MDOT CORS & M.H.M.P Andy Semenchuk, P.S. MSRN ADMINISTRATOR
Transcript
Page 1: MDOT CORS & M.H.M.P Andy Semenchuk, P.S. MSRN ADMINISTRATOR.

MDOT CORS&

M.H.M.PAndy Semenchuk, P.S.

MSRN ADMINISTRATOR

Page 2: MDOT CORS & M.H.M.P Andy Semenchuk, P.S. MSRN ADMINISTRATOR.

A review of definitions

: continuously operating reference station What is it? A permanently mounted GPS receiver.

: High Accuracy Reference Network : Michigan Height Modernization Project

: Federal Base Network : Cooperative Base network

Page 3: MDOT CORS & M.H.M.P Andy Semenchuk, P.S. MSRN ADMINISTRATOR.

ref •er • ence, n.,- 1. referred or consulted as a centering point

base, n.,- 1. the fundamental part or foundation

sta •tion, n.,- 1. a place or position where something is to remain 2. a place equipped for some particular kind of work, service, or broadcasting

Defined by “Webster”Defined by “Webster”

What is a Reference/ Base Station

Page 4: MDOT CORS & M.H.M.P Andy Semenchuk, P.S. MSRN ADMINISTRATOR.

MDOT CORS

First step in a in creating a Homogeneous 3D geodetic network in the state.

First CORS installed in Jackson, Michigan on September 2000.

CORS system was originally installed by MDOT for our own use.

Today it has become similar to a public road. Available to everyone at no cost!!!

Page 5: MDOT CORS & M.H.M.P Andy Semenchuk, P.S. MSRN ADMINISTRATOR.

MDOT CORS BACKGROUND

Department had been using GPS for static and rapid static control work since 1991.

MDOT used to have 38 crews state wide with each crew containing 8 people.

Today there are 8 crews statewide with no more than 2 to 3 person/crewThe Road budget has quadrupled in the same time frame.

We had to get the work out.

Page 6: MDOT CORS & M.H.M.P Andy Semenchuk, P.S. MSRN ADMINISTRATOR.

Behind the Eight Ball

The Survey and Photogrammetry Units were understaffed and ill prepared for the magnitude of requests we receive.

We did not possess the staff nor technology to complete the work.

The end result was the inability to deliver our product to our customer in a timely manner.

Page 7: MDOT CORS & M.H.M.P Andy Semenchuk, P.S. MSRN ADMINISTRATOR.

Search For Solutions We needed to develop solutions

for the situation. Our goal: To produce accurate

survey and photogrammetry data quicker and more efficiently.

We looked at several areas of our process: survey request timing Consultant contact scoping

improvements Application of new technology to

improve the actual process of surveying.

The Earl of Cone

Page 8: MDOT CORS & M.H.M.P Andy Semenchuk, P.S. MSRN ADMINISTRATOR.

CORS BECAME A REALITY

We investigated different methods to get the work out and realized that we were spending lots of hours bringing control to a project.

We decided to implement a reference network across the state that would assist us in the control process.

The next step was to “Sell” the idea to the management at MDOT.

Page 9: MDOT CORS & M.H.M.P Andy Semenchuk, P.S. MSRN ADMINISTRATOR.

Management’s Concerns

Management was rightly concerned with the following:Is this technology proven?What will be the overall costs?What will be the costs savings to the department?How long before we recoup our initial investment?

After satisfying managements concerns, they gave us the go ahead.

Page 10: MDOT CORS & M.H.M.P Andy Semenchuk, P.S. MSRN ADMINISTRATOR.

Jackson“UNIV” Station

Lets open the door and see a bit more about this network

The Michigan Spatial Reference Network

(56) Fifty six GPS receivers

6 more waiting for spring thaw.

Located at various MDOT and county faciltites.

RTK (RTCM) Available VIA WEB

All controlled by SpiderNET software.

Page 11: MDOT CORS & M.H.M.P Andy Semenchuk, P.S. MSRN ADMINISTRATOR.

Building the Monuments

We researched and consulted with Structural and mechanical engineers to try and build stable monuments for the conditions we encounter in Michigan.

We decided and a 2 part mount. The base consisting of a reinforced concrete

monument 24” in diameter by 12 feet below grade.And the mast which is know commonly known as

an “Earlconic”.

Page 12: MDOT CORS & M.H.M.P Andy Semenchuk, P.S. MSRN ADMINISTRATOR.
Page 13: MDOT CORS & M.H.M.P Andy Semenchuk, P.S. MSRN ADMINISTRATOR.

SITE PHOTOS

Looking in the monument hole. Waiting for the concrete.

Cable Trench

Page 14: MDOT CORS & M.H.M.P Andy Semenchuk, P.S. MSRN ADMINISTRATOR.

Site Selection.

The first 12 sites we had planned were selected on the following criteria. Must be on MDOT

property Must have had an

existing dedicated LAN connection.

Must have met visibility requirements and suitable soils for stability.

Page 15: MDOT CORS & M.H.M.P Andy Semenchuk, P.S. MSRN ADMINISTRATOR.

Completion of Initial stations

The initial stations were installed in a 3 month period.

During this 3 month period we decided to implement a user interface to access the data. www.mdotcors.org was born.In its 5 years of existence we have had over

30,000 downloads for the data. This does not include the people who get the

MSRN data directly from NGS.

Page 16: MDOT CORS & M.H.M.P Andy Semenchuk, P.S. MSRN ADMINISTRATOR.
Page 17: MDOT CORS & M.H.M.P Andy Semenchuk, P.S. MSRN ADMINISTRATOR.

Positioning the CORSWe then decided to position the CORS

relative to the HARN.We mobilized the MDOT survey forces and

discovered that we needed help.We asked for volunteers and the response

was overwhelming:Dept. of Natural ResourcesPrivate sector stepped up to the plateFerris State University Students

Page 18: MDOT CORS & M.H.M.P Andy Semenchuk, P.S. MSRN ADMINISTRATOR.

Positioning CORS

We had originally planned 2 5.5 hour sessions to position the CORS.

After discussing with NGS we revised the sessions to create a 3rd 5.5 hour session.

This observation also served as the re-observation of the HARN.

Page 19: MDOT CORS & M.H.M.P Andy Semenchuk, P.S. MSRN ADMINISTRATOR.

Cooperation

`

Local Gov.Agencies

other State Agencies

PRIVATESECTOR

Page 20: MDOT CORS & M.H.M.P Andy Semenchuk, P.S. MSRN ADMINISTRATOR.

Phase Description Phase I (Real-Time Data Acquisition and Integrity Monitoring)

Deploy network of Static Stations Operational Testing Public Access (User training/ Workshops/Seminars MDOT Expansion

County Expansion City Expansion Emergency/ Utilitarian expansion

Phase II (Real-Time Broadcasting) In Planning Real-time PCS Policy for City/ County additions to network

Phase III The future

Page 21: MDOT CORS & M.H.M.P Andy Semenchuk, P.S. MSRN ADMINISTRATOR.

Why Height Modernization? We already have the 2D dimensional component

(MSRN) in place why not add the height component and have a 3D geodetic control network in the state?

Other Benefits Land Surveying Land Use Planning Property Descriptions Great Lakes monitoring Floodplain Mapping Environmental Applications Precision Agriculture Precision GIS base mapping Navigation

Page 22: MDOT CORS & M.H.M.P Andy Semenchuk, P.S. MSRN ADMINISTRATOR.

MHMP

GoalsEliminate inconsistencies in the vertical network

Result will be a homogeneous vertical networkReplace and supplement control in High growth

areas where control has been destroyed.Statewide 3D Control Network.Further enhance RTK.

Page 23: MDOT CORS & M.H.M.P Andy Semenchuk, P.S. MSRN ADMINISTRATOR.

Phase Description Phase 1

Define a pilot areaSecure funding through state funds and Federal highway

research funds.Complete pilot project area using consultant forces.

2 PHASES (2 separate contracts) Monument Placement 2nd order class 1 Leveling and GPS

Report Results. Phase 2

Secure Congressional funding. Can be officially called “height modernization”

Ongoing until state is completed (long term) 10 year window for completion.

Page 24: MDOT CORS & M.H.M.P Andy Semenchuk, P.S. MSRN ADMINISTRATOR.

What is involved with Monument placement

Monuments Poured concrete 16” Diameter by 8’ in depth Monument will be re-enforced with 4 pieces of fiberglass re-

bar. Monuments will be located Approximately 1.8km to 2 km

apart along the designated route. Monuments will be located as much as possible in areas that

will give the longest monument life. 95% of monuments should be located in areas suitable for

GPS purposes.Obstructions shall be kept to a minimumForesight to future usage shall also be kept in mind.

Page 25: MDOT CORS & M.H.M.P Andy Semenchuk, P.S. MSRN ADMINISTRATOR.
Page 26: MDOT CORS & M.H.M.P Andy Semenchuk, P.S. MSRN ADMINISTRATOR.

2nd Order Class 1 leveling All 2nd order class 1 specs must be followed. Collimation performed daily 60 meter maximum backsight Backsights and foresight must be balanced. Double observe each section under different

circumstances. Use turning pins (turtles) and Rod supports. The use of ATV’s are recommended where permitted

to increase productivity.

Page 27: MDOT CORS & M.H.M.P Andy Semenchuk, P.S. MSRN ADMINISTRATOR.

Where are we today? Contract for monument placement will be released in

the upcoming month. Consists of placement of monuments in Macomb, Wayne,

St. Clair, and possibly Oakland Counties.Low bid/QBS contract Total number will be dependent on BID amount for

monuments and on the number of recoveries of existing control.

50% success rate in recoveries. Scope for leveling and GPS needs to be created.

Contract will be issued in the spring can not commence till monument placement is

complete. IDS pre-qualified contract

Pilot Must be completed by 9/1/06

Page 28: MDOT CORS & M.H.M.P Andy Semenchuk, P.S. MSRN ADMINISTRATOR.

PARTNERS?

We need partners at local level to achieve the same level of success as with the MSRN. Partnering does NOT mean $ commitment.

Different forms of Partners Time Resources Talent Education Preservation

If Stakeholders participate in the process it will almost ensure a successful program.