the earthing cable from Instrument Earth Dispatcher M1 & M2 to MSFN and from Instrument Earth Dispatcher at MSFN to Jacket Leg are not in cable schedule and not available on board.

New STQ to be raise for propose jacket leg location and estimate earthing material required

KHL discovered that thru gland are require for cable entry to Wellhead Control Panel WHCP-0100 and WHCP-0105. Total 8 runs of 21C x 1.5mm2 and 2 runs of 20PR x 1.0mm2 cables for each panel.

Insufficient cable entry space for MDF-8000A

KHL discovered that insufficient cable entry space for MDF-8000A panel. Still have 16 length of cable from other module to be terminate to this panel, but the space just enough for 3 or 4 cable for front side and totally no space for for near side.

As per discussion with client PCSB, they agreed to used unistrut for the FGS panel MPS 8000A. KPW

to proceed the unistant modification.

cable short for fire and gas juction box 054-FJB-801 incoming cable.

Incoming supply cable for QT-8822.

KHL discovered that incoming supply cable QT-8822-2 is not shown in cable schedule and no pull yet. As the

incoming power of the QT-8820 is from LCP-8800, the 240V AC power cable from DB-7820 shall be not require.

Incoming cable power 240v from DB 7820 to QT 8820 not require and cable schedule need to

redline markup (delete) Proceed with the cable proposed. MMHE will supply the gland adaptor 3/4

NPTM x M20.

Incoming supply cable for QT-8822.

KHL discovered that incoming supply cable QT-8822-2 is not shown in cable schedule and no pull yet. As the

incoming power of the QT-8820 is from LCP-8800, the 240V AC power cable from DB-7820 shall be not require.

proceed with the proposal. The shorted cable will be supply by MMHE. All the tag number above are intemodule cable and there is under KHL scope to

pull the cable, gland and termination.

Discrepency between cable schedule and block diagram

for fibre optic cables.

KHL discovered that IFC cable schedule shown fibre optic cable from turbine generator control panel GLP-7510,GLP-

7520 and GLP-7530 are going to FOP-4651. But vendor block diagram shown those cable are from turbine

generator control panels to RIOS-4602. Those cable already pulled & glanded according to laters IFC cable schedule. Also in vendor block diagram shown one fibre optic cable from RIOS-4602 to FOP-4651, but it doesn't show in cable schedule. Size of this fibre optic cable also doesn't show in

vendor drawing.

Base on the drawing attached, use 2 core fibre to proceed for the RIOS-4602 to FOP-4651. Proceed

as the vendor block diagram.

KHL discovered that 27 length of damage instrument cable still in good condition as results of continuity test and

insulation resistance test are inacceptable range. Please refer to attached result for your reference.

Outstanding cable for LCP-8800.

KHL discovered that 2 length of P4A-21C x 1.5mm cable from IRP-7840 to LCP-8800 and 2 length of I2-10PR x

1.0mm cable from TR-8100A&B to LCP-8800 haven't pull yet. Those cable also not listed in shiploose & coil cable list

provided by MMHE.

MMHE to instruct KHL to pull, gland and terminate the required cable for LCP-8800. Cable gland will

provided by MMHE. Please use this cable drum no I-SPD-0037 (P4A 21C x 1.5mm) , I-SPD-0080 (I2 10PR x 1.0mm) Cost impact will be verify by QS

MMHE.

Discrepency between cable schedule and termination

drawing.

KHL discovered that 4 length of instrument cable in cable schedule show to UPS panels, but termination drawing recently received shown to MCCB panel. Those cable

already pulled & glanded according to cable schedule and now those cable are insufficient to re-route to MCCB panel.

Those cable are: UZS-7860A (P5-2Cx1.5MM) , UZS-7860B (P5-2Cx1.5MM) , UZS-7850A (P5-2Cx1.5MM) , UZS-7850B

(P5-2Cx1.5MM).

Page 65: MDDR Kinabalu 16-10-12

SITE TECHNICAL QUERY (STQ) FOR -KNPG-B

13 HUC/I/STQ/013 7-Oct-12 9-Oct-12 T 0143 / 0093

14 HUC/I/STQ/014 10-Oct-12 13-Oct-12 T 0150 / 0108

No cable from LCP to level transmitter of fire water pump

A,B and C

KHL found that cabale from LCP to level transmitter of fire water pump A,B and C not shown in IFC cable schedule.

Please find attached picture for your reference.

The mentioned cable is not MMHE & KHL scope. All the materials required provide by vendor and to

be installed by vendor too. MMHE already shiploose the materials and KHL to prepare the

materials inplace during vendor MOB.

Cable shortage from FAP-8201 A&B to 021-HD-802.

KHL found 2 length onshore coil cable are shortage as per following details, Cable Tag No : 1. 021-HD-801 2. 021-

HD-802. Cable size/type : F2-1PR x 1.0mm (Non IS). Cable dest. : 021-HD-802. Cable Shortage : 20 meters. Please

find attached cable schedule for your reference.

As discussed, re-route the cable will be the best solution since this cable is in limited stock


Recommended