+ All Categories
Home > Documents > Measurements along track of aircraft between 11:30 and 12:30

Measurements along track of aircraft between 11:30 and 12:30

Date post: 13-Jan-2016
Category:
Upload: meg
View: 17 times
Download: 0 times
Share this document with a friend
Description:
Where we were in October ‘08: Comparison of CMAQ-MADRID Predictions & AMS Measurements of Nitrate Aerosol for ADIENT Flight B333 (13/12/2007). This is where we still are in terms of data analysis. 12.154.6410/ µ m. Measurements along track of aircraft between 11:30 and 12:30. - PowerPoint PPT Presentation
2
Measurements along track of aircraft between 11:30 and 12:30 .0215 .046 .1 .215 .464 1 2.15 4.64 10/µm Where we were in October ‘08: Comparison of CMAQ-MADRID Predictions & AMS Measurements of Nitrate Aerosol for ADIENT Flight B333 (13/12/2007) This is where we still are in terms of data analysis
Transcript
Page 1: Measurements along track of aircraft between 11:30 and 12:30

Measurements along track of aircraft between 11:30 and 12:30

.0215 .046 .1 .215 .464 1 2.15 4.64 10/µm

Where we were in October ‘08: Comparison of CMAQ-MADRID Predictions & AMS Measurements of Nitrate Aerosol for ADIENT Flight B333 (13/12/2007)

This is where we still are in terms of data analysis

Page 2: Measurements along track of aircraft between 11:30 and 12:30

PDRA (Michael Bane) had enough by November

CMAQ Status: parallelisation problems – dependency on domain shape

But optimal CMAQ MADRID version available when parallelised correctly

Need >1 month wallclock per 1 month simulation on O(100) cpus per 3 way nested simulation

Buying Bane time (and begging HORACE time) for completion of ADIENT simulations

Entire April-May 08 period for ADIENT-EUCAARI flights completed or queued for simulation

2 coarsest grids for May complete, finest to finish this weekend. April to complete by June. Will Morgan to data mine and compare with measurements!

Plan for completion of ADIENT CMAQ MADRID work


Recommended