NOTE: ALL SYMBOLS MAY NOT BE USED ON THIS PROJECT. 36"x12" 36"x12" 36"x18" 36"x18" 36"x18" ELBOW DOWN ELBOW - RADIUS (R) = 1.5 TIMES DIAMETER OF DUCT 18" DIA. 36"x12" 36"x12" 24"x12" 24"x12" RETURN AIR ELBOW DOWN RETURN AIR ELBOW UP SUPPLY AIR ELBOW DOWN 36"x24" TEMPERATURE SENSOR STATIC PRESSURE PROBE SP M T DAMPER MOTOR DESCRIPTION SUPPLY AIR DIFFUSER RETURN AIR GRILLE SYMBOL SUPPLY AIR DIFFUSER EXHAUST AIR GRILLE C EXHAUST AIR ELBOW DOWN EXHAUST AIR ELBOW UP HEATING COIL SUPPLY AIR ELBOW UP DIMENSION DESCRIPTION: 1ST FIGURE = SIDE SHOWN 2ND FIGURE = SIDE NOT SHOWN ALL SIZES IN INCHES DOUBLE SIDE TRANSITION TRANSITION SLOPE SPECIFICATION: MINIMUM SLOPE = 15 DEG. MAXIMUM SLOPE = 45 DEG. ALL SIZES IN INCHES SINGLE SIDE TRANSITION TRANSITION SLOPE SPECIFICATION: MINIMUM SLOPE = 15 DEG. MAXIMUM SLOPE = 45 DEG. ALL SIZES IN INCHES TOP TRANSITION (SLOPE ON TOP) TRANSITION SLOPE SPECIFICATION: MINIMUM SLOPE = 15 DEG. MAXIMUM SLOPE = 45 DEG. ALL SIZES IN INCHES BOTTOM TRANSITION (SLOPE ON BOTTOM) TRANSITION SLOPE SPECIFICATION: MINIMUM SLOPE = 15 DEG. MAXIMUM SLOPE = 45 DEG. ALL SIZES IN INCHES RECTANGULAR TO ROUND TRANSITION TRANSITION SLOPE SPECIFICATION: MINIMUM SLOPE = 15 DEG. MAXIMUM SLOPE = 45 DEG. ALL SIZES IN INCHES ELBOW UP DIMENSION DESCRIPTION: 14" DIA. = ROUND DUCT 24"x12" FO = FLAT OVAL DUCT VARIABLE AIR VOLUME BOX DIMENSION DESCRIPTION CLEARENCE (C) = 3 FT. FROM CONTROL PANEL DO NOT LOCATE PIPING BELOW VAV BOX OR IN FRONT OF CONTROL PANEL. LAB TERMINAL UNIT AND EXHAUST TERMINAL UNIT - CONTROLLER MOUNTED ON BUTTON OF EXHAUST UNIT - DO NOT LOCATE PIPING BELOW LAB TERMINAL UNIT. R 14" DIA. MANUAL VOLUME DAMPER VERTICAL SMOKE DAMPER VERTICAL FIRE DAMPER HORIZONTAL FIRE DAMPER HORIZONTAL COMBINATION FIRE/SMOKE DAMPER VERTICAL COMBINATION FIRE/SMOKE DAMPER SENSOR (CO2 UNLESS OTHERWISE NOTED) S S PRESSURE GAGE WITH COCK FLEXIBLE CONNECTOR PIPE OUT TOP PIPE OUT BOTTOM PIPE TURNED DOWN PIPE TURNED UP UNION SOLENOID VALVE MOTOR OPERATED VALVE THERMOMETER THREE WAY CONTROL VALVE TWO WAY CONTROL VALVE PRESSURE RELIEF VALVE PRESSURE REGULATOR VALVE BUTTERFLY VALVE STRAINER PLUG VALVE FULL PORT BALL VALVE CHECK VALVE AUTOMATIC FLOW CONTROL VALVE AUTOMATIC FLOW CONTROL VALVE W/ TEST PORTS GLOBE VALVE GENERIC VALVE M BACKFLOW PREVENTER FLOW METER STEAM TRAP DESCRIPTION SYMBOL DESCRIPTION SYMBOL MECHANICAL SYMBOLS MECHANICAL SYSTEM INDICATION HEAVY LINE- WEIGHT INDICATES NEW WORK LIGHT LINE WEIGHT- INDICATES EXISTING EQUIPMENT OR REFERENCED INFORMATION HATCH MARKS - EQUIPMENT OR MATERIALS TO BE DISCONNECTED AND REMOVED MECHANICAL DRAWING LEGEND DASHED LINES- PIPING ROUTED BELOW SLAB OR GRADE NEW / EXISTING CONNECTIONS EXISTING SYSTEM COMPONENT TO REMAIN POINT OF NEW CONNECTION NEW SYSTEM COMPONENT EXISTING POINT OF DISCONNECT EXISTING SYSTEM COMPONENT TO REMAIN POINT OF DISCONNECT EXISTING SYSTEM COMPONENT TO BE REMOVED H10 E001 DRAWING TITLE ##" = 1'-0" DRAWING/ DETAIL TITLE NOTE: DRAWING TITLE MAY NOT APPEAR ON LARGE SCALE DETAIL DRAWINGS DETAIL NUMBER REFER TO THIS DRAWING FOR DETAIL SECTION CUT SYMBOL ADDITIONAL DRAWING WHERE DETAIL IS REFERENCED SECTION NUMBER SHEET WHERE SECTION IS DRAWN M200 ENLARGED PLAN DETAIL REFER TO THIS SHEET FOR ENLARGED PLAN ENLARGED PLAN NUMBER 1 DRAWING REVISION SYMBOL DRAWING REVISION NUMBER TEXT LEADER INFORMATION TEXT CONSTRUCTION NOTE X CONSTRUCTION NOTE NUMBER EXISTING CONNECTIONS EXISTING SYSTEM COMPONENT TO REMAIN CAP OFF EXISTING NORTH ARROW N PROJECT NORTH TRUE NORTH MECHANICAL ABBREVIATIONS DIFFUSER TAG DIFFUSER ID SD-1 XXX-X NECK SIZE IN INCHES QUANTITY, IF MISSING QUANTITY EQUALS ONE AIRFLOW IN CUBIC FEET PER MINUTE 1 ISSUE: CHECKED: SCALE: © 2010 SHW Group SHW Project: SHEET TITLE: Final Plans for Bidding and Construction 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 H G F E D C B A H G F E D C B A DRAWN: C:\Revit Local Files\71108000 CH M12_CENTRAL_Ksimoneaux.rvt 3/5/2013 6:06:34 PM 12" = 1'-0" CJZ PETER AND PAT COOK ACADEMIC HALL RENOVATION GRAND RAPIDS, MI MECHANICAL LEGEND, SYMBOLS AND ABBREVIATIONS M001 7111.080.00 2338 COOLIDGE, BERKLEY, MICHIGAN 48072 P 248.336.4700 F 248.336.4701 RC Mechanical Drawing List Sheet # Sheet Name BIDS ADDENDUM 2 MECHANICAL M001 MECHANICAL LEGEND, SYMBOLS AND ABBREVIATIONS O O M002 TEMPERATURE CONTROLS LEGEND O MD121.2 LEVEL 2 SHEET METAL DEMOLITION PLAN - PHASE 2 O MD131.1 LEVEL 3 SHEET METAL DEMOLITION PLAN - PHASE 1 O MD131.2 LEVEL 3 SHEET METAL DEMOLITION PLAN - PHASE 2 O MD141.1 LEVEL 4 SHEET METAL DEMOLITION PLAN - PHASE 1 O MD151.1 LEVEL 5 SHEET METAL DEMOLITION PLAN - PHASE 1 O MD161.1 ROOF MECHANICAL DEMOLITION PLAN - PHASE 1 O O MD221.2 LEVEL 2 HVAC PIPING DEMOLITION PLAN - PHASE 2 O O MD231.1 LEVEL 3 HVAC PIPING DEMOLITION PLAN - PHASE 1 O O MD231.2 LEVEL 3 HVAC PIPING DEMOLITION PLAN - PHASE 2 O O MD241.1 LEVEL 4 HVAC PIPING DEMOLITION PLAN - PHASE 1 O O MD251.1 LEVEL 5 HVAC PIPING DEMOLITION PLAN - PHASE 1 O O M121.2 LEVEL 2 SHEET METAL PLAN - PHASE 2 O O M131.1 LEVEL 3 SHEET METAL PLAN - PHASE 1 O M131.2 LEVEL 3 SHEET METAL PLAN - PHASE 2 O O M141.1 LEVEL 4 SHEET METAL PLAN - PHASE 1 O O M151.1 LEVEL 5 SHEET METAL PLAN - PHASE 1 O O M161.1 ROOF MECHANICAL PLAN - PHASE 1 O O M221.2 LEVEL 2 HVAC PIPING PLAN - PHASE 2 O O M231.2 LEVEL 3 HVAC PIPING PLAN - PHASE 2 O O M241.1 LEVEL 4 HVAC PIPING PLAN - PHASE 1 O O M251.1 LEVEL 5 HVAC PIPING PLAN - PHASE 1 O O M301.1 ENLARGED MECHANICAL PLAN - PHASE 1 O O M302.1 LEVEL 4 & 5 ENLARGED MECHANICAL ROOM - PHASE 1 O O M302.2 LEVEL 2 & 3 ENLARGED MECHANICAL ROOM - PHASE 2 O O M401 MECHANICAL DIAGRAMS O O M402 MECHANICAL CONDENSER WATER PIPING DIAGRAMS O O M403 MECHANICAL STEAM PIPING DIAGRAMS O O M404A MECHANICAL HHWS&R DEMOLITION PIPING DIAGRAM O O M404B MECHANICAL HHWS&R NEW WORK PIPIING DIAGRAMS O O M501 MECHANICAL DETAILS O M502 MECHANICAL DETAILS O O M503 MECHANICAL DETAILS O M504 MECHANICAL DETAILS O M601 MECHANICAL SCHEDULES O O M602 MECHANICAL SCHEDULES O O M603 MECHANICAL SCHEDULES O O M701 CONTROLS DIAGRAM O O M702 CONTROLS DIAGRAM O O M703 CONTROLS DIAGRAM O O M704 CONTROLS DIAGRAM O O M705 CONTROLS DIAGRAM O O M706 CONTROLS DIAGRAM O O M707 CONTROLS DIAGRAM O O M708 BAS/DDC SYSTEM ARCHITECTURE O 02-20-2013 BIDS 03-05-2013 ADDENDUM 2 RF-# RETURN FAN RG-# RETURN AIR GRILLE / REGISTER / DIFFUSER RH RELATIVE HUMIDITY RL REFRIGERANT LIQUID RM ROOM RP RADIANT PANEL RPM REVOLUTIONS PER MINUTE RS REFRIGERANT SUCTION RTU-# ROOFTOP UNIT SA SUPPLY AIR SCH SCHEDULE SCHWR SECONDARY CHILLED WATER RETURN SCHWS SECONDARY CHILLED WATER SUPPLY SD-# SUPPLY GRILLE / REGISTER / DIFFUSER SF-# SUPPLY FAN SP STATIC PRESSURE SPEC(S) SPECIFICATON(S) STD STANDARD TAD TRANSFER AIR DUCT TC TEMPERATURE CONTROL TCHWR TERTIARY CHILLED WATER RETURN TCHWS TERTIARY CHILLED WATER SUPPLY TEMP TEMPERATURE TYP TYPICAL UH-# UNIT HEATER UV-# UNIT VENTILATOR V VENT VA VALVE VAC VACUUM VAV VARIABLE-AIR-VOLUME VAV-# VARIABLE VOLUME BOX VB VACUUM BREAKER VD VOLUME DAMPER VEL VELOCITY VFD VARIABLE FREQUENCY DRIVE VIB VIBRATION (SENSOR) VIF VERIFY IN FIELD VTR VENT-THRU-ROOF VUV VERTICAL UNIT VENTILATOR VVF-# VARIABLE VOLUME FAN POWERED W WIDE / WIDTH W/ WITH W/O WITHOUT WB WET BULB TEMPERATURE WG WATER GAUGE WH-# WATER HEATER KIT KITCHEN kW KILOWATT L LENGTH / LONG LAT LEAVING AIR TEMPERATURE LP LIQUID PETROLEUM LPC LOW PRESSURE STEAM CONDENSATE LPS LOW PRESSURE STEAM SUPPLY LTU-# LAB TERMINAL UNIT LOUVER LWT LEAVING WATER TEMPERATURE M METER MAU-# MAKEUP AIR UNIT MAX MAXIMUM MECH MECHANICAL MFR MANUFACTURER MIN MINIMUM MISC MISCELLANEOUS MOP MAXIMUM OVERCURRENT PROTECTION MPC MEDIUM PRESSURE STEAM CONDENSATE MPS MEDIUM PRESSURE STEAM SUPPLY MTD MOUNTED MV MANUAL AIR VENT NC NOISE CRITERIA NC NORMALLY CLOSED NG NATURAL GAS NIC NOT IN CONTRACT NO NORMALLY OPEN NO / # NUMBER NTS NOT TO SCALE OA OUTSIDE AIR OC ON CENTER OD OUTSIDE DIAMETER OED OPEN ENDED DUCT ORD-# OVERFLOW ROOF DRAIN PCHWR PRIMARY CHILLED WATER RETURN PCHWS PRIMARY CHILLED WATER SUPPLY PCU PRECISION COOLING UNIT PEFAB PREFABRICATED PHHWR PERIMETER HEATING HOT WATER RETURN PHHWS PERIMETER HEATING HOT WATER SUPPLY PRD PRESSURE RELIEF DEVICE PRV PRESSURE REDUCING VALVE PSI POUNDS PER SQUARE INCH PVC POLYVINYL CHLORIDE R / RAD RADIUS RA RETURN AIR RD-# ROOF DRAIN REQ'D REQUIRED DIA/Ø DIAMETER DIFF DIFFERENTIAL DN DOWN DSCH DISCHARGE DWG DRAWING EAT ENTERING AIR TEMPERATURE EF-# EXHAUST FAN EFF EFFICIENCY EG-# EXHAUST GRILLE / REGISTER / DIFFUSER EL ELEVATION ELEC ELECTRIC(AL) ELEV ELEVATOR EMER EMERGENCY EQUIP EQUIPMENT ERC ENERGY RECOVERY COIL ETU-# EXHAUST TERMINAL UNIT EWT ENTERING WATER TEMPERATURE EXH EXHAUST EXIST / (E) EXISTING EXT EXTERIOR F&TT FLOAT AND THERMOSTATIC TRAP FCU-# FAN COIL UNIT FD-# FLOOR DRAIN FEV FLUE EXHAUST VENT FIN F / FF FINISH FLOOR FLA FULL LOAD AMPERAGE FLR FLOOR FP FIRE PROTECTION FPM FEET PER MINUTE FTR-# FINNED TUBE RADIATOR FUR-# FURNACE GA GAUGE GAL GALLON GALV GALVANIZE(D) GPM GALLONS PER MINUTE H HEIGHT/HIGH HC-# HEATING COIL HHWP-# HEATING HOT WATER PUMP HHWR HEATING HOT WATER RETURN HHWS HEATING HOT WATER SUPPLY HP HORSEPOWER HPC HIGH PRESSURE STEAM CONDENSATE HPS HIGH PRESSURE STEAM SUPPLY HRU HEAT RECOVERY UNIT HVAC HEATING / VENTILATING / AIR CONDITIONING ID INSIDE DIAMETER IE INVERT ELEVATION INSUL INSULATION / INSULATE AC AIR CONDITIONING ACCU AIR COOLED CONDENSING UNIT ACU AIR CONDITIONING UNIT AFC AUTO. FLOW CONTROL AFF ABOVE FINISHED FLOOR AHU AIR HANDLING UNIT AL ACTIVE LENGTH ALT ALTERNATIVE AMB AMBIENT AP ACCESS PANEL / DOOR APPROX APPROXIMATE AR ACID RESISTANT ARCH ARCHITECT(URAL) ARV AIR RELIEF VALVE ATV AIR TURNING VANES AUTO AUTOMATIC B-# BOILER BAS BUILDING AUTOMATION SYSTEM BCU-# BLOWER COIL UNIT BD BAROMETRIC DAMPER BDD BACKDRAFT DAMPER BHP BRAKE HORSEPOWER BLDG BUILDING BOD BOTTOM OF DUCT BOT BOTTOM BTU BRITISH THERMAL UNIT BTUH BRITISH THERMAL UNIT PER HOUR C COMMON CAB CABINET CAV CONSTANT AIR VOLUME CC-# COOLING COIL CFM CUBIC FEET PER MINUTE CH-# CHILLER CHWP-# CHILLED WATER PUMP CHWR CHILLED WATER RETURN CHWS CHILLED WATER SUPPLY CL CENTERLINE CLG CEILING COL COLUMN CONC CONCRETE COND CONDENSER / CONDENSATE CPD CONDENSATE PUMP DISCHARGE CPRSR COMPRESSOR CT-# COOLING TOWER CUH-# CABINET UNIT HEATER CV CONTROL VALVE CW COLD WATER (DOMESTIC) CWP CONDENSER WATER PUMP CWR CONDENSER WATER RETURN CWS CONDENSER WATER SUPPLY D DEPTH/DEEP DB DRY BULB TEMEPRATURE DEG DEGREE
Transcript
Page 1: MECHANICAL SYMBOLS MECHANICAL DRAWING LEGEND111841/AN~2...MECHANICAL SYMBOLS MECHANICAL SYSTEM INDICATION HEAVY LINE-WEIGHT INDICATES NEW WORK LIGHT LINE WEIGHT-INDICATES EXISTING

NOTE: ALL SYMBOLS MAY NOT BE USED ON THIS PROJECT.

36"x12"

36"x12"

36"x18"

36"x18"

36"x18"

ELBOW DOWN

ELBOW - RADIUS (R) =1.5 TIMES DIAMETER OF DUCT

18" DIA.

36"x12"

36"x12"

24"x12"

24"x12"

RETURN AIR ELBOW DOWN

RETURN AIR ELBOW UP

SUPPLY AIR ELBOW DOWN

36"x24"

TEMPERATURE SENSOR

STATIC PRESSURE PROBESP

M

T

DAMPER MOTOR

DESCRIPTION

SUPPLY AIR DIFFUSER

RETURN AIR GRILLE

SYMBOL

SUPPLY AIR DIFFUSER

EXHAUST AIR GRILLE

C

EXHAUST AIR ELBOW DOWN

EXHAUST AIR ELBOW UP

HEATING COIL

SUPPLY AIR ELBOW UPDIMENSION DESCRIPTION:1ST FIGURE = SIDE SHOWN2ND FIGURE = SIDE NOT SHOWNALL SIZES IN INCHES

DOUBLE SIDE TRANSITIONTRANSITION SLOPE SPECIFICATION:MINIMUM SLOPE = 15 DEG.MAXIMUM SLOPE = 45 DEG.ALL SIZES IN INCHES

SINGLE SIDE TRANSITIONTRANSITION SLOPE SPECIFICATION:MINIMUM SLOPE = 15 DEG.MAXIMUM SLOPE = 45 DEG.ALL SIZES IN INCHES

TOP TRANSITION (SLOPE ON TOP)TRANSITION SLOPE SPECIFICATION:MINIMUM SLOPE = 15 DEG.MAXIMUM SLOPE = 45 DEG.ALL SIZES IN INCHES

BOTTOM TRANSITION (SLOPE ON BOTTOM)TRANSITION SLOPE SPECIFICATION:MINIMUM SLOPE = 15 DEG.MAXIMUM SLOPE = 45 DEG.ALL SIZES IN INCHES

RECTANGULAR TO ROUND TRANSITIONTRANSITION SLOPE SPECIFICATION:MINIMUM SLOPE = 15 DEG.MAXIMUM SLOPE = 45 DEG.ALL SIZES IN INCHES

ELBOW UPDIMENSION DESCRIPTION:14" DIA. = ROUND DUCT24"x12" FO = FLAT OVAL DUCT

VARIABLE AIR VOLUME BOXDIMENSION DESCRIPTIONCLEARENCE (C) = 3 FT. FROMCONTROL PANELDO NOT LOCATE PIPING BELOWVAV BOX OR IN FRONT OFCONTROL PANEL.

LAB TERMINAL UNIT ANDEXHAUST TERMINAL UNIT -CONTROLLER MOUNTED ONBUTTON OF EXHAUST UNIT -DO NOT LOCATE PIPINGBELOW LAB TERMINAL UNIT.

R

14" DIA.MANUAL VOLUME DAMPER

VERTICAL SMOKE DAMPER

VERTICAL FIRE DAMPER

HORIZONTAL FIRE DAMPER

HORIZONTAL COMBINATIONFIRE/SMOKE DAMPER

VERTICAL COMBINATIONFIRE/SMOKE DAMPER

SENSOR (CO2 UNLESS OTHERWISE NOTED)S

S

PRESSURE GAGE WITH COCK

FLEXIBLE CONNECTOR

PIPE OUT TOP

PIPE OUT BOTTOM

PIPE TURNED DOWN

PIPE TURNED UP

UNION

SOLENOID VALVE

MOTOR OPERATED VALVE

THERMOMETER

THREE WAY CONTROL VALVE

TWO WAY CONTROL VALVE

PRESSURE RELIEF VALVE

PRESSURE REGULATOR VALVE

BUTTERFLY VALVE

STRAINER

PLUG VALVE

FULL PORT BALL VALVE

CHECK VALVE

AUTOMATIC FLOW CONTROL VALVE

AUTOMATIC FLOW CONTROL VALVEW/ TEST PORTS

GLOBE VALVE

GENERIC VALVE

M

BACKFLOW PREVENTER

FLOW METER

STEAM TRAP

DESCRIPTIONSYMBOL DESCRIPTIONSYMBOL

MECHANICAL SYMBOLS

MECHANICAL SYSTEM INDICATION

HEAVY LINE-WEIGHTINDICATESNEW WORK

LIGHT LINEWEIGHT-INDICATESEXISTINGEQUIPMENT ORREFERENCEDINFORMATION

HATCH MARKS -EQUIPMENT ORMATERIALS TO BEDISCONNECTEDAND REMOVED

MECHANICAL DRAWING LEGEND

DASHED LINES-PIPINGROUTEDBELOW SLABOR GRADE

NEW / EXISTING CONNECTIONS

EXISTING SYSTEM COMPONENTTO REMAIN

POINT OF NEW CONNECTION

NEW SYSTEM COMPONENT

EXISTING POINT OF DISCONNECT

EXISTING SYSTEM COMPONENTTO REMAIN

POINT OF DISCONNECT

EXISTING SYSTEM COMPONENTTO BE REMOVED

H10

E001

DRAWING TITLE##" = 1'-0"

DRAWING/ DETAIL TITLENOTE:DRAWING TITLE MAYNOT APPEAR ONLARGE SCALE DETAILDRAWINGS

DETAIL NUMBER

REFER TO THIS DRAWING FOR DETAIL

SECTION CUT SYMBOL

ADDITIONAL DRAWING WHEREDETAIL IS REFERENCED

SECTION NUMBER

SHEET WHERESECTION IS DRAWN

M200

ENLARGED PLAN DETAIL

REFER TO THISSHEET FORENLARGEDPLAN

ENLARGED PLAN NUMBER

1

DRAWING REVISIONSYMBOL

DRAWING REVISIONNUMBER

TEXT LEADER

INFORMATION TEXT

CONSTRUCTION NOTE

X

CONSTRUCTIONNOTE NUMBER

EXISTING CONNECTIONS

EXISTING SYSTEMCOMPONENT TO REMAIN

CAP OFF EXISTING

NORTH ARROW

N

PROJECTNORTH

TRUENORTH

MECHANICAL ABBREVIATIONS

DIFFUSER TAG

DIFFUSER ID

SD-1XØXXX-X

NECK SIZE IN INCHES

QUANTITY, IFMISSING QUANTITYEQUALS ONE

AIRFLOW IN CUBICFEET PER MINUTE

1

ISSUE:

CHECKED:

SCALE:

© 2010 SHW Group

SHW Project:

SHEET TITLE:

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

C:\

Revit

Lo

calF

iles\7

1108000

CH

M12_C

EN

TR

AL

_K

sim

on

eau

x.r

vt

3/5

/2013

6:0

6:3

4P

M

12" = 1'-0"

CJZ

PETER AND PAT COOKACADEMIC HALL

RENOVATION

GRAND RAPIDS, MI

MECHANICAL LEGEND,SYMBOLS ANDABBREVIATIONS

M0017111.080.00

2338 COOLIDGE, BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

RC

Mechanical Drawing List

Sheet # Sheet Name BID

S

AD

DE

ND

UM

2

MECHANICAL

M001 MECHANICAL LEGEND, SYMBOLS AND ABBREVIATIONS O O

M002 TEMPERATURE CONTROLS LEGEND O

MD121.2 LEVEL 2 SHEET METAL DEMOLITION PLAN - PHASE 2 O

MD131.1 LEVEL 3 SHEET METAL DEMOLITION PLAN - PHASE 1 O

MD131.2 LEVEL 3 SHEET METAL DEMOLITION PLAN - PHASE 2 O

MD141.1 LEVEL 4 SHEET METAL DEMOLITION PLAN - PHASE 1 O

MD151.1 LEVEL 5 SHEET METAL DEMOLITION PLAN - PHASE 1 O

MD161.1 ROOF MECHANICAL DEMOLITION PLAN - PHASE 1 O O

MD221.2 LEVEL 2 HVAC PIPING DEMOLITION PLAN - PHASE 2 O O

MD231.1 LEVEL 3 HVAC PIPING DEMOLITION PLAN - PHASE 1 O O

MD231.2 LEVEL 3 HVAC PIPING DEMOLITION PLAN - PHASE 2 O O

MD241.1 LEVEL 4 HVAC PIPING DEMOLITION PLAN - PHASE 1 O O

MD251.1 LEVEL 5 HVAC PIPING DEMOLITION PLAN - PHASE 1 O O

M121.2 LEVEL 2 SHEET METAL PLAN - PHASE 2 O O

M131.1 LEVEL 3 SHEET METAL PLAN - PHASE 1 O

M131.2 LEVEL 3 SHEET METAL PLAN - PHASE 2 O O

M141.1 LEVEL 4 SHEET METAL PLAN - PHASE 1 O O

M151.1 LEVEL 5 SHEET METAL PLAN - PHASE 1 O O

M161.1 ROOF MECHANICAL PLAN - PHASE 1 O O

M221.2 LEVEL 2 HVAC PIPING PLAN - PHASE 2 O O

M231.2 LEVEL 3 HVAC PIPING PLAN - PHASE 2 O O

M241.1 LEVEL 4 HVAC PIPING PLAN - PHASE 1 O O

M251.1 LEVEL 5 HVAC PIPING PLAN - PHASE 1 O O

M301.1 ENLARGED MECHANICAL PLAN - PHASE 1 O O

M302.1 LEVEL 4 & 5 ENLARGED MECHANICAL ROOM - PHASE 1 O O

M302.2 LEVEL 2 & 3 ENLARGED MECHANICAL ROOM - PHASE 2 O O

M401 MECHANICAL DIAGRAMS O O

M402 MECHANICAL CONDENSER WATER PIPING DIAGRAMS O O

M403 MECHANICAL STEAM PIPING DIAGRAMS O O

M404A MECHANICAL HHWS&R DEMOLITION PIPING DIAGRAM O O

M404B MECHANICAL HHWS&R NEW WORK PIPIING DIAGRAMS O O

M501 MECHANICAL DETAILS O

M502 MECHANICAL DETAILS O O

M503 MECHANICAL DETAILS O

M504 MECHANICAL DETAILS O

M601 MECHANICAL SCHEDULES O O

M602 MECHANICAL SCHEDULES O O

M603 MECHANICAL SCHEDULES O O

M701 CONTROLS DIAGRAM O O

M702 CONTROLS DIAGRAM O O

M703 CONTROLS DIAGRAM O O

M704 CONTROLS DIAGRAM O O

M705 CONTROLS DIAGRAM O O

M706 CONTROLS DIAGRAM O O

M707 CONTROLS DIAGRAM O O

M708 BAS/DDC SYSTEM ARCHITECTURE O

02-20-2013 BIDS

03-05-2013 ADDENDUM 2

RF-# RETURN FAN

RG-# RETURN AIR GRILLE / REGISTER /DIFFUSER

RH RELATIVE HUMIDITY

RL REFRIGERANT LIQUID

RM ROOM

RP RADIANT PANEL

RPM REVOLUTIONS PER MINUTE

RS REFRIGERANT SUCTION

RTU-# ROOFTOP UNIT

SA SUPPLY AIR

SCH SCHEDULE

SCHWR SECONDARY CHILLED WATER RETURN

SCHWS SECONDARY CHILLED WATER SUPPLY

SD-# SUPPLY GRILLE / REGISTER / DIFFUSER

SF-# SUPPLY FAN

SP STATIC PRESSURE

SPEC(S) SPECIFICATON(S)

STD STANDARD

TAD TRANSFER AIR DUCT

TC TEMPERATURE CONTROL

TCHWR TERTIARY CHILLED WATER RETURN

TCHWS TERTIARY CHILLED WATER SUPPLY

TEMP TEMPERATURE

TYP TYPICAL

UH-# UNIT HEATER

UV-# UNIT VENTILATOR

V VENT

VA VALVE

VAC VACUUM

VAV VARIABLE-AIR-VOLUME

VAV-# VARIABLE VOLUME BOX

VB VACUUM BREAKER

VD VOLUME DAMPER

VEL VELOCITY

VFD VARIABLE FREQUENCY DRIVE

VIB VIBRATION (SENSOR)

VIF VERIFY IN FIELD

VTR VENT-THRU-ROOF

VUV VERTICAL UNIT VENTILATOR

VVF-# VARIABLE VOLUME FAN POWERED

W WIDE / WIDTH

W/ WITH

W/O WITHOUT

WB WET BULB TEMPERATURE

WG WATER GAUGE

WH-# WATER HEATER

KIT KITCHEN

kW KILOWATT

L LENGTH / LONG

LAT LEAVING AIR TEMPERATURE

LP LIQUID PETROLEUM

LPC LOW PRESSURE STEAM CONDENSATE

LPS LOW PRESSURE STEAM SUPPLY

LTU-# LAB TERMINAL UNIT LOUVER

LWT LEAVING WATER TEMPERATURE

M METER

MAU-# MAKEUP AIR UNIT

MAX MAXIMUM

MECH MECHANICAL

MFR MANUFACTURER

MIN MINIMUM

MISC MISCELLANEOUS

MOP MAXIMUM OVERCURRENT PROTECTION

MPC MEDIUM PRESSURE STEAMCONDENSATE

MPS MEDIUM PRESSURE STEAM SUPPLY

MTD MOUNTED

MV MANUAL AIR VENT

NC NOISE CRITERIA

NC NORMALLY CLOSED

NG NATURAL GAS

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NO / # NUMBER

NTS NOT TO SCALE

OA OUTSIDE AIR

OC ON CENTER

OD OUTSIDE DIAMETER

OED OPEN ENDED DUCT

ORD-# OVERFLOW ROOF DRAIN

PCHWR PRIMARY CHILLED WATER RETURN

PCHWS PRIMARY CHILLED WATER SUPPLY

PCU PRECISION COOLING UNIT

PEFAB PREFABRICATED

PHHWR PERIMETER HEATING HOT WATERRETURN

PHHWS PERIMETER HEATING HOT WATERSUPPLY

PRD PRESSURE RELIEF DEVICE

PRV PRESSURE REDUCING VALVE

PSI POUNDS PER SQUARE INCH

PVC POLYVINYL CHLORIDE

R / RAD RADIUS

RA RETURN AIR

RD-# ROOF DRAIN

REQ'D REQUIRED

DIA/Ø DIAMETER

DIFF DIFFERENTIAL

DN DOWN

DSCH DISCHARGE

DWG DRAWING

EAT ENTERING AIR TEMPERATURE

EF-# EXHAUST FAN

EFF EFFICIENCY

EG-# EXHAUST GRILLE / REGISTER /DIFFUSER

EL ELEVATION

ELEC ELECTRIC(AL)

ELEV ELEVATOR

EMER EMERGENCY

EQUIP EQUIPMENT

ERC ENERGY RECOVERY COIL

ETU-# EXHAUST TERMINAL UNIT

EWT ENTERING WATER TEMPERATURE

EXH EXHAUST

EXIST /(E)

EXISTING

EXT EXTERIOR

F&TT FLOAT AND THERMOSTATIC TRAP

FCU-# FAN COIL UNIT

FD-# FLOOR DRAIN

FEV FLUE EXHAUST VENT

FIN F / FF FINISH FLOOR

FLA FULL LOAD AMPERAGE

FLR FLOOR

FP FIRE PROTECTION

FPM FEET PER MINUTE

FTR-# FINNED TUBE RADIATOR

FUR-# FURNACE

GA GAUGE

GAL GALLON

GALV GALVANIZE(D)

GPM GALLONS PER MINUTE

H HEIGHT/HIGH

HC-# HEATING COIL

HHWP-# HEATING HOT WATER PUMP

HHWR HEATING HOT WATER RETURN

HHWS HEATING HOT WATER SUPPLY

HP HORSEPOWER

HPC HIGH PRESSURE STEAM CONDENSATE

HPS HIGH PRESSURE STEAM SUPPLY

HRU HEAT RECOVERY UNIT

HVAC HEATING / VENTILATING / AIRCONDITIONING

ID INSIDE DIAMETER

IE INVERT ELEVATION

INSUL INSULATION / INSULATE

AC AIR CONDITIONING

ACCU AIR COOLED CONDENSING UNIT

ACU AIR CONDITIONING UNIT

AFC AUTO. FLOW CONTROL

AFF ABOVE FINISHED FLOOR

AHU AIR HANDLING UNIT

AL ACTIVE LENGTH

ALT ALTERNATIVE

AMB AMBIENT

AP ACCESS PANEL / DOOR

APPROX APPROXIMATE

AR ACID RESISTANT

ARCH ARCHITECT(URAL)

ARV AIR RELIEF VALVE

ATV AIR TURNING VANES

AUTO AUTOMATIC

B-# BOILER

BAS BUILDING AUTOMATION SYSTEM

BCU-# BLOWER COIL UNIT

BD BAROMETRIC DAMPER

BDD BACKDRAFT DAMPER

BHP BRAKE HORSEPOWER

BLDG BUILDING

BOD BOTTOM OF DUCT

BOT BOTTOM

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

C COMMON

CAB CABINET

CAV CONSTANT AIR VOLUME

CC-# COOLING COIL

CFM CUBIC FEET PER MINUTE

CH-# CHILLER

CHWP-# CHILLED WATER PUMP

CHWR CHILLED WATER RETURN

CHWS CHILLED WATER SUPPLY

CL CENTERLINE

CLG CEILING

COL COLUMN

CONC CONCRETE

COND CONDENSER / CONDENSATE

CPD CONDENSATE PUMP DISCHARGE

CPRSR COMPRESSOR

CT-# COOLING TOWER

CUH-# CABINET UNIT HEATER

CV CONTROL VALVE

CW COLD WATER (DOMESTIC)

CWP CONDENSER WATER PUMP

CWR CONDENSER WATER RETURN

CWS CONDENSER WATER SUPPLY

D DEPTH/DEEP

DB DRY BULB TEMEPRATURE

DEG DEGREE

Page 2: MECHANICAL SYMBOLS MECHANICAL DRAWING LEGEND111841/AN~2...MECHANICAL SYMBOLS MECHANICAL SYSTEM INDICATION HEAVY LINE-WEIGHT INDICATES NEW WORK LIGHT LINE WEIGHT-INDICATES EXISTING

DN

UP

DN

UP

UP

DN

1619

2019

20

VFD

4" SAN UP& DN

4" SAN UP& DN

4" V UP &DN

4" V UP &DN

4" ST UP& DN

4" SAN UP &DN

4

3

4

(TYP-4)

4

(TYP-4)1

(TYP-2) 2

(TYP-4)

1

(TYP-5)

5

4" V UP &DN

6" SAN UP& DN

4" ST UP& DN

6" ST UP& DN

16

13

16

13

4" SAN UP& DN

6" ST UP & DN

7

1-1/2" HW UP & DN

3/4" HWRUP & DN

2-1/2" CW UP & DN

234

3"

SA

N

4" V UP &DN

7

7

3/4" HW3/4" CW

3/4" CW

1 1/4" V

11/4

"S

AN

3/4" CW

1

J

2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

G

H

K

2.1 8.17.1

11/2

"V

CONTRACTOR TO VERIFYEXISTING PIPING TO BEREMOVED IN THE FIELD

17

17

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

GRCC Bid No: 1213-3294

C:\

Revit

Lo

calF

iles\7

1108000

CH

M12_C

EN

TR

AL

_K

sim

on

eau

x.r

vt

3/5

/2013

6:1

2:5

1P

M

1/8" = 1'-0"

CJZ

PETER AND PAT COOKACADEMIC HALL

RENOVATION

GRAND RAPIDS, MI

LEVEL 4 PLUMBINGDEMOLITION PLAN -PHASE 1

PD141.17111.080.00

KMS

PLUMBING GENERAL DEMOLITION NOTES

1. ANY INTERRUPTIONS OF EXISTING SERVICES OR EQUIPMENT SHALL BEPERFORMED AT A TIME APPROVED IN ADVANCE BY THE OWNER'SREPRESENTATIVE SO AS NOT TO INTERFERE WITH THE BUILDINGOPERATION.

2. THESE DRAWINGS INDICATE THE GENERAL EXTENT OF WORK. THE EXTENTOF DEMOLITION SHALL BE AS REQUIRED BY THE NEW WORK AND REMOVALOF MATERIALS/COMPONENTS NOT REQUIRED FOR THE NEW ANDRENOVATED SYSTEMS.

3. ALL MECHANICAL SYSTEMS TO BE REMOVED SHALL BE REMOVED COMPLETEWITH ALL RELATED ITEMS INCLUDING HANGERS, SUPPORTS, CONTROLS,ETC. CAP ALL OPEN PIPES AND DUCTS. PATCH AND SEAL ALL OPENINGS ASA RESULT OF DEMOLITION IN RATED WALLS TO MAINTAIN EXISTING WALL'SFIRE OR SMOKE RATING AND TO MATCH EXISTING ADJACENT SURFACES.

4. ALL ITEMS AND EQUIPMENT REMOVED SHALL REMAIN PROPERTY OF THEOWNER UNLESS POSSISSION RIGHTS ARE WAIVED. CONTRACTOR SHALLMEET WITH OWNER PRIOR TO START OF DEMOLITION TO DETERMINE WHICHITEMS ARE TO BE SALVAGED. CONTRACTOR SHALL REMOVE REMAININGITEMS FROM SITE.

5. FIELD VERIFY EXACT SIZE AND LOCATION OF ALL EXISTING SERVICES PRIORTO DEMOLITION.

6 REFER TO PROJECT PHASING SCHEDULE. PROVIDE TEMPORARYCONNECTIONS AND PIPING TO MAINTAIN AN OPERATIONAL SYSTEM FOROTHER LEVELS.

PLUMBING DEMOLITION KEY NOTES

1 REMOVE EXISTING WALL HUNG WATER CLOSET COMPLETE. CAP CW PIPINGFOR RECONNECTION DURING NEW WORK. REMOVE EXISTING SANITARYPIPING BACK TO RISER AND CAP FOR RECONNECTION DURING NEW WORK.

2 REMOVE EXISTING URINAL COMPLETE. CAP CW PIPING FOR RECONNECTIONDURING NEW WORK. REMOVE EXISTING SANITARY PIPING BACK TO RISERAND CAP FOR RECONNECTION DURING NEW WORK.

3 REMOVE EXISTING FLOOR MOUNTED WATER CLOSET COMPLETE. CAP CWAND SAN PIPING FOR RECONNECTION DURING NEW WORK.

4 REMOVE EXISTING LAVATORY COMPLETE. CAP CW, HW, AND SAN PIPING ATWALL FOR FUTURE RECONNECTION DURING NEW WORK.

5 REMOVE EXISTING PLUMBING FIXTURES COMPLETE WITH ASSOCIATEDHANGERS AND PIPING. REMOVE PIPING BACK TO RISERS AND CAP.

6 REMOVE EXISTING NATURAL GAS TURRETS COMPLETE WITH ASSOCIATEDPIPING. REMOVE PIPING BACK TO MAIN AND CAP.

7 REMOVE EXISTING DRINKING FOUNTAIN COMPLETE WITH ASSOCIATEDPIPING AND HANGERS. REMOVE PIPING BACK TO MAIN AND CAP.

8 REMOVE EXISTING SINK COMPLETE WITH ASSOCIATED PIPING ANDHANGERS/SUPPORTS. REMOVE PIPING BACK TO MAIN AND CAP.

9 REMOVE EXISTING LAVATORY COMPLETE, CLEAN AND SAVE FORREINSTALLATION DURING NEW WORK. REMOVE EXISTING PIPING BACK TOMAIN AND CAP.

10 REMOVE EXISTING WASHING MACHINE COMPLETE WITH ASSOCIATED PIPING.REMOVE PIPING BACK TO MAIN AND CAP.

11 REMOVE EXISTING BATHTUB COMPLETE WITH ANY ASSOCIATED PIPING.REMOVE PIPING BACK TO MAIN AND CAP.

12 REMOVE EXISTING FLOOR MOUNTED WATER CLOSET COMPLETE WITHASSOCIATED PIPING. REMOVE PIPING BACK TO MAIN AND CAP.

13 REMOVE EXISTING LAVATORY COMPLETE WITH ASSOCIATED PIPING.REMOVE PIPING BACK TO MAIN AND CAP.

14 REMOVE EXISTING SINK COMPLETE, CLEAN AND SURRENDER TO OWNER.REMOVE ASSOCIATED PIIPING BACK TO MAIN AND CAP.

15 REMOVE EXISTING DENTAL CHAIR SERVICE CONNECTION BOX COMPLETEWITH ASSOCIATED PIPING. REMOVE PIPING BACK TO MAIN AND CAP.

16 REMOVE EXISTING WATER CLOSET COMPLETE WITH ASSOCIATED PIPING.REMOVE PIPING BACK TO MAIN AND CAP.

17 REMOVE EXISTING FLOOR DRAIN GRATE TOP AND ASSOCIATED P-TRAP ANDPREPARE FOR RECONNECTION DURING NEW WORK.

18 REMOVE EXISTING NG AND CA PIPING COMPLETE.

19 REMOVE DRINKING FOUNTAIN COMPLETE WITH ASSOCIATED PIPING ANDHANGERS. REMOVE PIPING TO WITHIN WALL AND CAP.

1/8" = 1'-0"A3

LEVEL 4 PLUMBING DEMOLITION PLAN - PHASE 1

X

02-20-2013 BIDS

03-05-2013 ADDENDUM 2

Page 3: MECHANICAL SYMBOLS MECHANICAL DRAWING LEGEND111841/AN~2...MECHANICAL SYMBOLS MECHANICAL SYSTEM INDICATION HEAVY LINE-WEIGHT INDICATES NEW WORK LIGHT LINE WEIGHT-INDICATES EXISTING

DN

UP

DN

UP

DN

UP

M

M

WC-1(TYP-2)

UR-1(TYP-4)

WC-1(TYP-5)

LAV-1(TYP-4)

LAV-1(TYP-4)

LAV-3

WC-2

4" SAN UP& DN

4" V UP &DN

4" SAN UP& DN

4" ST UP& DN 6" ST UP

& DN

4" V UP &DN

6" SAN UP& DN4" V UP &DN

4" ST UP &DN

3/4" HWR UP

TOILET263

CLASSROOM210

CLASSROOM225

WOMEN'S262

BREAKOUT ROOM227

CLASSROOM226

CLASSROOM224

MECHANICAL264

MEN'S261

VESTIBULE217 CLASSROOM

212

WORK CENTER209

OFFICE203

LOBBY260

CONF205

CONF206

CONF207

BRKRM204

COMPUTER LAB202

BUSINESSTUTORING

201

BREAKOUT ROOM216

CLASSROOM215

CLASSROOM211CLASSROOM

213

STUDY257

176 SF

STUDY256

CLASSROOM214

CLASSROOM223

CORRIDOR251

CLASSROOM208

CORRIDOR253

211 SF

STUDY219

CLASSROOM220

CLASSROOM221

211 SF

STUDY222

CLASSROOM218

2" V

4" SAN UP& DN

3/4" CW & HWUP TO SINK

11/2

"S

AN

1 1/2" SAN UPTO SINK

2" SAN UPTO SINK

3" SAN UPTO ISLANDSINK

6" ST UP& DN

3" SAN

1" HWR UP & DN

2 1/2" HW UP & DN3" CW UP & DN

3/4" CA UP3/4" CA, 3/4" DCA,2" DVAC, & 3/4" CWUP

3/4" DCA

3/4" CW

3/4" DCA UP

3/4" CW UP

1 1/2" SAN UPTO SINK

1 1/2" SAN UPTO SINK

FD-1

3" SAN UPTO FD

3" SAN UPTO FD

4" SAN UP& DN

3" SAN

1 1/2" SANUP TO SINK(TYP-3)

2" SAN UPTO SINK

3" SAN UP

1/2" CW, 1/2" HW,& 3" SAN UPTO CASEWORK

1/2" DCA UP TODENTAL CHAIR(TYP-24)

3/4" CW& HW UP

4" V UP &DN

3" V UP

1 1/4" DCA

1/2" CW, 1/2" DCA,& 1" DVAC UP TOCASEWORK2" SAN UP

TO SINK

3/4" CWEWC-1

1/2" DCA UP TODENTAL CHAIR

3"

SA

N

3" SAN

3"

SA

N

FD-1

FD-1

2 1/2" DVAC

PUSH BUTTONOPERATEDSOLENOID VALVE

PUSHBUTTONOPERATEDSOLENOIDVALVE

4"

DV

AC

1" DCA

4"

DV

AC

1

J

2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

G

H

K

2.1 8.17.1

3" SAN UPTO FLOORDRAIN

1" DCA

4" SAN UPTO FD

3/4" CA

1 1/2" DVAC UP

1 1/4" CA UP & DN

4" DVAC DN

11/4

"V

1 1/4" SAN 2'x2'x2' DRY RECESS PITLOCATED IN BOTTOM OFELEVATOR SHAFT PROVIDEDBY ARCHITECTURAL TRADES.

11/4

"D

CA

DC

A

DC

A

DC

A

DC

A

1/2" DCA & 1" DVACUP TO CASEWORK(TYP-4)

1/2

"D

CA DC

A

1/2" DCA

1/2

"

1/2

"

3/4" DCA &2" DVAC UPTO DENTALCABINETRY

1/2

"

1/2

"

HW

3" SAN UP

2" SAN UPTO SINK

1 1/4" CWUP1" HW UP

11/4

"

1/2" DCA &1" DVAC UP TOCASEWORK(TYP-4)

1/2" CW, 1/2"HW, & 3" SAN UPTO CASEWORK(TYP-2)

1"

DV

AC

1/2

"D

CA

19

1" DCA

1/2" DCA UP

3" SAN

PS

PRESSURESENSOR

PSPS

PRESSURESENSOR

PS

PRESSURESENSOR

1"1"

1/2

"

3/4" CW, 3" SAN, &3/4" HW UP TODENTAL CABINETRY

4" DVAC

2" 3

/4"

1" CW

3" SAN

3/4" DCA &2" DVAC UPTO DENTALCABINETRY

3/4" CW, 3" SAN, &3/4" HW UP TODENTAL CABINETRY

3"

SA

N

1"

DC

A

3"

SA

N

1 1/4" DCA3" DVAC

1/2" CW, 1/2" HW,& 3" SAN UP TOCASEWORK

3/4"

DV

AC

DC

A

1 1/2"

3"

SA

N

11/4

"D

VA

C1/2

"D

CA

1 1/2" DVAC

2" 3

/4"

3/4" HW

3" SAN

1/2" 1/2"1/2"

1/2

"

1"

1 1/2"

1 1/4"

3"

SA

N

co

co co co

co

co

coco

co

co

co

WC-1(TYP-2)

UR-1(TYP-4)

WC-1(TYP-5)

LAV-1(TYP-4)

LAV-1(TYP-4)

LAV-3

WC-22" V

6" ST UP& DN

1" HWR UP & DN

2 1/2" HWUP & DN

3" CW UP & DN

FD-1

3" SAN UPTO FD

3" SAN UPTO FD

FD-1

FD-1

4" DVACUP & DN

4" V UP &DN

6" SAN UP& DN

1 1/2" SAN UP

J

6 7

H

K

7.1

1 1/4" CAUP & DN

1 1/2" V DN

REINSTALL EXISTINGEWC AND CONNECTTO EXISTING CW ANDSAN PIPING19

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

GRCC Bid No: 1213-3294

C:\

Revit

Lo

calF

iles\7

1108000

CH

M12_C

EN

TR

AL

_K

sim

on

eau

x.r

vt

3/5

/2013

6:1

1:1

5P

M

1/8" = 1'-0"

CJZ

PETER AND PAT COOKACADEMIC HALL

RENOVATION

GRAND RAPIDS, MI

LEVEL 2 PLUMBING PLAN- PHASE 2

P121.27111.080.00

KMS

PLUMBING GENERAL NOTES

1. THESE DRAWINGS INDICATE THE GENERAL EXTENT OF WORK BUT ARE NOTFABRICATION DRAWINGS. COORDINATE PLUMBING SYSTEMS WITH WORK OFALL OTHER TRADES PRIOR TO ANY FABRICATION OR INSTALLATION. PROVIDEALL FITTINGS, OFFSETS, TRANSITIONS, ETC. AS REQUIRED FOR A COMPLETEWORKABLE INSTALLATION.

2. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATION OF ALL NEWPLUMBING FIXTURES.

3. ALL PLUMBING RELATED CORING THROUGH FLOORS SHALL BE BY PLUMBINGCONTRACTOR.

4. COORDINATE ALL NEW LOCATIONS, SIZES AND ELEVATIONS OF SLEEVESTHROUGH WALLS, SLABS AND FOUNDATIONS WITH STRUCTURAL DRAWINGSAND FIELD CONDITIONS.

5. COORDINATE ALL PIPE ROUTING WITH SITE CONDITIONS, EQUIPMENTMANUFACTURER’S RECOMMENDATIONS, AND ALL OTHER TRADES TO AVOIDINTERFERENCES.

6. PROVIDE ACCESS AROUND ALL NEW EQUIPMENT PER MANUFACTURER’SRECOMMENDATIONS.

7. ALL OVERHEAD DOMESTIC WATER AND STORM PIPING SHALL BE INSULATEDAND LABELED IN ACCORDANCE WITH THE REQUIREMENTS OF THE PROJECTSPECIFICATIONS.

8. ALL PIPING SHALL BE CONCEALED IN WALLS, CEILING SPACES ORARCHITECTURAL SOFFITS.

9. SEAL ALL PENETRATIONS THROUGH WALLS AND FLOORS AIR AND WATERTIGHT.

10. COORDINATE LOCATIONS AND ELEVATIONS OF ALL NEW UNDERGROUNDUTILITIES WITH CIVIL SITE PLANS PRIOR TO START OF CONSTRUCTION.

11. CONTRACTOR SHALL MAINTAIN ADEQUATE CLEARANCES (PER THE LATESTEDITION OF THE NATIONAL ELECTRIC CODE) ABOVE AND AROUND ANY NEWELECTRICAL PANELS, EQUIPMENT, AND TRANSFORMERS WHEN ROUTINGOVERHEAD PIPING.

12. RUN ALL SANITARY, VENT, AND STORM PIPING AT SLOPES COMPLYING WITHTHE MICHIGAN PLUMBING CODE LATEST EDITION.

13. PROVIDE WALL CLEANOUT AT THE BASE OF ALL VERTICAL STORM ANDSANITARY CONDUCTORS.

14. PROVIDE SHUT-OFF VALVES AT ALL PLUMBING FIXTURES. LOCATE ALLPLUMBING SHUT-OFF VALVES IN AN ACCESSIBLE LOCATION ABOVE ANACCESS PANEL AND NO MORE THAN 24” ABOVE THE CEILING.

15. FURNISH AND INSTALL BALANCING VALVES AT ALL BRANCHES OF HOTWATER RECIRCULATION PIPING SYSTEM. AT COMPLETION OF PIPINGINSTALLATION, THE CONTRACTOR MUST BALANCE THE HOT WATERRECIRCULATING SYSTEM TO FLOW RATES INDICATED AND SUBMIT BALANCERESULTS IN WRITING TO ARCHITECT/ENGINEER.

16. MINIMUM UNDERGROUND STORM AND SANITARY PIPING SHALL BE 3”.

17. REFER TO PIPING DIAGRAMS, DETAILS, AND SPECIFICATIONS FOR VALVES,FITTINGS, AND OTHER ACCESSORIES.

18. PROVIDE VENT PIPING THROUGH ROOF A MINIMUM OF 10’ AWAY FROMPARAPET WALL AND A MINIMUM OF 10’ CLEAR OR MORE FROM ANY OUTSIDEAIR INTAKES AS REQUIRED BY THE LATEST EDITION OF THE MICHIGANMECHANICAL CODE.

PLUMBING KEY NOTES

1 ROUTE 1/2" CW AND 1/2" HW DOWN IN WALL TO WASHING MACHINE OUTLETBOX. ROUTE 2" SAN FROM OUTLET BOX AND CONNECT TO 3" SAN STACK INWALL.

2 ROUTE CW AND HW IN WALL TO SERVICE SHUT OFF VALVE BOX. ROUTEPIPING IN SECOND FLOOR CEILING SPACE AND CONNECT TO THIRD FLOORDENTAL EQUIPMENT/SINK FLOOR LOCATIONS.

3 ROUTE 3/4" CW THROUGH SHUT OFF VALVE, BACKFLOW PREVENTER,RELOCATED FILTER ASSEMBLY, AND CONNECT TO FILM DEVELOPER PERMANUFACTURER RECOMMENDATIONS. ROUTE 1/2" DRAIN LINE FROMDEVELOPER AND DISCHARGE TO RELOCATED SILVER RECOVERY SYSTEM.ROUTE DRAIN FROM SILVER RECOVERY SYSTEM AND INDIRECT WASTE TOFLOOR DRAIN. PROVIDE ALL PIECES AS REQUIRED FOR A FULLYOPERATIONAL SYSTEM.

4 ROUTE 1/2" DCA AND 1/2" CW TO DENTAL CHAIR, VALVE AND CONNECT PERMANUFACTURER RECOMMENDATIONS.

5 ROUTE 3/4" CW AND 3/4" HW DOWN IN WALL AND CONNECT TO TWOCOMPARTMENT SINK FAUCET. ROUTE 1 1/2" DRAIN FROM EACHCOMPARTMENT AND CONNECT SEPARATELY TO 3" SAN IN WALL.

6 ROUTE 3/4" CW, 3/4" DCA, 2" DVAC, AND 3/4" CA WITHIN CASEWORK. VALVEAND CONNECT 1/2" CW, 1/2" DCA, AND 1" DVAC TO SIMULATORS PERMANUFACTURER RECOMMENDATIONS. ROUTE CA THROUGH VALVE,PRESSURE REGULATOR, VALVE, AND CONNECT TO AIR GUN PERMANUFACTURER RECOMMENDATIONS.

7 ROUTE 3/4" CW THROUGH BACKFLOW PREVENTER, VALVE AND CONNECT TOMILLIPORE ELIX 30 SYSTEM.

8 ROUTE 1/2" CA AND 1/2" VAC DOWN IN WALL AND CONNECT TO HEADWALLOUTLETS/INLET (1 OXYGEN, 1 MEDICAL COMPRESSED AIR, AND 1 MEDICALVACUUM).

9 ROUTE 1/2" CW, 1/2" DCA, 1 1/2" DVAC, AND 1/2" CA IN CHASE BEHINDCASEWORK. VALVE AND CONNECT 1/2" CW, 1/2" DCA, AND 1" DVAC TOSIMULATORS PER MANUFACTURER RECOMMENDATIONS. ROUTE CATHROUGH VALVE, PRESSURE REGULATOR, VALVE, AND CONNECT TO AIRGUN PER MANUFACTURER RECOMMENDATIONS.

10 PROVIDE NEW GENERAL SERVICE VACUUM PUMP (SIMPLEX PUMP).

11 ROUTE CW, CA, AND DCA IN WALL TO SERVICE SHUT OFF VALVE BOX. ROUTEPIPING IN SECOND FLOOR CEILING SPACE AND CONNECT TO THIRD FLOORDENTAL EQUIPMENT/SINK FLOOR LOCATIONS.

12 ROUTE 1/2" DCA, 1/2" CW, AND 3/4" DVAC FROM MAINS LOCATED WITHIN PIPECHASE, VALVE AND CONNECT TO ASSISTANT CABINETRY OUTLETS/INLETSPER MANUFACTURER RECOMMENDATIONS.

13 ROUTE 1/2" DCA AND CONNECT TO ASSISTINA PER MANUFACTURERRECOMMENDATIONS.

14 ROUTE 3/4" CW AND 3/4" HW DOWN IN WALL AND CONNECT TO HYDRIM PERMANUFACTURER RECOMMENDATIONS. ROUTE 3/4" DRAIN FROM HYDRIM ANDCONNECT TO WASHER OUTLET BOX.

15 ROUTE 1/2" CW THROUGH BACKFLOW PREVENTER LOCATED WITHINCABINETRY. ROUTE 1/4" PIPING FROM 1/2" PIPING AFTER BACKFLOWPREVENTER UP THROUGH COUNTER AT TRIMMER, VALVE AND CONNECT TOTRIMMERS PER MANUFACTURER RECOMMENDATIONS.

16 ROUTE 1/2" CW PIPING THROUGH ELECTRONIC TRAP PRIMER VALVE DOWNIN WALL AND CONNECT TO FLOOR DRAIN.

17 ROUTE 1/2" CW PIPING FROM WATER SAVER TRAP PRIMER AND CONNECT TOFLOOR DRAIN. REFER TO DETAIL ON DETAIL SHEET.

18 BALANCE VALVE. SET TO GPM INDICATED.

19 PROVIDE NEW SHUT OFF VALVE IN EXISTING BRANCH PIPING NEAR RISER.

X

1/8" = 1'-0"A3

LEVEL 2 PLUMBING PLAN - PHASE 21/8" = 1'-0"

A8PARTIAL LEVEL 1 PLUMBING PLAN - PHASE 2

NOTE:BASE BID: PROVIDE NEW PLUMBING FIXTURES/PIPING FORFIRST FLOOR TOILET ROOMS AND LOBBY AS INDICATED.DEDUCT ALTERNATE: WORK WITHIN FIRST FLOOR TOILETROOMS/LOBBY SHALL BE LIMITED TO PIPING SERVINGSECOND FLOOR TOILET ROOMS/LOBBY FIXTURES.

02-20-2013 BIDS

03-05-2013 ADDENDUM 2

Page 4: MECHANICAL SYMBOLS MECHANICAL DRAWING LEGEND111841/AN~2...MECHANICAL SYMBOLS MECHANICAL SYSTEM INDICATION HEAVY LINE-WEIGHT INDICATES NEW WORK LIGHT LINE WEIGHT-INDICATES EXISTING

DN

UP

DN

UP

DN

UP

WC-1(TYP-2)

UR-1(TYP-4)

WC-1(TYP-5)

LAV-1(TYP-4)

LAV-1(TYP-4)

LAV-2

WC-1

SK-4SK-4SK-4SK-4

SK-7

SK-7

4" ST UP& DN

4" SAN UP &DN

4" V UP &DN

6" SAN UP& DN

4" ST UP& DN

4" SAN UP& DN

4" V UP &DN

4" SAN UP& DN

4" V UP &DN

6" ST UP& DN

SK-3

SK-3

SK-3

SK-3

SK-3

SK-3

SK-3

SK-3

SK-3

SK-3

SK-8

SK-6

SK-12

SK-5W/ INSTAHOT

SK-9

3/4" HWR1 1/4" HW1 1/4" CW

SK-3

SK-3

3/4" HWR DN

1" CW DN

1" HW DN

WAITING308

DENTAL RCPT309 STORAGE

311

STORAGE330A

X-RAY314

X-RAY313

X-RAY315

X-RAY316

CLASSROOM304

WORK CENTER307

CLASSROOM329

TOILET363

WOMEN'S362

TESTING302

MECHANICAL364

MEN'S361

CNA TESTING303

CN

AT

ES

TIN

G301

CLASSROOM322

LOBBY360

M LOCKER333

STUDY335

CONSULTATION310

CORRIDOR354

STUDY352

MATERIALS LAB306

CLASSROOM305

X-RAY325

X-RAY326

X-RAY327

X-RAY328

X-RAY317

SIM LAB319

X-RAY318

CORRIDOR-1351-1

DRKRM324

STERILIZATION320

W LOCKERS334

W LOCKER332

M LOCKER331

LOCKERS330

POSITIONING LAB323

2

3

SK-6

SK-10

12

5

EEW-2

2" V

3"

SA

N

4" SAN UP& DN

7

11

1 1/2" SANUP TO SINK

1 1/2" SANUP TO SINK

1 1/2" SANUP TO SINK

1 1/2" SANUP TO SINK

3" SAN UPTO WASHER

2" SAN UPTO SINKS

3" SAN UPTO WC

1 1/2" SANUP TO SINK

1" CW

11/2

"V

2" HW UP & DN

3/4" HWR UP & DN

3" CW UP & DN

6" ST UP & DN

EEW-1SK-11

EEW-3EEW-3

1 1/2" SANUP TO SINK

1 1/2" SANUP TO SINK

1 1/2" SANUP TO SINK

1 1/2" SANUP TO SINK

3" SAN

3" SAN

3"

SA

N

4"

SA

N

4"

3"

SA

N

3" V

FD-1

FD-1

3" SAN UPTO FD

3" SAN UPTO FD

1 1/2" SANUP TO SINK

1 1/2" SANUP TO SINK

(TYP-24)

9

6

2" AV UP

1" CA UP

1" CA

1 1/2" SANUP TO SINK

1 1/2" SANUP TO SINK

4(TYP-24)

4

12

4" V UP &DN

3" SAN

3" V DN

3" V DN

3/4" CW

3" V

1"

HW

3/4" HW

EWC-1

3/4" CW

1/2" HWR

3" V

14

13

11/2

"C

W1

1/2

"H

W3/4

"H

WR

1/2

"H

WR

11/4

"C

W

1" HW

FD-2

1

J

2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

G

H

K

2.1 8.17.1

15 15

FD-3

16

17

17

2" V DN

3/4" CW &3/4" HW DN

3/4

"D

CA

3/4

"C

W3/4

"C

A

0.8 GPM

1.7 GPM

0.5 GPM

1/2

"H

WR

0.5 GPM

18

18

18

3/4" HWR

DAP-1, DAP-2, & DVP-1CONTROLLER, REFERTO ELECTRICAL PLANS

0.5 GPM

18

3/4" CW3/4" HW

FD-1

3/4" CADN

3/4" CWDN

3/4

"C

W

1 1/4" CA UP & DN

1/2" DCA &1" DVAC DN(TYP-4)

1/2" CW,1/2" HW,& 3" SAN DN

3/4" HW &3/4" CW DN

3/4" CW

1 1/4" SAN1 1/4" V

19

3/4" DCA,&2" DVAC DN

1/2" CW

1/2" CW,1/2" HW, &3" SAN UP TOCASEWORK

1/2" DCA &1" DVAC DN

3/4

"1"

1/2"3/4"

3/4"3/4" DCA 1 1/2" DVAC

3"

3"

3/4" HW

PS

1/2" CW

3" V

1 1/2" DVAC3/4" DCA

2" V DN

2" V DN

3" SAN

2"

V

3/4" HW,3/4" CW &3" SAN DN

3/4" DCA,&2" DVAC DN

1/2" CW

3/4" DCA 1 1/2" DVAC

1/2" CW

1 1/2" DVAC3/4" DCA

2" V DN

3" SAN

1/2" CW,1/2" HW, & 3"SAN UP TOCASEWORK

1/2" DCA &1" DVAC DN(TYP-4)

CO

CO

CO

CO

CO

CO

CO

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

GRCC Bid No: 1213-3294

C:\

Revit

Lo

calF

iles\7

1108000

CH

M12_C

EN

TR

AL

_K

sim

on

eau

x.r

vt

3/5

/2013

6:1

1:3

9P

M

1/8" = 1'-0"

CJZ

PETER AND PAT COOKACADEMIC HALL

RENOVATION

GRAND RAPIDS, MI

LEVEL 3 PLUMBING PLAN- PHASE 2

P131.27111.080.00

KMS

PLUMBING GENERAL NOTES

1. THESE DRAWINGS INDICATE THE GENERAL EXTENT OF WORK BUT ARE NOTFABRICATION DRAWINGS. COORDINATE PLUMBING SYSTEMS WITH WORK OFALL OTHER TRADES PRIOR TO ANY FABRICATION OR INSTALLATION. PROVIDEALL FITTINGS, OFFSETS, TRANSITIONS, ETC. AS REQUIRED FOR A COMPLETEWORKABLE INSTALLATION.

2. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATION OF ALL NEWPLUMBING FIXTURES.

3. ALL PLUMBING RELATED CORING THROUGH FLOORS SHALL BE BY PLUMBINGCONTRACTOR.

4. COORDINATE ALL NEW LOCATIONS, SIZES AND ELEVATIONS OF SLEEVESTHROUGH WALLS, SLABS AND FOUNDATIONS WITH STRUCTURAL DRAWINGSAND FIELD CONDITIONS.

5. COORDINATE ALL PIPE ROUTING WITH SITE CONDITIONS, EQUIPMENTMANUFACTURER’S RECOMMENDATIONS, AND ALL OTHER TRADES TO AVOIDINTERFERENCES.

6. PROVIDE ACCESS AROUND ALL NEW EQUIPMENT PER MANUFACTURER’SRECOMMENDATIONS.

7. ALL OVERHEAD DOMESTIC WATER AND STORM PIPING SHALL BE INSULATEDAND LABELED IN ACCORDANCE WITH THE REQUIREMENTS OF THE PROJECTSPECIFICATIONS.

8. ALL PIPING SHALL BE CONCEALED IN WALLS, CEILING SPACES ORARCHITECTURAL SOFFITS.

9. SEAL ALL PENETRATIONS THROUGH WALLS AND FLOORS AIR AND WATERTIGHT.

10. COORDINATE LOCATIONS AND ELEVATIONS OF ALL NEW UNDERGROUNDUTILITIES WITH CIVIL SITE PLANS PRIOR TO START OF CONSTRUCTION.

11. CONTRACTOR SHALL MAINTAIN ADEQUATE CLEARANCES (PER THE LATESTEDITION OF THE NATIONAL ELECTRIC CODE) ABOVE AND AROUND ANY NEWELECTRICAL PANELS, EQUIPMENT, AND TRANSFORMERS WHEN ROUTINGOVERHEAD PIPING.

12. RUN ALL SANITARY, VENT, AND STORM PIPING AT SLOPES COMPLYING WITHTHE MICHIGAN PLUMBING CODE LATEST EDITION.

13. PROVIDE WALL CLEANOUT AT THE BASE OF ALL VERTICAL STORM ANDSANITARY CONDUCTORS.

14. PROVIDE SHUT-OFF VALVES AT ALL PLUMBING FIXTURES. LOCATE ALLPLUMBING SHUT-OFF VALVES IN AN ACCESSIBLE LOCATION ABOVE ANACCESS PANEL AND NO MORE THAN 24” ABOVE THE CEILING.

15. FURNISH AND INSTALL BALANCING VALVES AT ALL BRANCHES OF HOTWATER RECIRCULATION PIPING SYSTEM. AT COMPLETION OF PIPINGINSTALLATION, THE CONTRACTOR MUST BALANCE THE HOT WATERRECIRCULATING SYSTEM TO FLOW RATES INDICATED AND SUBMIT BALANCERESULTS IN WRITING TO ARCHITECT/ENGINEER.

16. MINIMUM UNDERGROUND STORM AND SANITARY PIPING SHALL BE 3”.

17. REFER TO PIPING DIAGRAMS, DETAILS, AND SPECIFICATIONS FOR VALVES,FITTINGS, AND OTHER ACCESSORIES.

18. PROVIDE VENT PIPING THROUGH ROOF A MINIMUM OF 10’ AWAY FROMPARAPET WALL AND A MINIMUM OF 10’ CLEAR OR MORE FROM ANY OUTSIDEAIR INTAKES AS REQUIRED BY THE LATEST EDITION OF THE MICHIGANMECHANICAL CODE.

PLUMBING KEY NOTES

1 ROUTE 1/2" CW AND 1/2" HW DOWN IN WALL TO WASHING MACHINE OUTLETBOX. ROUTE 2" SAN FROM OUTLET BOX AND CONNECT TO 3" SAN STACK INWALL.

2 ROUTE CW AND HW IN WALL TO SERVICE SHUT OFF VALVE BOX. ROUTEPIPING IN SECOND FLOOR CEILING SPACE AND CONNECT TO THIRD FLOORDENTAL EQUIPMENT/SINK FLOOR LOCATIONS.

3 ROUTE 3/4" CW THROUGH SHUT OFF VALVE, BACKFLOW PREVENTER,RELOCATED FILTER ASSEMBLY, AND CONNECT TO FILM DEVELOPER PERMANUFACTURER RECOMMENDATIONS. ROUTE 1/2" DRAIN LINE FROMDEVELOPER AND DISCHARGE TO RELOCATED SILVER RECOVERY SYSTEM.ROUTE DRAIN FROM SILVER RECOVERY SYSTEM AND INDIRECT WASTE TOFLOOR DRAIN. PROVIDE ALL PIECES AS REQUIRED FOR A FULLYOPERATIONAL SYSTEM.

4 ROUTE 1/2" DCA AND 1/2" CW TO DENTAL CHAIR, VALVE AND CONNECT PERMANUFACTURER RECOMMENDATIONS.

5 ROUTE 3/4" CW AND 3/4" HW DOWN IN WALL AND CONNECT TO TWOCOMPARTMENT SINK FAUCET. ROUTE 1 1/2" DRAIN FROM EACHCOMPARTMENT AND CONNECT SEPARATELY TO 3" SAN IN WALL.

6 ROUTE 3/4" CW, 3/4" DCA, 2" DVAC, AND 3/4" CA WITHIN CASEWORK. VALVEAND CONNECT 1/2" CW, 1/2" DCA, AND 1" DVAC TO SIMULATORS PERMANUFACTURER RECOMMENDATIONS. ROUTE CA THROUGH VALVE,PRESSURE REGULATOR, VALVE, AND CONNECT TO AIR GUN PERMANUFACTURER RECOMMENDATIONS.

7 ROUTE 3/4" CW THROUGH BACKFLOW PREVENTER, VALVE AND CONNECT TOMILLIPORE ELIX 30 SYSTEM.

8 ROUTE 1/2" CA AND 1/2" VAC DOWN IN WALL AND CONNECT TO HEADWALLOUTLETS/INLET (1 OXYGEN, 1 MEDICAL COMPRESSED AIR, AND 1 MEDICALVACUUM).

9 ROUTE 1/2" CW, 1/2" DCA, 1 1/2" DVAC, AND 1/2" CA IN CHASE BEHINDCASEWORK. VALVE AND CONNECT 1/2" CW, 1/2" DCA, AND 1" DVAC TOSIMULATORS PER MANUFACTURER RECOMMENDATIONS. ROUTE CATHROUGH VALVE, PRESSURE REGULATOR, VALVE, AND CONNECT TO AIRGUN PER MANUFACTURER RECOMMENDATIONS.

10 PROVIDE NEW GENERAL SERVICE VACUUM PUMP (SIMPLEX PUMP).

11 ROUTE CW, CA, AND DCA IN WALL TO SERVICE SHUT OFF VALVE BOX. ROUTEPIPING IN SECOND FLOOR CEILING SPACE AND CONNECT TO THIRD FLOORDENTAL EQUIPMENT/SINK FLOOR LOCATIONS.

12 ROUTE 1/2" DCA, 1/2" CW, AND 3/4" DVAC FROM MAINS LOCATED WITHIN PIPECHASE, VALVE AND CONNECT TO ASSISTANT CABINETRY OUTLETS/INLETSPER MANUFACTURER RECOMMENDATIONS.

13 ROUTE 1/2" DCA AND CONNECT TO ASSISTINA PER MANUFACTURERRECOMMENDATIONS.

14 ROUTE 3/4" CW AND 3/4" HW DOWN IN WALL AND CONNECT TO HYDRIM PERMANUFACTURER RECOMMENDATIONS. ROUTE 3/4" DRAIN FROM HYDRIM ANDCONNECT TO WASHER OUTLET BOX.

15 ROUTE 1/2" CW THROUGH BACKFLOW PREVENTER LOCATED WITHINCABINETRY. ROUTE 1/4" PIPING FROM 1/2" PIPING AFTER BACKFLOWPREVENTER UP THROUGH COUNTER AT TRIMMER, VALVE AND CONNECT TOTRIMMERS PER MANUFACTURER RECOMMENDATIONS.

16 ROUTE 1/2" CW PIPING THROUGH ELECTRONIC TRAP PRIMER VALVE DOWNIN WALL AND CONNECT TO FLOOR DRAIN.

17 ROUTE 1/2" CW PIPING FROM WATER SAVER TRAP PRIMER AND CONNECT TOFLOOR DRAIN. REFER TO DETAIL ON DETAIL SHEET.

18 BALANCE VALVE. SET TO GPM INDICATED.

19 PROVIDE NEW SHUT OFF VALVE IN EXISTING BRANCH PIPING NEAR RISER.

1/8" = 1'-0"A3

LEVEL 3 PLUMBING PLAN - PHASE 2

X

02-20-2013 BIDS

03-05-2013 ADDENDUM 2

Page 5: MECHANICAL SYMBOLS MECHANICAL DRAWING LEGEND111841/AN~2...MECHANICAL SYMBOLS MECHANICAL SYSTEM INDICATION HEAVY LINE-WEIGHT INDICATES NEW WORK LIGHT LINE WEIGHT-INDICATES EXISTING

DN

UP

DN

UP

UP

DN

WC-3LAV-2

SH-1

SK-2

SK-6 SK-6

SK-6

SK-6

SK-6

SK-6

SK-6

SK-6

SK-1

SK-1

WC-1(TYP-2)

UR-1(TYP-4)

WC-1(TYP-5)

LAV-1(TYP-4)

LAV-1(TYP-4)

SK-6

SK-6

LAV-3

WC-2

4" ST UP& DN

4" SAN UP &DN 6" ST UP

& DN

6" SAN UP& DN

4" V UP &DN

4" V UP &DN

4" SAN UP& DN

4" SAN UP& DN

4" V UP &DN

4" ST UP& DN

6" ST UP& DN

1

SK-6

SK-6

CLASSROOM431

LACT410

TOILET463

WOMEN'S462

MECHANICAL464

MEN'S461

CORRIDOR452

RESTRM421A

OBSRV437

CNTRL435

OBSRV433

SIM LAB434

SIM LAB436

LOBBY460

BED LAB418

OFFICE403

BED PRACTICE409

BEDLAB413

BEDLAB424

CONF405

BRKRM404

COMPUTER LAB402

STORAGE430

STORAGE428

OTA LAB 1423

WORK CENTER411

BEDLAB426

BEDLAB432

OTA APARTMENT421

BED LAB416

STUDY455STUDY

454

BED LAB420

CORRIDOR451

BTE425

OTA LAB 2427

CONF407

CONF406

HEALTHTUTORING

401

CORRIDOR453

CONF408

OFFICE417

BEDLAB415

2" V

11/2

"V

2" V

4" SAN UP& DN

1"

HW

1"

CW

1-1/2" HWUP & DN

3/4" HWRUP & DN

2-1/2" CWUP & DN

3" V

1 1/2" V 3" V

1 1/4" HW1 1/4" CW

EEW-2

EEW-2

3"

V

EWC-13" SAN UPTO FD

3" SAN UPTO FD

8

8

8

8

8

8

8

8

8

8

8

1" CA DN

1/2" CA

3/4" VAC

3/4" VAC

3/4" VAC

1/2" CA

1"

VA

C

1/2" CA

10

1 1/2" V

FD-1

STORAGE419

1" VAC

3/4

"V

AC

VACP-1

4" V UP &DN

11/2

"C

W

3/4

"H

WR

11/2

"H

W

3/4" CW &3" SAN UPTO EWC

2" AV UP& DN

1/2

"H

WR

1/2

"C

W1/2

"H

W

3/4

"C

W3/4

"H

W

1/2" CW1/2" HW

1/2" HWR

FD-1

FD-1

co coco

0.5 GPM

0.5 GPM

0.5 GPM

0.5 GPM

0.5 GPM

0.5 GPM

2.0 GPM

1 1/2" V UP

2"

V

11/2

"V

3" SAN

1 1/4" V

11/4

"S

AN

11/4

"C

W3/4

"H

W

1 1/4" CW1 1/4" HW3/4" HWR

11/2

"C

W1

1/2

"H

W

1/2" HWR1/2" HW

1/2" CW

3/4

"H

WR

3/4" VAC

2" VAC EXHAUSTTERMINATE PERMANUFACTURERRECOMMENDATIONS

1" CA

1-1/4" CADN

1

J

2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

G

H

K

2.1 8.17.1

18

1818

18

18

18

18

1/2

"H

WR

1" CA

19

1"

CA

1"

VA

C1"

CA

1"

CA

3/4

"V

AC

PS

PS

PRESSURESENSOR

PRESSURESENSOR

co

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

GRCC Bid No: 1213-3294

C:\

Revit

Lo

calF

iles\7

1108000

CH

M12_C

EN

TR

AL

_K

sim

on

eau

x.r

vt

3/6

/2013

11:2

8:3

9A

M

1/8" = 1'-0"

CJZ

PETER AND PAT COOKACADEMIC HALL

RENOVATION

GRAND RAPIDS, MI

LEVEL 4 PLUMBING PLAN- PHASE 1

P141.17111.080.00

KMS

PLUMBING GENERAL NOTES

1. THESE DRAWINGS INDICATE THE GENERAL EXTENT OF WORK BUT ARE NOTFABRICATION DRAWINGS. COORDINATE PLUMBING SYSTEMS WITH WORK OFALL OTHER TRADES PRIOR TO ANY FABRICATION OR INSTALLATION. PROVIDEALL FITTINGS, OFFSETS, TRANSITIONS, ETC. AS REQUIRED FOR A COMPLETEWORKABLE INSTALLATION.

2. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATION OF ALL NEWPLUMBING FIXTURES.

3. ALL PLUMBING RELATED CORING THROUGH FLOORS SHALL BE BY PLUMBINGCONTRACTOR.

4. COORDINATE ALL NEW LOCATIONS, SIZES AND ELEVATIONS OF SLEEVESTHROUGH WALLS, SLABS AND FOUNDATIONS WITH STRUCTURAL DRAWINGSAND FIELD CONDITIONS.

5. COORDINATE ALL PIPE ROUTING WITH SITE CONDITIONS, EQUIPMENTMANUFACTURER’S RECOMMENDATIONS, AND ALL OTHER TRADES TO AVOIDINTERFERENCES.

6. PROVIDE ACCESS AROUND ALL NEW EQUIPMENT PER MANUFACTURER’SRECOMMENDATIONS.

7. ALL OVERHEAD DOMESTIC WATER AND STORM PIPING SHALL BE INSULATEDAND LABELED IN ACCORDANCE WITH THE REQUIREMENTS OF THE PROJECTSPECIFICATIONS.

8. ALL PIPING SHALL BE CONCEALED IN WALLS, CEILING SPACES ORARCHITECTURAL SOFFITS.

9. SEAL ALL PENETRATIONS THROUGH WALLS AND FLOORS AIR AND WATERTIGHT.

10. COORDINATE LOCATIONS AND ELEVATIONS OF ALL NEW UNDERGROUNDUTILITIES WITH CIVIL SITE PLANS PRIOR TO START OF CONSTRUCTION.

11. CONTRACTOR SHALL MAINTAIN ADEQUATE CLEARANCES (PER THE LATESTEDITION OF THE NATIONAL ELECTRIC CODE) ABOVE AND AROUND ANY NEWELECTRICAL PANELS, EQUIPMENT, AND TRANSFORMERS WHEN ROUTINGOVERHEAD PIPING.

12. RUN ALL SANITARY, VENT, AND STORM PIPING AT SLOPES COMPLYING WITHTHE MICHIGAN PLUMBING CODE LATEST EDITION.

13. PROVIDE WALL CLEANOUT AT THE BASE OF ALL VERTICAL STORM ANDSANITARY CONDUCTORS.

14. PROVIDE SHUT-OFF VALVES AT ALL PLUMBING FIXTURES. LOCATE ALLPLUMBING SHUT-OFF VALVES IN AN ACCESSIBLE LOCATION ABOVE ANACCESS PANEL AND NO MORE THAN 24” ABOVE THE CEILING.

15. FURNISH AND INSTALL BALANCING VALVES AT ALL BRANCHES OF HOTWATER RECIRCULATION PIPING SYSTEM. AT COMPLETION OF PIPINGINSTALLATION, THE CONTRACTOR MUST BALANCE THE HOT WATERRECIRCULATING SYSTEM TO FLOW RATES INDICATED AND SUBMIT BALANCERESULTS IN WRITING TO ARCHITECT/ENGINEER.

16. MINIMUM UNDERGROUND STORM AND SANITARY PIPING SHALL BE 3”.

17. REFER TO PIPING DIAGRAMS, DETAILS, AND SPECIFICATIONS FOR VALVES,FITTINGS, AND OTHER ACCESSORIES.

18. PROVIDE VENT PIPING THROUGH ROOF A MINIMUM OF 10’ AWAY FROMPARAPET WALL AND A MINIMUM OF 10’ CLEAR OR MORE FROM ANY OUTSIDEAIR INTAKES AS REQUIRED BY THE LATEST EDITION OF THE MICHIGANMECHANICAL CODE.

PLUMBING KEY NOTES

1 ROUTE 1/2" CW AND 1/2" HW DOWN IN WALL TO WASHING MACHINE OUTLETBOX. ROUTE 2" SAN FROM OUTLET BOX AND CONNECT TO 3" SAN STACK INWALL.

2 ROUTE CW AND HW IN WALL TO SERVICE SHUT OFF VALVE BOX. ROUTEPIPING IN SECOND FLOOR CEILING SPACE AND CONNECT TO THIRD FLOORDENTAL EQUIPMENT/SINK FLOOR LOCATIONS.

3 ROUTE 3/4" CW THROUGH SHUT OFF VALVE, BACKFLOW PREVENTER,RELOCATED FILTER ASSEMBLY, AND CONNECT TO FILM DEVELOPER PERMANUFACTURER RECOMMENDATIONS. ROUTE 1/2" DRAIN LINE FROMDEVELOPER AND DISCHARGE TO RELOCATED SILVER RECOVERY SYSTEM.ROUTE DRAIN FROM SILVER RECOVERY SYSTEM AND INDIRECT WASTE TOFLOOR DRAIN. PROVIDE ALL PIECES AS REQUIRED FOR A FULLYOPERATIONAL SYSTEM.

4 ROUTE 1/2" DCA AND 1/2" CW TO DENTAL CHAIR, VALVE AND CONNECT PERMANUFACTURER RECOMMENDATIONS.

5 ROUTE 3/4" CW AND 3/4" HW DOWN IN WALL AND CONNECT TO TWOCOMPARTMENT SINK FAUCET. ROUTE 1 1/2" DRAIN FROM EACHCOMPARTMENT AND CONNECT SEPARATELY TO 3" SAN IN WALL.

6 ROUTE 3/4" CW, 3/4" DCA, 2" DVAC, AND 3/4" CA WITHIN CASEWORK. VALVEAND CONNECT 1/2" CW, 1/2" DCA, AND 1" DVAC TO SIMULATORS PERMANUFACTURER RECOMMENDATIONS. ROUTE CA THROUGH VALVE,PRESSURE REGULATOR, VALVE, AND CONNECT TO AIR GUN PERMANUFACTURER RECOMMENDATIONS.

7 ROUTE 3/4" CW THROUGH BACKFLOW PREVENTER, VALVE AND CONNECT TOMILLIPORE ELIX 30 SYSTEM.

8 ROUTE 1/2" CA AND 1/2" VAC DOWN IN WALL AND CONNECT TO HEADWALLOUTLETS/INLET (1 OXYGEN, 1 MEDICAL COMPRESSED AIR, AND 1 MEDICALVACUUM).

9 ROUTE 1/2" CW, 1/2" DCA, 1 1/2" DVAC, AND 1/2" CA IN CHASE BEHINDCASEWORK. VALVE AND CONNECT 1/2" CW, 1/2" DCA, AND 1" DVAC TOSIMULATORS PER MANUFACTURER RECOMMENDATIONS. ROUTE CATHROUGH VALVE, PRESSURE REGULATOR, VALVE, AND CONNECT TO AIRGUN PER MANUFACTURER RECOMMENDATIONS.

10 PROVIDE NEW GENERAL SERVICE VACUUM PUMP (SIMPLEX PUMP).

11 ROUTE CW, CA, AND DCA IN WALL TO SERVICE SHUT OFF VALVE BOX. ROUTEPIPING IN SECOND FLOOR CEILING SPACE AND CONNECT TO THIRD FLOORDENTAL EQUIPMENT/SINK FLOOR LOCATIONS.

12 ROUTE 1/2" DCA, 1/2" CW, AND 3/4" DVAC FROM MAINS LOCATED WITHIN PIPECHASE, VALVE AND CONNECT TO ASSISTANT CABINETRY OUTLETS/INLETSPER MANUFACTURER RECOMMENDATIONS.

13 ROUTE 1/2" DCA AND CONNECT TO ASSISTINA PER MANUFACTURERRECOMMENDATIONS.

14 ROUTE 3/4" CW AND 3/4" HW DOWN IN WALL AND CONNECT TO HYDRIM PERMANUFACTURER RECOMMENDATIONS. ROUTE 3/4" DRAIN FROM HYDRIM ANDCONNECT TO WASHER OUTLET BOX.

15 ROUTE 1/2" CW THROUGH BACKFLOW PREVENTER LOCATED WITHINCABINETRY. ROUTE 1/4" PIPING FROM 1/2" PIPING AFTER BACKFLOWPREVENTER UP THROUGH COUNTER AT TRIMMER, VALVE AND CONNECT TOTRIMMERS PER MANUFACTURER RECOMMENDATIONS.

16 ROUTE 1/2" CW PIPING THROUGH ELECTRONIC TRAP PRIMER VALVE DOWNIN WALL AND CONNECT TO FLOOR DRAIN.

17 ROUTE 1/2" CW PIPING FROM WATER SAVER TRAP PRIMER AND CONNECT TOFLOOR DRAIN. REFER TO DETAIL ON DETAIL SHEET.

18 BALANCE VALVE. SET TO GPM INDICATED.

19 PROVIDE NEW SHUT OFF VALVE IN EXISTING BRANCH PIPING NEAR RISER.

1/8" = 1'-0"A3

LEVEL 4 PLUMBING PLAN - PHASE 1

X

02-20-2013 BIDS

03-05-2013 ADDENDUM 2

Page 6: MECHANICAL SYMBOLS MECHANICAL DRAWING LEGEND111841/AN~2...MECHANICAL SYMBOLS MECHANICAL SYSTEM INDICATION HEAVY LINE-WEIGHT INDICATES NEW WORK LIGHT LINE WEIGHT-INDICATES EXISTING

BFP

2"

NG

6"

ST

2 1/2" HW

3" CW

3" CW UP

2 1/2" HW UP

1" HWR UP

2" DVAC2" DVAC

1" DCA

11/2

"C

A

J

4 5 6 7

H

K

7.1

3" SAN

4"

SA

N

4" SAN

6" ST UP

EXISTINGDENTAL AIRCOMPRESSORS

EXISTINGDENTAL VACUUMPUMPS

1" HWR

EXISTINGCONDENSERWATER PUMPS

EXISTINGCHILLED WATERPUMPS

EXISTING HEATEXCHANGER

EXISTING HOTWATER HEATINGPUMPS

4"

CW

FLOOR DRAIN

FLOOR DRAIN

2"

NG

6"

ST

2 1/2" HW

3" CW UP

2 1/2" HW UP

1" HWR UP

3" CW

2" DVAC2" DVAC

CP-14

3

1" DCA

11/2

"C

A

J

4 5 6 7

H

K

7.1

ACP-1

4"

SA

N

4" SAN3" SAN

6" ST UP

1 1/4" CA

1 1/4" CA UP

4" SAN

HX-1

HX-2

CP-7CP-8CP-6

CP-5

CP-1 CP-2

EXISTINGDENTAL AIRCOMPRESSORS

EXISTINGDENTAL VACUUMPUMPS

1" HWR

1"

HW

R

4"

CW

1" NPCW TO AIRSEPARATOR

1" NPCW TO AIRSEPARATOR

1" NPCW

1" NPCW

FLOOR DRAIN

ROUTE DRAIN DOWNTIGHT TO WALL ANDSPILL TO FLOOR DRAIN.

FLOOR DRAIN

3" DRAIN

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

GRCC Bid No: 1213-3294

C:\

Revit

Lo

calF

iles\7

1108000

CH

M12_C

EN

TR

AL

_K

sim

on

eau

x.r

vt

3/6

/2013

11:0

1:4

8A

M

1/4" = 1'-0"

CJZ

PETER AND PAT COOKACADEMIC HALL

RENOVATION

GRAND RAPIDS, MI

ENLARGED PLUMBINGPLAN - PHASE 1

P301.17111.080.00

KMS

1/4" = 1'-0"E5

ENLARGED LEVEL G2 CHILLER ROOM PLUMBINGDEMOLITION PLAN - PHASE 1

1/4" = 1'-0"A5

ENLARGED LEVEL G2 CHILLER ROOM PLUMBING NEWWORK PLAN - PHASE 1

CHILLER ROOM PLUMBING DEMOLITION KEY NOTES

1 REMOVE EXISTING DENTAL VACUUM COMPLETE. CAP DENTAL VACUUMEXHAUST TERMINATION PIPING AT WALL FOR FUTURE CONNECTION.

2 REMOVE EXISTING DENTAL AIR COMPRESSOR COMPLETE WITHASSOCIATED PIPING.

3 REMOVE EXISTING NATURAL GAS AND COMPRESSED AIR PIPING BACKTO NEXT ACTIVE BRANCH AND CAP.

4 REMOVE EXISTING 3 INCH P-TRAP COMPLETE AND PREPARE PIPING FORRECONNECTION TO NEW P-TRAP.

X

CHILLER ROOM PLUMBING KEY NOTES

1 PROVIDE NEW TRIPLEX DENTAL VACUUM SYSTEM. RECONNECT TOEXISTING DENTAL VACUUM EXHUAST PIPING TERMINATION.

2 PROVIDE TWO NEW TRIPLEX DENTAL AIR COMPRESSOR SYSTEMS.

3 PROVIDE NEW INLINE RECIRCULATION PUMP. RECONNECT TO EXISTINGHWR PIPING.

4 PROVIDE NEW 3 INCH P-TRAP AND CONNECT TO EXISTING SAN PIPING

X

PLUMBING GENERAL DEMOLITION NOTES

1. ANY INTERRUPTIONS OF EXISTING SERVICES OR EQUIPMENT SHALL BEPERFORMED AT A TIME APPROVED IN ADVANCE BY THE OWNER'SREPRESENTATIVE SO AS NOT TO INTERFERE WITH THE BUILDINGOPERATION.

2. THESE DRAWINGS INDICATE THE GENERAL EXTENT OF WORK. THE EXTENTOF DEMOLITION SHALL BE AS REQUIRED BY THE NEW WORK AND REMOVALOF MATERIALS/COMPONENTS NOT REQUIRED FOR THE NEW ANDRENOVATED SYSTEMS.

3. ALL MECHANICAL SYSTEMS TO BE REMOVED SHALL BE REMOVED COMPLETEWITH ALL RELATED ITEMS INCLUDING HANGERS, SUPPORTS, CONTROLS,ETC. CAP ALL OPEN PIPES AND DUCTS. PATCH AND SEAL ALL OPENINGS ASA RESULT OF DEMOLITION IN RATED WALLS TO MAINTAIN EXISTING WALL'SFIRE OR SMOKE RATING AND TO MATCH EXISTING ADJACENT SURFACES.

4. ALL ITEMS AND EQUIPMENT REMOVED SHALL REMAIN PROPERTY OF THEOWNER UNLESS POSSISSION RIGHTS ARE WAIVED. CONTRACTOR SHALLMEET WITH OWNER PRIOR TO START OF DEMOLITION TO DETERMINE WHICHITEMS ARE TO BE SALVAGED. CONTRACTOR SHALL REMOVE REMAININGITEMS FROM SITE.

5. FIELD VERIFY EXACT SIZE AND LOCATION OF ALL EXISTING SERVICES PRIORTO DEMOLITION.

6 REFER TO PROJECT PHASING SCHEDULE. PROVIDE TEMPORARYCONNECTIONS AND PIPING TO MAINTAIN AN OPERATIONAL SYSTEM FOROTHER LEVELS.

PLUMBING GENERAL NOTES

1. THESE DRAWINGS INDICATE THE GENERAL EXTENT OF WORK BUT ARE NOTFABRICATION DRAWINGS. COORDINATE PLUMBING SYSTEMS WITH WORK OFALL OTHER TRADES PRIOR TO ANY FABRICATION OR INSTALLATION. PROVIDEALL FITTINGS, OFFSETS, TRANSITIONS, ETC. AS REQUIRED FOR A COMPLETEWORKABLE INSTALLATION.

2. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATION OF ALL NEWPLUMBING FIXTURES.

3. ALL PLUMBING RELATED CORING THROUGH FLOORS SHALL BE BY PLUMBINGCONTRACTOR.

4. COORDINATE ALL NEW LOCATIONS, SIZES AND ELEVATIONS OF SLEEVESTHROUGH WALLS, SLABS AND FOUNDATIONS WITH STRUCTURAL DRAWINGSAND FIELD CONDITIONS.

5. COORDINATE ALL PIPE ROUTING WITH SITE CONDITIONS, EQUIPMENTMANUFACTURER’S RECOMMENDATIONS, AND ALL OTHER TRADES TO AVOIDINTERFERENCES.

6. PROVIDE ACCESS AROUND ALL NEW EQUIPMENT PER MANUFACTURER’SRECOMMENDATIONS.

7. ALL OVERHEAD DOMESTIC WATER AND STORM PIPING SHALL BE INSULATEDAND LABELED IN ACCORDANCE WITH THE REQUIREMENTS OF THE PROJECTSPECIFICATIONS.

8. ALL PIPING SHALL BE CONCEALED IN WALLS, CEILING SPACES ORARCHITECTURAL SOFFITS.

9. SEAL ALL PENETRATIONS THROUGH WALLS AND FLOORS AIR AND WATERTIGHT.

10. COORDINATE LOCATIONS AND ELEVATIONS OF ALL NEW UNDERGROUNDUTILITIES WITH CIVIL SITE PLANS PRIOR TO START OF CONSTRUCTION.

11. CONTRACTOR SHALL MAINTAIN ADEQUATE CLEARANCES (PER THE LATESTEDITION OF THE NATIONAL ELECTRIC CODE) ABOVE AND AROUND ANY NEWELECTRICAL PANELS, EQUIPMENT, AND TRANSFORMERS WHEN ROUTINGOVERHEAD PIPING.

12. RUN ALL SANITARY, VENT, AND STORM PIPING AT SLOPES COMPLYING WITHTHE MICHIGAN PLUMBING CODE LATEST EDITION.

13. PROVIDE WALL CLEANOUT AT THE BASE OF ALL VERTICAL STORM ANDSANITARY CONDUCTORS.

14. PROVIDE SHUT-OFF VALVES AT ALL PLUMBING FIXTURES. LOCATE ALLPLUMBING SHUT-OFF VALVES IN AN ACCESSIBLE LOCATION ABOVE ANACCESS PANEL AND NO MORE THAN 24” ABOVE THE CEILING.

15. FURNISH AND INSTALL BALANCING VALVES AT ALL BRANCHES OF HOTWATER RECIRCULATION PIPING SYSTEM. AT COMPLETION OF PIPINGINSTALLATION, THE CONTRACTOR MUST BALANCE THE HOT WATERRECIRCULATING SYSTEM TO FLOW RATES INDICATED AND SUBMIT BALANCERESULTS IN WRITING TO ARCHITECT/ENGINEER.

16. MINIMUM UNDERGROUND STORM AND SANITARY PIPING SHALL BE 3”.

17. REFER TO PIPING DIAGRAMS, DETAILS, AND SPECIFICATIONS FOR VALVES,FITTINGS, AND OTHER ACCESSORIES.

18. PROVIDE VENT PIPING THROUGH ROOF A MINIMUM OF 10’ AWAY FROMPARAPET WALL AND A MINIMUM OF 10’ CLEAR OR MORE FROM ANY OUTSIDEAIR INTAKES AS REQUIRED BY THE LATEST EDITION OF THE MICHIGANMECHANICAL CODE.

02-20-2013 BIDS

03-05-2013 ADDENDUM 2

Page 7: MECHANICAL SYMBOLS MECHANICAL DRAWING LEGEND111841/AN~2...MECHANICAL SYMBOLS MECHANICAL SYSTEM INDICATION HEAVY LINE-WEIGHT INDICATES NEW WORK LIGHT LINE WEIGHT-INDICATES EXISTING

BFP

BFP

6"

ST

3" CW

2 1/2" HW

3" CW UP

2 1/2" HW UP

1" HWR UP

1

2

4" DVAC

1 1/4" DCA

4" DVAC UP

DVP-1DAP-2 DAP-1

4" DVAC

3" SAN 4" SAN

4

ACP-1

1 1/2" CA UP1 1/4" CA

4"

SA

N

J

4 5 6 7

H

K

7.1

4" SAN

CP-1 CP-2

CP-6

CP-5

CP-7 CP-8

CH-1

HX-1

HX-2CP-14

4"

CW

1" NPCW TO AIRSEPARATOR

1" NPCW TO AIRSEPARATOR

1" NPCW

1" NPCW

4" DVAC EXHAUST.TERMINATE PERMANUFACTURERRECOMMENDATIONS

FLOOR DRAIN

ROUTE DRAINS DOWNTIGHT TO WALL ANDSPILL TO FLOOR DRAIN.

3" DRAIN2" DRAIN

FLOOR DRAIN

12

3" CW UP

2 1/2" HW UP

1" HWR UP

2"

NG

6"

ST

3" CW

2 1/2" HW

11/2

"C

A

3

1" DCA

2" DVAC2" DVAC

4"

SA

N

3" SAN

4

4" SAN

DVACEXHAUST

J

4 5 6 7

H

K

7.1

1 1/4" CAACP-1

CP-5

CP-6

CP-1 CP-2

CP-7

CP-8

CH-1

HX-1

HX-2

CP-144" SAN

4"

CW

1" NPCW

1" NPCW

1" NPCW TO AIRSEPARATOR

1" NPCW TO AIRSEPARATOR

FLOOR DRAIN

ROUTE DRAIN DOWNTIGHT TO WALL ANDSPILL TO FLOOR DRAIN.

3" DRAIN

FLOOR DRAIN

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

GRCC Bid No: 1213-3294

C:\

Revit

Lo

calF

iles\7

1108000

CH

M12_C

EN

TR

AL

_K

sim

on

eau

x.r

vt

3/6

/2013

11:0

1:5

0A

M

1/4" = 1'-0"

CJZ

PETER AND PAT COOKACADEMIC HALL

RENOVATION

GRAND RAPIDS, MI

ENLARGED PLUMBINGPLAN - PHASE 2

P301.27111.080.00

KMS

CHILLER ROOM PLUMBING DEMOLITION KEY NOTES

1 REMOVE EXISTING DENTAL VACUUM COMPLETE. CAP DENTAL VACUUMEXHAUST TERMINATION PIPING AT WALL FOR FUTURE CONNECTION.

2 REMOVE EXISTING DENTAL AIR COMPRESSOR COMPLETE WITHASSOCIATED PIPING.

3 REMOVE EXISTING NATURAL GAS AND COMPRESSED AIR PIPING BACKTO NEXT ACTIVE BRANCH AND CAP.

4 REMOVE EXISTING 3 INCH P-TRAP COMPLETE AND PREPARE PIPING FORRECONNECTION TO NEW P-TRAP.

X

CHILLER ROOM PLUMBING KEY NOTES

1 PROVIDE NEW TRIPLEX DENTAL VACUUM SYSTEM. RECONNECT TOEXISTING DENTAL VACUUM EXHUAST PIPING TERMINATION.

2 PROVIDE TWO NEW TRIPLEX DENTAL AIR COMPRESSOR SYSTEMS.

3 PROVIDE NEW INLINE RECIRCULATION PUMP. RECONNECT TO EXISTINGHWR PIPING.

4 PROVIDE NEW 3 INCH P-TRAP AND CONNECT TO EXISTING SAN PIPING

X

PLUMBING GENERAL DEMOLITION NOTES

1. ANY INTERRUPTIONS OF EXISTING SERVICES OR EQUIPMENT SHALL BEPERFORMED AT A TIME APPROVED IN ADVANCE BY THE OWNER'SREPRESENTATIVE SO AS NOT TO INTERFERE WITH THE BUILDINGOPERATION.

2. THESE DRAWINGS INDICATE THE GENERAL EXTENT OF WORK. THE EXTENTOF DEMOLITION SHALL BE AS REQUIRED BY THE NEW WORK AND REMOVALOF MATERIALS/COMPONENTS NOT REQUIRED FOR THE NEW ANDRENOVATED SYSTEMS.

3. ALL MECHANICAL SYSTEMS TO BE REMOVED SHALL BE REMOVED COMPLETEWITH ALL RELATED ITEMS INCLUDING HANGERS, SUPPORTS, CONTROLS,ETC. CAP ALL OPEN PIPES AND DUCTS. PATCH AND SEAL ALL OPENINGS ASA RESULT OF DEMOLITION IN RATED WALLS TO MAINTAIN EXISTING WALL'SFIRE OR SMOKE RATING AND TO MATCH EXISTING ADJACENT SURFACES.

4. ALL ITEMS AND EQUIPMENT REMOVED SHALL REMAIN PROPERTY OF THEOWNER UNLESS POSSISSION RIGHTS ARE WAIVED. CONTRACTOR SHALLMEET WITH OWNER PRIOR TO START OF DEMOLITION TO DETERMINE WHICHITEMS ARE TO BE SALVAGED. CONTRACTOR SHALL REMOVE REMAININGITEMS FROM SITE.

5. FIELD VERIFY EXACT SIZE AND LOCATION OF ALL EXISTING SERVICES PRIORTO DEMOLITION.

6 REFER TO PROJECT PHASING SCHEDULE. PROVIDE TEMPORARYCONNECTIONS AND PIPING TO MAINTAIN AN OPERATIONAL SYSTEM FOROTHER LEVELS.

PLUMBING GENERAL NOTES

1. THESE DRAWINGS INDICATE THE GENERAL EXTENT OF WORK BUT ARE NOTFABRICATION DRAWINGS. COORDINATE PLUMBING SYSTEMS WITH WORK OFALL OTHER TRADES PRIOR TO ANY FABRICATION OR INSTALLATION. PROVIDEALL FITTINGS, OFFSETS, TRANSITIONS, ETC. AS REQUIRED FOR A COMPLETEWORKABLE INSTALLATION.

2. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATION OF ALL NEWPLUMBING FIXTURES.

3. ALL PLUMBING RELATED CORING THROUGH FLOORS SHALL BE BY PLUMBINGCONTRACTOR.

4. COORDINATE ALL NEW LOCATIONS, SIZES AND ELEVATIONS OF SLEEVESTHROUGH WALLS, SLABS AND FOUNDATIONS WITH STRUCTURAL DRAWINGSAND FIELD CONDITIONS.

5. COORDINATE ALL PIPE ROUTING WITH SITE CONDITIONS, EQUIPMENTMANUFACTURER’S RECOMMENDATIONS, AND ALL OTHER TRADES TO AVOIDINTERFERENCES.

6. PROVIDE ACCESS AROUND ALL NEW EQUIPMENT PER MANUFACTURER’SRECOMMENDATIONS.

7. ALL OVERHEAD DOMESTIC WATER AND STORM PIPING SHALL BE INSULATEDAND LABELED IN ACCORDANCE WITH THE REQUIREMENTS OF THE PROJECTSPECIFICATIONS.

8. ALL PIPING SHALL BE CONCEALED IN WALLS, CEILING SPACES ORARCHITECTURAL SOFFITS.

9. SEAL ALL PENETRATIONS THROUGH WALLS AND FLOORS AIR AND WATERTIGHT.

10. COORDINATE LOCATIONS AND ELEVATIONS OF ALL NEW UNDERGROUNDUTILITIES WITH CIVIL SITE PLANS PRIOR TO START OF CONSTRUCTION.

11. CONTRACTOR SHALL MAINTAIN ADEQUATE CLEARANCES (PER THE LATESTEDITION OF THE NATIONAL ELECTRIC CODE) ABOVE AND AROUND ANY NEWELECTRICAL PANELS, EQUIPMENT, AND TRANSFORMERS WHEN ROUTINGOVERHEAD PIPING.

12. RUN ALL SANITARY, VENT, AND STORM PIPING AT SLOPES COMPLYING WITHTHE MICHIGAN PLUMBING CODE LATEST EDITION.

13. PROVIDE WALL CLEANOUT AT THE BASE OF ALL VERTICAL STORM ANDSANITARY CONDUCTORS.

14. PROVIDE SHUT-OFF VALVES AT ALL PLUMBING FIXTURES. LOCATE ALLPLUMBING SHUT-OFF VALVES IN AN ACCESSIBLE LOCATION ABOVE ANACCESS PANEL AND NO MORE THAN 24” ABOVE THE CEILING.

15. FURNISH AND INSTALL BALANCING VALVES AT ALL BRANCHES OF HOTWATER RECIRCULATION PIPING SYSTEM. AT COMPLETION OF PIPINGINSTALLATION, THE CONTRACTOR MUST BALANCE THE HOT WATERRECIRCULATING SYSTEM TO FLOW RATES INDICATED AND SUBMIT BALANCERESULTS IN WRITING TO ARCHITECT/ENGINEER.

16. MINIMUM UNDERGROUND STORM AND SANITARY PIPING SHALL BE 3”.

17. REFER TO PIPING DIAGRAMS, DETAILS, AND SPECIFICATIONS FOR VALVES,FITTINGS, AND OTHER ACCESSORIES.

18. PROVIDE VENT PIPING THROUGH ROOF A MINIMUM OF 10’ AWAY FROMPARAPET WALL AND A MINIMUM OF 10’ CLEAR OR MORE FROM ANY OUTSIDEAIR INTAKES AS REQUIRED BY THE LATEST EDITION OF THE MICHIGANMECHANICAL CODE.

1/4" = 1'-0"A5

ENLARGED LEVEL G2 CHILLER ROOM PLUMBING NEWWORK PLAN - PHASE 2

1/4" = 1'-0"E5

ENLARGED LEVEL G2 CHILLER ROOM PLUMBINGDEMOLITION PLAN - PHASE 2

02-20-2013 BIDS

03-05-2013 ADDENDUM 2

Page 8: MECHANICAL SYMBOLS MECHANICAL DRAWING LEGEND111841/AN~2...MECHANICAL SYMBOLS MECHANICAL SYSTEM INDICATION HEAVY LINE-WEIGHT INDICATES NEW WORK LIGHT LINE WEIGHT-INDICATES EXISTING

1

ISSUE:

CHECKED:

SCALE:

© 2010 SHW Group

SHW Project:

SHEET TITLE:

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

C:\

Revit

Lo

calF

iles\7

1108000

CH

M12_C

EN

TR

AL

_K

sim

on

eau

x.r

vt

3/5

/2013

6:1

2:4

0P

M

CJZ

PETER AND PAT COOKACADEMIC HALL

RENOVATION

GRAND RAPIDS, MI

PLUMBING SCHEDULES

P6017111.080.00

2338 COOLIDGE, BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

KMS

02-20-2013 BIDS

03-05-2013 ADDENDUM 2

DOMESTIC HOT WATER CIRCULATING PUMP SCHEDULE

MARK LOCATION TYPEFLOW(GPM)

TOTAL HEAD(FT)

PUMPEFFICIENCY

(%)

ELECTRICAL DATA

MANUFACTURER MODEL NOTESHP RPM VOLTAGE PHASECP-14 MAIN BUILDING MECH ROOM IN-LINE 15 14 - 1/6 3300 115 1 BELL & GOSSETT PL SERIES PL-36B

PLUMBING FIXTURE SCHDEULE

MARK FIXTURE SAN V TRAP CW HW COMMENTSEEW-1 EMERGENCY EYEWASH - - - 3/4" 3/4" DECK MOUNTED, SWING DOWN TYPE EYE/FACE WASH WITH SINGLE OR TWIN AERATED SPRAY OUTLETS COMPLYING WITH ANSI

Z358.1. HAWS MODEL 7610.

EEW-2 EMERGENCY EYEWASH - - - 3/4" 3/4" DECK MOUNTED, SWING DOWN TYPE EYE/FACE WASH WITH TWIN AERATED SPRAY HEADS COMPLYING WITH ANSI Z358.1. GUARDIANMODEL GBF1849.

EEW-3 EMERGENCY EYEWASH - - - 3/4" 3/4" RECESSED WALL MOUNTED, SWING DOWN TYPE EYE/FACE WASH IN STAINLESS STEEL CABINET WITH SINGLE OR TWIN AERATEDSPRAY OUTLETS COMPLYING WITH ANSI Z358.1. HAWS MODEL 7655WCC.

FD-1 GENERAL FLOOR DRAIN (E)3" - (E)3" - - EXISTING DRAIN ASSEMBLY TO REMAIN. PROVIDE NEW LIGHT TRAFFIC NICKEL BRONZE COVER AND NEW P-TRAP ASSEMBLY. PROVIDEHEEL PROOF GRATING.

FD-2 EQUIPMENT FLOOR DRAIN 3" - 3" - - JAY R. SMITH MODEL 3040 CAST IRON FLOOR DRAIN WITH NICKEL BRONZE FINISH AND 8-1/2" TOP WITH VANDAL PROOF SCREWS,DOME STRAINER, ACID RESISTANT COATED INTERIOR AND EXPOSED EXTERIOR SURFACES, MEETS ASME A 112.6.3. BOTTOM OUTLETWITH SEEPAGE FLANGE AND CLAMPING DEVICE. TRAP PRIMER FITTING: CAST IRON WITH SPIGOT INLET AND SPIGOT OUTLET, ANDTRAP SEAL PRIMER VALVE CONNECTION WITH 1/2" CW SIDE INLET.

FD-3 DARKROOM FLOOR DRAIN 4" - 4" - - JAY R. SMITH MODEL 3060 CAST IRON FLOOR DRAIN WITH NICKEL BRONZE FINISH AND 12-1/2" TOP WITH VANDAL PROOF SCREWS,DOME STRAINER, ACID RESISTANT COATED INTERIOR AND EXPOSED EXTERIOR SURFACES, MEETS ASME A 112.6.3. BOTTOM OUTLETWITH SEEPAGE FLANGE AND CLAMPING DEVICE. TRAP PRIMER FITTING: CAST IRON WITH SPIGOT INLET AND SPIGOT OUTLET, ANDTRAP SEAL PRIMER VALVE CONNECTION WITH 1/2" CW SIDE INLET. PROVIDE DURIRON 4" P-TRAP.

LAV-1 LAY-IN LAVATORY 1 1/2" 1 1/2" 1 1/2" 1/2" 1/2" SINK BASIN BY ARCHITECTURAL TRADES. PROVIDE SLOAN "SOLIS" MODEL EAF-275-ISM, BATTERY POWERED LAVATORY FAUCET WITHTHERMOSTATIC MIXING VALVE FOR SINGLE FAUCET. PROVIDE 0.5 GPM VANDAL RESISTANT AERATOR, GRID DRAIN STRAINER, P-TRAPWITH C.O. PLUG, QUARTER TURN ANGLE SUPPLIES AND STOP VALVES. INSULATE EXPOSED WASTE AND WATER PIPING.

LAV-2 WALL HUNG LAVATORY 1 1/2" 1 1/2" 1 1/2" 1/2" 1/2" WALL HUNG VITREOUS CHINA LAVATORY WITH MANUAL FAUCET; KOHLER "GREENWICH" VITREOUS CHINA SINK, PROVIDE KOHLER"FORTE" MODEL K-10270-4 CHROME PLATED BATHROOM SINK FAUCET WITH METAL DRAIN AND ADA COMPLIANT LEVER HANDLES.PROVIDE 0.5 GPM VANDAL RESISTANT AERATOR, GRID DRAIN STRAINER, P-TRAP WITH C.O. PLUG, QUARTER TURN ANGLE SUPPLIESAND STOP VALVES. INSULATE EXPOSED WASTE AND WATER PIPING.

LAV-3 WALL HUNG LAVATORY 1 1/2" 1 1/2" 1 1/2" 1/2" 1/2" WALL HUNG VITREOUS CHINA LAVATORY WITH BATTERY, SENSOR FAUCET; KOHLER 'GREENWICH" VITREOUS CHINA SINK, PROVIDESLOAN "SOLIS" MODEL EAF-275-ISM, BATTERY POWERED LAVATORY FAUCET WITH THERMOSTATIC MIXING VALVE FOR SINGLEFAUCET. PROVIDE 0.5 GPM VANDAL RESISTANT AERATOR, GRID DRAIN STRAINER, P-TRAP WITH C.O. PLUG, QUARTER TURN ANGLESUPPLIES AND STOP VALVES. INSULATE EXPOSED WASTE AND WATER PIPING.

SH-1 BATH TUB - - - - - ENAMEL COATED, CAST IRON BATH TUB; KOHLER "VILLAGER" MODEL K-715. ADA COMPLIANT TUB WITH INTEGRAL APRON. PROVIDESYMMONS "TEMPTROL II TUB AND SHOWER SYSTEM" MODEL BP-56-2. TUB AND ACCESSORIES ARE FOR TRAINING PURPOSES ONLYAND WILL NOT BE PLUMBED.

SK-1 LAY-IN SINK (2) 1 1/2" 2" (2) 1 1/2" 1/2" 1/2" STAINLESS STEEL, DOUBLE BOWL, COUNTERTOP SINK: ELKAY MODEL LR2918, 29"x18" DOUBLE BOWL SINK, 12"x12"x7-5/8" EACH BASIN.PROVIDE CHICAGO FAUCET MODEL 895-317GN8A, MANUAL, GOOSENECK FAUCET WITH 4 INCH WRIST BLADE HANDLES, CERAMICOPERATING CARTRIDGE, AND SWING GOOSENECK FAUCET. PROVIDE 1.5 GPM VANDAL RESISTANT AERATOR. PROVIDE CONICALSTRAINERS, 1 1/2' TAILPIECE, P-TRAPS WITH C.O. PLUGS, QUARTER-TURN ANGLE SUPPLIES AND STOP VALVES. INSULATE EXPOSEDWASTE AND WATER PIPING.

SK-2 LAY-IN SINK (2) 1 1/2" 2" (2) 1 1/2" 1/2" 1/2" STAINLESS STEEL, DOUBLE BOWL, COUNTERTOP SINK: ELKAY MODEL LR2918, 29"x18" DOUBLE BOWL SINK, 12"x12"x7-5/8" EACH BASIN.PROVIDE DELTA FAUCET MODEL 9159-DST, MANUAL, GOOSENECK FAUCET WITH SINGLE HANDLE, PULL DOWN SPRAYER, AND SWINGGOOSENECK FAUCET. PROVIDE 1.8 GPM MAXIMUM FLOW RATE. PROVIDE CONICAL STRAINERS, 1 1/2' TAILPIECES, P-TRAPS WITH C.O.PLUGS, QUARTER-TURN ANGLE SUPPLIES AND STOP VALVES. INSULATE EXPOSED WASTE AND WATER PIPING.

SK-3 LAY-IN SINK 1 1/2" 1 1/2" 1 1/2" 1/2" 1/2" STAINLESS STEEL, SINGLE BOWL, COUNTERTOP SINK: ELKAY MODEL LR1720 17"x20"x7-5/8" SINGLE BOWL SINK. PROVIDE SLOAN"OPTIMA I.Q." MODEL EAF-150-ISM, BATTERY POWERED GOOSENECK FAUCET WITH THERMOSTATIC MIXING VALVE FOR SINGLEFAUCET. PROVIDE 0.5 GPM VANDAL RESISTANT AERATOR. PROVIDE CONICAL STRAINER, P-TRAP WITH C.O. PLUG, 1 1/2' TAILPIECE,QUARTER-TURN ANGLE SUPPLIES AND STOP VALVES. INSULATE EXPOSED WASTE AND WATER PIPING. PROVIDE CHICAGO FAUCETMODEL 712-ABCP DECK MOUNTED, SINGLE HOLE, CHROM PLATED GLASS FILLER WITH DUAL SCREEN OUTLER, ADJUSTABLE VOLUMECONTROL, BRASS PISTON VALVE, COATED METAL LOCKING CLIP, INTEGRAL ONE PIECE SPOUT, AND ECAST CONSTRUCTION.

SK-4 LAY-IN SINK 1 1/2" 1 1/2" 1 1/2" 1/2" 1/2" VITREOUS CHINA, COUNTERTOP SINK WITH BATTERY, SENSOR FAUCET; KOHLER 'PENNINGTON" VITREOUS CHINA SINK, PROVIDESLOAN "OPTIMA I.Q." MODEL EAF-150-ISM, BATTERY POWERED SINK FAUCET WITH THERMOSTATIC MIXING VALVE FOR SINGLEFAUCET. PROVIDE 0.5 GPM VANDAL RESISTANT AERATOR, GRID DRAIN STRAINER, P-TRAP WITH C.O. PLUG, QUARTER TURN ANGLESUPPLIES AND STOP VALVES. INSULATE EXPOSED WASTE AND WATER PIPING.

SK-5 LAY-IN SINK 1 1/2" 1 1/2" PLASTER TRAP 1/2" 1/2" STAINLESS STEEL, SINGLE BOWL, COUNTERTOP SINK: ELKAY MODEL LR2219 22"x19-1/2"x7-5/8" SINGLE BOWL SINK, PROVIDE SLOAN"OPTIMA I.Q." MODEL EAF-750-ISM, BATTERY POWERED GOOSENECK FAUCET. WITH THERMOSTATIC MIXING VALVE FOR SINGLEFAUCET. PROVIDE 1.5 GPM VANDAL RESISTANT AERATOR. PROVIDE CONICAL STRAINER, 1 1/2' TAILPIECE, PLASTER TRAP,QUARTER-TURN ANGLE SUPPLIES AND STOP VALVES. INSULATE EXPOSED WASTE AND WATER PIPING. PROVIDE PATTERSON DENTALSUPPLY MODEL 092-5503 PLASTER TRAP. PROVIDE IN-SINK-ERATOR MODEL F-H3300 INSTANT HOT WITH MODEL SST-FLTR F-201FILTRATION SYSTEM AND IN-SINK-ERATOR STAINLESS STEEL TANK.

SK-6 LAY-IN SINK 1 1/2" 1 1/2" 1 1/2" 1/2" 1/2" STAINLESS STEEL, SINGLE BOWL, COUNTERTOP SINK: ELKAY MODEL LR2219 22"x19-1/2"x7-5/8" SINGLE BOWL SINK, PROVIDE SLOAN"OPTIMA I.Q." MODEL EAF-150-ISM, BATTERY POWERED SINK FAUCET WITH THERMOSTATIC MIXING VALVE FOR SINGLE FAUCET.PROVIDE 0.5 GPM VANDAL RESISTANT AERATOR. PROVIDE CONICAL STRAINER, 1 1/2' TAILPIECE, P-TRAP WITH C.O. PLUG,QUARTER-TURN ANGLE SUPPLIES AND STOP VALVES. INSULATE EXPOSED WASTE AND WATER PIPING.

SK-7 LAY-IN SINK 1 1/2" 1 1/2" PLASTER TRAP 3/4" 3/4" STAINLESS STEEL, SINGLE BOWL, COUNTERTOP SINK: ELKAY MODEL LRAD2219 22"x19.5"x6" SINGLE BOWL SINK, PROVIDE CHICAGOFAUCET MODEL 895-317GN2A, MANUAL, GOOSENECK FAUCET WITH 4 INCH WRIST BLADE HANDLES, CERAMIC OPERATING CARTRIDGE,ECAST CONSTRUCTION, AND 5-1/4" SWING GOOSENECK FAUCET. PROVIDE 1.5 GPM VANDAL RESISTANT AERATOR. PROVIDE DELTAMODEL RP28900 SPRAY AND HOSE ASSEMBLY. PROVIDE CONICAL STRAINER, 1 1/2' TAILPIECE, PLASTER TRAP, QUARTER-TURN ANGLESUPPLIES AND STOP VALVES. INSULATE EXPOSED WASTE AND WATER PIPING. PROVIDE PATTERSON DENTAL SUPPLY MODEL092-5503 PLASTER TRAP.

SK-8 LAY-IN SINK 1 1/2" 1 1/2" 1 1/2" 1/2" 1/2" STAINLESS STEEL, SINGLE BOWL, COUNTERTOP SINK: ELKAY MODEL LR2219 22"x19-1/2"x7-5/8" SINGLE BOWL SINK, PROVIDE SLOAN"OPTIMA I.Q." MODEL EAF-150-ISM, BATTERY POWERED SINK FAUCET WITH THERMOSTATIC MIXING VALVE FOR SINGLE FAUCET.PROVIDE 0.5 GPM VANDAL RESISTANT AERATOR. PROVIDE CONICAL STRAINER, 1 1/2' TAILPIECE, P-TRAP WITH C.O. PLUG,QUARTER-TURN ANGLE SUPPLIES AND STOP VALVES. INSULATE EXPOSED WASTE AND WATER PIPING.

SK-9 LAY-IN SINK 1 1/2" 1 1/2" 1 1/2" 1/2" 1/2" STAINLESS STEEL, SINGLE BOWL, COUNTERTOP SINK: ELKAY MODEL DLR312212 31"x22"x11-5/8" SINGLE BOWL SINK, PROVIDECHICAGO FAUCET MODEL 895-317GN8A, MANUAL, GOOSENECK FAUCET WITH 4 INCH WRIST BLADE HANDLES, CERAMIC OPERATINGCARTRIDGE, ECAST CONSTRUCTION, AND 8" SWING GOOSENECK FAUCET. PROVIDE 1.5 GPM VANDAL RESISTANT AERATOR. PROVIDECONICAL STRAINER, 1 1/2' TAILPIECE, P-TRAP WITH C.O. PLUG, QUARTER-TURN ANGLE SUPPLIES AND STOP VALVES. INSULATEEXPOSED WASTE AND WATER PIPING.

SK-10 LAY-IN SINK (2) 1 1/2" 2" (2) 1 1/2" 1/2" 1/2" STAINLESS STEEL, DOUBLE BOWL, COUNTERTOP SINK: ELKAY MODEL LR2519 25"x19-1/2" DOUBLE BOWL SINK, 10"x14"x7-5/8" EACHBASIN. PROVIDE DELTA FAUCET MODEL 9159-DST, MANUAL, GOOSENECK FAUCET WITH SINGLE HANDLE, PULL DOWN SPRAYER, ANDSWING GOOSENECK FAUCET. PROVIDE 1.8 GPM MAXIMUM FLOW RATE. PROVIDE CONICAL STRAINER, 1 1/2' TAILPIECE, P-TRAPS WITHC.O. PLUGS, QUARTER-TURN ANGLE SUPPLIES AND STOP VALVES. INSULATE EXPOSED WASTE AND WATER PIPING.

SK-11 EPOXY SINK 1 1/2" 1 1/2" ACID WASTENEUTRALIZATION

TANK

3/4" 3/4" ARCHITECTURALLY PROVIDED EPOXY SINK. PROVIDE CHICAGO FAUCETS DECK MOUNTED FAUCET MODEL 895-317GN8A, MANUAL,GOOSENECK FAUCET WITH 4 INCH WRIST BLADE HANDLES, CERAMIC OPERATING CARTRIDGE AND SWING GOOSENECK FAUCET.PROVIDE 1.5 GPM VANDAL RESISTANT AERATOR. PROVIDE CONICAL STRAINER, 1 1/2' TAILPIECE, 5 GALLON NUETRALIZATION TANKWITH C.O. PLUG, QUARTER-TURN ANGLE SUPPLIES AND STOP VALVES. INSULATE EXPOSED WASTE AND WATER PIPING. PROVIDEZURN MODEL ORION STYLE 9 NEUTRALIZATION TANK.

SK-12 LAY-IN SINK 1 1/2" 1 1/2" 1 1/2" 1/2" 1/2" STAINLESS STEEL, SINGLE BOWL, COUNTERTOP SINK: ELKAY MODEL LR2219 22"x19-1/2"x7-5/8" SINGLE BOWL SINK, PROVIDE CHICAGOFAUCET MODEL 895-317GN2A, MANUAL, GOOSENECK FAUCET WITH 4 INCH WRIST BLADE HANDLES, CERAMIC OPERATING CARTRIDGEAND RIGID GOOSENECK FAUCET. PROVIDE 0.5 GPM VANDAL RESISTANT AERATOR. PROVIDE CONICAL STRAINER, 1 1/2' TAILPIECE,P-TRAP WITH C.O. PLUG, QUARTER-TURN ANGLE SUPPLIES AND STOP VALVES. INSULATE EXPOSED WASTE AND WATER PIPING.

T-1 TURRET - - - - - DUPLEX TURRET: DECK MOUNTED, VANDAL RESISTANT TURRET WITH TWO BALL VALVES AT 90 DEG ANGLE, ANSI CERTIFIED FOR GASSERVICE. PROVIDE NON-REMOVABLE SERRATED NOZZLE OUTLET WITH CHECK VALVE, LEVER HANDLES WITH INDICATOR BUTTONFOR NATURAL GAS SERVICE, AND ANTI-ROTATIONAL BODY DECK PIN.

UR-1 URINAL 3" 1 1/2" INTEGRAL 3/4" - WALL HUNG VITREOUS CHINA URINAL; KOHLER "BARDON SUPERIOR" MODEL K-49060-ET, 0.5 GPF HIGH EFFICIENCY URINAL WITH TOPSPUD AND SLOAN VALVE COMPANY "ECOS" MODEL 8186-0.5, CHROME PLATED, EXPOSED, BATTERY POWERED, SENSOR OPERATED,URINAL FLUSH VALVE WITH OVERRIDE BUTTON.

WC-1 WALL HUNG WATER CLOSET 4" 2" INTEGRAL 1 1/2" - WALL MOUNTED TYPE, VITREOUS CHINA WATER CLOSET; KOHLER "KINGSTON" MODEL K-4325. PROVIDE SLOAN "ECOS" MODEL8111-1.6/1.1 DUAL FLUSH, EXPOSED FLUSH VALVE. BEMIS MODEL 1955SSCT ELONGATED "TOILET SEAT" WITH ANTI-MICROBIALCOMP0UND AND STA-TITE FASTENING SYSTEM.

WC-2 FLOOR MOUNTED WATER CLOSET 4" 2" INTEGRAL 1 1/2" - FLOOR MOUNTED TYPE, VITREOUS CHINA WATER CLOSET; KOHLER 'WELLWORTH" MODEL K-4406. PROVIDE SLOAN "ECOS" MODEL8111-1.6/1.1 DUAL FLUSH, EXPOSED FLUSH VALVE. BEMIS MODEL 1955SSCT ELONGATED "TOILET SEAT" WITH ANTI-MICROBIALCOMP0UND AND STA-TITE FASTENING SYSTEM.

WC-3 FLOOR MOUNTED WATER CLOSET 4" 2" INTEGRAL 1" - FLOOR MOUNTED, TANK TYPE, VITREOUS CHINA WATER CLOSET; KOHLER "HIGHLINE" MODEL K-3979, 1.6 GPF, TWO-PIECE,ELONGATED TOILET SYSTEM. BEMIS MODEL 1955SSCT ELONGATED "TOILET SEAT" WITH ANTI-MICROBIAL COMP0UND AND STA-TITEFASTENING SYSTEM.

PLUMBING EQUIPMENT SCHEDULE

MARK EQUIPMENT SIZE ELECTRICAL MANUFACTURER AND MODEL NUMBEREWC-1 ELECTRIC WATER COOLER - 115V.-1ø ELKAY "EZH2O SYSTEM" MODEL - EZSTL8WSLK, BARRIER-FREE, BI-LEVEL, S.S. ELECTRIC WATER COOLER

WITH BOTTLE FILLING STATION; PROVIDE WITH CORD AND PLUG AND VANDAL RESISTANT BUBBLER.

DENTAL AIR COMPRESSOR SCHEDULE

MARK MANUFACTURER MODEL AREA SERVEDNO.

USERSCFM @ 80

PSITANK CAPACITY

(GAL)SOUND(DBA)

MAXIMUM DIMENSIONS

TOTAL HPVOLTAGE /

PHASE AMPS NOTESHEIGHT (IN) LENGTH (IN) WIDTH (IN)DAP-1 MIDMARK POWERAIR P72 3RD FLR DENTAL LABS 7-10 15.9 32 68 39 30 40 4.8 208 / 1 29

DAP-2 MIDMARK POWERAIR P72 3RD FLR DENTAL LABS 7-10 15.9 32 68 39 30 40 4.8 208 / 1 29

NOTES:1. PROVIDE SYSTEM COMPLETE WITH INLINE FILTER/EXHAUST MUFFLER, SWING TYPE CHECK VALVE, PRE-TANK FILTER AV460C, AND VACUUM SWITCH.

DENTAL VACUUM PUMP SCHEDULE

MARK MANUFACTURER MODEL AREA SERVEDNO.

USERSVACUUM

("HG)NO.

VACUUMS TOTAL HP

DIMENSIONS

VOLTAGE AMPS NOTESHEIGHT (IN) LENGTH (IN) WIDTH (IN)DVP-1 MIDMARK POWERVAC G14 3RD FLR DENTAL LABS 14-20 12 2 6 59 22 56 208 / 1 20 X 2

NOTES:1. PROVIDE SYSTEM COMPLETE WITH AMALGAM SEPARATOR SOLMETEX MODEL HG5 FOR EACH PUMP, VACUUM SWITCH, SWING TYPE CHECK VALVE, AND REMOTE CONTROL PANEL MIDMARK MODEL 77001599.

GENERAL SERVICE VACUUM PUMP SCHEDULE

MARK MANUFACTURER MODELAREA

SERVEDAIRFLOW

(CFM)TANK CAPACITY

(GAL.)

MAXIMUM DIMENSIONS

HP VOLTAGE / PHASE NOTESHEIGHT (IN) LENGTH (IN) WIDTH (IN)VACP-1 GAST 0523-V184T-G588DX 4TH FLR NURSING 4.5 2 17 21 10 1/4 115 / 1 OILLESS SYSTEM, 62 dBA

GENERAL SERVICE AIR COMPRESSOR SCHEDULE

MARK MANUFACTURER MODEL AREA SERVEDCFM @ 55

PSIGTANK CAPACITY

(GAL)SOUND(DBA)

MAXIMUM DIMENSIONS

TOTAL HPVOLTAGE /

PHASE NOTESHEIGHT (IN) LENGTH (IN) WIDTH (IN)ACP-1 GAST 8HDM-30DTD-M853 4TH FLR NURSING AND

3RD FLR MATERIALS LAB17 60 76 35 48 38 2 (2) 460 / 3

NOTES:1. PROVIDE SYSTEM COMPLETE WITH 0.01 MICRON COALESCENT FILTER, DESSICANT AIR DRYER, AUTO TANK DRAIN ASSEMBLY, PRESSURE GAUGES, CHECK VALVE, PRESSURE SWITCH, AND REMOTE CONTROL PANEL MIDMARK MODEL 77001599.

NOTES:1. PROVIDE SYSTEM COMPLETE WITH INTAKE FILTER, AUTO TANK DRAIN ASSEMBLY, PRESSURE GAUGES, CHECK VALVE, REFRIGERATED DRYER, PRESSURE SWITCH, AND DUPLEX CONTROL PANEL.

NOTES:1. EMERGENCY EYEWASHES DISCHARGE OVER SINK. PIPING SERVING EMERGENCY EYEWASH/SINK SHALL BE 3/4" CW AND 3/4" HW. SIZES INDICATED IN SCHEDULE ARE CONNECTION SIZES TO INDIVIDUAL FIXTURES.

Page 9: MECHANICAL SYMBOLS MECHANICAL DRAWING LEGEND111841/AN~2...MECHANICAL SYMBOLS MECHANICAL SYSTEM INDICATION HEAVY LINE-WEIGHT INDICATES NEW WORK LIGHT LINE WEIGHT-INDICATES EXISTING

DN

DN

DN

234

EF

EF

EF

COOLINGTOWER

EF-5

REMOVE EXISTING EXHAUST FANCOMPLETE AND PREP ROOF CURBFOR FUTURE CONNECTION.

1

J

2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

G

H

K

2.1 8.17.1

6

66

6

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

GRCC Bid No: 1213-3294

C:\

Revit

Lo

calF

iles\7

1108000

CH

M12_C

EN

TR

AL

_K

sim

on

eau

x.r

vt

3/5

/2013

6:1

0:2

4P

M

1/8" = 1'-0"

CJZ

PETER AND PAT COOKACADEMIC HALL

RENOVATION

GRAND RAPIDS, MI

ROOF MECHANICALDEMOLITION PLAN -PHASE 1

MD161.17111.080.00

RC

SHEET METAL DEMOLITION KEY NOTES

1 REMOVE EXISTING DUAL DUCT TERMINAL UNITS COMPLETE WITHASSOCIATED DUCTWORK AND DIFFUSERS.

2 REMOVE EXISTING FAN POWERED BOXES COMPLETE WITHASSOCIATED DUCTWORK, HEATING COILS, AND DIFFUSER.

3 REMOVE EXISTING EXHAUST DIFFUSER AND ASSOCIATEDDUCTWORK BACK TO CHASE AND CAP.

4 REMOVE EXISTING EXHAUST HOOD COMPLETE WITH ASSOCIATEDEXHAUST DUCTWORK BACK TO LOBBY AND CAP FOR FUTURECONNECTION.

5 REMOVE EXISTING RETURN DIFFUSERS COMPLETE WITHASSOCIATED DUCTWORK. REMOVE RETURN DUCTWORK BACK TOMECHANICAL ROOM AND CAP FOR FUTURE CONNECTION.

6 DISCONNECT AND REMOVE EXISITNG EXHAUST FAN COMPLETEINCLUDING ALL CONTROLS AND DUCTWORK

SHEET METAL GENERAL DEMOLITION NOTES

1. ANY INTERRUPTIONS OF EXISTING SERVICES OR EQUIPMENT SHALL BEPERFORMED AT A TIME APPROVED IN ADVANCE BY THE OWNER'SREPRESENTATIVE SO AS NOT TO INTERFERE WITH THE BUILDINGOPERATION.

2. THESE DRAWINGS INDICATE THE GENERAL EXTENT OF WORK. THE EXTENTOF DEMOLITION SHALL BE AS REQUIRED BY THE NEW WORK AND REMOVALOF MATERIALS/COMPONENTS NOT REQUIRED FOR THE NEW ANDRENOVATED SYSTEMS.

3. ALL MECHANICAL SYSTEMS TO BE REMOVED SHALL BE REMOVED COMPLETEWITH ALL RELATED ITEMS INCLUDING HANGERS, SUPPORTS, CONTROLS, ETC.CAP ALL OPEN PIPES AND DUCTS. PATCH AND SEAL ALL OPENINGS AS ARESULT OF DEMOLITION IN RATED WALLS TO MAINTAIN EXISTING WALL'S FIREOR SMOKE RATING AND TO MATCH EXISTING ADJACENT SURFACES.

4. ALL ITEMS AND EQUIPMENT REMOVED SHALL REMAIN PROPERTY OF THEOWNER UNLESS POSSISSION RIGHTS ARE WAIVED. CONTRACTOR SHALLMEET WITH OWNER PRIOR TO START OF DEMOLITION TO DETERMINE WHICHITEMS ARE TO BE SALVAGED. CONTRACTOR SHALL REMOVE REMAININGITEMS FROM SITE.

5. FIELD VERIFY EXACT SIZE AND LOCATION OF ALL EXISTING SERVICES PRIORTO DEMOLITION.

1/8" = 1'-0"A3

ROOF SHEET METAL DEMOLITION PLAN - PHASE 1

X

02-20-2013 BIDS

03-05-2013 ADDENDUM 2

Page 10: MECHANICAL SYMBOLS MECHANICAL DRAWING LEGEND111841/AN~2...MECHANICAL SYMBOLS MECHANICAL SYSTEM INDICATION HEAVY LINE-WEIGHT INDICATES NEW WORK LIGHT LINE WEIGHT-INDICATES EXISTING

DN

UP

DN

UP

DN

UP

TVFD

1-1/4" HWHSTO 3RD LEVELFINNED TUBE

1" HWHS 1" HWHR 1-1/4" HWHS

1-1/4" HWHR

1-1/4" HWHR

1-1/4" HWHR

FINNED TUBERADIATION (TYP)

3

3

3

1

8" CWRUP & DN8" CWSUP & DN

6" HHWRUP & DN

6" CHWSUP & DN

8" CHWRUP & DN

2" HHWRUP & DN

4

1

J

2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

G

H

K

2.1 8.17.1

11

11

11

11

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

GRCC Bid No: 1213-3294

C:\

Revit

Lo

calF

iles\7

1108000

CH

M12_C

EN

TR

AL

_K

sim

on

eau

x.r

vt

3/5

/2013

6:1

0:3

3P

M

1/8" = 1'-0"

CJZ

PETER AND PAT COOKACADEMIC HALL

RENOVATION

GRAND RAPIDS, MI

LEVEL 2 HVAC PIPINGDEMOLITION PLAN -PHASE 2

MD221.27111.080.00

RC

HVAC PIPING GENERAL DEMOLITION NOTES

1. ANY INTERRUPTIONS OF EXISTING SERVICES OR EQUIPMENT SHALL BEPERFORMED AT A TIME APPROVED IN ADVANCE BY THE OWNER’SREPRESENTATIVE SO AS NOT TO INTERFERE WITH THE BUILDINGOPERATION.

2. THESE DRAWINGS INDICATE THE GENERAL EXTENT OF WORK. THE EXTENTOF DEMOLITION SHALL BE AS REQUIRED BY THE NEW WORK AND REMOVALOF MATERIALS/COMPONENTS NOT REQUIRED FOR THE NEW ANDRENOVATED SYSTEMS.

3. ALL MECHANICAL SYSTEMS TO BE REMOVED SHALL BE REMOVEDCOMPLETE WITH ALL RELATED ITEMS INCLUDING HANGERS, SUPPORTS,CONTROLS, ETC CAP ALL OPEN PIPES AND DUCTS. PATCH AND SEAL ALLOPENINGS AS A RESULT OF DEMOLITION IN RATED WALLS TO MAINTAINEXISTING WALL’S FIRE OR SMOKE RATING AND TO MATCH EXISTINGADJACENT SURFACES

4. ALL ITEMS AND EQUIPMENT REMOVED SHALL REMAIN PROPERTY OF THEOWNER UNLESS POSSESSION RIGHTS ARE WAIVED. CONTRACTOR SHALLMEET WITH OWNER PRIOR TO START OF DEMOLITION TO DETERMINEWHICH ITEMS ARE TO BE SALVAGED. CONTRACTOR SHALL REMOVEREMAINING ITEMS FROM SITE.

5. FIELD VERIFY EXACT SIZE AND LOCATION OF ALL EXISTING SERVICESPRIOR TO START OF DEMOLITION.

DEMOLITION KEY NOTES

1 REMOVE EXISTING AIR HANDLING UNIT REHEAT COIL COMPLETE WITHASSOCIATED PIPING AND PUMP. REMOVE PIPING BACK TO NEXT ACTIVEBRANCH AND CAP FOR FUTURE CONNECTION. EXISTING PREHEAT COIL TOREMAIN.

2 REMOVE EXISTING DUCT MOUNTED HEATING COIL COMPLETE WITHASSOCIATED PIPING. REMOVE PIPING BACK TO MECHANICAL ROOM ANDCAP FOR FUTURE CONNECTION.

3 REMOVE EXISTING FINNED TUBE RADIATION COMPLETE WITH ASSOCIATEDPIPING. REMOVE PIPING BACK TO CHASE AND CAP.

4 REMOVE EXISTING CHILLED WATER PUMP COMPLETE WITH ASSOCIATEDCONTROLS.

5. DISCONNECT AND REMOVE EXISTING AHU SUPPLY AIR DUCT COMPLETE,SEE NEW WORK PLANS FOR NEW DUCTWORK

6. DISCONNECT AND REMOVE EXISTING AHU FILTER RACK, EXISTING FILTERBOX TO REMAIN FOR NEW WORK

7. DISCONNECT AND REMOVE EXISTING RETURN FAN MOTOR, BELTS ANDSHEAVES, SEE NEW WORK PLANS

8. EXISTING AHU SUPPLY FAN VFD TO REMAIN

9. DISCONNECT AND REMOVE EXSITING AHU BELTS AND SHEEVES, SEE NEWWORK PLANS AND DETAILS FOR NEW WORK

10. DISCONNECT AND REMOVE EXISTING DUCTWORK COMPLETE INCLUDINGALL HANGERS AND SUPPORTS. PATCH OPENINGS TO MATCH EXISTING

11. DISCONNECT AND REMOVE EXISTING HYDRONIC PIPING AS REQUIRED TOFACILITATE THE INSTALLATION OF NEW HVAC WORK

1/8" = 1'-0"A3

LEVEL 2 HVAC PIPING DEMOLITION PLAN - PHASE 2

X

02-20-2013 BIDS

03-05-2013 ADDENDUM 2

Page 11: MECHANICAL SYMBOLS MECHANICAL DRAWING LEGEND111841/AN~2...MECHANICAL SYMBOLS MECHANICAL SYSTEM INDICATION HEAVY LINE-WEIGHT INDICATES NEW WORK LIGHT LINE WEIGHT-INDICATES EXISTING

DN

UP

DN

UP

DN

UP

VFD

8" CWRUP & DN8" CWSUP & DN

1-1/4" HWHS 1-1/4" HWHS 1-1/4" HWHR 1-1/4" HWHS

1-1/4" HWHR1-1/4" HWHR

6" CHWRUP & DN

6" CHWSUP & DN

6" HHWRUP & DN

234

2" HHWRUP & DN

1

J

2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

G

H

K

2.1 8.17.1

1 1/2" HHWR

3

(TYPICAL)

3

(TYPICAL)

3

(TYPICAL)

3

(TYPICAL)

(TYPICAL)

3

(TYPICAL)

3

11

11

11

11

3

(TYPICAL)

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

GRCC Bid No: 1213-3294

C:\

Revit

Lo

calF

iles\7

1108000

CH

M12_C

EN

TR

AL

_K

sim

on

eau

x.r

vt

3/5

/2013

6:1

0:4

3P

M

1/8" = 1'-0"

CJZ

PETER AND PAT COOKACADEMIC HALL

RENOVATION

GRAND RAPIDS, MI

LEVEL 3 HVAC PIPINGDEMOLITION PLAN -PHASE 1

MD231.17111.080.00

RC

HVAC PIPING GENERAL DEMOLITION NOTES

1. ANY INTERRUPTIONS OF EXISTING SERVICES OR EQUIPMENT SHALL BEPERFORMED AT A TIME APPROVED IN ADVANCE BY THE OWNER’SREPRESENTATIVE SO AS NOT TO INTERFERE WITH THE BUILDINGOPERATION.

2. THESE DRAWINGS INDICATE THE GENERAL EXTENT OF WORK. THE EXTENTOF DEMOLITION SHALL BE AS REQUIRED BY THE NEW WORK AND REMOVALOF MATERIALS/COMPONENTS NOT REQUIRED FOR THE NEW ANDRENOVATED SYSTEMS.

3. ALL MECHANICAL SYSTEMS TO BE REMOVED SHALL BE REMOVEDCOMPLETE WITH ALL RELATED ITEMS INCLUDING HANGERS, SUPPORTS,CONTROLS, ETC CAP ALL OPEN PIPES AND DUCTS. PATCH AND SEAL ALLOPENINGS AS A RESULT OF DEMOLITION IN RATED WALLS TO MAINTAINEXISTING WALL’S FIRE OR SMOKE RATING AND TO MATCH EXISTINGADJACENT SURFACES

4. ALL ITEMS AND EQUIPMENT REMOVED SHALL REMAIN PROPERTY OF THEOWNER UNLESS POSSESSION RIGHTS ARE WAIVED. CONTRACTOR SHALLMEET WITH OWNER PRIOR TO START OF DEMOLITION TO DETERMINEWHICH ITEMS ARE TO BE SALVAGED. CONTRACTOR SHALL REMOVEREMAINING ITEMS FROM SITE.

5. FIELD VERIFY EXACT SIZE AND LOCATION OF ALL EXISTING SERVICESPRIOR TO START OF DEMOLITION.

DEMOLITION KEY NOTES

1 REMOVE EXISTING AIR HANDLING UNIT REHEAT COIL COMPLETE WITHASSOCIATED PIPING AND PUMP. REMOVE PIPING BACK TO NEXT ACTIVEBRANCH AND CAP FOR FUTURE CONNECTION. EXISTING PREHEAT COIL TOREMAIN.

2 REMOVE EXISTING DUCT MOUNTED HEATING COIL COMPLETE WITHASSOCIATED PIPING. REMOVE PIPING BACK TO MECHANICAL ROOM ANDCAP FOR FUTURE CONNECTION.

3 REMOVE EXISTING FINNED TUBE RADIATION COMPLETE WITH ASSOCIATEDPIPING. REMOVE PIPING BACK TO CHASE AND CAP.

4 REMOVE EXISTING CHILLED WATER PUMP COMPLETE WITH ASSOCIATEDCONTROLS.

5. DISCONNECT AND REMOVE EXISTING AHU SUPPLY AIR DUCT COMPLETE,SEE NEW WORK PLANS FOR NEW DUCTWORK

6. DISCONNECT AND REMOVE EXISTING AHU FILTER RACK, EXISTING FILTERBOX TO REMAIN FOR NEW WORK

7. DISCONNECT AND REMOVE EXISTING RETURN FAN MOTOR, BELTS ANDSHEAVES, SEE NEW WORK PLANS

8. EXISTING AHU SUPPLY FAN VFD TO REMAIN

9. DISCONNECT AND REMOVE EXSITING AHU BELTS AND SHEEVES, SEE NEWWORK PLANS AND DETAILS FOR NEW WORK

10. DISCONNECT AND REMOVE EXISTING DUCTWORK COMPLETE INCLUDINGALL HANGERS AND SUPPORTS. PATCH OPENINGS TO MATCH EXISTING

11. DISCONNECT AND REMOVE EXISTING HYDRONIC PIPING AS REQUIRED TOFACILITATE THE INSTALLATION OF NEW HVAC WORK

1/8" = 1'-0"A3

LEVEL 3 HVAC PIPING DEMOLITION PLAN - PHASE 1

X

02-20-2013 BIDS

03-05-2013 ADDENDUM 2

Page 12: MECHANICAL SYMBOLS MECHANICAL DRAWING LEGEND111841/AN~2...MECHANICAL SYMBOLS MECHANICAL SYSTEM INDICATION HEAVY LINE-WEIGHT INDICATES NEW WORK LIGHT LINE WEIGHT-INDICATES EXISTING

DN

UP

DN

UP

DN

UP

VFD

1-1/4" HWHS 1-1/4" HWHS 1-1/4" HWHR 1-1/4" HWHS

FINNED TUBERADIATION (TYP)

1-1/4" HWHR1-1/4" HWHR

3

3

3

1

4

8" CWRUP & DN8" CWSUP & DN

6" HHWRUP & DN6" HHWSUP & DN

6" CHWSUP & DN

6" CHWRUP & DN

2" HHWRUP & DN

1

J

2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

G

H

K

2.1 8.17.1

2" HHWS2" HHWR

2" HHWS

2" HHWS

1 1/2" HHWR

11

11

11

11

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

GRCC Bid No: 1213-3294

C:\

Revit

Lo

calF

iles\7

1108000

CH

M12_C

EN

TR

AL

_K

sim

on

eau

x.r

vt

3/5

/2013

6:1

0:5

2P

M

1/8" = 1'-0"

CJZ

PETER AND PAT COOKACADEMIC HALL

RENOVATION

GRAND RAPIDS, MI

LEVEL 3 HVAC PIPINGDEMOLITION PLAN -PHASE 2

MD231.27111.080.00

RC

HVAC PIPING GENERAL DEMOLITION NOTES

1. ANY INTERRUPTIONS OF EXISTING SERVICES OR EQUIPMENT SHALL BEPERFORMED AT A TIME APPROVED IN ADVANCE BY THE OWNER’SREPRESENTATIVE SO AS NOT TO INTERFERE WITH THE BUILDINGOPERATION.

2. THESE DRAWINGS INDICATE THE GENERAL EXTENT OF WORK. THE EXTENTOF DEMOLITION SHALL BE AS REQUIRED BY THE NEW WORK AND REMOVALOF MATERIALS/COMPONENTS NOT REQUIRED FOR THE NEW ANDRENOVATED SYSTEMS.

3. ALL MECHANICAL SYSTEMS TO BE REMOVED SHALL BE REMOVEDCOMPLETE WITH ALL RELATED ITEMS INCLUDING HANGERS, SUPPORTS,CONTROLS, ETC CAP ALL OPEN PIPES AND DUCTS. PATCH AND SEAL ALLOPENINGS AS A RESULT OF DEMOLITION IN RATED WALLS TO MAINTAINEXISTING WALL’S FIRE OR SMOKE RATING AND TO MATCH EXISTINGADJACENT SURFACES

4. ALL ITEMS AND EQUIPMENT REMOVED SHALL REMAIN PROPERTY OF THEOWNER UNLESS POSSESSION RIGHTS ARE WAIVED. CONTRACTOR SHALLMEET WITH OWNER PRIOR TO START OF DEMOLITION TO DETERMINEWHICH ITEMS ARE TO BE SALVAGED. CONTRACTOR SHALL REMOVEREMAINING ITEMS FROM SITE.

5. FIELD VERIFY EXACT SIZE AND LOCATION OF ALL EXISTING SERVICESPRIOR TO START OF DEMOLITION.

DEMOLITION KEY NOTES

1 REMOVE EXISTING AIR HANDLING UNIT REHEAT COIL COMPLETE WITHASSOCIATED PIPING AND PUMP. REMOVE PIPING BACK TO NEXT ACTIVEBRANCH AND CAP FOR FUTURE CONNECTION. EXISTING PREHEAT COIL TOREMAIN.

2 REMOVE EXISTING DUCT MOUNTED HEATING COIL COMPLETE WITHASSOCIATED PIPING. REMOVE PIPING BACK TO MECHANICAL ROOM ANDCAP FOR FUTURE CONNECTION.

3 REMOVE EXISTING FINNED TUBE RADIATION COMPLETE WITH ASSOCIATEDPIPING. REMOVE PIPING BACK TO CHASE AND CAP.

4 REMOVE EXISTING CHILLED WATER PUMP COMPLETE WITH ASSOCIATEDCONTROLS.

5. DISCONNECT AND REMOVE EXISTING AHU SUPPLY AIR DUCT COMPLETE,SEE NEW WORK PLANS FOR NEW DUCTWORK

6. DISCONNECT AND REMOVE EXISTING AHU FILTER RACK, EXISTING FILTERBOX TO REMAIN FOR NEW WORK

7. DISCONNECT AND REMOVE EXISTING RETURN FAN MOTOR, BELTS ANDSHEAVES, SEE NEW WORK PLANS

8. EXISTING AHU SUPPLY FAN VFD TO REMAIN

9. DISCONNECT AND REMOVE EXSITING AHU BELTS AND SHEEVES, SEE NEWWORK PLANS AND DETAILS FOR NEW WORK

10. DISCONNECT AND REMOVE EXISTING DUCTWORK COMPLETE INCLUDINGALL HANGERS AND SUPPORTS. PATCH OPENINGS TO MATCH EXISTING

11. DISCONNECT AND REMOVE EXISTING HYDRONIC PIPING AS REQUIRED TOFACILITATE THE INSTALLATION OF NEW HVAC WORK

1/8" = 1'-0"A3

LEVEL 3 HVAC PIPING DEMOLITION PLAN - PHASE 2

X

02-20-2013 BIDS

03-05-2013 ADDENDUM 2

Page 13: MECHANICAL SYMBOLS MECHANICAL DRAWING LEGEND111841/AN~2...MECHANICAL SYMBOLS MECHANICAL SYSTEM INDICATION HEAVY LINE-WEIGHT INDICATES NEW WORK LIGHT LINE WEIGHT-INDICATES EXISTING

DN

UP

DN

UP

UP

DN

1619

2019

20

VFD

1-1/4" HWHS 1" HWHS 1" HWHR 1-1/4" HWHS

1-1/4" HWHR

1-1/4" HWHR

1-1/4" HWHR

FINNED TUBERADIATION (TYP) 3

3

3

3

3

3

1

6" CHWRUP & DN

6" CHWSUP & DN

6" HHWRUP & DN

8" CWSUP & DN

8" CWRUP & DN

234

4

1

J

2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

G

H

K

2.1 8.17.1

6" HHWS

1 1/4" HHWR

2" HHWS

2" HHWS2" HHWR 2" HHWS

11 11

11

11

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

GRCC Bid No: 1213-3294

C:\

Revit

Lo

calF

iles\7

1108000

CH

M12_C

EN

TR

AL

_K

sim

on

eau

x.r

vt

3/5

/2013

6:1

1:0

1P

M

1/8" = 1'-0"

CJZ

PETER AND PAT COOKACADEMIC HALL

RENOVATION

GRAND RAPIDS, MI

LEVEL 4 HVAC PIPINGDEMOLITION PLAN -PHASE 1

MD241.17111.080.00

RC

HVAC PIPING GENERAL DEMOLITION NOTES

1. ANY INTERRUPTIONS OF EXISTING SERVICES OR EQUIPMENT SHALL BEPERFORMED AT A TIME APPROVED IN ADVANCE BY THE OWNER’SREPRESENTATIVE SO AS NOT TO INTERFERE WITH THE BUILDINGOPERATION.

2. THESE DRAWINGS INDICATE THE GENERAL EXTENT OF WORK. THE EXTENTOF DEMOLITION SHALL BE AS REQUIRED BY THE NEW WORK AND REMOVALOF MATERIALS/COMPONENTS NOT REQUIRED FOR THE NEW ANDRENOVATED SYSTEMS.

3. ALL MECHANICAL SYSTEMS TO BE REMOVED SHALL BE REMOVEDCOMPLETE WITH ALL RELATED ITEMS INCLUDING HANGERS, SUPPORTS,CONTROLS, ETC CAP ALL OPEN PIPES AND DUCTS. PATCH AND SEAL ALLOPENINGS AS A RESULT OF DEMOLITION IN RATED WALLS TO MAINTAINEXISTING WALL’S FIRE OR SMOKE RATING AND TO MATCH EXISTINGADJACENT SURFACES

4. ALL ITEMS AND EQUIPMENT REMOVED SHALL REMAIN PROPERTY OF THEOWNER UNLESS POSSESSION RIGHTS ARE WAIVED. CONTRACTOR SHALLMEET WITH OWNER PRIOR TO START OF DEMOLITION TO DETERMINEWHICH ITEMS ARE TO BE SALVAGED. CONTRACTOR SHALL REMOVEREMAINING ITEMS FROM SITE.

5. FIELD VERIFY EXACT SIZE AND LOCATION OF ALL EXISTING SERVICESPRIOR TO START OF DEMOLITION.

DEMOLITION KEY NOTES

1 REMOVE EXISTING AIR HANDLING UNIT REHEAT COIL COMPLETE WITHASSOCIATED PIPING AND PUMP. REMOVE PIPING BACK TO NEXT ACTIVEBRANCH AND CAP FOR FUTURE CONNECTION. EXISTING PREHEAT COIL TOREMAIN.

2 REMOVE EXISTING DUCT MOUNTED HEATING COIL COMPLETE WITHASSOCIATED PIPING. REMOVE PIPING BACK TO MECHANICAL ROOM ANDCAP FOR FUTURE CONNECTION.

3 REMOVE EXISTING FINNED TUBE RADIATION COMPLETE WITH ASSOCIATEDPIPING. REMOVE PIPING BACK TO CHASE AND CAP.

4 REMOVE EXISTING CHILLED WATER PUMP COMPLETE WITH ASSOCIATEDCONTROLS.

5. DISCONNECT AND REMOVE EXISTING AHU SUPPLY AIR DUCT COMPLETE,SEE NEW WORK PLANS FOR NEW DUCTWORK

6. DISCONNECT AND REMOVE EXISTING AHU FILTER RACK, EXISTING FILTERBOX TO REMAIN FOR NEW WORK

7. DISCONNECT AND REMOVE EXISTING RETURN FAN MOTOR, BELTS ANDSHEAVES, SEE NEW WORK PLANS

8. EXISTING AHU SUPPLY FAN VFD TO REMAIN

9. DISCONNECT AND REMOVE EXSITING AHU BELTS AND SHEEVES, SEE NEWWORK PLANS AND DETAILS FOR NEW WORK

10. DISCONNECT AND REMOVE EXISTING DUCTWORK COMPLETE INCLUDINGALL HANGERS AND SUPPORTS. PATCH OPENINGS TO MATCH EXISTING

11. DISCONNECT AND REMOVE EXISTING HYDRONIC PIPING AS REQUIRED TOFACILITATE THE INSTALLATION OF NEW HVAC WORK

1/8" = 1'-0"A3

LEVEL 4 HVAC PIPING DEMOLITION PLAN - PHASE 1

X

02-20-2013 BIDS

03-05-2013 ADDENDUM 2

Page 14: MECHANICAL SYMBOLS MECHANICAL DRAWING LEGEND111841/AN~2...MECHANICAL SYMBOLS MECHANICAL SYSTEM INDICATION HEAVY LINE-WEIGHT INDICATES NEW WORK LIGHT LINE WEIGHT-INDICATES EXISTING

UP

DNDN

UP

DN

UP

VFD

VFDVFD

2

3

3

3

FINNED TUBERADIATION (TYP)

(E)

HH

WR

(E)

HH

WS

(E)

HH

WR

(E)

HH

WS

(E)

HH

WR

(E) HHWR(E) HHWS

(E)

HH

WR

(E)

HH

WS

(E) HHWR(E) HHWS

1-1/4" HWHS 1-1/4" HWHS 1-1/4" HWHR 1-1/4" HWHS

1-1/4" HWHR1-1/4" HWHR

8" CHWS DN

8" CHWS DN

6" HHWR DN

6" HHWS DN

8" CWS DN

8" CWR DN

234

4

DUCT MOUNTEDREHEAT COIL (TYP)

1

J

2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

G

H

K

2.1 8.17.1

1111

11

11

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

GRCC Bid No: 1213-3294

C:\

Revit

Lo

calF

iles\7

1108000

CH

M12_C

EN

TR

AL

_K

sim

on

eau

x.r

vt

3/5

/2013

6:1

1:1

0P

M

1/8" = 1'-0"

CJZ

PETER AND PAT COOKACADEMIC HALL

RENOVATION

GRAND RAPIDS, MI

LEVEL 5 HVAC PIPINGDEMOLITION PLAN -PHASE 1

MD251.17111.080.00

RC

HVAC PIPING GENERAL DEMOLITION NOTES

1. ANY INTERRUPTIONS OF EXISTING SERVICES OR EQUIPMENT SHALL BEPERFORMED AT A TIME APPROVED IN ADVANCE BY THE OWNER’SREPRESENTATIVE SO AS NOT TO INTERFERE WITH THE BUILDINGOPERATION.

2. THESE DRAWINGS INDICATE THE GENERAL EXTENT OF WORK. THE EXTENTOF DEMOLITION SHALL BE AS REQUIRED BY THE NEW WORK AND REMOVALOF MATERIALS/COMPONENTS NOT REQUIRED FOR THE NEW ANDRENOVATED SYSTEMS.

3. ALL MECHANICAL SYSTEMS TO BE REMOVED SHALL BE REMOVEDCOMPLETE WITH ALL RELATED ITEMS INCLUDING HANGERS, SUPPORTS,CONTROLS, ETC CAP ALL OPEN PIPES AND DUCTS. PATCH AND SEAL ALLOPENINGS AS A RESULT OF DEMOLITION IN RATED WALLS TO MAINTAINEXISTING WALL’S FIRE OR SMOKE RATING AND TO MATCH EXISTINGADJACENT SURFACES

4. ALL ITEMS AND EQUIPMENT REMOVED SHALL REMAIN PROPERTY OF THEOWNER UNLESS POSSESSION RIGHTS ARE WAIVED. CONTRACTOR SHALLMEET WITH OWNER PRIOR TO START OF DEMOLITION TO DETERMINEWHICH ITEMS ARE TO BE SALVAGED. CONTRACTOR SHALL REMOVEREMAINING ITEMS FROM SITE.

5. FIELD VERIFY EXACT SIZE AND LOCATION OF ALL EXISTING SERVICESPRIOR TO START OF DEMOLITION.

DEMOLITION KEY NOTES

1 REMOVE EXISTING AIR HANDLING UNIT REHEAT COIL COMPLETE WITHASSOCIATED PIPING AND PUMP. REMOVE PIPING BACK TO NEXT ACTIVEBRANCH AND CAP FOR FUTURE CONNECTION. EXISTING PREHEAT COIL TOREMAIN.

2 REMOVE EXISTING DUCT MOUNTED HEATING COIL COMPLETE WITHASSOCIATED PIPING. REMOVE PIPING BACK TO MECHANICAL ROOM ANDCAP FOR FUTURE CONNECTION.

3 REMOVE EXISTING FINNED TUBE RADIATION COMPLETE WITH ASSOCIATEDPIPING. REMOVE PIPING BACK TO CHASE AND CAP.

4 REMOVE EXISTING CHILLED WATER PUMP COMPLETE WITH ASSOCIATEDCONTROLS.

5. DISCONNECT AND REMOVE EXISTING AHU SUPPLY AIR DUCT COMPLETE,SEE NEW WORK PLANS FOR NEW DUCTWORK

6. DISCONNECT AND REMOVE EXISTING AHU FILTER RACK, EXISTING FILTERBOX TO REMAIN FOR NEW WORK

7. DISCONNECT AND REMOVE EXISTING RETURN FAN MOTOR, BELTS ANDSHEAVES, SEE NEW WORK PLANS

8. EXISTING AHU SUPPLY FAN VFD TO REMAIN

9. DISCONNECT AND REMOVE EXSITING AHU BELTS AND SHEEVES, SEE NEWWORK PLANS AND DETAILS FOR NEW WORK

10. DISCONNECT AND REMOVE EXISTING DUCTWORK COMPLETE INCLUDINGALL HANGERS AND SUPPORTS. PATCH OPENINGS TO MATCH EXISTING

11. DISCONNECT AND REMOVE EXISTING HYDRONIC PIPING AS REQUIRED TOFACILITATE THE INSTALLATION OF NEW HVAC WORK

1/8" = 1'-0"A3

LEVEL 5 HVAC PIPING DEMOLITION PLAN - PHASE 1

X

02-20-2013 BIDS

03-05-2013 ADDENDUM 2

Page 15: MECHANICAL SYMBOLS MECHANICAL DRAWING LEGEND111841/AN~2...MECHANICAL SYMBOLS MECHANICAL SYSTEM INDICATION HEAVY LINE-WEIGHT INDICATES NEW WORK LIGHT LINE WEIGHT-INDICATES EXISTING

DN

UP

DN

UP

DN

UP

M

60"x20"SA

72"x20"RA

SD-110" Ø310-2

SD-110" Ø250-4

SD-110" Ø250-4

SD-110" Ø250-4

SD-110" Ø280-4

SD-110" Ø270-2

SD-110" Ø320-4

SD-110" Ø280-4

SD-112" Ø345-4

SD-110" Ø225-4

SD-110" Ø225-4

SD-110" Ø225-4

SD-18" Ø175-2

SD-110" Ø315-4

SD-210" Ø315-4

SD-110" Ø310-4

CLASSROOM223

CLASSROOM221

STUDY222

CLASSROOM220

STUDY219

CLASSROOM218

VESTIBULE217

BREAKOUT ROOM216

CLASSROOM214

CLASSROOM212

CLASSROOM210

WORK CENTER209

CLASSROOM208

BUSINESSTUTORING

201

CLASSROOM211

CLASSROOM213

CLASSROOM215

CLASSROOM224 CLASSROOM

225

CLASSROOM226

BREAKOUT ROOM227

STUDY256

COMPUTER LAB202

OFFICE203

BRKRM204

CONF205

CONF206

CONF207

CORRIDOR251

STUDY257 CORRIDOR

253

MECHANICAL264

MEN'S261

WOMEN'S262

LOBBY260

TOILET263

RG-1RG-1RG-1

TYPICAL EACH VAVZONE, ROOM SENSOR

T TT

T

T

14"x14"

12"x12"

SD-110" Ø270-2

T

T

T

14"x14"

T

-220VAV

-221VAV

-222VAV

-223VAV

-224VAV

-250VAV

-213VAV

-215VAV

-251VAV

-216VAV

-225VAV -226VAV

-210VAV

-201AVAV

-206VAV

-205VAV

-201BVAV

-203VAV

RG-1

RG-1

RG-1

RG-1

RG-1 RG-1

RG-1

RG-1

RG-1

RG-1

RG-1

RG-1

RG-1

RG-1

SD-312x8200-3

SD-18" Ø175-4

SD-312x8200-2

SD-112" Ø520-5

SD-110" Ø260

SD-18" Ø130

SD-112" Ø375-4

SD-18" Ø140

SD-18" Ø140

SD-18" Ø140

60"x20"SA

RG-1

RG-1 RG-1

SD-18" Ø150-2

SD-18" Ø200

SD-110"Ø300-2

-227VAV-202VAV

RG-1

14"x14"

14"x

14"

12"x12"

14"x15"

14"x12"

14"x14" 14"x14"14"x14"

12"x

10"

-217VAV

20"x

12"

50"x20"

12"x12"

72"x

20"

RA

14"x

14"

10"ø

RG-1

T

T

14"x

13"

10"ø

6"ø

12"x

8"

T

6"ø

12"x

8"

T

6"ø

12"x

8"

12"ø

14"x

15"

12"x12"

6"ø

14"x

15"

5

20"x14"

5

30"x20"

SD-112" Ø375-4

14"x

15"

T

T

14"x

15"

5

20"x14"

5

30"x20"

-212VAV

14"x

15"

-214VAV

14"x

15"

12"ø

RG-2

RG-2

T

8"ø

16"ø

12"ø

12"ø

12"ø

24"x20" RABELLMOUTHBALANCE TO3000 CFM

60"x

20"

SA

48"x

20"

SA

14"x15"

12"x8"6"ø

14"x15" 12"ø

16"x14" RABELLMOUTHBALANCE TO1120 CFM

12"x12" RABELLMOUTHBALANCE TO540 CFM

12"ø

8"ø

RG-2

RG-2

12"x12" RABELLMOUTHBALANCE TO540 CFM

16"x14" RABELLMOUTHBALANCE TO1120 CFM

5

40"x20"

5

24"x20"

12"ø

16"x16" RABELLMOUTHBALANCE TO1380 CFM

12"x

8"

6"ø

T

SD-18" Ø200

6"ø

12"x8"

8"ø12"x12"

SD-18" Ø200

T

12"ø

20"x20"

20"x20" RA BELLMOUTHBALANCE TO 3250 CFM

20"x20"

20"x20" RA BELLMOUTHBALANCE TO 3250 CFM

RG-2

RG-2

RG-2

RG-2

RG-2

T

12"ø

12"ø

12"ø

60"x20"SA

12"ø

12"ø

12"x

12"

5 20"x14"

6

T

T

T

T

TS

RG-1

RG-1

12"ø

12"ø 8"ø

14"x

15"

T

10"ø72"x20"

RA

56"x

20"

RA

56"x

20"

RA

56"x20"RA6

24"x20"

40"x

20"

RA

14"x14" RABELLMOUTHBALANCE TO1280 CFM

24"x

20"

RA

40"x

20"

RA

24"x18"16"ø

RG-1

50"x

20"

30"x

20"

SA

T

56"x20"RA

255

12"x

8"

6"ø

T

T

T

T

TT

T

CORRIDOR252

STUDY255

-207VAV

-208VAV

-209VAV

-211VAV

-218VAV

-255VAV

-219VAV

-257VAV

-262VAV

7

7

7

7

7

7

7

BALANCE TO450 CFMEACH

BALANCE TO450 CFMEACH

SD-18" Ø175-2

56"x20"" RABELLMOUTHBALANCE TO5515 CFM

7

24"x18"" RABELLMOUTHBALANCE TO2600 CFM

7

7

7

14"x15"

SD-18" Ø150-2

10"x10"

10"x10"10

"x10

"

SD-18" Ø200

6"ø

6"ø

8"ø12"ø

EG-112" Ø450

EG-112" Ø450

EG-26" Ø100

EG-26" Ø758

8 8

8

8

12"ø

8

SD-18" Ø150-2

18"ø

1

J

2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

G

H

K

2.1 8.17.1

30"x

20"

SA

72"x20"RA

14"x14"

SD-110" Ø300-3

8"x12"

88

12"ø

5

20"x12"

5

20"x12"

8

8

48"x

20"

SA

SP

SF-2 STATICPRESSURESENSOR

9

9

9

9

9

9

9

9

99

9

9

9

24"x20"RA

120"x

24"

SA

60"x

20"

SA

10

RG-1

AFMSSF-2 AFMSLOCATION

9

J

6 7

H

K

7.1

16"x

10"

(E)18"x16"EXHAUSTDUCT UP

16"x10"

10"x4"

16"x10" 12"x10"

12"x8"

10"x6"10"x6"

10"x6"

26"x

6"

18"x

6"

(E)SA DUCTTO REMAIN

(E)EA DUCTTO REMAIN

SD-18" Ø200

EG-26" Ø75-2

SD-110" Ø215

EG-110" Ø450-2

EG-110" Ø450-2

SD-110" Ø215

(E)EA DUCTTO REMAIN

(E)EA DUCTTO REMAIN

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

GRCC Bid No: 1213-3294

C:\

Revit

Lo

calF

iles\7

1108000

CH

M12_C

EN

TR

AL

_K

sim

on

eau

x.r

vt

3/5

/2013

6:0

6:4

9P

M

1/8" = 1'-0"

CJZ

PETER AND PAT COOKACADEMIC HALL

RENOVATION

GRAND RAPIDS, MI

LEVEL 2 SHEET METALPLAN - PHASE 2

M121.27111.080.00

RC

SHEET METAL GENERAL NOTES

1. THESE DRAWINGS INDICATE THE GENERAL EXTENT OF WORK BUT ARE NOTFABRICATION DRAWINGS. COORDINATE SHEET METAL SYSTEMS WITH WORKOF ALL OTHER TRADES PRIOR TO ANY FABRICATION OR INSTALLATION.PROVIDE ALL FITTINGS, OFFSETS, AND TRANSITIONS, ETC. AS REQUIREDFOR A COMPLETE WORKABLE INSTALLATION.

2. PROVIDE ACCESS AROUND ALL NEW EQUIPMENT PER MANUFACTURERSRECOMMENDATIONS.

3. ALL SHEET METAL RELATED CORING THROUGH FLOORS SHALL BE BYMECHANICAL CONTRACTOR.

4. ALL DUCTWORK SHALL BE ROUTED AS HIGH AS POSSIBLE, UNLESSOTHERWISE NOTED. COORDINATE ROUTING WITH OTHER TRADES TO AVOIDINTERERENCES.

5. BALANCE ALL AIR SYSTEMS TO INDICATED AIR FLOW RATES.

6. DUCT SIZES TO DIFFUSERS SHALL MATCH NECK SIZE OF EACH. REFER TOGRILLE, REGISTER & DIFFUSER SCHEDULE.

7. ALL DUCTWORK SHALL BE INSULATED AND LABELED IN ACCORDANCE WITHTHE REQUIREMENTS OF THE PROJECT SPECIFICATION.

8. ALL DUCTWORK SHALL BE CONCEALED IN WALLS AND/OR CEILING SPACE,UNLESS OTHERWISE NOTED.

9. SEAL ALL PENETRATIONS THROUGH WALLS PER DETAILS ANDSPECIFICATIONS.

10. COORDINATE EXACT LOCATIONS OF ALL DIFFUSERS AND RETURN GRILLESWITH ARCHITECTURAL AND ELECTRIC REFLECTED CEILING PLANS.

11. COORDINATE ALL THERMOSTAT LOCATIONS WITH FURNITURE ANDARCHITECT.

12. VAV BOXES AND VALVES SHALL BE LOCATED NO MORE THAN 24 INCHESABOVE SUSPENDED CEILINGS FOR ACCESS.

13. COORDINATE DUCT LOCATIONS WITHIN CLASSROOMS WITH CEILINGPROJECT SUPPORTS

SHEET METAL KEY NOTES

1 ROUTE 12"Ø EXHAUST DUCT FROM CAPTURE HOOD. CAPTURE HOODRELOCATED FROM EXISTING 3RD FLOOR CLASSROOM. PROVIDE NEWHANGING SUPPORT FOR EXISTING HOOD

2 PROVIDE TYPE II EXHAUST HOOD. ROUTE 8"X12" EXHAUST UP IN CHASE TOROOF. PROVIDE FIRE DAMPERS AT FLOOR PENETRATIONS AND ACCESSDOORS

3 ROUTE 4" DRYER VENT UP AND THROUGH BUILDING SIDEWALL. CORE DRILLAND SEAL EXTERIOR WALL PENETRATION. PROVIDE HOODED WALL CAP ONEXTERIOR WALL

4. ROUTE KILN EXHAUST VENT UP FROM KILN. ROUTE EXHAUST DUCT OUT TOEXTERIOR WALL AND PROVIDE HOODED WALL CAP OVER OPENING.

5. SOUND LINED TRANSFER DUCT, REFER TO DETAIL. SIZE AS SHOWN ONDRAWING.

6. ROUTE 12"x12" SOUND LINED RETURN DUCT UP FROM RETURN AIR MAIN INSTRUCTURAL WEBBING, PROVIDE VOLME DAMPER

7. SOUND LINE RA BELLMOUTH DUCT FROM TAKEOFF TO OPENING

8. PROVIDE REMOTE DAMPER ACTUATOR ON DIFFUSER OR GRILLE, MOUNT INTHROUGHT OF DIFFUSER OR GRILLE

9. FIRE/SMOKE DAMPER AT DUCT PENETRATION

10. PROVIDE DOUBLE WALL DUCTWORK FROM THE OUTLET OF THE AHU TO THETWO SA TAKEOFFS

1/8" = 1'-0"A3

LEVEL 2 SHEET METAL PLAN - PHASE 2

X

02-20-2013 BIDS

03-05-2013 ADDENDUM 2

1/8" = 1'-0"1

PARTIAL LEVEL 1 SHEET METAL PLAN - PHASE2

Page 16: MECHANICAL SYMBOLS MECHANICAL DRAWING LEGEND111841/AN~2...MECHANICAL SYMBOLS MECHANICAL SYSTEM INDICATION HEAVY LINE-WEIGHT INDICATES NEW WORK LIGHT LINE WEIGHT-INDICATES EXISTING

DN

UP

DN

UP

DN

UP

M

60"x20"SA

CLASSROOM329

X-RAY328 WAITING

308

STORAGE311

DENTAL RCPT309

X-RAY327

X-RAY326

X-RAY325

POSITIONING LAB323

DRKRM324

CONSULTATION310

CLASSROOM322

STERILIZATION320

WORK CENTER307

MATERIALS LAB306

CLASSROOM305

LOBBY360

WOMEN'S362

MEN'S361

TOILET363

MECHANICAL364

CORRIDOR354

LOCKERS330

CORRIDOR-1351-1

SIM LAB319

X-RAY313

X-RAY314

X-RAY315

X-RAY316

X-RAY317

W LOCKERS334

M LOCKER333

W LOCKER332

M LOCKER331

1

-329VAV

STORAGE330A

-328VAV

-326VAV

CLASSROOM304

CNA TESTING301

TESTING302

CNA TESTING303

STUDY335

X-RAY318

12"ø

12" EXHAUST DUCT UPTO 4TH FLOOR, WITHFIRE DAMPER ATFLOOR PENETRATION

T

SD-110"Ø260-6

T

SD-110"Ø215-6

SD-110"Ø325-2

SD-110"Ø290-6

T

-310VAV

SD-18"Ø175

T

-325VAV SD-18"Ø130-3

SD-16"Ø100-3

SD-18"Ø180-8

-321CVAV

SD-18"Ø150-4

SD-18"Ø200-2

SD-110"Ø230-2

SD-18"Ø190-4

TTTTT

T

T

T

T

12"x10"

14"x

12"

SD-16"Ø100

SD-110"Ø300-2

-301VAV

T

T

T

-321AVAV-306VAV

SD-110"Ø225-6

-305VAV

SD-18"Ø150-2

SD-16"Ø100

SD-16"Ø75

SD-110"Ø245-4

ED-112"Ø300-2

14"x14"EXHAUSTDUCT UP

SD-18"Ø125

SD-18"Ø130-2

SD-18"Ø130-2

30"x

20"

SA

-307VAV

14"x13"10"ø T

T

12"ø 14"x16"

12"x

12"

12"x

12"

RG-1

RG-1

12"x

12"

20"x18"

14"ø

12"x

12"

RG-1

RG-1

RG-2

12"x

12"

12"x

12"

14"x15"

RG-1

RG-1

12"ø

SD-18"Ø175

30"x20"5

50"x

20"

RA

8"ø

12"x

10"

-303VAV

-304VAV

RG-2

RG-2 RG-1

12"x

8"

6"ø

-302VAV

50"x20"RA

50"x

20"

RA

T

T S

T

16"x12" RABELLMOUTHBALANCETO 875 CFM

7

16"x16" RABELLMOUTHBALANCE TO1350 CFM

7

50"x20" RABELLMOUTHBALANCE TO3500 CFM

24"x

18"

16"ø

-322VAV

RG-1

RG-1

RG-1

14"x

15"

12"ø

-323AVAV

14"x

15"

12"ø

-323BVAV

SD-18"Ø190-4

SD-18"Ø235-2

12"x10"

-330AVAV

RG-1

-323CVAV

12"x

10"

8"ø

T

T

T

RG-1

10"ø10"ø

-327VAV

14"x13"

12"x8"

TT

TT

8"ø

RG-2

RG-2

12"x12"5

12"x10"

8"ø

T

RG-2

RG-2

6"ø

12"x8"

34"x

18"

SA

54"x1

8"

T

12"x12"5

16"ø

40"x

20"

RA

40"x

20"

RA

40"x20"BELLMOUTHBALANCE6715 CFM

36"x

20"

SA

SD-18"Ø125

SD-18"Ø125

SD-18"Ø125

RG-2 RG-2 RG-2 RG-2 RG-2

RG-2

-317VAV

SD-16"Ø100-2

SD-18"Ø125

36"x2

0"

SA

T

RG-1

RG-2RG-2

-311VAV

12"x

8"

6"ø

RG-2

14"x

16"

12"ø

TT

14"x

16"

SD-18"Ø180-8

RG-1

14"x

15"

SD-18"Ø180-7

RG-1

RG-1

-321BVAV

SD-18"Ø210 ED-1

12"Ø300

10"x14" 10"x14"14"x14"

12"ø

14"ø

14"ø

12"ø

20"ø

20"ø

12"x

12"

8"ø

-320VAV 12"x

12"

8"ø

-319VAV

SD-110"Ø275

RG-2

RG-2

36"x

20"

36"x20"36"x20"

SD-314"x8"300-2

-321VAV

8"ø

8"ø

SD-110"Ø300-2

SD-18"Ø200-2

T

-354VAV

12"x10"

8"ø

-351AVAV

T

12"x10"

-335VAV

SD-18"Ø200-2

8"ø

T

8"ø

6"ø

12"x

8"

SD-18"Ø200

-330VAV

EG-110"Ø250

SD-18"Ø125

12"x

8"

-332VAV

12"x

8"

-333VAV

8"ø12"x10"

-334VAV

SD-18"Ø140 SD-1

8"Ø125

SD-18"Ø200-2

EG-18"Ø150

EG-18"Ø175

EG-18"Ø175

EG-112"Ø500

50"x20"RA

48"x20"SA

48"x20"SA

48"x

20"

SA

48"x

20"

SA

12"x8"6"ø

40"x20"RA

40"x20"RA

20"x16" RABALANCE TO1740 CFM

7

20"x16" RABALANCE TO1425 CFM

7

20"x16" RABALANCE TO1495 CFM

7

SD-16"Ø75

SD-110"Ø260-2

50"x

20"

RA

50"x

20"

RA

66"x

20"

RA

16"x12" RABALANCE TO980 CFM

7

66"x20"RA

66"x20"RA

66"x

20"

RA

-351VAV

12"x8"

6"ø

12"x

8"

6"ø

12"x

8"

6"ø

12"x

8"

6"ø

12"x

8"

12"x

8"

-318VAV

6"ø-314VAV

-315VAV

6"ø

6"ø-313VAV -316VAV

18"x18"

12"x

10"

8"ø

12"x10"8"ø

-309VAV

8"ø

T

T

T

T

T

TT

T

T

-308VAV

SD-18"Ø150-2

12"ø

12"ø

14"x

14"

EA

-324VAV

7

7

-331VAV

M302.2A7

60"x20"SA

60"x

20"

54"x

18"

30"x

20"

SA

10"x

14"

12"x

12"

SD-18" Ø150-2

SD-18" Ø150-2

10"x10"

10"x10"

10"x

10"

6"ø6"ø

8"ø12"ø

EG-112" Ø450

EG-112" Ø450

EG-26" Ø100

EG-26" Ø758

8 8

8

12"ø

8

10"ø

SD-18" Ø200

8

1

J

2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

G

H

K

2.1 8.17.1

SPSF-3STATICPRESSURESENSOR

10"ø10"x10"

-VA

V-3

62

VA

V

14"x

13"

9

12"x10"

18"x18"

18"x

18"

9999

9

9

9

9

9

9

9

9

9

9

9

9

9

9

9

18"x

10"

9

8"ø

12"x10"

6"ø 6

6"ø

120"x

24"

SA

60"x20"SA

10

12"x

10"

AFMS

SF-3 AFMSLOCATION

CLINIC321

EG-112"Ø500

10"ø

12"ø

RG-2

12"x

8"

18"x10"18"x10"

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

GRCC Bid No: 1213-3294

C:\

Revit

Lo

calF

iles\7

1108000

CH

M12_C

EN

TR

AL

_K

sim

on

eau

x.r

vt

3/5

/2013

6:0

7:0

1P

M

1/8" = 1'-0"

CJZ

PETER AND PAT COOKACADEMIC HALL

RENOVATION

GRAND RAPIDS, MI

LEVEL 3 SHEET METALPLAN - PHASE 2

M131.27111.080.00

RC

SHEET METAL GENERAL NOTES

1. THESE DRAWINGS INDICATE THE GENERAL EXTENT OF WORK BUT ARE NOTFABRICATION DRAWINGS. COORDINATE SHEET METAL SYSTEMS WITH WORKOF ALL OTHER TRADES PRIOR TO ANY FABRICATION OR INSTALLATION.PROVIDE ALL FITTINGS, OFFSETS, AND TRANSITIONS, ETC. AS REQUIREDFOR A COMPLETE WORKABLE INSTALLATION.

2. PROVIDE ACCESS AROUND ALL NEW EQUIPMENT PER MANUFACTURERSRECOMMENDATIONS.

3. ALL SHEET METAL RELATED CORING THROUGH FLOORS SHALL BE BYMECHANICAL CONTRACTOR.

4. ALL DUCTWORK SHALL BE ROUTED AS HIGH AS POSSIBLE, UNLESSOTHERWISE NOTED. COORDINATE ROUTING WITH OTHER TRADES TO AVOIDINTERERENCES.

5. BALANCE ALL AIR SYSTEMS TO INDICATED AIR FLOW RATES.

6. DUCT SIZES TO DIFFUSERS SHALL MATCH NECK SIZE OF EACH. REFER TOGRILLE, REGISTER & DIFFUSER SCHEDULE.

7. ALL DUCTWORK SHALL BE INSULATED AND LABELED IN ACCORDANCE WITHTHE REQUIREMENTS OF THE PROJECT SPECIFICATION.

8. ALL DUCTWORK SHALL BE CONCEALED IN WALLS AND/OR CEILING SPACE,UNLESS OTHERWISE NOTED.

9. SEAL ALL PENETRATIONS THROUGH WALLS PER DETAILS ANDSPECIFICATIONS.

10. COORDINATE EXACT LOCATIONS OF ALL DIFFUSERS AND RETURN GRILLESWITH ARCHITECTURAL AND ELECTRIC REFLECTED CEILING PLANS.

11. COORDINATE ALL THERMOSTAT LOCATIONS WITH FURNITURE ANDARCHITECT.

12. VAV BOXES AND VALVES SHALL BE LOCATED NO MORE THAN 24 INCHESABOVE SUSPENDED CEILINGS FOR ACCESS.

13. COORDINATE DUCT LOCATIONS WITHIN CLASSROOMS WITH CEILINGPROJECT SUPPORTS

SHEET METAL KEY NOTES

1 ROUTE 12"Ø EXHAUST DUCT FROM CAPTURE HOOD. CAPTURE HOODRELOCATED FROM EXISTING 3RD FLOOR CLASSROOM. PROVIDE NEWHANGING SUPPORT FOR EXISTING HOOD

2 PROVIDE TYPE II EXHAUST HOOD. ROUTE 8"X12" EXHAUST UP IN CHASE TOROOF. PROVIDE FIRE DAMPERS AT FLOOR PENETRATIONS AND ACCESSDOORS

3 ROUTE 4" DRYER VENT UP AND THROUGH BUILDING SIDEWALL. CORE DRILLAND SEAL EXTERIOR WALL PENETRATION. PROVIDE HOODED WALL CAP ONEXTERIOR WALL

4. ROUTE KILN EXHAUST VENT UP FROM KILN. ROUTE EXHAUST DUCT OUT TOEXTERIOR WALL AND PROVIDE HOODED WALL CAP OVER OPENING.

5. SOUND LINED TRANSFER DUCT, REFER TO DETAIL. SIZE AS SHOWN ONDRAWING.

6. ROUTE 12"x12" SOUND LINED RETURN DUCT UP FROM RETURN AIR MAIN INSTRUCTURAL WEBBING, PROVIDE VOLME DAMPER

7. SOUND LINE RA BELLMOUTH DUCT FROM TAKEOFF TO OPENING

8. PROVIDE REMOTE DAMPER ACTUATOR ON DIFFUSER OR GRILLE, MOUNT INTHROUGHT OF DIFFUSER OR GRILLE

9. FIRE/SMOKE DAMPER AT DUCT PENETRATION

10. PROVIDE DOUBLE WALL DUCTWORK FROM THE OUTLET OF THE AHU TO THETWO SA TAKEOFFS

1/8" = 1'-0"A3

LEVEL 3 SHEET METAL PLAN - PHASE 2

X

02-20-2013 BIDS

03-05-2013 ADDENDUM 2

Page 17: MECHANICAL SYMBOLS MECHANICAL DRAWING LEGEND111841/AN~2...MECHANICAL SYMBOLS MECHANICAL SYSTEM INDICATION HEAVY LINE-WEIGHT INDICATES NEW WORK LIGHT LINE WEIGHT-INDICATES EXISTING

DN

UP

DN

UP

UP

DN

VFD

VFD

CLASSROOM431

LACT410

TOILET463

WOMEN'S462

MECHANICAL464

MEN'S461

CORRIDOR452

RESTRM421A

OBSRV437

CNTRL435

OBSRV433

SIM LAB434

SIM LAB436

LOBBY460

OFFICE403

BED PRACTICE409

BEDLAB413

BEDLAB424

CONF405

BRKRM404

COMPUTER LAB402

STORAGE430

STORAGE428

OTA LAB 1423

WORK CENTER411

BEDLAB426

BEDLAB432

OTA APARTMENT421

BED LAB416

STUDY455

STUDY454

BED LAB420

CORRIDOR451

BTE425

OTA LAB 2427

CONF407

CONF406

HEALTHTUTORING

401

CORRIDOR453

CONF408

OFFICE417

BEDLAB415

72"x20"RA

42"x

20"

RA

46"x

20"

T T T

SD-18" Ø200-4

T

T

SD-110" Ø225-3

SD-110" Ø175-2

T

T

T

T

12"x

12"

SD-18" Ø200-4

SD-18" Ø200-4

SD-18" Ø200-3

T

T

12"x

12"

14"x10"

3

2

TYPICAL ROOMSENSOR

14"x10"

SD-18" Ø200-4

SD-18" Ø200-4 SD-1

8" Ø200-4

T

T

T

T

T

DRYER

KEH-1

4

4" DIA

3

EG-16" Ø75

6"x6"EXHAUSTDUCT UP

12" DIA EXHAUST UPTO 5TH FLOOR WITHFIRE DAMPER ATFLOOR PENETRATION

12" DIA EXHAUSTUP FROM 3RDFLOOR

234

-427VAV

-424VAV

-432VAV-413VAV

-415VAV

-416VAV

-401AVAV

-405VAV

-403VAV

-VAV-401BVAV

T

SD-18" Ø150-2

14"x12"

SD-18" Ø200-4

SD-18" Ø200-4

14"x12"

SD-112" Ø480-4

14"x14" UP AND DOWN WITHFIRE DAMPER AT FLOOR

STORAGE419

SD-18" Ø130

SD-16" Ø100

T

60"x

20"

T

T

72"x

20"

RA

12"ø

10"ø 16"ø

14"x

14"

-455VAV

8"ø

12"x1

0"

RG-1

-418VAV

14"x

14"

BED LAB418

RG-1

-420VAV

14"x

14"

RG-1

SD-18" Ø200-4

SD-18" Ø200-4

18"ø 12"ø

10"ø

5

20"x14"

5

30"x20"

-454VAV

10"x

12"

10"ø

T

20"x20"

RA BELLMOUTHBALANCE TO 2400 CFM

SD-110" Ø300-2

RG-1

RG-1

24"x

18"

RG-1

8"ø

10"ø

RG-1

RG-1

T

-421VAV

SD-314"X8"300-210'-10" AFF

10"ø

10"ø

RG-1

RG-1

RG-1

T

-417VAV

SD-110" Ø250

RG-2

RG-1

10"x

12"

14"ø

-419VAV

10"ø

14"x14"

14"x10"

10"ø

12"x10" 6"ø

RG-1

RG-1

SD-112" Ø385-4

14"x16"

12"ø 60"x20"

SA

T

-428VAV

-430VAV

T

14"x16"

RG-1

T

-436VAV

SD-18" Ø225-6

SD-110" Ø275-2

SD-18" Ø200

SD-18" Ø150

SD-18" Ø200

-433VAV

-437VAV

6"ø

10"x

10" 12"x8"

6"ø

T

T

TRG-2 RG-2

RG-2

24"x18"16"ø

RG-1

RG-1

SD-114" Ø510-4

T

20"x16" RABALANCETO 2040CFM

SD-110" Ø260

10"x10"6"ø

RG-1 RG-2

RG-1

-404VAV

T

6"ø

10"x

10"

SD-18" Ø140

SD-18" Ø200

6"ø

10"x

10"

T

6"ø

10"x

10"

SD-18" Ø140

RG-2

RG-2

RG-2

6"ø

10"x

10"

RG-2

SD-18" Ø200

5

20"x14"

5

20"x14"

5

30"x20"

5

30"x20"

12"ø12"ø

14"x

16"

14"x

16"

SD-110" Ø320-4

SD-110" Ø320-4

10"x

10"

6"ø

RG-2

RG-2T

20"x

20"

12"x

8"

6"ø

-410VAV

14"x

14"

10"ø

-VAV-411VAV

8"ø

10"x12"-409VAV

RG-1

RG-2

5

20"x20"

72"x20"RA

56"x20"RA

14"x14" RABALANCE TO1100 CFM

6"ø

12"x8"

12"x12"

SD-18" Ø200

60"x20"SA

60"x20"SA

16"x14" RABALANCE TO1350 CFM

20"x

20"

56"x

20"

RA

20"x16" RABALANCETO 1920CFM

14"x14" RABALANCETO 800CFM

14"x14" RABALANCETO 800CFM

20"x20" RABALANCE TO2400 CFM

12"x12" RABALANCETO 300CFM

16"x16" RABALANCETO 1540CFM

20"x20" RABALANCE TO2400 CFM

40"x20"TRANSFER

40"x20"TRANSFER

16"ø

46"x

20"

SA

46"x

20"

SA

46"x20"SA

-406VAV

T

T

SD-18" Ø200

SD-18" Ø120

-402VAV

-423BVAV

14"x14"EXHAUST UPTO 5TH FLOOR

14"x

14"

FIRE DAMPERAT FLOORPENETRATION

7

7

7

7

7

7

7

7

7

7

7

M302.1A2

6"ø8"ø

7

56"x20" RABALANCETO 4505CFM

SD-18" Ø150-2

SD-18" Ø150-2

MEN'S461

14"x

15"

10"x10"

10"x

10"

6"ø

6"ø

8"ø12"ø

EG-112" Ø450

EG-112" Ø450

10"x10"

EG-26" Ø100

EG-26" Ø75

88

8 8

8

8

8

-462VAV

56"x20"RA

-423BVAV

-426VAV

10"x10"

46"x

20"

SA

10"ø

12"ø

-408VAV

-431VAV

1

J

2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

G

H

K

2.1 8.17.1

SPSF-4 STATICPRESSURESENSOR

12"ø

12"ø

-435VAV

10"ø9

9

9

9

14"ø

99

9

9

9

20"x20"

9

9

120"x

24"

SA

120"x

24"

SA

10

AFMS

SF-4 AFMSLOCATION

RG-1

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

GRCC Bid No: 1213-3294

C:\

Revit

Lo

calF

iles\7

1108000

CH

M12_C

EN

TR

AL

_K

sim

on

eau

x.r

vt

3/5

/2013

6:0

7:1

7P

M

1/8" = 1'-0"

CJZ

PETER AND PAT COOKACADEMIC HALL

RENOVATION

GRAND RAPIDS, MI

LEVEL 4 SHEET METALPLAN - PHASE 1

M141.17111.080.00

RC

SHEET METAL GENERAL NOTES

1. THESE DRAWINGS INDICATE THE GENERAL EXTENT OF WORK BUT ARE NOTFABRICATION DRAWINGS. COORDINATE SHEET METAL SYSTEMS WITH WORKOF ALL OTHER TRADES PRIOR TO ANY FABRICATION OR INSTALLATION.PROVIDE ALL FITTINGS, OFFSETS, AND TRANSITIONS, ETC. AS REQUIREDFOR A COMPLETE WORKABLE INSTALLATION.

2. PROVIDE ACCESS AROUND ALL NEW EQUIPMENT PER MANUFACTURERSRECOMMENDATIONS.

3. ALL SHEET METAL RELATED CORING THROUGH FLOORS SHALL BE BYMECHANICAL CONTRACTOR.

4. ALL DUCTWORK SHALL BE ROUTED AS HIGH AS POSSIBLE, UNLESSOTHERWISE NOTED. COORDINATE ROUTING WITH OTHER TRADES TO AVOIDINTERERENCES.

5. BALANCE ALL AIR SYSTEMS TO INDICATED AIR FLOW RATES.

6. DUCT SIZES TO DIFFUSERS SHALL MATCH NECK SIZE OF EACH. REFER TOGRILLE, REGISTER & DIFFUSER SCHEDULE.

7. ALL DUCTWORK SHALL BE INSULATED AND LABELED IN ACCORDANCE WITHTHE REQUIREMENTS OF THE PROJECT SPECIFICATION.

8. ALL DUCTWORK SHALL BE CONCEALED IN WALLS AND/OR CEILING SPACE,UNLESS OTHERWISE NOTED.

9. SEAL ALL PENETRATIONS THROUGH WALLS PER DETAILS ANDSPECIFICATIONS.

10. COORDINATE EXACT LOCATIONS OF ALL DIFFUSERS AND RETURN GRILLESWITH ARCHITECTURAL AND ELECTRIC REFLECTED CEILING PLANS.

11. COORDINATE ALL THERMOSTAT LOCATIONS WITH FURNITURE ANDARCHITECT.

12. VAV BOXES AND VALVES SHALL BE LOCATED NO MORE THAN 24 INCHESABOVE SUSPENDED CEILINGS FOR ACCESS.

13. COORDINATE DUCT LOCATIONS WITHIN CLASSROOMS WITH CEILINGPROJECT SUPPORTS

SHEET METAL KEY NOTES

1 ROUTE 12"Ø EXHAUST DUCT FROM CAPTURE HOOD. CAPTURE HOODRELOCATED FROM EXISTING 3RD FLOOR CLASSROOM. PROVIDE NEWHANGING SUPPORT FOR EXISTING HOOD

2 PROVIDE TYPE II EXHAUST HOOD. ROUTE 8"X12" EXHAUST UP IN CHASE TOROOF. PROVIDE FIRE DAMPERS AT FLOOR PENETRATIONS AND ACCESSDOORS

3 ROUTE 4" DRYER VENT UP AND THROUGH BUILDING SIDEWALL. CORE DRILLAND SEAL EXTERIOR WALL PENETRATION. PROVIDE HOODED WALL CAP ONEXTERIOR WALL

4. ROUTE KILN EXHAUST VENT UP FROM KILN. ROUTE EXHAUST DUCT OUT TOEXTERIOR WALL AND PROVIDE HOODED WALL CAP OVER OPENING.

5. SOUND LINED TRANSFER DUCT, REFER TO DETAIL. SIZE AS SHOWN ONDRAWING.

6. ROUTE 12"x12" SOUND LINED RETURN DUCT UP FROM RETURN AIR MAIN INSTRUCTURAL WEBBING, PROVIDE VOLME DAMPER

7. SOUND LINE RA BELLMOUTH DUCT FROM TAKEOFF TO OPENING

8. PROVIDE REMOTE DAMPER ACTUATOR ON DIFFUSER OR GRILLE, MOUNT INTHROUGHT OF DIFFUSER OR GRILLE

9. FIRE/SMOKE DAMPER AT DUCT PENETRATION

10. PROVIDE DOUBLE WALL DUCTWORK FROM THE OUTLET OF THE AHU TO THETWO SA TAKEOFFS

1/8" = 1'-0"A3

LEVEL 4 SHEET METAL PLAN - PHASE 1

X

02-20-2013 BIDS

03-05-2013 ADDENDUM 2

Page 18: MECHANICAL SYMBOLS MECHANICAL DRAWING LEGEND111841/AN~2...MECHANICAL SYMBOLS MECHANICAL SYSTEM INDICATION HEAVY LINE-WEIGHT INDICATES NEW WORK LIGHT LINE WEIGHT-INDICATES EXISTING

UP

DNDN

UP

DN

UP

VFD

72"x20"RA

72"x

20"

RA

72"x

20"

RA

12"x8"

SD-16" Ø100

SD-18" Ø210-4

14"x14"

14"x

16"

14"x

16"

SD-110" Ø260-4

SD-110" Ø260-4

SD-110" Ø260-4

ENGLISHTUTORING

501

14"x16"

14"x16"

SD-110" Ø290-4

SD-112" Ø355-2

SD-112" Ø340-4

T

T

T

T

T

TYPICAL ROOMSENSOR FOR EACHVAV BOX

14"x16"

14"x16"

14"x16"

SD-110" Ø290-4

SD-112" Ø355-2

SD-112" Ø360-4

T

T

T

T

T

T

T

NOTE: THREE NORTHROOMS, ROUTE FLATOVAL DUCT UNDER ROOFBEAM ON OUTER 2DIFFUSERS

T

14"x14"14"x14" 14"x14" 14"x14"

14"x

16"

SD-112" Ø400-4

SD-112" Ø400-4

SD-112" Ø400-4

SD-112" Ø400-4

SD-110" Ø315-4

SD-210" Ø315-4

T

T

T

T

14"x16"

SD-110" Ø315-4

COMPUTER LAB503

SD-114" Ø600-5

CONF505

CLASSROOM510CLASSROOM

512

CLASSROOM518

CLASSROOM513

T T T

SD-18" Ø200

T

2

SD-312x8200-4

14"x12"

-518VAV

-512VAV

-519VAV

-552VAV-520VAV

-521VAV

-513VAV

-515VAV

-523VAV

-522VAV

-554VAV

-524VAV -525VAV

-526VAV

-503VAV

-504VAV

-502VAV

-505VAV

-506VAV

-510VAV

CORRIDOR550-550VAV

SD-212x8300-2

T12"ø

8"ø

18"ø

5

5

20"x14"

5

20"x14"

12" DIA EXHAUSTDUCT UP TO EF-3ON ROOF

12"ø12"ø

12"ø18"ø

940 CFM

1780 CFM

SD-18" Ø210-4

5

30"x20"20"x20"

RA BELLMOUTHBALANCE TO3600 CFM

SD-110" Ø320-2

5

12"x12"

5

12"x12"

36"x

20"

RA

16"x14" RABALANCE 1340CFM

16"x14" RABALANCE TO 710CFM

5

24"x20"

5

24"x20"

SD-18" Ø170-6

16"x14" RABALANCE TO 710CFM

16"x14" RABALANCE TO 1440CFM

12"ø

12"ø

TT

T

T

T

SD-18" Ø150-2

14"x

16"

RA BELLMOUTHBALANCE TO2700 CFM

12"ø

12"ø

-511VAV

60"x

20"

SA

60"x

20"

SA

30"x

20"

30"x

20"

10"ø

6"ø

6"ø

SD-18" Ø200

10"x

10"

10"x

10"

T

T

20"x20"

56"x20"RA

ROUTE FLATOVAL DUCTUNDER BEAM

30"x

14"

RG-1

RG-1

RG-1

RG-1

RG-1

RG-1

CLASSROOM514

CORRIDOR552

60"x

20"

SA

12"ø

12"ø

RG-1 RG-1

12"ø12"ø

16"x14" RABALANCE TO 1160CFM

RG-1

RG-1

RG-1

RG-1

10"ø

12"ø

14"x16"

RG-1

RG-1

RG-1

66 6

14"x12"

12"ø

8"x10"12"ø

RG-1

RG-1

RG-1

5

30"x20"

SD-110" Ø290-6

SD-18" Ø200

SD-18" Ø200

10"x

10"

6"ø

14"x16"

SD-110" Ø290-5

14"x16"

14"x

16"

12"x10"SD-18" Ø200

SD-18" Ø150-2

CLASSROOM521

STUDY522

STUDY517

COMPUTER LAB525

CLASSROOM524

COMPUTER LAB527

CORRIDOR553

CORRIDOR554

CLASSROOM520

CLASSROOM523

COMPUTER LAB526

CLASSROOM511

CLASSROOM515

WORK CENTER508

CLASSROOM507

MEETING RM509

CONF506

BRKRM504

OFFICE502

LOBBY560

WOMEN'S562

MEN'S561

TOILET563

RG-1

RA BELLMOUTHBALANCE TO2700 CFM

RG-1

RG-1

RG-1

RG-1

RG-2

T

12"ø

8"øRG-1

RG-1RG-1

RG-2

RG-2

56"x

20"

RA

56"x20" RABELLMOUTHBALANCE TO5800 CFMRG-2

24"x

18"

18"x6" FLAT OVALUNDER BEAM

72"x20"RA

56"x20"

RG-1

12"ø

14"ø

16"/

6"

FLAT OVAL DUCTUNDER RA MAIN

10"ø

6"ø

12"ø

5

30"x16"

RG-1 RG-110"x

10"

14"x

16"

12"x

10"

RG-2

36"x

20"

RA

16"ø

-507VAV

-501BVAV

16"x14" RABALANCE TO 1160CFM

14"x

15"

10"x10" 10"x10"

10"x10"

10"x

10"

SD-18" Ø200

-560VAV

14"x

14"

12"x

8"

12"x12"

16"x

10"

34"x28"

6"ø

6"ø

8"ø12"ø

EG-112" Ø450

EG-112" Ø450

20"x16"

20"x16"T

T

T

14"x14" UP TO EF-4 ONROOF WITH FD AT FLOOR

8"x12" KITCHEN EXHAUSTDUCT UP TO EF-2 ON ROOFWITH FD AT FLOOR

6"x6" EXHAUSTDUCT UP FROMBELOW

6"x6" EXHAUSTDUCT UP TOEF-5 ON ROOF

M302.1A7

-527VAV

24"x18" RABELLMOUTHBALANCE TO3000 CFM

7

BALANCETO 800 CFMEACH

BALANCETO 800 CFMEACH

BALANCETO 800 CFMEACH

5

24"x20"

7

7

7

7

7

7

7

7

-501AVAV

-514VAV

-516-2VAV

120"x

24"

60"x20"SA

60"x20"SA

14"x14" 14"x14"FIRE/SMOKEDAMPER,TYPICAL

8

8

8 8 8

8

EG-26" Ø100

EG-26" Ø758

8 8

8

12"ø

8

8

1

J

2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

G

H

K

2.1 8.17.1

RG-1

RG-1RG-1

RG-1

RG-1

RG-1

RG-1

RG-1

SP

SF-5 STATICPRESSURE SENSOR

FSD10"ø7

2"x

20"

RA

9

9

9

9

9

9

9

9

9

9

9

9

99

9

10

MOUNT LINEARSLOT DIFFUSER AT9'-6" A.F.F.,TYPICAL

AFMS

SF-5 AFMSLOCATION

BREAKOUT516

CORRIDOR550

CORRIDOR553

-508VAV

8"ø

-517VAV

12"x

10"

9

46"x

20"

SA

46"x

20"

SA

46"x

20"

SA

RG-1

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

GRCC Bid No: 1213-3294

C:\

Revit

Lo

calF

iles\7

1108000

CH

M12_C

EN

TR

AL

_K

sim

on

eau

x.r

vt

3/5

/2013

6:0

7:3

2P

M

1/8" = 1'-0"

CJZ

PETER AND PAT COOKACADEMIC HALL

RENOVATION

GRAND RAPIDS, MI

LEVEL 5 SHEET METALPLAN - PHASE 1

M151.17111.080.00

RC

SHEET METAL GENERAL NOTES

1. THESE DRAWINGS INDICATE THE GENERAL EXTENT OF WORK BUT ARE NOTFABRICATION DRAWINGS. COORDINATE SHEET METAL SYSTEMS WITH WORKOF ALL OTHER TRADES PRIOR TO ANY FABRICATION OR INSTALLATION.PROVIDE ALL FITTINGS, OFFSETS, AND TRANSITIONS, ETC. AS REQUIREDFOR A COMPLETE WORKABLE INSTALLATION.

2. PROVIDE ACCESS AROUND ALL NEW EQUIPMENT PER MANUFACTURERSRECOMMENDATIONS.

3. ALL SHEET METAL RELATED CORING THROUGH FLOORS SHALL BE BYMECHANICAL CONTRACTOR.

4. ALL DUCTWORK SHALL BE ROUTED AS HIGH AS POSSIBLE, UNLESSOTHERWISE NOTED. COORDINATE ROUTING WITH OTHER TRADES TO AVOIDINTERERENCES.

5. BALANCE ALL AIR SYSTEMS TO INDICATED AIR FLOW RATES.

6. DUCT SIZES TO DIFFUSERS SHALL MATCH NECK SIZE OF EACH. REFER TOGRILLE, REGISTER & DIFFUSER SCHEDULE.

7. ALL DUCTWORK SHALL BE INSULATED AND LABELED IN ACCORDANCE WITHTHE REQUIREMENTS OF THE PROJECT SPECIFICATION.

8. ALL DUCTWORK SHALL BE CONCEALED IN WALLS AND/OR CEILING SPACE,UNLESS OTHERWISE NOTED.

9. SEAL ALL PENETRATIONS THROUGH WALLS PER DETAILS ANDSPECIFICATIONS.

10. COORDINATE EXACT LOCATIONS OF ALL DIFFUSERS AND RETURN GRILLESWITH ARCHITECTURAL AND ELECTRIC REFLECTED CEILING PLANS.

11. COORDINATE ALL THERMOSTAT LOCATIONS WITH FURNITURE ANDARCHITECT.

12. VAV BOXES AND VALVES SHALL BE LOCATED NO MORE THAN 24 INCHESABOVE SUSPENDED CEILINGS FOR ACCESS.

13. COORDINATE DUCT LOCATIONS WITHIN CLASSROOMS WITH CEILINGPROJECT SUPPORTS

SHEET METAL KEY NOTES

1 ROUTE 12"Ø EXHAUST DUCT FROM CAPTURE HOOD. CAPTURE HOODRELOCATED FROM EXISTING 3RD FLOOR CLASSROOM. PROVIDE NEWHANGING SUPPORT FOR EXISTING HOOD

2 PROVIDE TYPE II EXHAUST HOOD. ROUTE 8"X12" EXHAUST UP IN CHASE TOROOF. PROVIDE FIRE DAMPERS AT FLOOR PENETRATIONS AND ACCESSDOORS

3 ROUTE 4" DRYER VENT UP AND THROUGH BUILDING SIDEWALL. CORE DRILLAND SEAL EXTERIOR WALL PENETRATION. PROVIDE HOODED WALL CAP ONEXTERIOR WALL

4. ROUTE KILN EXHAUST VENT UP FROM KILN. ROUTE EXHAUST DUCT OUT TOEXTERIOR WALL AND PROVIDE HOODED WALL CAP OVER OPENING.

5. SOUND LINED TRANSFER DUCT, REFER TO DETAIL. SIZE AS SHOWN ONDRAWING.

6. ROUTE 12"x12" SOUND LINED RETURN DUCT UP FROM RETURN AIR MAIN INSTRUCTURAL WEBBING, PROVIDE VOLME DAMPER

7. SOUND LINE RA BELLMOUTH DUCT FROM TAKEOFF TO OPENING

8. PROVIDE REMOTE DAMPER ACTUATOR ON DIFFUSER OR GRILLE, MOUNT INTHROUGHT OF DIFFUSER OR GRILLE

9. FIRE/SMOKE DAMPER AT DUCT PENETRATION

10. PROVIDE DOUBLE WALL DUCTWORK FROM THE OUTLET OF THE AHU TO THETWO SA TAKEOFFS

1/8" = 1'-0"A3

LEVEL 5 SHEET METAL PLAN - PHASE 1

X

02-20-2013 BIDS

03-05-2013 ADDENDUM 2

Page 19: MECHANICAL SYMBOLS MECHANICAL DRAWING LEGEND111841/AN~2...MECHANICAL SYMBOLS MECHANICAL SYSTEM INDICATION HEAVY LINE-WEIGHT INDICATES NEW WORK LIGHT LINE WEIGHT-INDICATES EXISTING

DN

DN

DN

M

M

234

EF-4

EF-2

EF-5

EF-1

MOUNT NEW EF-1 ONEXISTING ROOF CURB.PROVIDE TRANSITIONBETWEEN EXISTINGCURB AND NEWEXHAUST FAN

COOLINGTOWER

8"x12" KITCHEN EXHAUSTDUCT UP TO EF-2 ON ROOF

14"x14" EXHAUSTDUCT UP TO EF-4 ONROOF

6"x6" EXHAUST DUCTUP FROM BELOW TOEF-5 ON ROOF

EXISTING ROOFOPENINGS TO BEPATCHED

ACU-1

EF-3

12" DIA DOUBLEWALL LINEDEXHAUST DUCT UPFROM BELOWTHROUGH ROOFCURB TO EF-3

MOUNT EF-3 ONEQUIPMENT SUPPORTRAILS

12"x12" EXHAUST DUCT UPFROM EF-3 TO 7'-0" ABOVEROOF, USE GUY WIRESANCHORED TO ROOF DECKTO SECURE EXHAUSTSTACK

PROVIDE DRAIN OFFBOTTOM OF EXHAUSTSTACK AND SPILL ONROOF

ACCU-1

T

(E)24"x24"(E)RELIEFLOUVER

(E)44"x48"LOUVER

1

J

2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

G

H

K

2.1 8.17.1

8" CWR

8" CWS

EXISTING MARLEY COOLINGTOWER MODEL NC8305FLIGG,REMOVE AND REPLACE EXISTINGMETERING ORIFICES, CONTACTDAN ROESNER 248-874-2006.BALANCE TO 1320 GPM

LABEL EXISTINGCONDENSER, PIPINGAND MAKEUP WATERPIPING, REFER TOSPECIFICATIONS

EXISTING 8" CWSAND CWR UP FROMBELOW

ROUTE CONDENSATEAND SPILL ON LOWERROOF

RS AND RL LINES ROUTEDALONG ROOF ON PIPESUPPORT RAILS TOACCU-1

CORE DRILL ANDSEAL WALLPENETRATION

EF-7T

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

GRCC Bid No: 1213-3294

C:\

Revit

Lo

calF

iles\7

1108000

CH

M12_C

EN

TR

AL

_K

sim

on

eau

x.r

vt

3/5

/2013

6:0

7:3

9P

M

1/8" = 1'-0"

CJZ

PETER AND PAT COOKACADEMIC HALL

RENOVATION

GRAND RAPIDS, MI

ROOF MECHANICAL PLAN- PHASE 1

M161.17111.080.00

RC

SHEET METAL GENERAL NOTES

1. THESE DRAWINGS INDICATE THE GENERAL EXTENT OF WORK BUT ARE NOTFABRICATION DRAWINGS. COORDINATE SHEET METAL SYSTEMS WITH WORKOF ALL OTHER TRADES PRIOR TO ANY FABRICATION OR INSTALLATION.PROVIDE ALL FITTINGS, OFFSETS, AND TRANSITIONS, ETC. AS REQUIREDFOR A COMPLETE WORKABLE INSTALLATION.

2. PROVIDE ACCESS AROUND ALL NEW EQUIPMENT PER MANUFACTURERSRECOMMENDATIONS.

3. ALL SHEET METAL RELATED CORING THROUGH FLOORS SHALL BE BYMECHANICAL CONTRACTOR.

4. ALL DUCTWORK SHALL BE ROUTED AS HIGH AS POSSIBLE, UNLESSOTHERWISE NOTED. COORDINATE ROUTING WITH OTHER TRADES TO AVOIDINTERERENCES.

5. BALANCE ALL AIR SYSTEMS TO INDICATED AIR FLOW RATES.

6. DUCT SIZES TO DIFFUSERS SHALL MATCH NECK SIZE OF EACH. REFER TOGRILLE, REGISTER & DIFFUSER SCHEDULE.

7. ALL DUCTWORK SHALL BE INSULATED AND LABELED IN ACCORDANCE WITHTHE REQUIREMENTS OF THE PROJECT SPECIFICATION.

8. ALL DUCTWORK SHALL BE CONCEALED IN WALLS AND/OR CEILING SPACE,UNLESS OTHERWISE NOTED.

9. SEAL ALL PENETRATIONS THROUGH WALLS PER DETAILS ANDSPECIFICATIONS.

10. COORDINATE EXACT LOCATIONS OF ALL DIFFUSERS AND RETURN GRILLESWITH ARCHITECTURAL AND ELECTRIC REFLECTED CEILING PLANS.

11. COORDINATE ALL THERMOSTAT LOCATIONS WITH FURNITURE ANDARCHITECT.

12. VAV BOXES AND VALVES SHALL BE LOCATED NO MORE THAN 24 INCHESABOVE SUSPENDED CEILINGS FOR ACCESS.

13. COORDINATE DUCT LOCATIONS WITHIN CLASSROOMS WITH CEILINGPROJECT SUPPORTS

SHEET METAL KEY NOTES

1 ROUTE 12"Ø EXHAUST DUCT FROM CAPTURE HOOD. CAPTURE HOODRELOCATED FROM EXISTING 3RD FLOOR CLASSROOM. PROVIDE NEWHANGING SUPPORT FOR EXISTING HOOD

2 PROVIDE TYPE II EXHAUST HOOD. ROUTE 8"X12" EXHAUST UP IN CHASE TOROOF. PROVIDE FIRE DAMPERS AT FLOOR PENETRATIONS AND ACCESSDOORS

3 ROUTE 4" DRYER VENT UP AND THROUGH BUILDING SIDEWALL. CORE DRILLAND SEAL EXTERIOR WALL PENETRATION. PROVIDE HOODED WALL CAP ONEXTERIOR WALL

4. ROUTE KILN EXHAUST VENT UP FROM KILN. ROUTE EXHAUST DUCT OUT TOEXTERIOR WALL AND PROVIDE HOODED WALL CAP OVER OPENING.

5. SOUND LINED TRANSFER DUCT, REFER TO DETAIL. SIZE AS SHOWN ONDRAWING.

6. ROUTE 12"x12" SOUND LINED RETURN DUCT UP FROM RETURN AIR MAIN INSTRUCTURAL WEBBING, PROVIDE VOLME DAMPER

7. SOUND LINE RA BELLMOUTH DUCT FROM TAKEOFF TO OPENING

8. PROVIDE REMOTE DAMPER ACTUATOR ON DIFFUSER OR GRILLE, MOUNT INTHROUGHT OF DIFFUSER OR GRILLE

9. FIRE/SMOKE DAMPER AT DUCT PENETRATION

10. PROVIDE DOUBLE WALL DUCTWORK FROM THE OUTLET OF THE AHU TO THETWO SA TAKEOFFS

1/8" = 1'-0"A3

ROOF SHEET METAL PLAN - PHASE 1

X

02-20-2013 BIDS

03-05-2013 ADDENDUM 2

Page 20: MECHANICAL SYMBOLS MECHANICAL DRAWING LEGEND111841/AN~2...MECHANICAL SYMBOLS MECHANICAL SYSTEM INDICATION HEAVY LINE-WEIGHT INDICATES NEW WORK LIGHT LINE WEIGHT-INDICATES EXISTING

DN

UP

DN

UP

DN

UP

VFD

VFD

M

TOILET263

CLASSROOM210

CLASSROOM225

WOMEN'S262

BREAKOUT ROOM227

CLASSROOM226

CLASSROOM224

MECHANICAL264

MEN'S261

VESTIBULE217

CLASSROOM212

Space382

WORK CENTER209

OFFICE203

LOBBY260

CONF205

CONF206

CONF207

BRKRM204

COMPUTER LAB202

BUSINESSTUTORING

201

BREAKOUT ROOM216

CLASSROOM215

CLASSROOM211CLASSROOM

213

STUDY257

STUDY256

CLASSROOM214

CLASSROOM223

CORRIDOR251

CLASSROOM208

CORRIDOR253

STUDY219

CLASSROOM220

CLASSROOM221

STUDY222

CLASSROOM218

-CUH-1?

RCP-1(TYP)

2"

HH

WS

2"

HH

WR

6" CHWSUP & DN

8" CHWRUP & DN

6" HHWRUP & DN

8" CWSUP & DN

8" CWRUP & DN

-218VAV

-216VAV

-210VAV

-201AVAV

-207VAV

-206VAV

-205VAV

-201BVAV

-203VAV

-226VAV

-225VAV-223VAV

-224VAV

-250VAV

-213VAV

-215VAV

-221VAV

-222VAV

-220VAV

-251VAV

234

1" HHWS1" HHWR1 1/4" HHWS

3/4" HHWR

3/4" HHWS3/4" HHWS

2" HHWR

1 1/2" HHWR

6" HHWSUP & DN

2" HHWRUP & DN

2" HHWS

-202VAV

-227VAV

-217VAV

2" HHWS

RCP-112'-0"0.5 GPM

RCP-15'-0"0.3 GPM

RCP-116'-0"0.7 GPM

RCP-124'-0"1.0 GPM

RCP-12'-0"0.3 GPM

1" HHWS

RCP-114'-6"0.6 GPM

RCP-112'-0"0.5 GPM

RCP-118'-0"0.8 GPM

RCP-118'-0"0.8 GPM

RCP-112'-0"0.5 GPM

RCP-124'-0"1.0 GPM

1"

HH

WR

RCP-112'-0"0.5 GPM

RCP-112'-0"0.5 GPM

RCP-148'-0"2.0 GPM

RCP-112'-0"0.5 GPM

RCP-124'-0"1.0 GPM

-209VAV

-208VAV

-211VAV

1"

HH

WS

3/4

"H

HW

S1"

HH

WS

3/4

"H

HW

R

3/4" HHWR

1 1/2" HHWR

1"

HH

WR

3/4

"H

HW

S

3/4

"H

HW

R

1"

HH

WS

1

(TYP)

1

(TYP)

1

(TYP)

1

(TYP)

2

-257VAV

-255VAV-214VAV -212VAV

-219VAV

-262VAV

1 1/4" HHWS

11/2

"H

HW

S2"

HH

WS

3/4

"H

HW

R1"

HH

WR

11/4

"H

HW

R

2"

HH

WR

3/4" HHWS

1"

HH

WR

1" HHWR

EL-2B

EL-2A

RCP-114'-0"0.5 GPM

1"

HH

WR

1"

HH

WS

EL-2C

EL-2D

1 1/2" HHWR2" HHWS

EL-2E

EL-2F

2" HHWR1" HHWS

EL-2G

1

J

2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

G

H

K

2.1 8.17.1

-204VAV

RCP-127'-0"1.1 GPM

3

3

3 3

RCP-124'-0"1.0 GPM

3

3

RCP-124'-0"1.0 GPM

RCP-114'-0"0.6 GPM

2ND FLOOR RCPNORTH BALANCETO 4.0 GPM

2ND FLOOR EASTRCP BALANCE TO6.5 GPM

2ND FLOOR EAST RCPBALANCE TO 7.0 GPM

1 1/4" HHWR

1" HHWS 1 1/4" HHWS

1 1/4" HHWR

DP

T EAST RCP DPTLOCATION

DPT

NORTH RCP DPTLOCATION

DP

T

WEST RCP DPTLOCATION

PIPE GUIDETYPICAL

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

GRCC Bid No: 1213-3294

C:\

Revit

Lo

calF

iles\7

1108000

CH

M12_C

EN

TR

AL

_K

sim

on

eau

x.r

vt

3/5

/2013

6:0

7:5

1P

M

1/8" = 1'-0"

CJZ

PETER AND PAT COOKACADEMIC HALL

RENOVATION

GRAND RAPIDS, MI

LEVEL 2 HVAC PIPINGPLAN - PHASE 2

M221.27111.080.00

RC

HVAC PIPING KEY NOTES

1 RADIANT CEILING PANEL CONTROL VALVES TO OPERATE ON SAME SIGNALFROM ROOM VAV CONTROLLER.

2. EXISTING AHU CHILLED WATER CONTROL VALVE TO BE REWORKED, REFERTO PIPING DIAGRAMS

3. PROVIDE THREE WAY CONTROL VALVE ON RCP

4. EXISTING FTR, PROVIDE NEW ISOLATION VALVE AND CONTROL VALVE FOREXISTING FTR

5. EXISTING CABINET UNIT HEATER, PROVIDE NEW ISOLATION VALVES ANDSTRAINER

HVAC PIPING GENERAL NOTES

1. THESE DRAWINGS INDICATE THE GENERAL EXTENT OF WORK BUT ARE NOTFABRICATION DRAWINGS. COORDINATE HVAC PIPING SYSTEMS WITH WORKOF ALL OTHER TRADES PRIOR TO ANY FABRICATION OR INSTALLATION.PROVIDE ALL FITTINGS, OFFSETS, AND TRANSITIONS AS REQUIRED FOR ACOMPLETE WORKABLE INSTALLATION.

2. PROVIDE ACCESS AROUND ALL NEW EQUIPMENT PER MANUFACTURER’SRECOMMENDATIONS.

3. ALL HVAC PIPING SHALL BE INSULATED AND LABELED IN ACCORDANCEWITH THE REQUIREMENTS OF THE PROJECT SPECIFICATIONS.

4. COORDINATE ALL RADIANT CEILING PANEL LENGTHS AND LOCATIONSALONG WITH ASSOCIATED PIPE DROPS WITH ARCHITECTURAL ANDSTRUCTURAL TRADES.

5. CONNECT ALL PIPING TO TERMINAL UNIT COILS PER DETAILS. DO NOTINSTALL PIPING WITHIN THE SERVICE CLEARANCE FOR TERMINAL UNITCONTROL PANEL OR ACCESS DOOR CLEARANCE ZONES.

6. LOCATE ALL HVAC SHUT-OFF VALVES AND TERMINAL UNITS IN ANACCESSIBLE LOCATION ABOVE AN ACCESS PANEL AND NO MORE THAN 24”ABOVE THE CEILING.

7. SEAL ALL PENETRATIONS THROUGH WALLS AND FLOORS AIR AND WATERTIGHT.

8. CONTRACTOR SHALL MAINTAIN ADEQUATE CLEARANCES (PER THE LATESTEDITION OF THE NATIONAL ELECTRIC CODE) ABOVE AND AROUND ANY NEWELECTRICAL PANELS, EQUIPMENT, AND TRANSFORMERS WHEN ROUTINGOVERHEAD HVAC PIPING.

9. COORDINATE ALL PIPE ROUTING WITH SITE CONDITIONS, EQUIPMENTMANUFACTURER’S RECOMMENDATIONS AND ALL OTHER TRADES TO AVOIDINTERFERENCES.

10. REFER TO PIPING DIAGRAMS, DETAILS, AND SPECIFICATIONS FOR VALVES,FITTINGS, AND OTHER ACCESSORIES.

11. COORDINATE ALL THERMOSTAT LOCATIONS WITH FURNITURE ANDARCHITECT. LOCATE AS CLOSE AS POSSIBLE TO DOOR WHERE INDICATEDBY DOOR.

12. ALL BRANCH PIPING TO TERMINAL UNITS SHALL BE 3/4” DIAMETER UNLESSNOTED OTHERWISE. BRANCH PIPING SERVING MORE THAN ONE TERMINALUNIT SHALL BE 1” DIAMETER UNLESS NOTED OTHERWISE.

13. ALL BRANCH PIPING SERVING CABINET UNIT HEATERS AND HOT WATERUNIT HEATERS SHALL BE 1” UNLESS NOTED OTHERWISE.

14. COORDINATE WITH SHEET METAL TRADES LOCATIONS OF DUCT-MOUNTEDHYDRONIC DEVICES.

1/8" = 1'-0"A3

LEVEL 2 HVAC PIPING PLAN - PHASE 2

X

02-20-2013 BIDS

03-05-2013 ADDENDUM 2

Page 21: MECHANICAL SYMBOLS MECHANICAL DRAWING LEGEND111841/AN~2...MECHANICAL SYMBOLS MECHANICAL SYSTEM INDICATION HEAVY LINE-WEIGHT INDICATES NEW WORK LIGHT LINE WEIGHT-INDICATES EXISTING

DN

UP

DN

UP

DN

UP

M

WAITING308

DENTAL RCPT309

STORAGE311

STORAGE330A

X-RAY314

X-RAY313

X-RAY315

X-RAY316

CLASSROOM304

WORK CENTER307

CLASSROOM329

TOILET363

WOMEN'S362

TESTING302

MECHANICAL364

MEN'S361

CNA TESTING303

CNA TESTING301

CLASSROOM322

LOBBY360

Space341

M LOCKER333

STUDY335

CONSULTATION310

CORRIDOR354

STUDY352

MATERIALS LAB306

CLASSROOM305

X-RAY325

X-RAY326

X-RAY327

X-RAY328

X-RAY317

SIM LAB319

X-RAY318

CORRIDOR-1351-1DRKRM

324

STERILIZATION320

W LOCKERS334

W LOCKER332

M LOCKER331

LOCKERS330

POSITIONING LAB323

8" CWRUP & DN8" CWSUP & DN

RCP-129'-4"1.2 GPM

6" HHWRUP & DN

6" CHWSUP & DN

6" CHWRUP & DN

-325VAV

-326VAV

-328VAV

-329VAV

-310VAV

-321CVAV

3/4" HHWS

3/4" HHWR

2" HHWS

1" HHWR

3/4" HHWR

2" HHWR

3/4" HHWS

6" HHWSUP & DN

1" HHWS

2" HHWS

-305VAV

-306VAV

-322VAV

-321AVAV

-301VAV

RCP-128'-0"1.2 GPM

RCP-116'-0"0.7 GPM

RCP-125'-0"1.0 GPM

RCP-129'-10"1.2 GPM

RCP-18'-0"0.3 GPM

RCP-112'-6"0.6 GPM

RCP-18'-0"0.3 GPM

RCP-116'-0"0.7 GPM

RCP-127'-10"1.1 GPM

RCP-128'-0"1.2 GPM

RCP-118'-0"0.8 GPM

RCP-114'-0"0.6 GPM

RCP-128'-0"1.2 GPM

1"

HH

WS

1"

HH

WR

1 1/2" HHWR

1

(TYP)

1

(TYP)

1"

HH

WR

1"

HH

WR

3/4

"H

HW

S

-327VAV

-323AVAV

-351AVAV

-320VAV -319VAV

-313VAV -314VAV -315VAV -316VAV -317VAV -318VAV

-311VAV

-309VAV

-335VAV

-334VAV-333VAV-332VAV

-330VAV

-330AVAV

-323CVAV

-323BVAV

-354VAV

-304VAV

-308VAV

-302VAV

-303VAV

-321BVAV

-321VAV

-351VAV

-307VAV

2"

HH

WS

-324VAV

3/4" HHWS 1 1/4" HHWS

11/2

"H

HW

S

2"

HH

WS

3/4

"H

HW

R

1"

HH

WR

11/4

"H

HW

R

2" HHWR1" HHWS

2"

HH

WR

RCP-125'-0"1.0 GPM

1"

HH

WR

1"

HH

WS

EL-3A

RCP-15'-0"0.5 GPM

RCP-14'-0"0.3 GPM

RCP-129'-4"1.2 GPM

RCP-129'-4"1.2 GPM

3/4" HHWS3/4" HHWR

EL-3B

1"

HH

WR

1"

HH

WS

EL-3C

EL-3D

1 1/2" HHWR2" HHWS

EL-3E

11/2

"H

HW

R

EL-3F

EL-3G

2"

HH

WS

1

J

2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

G

H

K

2.1 8.17.1

-331VAV

1 1/2" HHWR

3

3

3

3

3

3

RCP-15'-0"0.3 GPM

33RD FLOOR EAST RCPBALANCE TO 7.0 GPM

3RD FLOOR NORTHRCP BALANCE TO4.0 GPM

3RD FLOOREAST RCP,BALANCE TO7.0 GPM

1 1/2" HHWR

VAV-362

55

5

1 1/4" HHWR

1 1/4" HHWS

3/4

"H

HW

S

1 1/4" HHWR

1" HHWS1" HHWR

PIPE GUIDETYPICAL

1 1/4" HHWR1 1/4" HHWS

1" HHWS1" HHWR

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

GRCC Bid No: 1213-3294

C:\

Revit

Lo

calF

iles\7

1108000

CH

M12_C

EN

TR

AL

_K

sim

on

eau

x.r

vt

3/5

/2013

6:0

8:0

5P

M

1/8" = 1'-0"

CJZ

PETER AND PAT COOKACADEMIC HALL

RENOVATION

GRAND RAPIDS, MI

LEVEL 3 HVAC PIPINGPLAN - PHASE 2

M231.27111.080.00

RC

HVAC PIPING KEY NOTES

1 RADIANT CEILING PANEL CONTROL VALVES TO OPERATE ON SAME SIGNALFROM ROOM VAV CONTROLLER.

2. EXISTING AHU CHILLED WATER CONTROL VALVE TO BE REWORKED, REFERTO PIPING DIAGRAMS

3. PROVIDE THREE WAY CONTROL VALVE ON RCP

4. EXISTING FTR, PROVIDE NEW ISOLATION VALVE AND CONTROL VALVE FOREXISTING FTR

5. EXISTING CABINET UNIT HEATER, PROVIDE NEW ISOLATION VALVES ANDSTRAINER

HVAC PIPING GENERAL NOTES

1. THESE DRAWINGS INDICATE THE GENERAL EXTENT OF WORK BUT ARE NOTFABRICATION DRAWINGS. COORDINATE HVAC PIPING SYSTEMS WITH WORKOF ALL OTHER TRADES PRIOR TO ANY FABRICATION OR INSTALLATION.PROVIDE ALL FITTINGS, OFFSETS, AND TRANSITIONS AS REQUIRED FOR ACOMPLETE WORKABLE INSTALLATION.

2. PROVIDE ACCESS AROUND ALL NEW EQUIPMENT PER MANUFACTURER’SRECOMMENDATIONS.

3. ALL HVAC PIPING SHALL BE INSULATED AND LABELED IN ACCORDANCEWITH THE REQUIREMENTS OF THE PROJECT SPECIFICATIONS.

4. COORDINATE ALL RADIANT CEILING PANEL LENGTHS AND LOCATIONSALONG WITH ASSOCIATED PIPE DROPS WITH ARCHITECTURAL ANDSTRUCTURAL TRADES.

5. CONNECT ALL PIPING TO TERMINAL UNIT COILS PER DETAILS. DO NOTINSTALL PIPING WITHIN THE SERVICE CLEARANCE FOR TERMINAL UNITCONTROL PANEL OR ACCESS DOOR CLEARANCE ZONES.

6. LOCATE ALL HVAC SHUT-OFF VALVES AND TERMINAL UNITS IN ANACCESSIBLE LOCATION ABOVE AN ACCESS PANEL AND NO MORE THAN 24”ABOVE THE CEILING.

7. SEAL ALL PENETRATIONS THROUGH WALLS AND FLOORS AIR AND WATERTIGHT.

8. CONTRACTOR SHALL MAINTAIN ADEQUATE CLEARANCES (PER THE LATESTEDITION OF THE NATIONAL ELECTRIC CODE) ABOVE AND AROUND ANY NEWELECTRICAL PANELS, EQUIPMENT, AND TRANSFORMERS WHEN ROUTINGOVERHEAD HVAC PIPING.

9. COORDINATE ALL PIPE ROUTING WITH SITE CONDITIONS, EQUIPMENTMANUFACTURER’S RECOMMENDATIONS AND ALL OTHER TRADES TO AVOIDINTERFERENCES.

10. REFER TO PIPING DIAGRAMS, DETAILS, AND SPECIFICATIONS FOR VALVES,FITTINGS, AND OTHER ACCESSORIES.

11. COORDINATE ALL THERMOSTAT LOCATIONS WITH FURNITURE ANDARCHITECT. LOCATE AS CLOSE AS POSSIBLE TO DOOR WHERE INDICATEDBY DOOR.

12. ALL BRANCH PIPING TO TERMINAL UNITS SHALL BE 3/4” DIAMETER UNLESSNOTED OTHERWISE. BRANCH PIPING SERVING MORE THAN ONE TERMINALUNIT SHALL BE 1” DIAMETER UNLESS NOTED OTHERWISE.

13. ALL BRANCH PIPING SERVING CABINET UNIT HEATERS AND HOT WATERUNIT HEATERS SHALL BE 1” UNLESS NOTED OTHERWISE.

14. COORDINATE WITH SHEET METAL TRADES LOCATIONS OF DUCT-MOUNTEDHYDRONIC DEVICES.

X

1/8" = 1'-0"A3

LEVEL 3 HVAC PIPING PLAN - PHASE 2

02-20-2013 BIDS

03-05-2013 ADDENDUM 2

Page 22: MECHANICAL SYMBOLS MECHANICAL DRAWING LEGEND111841/AN~2...MECHANICAL SYMBOLS MECHANICAL SYSTEM INDICATION HEAVY LINE-WEIGHT INDICATES NEW WORK LIGHT LINE WEIGHT-INDICATES EXISTING

DN

UP

DN

UP

UP

DN

M

8" CWRUP & DN8" CWSUP & DN

CLASSROOM431

LACT410

TOILET463

WOMEN'S462

MECHANICAL464

MEN'S461

CO

RR

IDO

R452

RESTRM421A

OBSRV437

CNTRL435

OBSRV433

SIM LAB434

SIM LAB436

LOBBY460

BED LAB418

OFFICE403

BED PRACTICE409

BEDLAB413

BEDLAB424

CONF405

BRKRM404

COMPUTER LAB402

STORAGE430

STORAGE428

OTA LAB 1423

WORK CENTER411

BEDLAB426 BEDLAB

432

OTA APARTMENT421

BED LAB416

STUDY455STUDY

454BED LAB

420

CORRIDOR451

BTE425

OTA LAB 2427

CONF407

CONF406

HEALTHTUTORING

401

CORRIDOR453

CONF408

OFFICE417

BEDLAB415

2"

HH

WS

2"

HH

WR

-424VAV-423BVAV

-416VAV

-415VAV

-413VAV-432VAV

6" CHWRUP & DN

-427VAV

-403VAV

-405VAV

11/2

"H

HW

R

2" HHWS

2" HHWR 2" HHWS

3/4" HHWS

1 1/4" HHWR

6" HHWRUP & DN6" HHWSUP & DN6" CHWSUP & DN

2" HHWRUP & DN

RCP-124'-0"1.0 GPM

1

(TYP)

1

(TYP)

RCP-14'-0"0.3 GPM

RCP-128'-0"1.2 GPM

RCP-124'-0"1.0 GPM

RCP-14'-0"0.3 GPM

3/4" HHWR 1" HHWR1" HHWS3/4" HHWR

RCP-128'-9"1.2 GPM

3/4

"H

HW

R1

1/4

"H

HW

S1"

HH

WS

1"

HH

WR

RCP-149'-2"2.0 GPM

RCP-19'-7"0.4 GPM

RCP-128'-0"1.2 GPM

RCP-113'-4"0.6 GPM

RCP-154'-7"2.3 GPM

RCP-19'-7"0.5 GPM

RCP-123'-9"1.0 GPM

RCP-114'-8"0.6 GPM

1"

HH

WS

1"

HH

WR

1 1/4" HHWS3/4" HHWR

3/4

"H

HW

R1"

HH

WS

2

-402VAV

1 1/2" HHWR

-421VAV

-454VAV

-420VAV -418VAV-455VAV

-410VAV

-409VAV

-417VAV

-419VAV

-404VAV

-433VAV

-437VAV

-436VAV

-430VAV

-428VAV

-406VAV

RCP-115'-8"0.65 GPM

RCP-126'-10"1.1 GPM

RCP-126'-10"1.1 GPM

RCP-127'-0"1.2 GPM

3/4

"H

HW

R

1 1/4" HHWR

2"

HH

WR

1" HHWS 1" HHWS 1 1/4" HHWR2" HHWR

11/2

"H

HW

S1

1/2

"H

HW

S

2"

HH

WS

2"

HH

WS

1 1/2" HHWS

1"

HH

WR

1"

HH

WR

1"

HH

WS

EL-4A

3/4" HHWS

EL-4B

1"

HH

WR

EL-3C

1"

HH

WR

EL-4D

2" HHWS

EL-4E

EL-4F

EL-4G

2" HHWR

11/2

"H

HW

R

2" HHWS

1

J

2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

G

H

K

2.1 8.17.1

-426VAV

-423BVAV

-425VAV

-431VAV

-433VAV

-435VAV

-462VAV

-408VAV

-407VAV

-401AVAV

VAV-411

VAV-401B

3

3

3 3

3

3

4TH FLOOR WESTRCP, BALANCE TO7.0 GPM

4TH FLOORNORTH RCP,BALANCE TO4.0 GPM

4TH FLOOR EASTRCP, BALANCETO 10.0 GPM

1" HHWS

3/4" HWHS AND HWHRUP TO FTR

3/4" HWHSAND HWHRUP1 1/2" HWHR

DOWN1 1/4" HHWR

3/4" HHWS3/4" HHWS

3/4

"H

HW

S

11/2

"H

HW

R

1 1/2" HHWR

PIPE GUIDETYPICAL

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

GRCC Bid No: 1213-3294

C:\

Revit

Lo

calF

iles\7

1108000

CH

M12_C

EN

TR

AL

_K

sim

on

eau

x.r

vt

3/5

/2013

6:0

8:1

8P

M

1/8" = 1'-0"

CJZ

PETER AND PAT COOKACADEMIC HALL

RENOVATION

GRAND RAPIDS, MI

LEVEL 4 HVAC PIPINGPLAN - PHASE 1

M241.17111.080.00

RC

HVAC PIPING KEY NOTES

1 RADIANT CEILING PANEL CONTROL VALVES TO OPERATE ON SAME SIGNALFROM ROOM VAV CONTROLLER.

2. EXISTING AHU CHILLED WATER CONTROL VALVE TO BE REWORKED, REFERTO PIPING DIAGRAMS

3. PROVIDE THREE WAY CONTROL VALVE ON RCP

4. EXISTING FTR, PROVIDE NEW ISOLATION VALVE AND CONTROL VALVE FOREXISTING FTR

5. EXISTING CABINET UNIT HEATER, PROVIDE NEW ISOLATION VALVES ANDSTRAINER

HVAC PIPING GENERAL NOTES

1. THESE DRAWINGS INDICATE THE GENERAL EXTENT OF WORK BUT ARE NOTFABRICATION DRAWINGS. COORDINATE HVAC PIPING SYSTEMS WITH WORKOF ALL OTHER TRADES PRIOR TO ANY FABRICATION OR INSTALLATION.PROVIDE ALL FITTINGS, OFFSETS, AND TRANSITIONS AS REQUIRED FOR ACOMPLETE WORKABLE INSTALLATION.

2. PROVIDE ACCESS AROUND ALL NEW EQUIPMENT PER MANUFACTURER’SRECOMMENDATIONS.

3. ALL HVAC PIPING SHALL BE INSULATED AND LABELED IN ACCORDANCEWITH THE REQUIREMENTS OF THE PROJECT SPECIFICATIONS.

4. COORDINATE ALL RADIANT CEILING PANEL LENGTHS AND LOCATIONSALONG WITH ASSOCIATED PIPE DROPS WITH ARCHITECTURAL ANDSTRUCTURAL TRADES.

5. CONNECT ALL PIPING TO TERMINAL UNIT COILS PER DETAILS. DO NOTINSTALL PIPING WITHIN THE SERVICE CLEARANCE FOR TERMINAL UNITCONTROL PANEL OR ACCESS DOOR CLEARANCE ZONES.

6. LOCATE ALL HVAC SHUT-OFF VALVES AND TERMINAL UNITS IN ANACCESSIBLE LOCATION ABOVE AN ACCESS PANEL AND NO MORE THAN 24”ABOVE THE CEILING.

7. SEAL ALL PENETRATIONS THROUGH WALLS AND FLOORS AIR AND WATERTIGHT.

8. CONTRACTOR SHALL MAINTAIN ADEQUATE CLEARANCES (PER THE LATESTEDITION OF THE NATIONAL ELECTRIC CODE) ABOVE AND AROUND ANY NEWELECTRICAL PANELS, EQUIPMENT, AND TRANSFORMERS WHEN ROUTINGOVERHEAD HVAC PIPING.

9. COORDINATE ALL PIPE ROUTING WITH SITE CONDITIONS, EQUIPMENTMANUFACTURER’S RECOMMENDATIONS AND ALL OTHER TRADES TO AVOIDINTERFERENCES.

10. REFER TO PIPING DIAGRAMS, DETAILS, AND SPECIFICATIONS FOR VALVES,FITTINGS, AND OTHER ACCESSORIES.

11. COORDINATE ALL THERMOSTAT LOCATIONS WITH FURNITURE ANDARCHITECT. LOCATE AS CLOSE AS POSSIBLE TO DOOR WHERE INDICATEDBY DOOR.

12. ALL BRANCH PIPING TO TERMINAL UNITS SHALL BE 3/4” DIAMETER UNLESSNOTED OTHERWISE. BRANCH PIPING SERVING MORE THAN ONE TERMINALUNIT SHALL BE 1” DIAMETER UNLESS NOTED OTHERWISE.

13. ALL BRANCH PIPING SERVING CABINET UNIT HEATERS AND HOT WATERUNIT HEATERS SHALL BE 1” UNLESS NOTED OTHERWISE.

14. COORDINATE WITH SHEET METAL TRADES LOCATIONS OF DUCT-MOUNTEDHYDRONIC DEVICES.

1/8" = 1'-0"A3

LEVEL 4 HVAC PIPING PLAN - PHASE 1

X

02-20-2013 BIDS

03-05-2013 ADDENDUM 2

Page 23: MECHANICAL SYMBOLS MECHANICAL DRAWING LEGEND111841/AN~2...MECHANICAL SYMBOLS MECHANICAL SYSTEM INDICATION HEAVY LINE-WEIGHT INDICATES NEW WORK LIGHT LINE WEIGHT-INDICATES EXISTING

UP

DNDN

UP

DN

UP

VFD

VFDVFD

VFD

CLASSROOM514

WORK CENTER508

MEETING RM509

TOILET563

WOMEN'S562

CLASSROOM523

CLASSROOM524 COMPUTER LAB

525 COMPUTER LAB526

MECH564

MEN'S561

LOBBY560

CLASSROOM511CLASSROOM

513

CLASSROOM515

CLASSROOM512

Space476

COMPUTER LAB527

CONF506

OF

FIC

E502

CORRIDOR554

CLASSROOM510

STUDY522

CORRIDOR553

CLASSROOM520

CLASSROOM521

BREAKOUT516

STUDY517

BRKRM504

CLASSROOM507

CONF505

COMPUTER LAB503

CORRIDOR552

CORRIDOR550

ENGLISHTUTORING

501

CLASSROOM518

2"

HH

WS

2"

HH

WR

8" CWRUP & DN8" CWSUP & DN

234

RCP-120'-0"0.8 GPM

-522VAV

-521VAV

-520VAV

-519VAV

-518VAV

-512VAV-510VAV

-550VAV

-511VAV

-552VAV

-515VAV

-513VAV

-554VAV

-524VAV

-523VAV

-525VAV -526VAV

-503VAV

2" HHWS 2" HHWS2" HHWR

11/4

"H

HW

R

6" HHWRUP & DN6" HHWSUP & DN

6" CHWSUP & DN

RCP-119'-8"0.8 GPM

RCP-118'-0"0.75 GPM

RCP-112'-3"0.5 GPM

RCP-119'-8"0.8 GPM

RCP-118'-0"0.8 GPM

RCP-110'-0"0.5 GPM

1

(TYP)

1

(TYP)

3/4

"H

HW

S1"

HH

WS

RCP-119'-8"0.8 GPM

1"

HH

WS

1"

HH

WR

3/4

"H

HW

R

RCP-18'-9"0.5 GPM

RCP-124'-7"1.0 GPM

RCP-123'-8"0.9 GPM

RCP-127'-10"1.2 GPM

1" HHWS3/4" HHWR

RCP-19'-7"0.5 GPM

RCP-123'-0"0.9 GPM

RCP-18'-3"0.5 GPM

RCP-114'-7"0.6 GPM

RCP-113'-0"0.6 GPM

RCP-110'-0"0.5 GPM

RCP-154'-10"2.3 GPM

3/4" HHWR

3/4

"H

HW

S1"

HH

WS

3/4

"H

HW

R

3/4

"H

HW

S

1"

HH

WR

1" HHWS

-502VAV

-501BVAV

-504VAV

-505VAV

-506VAV

-507VAV

-560VAVRCP-19'-9"0.5 GPM

RCP-114'-3"0.7 GPM

RCP-114'-3"0.6 GPM

RCP-113'-11"0.6 GPM

3/4" HWHS &HWHWR TORCP,TYPICAL

1"

HH

WR

1"

HH

WR

11/4

"H

HW

R2"

HH

WS

1 1/4" HHWR 1 1/2" HHWR

2"

HH

WR

11/2

"H

HW

R1

1/2

"H

HW

S

2" HHWS

1"

HH

WR

1"

HH

WS

EL-5A

1" HHWR3/4" HHWS

EL-5B

1"

HH

WR

1"

HH

WS

EL-5C

11/4

"H

HW

R

EL-5D

EL-5E

EL-5F

2" HHWS

2"

HH

WS

2"

HH

WS

2"

HH

WS

2"

HH

WR

EL-5G

1" HHWS

2" HHWS1 1/2" HHWR

-527VAV

2" HHWS

1

J

2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

G

H

K

2.1 8.17.1

DPT

CP-1&2 DPTLOCATION

DP

T

CP-3&4 DPTLOCATION

-516-2VAV

-514VAV

3

3

3

3 3

3

3

3

5TH FLOOR WEST RCP,BALANCE TO 7.0 GPM

5TH FLOORNORTH RCP,BALANCE TO4.0 GPM

1 1/4" HHWS

1 1/2" HHWR

5TH FLOOR EASTRCP, BALANCE TO7.5 GPM

4

T

T

4

5 5

1" HHWR

1 1/4" HHWS

8" CHWRUP & DN

1 1/2" HWHRDOWN

STUDY519

PIPE GUIDETYPICAL

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

GRCC Bid No: 1213-3294

C:\

Revit

Lo

calF

iles\7

1108000

CH

M12_C

EN

TR

AL

_K

sim

on

eau

x.r

vt

3/5

/2013

6:0

8:3

0P

M

1/8" = 1'-0"

CJZ

PETER AND PAT COOKACADEMIC HALL

RENOVATION

GRAND RAPIDS, MI

LEVEL 5 HVAC PIPINGPLAN - PHASE 1

M251.17111.080.00

RC

HVAC PIPING KEY NOTES

1 RADIANT CEILING PANEL CONTROL VALVES TO OPERATE ON SAME SIGNALFROM ROOM VAV CONTROLLER.

2. EXISTING AHU CHILLED WATER CONTROL VALVE TO BE REWORKED, REFERTO PIPING DIAGRAMS

3. PROVIDE THREE WAY CONTROL VALVE ON RCP

4. EXISTING FTR, PROVIDE NEW ISOLATION VALVE AND CONTROL VALVE FOREXISTING FTR

5. EXISTING CABINET UNIT HEATER, PROVIDE NEW ISOLATION VALVES ANDSTRAINER

HVAC PIPING GENERAL NOTES

1. THESE DRAWINGS INDICATE THE GENERAL EXTENT OF WORK BUT ARE NOTFABRICATION DRAWINGS. COORDINATE HVAC PIPING SYSTEMS WITH WORKOF ALL OTHER TRADES PRIOR TO ANY FABRICATION OR INSTALLATION.PROVIDE ALL FITTINGS, OFFSETS, AND TRANSITIONS AS REQUIRED FOR ACOMPLETE WORKABLE INSTALLATION.

2. PROVIDE ACCESS AROUND ALL NEW EQUIPMENT PER MANUFACTURER’SRECOMMENDATIONS.

3. ALL HVAC PIPING SHALL BE INSULATED AND LABELED IN ACCORDANCEWITH THE REQUIREMENTS OF THE PROJECT SPECIFICATIONS.

4. COORDINATE ALL RADIANT CEILING PANEL LENGTHS AND LOCATIONSALONG WITH ASSOCIATED PIPE DROPS WITH ARCHITECTURAL ANDSTRUCTURAL TRADES.

5. CONNECT ALL PIPING TO TERMINAL UNIT COILS PER DETAILS. DO NOTINSTALL PIPING WITHIN THE SERVICE CLEARANCE FOR TERMINAL UNITCONTROL PANEL OR ACCESS DOOR CLEARANCE ZONES.

6. LOCATE ALL HVAC SHUT-OFF VALVES AND TERMINAL UNITS IN ANACCESSIBLE LOCATION ABOVE AN ACCESS PANEL AND NO MORE THAN 24”ABOVE THE CEILING.

7. SEAL ALL PENETRATIONS THROUGH WALLS AND FLOORS AIR AND WATERTIGHT.

8. CONTRACTOR SHALL MAINTAIN ADEQUATE CLEARANCES (PER THE LATESTEDITION OF THE NATIONAL ELECTRIC CODE) ABOVE AND AROUND ANY NEWELECTRICAL PANELS, EQUIPMENT, AND TRANSFORMERS WHEN ROUTINGOVERHEAD HVAC PIPING.

9. COORDINATE ALL PIPE ROUTING WITH SITE CONDITIONS, EQUIPMENTMANUFACTURER’S RECOMMENDATIONS AND ALL OTHER TRADES TO AVOIDINTERFERENCES.

10. REFER TO PIPING DIAGRAMS, DETAILS, AND SPECIFICATIONS FOR VALVES,FITTINGS, AND OTHER ACCESSORIES.

11. COORDINATE ALL THERMOSTAT LOCATIONS WITH FURNITURE ANDARCHITECT. LOCATE AS CLOSE AS POSSIBLE TO DOOR WHERE INDICATEDBY DOOR.

12. ALL BRANCH PIPING TO TERMINAL UNITS SHALL BE 3/4” DIAMETER UNLESSNOTED OTHERWISE. BRANCH PIPING SERVING MORE THAN ONE TERMINALUNIT SHALL BE 1” DIAMETER UNLESS NOTED OTHERWISE.

13. ALL BRANCH PIPING SERVING CABINET UNIT HEATERS AND HOT WATERUNIT HEATERS SHALL BE 1” UNLESS NOTED OTHERWISE.

14. COORDINATE WITH SHEET METAL TRADES LOCATIONS OF DUCT-MOUNTEDHYDRONIC DEVICES.

1/8" = 1'-0"A3

LEVEL 5 HVAC PIPING PLAN - PHASE 1

X

02-20-2013 BIDS

03-05-2013 ADDENDUM 2

Page 24: MECHANICAL SYMBOLS MECHANICAL DRAWING LEGEND111841/AN~2...MECHANICAL SYMBOLS MECHANICAL SYSTEM INDICATION HEAVY LINE-WEIGHT INDICATES NEW WORK LIGHT LINE WEIGHT-INDICATES EXISTING

DN

6" CHWR

8" CWR

8" CWS

6" HHWR

6" CHWS

1

2

3

4

5

6

6" CHWS

6" CHWR

8" CWS8" STM 8" STM

2"

HH

WS

11/2

"H

HW

S1

1/4

"H

HW

R2"

HH

WR

2"

HH

WS

2"

HH

WS

6" CHWR

6" HHWS

2" HHWR

(E)COOLING TOWERPUMPS

(E)DENTAL VACUUMPUMPS, TO BEREMOVED

(E)DENTAL AIRPUMPS, TO BEREMOVED

(E)CHILLEDWATER PUMPS

(E)CHILLER

(E)STEAM HEATEXCHANGER

(E)PERIMETERHEATING PUMPS

7 (E)CONDENSATERECEIVER

(E)60"x48" INTAKELOUVER ANDDAMPER

(E)AIRSEPARATOR

6" CHWR

88

8"

CW

R

8"

CW

S6"

CH

WR

6"

CH

WS

(E)60"x48" INTAKELOUVER ANDDAMPER

J

4 5 6 7

H

K

7.1

6" CHWS

6" CHWS

6" HHWR

(E)EF-9 9

10

(E)2" HWHS TO WESTPERIMETER ZONE

(E)2" HWHS TO NORTHPERIMETER ZONE

(E)2" HWHR FROM NORTHPERIMETER ZONE

(E)2" HWHS TO EASTPERIMETER ZONE

(E)1 1/4" HWHR FROMGARAGE ZONE

(E)1 1/2" HWHS TOGARAGE ZONE

(E)1 1/4" HWHR FROMGARAGE ZONE

(E)2" HWHR FROM WESTPERIMETER ZONE

(E)3/4" HWHR FROMWEST PERIMETER ZONE

(E)1" HWHS ANDHWHR FORSOUTHWESTSTAIRWELL CUH'S

(E)LOBBYCUH

1" HHWS 1" HHWS1" HHWR 1" HHWR

1" HHWS1" HHWR

(E)2" HWHR FROM EASTPERIMETER ZONE

3/4" HHWR

(E)3/4" HWHR FROMEAST PERIMETERZONE

3/4

"H

HW

R

11/4

"H

HW

R

11

11

11

11

11

11

11

11

11

11

8" CWR

8" CWS

6" HHWR

CH-1

CP-6

CP-5

CP-7 CP-8

CP-1 CP-2

2"

HH

WS

2"

HH

WS

2"

HH

WR

11/4

"H

HW

R1

1/2

"H

HW

S

2"

HH

WS

10" CWS

1

8" STM

2" HHWR

3/4

"H

HW

R

6" HHWS

2" HHWR

HX-1

HX-2

(E)60"x48" INTAKELOUVER ANDDAMPER

48" SERVICECLEARANCE TO SIDEOF CHILLER

48" ELECTRICALCLEARANCE TO SIDEOF CHILLER

TUBE PULL CLEARANCE INFRONT OF CHILLER TO EXTENDTHROUGH EXISTING DOUBLEENTRANCE DOORS

50"x50" EXHAUSTLOUVER ANDDAMPER

10" CWR

CONNECT NEW10" CWR & CWSINTO (E)8" CWS &CWR

10" CWR

10"

CW

R

10"

CW

R

10" CWS

10"

CW

S

10" CWS

10" CWR

J

4 5 6 7

H

K

7.1

6" STM

CONNECT NEW 8"STEAM INTOEXISTING EF-6

3

4

CRU-1

CONDENSATELINE FROM HX-1AND HX-2 TOCRU-1

10" CWR

8" CHWS

8" CHWR

SSF-3AIR/DIRTSEPARATOR

CONNECT NEW 8"CHWR & CHWSINTO (E)6" CHWS& CHWR

SSF-1 AIR/DIRTSEPARATOR

6" HHWR

6" HHWR

6" HHWR

CONNECT NEW 6"HWHR & HWHSINTO (E)6" HWHS& HWHR

CP-4CP-3

6" HHWS

6" HHWS6"

HH

WS

ET-2

NURSING AIRCOMP. ACP-1

ACP-1

LINE SIZE AIR/DIRTSEPARATOR

50"x

50"

(E)LOBBYCUH

1" HHWS1" HHWR

8" CHWR

8" CHWS

8" CHWR

INSTALL NEWBALANCE ANDISOLATION VALVE, SETAT 6.0 GPM

3/4" HWHR FROM1ST FLOOR WESTPERIMETER ZONE

3/4" HWHR FROM1ST FLOOR EASTPERIMETER ZONE

INSTALL NEWBALANCE ANDISOLATION VALVE, SETAT 6.0 GPM

EXISTING 2" HWHR FROMPERIMTER EAST ZONE

PROVIDE NEWISOLATION, BALANCEVALVES AND FILTERSFOR EXISTING CUH,1ST AND 2ND FLOOR

EXISTING 8" STEAMFROM CENTRAL PLANTIN MAIN BUILDING

11/4

"H

HW

R

INSTALL NEW ISOLATIONVALVES IN EXISTING LINES

(E)2" HWHS TO WESTPERIMETER ZONE

(E)2" HWHS TO NORTHPERIMETER ZONE

(E)2" HWHR FROM NORTHPERIMETER ZONE

(E)2" HWHS TO EASTPERIMETER ZONE

(E)1 1/4" HWHR FROMGARAGE ZONE

(E)1 1/2" HWHS TOGARAGE ZONE

(E)1 1/4" HWHR FROMGARAGE ZONE

INSTALL NEWBALANCE VALVES,SET @ 11.0 GPM ea

INSTALL NEWBALANCE VALVE, SET@ 39.0 GPM

(E)FIRE PROTECTIONRISER TO REMAIN

6" HHWS 6" HHWS1" HHWS

(E)1" HWHS ANDHWHR TO SWSTAIRWELL CUH'S

INSTALL NEW ISOLATIONAND BALANCE VALVES, SET@ 6.0 GPM

5

5

5 5

5

5

4" HHWS

10" CWR

10" CWS

10" CWR

1" HHWR

2" HHWR

1" HHWR1" HHWS

4" HHWS

6" HHWR

4" HHWR

4" HHWR

4" HHWR

CAP EXISTING 60"x40"LOUVER

6

6" HHWS

6" HHWR

SSF-2

2"

HH

WS

2"

HH

WS

BALANCEVALVE SET@ 40.0 GPM

8" CHWS

2"

CH

WS

2" CHWS

7

6" FP

6"

FP

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

GRCC Bid No: 1213-3294

C:\

Revit

Lo

calF

iles\7

1108000

CH

M12_C

EN

TR

AL

_K

sim

on

eau

x.r

vt

3/6

/2013

11:5

0:4

9A

M

1/4" = 1'-0"

CJZ

PETER AND PAT COOKACADEMIC HALL

RENOVATION

GRAND RAPIDS, MI

ENLARGED MECHANICALPLAN - PHASE 1

M301.17111.080.00

RC

1/4" = 1'-0"E5

ENLARGED LEVEL G2 CHILLER ROOM DEMOLITION PLAN- PHASE 1

1/4" = 1'-0"A5

ENLARGED LEVEL G2 CHILLER ROOM NEW WORK PLAN -PHASE 1

MECHANICAL KEY NOTES

1 HX-1 AND HX-2 MOUNTED ON STEEL FRAME MOUNTED TO WALL.

2. CH-1 TO BE SHIPPED BROKEN DOWN TO FIT THROUGH EXISTINGDOUBLE 36" DOOR OPENING. EXISTING MASONARY OPENING IS 82"HIGH x 76" WIDE

3. ROUTE 26"x26" EXHAUST DUCT DOWN TO 18" A.F.F.. MOUNTEDEMERGENCY EXHAUST FAN EF-6 IN EXHAUST DUCT. PROVIDEBACKDRAFT DAMPER ON 50"x50" EXHAUST DUCT

4. MOUNT CONDENSATE RECIEVER ON 4" CONCRETE HOUSKEEPINGPAD

5. INSULATE AND LABEL ALL NEW AND EXISTING PIPING INMECHANICAL ROOM

6. ROUTE NEW 1 1/2" HWHS AND HWHR TO RELOCATED UNIT HEATER,PROVIDE ISOILATION AND BALANCE VALVES

7. ROUTE REFRIGERANT RELIEF PIPING FROM CHILLER TOATMOSPHERE, TURN DOWN 90 DEGREE

X

MECHANICAL DEMOLITION NOTES

1 REMOVE EXISTING CHILLED WATER PUMPS COMPLETE INCLUDINGCONCRETE BASES. CAP PIPING FOR FUTURE CONNECTION.

2 REMOVE EXISTING CONDENSER WATER PUMPS COMPLETE INCLUDINGCONCRETE BASES. CAP PIPING FOR FUTURE CONNECTION.

3 REMOVE EXISTING CHILLER COMPLETE WITH ASSOCIATED PIPING.REMOVE STEAM AND CONDENSATE PIPING BACK TO STEAM MAIN ANDCAP. REMOVE EXISTING CHILLED WATER AND CONDENSER WATERPIPING AND CAP FOR FUTURE CONNECTION.

4 REMOVE EXISTING FOUR INLINE RECIRCULATING PUMPS COMPLETEWITH ASSOCIATED HHW PIPING.

5 REMOVE EXISTING BASE MOUNTED HOT WATER HEATING PUMPSCOMPLETE WITH ASSOCIATED PIPING AND CONTROLS.

6 REMOVE EXISTING HYDRONIC HEAT EXCHANGER COMPLETE WITHASSOCIATED PIPING. REMOVE STEAM PIPING BACK TO MAIN AND CAPFOR FUTURE CONNECTION.

7 DISCONNECT AND REMOVE EXISTING CONDENSATE LINE,CONDENSATE RECIEVER, PUMPS AND CONTROLS COMPLETE.

8 DISCONNECT AND REMOVE EXISTING STEAM AND CONDENSATE PIPINGFROM EXISTING STEAM HEAT EXCHANGER BACK CONDENSATERECIEVER. CAP PIPING.

9 DISCONNECT AND REMOVE EXISTING EXHAUST FAN, DUCTWORK,HANGERS AND CONTROLS COMPLETE. EXISTING EXHAUST LOUVER TOREMAIN, PROVIDE INSULATED SHEET METAL CAP OVER LOUVEROPENING. INSULATE WITH MINIMUM 8" INSULATION.

10 DISCONNECT AND RELOCATE EXISTING HYDRONIC UNIT HEATER, SEENEW WORK PLANS FOR NEW LOCATION.

11 REMOVE ALL EXISTING PIPE INSULATION ON ALL CW, HW, HWR, CHWS,CHWR, HWHS AND HWHR IN MECHANICAL ROOM. PROVIDE NEW PIPEINSULATION AND LABELS PER SPECIFICATIONS.

X

HVAC PIPING GENERAL DEMOLITION NOTES

1. ANY INTERRUPTIONS OF EXISTING SERVICES OR EQUIPMENT SHALL BEPERFORMED AT A TIME APPROVED IN ADVANCE BY THE OWNER’SREPRESENTATIVE SO AS NOT TO INTERFERE WITH THE BUILDINGOPERATION.

2. THESE DRAWINGS INDICATE THE GENERAL EXTENT OF WORK. THE EXTENTOF DEMOLITION SHALL BE AS REQUIRED BY THE NEW WORK AND REMOVALOF MATERIALS/COMPONENTS NOT REQUIRED FOR THE NEW ANDRENOVATED SYSTEMS.

3. ALL MECHANICAL SYSTEMS TO BE REMOVED SHALL BE REMOVEDCOMPLETE WITH ALL RELATED ITEMS INCLUDING HANGERS, SUPPORTS,CONTROLS, ETC CAP ALL OPEN PIPES AND DUCTS. PATCH AND SEAL ALLOPENINGS AS A RESULT OF DEMOLITION IN RATED WALLS TO MAINTAINEXISTING WALL’S FIRE OR SMOKE RATING AND TO MATCH EXISTINGADJACENT SURFACES

4. ALL ITEMS AND EQUIPMENT REMOVED SHALL REMAIN PROPERTY OF THEOWNER UNLESS POSSESSION RIGHTS ARE WAIVED. CONTRACTOR SHALLMEET WITH OWNER PRIOR TO START OF DEMOLITION TO DETERMINEWHICH ITEMS ARE TO BE SALVAGED. CONTRACTOR SHALL REMOVEREMAINING ITEMS FROM SITE.

5. FIELD VERIFY EXACT SIZE AND LOCATION OF ALL EXISTING SERVICESPRIOR TO START OF DEMOLITION.

HVAC PIPING GENERAL NOTES

1. THESE DRAWINGS INDICATE THE GENERAL EXTENT OF WORK BUT ARE NOTFABRICATION DRAWINGS. COORDINATE HVAC PIPING SYSTEMS WITH WORKOF ALL OTHER TRADES PRIOR TO ANY FABRICATION OR INSTALLATION.PROVIDE ALL FITTINGS, OFFSETS, AND TRANSITIONS AS REQUIRED FOR ACOMPLETE WORKABLE INSTALLATION.

2. PROVIDE ACCESS AROUND ALL NEW EQUIPMENT PER MANUFACTURER’SRECOMMENDATIONS.

3. ALL HVAC PIPING SHALL BE INSULATED AND LABELED IN ACCORDANCEWITH THE REQUIREMENTS OF THE PROJECT SPECIFICATIONS.

4. COORDINATE ALL RADIANT CEILING PANEL LENGTHS AND LOCATIONSALONG WITH ASSOCIATED PIPE DROPS WITH ARCHITECTURAL ANDSTRUCTURAL TRADES.

5. CONNECT ALL PIPING TO TERMINAL UNIT COILS PER DETAILS. DO NOTINSTALL PIPING WITHIN THE SERVICE CLEARANCE FOR TERMINAL UNITCONTROL PANEL OR ACCESS DOOR CLEARANCE ZONES.

6. LOCATE ALL HVAC SHUT-OFF VALVES AND TERMINAL UNITS IN ANACCESSIBLE LOCATION ABOVE AN ACCESS PANEL AND NO MORE THAN 24”ABOVE THE CEILING.

7. SEAL ALL PENETRATIONS THROUGH WALLS AND FLOORS AIR AND WATERTIGHT.

8. CONTRACTOR SHALL MAINTAIN ADEQUATE CLEARANCES (PER THE LATESTEDITION OF THE NATIONAL ELECTRIC CODE) ABOVE AND AROUND ANY NEWELECTRICAL PANELS, EQUIPMENT, AND TRANSFORMERS WHEN ROUTINGOVERHEAD HVAC PIPING.

9. COORDINATE ALL PIPE ROUTING WITH SITE CONDITIONS, EQUIPMENTMANUFACTURER’S RECOMMENDATIONS AND ALL OTHER TRADES TO AVOIDINTERFERENCES.

10. REFER TO PIPING DIAGRAMS, DETAILS, AND SPECIFICATIONS FOR VALVES,FITTINGS, AND OTHER ACCESSORIES.

11. COORDINATE ALL THERMOSTAT LOCATIONS WITH FURNITURE ANDARCHITECT. LOCATE AS CLOSE AS POSSIBLE TO DOOR WHERE INDICATEDBY DOOR.

12. ALL BRANCH PIPING TO TERMINAL UNITS SHALL BE 3/4” DIAMETER UNLESSNOTED OTHERWISE. BRANCH PIPING SERVING MORE THAN ONE TERMINALUNIT SHALL BE 1” DIAMETER UNLESS NOTED OTHERWISE.

13. ALL BRANCH PIPING SERVING CABINET UNIT HEATERS AND HOT WATERUNIT HEATERS SHALL BE 1” UNLESS NOTED OTHERWISE.

14. COORDINATE WITH SHEET METAL TRADES LOCATIONS OF DUCT-MOUNTEDHYDRONIC DEVICES.

02-20-2013 BIDS

03-05-2013 ADDENDUM 2

Page 25: MECHANICAL SYMBOLS MECHANICAL DRAWING LEGEND111841/AN~2...MECHANICAL SYMBOLS MECHANICAL SYSTEM INDICATION HEAVY LINE-WEIGHT INDICATES NEW WORK LIGHT LINE WEIGHT-INDICATES EXISTING

MM

VFD

VFD

VFD

M

M

M

M

MM

J

4 5

H

K

11

EXISTING 72"x60"RETURN AIRPLENUM

16"x

10"

EXISTING34"x34"EXHAUST DUCT

EXISTING 60"x120"RELIEF AIRLOUVER

EXISTING 120"x60"OUTSIDE AIRLOUVER

60"x36"

60"x36"

2

EXISTING RF-5

EXISTINGRELIEF AIRDAMPEREXISTING RETURN

AIR DAMPER

EXISTINGRF-5 VFD

EXISTING 6"CHWS & CHWR

EXISTING 4"HWHS & HWHR

EXISTING 8" CWS& CWR

1 1/4" HWHRDOWN(PERIMETER)

120"x

24"

EXISTINGAHU-5 CC-5

EXISTINGAHU-5 3

4EXISTING AHUFILTERSECTION

5

6

74"

CH

WS

4"

CH

WR

2 1/2" HHWR2

1/2

"H

HW

S

CP-12

2"

HH

WS

2"

HH

WR

9

9

9

9

72"x

20"

AFMS

10

AF

MS

11

DPT

CP-5&6 DPTLOCATION

12

12

J

4 5

H

EXISTING 120"x60"OUTSIDE AIR LOUVERAND DAMPER

EXISTING 60"x120"RELIEF AIR LOUVER

EXISTING RF-4

EXISTING 72"x60"RETURN AIRPLENUM

EXISTING AHU-5FILTER AND PREHEATCOIL

EXISTING AHU-4

EXISTING AHU-4CC-5

EXISTINGAHU-4 SF-4VFD

4

5

EXISTING60"x22" RADUCT LOW TOREMAIN

6

7

9

10

EXISTING RETURNAIR DUCT

16"x10"

16"x

10"

16"x10"

EXISTING 28"x34"EXHAUST DUCT UPAND DOWN

EXISTING 6"CHWS & CHWR

EXISTING 4"HWHS & HWHR

EXISTING 8"CWS & CWR

1

8

J

4 5

H

1

EXISTING 72"x60"RETURN AIRPLENUM

EXISTING28"x34"EXHAUST DUCT

EXISTING 60"x120"RELIEF AIRLOUVER

EXISTING 120"x60"OUTSIDE AIRLOUVER

8

EXISTING RF-4

EXISTINGRELIEF AIRDAMPEREXISTING RETURN

AIR DAMPER

EXISTINGAHU-4 CC-4

EXISTINGAHU-4

3

72"x20"

EXISTING 6"CHWS & CHWR

EXISTING 4"HWHS & HWHR

EXISTING 8" CWS& CWR

1 1/4" HWHRDOWN(PERIMETER)

4EXISTING AHUFILTERSECTION

5

6

7

1

4"

CH

WS

4"

CH

WR

60"x36"

2" HHWS

2" HHWR

CP-11

2 1/2" HHWR

EXISTING AHU-4VFD LOCATION

9

9

9

9

120"x

24"

72"x

20"

72"x

20"

AFMS

10

AF

MS

11

12

12

J

4 5

H

EXISTING 120"x60"OUTSIDE AIR LOUVERAND DAMPER

EXISTING 60"x120"RELIEF AIR LOUVER

EXISTING RF-5

EXISTING 72"x60"RETURN AIRPLENUM

EXISTING AHU-5FILTER AND PREHEATCOIL

EXISTING AHU-5

EXISTING AHU-5CC-5

EXISTINGAHU-5 SF-5VFD

4

5

EXISTING60"x22" RADUCT LOW TOREMAIN

6

7

8

60"x36" 60"x36"9

10

EXISTING 44"x44" EXHAUSTDUCT UP TO ROOF EXHAUSTFAN

16"x10"

16"x10"

16"x

10"

64"x

22"

EXISTING RETURNAIR DUCT

EXISTING 6"CHWS ANDCHWR

EXISTING 4"HWHS ANDHWHR

EXISTING4" RC

EXISTING 8"CWS AND CWR

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

GRCC Bid No: 1213-3294

C:\

Revit

Lo

calF

iles\7

1108000

CH

M12_C

EN

TR

AL

_K

sim

on

eau

x.r

vt

3/5

/2013

6:0

9:0

3P

M

1/4" = 1'-0"

CJZ

PETER AND PAT COOKACADEMIC HALL

RENOVATION

GRAND RAPIDS, MI

LEVEL 4 & 5 ENLARGEDMECHANICAL ROOM -PHASE 1

M302.17111.080.00

RC

1/4" = 1'-0"A7

ENLARGED LEVEL 5 NEW WORK PLAN - PHASE 1

1/4" = 1'-0"C2

ENLARGED LEVEL 4 DEMOLTION PLAN - PHASE 1

1/4" = 1'-0"A2

ENLARGED LEVEL 4 NEW WORK PLAN - PHASE 1

NTSC7

ENLARGED LEVEL 5 DEMOLITION PLAN -PHASE 1

DEMOLITION KEY NOTES

1 REMOVE EXISTING AIR HANDLING UNIT REHEAT COIL COMPLETE WITHASSOCIATED PIPING AND PUMP. REMOVE PIPING BACK TO NEXT ACTIVEBRANCH AND CAP FOR FUTURE CONNECTION. EXISTING PREHEAT COIL TOREMAIN.

2 REMOVE EXISTING DUCT MOUNTED HEATING COIL COMPLETE WITHASSOCIATED PIPING. REMOVE PIPING BACK TO MECHANICAL ROOM ANDCAP FOR FUTURE CONNECTION.

3 REMOVE EXISTING FINNED TUBE RADIATION COMPLETE WITH ASSOCIATEDPIPING. REMOVE PIPING BACK TO CHASE AND CAP.

4 REMOVE EXISTING CHILLED WATER PUMP COMPLETE WITH ASSOCIATEDCONTROLS.

5. DISCONNECT AND REMOVE EXISTING AHU SUPPLY AIR DUCT COMPLETE,SEE NEW WORK PLANS FOR NEW DUCTWORK

6. DISCONNECT AND REMOVE EXISTING AHU FILTER RACK, EXISTING FILTERBOX TO REMAIN FOR NEW WORK

7. DISCONNECT AND REMOVE EXISTING RETURN FAN MOTOR, BELTS ANDSHEAVES, SEE NEW WORK PLANS

8. EXISTING AHU SUPPLY FAN VFD TO REMAIN

9. DISCONNECT AND REMOVE EXSITING AHU BELTS AND SHEEVES, SEE NEWWORK PLANS AND DETAILS FOR NEW WORK

10. DISCONNECT AND REMOVE EXISTING DUCTWORK COMPLETE INCLUDINGALL HANGERS AND SUPPORTS. PATCH OPENINGS TO MATCH EXISTING

11. DISCONNECT AND REMOVE EXISTING HYDRONIC PIPING AS REQUIRED TOFACILITATE THE INSTALLATION OF NEW HVAC WORK

HVAC PIPING GENERAL NOTES

1. THESE DRAWINGS INDICATE THE GENERAL EXTENT OF WORK BUT ARE NOTFABRICATION DRAWINGS. COORDINATE HVAC PIPING SYSTEMS WITH WORKOF ALL OTHER TRADES PRIOR TO ANY FABRICATION OR INSTALLATION.PROVIDE ALL FITTINGS, OFFSETS, AND TRANSITIONS AS REQUIRED FOR ACOMPLETE WORKABLE INSTALLATION.

2. PROVIDE ACCESS AROUND ALL NEW EQUIPMENT PER MANUFACTURER’SRECOMMENDATIONS.

3. ALL HVAC PIPING SHALL BE INSULATED AND LABELED IN ACCORDANCEWITH THE REQUIREMENTS OF THE PROJECT SPECIFICATIONS.

4. COORDINATE ALL RADIANT CEILING PANEL LENGTHS AND LOCATIONSALONG WITH ASSOCIATED PIPE DROPS WITH ARCHITECTURAL ANDSTRUCTURAL TRADES.

5. CONNECT ALL PIPING TO TERMINAL UNIT COILS PER DETAILS. DO NOTINSTALL PIPING WITHIN THE SERVICE CLEARANCE FOR TERMINAL UNITCONTROL PANEL OR ACCESS DOOR CLEARANCE ZONES.

6. LOCATE ALL HVAC SHUT-OFF VALVES AND TERMINAL UNITS IN ANACCESSIBLE LOCATION ABOVE AN ACCESS PANEL AND NO MORE THAN 24”ABOVE THE CEILING.

7. SEAL ALL PENETRATIONS THROUGH WALLS AND FLOORS AIR AND WATERTIGHT.

8. CONTRACTOR SHALL MAINTAIN ADEQUATE CLEARANCES (PER THE LATESTEDITION OF THE NATIONAL ELECTRIC CODE) ABOVE AND AROUND ANY NEWELECTRICAL PANELS, EQUIPMENT, AND TRANSFORMERS WHEN ROUTINGOVERHEAD HVAC PIPING.

9. COORDINATE ALL PIPE ROUTING WITH SITE CONDITIONS, EQUIPMENTMANUFACTURER’S RECOMMENDATIONS AND ALL OTHER TRADES TO AVOIDINTERFERENCES.

10. REFER TO PIPING DIAGRAMS, DETAILS, AND SPECIFICATIONS FOR VALVES,FITTINGS, AND OTHER ACCESSORIES.

11. COORDINATE ALL THERMOSTAT LOCATIONS WITH FURNITURE ANDARCHITECT. LOCATE AS CLOSE AS POSSIBLE TO DOOR WHERE INDICATEDBY DOOR.

12. ALL BRANCH PIPING TO TERMINAL UNITS SHALL BE 3/4” DIAMETER UNLESSNOTED OTHERWISE. BRANCH PIPING SERVING MORE THAN ONE TERMINALUNIT SHALL BE 1” DIAMETER UNLESS NOTED OTHERWISE.

13. ALL BRANCH PIPING SERVING CABINET UNIT HEATERS AND HOT WATERUNIT HEATERS SHALL BE 1” UNLESS NOTED OTHERWISE.

14. COORDINATE WITH SHEET METAL TRADES LOCATIONS OF DUCT-MOUNTEDHYDRONIC DEVICES.

SHEET METAL GENERAL NOTES

1. THESE DRAWINGS INDICATE THE GENERAL EXTENT OF WORK BUT ARE NOTFABRICATION DRAWINGS. COORDINATE SHEET METAL SYSTEMS WITH WORKOF ALL OTHER TRADES PRIOR TO ANY FABRICATION OR INSTALLATION.PROVIDE ALL FITTINGS, OFFSETS, AND TRANSITIONS, ETC. AS REQUIREDFOR A COMPLETE WORKABLE INSTALLATION.

2. PROVIDE ACCESS AROUND ALL NEW EQUIPMENT PER MANUFACTURERSRECOMMENDATIONS.

3. ALL SHEET METAL RELATED CORING THROUGH FLOORS SHALL BE BYMECHANICAL CONTRACTOR.

4. ALL DUCTWORK SHALL BE ROUTED AS HIGH AS POSSIBLE, UNLESSOTHERWISE NOTED. COORDINATE ROUTING WITH OTHER TRADES TO AVOIDINTERERENCES.

5. BALANCE ALL AIR SYSTEMS TO INDICATED AIR FLOW RATES.

6. DUCT SIZES TO DIFFUSERS SHALL MATCH NECK SIZE OF EACH. REFER TOGRILLE, REGISTER & DIFFUSER SCHEDULE.

7. ALL DUCTWORK SHALL BE INSULATED AND LABELED IN ACCORDANCE WITHTHE REQUIREMENTS OF THE PROJECT SPECIFICATION.

8. ALL DUCTWORK SHALL BE CONCEALED IN WALLS AND/OR CEILING SPACE,UNLESS OTHERWISE NOTED.

9. SEAL ALL PENETRATIONS THROUGH WALLS PER DETAILS ANDSPECIFICATIONS.

10. COORDINATE EXACT LOCATIONS OF ALL DIFFUSERS AND RETURN GRILLESWITH ARCHITECTURAL AND ELECTRIC REFLECTED CEILING PLANS.

11. COORDINATE ALL THERMOSTAT LOCATIONS WITH FURNITURE ANDARCHITECT.

12. VAV BOXES AND VALVES SHALL BE LOCATED NO MORE THAN 24 INCHESABOVE SUSPENDED CEILINGS FOR ACCESS.

13. COORDINATE DUCT LOCATIONS WITHIN CLASSROOMS WITH CEILINGPROJECT SUPPORTS

SHEET METAL GENERAL DEMOLITION NOTES

1. ANY INTERRUPTIONS OF EXISTING SERVICES OR EQUIPMENT SHALL BEPERFORMED AT A TIME APPROVED IN ADVANCE BY THE OWNER'SREPRESENTATIVE SO AS NOT TO INTERFERE WITH THE BUILDINGOPERATION.

2. THESE DRAWINGS INDICATE THE GENERAL EXTENT OF WORK. THE EXTENTOF DEMOLITION SHALL BE AS REQUIRED BY THE NEW WORK AND REMOVALOF MATERIALS/COMPONENTS NOT REQUIRED FOR THE NEW ANDRENOVATED SYSTEMS.

3. ALL MECHANICAL SYSTEMS TO BE REMOVED SHALL BE REMOVED COMPLETEWITH ALL RELATED ITEMS INCLUDING HANGERS, SUPPORTS, CONTROLS, ETC.CAP ALL OPEN PIPES AND DUCTS. PATCH AND SEAL ALL OPENINGS AS ARESULT OF DEMOLITION IN RATED WALLS TO MAINTAIN EXISTING WALL'S FIREOR SMOKE RATING AND TO MATCH EXISTING ADJACENT SURFACES.

4. ALL ITEMS AND EQUIPMENT REMOVED SHALL REMAIN PROPERTY OF THEOWNER UNLESS POSSISSION RIGHTS ARE WAIVED. CONTRACTOR SHALLMEET WITH OWNER PRIOR TO START OF DEMOLITION TO DETERMINE WHICHITEMS ARE TO BE SALVAGED. CONTRACTOR SHALL REMOVE REMAININGITEMS FROM SITE.

5. FIELD VERIFY EXACT SIZE AND LOCATION OF ALL EXISTING SERVICES PRIORTO DEMOLITION.

HVAC PIPING GENERAL DEMOLITION NOTES

1. ANY INTERRUPTIONS OF EXISTING SERVICES OR EQUIPMENT SHALL BEPERFORMED AT A TIME APPROVED IN ADVANCE BY THE OWNER’SREPRESENTATIVE SO AS NOT TO INTERFERE WITH THE BUILDINGOPERATION.

2. THESE DRAWINGS INDICATE THE GENERAL EXTENT OF WORK. THE EXTENTOF DEMOLITION SHALL BE AS REQUIRED BY THE NEW WORK AND REMOVALOF MATERIALS/COMPONENTS NOT REQUIRED FOR THE NEW ANDRENOVATED SYSTEMS.

3. ALL MECHANICAL SYSTEMS TO BE REMOVED SHALL BE REMOVEDCOMPLETE WITH ALL RELATED ITEMS INCLUDING HANGERS, SUPPORTS,CONTROLS, ETC CAP ALL OPEN PIPES AND DUCTS. PATCH AND SEAL ALLOPENINGS AS A RESULT OF DEMOLITION IN RATED WALLS TO MAINTAINEXISTING WALL’S FIRE OR SMOKE RATING AND TO MATCH EXISTINGADJACENT SURFACES

4. ALL ITEMS AND EQUIPMENT REMOVED SHALL REMAIN PROPERTY OF THEOWNER UNLESS POSSESSION RIGHTS ARE WAIVED. CONTRACTOR SHALLMEET WITH OWNER PRIOR TO START OF DEMOLITION TO DETERMINEWHICH ITEMS ARE TO BE SALVAGED. CONTRACTOR SHALL REMOVEREMAINING ITEMS FROM SITE.

5. FIELD VERIFY EXACT SIZE AND LOCATION OF ALL EXISTING SERVICESPRIOR TO START OF DEMOLITION.

ENLARGED MECHANICAL PLAN KEY NOTES

1. NEW RETURN AIR DUCT FROM SPACE, CONNECT TO EXSITING RETURN AIRDUCT IN MECHAICAL ROOM. PROVIDE FIRE/SMOKE DAMPER AT WALL

2. PROVIDE NEW DOUBLE BELTS, SHEEVES, BELT GUARD FOR EXISTINGMOTOR. BALANCE RETURN FAN TO NEW CFM. PROVIDE STEEL SUPPORTSTAND TO MOUNT VFD ON

3. PROVIDE NEW DOUBLE BELTS AND SHEEVES ON EXISTING AHU SUPPLYFAN. BALANCE TO CFM INDICATED ON SCHEDULES

4. PROVIDE NEW FILTERS IN EXISTING FILTER HOUSING, REFER TOSCHEDULES FOR FILTER DIMENSIONS. PROVIDE ACCESS PANEL IN SIDE OFEXISTING DUCT FOR ACCESS FOR INSTALLTION OF NEW FILTER RACK

5. PROVIDE DOUBLE WALL DUCTWORK OFF TOP OF EXISTING AHU TO WALLPENETRATION. INSULATE DOUBLE WALL PANEL. PROVIDE FIRE/SMOKEDAMPER AT WALL

6. CONNECT NEW CHILLED WATER PIPING TO EXISTING. REFER TO DETAILSHEET FOR PIPING ARRANGEMENT

7. CONNECT NEW HEATING PIPING INTO EXISTING. REFER TO DETAIL SHEETFOR PIPING ARRANGEMENT

8. PROVIDE NEW DOUBLE BELTS, SHEEVES, BELT GUARD, MOTOR AND VFDFOR EXISTING RETURN FAN. BALANCE RETURN FAN TO NEW CFM. PROVIDESTEEL SUPPORT STAND FOR VFD TO MOUNT ON

9. PROVIDE NEW PIPE LABELS AND FLOW ARROWS ON EXISTING PIPING .PATCH EXSITING PIPE INSULLATION

10. RETURN FAN AIR FLOW MEASURING STATION MOUNTED IN EXISTING DUCT

11. RELIEF AIR FLOW MEASURING STATION MOUNTED IN EXISTING DUCT

12. PROVIDE 24"x24" PRESSURE RELIEF ACCESS DOOR ON DUCT

X X

02-20-2013 BIDS

03-05-2013 ADDENDUM 2

Page 26: MECHANICAL SYMBOLS MECHANICAL DRAWING LEGEND111841/AN~2...MECHANICAL SYMBOLS MECHANICAL SYSTEM INDICATION HEAVY LINE-WEIGHT INDICATES NEW WORK LIGHT LINE WEIGHT-INDICATES EXISTING

M

M

M

M

M

J

4 5

H

EXISTING 120"x60"OUTSIDE AIR LOUVERAND DAMPER

EXISTING 60"x120"RELIEF AIR LOUVER

EXISTING RF-2

EXISTING 72"x60"RETURN AIRPLENUM

EXISTING AHU-2FILTER AND PREHEATCOIL

EXISTING AHU-2CC-5

EXISTING AHU-2SF-2 VFD

4

5

EXISTING60"x22" RADUCT LOW TOREMAIN

6

7

8

9

EXISTING 18"x28" EXHAUSTDUCT UP TO ROOF EXHAUSTFAN

EXISTING RETURNAIR DUCT

EXISTING 6"CHWS ANDCHWR

EXISTING 4"HWHS ANDHWHR

EXISTING4" RC

EXISTING 8"CWS AND CWR 1

6"x

10"

16"x

10"

60"x36"60"x36"

1

5

J

4 5

H

EXISTING 120"x60"OUTSIDE AIR LOUVERAND DAMPER

EXISTING 60"x120"RELIEF AIR LOUVER

EXISTING RF-3

EXISTING 72"x60"RETURN AIRPLENUM

EXISTING AHU-3FILTER AND PREHEATCOIL

EXISTING AHU-3CC-3

EXISTINGAHU-3 SF-3VFD

4

5

EXISTING60"x22" RADUCT LOW TOREMAIN

6

7

8

9

10

EXISTING 44"x44" EXHAUSTDUCT UP TO ROOF EXHAUSTFAN

EXISTING RETURNAIR DUCT

EXISTING 6"CHWS ANDCHWR

EXISTING 4"HWHS ANDHWHR

EXISTING4" RC

EXISTING 8"CWS AND CWR

EXSITING 12" DIAEXHAUST DUCTUP TO 4TH FLOOR

EXISTING28"x28"EXHAUST DUCT

16"x

10"

16"x

10"

60"x36"

EXISTING AHU-3

5

1

J

4 5

H

1

EXISTING 72"x60"RETURN AIRPLENUM

EXISTING18"x28"EXHAUST DUCT

EXISTING 60"x120"RELIEF AIRLOUVER

EXISTING 120"x60"OUTSIDE AIRLOUVER

8

EXISTING RF-2

EXISTINGRELIEF AIRDAMPER

EXISTING RETURNAIR DAMPER

EXISTINGAHU-2, CC-2

EXISTINGAHU-2 3

EXISTING AHU-2VFD LOCATION

72"x

20"

72"x22"

1

2" HHWR

2" HHWS

11/4

"D

CA

EXISTING60"x22" RADUCT LOW TOREMAIN

EXISTING 6"CHWS ANDCHWR

EXISTING 4"HWHS ANDHWHR

EXISTING4" RC

EXISTING 8"CWS AND CWR

9

9

9

9

EXISTING 120"x60"OUTSIDE AIRLOUVER

4EXISTING AHUFILTERSECTION

5

6

7

4"

CH

WS

4"

CH

WR

CP-9

3"

SA

N

3" SAN

3"

SA

N

2ND RCPWESTBALANCE TO16.0 GPM

2ND FLOOR VAVBALANCE TO 35.0 GPM

1 1/4" HHWRAFMS

10

11

AF

MS

1212

J

4 5

H

18"x

10"

16"x

10"

16"x

10"

1

EXISTING 72"x60"RETURN AIRPLENUM

EXISTING28"x28"EXHAUST DUCT

EXISTING 60"x120"RELIEF AIRLOUVER

EXISTING 120"x60"OUTSIDE AIRLOUVER

8

EXISTING RF-3

EXISTINGRELIEF AIRDAMPEREXISTING RETURN

AIR DAMPER

EXISTINGAHU-3, CC-3

EXISTINGAHU-3 3

72"x

20"

2" HHWS

2" HHWR

11/4

"H

HW

R

1

EXISTING AHU-3FILTER AND PREHEATCOIL

EXISTING60"x22" RADUCT LOW TOREMAIN

6

EXISTING 6"CHWS ANDCHWR

EXISTING 6"HWHS ANDHWHR

EXISTING4" RC

EXISTING 8"CWS AND CWR

4"

CH

WS

4"

CH

WR

6

9

9

9

9

9

53RD FLOOR RCPWEST, BALANCETO 7.0 GPM

3RD FLOOR VAVBALANCE TO 35.0 GPM

AFMS

10

AF

MS

11

CP-10

2 1/2" HHWR

1212

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

GRCC Bid No: 1213-3294

C:\

Revit

Lo

calF

iles\7

1108000

CH

M12_C

EN

TR

AL

_K

sim

on

eau

x.r

vt

3/5

/2013

6:0

9:2

3P

M

1/4" = 1'-0"

CJZ

PETER AND PAT COOKACADEMIC HALL

RENOVATION

GRAND RAPIDS, MI

LEVEL 2 & 3 ENLARGEDMECHANICAL ROOM -PHASE 2

M302.27111.080.00

RC

1/4" = 1'-0"C2

ENLARGED LEVEL 2 DEMOLITION PLAN - PHASE 21/4" = 1'-0"

C7ENLARGED LEVEL 3 DEMOLITION PLAN - PHASE 2

1/4" = 1'-0"A2

ENLARGED LEVEL 2 NEW WORK PLAN - PHASE 21/4" = 1'-0"

A7ENLARGED LEVEL 3 NEW WORK PLAN - PHASE 2

HVAC PIPING GENERAL DEMOLITION NOTES

1. ANY INTERRUPTIONS OF EXISTING SERVICES OR EQUIPMENT SHALL BEPERFORMED AT A TIME APPROVED IN ADVANCE BY THE OWNER’SREPRESENTATIVE SO AS NOT TO INTERFERE WITH THE BUILDINGOPERATION.

2. THESE DRAWINGS INDICATE THE GENERAL EXTENT OF WORK. THE EXTENTOF DEMOLITION SHALL BE AS REQUIRED BY THE NEW WORK AND REMOVALOF MATERIALS/COMPONENTS NOT REQUIRED FOR THE NEW ANDRENOVATED SYSTEMS.

3. ALL MECHANICAL SYSTEMS TO BE REMOVED SHALL BE REMOVEDCOMPLETE WITH ALL RELATED ITEMS INCLUDING HANGERS, SUPPORTS,CONTROLS, ETC CAP ALL OPEN PIPES AND DUCTS. PATCH AND SEAL ALLOPENINGS AS A RESULT OF DEMOLITION IN RATED WALLS TO MAINTAINEXISTING WALL’S FIRE OR SMOKE RATING AND TO MATCH EXISTINGADJACENT SURFACES

4. ALL ITEMS AND EQUIPMENT REMOVED SHALL REMAIN PROPERTY OF THEOWNER UNLESS POSSESSION RIGHTS ARE WAIVED. CONTRACTOR SHALLMEET WITH OWNER PRIOR TO START OF DEMOLITION TO DETERMINEWHICH ITEMS ARE TO BE SALVAGED. CONTRACTOR SHALL REMOVEREMAINING ITEMS FROM SITE.

5. FIELD VERIFY EXACT SIZE AND LOCATION OF ALL EXISTING SERVICESPRIOR TO START OF DEMOLITION.

HVAC PIPING GENERAL NOTES

1. THESE DRAWINGS INDICATE THE GENERAL EXTENT OF WORK BUT ARE NOTFABRICATION DRAWINGS. COORDINATE HVAC PIPING SYSTEMS WITH WORKOF ALL OTHER TRADES PRIOR TO ANY FABRICATION OR INSTALLATION.PROVIDE ALL FITTINGS, OFFSETS, AND TRANSITIONS AS REQUIRED FOR ACOMPLETE WORKABLE INSTALLATION.

2. PROVIDE ACCESS AROUND ALL NEW EQUIPMENT PER MANUFACTURER’SRECOMMENDATIONS.

3. ALL HVAC PIPING SHALL BE INSULATED AND LABELED IN ACCORDANCEWITH THE REQUIREMENTS OF THE PROJECT SPECIFICATIONS.

4. COORDINATE ALL RADIANT CEILING PANEL LENGTHS AND LOCATIONSALONG WITH ASSOCIATED PIPE DROPS WITH ARCHITECTURAL ANDSTRUCTURAL TRADES.

5. CONNECT ALL PIPING TO TERMINAL UNIT COILS PER DETAILS. DO NOTINSTALL PIPING WITHIN THE SERVICE CLEARANCE FOR TERMINAL UNITCONTROL PANEL OR ACCESS DOOR CLEARANCE ZONES.

6. LOCATE ALL HVAC SHUT-OFF VALVES AND TERMINAL UNITS IN ANACCESSIBLE LOCATION ABOVE AN ACCESS PANEL AND NO MORE THAN 24”ABOVE THE CEILING.

7. SEAL ALL PENETRATIONS THROUGH WALLS AND FLOORS AIR AND WATERTIGHT.

8. CONTRACTOR SHALL MAINTAIN ADEQUATE CLEARANCES (PER THE LATESTEDITION OF THE NATIONAL ELECTRIC CODE) ABOVE AND AROUND ANY NEWELECTRICAL PANELS, EQUIPMENT, AND TRANSFORMERS WHEN ROUTINGOVERHEAD HVAC PIPING.

9. COORDINATE ALL PIPE ROUTING WITH SITE CONDITIONS, EQUIPMENTMANUFACTURER’S RECOMMENDATIONS AND ALL OTHER TRADES TO AVOIDINTERFERENCES.

10. REFER TO PIPING DIAGRAMS, DETAILS, AND SPECIFICATIONS FOR VALVES,FITTINGS, AND OTHER ACCESSORIES.

11. COORDINATE ALL THERMOSTAT LOCATIONS WITH FURNITURE ANDARCHITECT. LOCATE AS CLOSE AS POSSIBLE TO DOOR WHERE INDICATEDBY DOOR.

12. ALL BRANCH PIPING TO TERMINAL UNITS SHALL BE 3/4” DIAMETER UNLESSNOTED OTHERWISE. BRANCH PIPING SERVING MORE THAN ONE TERMINALUNIT SHALL BE 1” DIAMETER UNLESS NOTED OTHERWISE.

13. ALL BRANCH PIPING SERVING CABINET UNIT HEATERS AND HOT WATERUNIT HEATERS SHALL BE 1” UNLESS NOTED OTHERWISE.

14. COORDINATE WITH SHEET METAL TRADES LOCATIONS OF DUCT-MOUNTEDHYDRONIC DEVICES.

SHEET METAL GENERAL NOTES

1. THESE DRAWINGS INDICATE THE GENERAL EXTENT OF WORK BUT ARE NOTFABRICATION DRAWINGS. COORDINATE SHEET METAL SYSTEMS WITH WORKOF ALL OTHER TRADES PRIOR TO ANY FABRICATION OR INSTALLATION.PROVIDE ALL FITTINGS, OFFSETS, AND TRANSITIONS, ETC. AS REQUIREDFOR A COMPLETE WORKABLE INSTALLATION.

2. PROVIDE ACCESS AROUND ALL NEW EQUIPMENT PER MANUFACTURERSRECOMMENDATIONS.

3. ALL SHEET METAL RELATED CORING THROUGH FLOORS SHALL BE BYMECHANICAL CONTRACTOR.

4. ALL DUCTWORK SHALL BE ROUTED AS HIGH AS POSSIBLE, UNLESSOTHERWISE NOTED. COORDINATE ROUTING WITH OTHER TRADES TO AVOIDINTERERENCES.

5. BALANCE ALL AIR SYSTEMS TO INDICATED AIR FLOW RATES.

6. DUCT SIZES TO DIFFUSERS SHALL MATCH NECK SIZE OF EACH. REFER TOGRILLE, REGISTER & DIFFUSER SCHEDULE.

7. ALL DUCTWORK SHALL BE INSULATED AND LABELED IN ACCORDANCE WITHTHE REQUIREMENTS OF THE PROJECT SPECIFICATION.

8. ALL DUCTWORK SHALL BE CONCEALED IN WALLS AND/OR CEILING SPACE,UNLESS OTHERWISE NOTED.

9. SEAL ALL PENETRATIONS THROUGH WALLS PER DETAILS ANDSPECIFICATIONS.

10. COORDINATE EXACT LOCATIONS OF ALL DIFFUSERS AND RETURN GRILLESWITH ARCHITECTURAL AND ELECTRIC REFLECTED CEILING PLANS.

11. COORDINATE ALL THERMOSTAT LOCATIONS WITH FURNITURE ANDARCHITECT.

12. VAV BOXES AND VALVES SHALL BE LOCATED NO MORE THAN 24 INCHESABOVE SUSPENDED CEILINGS FOR ACCESS.

13. COORDINATE DUCT LOCATIONS WITHIN CLASSROOMS WITH CEILINGPROJECT SUPPORTS

SHEET METAL GENERAL DEMOLITION NOTES

1. ANY INTERRUPTIONS OF EXISTING SERVICES OR EQUIPMENT SHALL BEPERFORMED AT A TIME APPROVED IN ADVANCE BY THE OWNER'SREPRESENTATIVE SO AS NOT TO INTERFERE WITH THE BUILDINGOPERATION.

2. THESE DRAWINGS INDICATE THE GENERAL EXTENT OF WORK. THE EXTENTOF DEMOLITION SHALL BE AS REQUIRED BY THE NEW WORK AND REMOVALOF MATERIALS/COMPONENTS NOT REQUIRED FOR THE NEW ANDRENOVATED SYSTEMS.

3. ALL MECHANICAL SYSTEMS TO BE REMOVED SHALL BE REMOVED COMPLETEWITH ALL RELATED ITEMS INCLUDING HANGERS, SUPPORTS, CONTROLS, ETC.CAP ALL OPEN PIPES AND DUCTS. PATCH AND SEAL ALL OPENINGS AS ARESULT OF DEMOLITION IN RATED WALLS TO MAINTAIN EXISTING WALL'S FIREOR SMOKE RATING AND TO MATCH EXISTING ADJACENT SURFACES.

4. ALL ITEMS AND EQUIPMENT REMOVED SHALL REMAIN PROPERTY OF THEOWNER UNLESS POSSISSION RIGHTS ARE WAIVED. CONTRACTOR SHALLMEET WITH OWNER PRIOR TO START OF DEMOLITION TO DETERMINE WHICHITEMS ARE TO BE SALVAGED. CONTRACTOR SHALL REMOVE REMAININGITEMS FROM SITE.

5. FIELD VERIFY EXACT SIZE AND LOCATION OF ALL EXISTING SERVICES PRIORTO DEMOLITION.

DEMOLITION KEY NOTES

1 REMOVE EXISTING AIR HANDLING UNIT REHEAT COIL COMPLETE WITHASSOCIATED PIPING AND PUMP. REMOVE PIPING BACK TO NEXT ACTIVEBRANCH AND CAP FOR FUTURE CONNECTION. EXISTING PREHEAT COIL TOREMAIN.

2 REMOVE EXISTING DUCT MOUNTED HEATING COIL COMPLETE WITHASSOCIATED PIPING. REMOVE PIPING BACK TO MECHANICAL ROOM ANDCAP FOR FUTURE CONNECTION.

3 REMOVE EXISTING FINNED TUBE RADIATION COMPLETE WITH ASSOCIATEDPIPING. REMOVE PIPING BACK TO CHASE AND CAP.

4 REMOVE EXISTING CHILLED WATER PUMP COMPLETE WITH ASSOCIATEDCONTROLS.

5. DISCONNECT AND REMOVE EXISTING AHU SUPPLY AIR DUCT COMPLETE,SEE NEW WORK PLANS FOR NEW DUCTWORK

6. DISCONNECT AND REMOVE EXISTING AHU FILTER RACK, EXISTING FILTERBOX TO REMAIN FOR NEW WORK

7. DISCONNECT AND REMOVE EXISTING RETURN FAN MOTOR, BELTS ANDSHEAVES, SEE NEW WORK PLANS

8. EXISTING AHU SUPPLY FAN VFD TO REMAIN

9. DISCONNECT AND REMOVE EXSITING AHU BELTS AND SHEEVES, SEE NEWWORK PLANS AND DETAILS FOR NEW WORK

10. DISCONNECT AND REMOVE EXISTING DUCTWORK COMPLETE INCLUDINGALL HANGERS AND SUPPORTS. PATCH OPENINGS TO MATCH EXISTING

11. DISCONNECT AND REMOVE EXISTING HYDRONIC PIPING AS REQUIRED TOFACILITATE THE INSTALLATION OF NEW HVAC WORK

02-20-2013 BIDS

03-05-2013 ADDENDUM 2

ENLARGED MECHANICAL PLAN KEY NOTES

1. NEW RETURN AIR DUCT FROM SPACE, CONNECT TO EXSITING RETURN AIRDUCT IN MECHAICAL ROOM. PROVIDE FIRE/SMOKE DAMPER AT WALL

2. PROVIDE NEW DOUBLE BELTS, SHEEVES, BELT GUARD FOR EXISTINGMOTOR. BALANCE RETURN FAN TO NEW CFM. PROVIDE STEEL SUPPORTSTAND TO MOUNT VFD ON

3. PROVIDE NEW DOUBLE BELTS AND SHEEVES ON EXISTING AHU SUPPLYFAN. BALANCE TO CFM INDICATED ON SCHEDULES

4. PROVIDE NEW FILTERS IN EXISTING FILTER HOUSING, REFER TOSCHEDULES FOR FILTER DIMENSIONS. PROVIDE ACCESS PANEL IN SIDE OFEXISTING DUCT FOR ACCESS FOR INSTALLTION OF NEW FILTER RACK

5. PROVIDE DOUBLE WALL DUCTWORK OFF TOP OF EXISTING AHU TO WALLPENETRATION. INSULATE DOUBLE WALL PANEL. PROVIDE FIRE/SMOKEDAMPER AT WALL

6. CONNECT NEW CHILLED WATER PIPING TO EXISTING. REFER TO DETAILSHEET FOR PIPING ARRANGEMENT

7. CONNECT NEW HEATING PIPING INTO EXISTING. REFER TO DETAIL SHEETFOR PIPING ARRANGEMENT

8. PROVIDE NEW DOUBLE BELTS, SHEEVES, BELT GUARD, MOTOR AND VFDFOR EXISTING RETURN FAN. BALANCE RETURN FAN TO NEW CFM. PROVIDESTEEL SUPPORT STAND FOR VFD TO MOUNT ON

9. PROVIDE NEW PIPE LABELS AND FLOW ARROWS ON EXISTING PIPING .PATCH EXSITING PIPE INSULLATION

10. RETURN FAN AIR FLOW MEASURING STATION MOUNTED IN EXISTING DUCT

11. RELIEF AIR FLOW MEASURING STATION MOUNTED IN EXISTING DUCT

12. PROVIDE 24"x24" PRESSURE RELIEF ACCESS DOOR ON DUCT

XX

Page 27: MECHANICAL SYMBOLS MECHANICAL DRAWING LEGEND111841/AN~2...MECHANICAL SYMBOLS MECHANICAL SYSTEM INDICATION HEAVY LINE-WEIGHT INDICATES NEW WORK LIGHT LINE WEIGHT-INDICATES EXISTING

G1 LEVEL

1ST LEVEL

2ND LEVEL

3RD LEVEL

4TH LEVEL

5TH LEVEL

CHILLEDWATERSUPPLY& RETURN

ROOF

(E) CONCRETE PAD

(E)CONDENSINGWATER SUPPLY(REFER TO M402)

CHWP-4

CHWP-3

CHWP-2

(E)AIR SEPARATORCHILLED WATER RETURN

CHILLED WATER SUPPLY

(E)DRAINVALVES

FLOW INDICATOR

FLOW INDICATOR

(E)FLOW INDICATOR

CHILLEDWATERSUPPLY& RETURN

(E)EXPANSION TANK80 GAL.20"Ø X 66"

#12 REDUCINGVALVE & BY PASS

C.W.

(E)RELIEF VALVE

(E)CONDENSING WATER RETURN(REFER TO M402)

CONDENSINGWATER SUPPLY(REFER TO M402)

(E)STEAM PIPE(REFER TO M403)

G2 LEVEL

CHWP-5

(E)CC-5

(E)CC-4

CC-3

CC-2

CC-1

CHWP-1

CP-6

CP-7

CH-1

DISCONNECT AND REMOVE EXISTINGCHILLED WATER PUMP, TYPICAL 2ND,3RD, 4TH AND 5TH FLOORS.

(E)CHILLED WATER PUMP ANDPIPING ON 1ST FLOOR REMAIN

DISCONNECT AND REMOVE EXISTINGCHILLED WATER PUMPS, ISOLATIONVALVES, CHECK VALVES AND BALANCEVALVES COMPLETE, SEE NEW WORKPLANS

DISCONNECT AND REMOVE EXISTINGCHILLED, STEAM, CONDENSATE, CHWS,CHWR, CWS AND CWR PIPING COMPLETE.INCLUDING ALL CHILLER SENSORS ANDCONTROLS. SEE NEW WORK PLANS FORNEW CHILLER PIPING

DISCONNECT AND REMOVE EXISTINGBYPASS, TYPICAL 2ND, 3RD, 4TH AND5TH FLOORS.

FLOW INDICATOR

FLOW INDICATOR

AIR/DIRTSEPARATOR

8" CHILLED WATERRETURN

8" CHILLED WATERSUPPLY

DRAIN VALVES

FLOW INDICATOR

ROOF

#12 REDUCINGVALVE & BY PASS

C.W.

RELIEF VALVE

CONDENSING WATER RETURN(REFER TO M402)

CONDENSINGWATER SUPPLY(REFER TO M402)

PROVIDE NEW CONCRETE PADMINIMUM 15" HIGH UNDER NEWCHILLER

CONDENSINGWATER SUPPLY(REFER TO M402)

(E)CC-5

(E)CC-2

CC-1

CHWP-1

CP-6

CP-5

CH-1

(E)CHILLED WATER PUMPON 1ST FLOOR TO REMAINAS IS

PROVIDE NEW CP 5 &6 ISOLATIONVALVES, CHECK VALVES, BALANCEVALVES AND FLEX CONENCTIONS,REFER TO PUMP PIPING DIAGRAM

G1 LEVEL

1ST LEVEL

2ND LEVEL

3RD LEVEL

4TH LEVEL

5TH LEVEL

G2 LEVEL

PROVIDE NEW CHILLER PIPING COMPLETE.INCLUDING ALL CHILLER SENSORS ANDCONTROLS. PROVIDE REFRIGERANTMONITORING SYSTEM.

REPIPE EXISTINGCOOLING COIL,REFER TO DETAILSFOR FITTINGS ANDACCESSORIES

(E)CC-3

REPIPE EXISTINGCOOLING COIL,REFER TO DETAILSFOR FITTINGS ANDACCESSORIES

(E)CC-4

REPIPE EXISTINGCOOLING COIL,REFER TO DETAILSFOR FITTINGS ANDACCESSORIES

REPIPE EXISTINGCOOLING COIL,REFER TO DETAILSFOR FITTINGS ANDACCESSORIES

REFER TO SCHDULESFOR COOIL COIL NEWFLOW RATES

REFER TO SCHDULESFOR COOIL COIL NEWFLOW RATES

REFER TO SCHDULESFOR COOIL COIL NEWFLOW RATES

REFER TO SCHDULESFOR COOIL COIL NEWFLOW RATES

EXISTING CHILLED WATERSUPPLY AND RETURN,PROVIDE NEW PIPELABELS ON EXISTINGPIPING

EXISTING CHILLED WATERSUPPLY AND RETURN,PROVIDE NEW PIPELABELS ON EXISTINGPIPING

SSF-2

2"

MOUNT SIDE STREAMFILTER ON 4"CONCRETEHOUSEKEEPING PAD

EXPANSION TANKET-1

MOUNT EXPANSIONTANK ON 4"CONCRETEHOUSEKEEPING PAD

PROVIDE FULL SIZEDRAIN AND VALVE,ROUTE TO NEARESTFLOOR DRAIN

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

GRCC Bid No: 1213-3294

C:\

Revit

Lo

calF

iles\7

1108000

CH

M12_C

EN

TR

AL

_K

sim

on

eau

x.r

vt

3/5

/2013

6:4

1:4

8P

M

12" = 1'-0"

CJZ

PETER AND PAT COOKACADEMIC HALL

RENOVATION

GRAND RAPIDS, MI

MECHANICAL DIAGRAMS

M4017111.080.00

RC

NTSA2

DEMOLITION CHILLED WATER RISER DIAGRAMNTS

A7NEW WORK CHILLED WATER RISER DIAGRAM

02-20-2013 BIDS

03-05-2013 ADDENDUM 2

Page 28: MECHANICAL SYMBOLS MECHANICAL DRAWING LEGEND111841/AN~2...MECHANICAL SYMBOLS MECHANICAL SYSTEM INDICATION HEAVY LINE-WEIGHT INDICATES NEW WORK LIGHT LINE WEIGHT-INDICATES EXISTING

DRAIN VALVES

CONDENSING WATER RETURN

CONDENSING WATER SUPPLY

G1 LEVEL

1ST LEVEL

2ND LEVEL

3RD LEVEL

4TH LEVEL

5TH LEVEL

ROOF

(E) CONCRETE CHILLER PAD

(E)STRAINER

(E)DRAINVALVES

TRIPLE DUTYCHECK VALVE

PIPE UP TOCOOLING TOWER

DISCONNECT AND REMOVE EXISTINGCHILLED WATER SUPPLY AND RETURNPIPING ON CHILLER, INCLUDING ALLCONTROL SENSORS. EXISTING PIPINGTO REMAIN FOR NEW WORK

DISCONNECT AND REMOVE (E)STEAMAND CONDENSATE PIPING CAP AT MAIN.DISCONNECT AND REMOVE EXISTINGCONDENSATE RECEIVER, PIPING ANDCONTROLS COMPLETE

G2 LEVEL

CONDENSING WATER SUPPLY

CHWP-8

CHWP-9

CH-1

DISCONNECT AND REMOVE EXISTING BASEMOUNTED CIRCULATING PUMPS, ISOLATIONVALVES, CHECK VALVES AND PUMPCONTROLS COMPLETE. EXISTING PIPING TOREMAIN FOR NEW WORK

DISCONNECT AND REMOVE EXISTINGCONDENSER WATER PIPING SUPPLYAND RETURN FROM EXISTING CHILLER,INCLUDING ALL CONTROL SENSORS

10" CONDENSINGWATER RETURN

10" CONDENSINGWATER SUPPLY

ROOF

PROVIDE NEW CONCRETEPAD TO ACCLIMATED NEWCHILLER FOOT PRINT.PROVIDE MINIMUM 15" PADFOR TUBE REMOVAL

CP-8

CP-7

PROVIDE NEW CHWS ANDCHWR PIPING AT NEWCHILLER, INCLUDE NEWISOLATION VALVES, CHECKVALVES, FLOW SWITCHES,THERMOMETERS ANDPRESSURE GAUGES ATCHILLER

ROUTE NEW DRAINVALVES FROM NEWCHILLER TO NEARESTFLOOR DRAIN

ROUTE REFRIGERANTRELIEF LINE FROM CHILLERTO ATMOSPHERE

PROVIDE NEW CWP-8&9 WITH NEWISOLATION, FLEXIBLE CONNECTORS,BALANCE AND CHECK VALES

(E)CWS AND CWR PIPING TO REMAIN. PROVIDENEW PIPE LABELS AND FLOW ARROWS ONEXISTING PIPING EACH FLOOR ANDMECHANICAL ROOMS

(E)CWS AND CWR PIPING TO REMAIN. PROVIDENEW PIPE LABELS AND FLOW ARROWS ONEXISTING PIPING EACH FLOOR ANDMECHANICAL ROOMS

G1 LEVEL

1ST LEVEL

2ND LEVEL

3RD LEVEL

4TH LEVEL

5TH LEVEL

G2 LEVEL

CH-1

CWR

CWS

SSF-1

10" DIRTSEPERATOR

10"

10"

10"

10"

10"

CWS

10"

2"

2"

MOUNT SIDE STREAMFILTER ON 4"CONCRETEHOUSEKEEPING PAD

EXISTING COOLING TOWER ONROOF, MARLEY MODELNC8305FLIGG, BUILT 03/19/09,REMOVE AND REPLACEEXISTING METERING ORFICESTO MATCH NEW FLOW OF 1200GPM. CONTACT DAN ROESNERAT RBE INC 248-874-2006

EXISTING 8" PIPING ONROOF, LABELEXISTING PIPING

EXSITING BYPASSCONTROL VALVEON ROOF

PROVIDE FULL SIZE DRAINLINE AND VALVE, PIPE TONEAREST FLOOR DRAIN

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

GRCC Bid No: 1213-3294

C:\

Revit

Lo

calF

iles\7

1108000

CH

M12_C

EN

TR

AL

_K

sim

on

eau

x.r

vt

3/5

/2013

6:4

5:4

6P

M

12" = 1'-0"

CJZ

PETER AND PAT COOKACADEMIC HALL

RENOVATION

GRAND RAPIDS, MI

MECHANICALCONDENSER WATERPIPING DIAGRAMS

M4027111.080.00

RC

NTSA2

CONDENSER WATER DEMOLITION PIPINGDIAGRAM

NTSA7

CONDENSER WATER NEW WORK PIPINGDIAGRAM

02-20-2013 BIDS

03-05-2013 ADDENDUM 2

Page 29: MECHANICAL SYMBOLS MECHANICAL DRAWING LEGEND111841/AN~2...MECHANICAL SYMBOLS MECHANICAL SYSTEM INDICATION HEAVY LINE-WEIGHT INDICATES NEW WORK LIGHT LINE WEIGHT-INDICATES EXISTING

1ST LEVEL

2ND LEVEL

3RD LEVEL

CONDENSING WATER RETURN(REFER TO M402)

CONDENSINGWATER SUPPLY

(REFER TO M402)

12" HIGH CONC. PAD16'-0" X 6'-2"

CONDENSINGWATER SUPPLY(REFER TO M402)

CHILLED WATER SUPPLY & RETURN(REFER TO M401)

PIPING FROMEXISTING BUILDING

STRUCTURALFRAMET

6" HW SUPPLY

2" CONDENSATELINE

STEAM MAIN CAPEDAFTER HEAT EXCHANGER

CAPILARYTUBING

G1 LEVEL

1ST LEVEL

PIPING FROMEXISTING BUILDING

75 PSIG RELIEF VALVE.PIPE FULL SIZETO DRAIN

TEMPERATUREWELL (TYP)

ISOLATION VALVE(TYP)

1/3 & 2/3 CONTROLVALVE ASSEMBLIES

PRESSURE GAUGE

PROVIDE STEEL SUPPORT TOMOUNT HX-1 AND HX-2 OFFEXISTING WALL

HHWS

HHWR

TP

TP

15" MIN.

HX-1

P

P

HHWS

HHWR

TP

TP

15" MIN.

HX-2

P

P

EXISTING 8" STEAMMAIN

CAP EXISTINGSTEAM MAIN

CONNECT NEW 8"STEAM MAIN INTOEXISTING

8" STEAM

8" STEAM

8" STEAM

DRAIN VALVEAND CAP

3" CONDENSATELINE

NORMALLYCLOSED 2"BYPASS LINE WITHGLOBE VALVE,TYPICAL

CRU-1

EXISTING CONDENSATERETURN LINE BACK TOMAIN BUILDING

CONNECT NEWCONDENSATE RETURNLINE INTO EXISTING

REFER TO CONDENSATERECEIVER PIPING DIAGRAMON DETAIL SHEETS FORPIPING SPECIALITIES

M

CONDENSATE METER REFER TOSPECIFICATIONS AND TEMPERATURECONTROL DRAWINGS

6"

6"

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

GRCC Bid No: 1213-3294

C:\

Revit

Lo

calF

iles\7

1108000

CH

M12_C

EN

TR

AL

_K

sim

on

eau

x.r

vt

3/5

/2013

6:0

9:3

1P

M

12" = 1'-0"

CJZ

PETER AND PAT COOKACADEMIC HALL

RENOVATION

GRAND RAPIDS, MI

MECHANICAL STEAMPIPING DIAGRAMS

M4037111.080.00

RC

NTSE4

STEAM SYSTEM DEMOLITION PIPING DIAGRAM

NTSA4

STEAM SYSTEM NEW WORK PIPING DIAGRAM

02-20-2013 BIDS

03-05-2013 ADDENDUM 2

Page 30: MECHANICAL SYMBOLS MECHANICAL DRAWING LEGEND111841/AN~2...MECHANICAL SYMBOLS MECHANICAL SYSTEM INDICATION HEAVY LINE-WEIGHT INDICATES NEW WORK LIGHT LINE WEIGHT-INDICATES EXISTING

1ST LEVEL

HHWS

TO EAST ZONE RADIANTCEILING PANELS

TO GARAGE

TO GARAGE

TO NORTH ZONE RADIANTCEILING PANELS

TO WEST ZONE RADIANTCEILING PANELS

FROM EAST ZONE RADIANTCEILING PANELS

FROM GARAGE

FROM NORTH ZONE RADIANTCEILING PANELS

FROM WEST ZONE RADIANTCEILING PANELS

STRUCTURALFRAME

T 2" CONDENSATELINE

STEAM MAIN CAPEDAFTER HEAT EXCHANGER

P THHWS

P THHWR

HHWS

HHWR

HHWS

G1 LEVEL

G2 LEVEL

1ST LEVEL

CIRC PUMP

HEATING COIL

CIRC PUMP

PREHEAT COIL

2ND LEVEL

CIRC PUMP

HEATING COIL

CIRC PUMP

PREHEAT COIL

3RD LEVEL

4TH LEVEL

5TH LEVEL

CIRC PUMP

PREHEAT COIL

ROOF

CIRC PUMP

HEATING COIL

CIRC PUMP

PREHEAT COIL

CIRC PUMP

HEATING COIL

CIRC PUMP

PREHEAT COIL

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

GRCC Bid No: 1213-3294

C:\

Revit

Lo

calF

iles\7

1108000

CH

M12_C

EN

TR

AL

_K

sim

on

eau

x.r

vt

3/5

/2013

6:5

3:2

8P

M

12" = 1'-0"

CJZ

PETER AND PAT COOKACADEMIC HALL

RENOVATION

GRAND RAPIDS, MI

MECHANICAL HHWS&RDEMOLITION PIPINGDIAGRAM

M404A7111.080.00

RC

NTSA5

HHWS&R DEMOLITION PIPING DIAGRAM

02-20-2013 BIDS

03-05-2013 ADDENDUM 2

Page 31: MECHANICAL SYMBOLS MECHANICAL DRAWING LEGEND111841/AN~2...MECHANICAL SYMBOLS MECHANICAL SYSTEM INDICATION HEAVY LINE-WEIGHT INDICATES NEW WORK LIGHT LINE WEIGHT-INDICATES EXISTING

HOT WATER TEMPERING COIL PIPINGDIAGRAM WITH TWO-WAY CONTROL VALVE

SCALE: NONE

RETURN

SUPPLY

ISOLATIONVALVE (TYPICAL)

STRAINER

UNION (TYPICAL)MODULATINGCONTROL VALVE

ECCENTRICREDUCER(TYPICAL)DRAIN VALVE

WITH HOSEEND FITTING

TEMPERING COIL

MANUALAIR VENT

OFFSET PIPING AT COILCONNECTION TO ALLOWCOIL REMOVAL WITHOUTPIPING REMOVAL

TEE WITH BALLVALVE AND CAP FORTESTING (TYPICAL)

BALANCING VALVE

NOTE: REFER TO SCHEDULES FOR LOCATION

HOT WATER TEMPERING COIL PIPING DIAGRAMWITH THREE-WAY CONTROL VALVE

SCALE: NONE

HWHR

HWHS

ISOLATIONVALVE (TYPICAL)

STRAINERUNION (TYPICAL)

MODULATINGCONTROL VALVE

ECCENTRICREDUCER(TYPICAL)

DRAIN VALVEWITH HOSEEND FITTING

TEMPERING COIL

MANUALAIR VENT

OFFSET PIPING AT COILCONNECTION TO ALLOWCOIL REMOVAL WITHOUTPIPING REMOVAL

PRESSURE ANDTEMPERATURE TESTPLUG (TYPICAL)

BALANCING VALVE

NOTE: REFER TO SCHEDULES FOR LOCATIONS

ISOLATIONVALVE (TYP.)

PIPE TO SYSTEMSEE PLANS FORCONTINUATION

STRAINERECCENTRICREDUCER(TYP.)

UNION TYPE CONNECTIONPIPE SO PUMP CAN BEREMOVED FOR SERVICE

BALANCE VALVE

LUBRICATION POINTS

CHECK VALVEPIPE TOSYSTEM. SEEPLANS FORCONTINUATION

PRESSUREGAUGE

1/4" SHUT-OFF COCK

MOTOR

1/4" GAUGE LINE

INSTALLATION NOTES:

1. THE PUMP SHALL BE INSTALLED DEAD LEVEL, AND SHALL NOT TOUCH OR REST ON ANY PART OF THE BUILDING STRUCTURE.

2. THE ELECTRICAL CONNECTION TO THE PUMP SHALL BE MADE THROUGH THE USE OF FLEXIBLE CONDUIT (GREENFIELD) AT LEAST 18" LONG.

3. THE PUMP SUPPORTED INDEPENDENTLY OF PIPING AND SHALL BE INSTALLED SUCH THAT THE PUMP CAN BE COMPLETELY REMOVEDWITHOUT THE DISMANTLING OR REMOVAL OF ANY PIPING OR VALVES.

4. THE MOTOR & COUPLING SHALL BE CHECKED AND PROPERLY ALIGNED IN STRICT ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS.

5. THE ADJACENT PIPING SHALL BE CAREFULLY FITTED AND ERECTED SO THAT THE PUMP CAN BE INSTALLED OR REMOVED FROM THEPIPE LINE WITHOUT FORCING OR SPRINGING.

6. AFTER THE SYSTEM HAS BEEN COMPLETED AND THE PUMP STARTED THE PUMP AND SYSTEM SHALL BE CHECKED FOR VIBRATION ANDEXCESSIVE NOISE AND ANY SUCH NOISE OR VIBRATION SHALL BE IMMEDIATELY CORRECTED.

7. PROVIDE PIPE FLEXIBLE CONNECTION FOR PUMPS WITH MOTORS GREATER THAN 1/2 HORSEPOWER.

IN-LINE CIRCULATING PUMP PIPING DETAILSCALE: NONE

IPS PIPESLEEVE

PIPE

SPECIFIEDINSULATION

STUD WALL

METAL STUDCHANNEL FRAME

AT FIRE RATED WALLS,OMIT SPECIFIED INSULATIONAND APPLY SAME THICKNESSUL APPROVED INSULATION.

PACK ANNULARSPACE WITH CERAMICFIBER SEAL ENDSWITH DUX SEAL

CHROME PLATEDESCUTCHEON

STEEL PIPE SLEEVEWITH SQUAREWATERSTOP

UG CHW & R CONDUIT

PRESSURE PLATE

CONCRETE WALL

SCALE: NONE

PIPE THROUGH WALL PENETRATION

NOTES:1. SIMILAR FOR CONCRETE WALL EXCEPT OMIT FRAMING, DRILL CONCRETE NEATLY TO ACCEPT SLEEVE.2. INSTALL 3M FIRESTOP CP25 CAULK OR EQUAL ON BOTH SIDES OF WALL.3. PRODUCT PERFORMANCE PER ASTM E-814 (UL 1479) FIRE TEST AND UL. THRU-PENETRATION FIRESTOP.

FOR GYP BOARD CONTRUCTION: SYSTEM W4001 RATED UP TO 2 HRS. FOR UN-INSULATED PIPE FORCONCRETE CONSTRUCTION: SYSTEM CBJ1003 RATED UP TO 1-1/2 HRS., SYSTEM CBJ1005 RATED UP TO3 HRS

AIR AND DIRT SEPARATOR PIPING DIAGRAMSCALE: NONE

FROM SYSTEM

ISOLATION VALVE(TYPICAL)

DRAIN VALVEWITH HOSE ENDCONNECTION

TO PUMP SUCTION

FLANGE OR UNION(TYPICAL)

SUPPORT (TYP)

HIGH CAPACITYAUTOMATIC AIRVENT

PIPE AUTOMATIC AIRVENT TO NEARESTFLOOR DRAIN

TYPICAL BASE MOUNTED ENDSUCTION PUMP DETAIL

SCALE: NONE

VERTICAL PIPING ARRANGEMENT

ISOLATION VALVE (TYPICAL)

1/4" COPPER, GAUGEPIPING (TYPICAL)

BALANCING VALVEWITH TEST PORTS

INSTALL GAUGE COCKS ATACCESSIBLE LOCATIONS

SILENT CHECK VALVE

FLEXIBLE CONNECTION(TYPICAL)

COUPLING GUARD

MOTOR

PUMP BASE

INERTIA BASEIF SPECIFIED

4" CONCRETEHOUSEKEEPING PAD

FLOOR SLAB

VIBRATIONISOLATOR(TYPICAL)

SUPPORT PEDESTAL

SUCTION DIFFUSER

REDUCER (TYPICAL)

STRAINER WITHBLOWDOWN VALVE

PRESSURE GAUGE

FROM SYSTEMTO SYSTEM

AEGIS BEARING PROTECTIONRINGS - SERIES SGR ON ALL VFDCONTROLLED PUMPS

BLADDER EXPANSION TANKPIPING DIAGRAM

SCALE: NONE

FLOOR SLAB

STEEL FRAME

ANTI-THERMOSYPHON LOOP

SHUT-OFFVALVE WITHLOCK SHIELD

SYSTEM MAINFROM AIRSEPARATOR

CONNECTTO SIDEOF MAIN

SYSTEM MAIN

TO PUMPSUCTION

MANUAL AIR VENT

PRESSURE GAUGE

AIR CHARGINGCONNECTION

DRAIN VALVE WITHHOSE ENDCONNECTION(TYP.)

4" CONCRETEHOUSEKEEPINGPAD

MINIMUM 3'-0"

SIDE STREAM FILTER PIPINGDIAGRAM

SCALE: NONE

NOTES:

1. MOUNT ON STANDARD SUPPORT LEGS FROM FINISHED FLOOR.

FLOOR SLAB

ISOLATION VALVETYPICAL

1" DIA.

UNION (TYPICAL)

SIDE STREAMFILTER

4" CONCRETEHOUSEKEEPINGPAD

BALANCE VALVETYPICAL

ALLOW CLEARANCEOVER TOP OF UNITFOR FILTER REMOVAL

NORMALLY CLOSED BYPASSLINE, FULL SIZE

1"

1"

PIPING FROMDISCHARGE OFPUMP

PIPING TOSUCTION SIDE OFPUMP

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

GRCC Bid No: 1213-3294

C:\

Revit

Lo

calF

iles\7

1108000

CH

M12_C

EN

TR

AL

_K

sim

on

eau

x.r

vt

3/5

/2013

6:0

9:3

9P

M

1/2" = 1'-0"

CJZ

PETER AND PAT COOKACADEMIC HALL

RENOVATION

GRAND RAPIDS, MI

MECHANICAL DETAILS

M5027111.080.00

RC

02-20-2013 BIDS

03-05-2013 ADDENDUM 2

Page 32: MECHANICAL SYMBOLS MECHANICAL DRAWING LEGEND111841/AN~2...MECHANICAL SYMBOLS MECHANICAL SYSTEM INDICATION HEAVY LINE-WEIGHT INDICATES NEW WORK LIGHT LINE WEIGHT-INDICATES EXISTING

1

ISSUE:

CHECKED:

SCALE:

© 2010 SHW Group

SHW Project:

SHEET TITLE:

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

C:\

Revit

Lo

calF

iles\7

1108000

CH

M12_C

EN

TR

AL

_K

sim

on

eau

x.r

vt

3/5

/2013

6:0

9:4

3P

M

CJZ

PETER AND PAT COOKACADEMIC HALL

RENOVATION

GRAND RAPIDS, MI

MECHANICAL SCHEDULES

M6017111.080.00

2338 COOLIDGE, BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

RC

02-20-2013 BIDS

03-05-2013 ADDENDUM 2

VAV BOX NOTES

1. HEATING COIL PERFORMANCE BASED ON WATER.

2. BOXES TO BE PROVIDED WITH INTEGRAL ACCESS PANEL.

3. REFER TO VAV BOX SOUND PERFORMANCE SCHEDULED FOR VAV BOX MAXIMUM SOUND POWERLEVEL PERFORMANCE.

VAV BOX SCHEDULE

UNIT IDENTIFICATION BOX CHARACTERISTICS AIRFLOW HEATING COIL CONTROLS

MANUFACTURERMODEL

NUMBER NOTESMARK NUMBER AREA/UNIT SERVED AHU BOX INLETBOX

OUTLET

TOTALBOX APDIN W.G.

INTEGRALSOUND

ATTENUATORHEATING

CFMCOOLING

CFMCAPACITY

BTU E.D.B.(F) L.D.B.(F) E.W.T.(F) L.W.T. (F)

FLUIDFLOWGPM

MAX A.P.D.IN W.G.

MAXW.P.D. FT

HdOCCUPANCY

SENSOR

DEMANDCONTROL

VENTILATION

PUSHBUTTON

OVERRIDE

CONTROLVALVETYPE

VAV 201A BUSINESS TUTORING 2 12"Ø 14"X15" 0.25 No 750 1500 32550 55 87 180 140 1.63 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 201B BUSINESS TUTORING 2 12"Ø 14"X15" 0.25 No 750 1500 32550 55 87 180 140 1.63 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 202 COMPUTER LAB 2 16"Ø 24"X18" 0.25 No 1300 2600 56420 55 87 180 140 2.83 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 203 OFFICE 2 6"Ø 12"X10" 0.25 No 130 260 5642 55 87 180 140 .5 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 204 BREAKROOM 2 6"Ø 12"X8" 0.25 No 65 130 2821 55 87 180 140 .5 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 205 CONFERENCE 2 6"Ø 12"X8" 0.25 No 70 140 3038 55 87 180 140 .5 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 206 CONFERENCE 2 6"Ø 12"X8" 0.25 No 70 140 3038 55 87 180 140 .5 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 207 CONFERENCE 2 6"Ø 12"X8" 0.25 No 70 140 3038 55 87 180 140 .5 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 208 CLASSROOM 2 10"Ø 14"X13" 0.25 No 350 700 15190 55 87 180 140 .76 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 209 WORK CENTER 2 10"Ø 14"X13" 0.25 No 310 620 13454 55 87 180 140 .68 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 210 CLASSROOM 2 12"Ø 14"X15" 0.25 No 500 1000 21700 55 87 180 140 1.09 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 211 CLASSROOM 2 12"Ø 14"X15" 0.25 No 620 1240 26908 55 87 180 140 1.35 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 212 CLASSROOM 2 12"Ø 14"X15" 0.25 No 500 1000 21700 55 87 180 140 1.09 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 213 CLASSROOM 2 12"Ø 14"X14" 0.25 No 630 1260 26908 55 87 180 140 1.38 0.25 0.5 No NO No 3-WAY TITUS DESV

VAV 214 CLASSROOM 2 12"Ø 14"X15" 0.25 No 500 1000 21700 55 87 180 140 1.09 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 215 CLASSROOM 2 12"Ø 14"X14" 0.25 No 630 1260 26908 55 87 180 140 1.37 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 216 BREAKROOM 2 8"Ø 12"X10" 0.25 No 150 300 6510 55 87 180 140 .5 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 217 VESTIBULE 2 6"Ø 12"X8" 0.25 No 100 200 4340 55 87 180 140 .5 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 218 CLASSROOM 2 12"Ø 14"X15" 0.25 No 640 1280 27776 55 87 180 140 1.39 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 219 STUDY 2 8"Ø 12"X10" 0.25 No 270 540 11718 55 87 180 140 .59 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 220 CLASSROOM 2 12"Ø 14"X15" 0.25 No 560 1120 24304 55 87 180 140 1.22 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 221 CLASSROOM 2 12"Ø 14"X14" 0.25 No 560 1120 24304 55 87 180 140 1.22 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 222 STUDY 2 8"Ø 12"X10" 0.25 No 270 540 11718 55 87 180 140 .59 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 223 CLASSROOM 2 12"Ø 14"X14" 0.25 No 690 1380 29946 55 87 180 140 1.50 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 224 CLASSROOM 2 12"Ø 14"X15" 0.25 No 450 900 19530 55 87 180 140 .98 0.25 0.5 No NO No 3-WAY TITUS DESV

VAV 225 CLASSROOM 2 12"Ø 14"X14" 0.25 No 450 900 19530 55 87 180 140 .98 0.25 0.5 No NO No 3-WAY TITUS DESV

VAV 226 CLASSROOM 2 12"Ø 14"X14" 0.25 No 450 900 19530 55 87 180 140 .98 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 227 BREAKROOM 2 8"Ø 12"X10" 0.25 No 175 350 7595 55 87 180 140 .5 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 250 CORRIDOR/STUDY 2 12"Ø 16"X15" 0.25 No 600 1200 26040 55 87 180 140 1.3 0.25 0.5 No NO No 3-WAY TITUS DESV

VAV 251 CORRIDOR 2 12"Ø 14"X14" 0.25 No 700 1300 30380 55 87 180 140 1.5 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 255 STUDY 2 6"Ø 12"X8" 0.25 No 100 200 4340 55 87 180 140 .5 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 257 STUDY 2 6"Ø 12"X8" 0.25 No 100 200 2170 55 87 180 140 .5 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 262 TOILET 2 12"Ø 14"X15" 0.25 No 800 800 34720 55 87 180 140 1.7 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 301 CNA TESTING 3 6"Ø 12"X8" 0.25 No 88 175 3797 55 87 180 140 .5 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 302 CNA TESTING 3 6"Ø 12"X8" 0.25 No 50 100 2170 55 87 180 140 .5 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 303 CNA TESTING 3 8"Ø 12"X10" 0.25 No 300 600 13020 55 87 180 140 .66 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 304 CLASSROOM 3 12"Ø 14"X15" 0.25 No 675 1350 29295 55 87 180 140 1.47 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 305 CLASSROOM 3 14"Ø 20"X18" 0.25 No 780 1560 33852 55 95 180 140 1.70 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 306 MATERIALS LAB 3 12"Ø 14"X15" 0.25 No 645 1290 27993 55 87 180 140 1.40 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 307 WORK CENTER 3 10"Ø 14"X13" 0.25 No 325 650 14105 55 87 180 140 .71 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 308 WAITING 3 8"Ø 12"X10" 0.25 No 300 600 13020 55 87 180 140 .66 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 309 DENTAL RECEPTION 3 8"Ø 12"X10" 0.25 No 150 300 6510 55 87 180 140 .5 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 310 CONSULTATION 3 6"Ø 12"X8" 0.25 No 88 175 3798 55 87 180 140 .5 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 311 STORAGE 3 8"Ø 12"X10" 0.25 No 200 400 8680 55 87 180 140 .5 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 313 X-RAY 3 6"Ø 12"X8" 0.25 No 63 125 2713 55 87 180 140 .5 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 314 X-RAY 3 6"Ø 12"X8" 0.25 No 63 125 2713 55 87 180 140 .5 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 315 X-RAY 3 6"Ø 12"X8" 0.25 No 63 125 2713 55 87 180 140 .5 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 316 X-RAY 3 6"Ø 12"X8" 0.25 No 63 125 2713 55 87 180 140 .5 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 317 X-RAY 3 6"Ø 12"X8" 0.25 No 63 125 2713 55 87 180 140 .5 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 318 X-RAY 3 6"Ø 12"X8" 0.25 No 100 200 4340 55 87 180 140 .5 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 319 SIM LAB 3 8"Ø 12"X10" 0.25 No 138 275 5968 55 87 180 140 .5 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 320 STERILIZATION 3 8"Ø 12"X10" 0.25 No 230 460 9982 55 87 180 140 .5 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 321 CORRIDOR 3 8"Ø 12"X10" 0.25 No 300 600 13020 55 87 180 140 .66 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 321A DENTAL 3 12"Ø 14"X15" 0.25 No 630 1260 27342 55 87 180 140 1.37 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 321B DENTAL 3 12"Ø 14"X15" 0.25 No 720 1440 31248 55 87 180 140 1.57 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 321C DENTAL 3 12"Ø 14"X15" 0.25 No 720 1440 31248 55 87 180 140 1.57 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 322 CLASSROOM 3 16"Ø 24"X18" 0.25 No 870 1740 37758 55 87 180 140 1.89 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 323A POSITIONING LAB 3 12"Ø 14"X15" 0.25 No 380 760 16492 55 87 180 140 .83 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 323B POSITIONING LAB 3 12"Ø 14"X15" 0.25 No 490 980 21266 55 87 180 140 1.07 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 323C POSITIONING LAB 3 8"Ø 12"X10" 0.25 No 260 520 11284 55 87 180 140 .57 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 324 DARK ROOM 3 6"Ø 12"X8" 0.25 No 210 210 9115 55 87 180 140 .5 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 325 X-RAY 3 8"Ø 12"X10" 0.25 No 233 465 10090 55 87 180 140 .51 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 326 X-RAY 3 6"Ø 12"X8" 0.25 No 168 335 7230 55 87 180 140 .5 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 327 X-RAY 2 10"Ø 14"X13" 0.25 No 200 400 8680 55 87 180 140 .5 0.25 0.5 No NO No 3-WAY TITUS DESV

VAV 328 X-RAY 3 8"Ø 12"X10" 0.25 No 130 260 5642 55 87 180 140 .5 0.25 0.5 No NO No 3-WAY TITUS DESV

VAV 329 CLASSROOM 3 12"Ø 14"x12" 0.25 No 490 980 21266 55 87 180 140 1.07 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 330 LOCKERS 3 6"Ø 12"X8" 0.25 No 100 200 4340 55 87 180 140 .5 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 330A LOCKERS 3 8"Ø 12"X10" 0.25 No 235 470 10199 55 87 180 140 .51 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 331 M LOCKERS 3 6"Ø 12"X8" 0.25 No 63 125 2713 55 87 180 140 .5 0.25 0.5 No NO No 3-WAY TITUS DESV

VAV 332 W LOCKERS 3 6"Ø 12"X8" 0.25 No 70 140 3038 55 87 180 140 .5 0.25 0.5 No NO No 3-WAY TITUS DESV

VAV 333 M LOCKERS 3 6"Ø 12"X8" 0.25 No 63 125 2713 55 87 180 140 .5 0.25 0.5 No NO No 3-WAY TITUS DESV

VAV 334 W LOCKERS 3 8"Ø 12"X10" 0.25 No 200 400 8680 55 87 180 140 .5 0.25 0.5 No NO No 3-WAY TITUS DESV

VAV 335 STUDY 3 8"Ø 12"X10" 0.25 No 300 600 13020 55 87 180 140 .66 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 351 CORRIDOR 3 8"Ø 12"X10" 0.25 No 150 300 6510 55 87 180 140 .5 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 351A CORRIDOR 3 8"Ø 12"X10" 0.25 No 200 400 8680 55 87 180 140 .5 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 354 CORRIDOR 3 8"Ø 12"X10" 0.25 No 200 400 8680 55 87 180 140 .5 0.25 0.5 No NO No 3-WAY TITUS DESV

VAV 401A HEALTH TUTORING 4 12"Ø 14"X15" 0.25 No 640 1280 27776 55 87 180 140 1.39 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 402 COMPUTER LAB 4 16"Ø 24"X18" 0.25 No 1020 2040 44268 55 87 180 140 2.22 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 403 OFFICE 4 6"Ø 12"X8" 0.25 No 130 260 5642 55 87 180 140 .5 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 404 BREAKROOM 4 6"Ø 12"X8" 0.25 No 70 140 1519 55 87 180 140 .5 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 405 CONFERENCE 4 6"Ø 12"X8" 0.25 No 100 200 4340 55 87 180 140 .5 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 406 CONFERENCE 4 6"Ø 14"X15" 0.25 No 70 140 3038 55 87 180 140 .5 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 407 CONFERENCE 4 6"Ø 12"X8" 0.25 No 100 200 4340 55 87 180 140 .5 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 408 CONFERENCE 4 6"Ø 12"X8" 0.25 No 03.0 130 2821 55 87 180 140 .5 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 409 BED PRACTICE 4 8"Ø 12"X10" 0.25 No 175 350 7595 55 87 180 140 .5 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 410 LACT 4 6"Ø 12"X8" 0.25 No 50 100 2170 55 87 180 140 .5 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 413 BED LAB 4 10"Ø 14"x10" 0.25 No 400 800 17360 55 87 180 140 .87 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 415 BED LAB 4 10"Ø 14"x10" 0.25 No 400 800 17360 55 87 180 140 .87 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 416 BED LAB 4 10"Ø 14"X13" 0.25 No 400 800 17360 55 87 180 140 .87 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 417 OFFICE 4 6"Ø 12"X10" 0.25 No 125 250 5425 55 87 180 140 .5 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 418 BED LAB 4 10"Ø 14"X13" 0.25 No 400 800 17360 55 87 180 140 .87 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 419 STORAGE 4 10"Ø 14"X13" 0.25 No 300 600 13020 55 87 180 140 .67 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 420 BED LAB 4 10"Ø 14"X13" 0.25 No 400 800 17360 55 87 180 140 .87 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 421 OTA 4 16"Ø 24"X18" 0.25 No 960 1920 41664 55 87 180 140 2.09 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 423B OTA LAB 4 10"Ø 14"x12" 0.25 No 400 800 17360 55 87 180 140 .87 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 423B OTA LAB 4 10"Ø 14"x12" 0.25 No 400 800 17360 55 87 180 140 .87 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 424 BED LAB 4 10"Ø 14"x10" 0.25 No 400 800 17360 55 87 180 140 .87 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 425 BTE 4 6"Ø 12"X8" 0.25 No 150 300 6510 55 87 180 140 .5 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 426 BED LAB 4 10"Ø 14"x10" 0.25 No 400 800 17360 55 87 180 140 .87 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 427 OTA LAB 2 4 12"Ø 14"X15" 0.25 No 770 1540 33418 55 87 180 140 1.68 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 428 STORAGE 4 6"Ø 12"X8" 0.25 No 100 200 4340 55 87 180 140 .5 0.25 0.5 No NO No 3-WAY TITUS DESV

VAV 430 STORAGE 4 6"Ø 12"X8" 0.25 No 60 120 2604 55 87 180 140 .5 0.25 0.5 No NO No 3-WAY TITUS DESV

VAV 431 CLASSROOM 4 12"Ø 14"X15" 0.25 No 675 1350 29295 55 87 180 140 1.47 0.25 0.5 No NO No 3-WAY TITUS DESV

VAV 432 BED LAB 4 10"Ø 14"x10" 0.25 No 400 800 17360 55 87 180 140 .87 0.25 0.5 No NO No 3-WAY TITUS DESV

VAV 433 OBSRV 4 6"Ø 12"X8" 0.25 No 100 200 4340 55 87 180 140 .5 0.25 0.5 No NO No 3-WAY TITUS DESV

VAV 435 CNTRL 4 6"Ø 12"X8" 0.25 No 75 150 3255 55 87 180 140 .5 0.25 0.5 No NO No 3-WAY TITUS DESV

VAV 436 SIM LAB 4 8"Ø 12"X12" 0.25 No 275 550 11935 55 87 180 140 .60 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 437 OBSRV 4 6"Ø 12"X8" 0.25 No 100 200 4340 55 87 180 140 .5 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 454 CORRIDOR 4 8"Ø 12"X10" 0.25 No 300 600 13020 55 87 180 140 .66 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 455 STUDY 4 8"Ø 12"X10" 0.25 No 300 600 13020 55 87 180 140 .66 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 462 TOILET 5 12"Ø 14"X15" 0.25 No 800 800 34720 55 87 180 140 1.7 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 464 MEETING 5 6"Ø 12"X8" 0.25 No 100 100 4340 55 87 180 140 .5 0.25 0.5 No NO No 2-WAY TITUS DESV

Page 33: MECHANICAL SYMBOLS MECHANICAL DRAWING LEGEND111841/AN~2...MECHANICAL SYMBOLS MECHANICAL SYSTEM INDICATION HEAVY LINE-WEIGHT INDICATES NEW WORK LIGHT LINE WEIGHT-INDICATES EXISTING

SIDE STREAM FILTER SEPARATOR SCHEDULE

TAG MANUFACTURER MODELSYSTEMSERVED

WATERFLOWGPM

INLET SIZE OUTLET SIZE DIMENSIONSNOTES

1,2 & 3

CENTRIFUGAL SEPARATOR

SSF-1 CONDENSERWATER

NOTES:1. UNIT TO BE MOUNTED ON 4" CONCRETE HOUSEKEEPING PAD.2. SEPARATORS SHALL BE CAPABLE OF REMOVING SOLIDS 45 MICRON/325 MESH IN SIZE AND HEAVIER THAN 1.20 SPECIFIC GRAVITY.3. PROVIDE EACH FILTER WITH THREE (3) SETS OF FILTERS

HARMSCO HIF-7 30.0 1 1/2" 1 1/2" 28"Hx13"D

1,2 & 3SSF-2 AHU HHWSHARMSCO HIF-7 20.0 1 1/2" 1 1/2"

1,2 & 3SSF-3 AHU CHWSHARMSCO HIF-7 20.0 1 1/2" 1 1/2"

28"Hx13"D

28"Hx13"D

UNIT IDENTIFICATION

MARK 63

CHILLER SOUND PRESSURE SCHEDULE

CH-1 BASE BID

125 250 500 1K 2K 4K 8K

MAXIMUM RADIANT/SOUND POWER LEVEL DB

69.0 67.0 69.0 72.0 77.0 79.0 79.0 75.0

41.0 59.0 67.0 72.0 74.0 71.0 83.0 71.0CH-2 ALTERNATE BID

OVERALL (dBA)

84.5

85.6

NOTES:1. SOUND PRESSURE (dB) (WITH SOUND INSULATION) MEASURED IN ACCORDANCE WITH ANSI/AHRISTANDARDS 575-2008 (A-WEIGHTED)

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

GRCC Bid No: 1213-3294

C:\

Revit

Lo

calF

iles\7

1108000

CH

M12_C

EN

TR

AL

_K

sim

on

eau

x.r

vt

3/6

/2013

9:0

8:1

0A

M

As indicated

CJZ

PETER AND PAT COOKACADEMIC HALL

RENOVATION

GRAND RAPIDS, MI

MECHANICAL SCHEDULES

M6027111.080.00

RC

CABINET UNIT HEATER SCHEDULE

UNIT IDENTIFICATION

CAPACITY(MbH)

FAN AIR WATER CABINET FILTER ELECTRICAL

CONTROLTYPE

CONTROLVALVE

MAX P.D.(FT) MANUFACTURER

MODELNO. NOTESMARK NUMBER

AREASERVED

FANSPEED

NUMBEROF FANS HP

AIRFLOW(CFM) E.D.B (F) L.B.D (F)

COILWATERFLOW

(GPM) E.W.T (F) L.W.T (F)MAX W.P.D

(FT)LENGTH

(IN)HEIGHT

(IN)DEPTH

(IN)

RECESSDEPTH

(IN) TYPEAREA

(SQ. FT) VOLTS PHASE HERTZCUH 1 VESTIBULE 217 23.8 1050 1 1/15 335 60 126 3.0 180 140 0.6 43" 23-5/8" 9-1/2" 9-1/16" 1" PLEATED 1.6 115 1 60 AUTO 5.0 STERLING RW-1200-03

PUMP SCHEDULE

MARK NUMBER LOCATION SYSTEM SERVED TYPECOUPLING

TYPEWATERFLOW

(GPM)PUMP

HEAD (FT)

MIN.EFFICIENCY

(%) BHP HP RPM VOLTS PHASE MANUFACTURERMODEL

NO. NOTESCP 1 LEVEL G2 CHILLER ROOM HEATING HOT WATER CENTRIFUGAL FLEXIBLE 495 70 79.7 10.96 15 1750 460 3 BELL & GOSSETT 4 BC NOTE 1

CP 2 LEVEL G2 CHILLER ROOM HEATING HOT WATER CENTRIFUGAL FLEXIBLE 495 70 79.7 10.96 15 1750 460 3 BELL & GOSSETT 4 BC NOTE 1

CP 3 LEVEL G2 CHILLER ROOM PERIMETER HEATING HOT WATER CENTRIFUGAL FLEXIBLE 160 75 60.3 4.36 7.5 1750 460 3 BELL & GOSSETT 2 BC NOTE 1

CP 4 LEVEL G2 CHILLER ROOM PERIMETER HEATING HOT WATER CENTRIFUGAL FLEXIBLE 160 75 60.3 4.36 7.5 1750 460 3 BELL & GOSSETT 2 BC NOTE 1

CP 5 LEVEL G2 CHILLER ROOM CHILLED WATER CENTRIFUGAL FLEXIBLE 920 124 76.2 43.5 50 1750 460 3 BELL & GOSSETT 4GB NOTE 1

CP 6 LEVEL G2 CHILLER ROOM CHILLED WATER CENTRIFUGAL FLEXIBLE 920 124 76.2 43.5 50 1750 460 3 BELL & GOSSETT 4GB NOTE 1

CP 7 LEVEL G2 CHILLER ROOM CONDENSER WATER CENTRIFUGAL FLEXIBLE 1350 72 81.2 29.5 40 1750 460 3 BELL & GOSSETT 6E

CP 8 LEVEL G2 CHILLER ROOM CONDENSER WATER CENTRIFUGAL FLEXIBLE 1350 72 81.2 29.5 40 1750 460 3 BELL & GOSSETT 6E

CP 9 2ND FLOOR M ECHANICAL ROOM AHU-2 HEATING COIL IN-LINE FLEXIBLE 35 21 59.3 0.32 0.5 1750 460 3 BELL & GOSSETT 60 1 1/4x5 1/4

CP 10 3 RD FLOOR MECHANICAL ROOM AHU-3 HEATING COIL IN-LINE FLEXIBLE 35 21 59.3 0.32 0.5 1750 460 3 BELL & GOSSETT 60 1 1/4x5 1/4

CP 11 4TH FLOOR MECHANICAL ROOM AHU-4 HEATING COIL IN-LINE FLEXIBLE 35 21 59.3 0.32 0.5 1750 460 3 BELL & GOSSETT 60 1 1/4x5 1/4

CP 12 5TH FLOOR MECHANICAL ROOM AHU-5 HEATING COIL IN-LINE FLEXIBLE 35 21 59.3 0.32 0.5 1750 460 3 BELL & GOSSETT 60 1 1/4x5 1/4

POWER VENTILATOR SCHEDULE

UNIT IDENTIFICATION

AIRFLOW E.S.P. CONTROL

FAN WHEEL FAN MOTOR

HEIGHT

ELECTRICAL

MANUFACTURER

MODELNO. NOTESMARK NUMBER LOCATION AREA SERVED TYPE

FANSPEED

FAN TIPSPEED FAN BHP FAN HP RPM

DRIVETYPE VOLTS PHASE

EF 1 ROOF TOILET ROOMS 7500 0.85 STARTER CENTRIFUGAL 652 5206 2.06 3 1750 BELT 36" 460 3 GREENHECK GB-300-30 1, 2, 3 & 5

EF 2 ROOF OTA TYPE II KITCHENHOOD

700 0.6 STARTER CENTRIFUGAL 1976 5754 0.26 1/3 1976 BELT 30" 120 1 GREENHECK CUBE-101HP 1, 2, 3

EF 3 ROOF MODELING LAB 1300 0.75 STARTER CENTRIFUGAL 3600 8121 0.7 1 3600 BELT 26 3/4" 460 3 GREENHECK 9-BISW-21 1, 2, 3 & 4

EF 4 ROOF DARKROOM/STERILIZATION

900 0.5 STARTER CENTRIFUGAL 1536 4499 0.18 1/4 1725 DIRECT 25 1/2" 120 1 GREENHECK G-099-VG 1, 2, 3

EF 5 ROOM OTA APARTMENTRESTROOM

100 0.25 STARTER CENTRIFUGAL 1473 3133 0.01 1/6 1725 DIRECT 14" 120 1 GREENHECK G-060-VG 1, 2, 3

EF 6 MECHANICALROOM

CHILLER ROOM 4200/2100 0.6" STARTER CENTRIFUGAL 1595 6996 1.42 2 1750 DIRECT -- 460 3 GREENHECK SQ-160-VG

EF 7 ELEVATORROOM

ELEVATOREQUIPMENT

1690 0.5" STARTER CENTRIFUGAL 1462 5022 0.38 3/4 1750 DIRECT -- 120 1 GREENHECK SQ-130VG 1, 2 & 7

NOTES:1. FAN SHALL HAVE AMCA & BE U.L. CERTIFIED.2. PROVIDE SAFETY DISCONNECT SWITCH - NEMA-1, TOGGLE, JUNCTION BOX MOUNTED AND WIRED.3. PROVIDE DUCT MOUNTED MOTORIZED BACKDRAFT DAMPER, AND MINIMUM 24" HIGH ROOF CURB4. EF-3, PROVIDE 12" HIGH EQUIPMENT SUPPORT RAILS TO MOUNT EXHAUST FAN ON AND ROOF CURB FOR EXHAUST DUCT5. EF-1 MOUNT EXHAUST FAN ON EXISTING ROOF CURB, PROVIDE MINIMUM 16 GAUGE GALVANIZED WELDED STEEL TRANSITION BETWEEN EXISTING ROOF CURB AND NEW EXHAUST FAN6. EF-7 CONTROLLED OFF LOCAL ROOM THERMOSTAT. PROVIDE HANGING VIBRATION ISOLATORS AND BACKDRAFT DAMPER ON OUTLET

DUCTWORK APPLICATION SCHEDULE

AIR SYSTEM MATERIAL

DESIGN PRESSURECLASSIFICATION

(INCHES WG)DUCTWORK BETWEEN FAN AND ISOLATION DAMPERS AS INDICATED FOR EACH SYSTEM +/-12

KITCHEN HOOD EXHAUST 10 GAUGE 316L WELDED STAINLESS STEEL -2"

LOUVER BLANK OFF PANELS DOUBLE WALL LINED GALVANIZED STEEL PANELS +/-2

MATERIALS LAB EXHAUST ALUMINUM MINIMUM 16 GAUGE -2"

OUTSIDE AIR INTAKE DUCTWORK TDC GALVANIZED STEEL -6

OUTSIDE AIR INTAKE PLENUMS DOUBLE WALL LINED GALVANIZED STEEL PANELS -6

RETURN AIR TDC GALVANIZED STEEL (PROVIDE LINED GALVANIZED STEEL WHEREINDICATED ON DRAWINGS)

-2

STERILIZATION ROOM EXHAUST ALUMINUM -2

SUPPLY AIR DOWNSTREAM OF AIR TERMINAL UNITS GALVANIZED STEEL +2

SUPPLY AIR UPSTREAM OF AIR TERMINAL UNITS SPIRAL ROUND GALVANIZED STEEL +6

TOILET ROOM / JANITOR'S CLOSET EXHAUST GALVANIZED STEEL -2

KITCHEN EXHAUST HOOD SCHEDULE

MARK MANUFACTURERHOODTYPE

DIMENSIONS(L" x W" x H")

EXHAUSTVOLUME (CFM)

EXHAUSTS.P. (IN WG)

DUCT CONNECTIONSIZE (INCHES)

VELOCITY(FPM) NOTES

KEH-1 GREENHECK TYPE II 42" x 39" x 24" 700 0.035 17" x 11" 539 1,2,3

NOTES:1. HOOD TO BE MOUNTED 6'-6" ABOVE FINISHED FLOOR.2. REFER TO POWER VENTILATOR SCHEDULE FOR ASSOCIATED EXHAUST FAN.3. PROVIDE UL LISTED LIGHT UNDER HOOD AND CONTROL STARTER MOUNTED ON WALL.

CHILLER SCHEDULE

MARK MANUFACTURER MODELCOMPRESSOR

TYPECAPACITY

(TONS)REFRIGERANT

TYPEREFRIGERANT

CHARGE

CHILLED WATER DATA CONDENSER WATER DATA ELECTRICAL DATA

DIMENSIONS(L" x W" x H")

WEIGHT(LBS) NOTES

FLOW(GPM)

E.W.T.(DEG F)

L.W.T.(DEG F)

MAX. W.P.D.(FT. HEAD)

NO. OFPASSES

FOULINGFACTOR

FLOW(GPM)

E.W.T.(DEG F)

L.W.T.(DEG F)

MAX W.P.D.(FT. HEAD)

NO. OFPASSES

FOULINGFACTOR

VOLTS/PHASE F.L.A. M.C.A. KW/TON IPLV

CH-1 TRANE CVHF CENTRIFUGAL 438 123 850 875 54 42 15.9 2 0.0001 1320 85 95 13.8 2 0.00025 460/3 345.5 396 0.55 0.39 181"Lx69"Wx104"H 24,350 BASE BID

CH-1 ALT McQUAY WME0500D MAGNETIC OILLESS 438 R134a 1067 875 54 42 18.6 2 0.0001 1320 85 95 25.0 2 0.00025 460/3 364 458 0.593 0.351 165"Lx66"Wx93"H 15,100 ALTERNATE BID

NOTES:1. BASE BID AND ALTERNATE BID CHILLER SHALL BE CONTROLLED BY A VARIABLE FREQUENCY DRIVE.2. BASE BID AND ALTERNATE CHILLER: CHILLER TO BE SHIPPED BROKEN DOWN TO FIT THROUGH EXISTING DOOR OPENING. DOOR SIZE IS 82" WIDE x 72" HIGH. CHILLER TO BE REASSEMBLED IN THE FIELD BY FACTORY SERVICE PERSONAL

CONDENSATE RECEIVER SCHEDULE

MARK MANUFACTURER MODELNUMBER

OF PUMPS

RECEIVERCAPACITY(GALLONS)

INLET(INCHES)

DISCHARGE(INCHES)

PUMPCAPACITY

EACH (GPM)

PUMPDISCHARGE

PRESSURE (PSIG) PUMP (HP) RPMVOLTS/PHASE NOTES

CRU-1 BELL & GOSSETT 36C B E30-25 DUPLEX 36 3" 1 1/2" 25 25 3/4 3500 460/3 1,2

NOTES:1. MOUNTED CONDENSATE RECEIVER ON 4" CONCRETE HOUSEKEEPING PAD.2. PROVIDE UNIT MOUNTED SINGLE POWER POINT CONTROL PANEL.

STEAM TO WATER HEAT EXCHANGER SCHEDULE

MARK MANUFACTURERMODEL

NUMBERSYSTEMSERVED TYPE

FLUIDTYPE

SOURCE SIDE DATA GENERATED SIDE DATA

NOTESFLOW(GPM)

ENTERINGTEMPERATURE

(DEG F)

LEAVINGTEMPERATURE

(DEG F)

MAXPRESSURE

DROP (FT WG)

STEAMPRESSURE

(PSIG)POUNDS/H

OUR

PRESSUREDROP (PSIG)

INLET

TOTALCAPACITY

(MBH)HX-1 BELL & GOSSETT SU14 6-2 HOT WATER

HEATINGSHELL & TUBE WATER 495 157.6 180 2.17 2 5589.9 2 5400 1,2 & 3

HX-2 BELL & GOSSETT SU14 6-2 HOT WATERHEATING

SHELL & TUBE WATER 495 157.6 180 2.17 2 5589.9 2 5400 1,2 & 3

NOTES:1. SOURCE SIDE FLUID IS WATER.2. CONTRACTOR TO PROVIDE WELDED STEEL FRAME TO MOUNT HX-1&2 ON EXISTING WALL. PAINT TWO COATS FLAT BLACK.3. 6" HEATING WATER INLET AND 8" STEAM INLET

VAV BOX SCHEDULE FIFTH FLOOR

UNIT IDENTIFICATION BOX CHARACTERISTICS AIRFLOW HEATING COIL CONTROLS

CONTROLVALVETYPE MANUFACTURER

MODELNUMBER NOTESMARK NUMBER AREA/UNIT SERVED AHU BOX INLET

BOXOUTLET

TOTALBOX APDIN W.G.

INTEGRALSOUND

ATTENUATORHEATING

CFMCOOLING

CFMCAPACITY

BTU E.D.B.(F) L.D.B.(F) E.W.T.(F) L.W.T. (F)

FLUIDFLOWGPM

MAX A.P.D.IN W.G.

MAXW.P.D. FT

HdOCCUPANCY

SENSOR

DEMANDCONTROL

VENTILATION

PUSHBUTTON

OVERRIDE

VAV 501A ENGLISH TUTORING 5 12"Ø 14"X15" 0.25 No 870 1740 37758 55 87 180 140 1.89 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 501B ENGLISH TUTORING 5 12"Ø 14"X15" 0.25 No 725 1450 31465 55 87 180 140 1.58 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 502 OFFICE 5 8"Ø 12"X10" 0.25 No 100 200 4340 55 87 180 140 .5 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 503 COMPUTER LAB 5 16"Ø 24"X18" 0.25 No 1500 3000 65100 55 87 180 140 3.26 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 504 BREAKROOM 5 6"Ø 12"X8" 0.25 No 100 200 4340 55 87 180 140 .5 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 505 CONFERENCE 5 6"Ø 12"X10" 0.25 No 100 200 4340 55 87 180 140 .5 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 506 CONFERENCE 5 6"Ø 12"X8" 0.25 No 100 200 4340 55 87 180 140 .5 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 507 CLASSROOM 5 10"Ø 14"X13" 0.25 No 420 840 18228 55 87 180 140 .92 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 508 WORK CENTER 5 10"Ø 14"X13" 0.25 No 420 840 18228 55 87 180 140 .92 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 510 CLASSROOM 5 12"Ø 14"X15" 0.25 No 520 1040 22568 55 87 180 140 1.13 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 511 CLASSROOM 5 12"Ø 14"X15" 0.25 No 630 1260 27342 55 87 180 140 1.37 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 512 CLASSROOM 5 12"Ø 14"X15" 0.25 No 520 1040 22568 55 87 180 140 1.13 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 513 CLASSROOM 5 12"Ø 14"X15" 0.25 No 630 1260 27342 55 87 180 140 1.37 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 514 CLASSROOM 5 12"Ø 14"X15" 0.25 No 520 1040 22568 55 87 180 140 1.13 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 515 CLASSROOM 5 12"Ø 14"X15" 0.25 No 630 1260 27342 55 87 180 140 1.37 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 516-2 BREAKROOM 5 6"Ø 12"X8" 0.25 No 100 200 4340 55 87 180 140 .5 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 517 STUDY 5 8"Ø 12"X10" 0.25 No 320 640 13888 55 87 180 140 .70 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 518 CLASSROOM 5 12"Ø 14"X15" 0.25 No 720 1440 31248 55 87 180 140 1.5 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 519 STUDY 5 12"Ø 14"X15" 0.25 No 355 710 15407 55 87 180 140 .78 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 520 CLASSROOM 5 12"Ø 14"X15" 0.25 No 580 1160 25172 55 87 180 140 1.26 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 521 CLASSROOM 5 12"Ø 14"X15" 0.25 No 580 1160 25172 55 87 180 140 1.26 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 522 STUDY 5 12"Ø 14"X15" 0.25 No 355 710 15407 55 87 180 140 .78 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 523 CLASSROOM 5 12"Ø 14"X15" 0.25 No 720 1440 31248 55 87 180 140 1.57 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 524 CLASSROOM 5 12"Ø 14"X14" 0.25 No 800 1600 34720 55 87 180 140 1.74 0.25 0.5 No NO No 3-WAY TITUS DESV

VAV 525 COMPUTER LAB 5 12"Ø 14"X14" 0.25 No 800 1600 34720 55 87 180 140 1.7 0.25 0.5 No NO No 3-WAY TITUS DESV

VAV 526 COMPUTER LAB 5 12"Ø 14"X14" 0.25 No 800 1600 34720 55 87 180 140 1.7 0.25 0.5 No NO No 3-WAY TITUS DESV

VAV 527 COMPUTER LAB 5 12"Ø 14"X14" 0.25 No 800 1600 34720 55 87 180 140 1.7 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 550 CORRIDOR 5 8"Ø 12"X10" 0.25 No 300 600 13020 55 87 180 140 .66 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 552 CORRIDOR 5 12"Ø 14"X14" 0.25 No 510 1020 22134 55 87 180 140 1.11 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV 554 CORRIDOR 5 10"Ø 14"x12" 0.25 No 400 800 17360 55 87 180 140 .87 0.25 0.5 No NO No 3-WAY TITUS DESV

VAV 560 TOILET 5 12"Ø 14"X15" 0.25 No 800 800 34720 55 87 180 140 1.7 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV VAV-362 TOILET 2 12"Ø 14"X15" 0.25 No 800 800 34720 55 87 180 140 1.7 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV VAV-401B HEALTH TUTORING 4 12"Ø 14"X15" 0.25 No 640 1280 27776 55 87 180 140 1.39 0.25 0.5 No NO No 2-WAY TITUS DESV

VAV VAV-411 WORK CENTER 4 10"Ø 14"X13" 0.25 No 338 675 14648 55 87 180 140 .74 0.25 0.5 No NO No 2-WAY TITUS DESV

NOTES:1. PROVIDE PUMP WITH VARIABLE FREQUENCY DRIVE

NOTES:1. ALL DUCTWORK TO BE EITHER TDC CONNECTION OR SPIRAL ROUND

02-20-2013 BIDS

03-05-2013 ADDENDUM 2

Page 34: MECHANICAL SYMBOLS MECHANICAL DRAWING LEGEND111841/AN~2...MECHANICAL SYMBOLS MECHANICAL SYSTEM INDICATION HEAVY LINE-WEIGHT INDICATES NEW WORK LIGHT LINE WEIGHT-INDICATES EXISTING

EXPANSION TANK SCHEDULETAG SYSTEM SERVED MAKE MODEL TYPE

ET-1 CHILLED WATER BELL & GOSSET VERTICALBLADDER

B-130LA

FLUID

WATER

MEAN WATERTEMP.

48

ASMECONSTRUCTION

PRESSURERATING

TANKVOLUME

(GALLONS)

ACCEPTANCEVOLUME

(GALLONS)

WEIGHTLBS.

NOTES/ACCESSORIES

YES 125 34 27 410 REMOVABLE BLADDER TYPETHERMAL EXPANSION TANK

ET-2 HWHS WATER BELL & GOSSET VERTICALBLADDER

B-400 WATER 170 YES 125 106 106 1184 REMOVABLE BLADDER TYPETHERMAL EXPANSION TANK

1

ISSUE:

CHECKED:

SCALE:

© 2012 SHW Group

SHW Project:

SHEET TITLE:

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

2338 COOLIDGESUITE 100

BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

GRCC Bid No: 1213-3294

C:\

Revit

Lo

calF

iles\7

1108000

CH

M12_C

EN

TR

AL

_K

sim

on

eau

x.r

vt

3/5

/2013

6:1

0:0

0P

M

1/8" = 1'-0"

CJZ

PETER AND PAT COOKACADEMIC HALL

RENOVATION

GRAND RAPIDS, MI

MECHANICAL SCHEDULES

M6037111.080.00

RC

RADIANT CEILING PANEL SCHEDULE

UNIT IDENTIFICATION CAPACITY(BTU/H/

LINEAR FT.)AMBIENTD.B. (F)

WATER PANEL CONTROLVALVE MAX

P.D. (FT) MANUFACTURERMODEL

NO. NOTESMARK NUMBER E.W.T. (F) L.W.T. (F) TYPETUBE DIA.

(IN)NO. OF

PASSES WIDTH (IN) FINISHRCP 1 413 70 180 160 CEILING RECESSED 5/8" 4 24 WHITE 1' STERLING LRP

1. RADIANT CEILING PANELS SHALL EXTEND FROM WALL TO WALL. PROVIDE BLANK OFF SECTIONS AS REQUIRED.

GRILLE, REGISTER, DIFFUSER SCHEDULE

UNIT IDENTIFICATION DIFFUSERFACE SIZE

(IN)

DIFFUSERNECK SIZE

(IN)MOUNTING

TYPE COLOR MATERIAL ACCESSORY MANUFACTURERMODEL

NUMBER NOTESMARK NUMBEREG 1 24"x24" SEE PLANS NOTE 1 WHITE ALUMINUM - TITUS 50F 3

EG 2 12"x12" SEE PLANS NOTE 1 WHITE ALUMINUM - TITUS 50F 3

RG 1 24"x24" 22"x22" NOTE 1 WHITE ALUMINUM - TITUS 50F 3

RG 2 24"x12" 22"x10" NOTE 1 WHITE ALUMINUM - TITUS 50F 3

SD 1 24"x24" SEE PLANS NOTE 1 WHITE STEEL - TITUS TMS 3

SD 2 48"x6" SEE PLANS NOTE 1 WHITE STEEL NOTE 2 TITUS ML-37 3

SD 3 NECK SIZE +1 3/4" SEE PLANS NOTE 1 WHITE STEEL - TITUS 300RL 3

NOTES:1. REFER TO REFLECTED CEILING PLAN FOR LOCATIONS. PROVIDE ALL ACCESSORIES NEEDED TO PROPERLY MOUNT DEVICE.2. PROVIDE INSULATED AND LINED PLENUM BOX. PROVIDE 4, 1" SLOTS3. FINISH AS SELECTED BY ARCHITECT

EXPANSION LOOP SCHEDULE

EXPANSION LOOPNUMBER

EXPANSION LOOPLOCATION PIPE SIZE

PIPETEMPERATURE

EXPANSION(INCHES) MODEL NUMBER

EL-2A 2ND FLOOR WEST RCP 1" HHWS & 1" HHWR 180 +/- 1.5" 2 @ MLS30100

EL-2B 2ND FLOOR NORTH RCP 1" HHWS & 1"HHWR 180 +/- 1.5" 2 @ MLS30100

EL-2C 2ND FLOOR EAST RCP 1" HHWS & 1" HHWR 180 +/- 1.5" 2 @ MLS30100

EL-2D 2ND FLOOR WEST VAV 2" HHWS & 1" HHWR 180 +/- 1.5" MLS30200 & MLS30100

EL-2E 2ND FLOOR NORTH VAV 2" HHWS & 1 1/2" HHWR 180 +/- 1.5" MLS30200 & MLS30150

EL-2F 2ND FLOOR EAST VAV 1 1/2" HHWS & 2" HHWR 180 +/- 1.5" MLS30150 & MLS30200

EL-2G 2ND FLOOR SOUTH VAV 1" HHWS & 2" HHWR 180 +/- 1.5" MSL30100 & MLS30200

EL-3A 3RD FLOOR WEST RCP 1" HHWS & 1" HHWR 180 +/- 1.5" 2 @ MSL30100

EL-3B 3RD FLOOR NORTH RCP 1" HHWS & 1" HHWR 180 +/- 1.5" 2 @ MLS30100

EL-3C 3RD FLOOR EAST RCP 1" HHWS & 1" HHWR 180 +/- 1.5" 2 @ MLS30100

EL-3D 3RD FLOOR WEST VAV 2" HHWS & 1" HHWR 180 +/- 1.5" MSL30200 & MLS30150

EL-3E 3RD FLOOR NORTH VAV 2" HHWS & 1 1/2" HHWR 180 +/- 1.5" MSL30200 & MSL30150

EL-3F 3RD FLOOR EAST VAV 1 1/2" HHWS & 2" HHWR 180 +/- 1.5" MLS30200 & MLS30200

EL-3G 3RD FLOOR SOUTH VAV 1" HHWS & 2" HHWR 180 +/- 1.5" MSL30100 & MLS30200

EL-4A 4TH FLOOR WEST RCP 1" HHWS & 1" HHWR 180 +/- 1.5" 2 @ MLS30100

EL-4B 4TH FLOOR NORTH RCP 3/4" HHWS & 3/4" HHWR 180 +/- 1.5" 2 @ MLS30077

EL-4C 4TH FLOOR EAST RCP 1" HHWS & 1" HHWR 180 +/- 1.5" 2 @ MLS30100

EL-4D 4TH FLOOR WEST VAV 2" HHWS & 1" HHWR 180 +/- 1.5" MLS30200 & MLS30150

EL-4E 4TH FLOOR NORTH VAV 2" HHWS & 1 1/2" HHWR 180 +/- 1.5" MLS30200 & MLS30150

EL-4F 4TH FLOOR EAST VAV 1 1/2" HHWS & 1 1/2" HHWR 180 +/- 1.5" 2 @ MLS30150

EL-4G 4TH FLOOR SOUTH VAV 1" HHWS & 2" HHWR 180 +/- 1.5" MLS30100 & MLS30150

EL-5A 5TH FLOOR WEST RCP 1" HHWS & 1" HHWR 180 +/- 1.5" 2 @ MLS30100

EL-5B 5TH FLOOR NORTH RCP 3/4" HHWS & 1" HHWR 180 +/- 1.5" MLS30075 & MLS30100

EL-5C 5TH FLOOR EAST RCP 1" HHWS & 1" HHWR 180 +/- 1.5" MLS30075 & MLS30100

EL-5D 5TH FLOOR WEST VAV 1 1/4" HHWS & 2" HHWR 180 +/- 1.5" 2 @ MLS30100

EL-5E 5TH FLOOR NORTH VAV 2" HHWS & 1 1/2" HHWR 180 +/- 1.5" MLS30200 & MLS30150

EL-5F 5TH FLOOR EAST VAV 2" HHWS & 2" HHWR 180 +/- 1.5" 2 @ MLS30200

EL-5G 5TH FLOOR SOUTH VAV 1" HHWS & 2" HHWR 180 +/- 1.5" MLS30100 & MLS30200

AIR FILTER SCHEDULE

UNIT IDENTIFICATION FILTER FILTER MEDIA

MANUFACTURER NOTESMARK NUMBERUNIT

SERVEDFILTERTYPE

TOTALAIRFLOW

(CFM)

TOTALMEDIA AREA

(SQ. FT)

AIR PRESSURE DROP

EFFICIENCYMERV QTY 12 3

DEPTH(IN)

INITIAL(IN W.G.)

FINAL(IN W.G.)

AF 2 AHU-2 PLEATED 28000 44.2 0.25 1.0 13 12 & 3 24"x20" 20"x16" 4 CAMFIL-FARR 1, 2 & 3

AF 3 AHU-3 PLEATED 28000 44.2 0.25 1.0 13 12 & 3 24"x20" 20"x16" 4 CAMFIL-FARR 1, 2 & 3

AF 4 AHU-4 PLEATED 28000 44.2 0.25 1.0 13 12 & 3 24"x20" 20"x16" 4 CAMFIL-FARR 1, 2 & 3

AF 5 AHU-5 PLEATED 31000 44.2 0.25 1.0 13 12 & 3 24"x20" 20"x16" 4 CAMFIL-FARR 1, 2 & 3

CHILLED WATER COOLING COIL SCHEDULE

UNIT IDENTIFICATION

TOTALCAPACITY

(MBH)

COIL AIR WATER

CONTROLVALVE MAX

P.D. (°F) MANUFACTURERMODEL

NO. NOTESMARK NUMBERUNIT

SERVED

SENSIBLECAPACITY

(MBH)MAX VELOCITY

(FPM)TOTAL COILED AREA

(SQ. FT)

NO. OFCOIL

BANKSNO. OFROWS

TOTAL COILAIRFLOW

(CFM) E.D.B. (°F) E.W.B. (°F) L.D.B. (°F) L.W.B. (°F)MAX A.P.D.(IN W.G.)

TOTAL COILWATERFLOW

(GPM) E.W.T. (°F) L.W.T. (°F)MAX W.P.D.

(IN W.G.)(E)CC 2 AHU-2 1312.0 967.4 531 56.5 1 6 28000 79.7 65.3 50.3 50.2 0.9 187.0 42 56 12.0 10 TRANE EXISTING 1

(E)CC 3 AHU-3 1312.0 967.4 531 56.5 1 6 28000 79.7 65.3 50.3 50.2 0.9 187.0 42 56 12.0 10 TRANE EXISTING 1

(E)CC 4 AHU-4 1312.0 967.4 531 56.5 1 6 28000 79.7 65.3 50.3 50.2 0.9 187.0 42 56 12.0 10 TRANE EXISTING 1

(E)CC 5 AHU-5 1312.0 967.4 531 56.5 1 6 31000 79.7 65.3 50.3 50.2 0.9 187.0 42 56 12.0 10 TRANE EXISTING 1

HOT WATER HEATING COIL SCHEDULE

UNIT IDENTIFICATION COIL AIR WATER CONTROLVALVE

MAX P.D.(FT) MANUFACTURER NOTESMARK

UNITSERVED

TOTALCAPACITY

(MBH)

MAXVELOCITY

(FPM)

TOTALCOIL AREA

(SQ. FT.)

NUMBEROF COILBANKS

NUMBEROF ROWS

TOTALAIRFLOW

(CFM) E.D.B. (°F) L.D.B. (°F)MAX A.P.D.(IN W.G.)

FLUIDFLOW(GPM) E.W.T. (°F) L.W.T. (°F)

MAXW.P.D.(FT.)

(E)HC-2 AHU-2 675.6 265 56.5 1 1 15000 24.6 65.0 0.02 35.0 180 141 1.0 5 TRANE 1 & 2

(E)HC-3 AHU-3 323.0 265 56.5 1 1 15000 45.2 65.0 0.02 35.0 180 161 1.0 5 TRANE 1 & 2

(E)HC-4 AHU-4 479.0 265 56.5 1 1 15000 35.6 65.0 0.02 35.0 180 152 1.0 5 TRANE 1 & 2

(E)HC-5 AHU-5 739.0 265 56.5 1 1 15000 19.6 65.0 0.02 35.0 180 137 1.0 5 TRANE 1 & 2

NOTES:1. COIL SELECTIONS BASED ON WATER. REBALANCE EXISTING COIL TO NEW FLOW INDICATED

NOTES:1. COIL SELECTIONS BASED ON WATER.2. REBALACE EXISTING HEATING TO FLOW AS SHOWN

NOTES:1. CONTRACTOR TO REMOVEL EXISTING FILTER RACK AND PROVIDE NEW 4" FILTER RACK IN EXISTING FILTER FRAME2. CONFIRM SIZE AND QUANTITIES OF FILTERS BEFORE FABRICATION OF NEW FILTER RACK3. PROVIDE THREE SETS OF FILTERS FOR EACH AHU

NOTES:1. BASE ON METERFLEX NESTED EXPANSION LOOPS2. PROVIDE PIPE GUIDES AND ANCHORS FOR PIPING3. INSULATE EXPANSION LOOP PIPING WITH FLEXIBLE ELASTOMERIC PIPE INSULATION

RETURN FAN FAN SCHEDULE

UNIT IDENTIFICATION FAN SYSTEM FAN(S) ELECTRICAL

MANUFACTURER NOTESMARK LOCATION UNIT SERVEDNO. OFFANS

MAX.AIRFLOW

(CFM)

MIN.AIRFLOW

(CFM)E.S.P.

(IN W.G.) CONTROL

FAN WHEEL FAN MOTOR

TYPE

FANSPEED(RPM)

ESTIMATEDBHP

FAN HPEXISTING

NEW MOTORHP (EACH) RPM

DRIVETYPE VOLTS PHASE

RF-2 2ND FLOOR AHU-2 1 28000 14000 1.5" VFD (E)SWSI 438 9.8 7.5 15 1800 BELT 460 3 TRANE 1, 2, 3, 4 & 5

RF-3 3RD FLOOR AHU-3 1 28000 14000 1.5" VFD (E)SWSI 438 9.8 7.5 15 1800 BELT 460 3 TRANE 1, 2, 3, 4 & 5

RF-4 4TH FLOOR AHU-4 1 28000 14000 1.5" VFD (E)SWSI 438 9.8 7.5 15 1800 BELT 460 3 TRANE 1, 2, 3, 4 & 5

RF-5 5TH FLOOR AHU-5 1 31000 15000 1.5" (E)VFD (E)SWSI 438 9.8 15 -- 1800 BELT 460 3 TRANE 1, 2 & 4

NOTES:1. CONTRACTOR TO REMOVE EXISTING BELTS AND SHEEVES AND REPLACE WITH NEW DOUBLE BELTS AND SHEEVES TO MEET NEW PERFORMACE REQUIREMENTS2. EXSITING RF-5 MOTOR TO REMAIN, REBALANCE TO NEW REQUIREMENTS3. PROVIDE VFD FOR RF-2, 3, AND 44. PROVIDE NEW ENCLOSED BELT GUARD OVER NEW BELTS AND SHEEVES. PROVIDE EXPANDED METAL FRONT FOR MAINTENACE VIEWING. PAINT NEW BELT GUARD TWO COATS SAFETY YELLOW5. PROVIDE NEW 15 HP MOTORS FOR RF-2, 3, AND 4

02-20-2013 BIDS

03-05-2013 ADDENDUM 2

SPLIT SYSTEM AIR CONDITIONER UNIT (ACU) & AIR COOLED CONDENSING (ACU) SCHEDULE

EVAPORATOR AIR COOLED CONDENSER

NOTESMARK MANUF. MODEL

TOTALCOOLING

(BTUH)AIRFLOW

(CFM)

ELECTRICAL DATA

MARK

REFRIGERANT

MANUF. MODEL SEER

SYSTEM ELECTRICAL DATA

VOLT/PH F.L.A TYPE LIQ Ø SUC. Ø VOLT/PH M.C.A M.O.C.P.

ACU-1 DAIKIN DTXS36LVJU 36,000 770/519/473 208-230/1Ø -- ACCU-1 R-410A 3/8" 5/8" DAIKIN RKS36LVJU 17.9 208-230/1Ø 19.5 0 1,2,3,4,5,6

NOTES:1. PROVIDE MANUFACTURER'S WIRED THERMOSTAT CONTROLLER FOR WALL MOUNTING. PROVIDE INTEGRAL CONDENSATE DRAIN PAN OVERFLOW SWITCH TO DISABLE UNIT ON HIGH CONDENSATE LEVEL.2. OUTDOOR CONDENSER TO BE SELECTED FOR OPERATION AT 95°F WB / 75°F DB.3. PROVIDE LOW AMBIENT KIT FOR OPERATION AT -3°F DB.4. PROVIDE ROOM HIGH LIMIT ALARM SENSOR TO SIGNAL THE BAS. WHERE INSTALLED IN IT ROOMS OR ELEVATOR ROOMS.5. PROVIDE ALL NECESSARY PIPING AND REFRIGERANT REQUIRED TO INSTALL SYSTEM. MANUFACTURER TO PROVIDE UNIT CAPABLE OF PERFORMING AT LINE LENGTHS REQUIRED FOR INSTALLATION COORDINATED WITH ALL

TRADES. SHOP DRAWINGS SHALL INDICATE TOTAL LINE LENGTHS FOR EACH ACU/ACCU COMBINATION.6. SEE PLANS FOR ACU AND ACCU COMBINATIONS.

Page 35: MECHANICAL SYMBOLS MECHANICAL DRAWING LEGEND111841/AN~2...MECHANICAL SYMBOLS MECHANICAL SYSTEM INDICATION HEAVY LINE-WEIGHT INDICATES NEW WORK LIGHT LINE WEIGHT-INDICATES EXISTING

AI

AI

DIDI

M

CS

HOA

DIDI

M

CS

HOA

DI

AI

DP

TD

PT

DP

TD

PT

DI DIDIDIDI DI DI

M

DO AO

CS

HOA

DIDI

DI DI

M

DI

CS

HOA

DIDI

DI DI

DP

T

M

M

M

TS

TS

DOAOAO

M

DOAOAO

TS

AI

VFD ES

M

ES

AO

DO

VFD

AO

ES

ES

ES

M

M

ES

ES

TS

AI

AI

AI

AI

DOAO

VFD

DI

ES

DO

VFD

AO

ES

AI

FM

AI

PHHWRETURN

TEMP

BUILDINGRETURN

TEMP

HHW SUPPLYTO BUILDING

HHW RETURNFROM BUILDING

HEAT EXCHANGERS

LPS

LPS

2/3 VALVE

N.C.

1/3 VALVE

N.O.

N.O.

COND.

OPEN/CLOSE

ES

FULLYMODUL.

FULLYMODUL.

POSITIONINDICATION

ES

OPEN/CLOSE

POSITIONINDICATION

FULLYMODUL.

FULLYMODUL.

N.O.

HHWSUPPLY

TEMP

HEATING HOT WATER SYSTEMCONTROL DIAGRAM

NOTES:

1. UNIT LAYOUT IS DIAGRAMMATIC IN NATURE. SEE UNIT LAYOUT DRAWINGS FOR DEVICE PHYSICAL ORIENTATION.

2. ALL SETPOINTS, DEADBANDS, AND TIME INTERVALS DESCRIBED IN THE SEQUENCE SHALL BE ADJUSTABLE BYDDC/BAS SYSTEM OPERATORS (CREATE REQUIRED VIRTUAL POINTS).

3. APPROPRIATE DEADBANDS AND TIME DELAYS SHALL BE USED IN TO PREVENT SHORT CYCLING SITUATIONS.

4. THE HAND-OFF-AUTO (H-O-A) SWITCH FOR THE VARIABLE FREQUENCY DRIVE (VFD) NORMALLY REMAINS IN THE"AUTO" POSITION. "HAND" AND "OFF" POSITIONS ARE USED FOR MAINTENANCE SITUATIONS.

5. PROVIDE DDC CONTROLLER, SENSORS, RELAYS, DEVICES, AND WIRING FOR A COMPLETE CONTROL SYSTEM TOPERFORM THE SEQUENCE OF OPERATION.

SEQUENCE OF OPERATIONS:

1. HEATING HOT WATER SYSTEM IS ENABLED TO RUN CONTINUOUSLY TO PROVIDE TEMPERING AT AIR HANDLINGUNITS AND AIR TERMINALS FOR SPACE TEMPERATURE CONTROL. VALVES MARKED N.O. (NORMALLY OPEN) AND N.C.(NORMALLY CLOSED) HAVE SPRING RETURN ACTUATORS AND FAIL TO THE POSITION INDICATED UPON POWER ORSIGNAL LOSS TO THE ACTUATOR.

2. UPON INITIAL SYSTEM START, HX-1, CP1, AND CP-3 ARE SELECTED AS "LEAD" DEVICES FOR ODD NUMBEREDMONTHS. HX-2, CP-2, AND CP-4 FOR EVEN NUMBERED MONTHS. ONE OF EITHER CP-1 OR CP-2, AND ONE OF EITHERCP-10 OR CP-11, IS ACTIVATED BY THE DDC AND RUNS CONTINUOUSLY. THE OTHER WILL SERVE AS A STANDBY. THEDDC ALTERNATES PUMP OPERATION THE FIRST DAY OF EACH MONTH AT 11:00A.M.

3. HOT WATER HEATING SYSTEM CIRCULATING PUMPS CP-1, CP-2, CP-3 AND CP-4 HAVE START/STOP CAPABILITY FROMTHE DDC/BAS SYSTEM. DDC MONITORS THE OPERATING STATUS OF EACH PUMP MOTOR VIA CURRENT SENSOR.UPON PUMP MOTOR FAILURE, THE DDC ACTIVATES A PUMP MOTOR FAILURE ALARM AND AUTOMATICALLY STARTS THESTANDBY PUMP.

4. UPON PUMP START, THE PUMP VFD STARTS AT A MINIMUM LOADING OF 20 TO 25% AND THEN RAMPS SLOWLY ANDLINEARLY OVER A 120 SECOND TIME PERIOD (ADJUSTABLE) TO REACH SETPOINT IN AN ORDERLY AND CONTROLLEDMANNER. THE VFDS REQUIRE MINIMUM/MAXIMUM HZ SPEED SETTINGS, BI-DIRECTIONAL AUTO-SPEED SEARCH TOALLOW STARTING INTO ROLLING LOADS IN EITHER DIRECTION, AND AUTOMATIC RESET/RESTART FOR THREERESTARTS BEFORE SHUTTING DOWN FOR MANUAL RESET OR FAULT CORRECTION.

5. THE DDC CONTROLS THE VALVES ASSOCIATED WITH STEAM HEAT EXCHANGERS HX-1 AND HX-2. THE "LEAD" HEATEXCHANGER SHALL BE ACTIVATED AUTOMATICALLY. THE HX ISOLATION VALVES SHALL BE COMMANDED OPEN PRIORTO PUMP ACTIVATION AND STEAM VALVE CONTROL. VALVE OPEN/CLOSED SWITCH SHALL INDICATE VALVE IS IN OPENPOSITION BEFORE COMMANDING THE PUMP TO RUN. THE OTHER HEAT EXCHANGER SHALL BE DESIGNATED ASSTANDBY AND ITS ISOLATION VALVES ARE COMMANDED CLOSED.

6. THE HOT WATER SUPPLY TEMPERATURE SENSOR MODULATES IN SEQUENCE THE ACTIVATED HX 1/3 AND 2/3 STEAMCONTROL VALVES TO MAINTAIN HOT WATER TEMPERATURE SETPOINT (ADJUSTABLE). INITIALLY, THE TEMPERATURESENSOR FIRST MODULATES THE 1/3 VALVE UNTIL ITS MAXIMUM POSITION HAS BEEN REACHED. AFTER THE 1/3 VALVEHAS REACHED ITS MAXIMUM POSITION, THE 2/3 VALVE SHALL MODULATE OPEN AND THE 1/3 VALVE SHALL MODULATECLOSED. THE TEMPERATURE SENSOR MODULATES THE 2/3 VALVE AS REQUIRED TO MAINTAIN TEMPERATURESETPOINT. AFTER THE 2/3 VALVE HAS BEEN MODULATED TO ITS MAXIMUM POSITION, IT SHALL REMAIN OPEN AND THE1/3 VALVE SHALL MODULATE OPEN TO MAINTAIN TEMPERATURE SETPOINT. THE 1/3 AND 2/3 VALVES SHALL REVERSETHIS OPERATION AS NEEDED TO MAINTAIN TEMPERATURE SETPOINT.

7. DDC MONITORS HEATING LOOP SYSTEM DIFFERENTIAL PRESSURE SENSOR AND MODULATES THE VFD OF THEACTIVE HEATING HOT WATER PUMP TO MAINTAIN CONTROL SETPOINT THAT SHALL BE ESTABLISHED DURING SYSTEMBALANCING AND COMMISSIONING. THE SETPOINT IS INITIALLY SET TO 25 FT OF HEAD. THERE ARE ENOUGH THREE-WAY VALVES IN THE SYSTEM TO KEEP THE PUMP ON ITS MINIMUM CURVE. THE FLOW METER MEASURES HHWS FLOWRATE (GPM) AND DDC PROVIDES TOTALIZED CAPACITY (THOUSANDS OF GALLONS) ON A DAILY, WEEKLY, AND MONTHLYBASIS AND FOR DISPLAY AT THE BAS.

8. THE PRIMARY HEATING HOT WATER SYSTEM SHALL PROVIDE HEATING HOT WATER AS SHOWN IN THE RESETSCHEDULE.

PERIMETER HOT WATER CONTROL:

1. THE DDC MONITORS THE PERIMETER HEATING LOOP SYSTEM DIFFERENTIAL PRESSURE SENSORS ANDMODULATES THE VFD OF THE "LEAD" PERIMETER HEATING HOT WATER PUMP TO MAINTAIN CONTROL SETPOINT(ADJUSTABLE) THAT SHALL BE ESTABLISHED DURING SYSTEM BALANCING AND COMMISSIONING. THE SETPOINT ISINITIALLY SET TO 25 FT OF HEAD. DDC MODULATES THE PUMP VFD TO MAINTAIN THE LOWEST DIFFERENTIALPRESSURE SENSOR AT SETPOINT.

2. UPON PUMP START, THE PUMP VFD STARTS AT A MINIMUM LOADING OF 20 TO 25% AND THEN RAMPS SLOWLY ANDLINEARLY OVER A 120 SECOND TIME PERIOD (ADJUSTABLE) TO REACH SETPOINT IN AN ORDERLY AND CONTROLLEDMANNER. THE VFDS REQUIRE MINIMUM/MAXIMUM HZ SPEED SETTINGS, BI-DIRECTIONAL AUTO-SPEED SEARCH TOALLOW STARTING INTO ROLLING LOADS IN EITHER DIRECTION, AND AUTOMATIC RESET/RESTART FOR THREERESTARTS BEFORE SHUTTING DOWN FOR MANUAL RESET OR FAULT CORRECTION.

3. DDC MONITORS MULTIPLE PERIMETER SYSTEM DIFFERENTIAL PRESSURE SENSORS AND MODULATES THE VFD OFTHE PERIMETER HEATING HOT WATER PUMP TO MAINTAIN THE LOWEST LOOP CONTROL SETPOINT INITIALLY SET TO 25FEET OF HEAD. WHEN THE DIFFERENTIAL PRESSURE SENSOR MODULATES THE PUMP DOWN TO MINIMUMALLOWABLE PUMP SPEED AND THE SYSTEM FLOW STARTS TO DROP BELOW MINIMUM PUMP FLOW RATE, THE FLOWMETER MODULATES THE ASSOCIATED BYPASS VALVE OPEN TO MAINTAIN SYSTEM MINIMUM FLOW AND KEEP THE PUMPOPERATING ABOVE MINIMUM ACCEPTABLE SPEED.

4. DDC MODULATES THE PERIMETER LOOP TEMPERATURE CONTROL VALVE FOR SUPPLY HOT WATER TEMPERATUREAS SHOWN IN THE RESET SCHEDULE.

5. PERIMETER PUMPING SHALL BE SHUT OFF ABOVE 60° F OUTDOOR AIR TEMPERATURE. WHEN TURNED OFF, CLOSETHE PERIMETER HEATING LOOP CONTROL VALVE.

SEQUENCE OF OPERATIONSDS

HOA INHAND

POSITION

START/STOP

SPEEDCONTROL

VFDFAULT

DS

THESE POINTS PROVIDED VIACOMMUNICATION CARD INTERFACE TO DDC

RUNNINGSTATUS

PHWR

GARAGE

FULLYMODULATING

CP-1

CP-2

CP-3

CP-4

HX-1

HX-2

LPS

LPS

2/3 VALVE

N.C.

1/3 VALVE

N.O.

PHWS

EAST

NORTH

WEST

PHHWSUPPLY

TEMP

DIFFERENTIAL PRESSURE TRANSMITTER.PROVIDE 3 VALVE MANIFOLD WITHTRANSMITTER. LOCATIONS SHOWN ONPLANS.

DIFF.PRESS

PHWR

PHWS

DIFFERENTIAL PRESSURE TRANSMITTER.PROVIDE 3 VALVE MANIFOLD WITHTRANSMITTER. LOCATIONS SHOWN ONPLANS.

DIFF.PRESS

PHWR

PHWS

DIFFERENTIAL PRESSURE TRANSMITTER.PROVIDE 3 VALVE MANIFOLD WITHTRANSMITTER. LOCATIONS SHOWN ONPLANS.

DIFF.PRESS

PHWR

PHWS

DIFFERENTIAL PRESSURE TRANSMITTER.PROVIDE 3 VALVE MANIFOLD WITHTRANSMITTER. LOCATIONS SHOWN ONPLANS.

DIFF.PRESS

PHASELOSS

COMMONALARM

HOA INHAND

POSITION

START/STOP

SPEEDCONTROL

VFDFAULT

THESE POINTS PROVIDED VIACOMMUNICATION CARD INTERFACE TO DDC

RUNNINGSTATUS

PHASELOSS

COMMONALARM

HEAT/REHEAT WATER RESET SCHEDULE (ADJUSTABLE)

OUTSIDE AIR TEMPERATURE HEATING LOOP TEMPERATURE

< 10° F

BETWEEN 10 - 50° F

180° F

BETWEEN 160-140° F

> 60° F 130° F

HHWR

2ND FLR

HHWS

3RD FLR

4TH FLR

5TH FLR

HHWR

HHWS

HHWR

HHWS

HHWR

HHWS

HHWR

1ST FLR

HHWS

OAT >60° F

PERIMETER HOT WATER RESET SCHEDULE (ADJUSTABLE)

OUTSIDE AIR TEMPERATURE HEATING LOOP TEMPERATURE

< 10° F

BETWEEN 10 - 50° F

140° F

BETWEEN 160-140° F

SYSTEM OFF

> 50° F 120° F

START/STOP

RUNNINGSTATUS

SPEEDCONTROL

DS

HOA INHAND

POSITION

VFDFAULT

THESE POINTS PROVIDEDVIA BACNET CARD

INTERFACE TO DDC

PHASELOSS

COMMONALARM

START/STOP

RUNNINGSTATUS

SPEEDCONTROL

DS

HOA INHAND

POSITION

VFDFAULT

THESE POINTS PROVIDEDVIA BACNET CARD

INTERFACE TO DDC

PHASELOSS

COMMONALARM

DIFFERENTIAL PRESSURE TRANSMITTER.PROVIDE 3 VALVE MANIFOLD WITHTRANSMITTER. LOCATIONS SHOWN ONPLANS.

DIFF.PRESS

HHWSFLOW

N.O.

1

ISSUE:

CHECKED:

SCALE:

© 2010 SHW Group

SHW Project:

SHEET TITLE:

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

C:\

Revit

Lo

calF

iles\7

1108000

CH

M12_C

EN

TR

AL

_K

sim

on

eau

x.r

vt

3/5

/2013

6:1

0:0

3P

M

1/4" = 1'-0"

CJZ

PETER AND PAT COOKACADEMIC HALL

RENOVATION

GRAND RAPIDS, MI

CONTROLS DIAGRAM

M7017111.080.00

2338 COOLIDGE, BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

DJT

02-20-2013 BIDS

03-05-2013 ADDENDUM 2

Page 36: MECHANICAL SYMBOLS MECHANICAL DRAWING LEGEND111841/AN~2...MECHANICAL SYMBOLS MECHANICAL SYSTEM INDICATION HEAVY LINE-WEIGHT INDICATES NEW WORK LIGHT LINE WEIGHT-INDICATES EXISTING

DPS DPS

AO DO

AI

M

DO

M

DO

M

M

CS

HOA

HOA

CS

HOA

CS

HOA

HOA

AODO

CS

AODO

CS

DP

T

DO

M

CS

DI

LS

M

LS

M

CS

DI

DI

DI

TS

VIBVFD

TS

AI

DI AI

TS

AI

ES

STRES

DI

STRES

DI

VFDES

VFDES

M

DIDI

AO TS

AI

TS

AI

TS

AI

DI DI DI

DI DI DI

AI

FM

AI

DO

STR ES

DO

SPEEDCONTROL

START/STOP

RUNNINGSTATUS

TOWERC.W.

SUPPLYTEMP

DS

CP-8

COND.RETURN

TEMP

M

ALARM

HARDWIREINTERLOCK

TO HIGHSPEED

STARTER OFMECH. RM.

VENTILATIONSYSTEM

TROUBLEALARM

REFRIG.LEVEL

ALARMHORN

REFRIGERANTMONITORSYSTEM

TYPICAL REFRIGERANT MONITORSENSING HEAD WITH FILTER.MOUNT SENSOR ON UNISTRUTBRACKET 12" ABOVE THE FLOORON OPPOSITE SIDES AND ATOPPOSITE CORNERS OF THECHILLER.

CP-5

CP-6

ALARMBEACON

REFRIGERANT ALARMWARNING LIGHTSAT EACH DOOR

SUPPLYTEMP.

CHILLED WATER SYSTEM CONTROL DIAGRAM

START/STOP

STATUS

CP-7

START/STOP

STATUS

NOTES:

1. UNIT LAYOUT IS DIAGRAMMATIC IN NATURE. SEE UNIT LAYOUT DRAWINGS FOR DEVICE PHYSICAL ORIENTATION.

2. ALL SETPOINTS, TIME DELAY INTERVALS, AND RESET SETPOINTS DESCRIBED IN SEQUENCE SHALL BE ADJUSTABLEBY SYSTEM OPERATORS. APPROPRIATE DEADBANDS AND TIME DELAYS SHALL BE USED TO PREVENT SHORTCYCLING SITUATIONS.

3. ALL H-O-A SWITCHES NORMALLY REMAIN IN THE "AUTO" POSITION AND THE "HAND" AND "OFF" POSITIONS AREUSED FOR MAINTENANCE SITUATIONS.

4. PROVIDE DDC CONTROLLER, SENSORS, RELAYS, DEVICES, AND WIRING FOR A COMPLETE CONTROL SYSTEM TOPERFORM THE SEQUENCE OF OPERATION.

SEQUENCE OF OPERATION - CHILLED WATER SYSTEM (CHW):

1. THE CHW SYSTEM IS ENABLED WHEN OUTDOOR AIR TEMPERATURE IS ABOVE 54° F (ADJUSTABLE BY OPERATORS)AND IS DISABLED WHEN OUTDOOR IS BELOW 52° F (ADJUSTABLE BY OPERATORS). CHILLER CH-1 LOCAL CONTROLPANEL SHALL BE SET FOR REMOTE START FUNCTION BY SYSTEM OPERATORS WHEN THE COOLING SEASON IS TOBEGIN. ALL PUMP AND COOLING TOWER FAN MOTOR CONTROL SWITCHES SHALL BE IN THE “AUTO” POSITION.CHILLER CONTROL PANEL SHALL PROVIDE ALL NECESSARY MACHINE CONTROLS FOR PRODUCTION OF CHILLEDWATER.

2. VALVES MARKED N.O. (NORMALLY OPEN) AND N.C. (NORMALLY CLOSED) HAVE SPRING RETURN ACTUATORS ANDFAIL TO THE POSITION INDICATED UPON POWER OR SIGNAL LOSS TO THE ACTUATOR.

CHILLER, PRIMARY CHILLED WATER PUMP, AND CONDENSER WATER PUMP CONTROL

1. CHW SYSTEM SHALL BE ENABLED BY SYSTEM OPERATORS. CHILLER CH-1 PACKAGED CONTROLS SHALL BE SETFOR REMOTE START FUNCTION BY OPERATORS WHEN THE COOLING SEASON IS TO BEGIN.

2. CONDENSER WATER PUMP AND PRIMARY CHILLED WATER PUMP LEAD/LAG AND STANDBY SHALL BE SELECTABLETHROUGH THE DDC. PUMPS ARE DEDICATED TO EACH CHILLER WITH THE REMAINING CONDENSER WATER ANDPRIMARY CHILLED WATER PUMPS SERVING AS STANDBY.

3. WHEN CHILLER IS COMMANDED TO START, THE CHILLER CONTROLLER COMMANDS THE RESPECTIVE CHILLEREVAPORATOR AND CONDENSER ISOLATION VALVES TO OPEN. THE RESPECTIVE CONDENSER WATER PUMP ISCOMMANDED TO START AND ONCE WATER FLOW IS PROVEN THROUGH THE CONDENSER, THE RESPECTIVE PRIMARYCHILLED WATER PUMP IS COMMANDED TO START. WHEN WATER FLOW IS PROVEN IN THE EVAPORATOR SECTION OFTHE CHILLER AND ALL INTERLOCKS AND SAFETIES ARE COMPLETED, THE CHILLER CONTROLLER START SEQUENCE ISENABLED TO MAINTAIN THE SUPPLY CHILLED WATER TEMPERATURE.

4. THE FLOWS THROUGH THE CHILLER ARE PROVEN BY DIFFERENTIAL PRESSURE SWITCHES ACROSS THECONDENSER AND EVAPORATOR SECTIONS OF THE CHILLER. THE DDC MONITORS THE STATUS OF THE PUMPSTHROUGH RESPECTIVE CURRENT SWITCH.

5. THE DDC MONITORS THE PRIMARY CHILLED WATER TEMPERATURE DIFFERENCE AND BASED ON LOAD FEEDBACK

6. WHENEVER CHILLER IS DEACTIVATED, THE OPERATING CHW AND CW PUMP SHALL REMAIN ACTIVE FOR 5 MINUTESBEFORE SHUT DOWN. THE CONDENSER WATER PUMPS ARE STOPPED BY A LEVEL CONTROL IN THE RESPECTIVECOOLING TOWER IF THE WATER LEVEL DROPS BELOW A SAFE OPERATING LEVEL. IN TURN, THE CHILLER ISDEACTIVATED.

7. THE DDC SHALL ACTIVATE THE PACKAGED CONDENSER WATER SIDE STREAM SEPARATOR SYSTEM WHENEVERTHE CONDENSER WATER SYSTEM IS ACTIVATED. THE DDC SHALL MONITOR PACKAGED SIDE STREAM SYSTEMSTATUS AND ACTIVATE AN ALARM FOR ABNORMAL OPERATION CONDITIONS. THE DDC SHALL MONITOR THE SIDESTREAM DIRTY FILTER ALARM CONTACT AND ACTIVATE A DIRTY FILTER ALARM IN THE DDC/BAS.

8. THE DDC GENERATES A CHILLED WATER SIDE STREAM FILTER "DIRTY" ALARM WHEN THE PRESSURE DROPACROSS THE FILTER EXCEEDS A HIGH LIMIT AS ESTABLISHED BY THE MANUFACTURER.

COOLING TOWER CONTROL

1. THE COOLING TOWER FAN HAS A VFD WITH SPEED CONTROL FROM THE DDC SYSTEM. UPON PROOF OFCONDENSER WATER PUMP ACTIVATION, THE DDC SHALL ACTIVATE THE COOLING TOWER FAN CONTROL.

2. ON LIGHT LOAD DAYS, TOWER FAN REMAINS OFF AND CONDENSER WATER TEMPERATURE CONTROL ISMAINTAINED BY MODULATING THE TOWER BYPASS VALVE TO MAINTAIN CONDENSER WATER SUPPLY TEMPERATURESETPOINT OF 85° F (ADJUSTABLE).

3. UPON CONDENSER WATER TEMPERATURE RISING TO 86° F, DDC SHALL MODULATE THE COOLING TOWER FAN VFDSPEED SIGNAL TO MAINTAIN CONDENSER WATER SUPPLY TEMPERATURE SETPOINT OF 85° F (ADJUSTABLE).

4. THE DDC SHALL MONITOR COOLING TOWER FAN STATUS THROUGH THE RESPECTIVE CURRENT SWITCH. UPONFAILURE, THE DDC SHALL PROVIDE A FAILURE ALARM. IF COOLING TOWER FAN FAILS AND THE CONDENSER WATERTEMPERATURE IS RISING ABOVE AN ACCEPTABLE LEVEL (PER THE CHILLER MANUFACTURER), THE CHILLER SHALL BEDEACTIVATED AND AN ALARM GENERATED IN THE BAS.

5. DDC SHALL MONITOR THE COOLING TOWER FAN VIBRATION SWITCH IF A VIBRATION SWITCH TRIPS, DDC SHALLPROVIDE AN ALARM AND SHUT DOWN THE COOLING TOWER AND THE CHILLER SHALL BE DEACTIVATED.

SEQUENCE OF OPERATION-CHILLED WATER SYSTEM (CONT'D)

SECONDARY PUMP/FLOW CONTROL

1. CHILLED WATER SYSTEM SECONDARY CHILLED WATER PUMPS CP-6 AND CP-7 HAVE START/STOP CAPABILITYFROM THE DDC SYSTEM. ONE OF THE TWO PUMPS IS ACTIVATED AND IS STARTED BY THE DDC (BEFORE THEPRIMARY PUMPS ARE STARTED) AND RUNS CONTINUOUSLY WHEN CHILLED WATER IS REQUIRED. THE OTHER PUMPWILL SERVE AS A STANDBY.

2. THE DDC ALTERNATES THE PUMP OPERATION BASED ON RUN TIME HOURS OR AT THE BEGINNING OF EACHMONTH, OPERATOR SELECTABLE. ROTATION BY MONTH IS PERFORMED ON THE FIRST DAY OF THE MONTH AT10:00A.M.

3. UPON PUMP START, THE PUMP VFD STARTS AT A MINIMUM LOADING OF 20 TO 25% AND THEN RAMPS SLOWLY ANDLINEARLY OVER A 120 SECOND TIME PERIOD (ADJUSTABLE) TO REACH SETPOINT IN AN ORDERLY AND CONTROLLEDMANNER. THE VFDS REQUIRE MINIMUM/MAXIMUM HZ SPEED SETTINGS, BI-DIRECTIONAL AUTO-SPEED SEARCH TOALLOW STARTING INTO ROLLING LOADS IN EITHER DIRECTION, AND AUTOMATIC RESET/RESTART FOR THREERESTARTS BEFORE SHUTTING DOWN FOR MANUAL RESET OR FAULT CORRECTION.

4. DDC MONITORS CHILLED WATWE SECONDARY SYSTEM DIFFERENTIAL PRESSURE SENSOR AND MODULATES THEVFD OF THE CHILLED WATER PUMP TO MAINTAIN CONTROL SETPOINT THAT SHALL BE ESTABLISHED DURING SYSTEMBALANCING AND COMMISSIONING. THE SETPOINT IS INITIALLY SET TO 25 FT OF HEAD. THERE ARE ENOUGH THREE-WAY VALVES IN THE SYSTEM TO KEEP THE PUMP ON ITS MINIMUM CURVE. THE FLOW METER MEASURES HHWS FLOWRATE (GPM) AND DDC PROVIDES TOTALIZED CAPACITY (THOUSANDS OF GALLONS) ON A DAILY, WEEKLY, ANDMONTHLY BASIS AND FOR DISPLAY AT THE BAS.

5. SECONDARY SUPPLY WATER TEMPERATURE IS 44° F, SECONDARY RETURN WATER TEMPERATURE SETPOINT IS54° F.

6. THE DDC MONITORS THE OPERATING STATUS OF EACH PUMP VIA CURRENT SENSOR. UPON PUMP FAILURE, THEDDC ACTIVATES A PUMP FAILURE ALARM AND AUTOMATICALLY STARTS THE STANDBY PUMP.

THE FOLLOWING ALARMS SHALL BE SENT TO THE BAS.

A. VFD’S FAULT/FAILUREB. VFD’S IN HAND POSITIONC. PUMP MOTOR FAILURE FROM CURRENT SWITCH ALARMD. SUPPLY WATER TEMPERATURE HIGH LIMITE. SUPPLY WATER TEMPERATURE LOW LIMITF. CHILLER FAULT ALARMSG. REFRIGERANT MONITORING SYSTEM TROUBLE ALARMH. COOLING TOWER VIBRATION ALARMSI. SIDE STREAM DIRTY FILTER ALARMJ. SOLIDS SEPARATION VESSEL DIRTY FILTER ALARM

REFRIGERANT MONITORING:

1. THE REFRIGERANT MONITORING SYSTEM MONITORS THE REFRIGERANT LEVEL IN THE CHILLER ROOMAND ALARMS WHEN A REFRIGERANT LEAK IS DETECTED. A HORN SOUNDS, A BEACON STROBE IS LITDURING AN ALARM CONDITION, AND EXHAUST FAN IS ACTIVATED AND RUNS IN HIGH SPEED MODECONTINUOUSLY UNTIL THE PROBLEM IS CLEARED. THE ALARM HORN MAY BE SILENCED BUT THEFLASHER REMAINS ON UNTIL THE SYSTEM IS MANUALLY RESET AND THE PROBLEM CLEARED. WARNINGLIGHTS ARE ACTIVATED AT EACH DOOR TO THE ROOM. THE LIGHTS HAVE WARNINGS SIGNS TO ALERTPEOPLE: DO NOT ENTER REFRIGERANT LEAK DETECTED UNSAFE TO ENTER ROOM WITHOUT PROPERBREATHING APPARATUS. THE DDC MONITORS EMERGENCY VENTILATION START, THE REFRIGERANTLEVEL AND GENERATES A TROUBLE ALARM AT THE BAS. DDC CAN ALSO COMMAND THE FAN INTO HIGHSPEED FOR MAINTENANCE AND CONTROL REASONS.

2. EXHAUST FAN EF-6 RUNS IN LOW SPEED OPERATION BASED ON A ROOM TEMPERATURE SENSOR.WHEN ROOM TEMPERATURE EXCEEDS 78 °F (ADJUSTABLE) BY 1° F, THE FAN SHALL RUN IN LOW SPEED.ONCE ROOM TEMPERATURE DROPS 1° F BELOW SETPOINT, THE FAN SHALL TURN OFF. A MINIMUMDEADBAND OF 2° F (ADJUSTABLE IN DDC) SHALL BE USED.

3. EXHAUST FAN EF-6 IS MONITORED BY TWO CURRENT SENSORS, ONE IN THE LOW SPEED AND ONE INTHE HIGH SPEED MOTOR LEADS. DDC SYSTEM MONITORS THE INDIVIDUAL FAN MOTOR CURRENTSWITCH. WHEN COMMANDED TO RUN AND IF APPROPRIATE CURRENT IS NOT SENSED WITHIN 120SECONDS (ADJUSTABLE), DDC SHALL ACTIVATE FAILURE ALARM TO THE BAS. WHEN COMMANDED TOSTOP AND IF THE CURRENT IS NOT ZERO WITHIN 120 SECONDS (ADJUSTABLE), DDC SHALL ACTIVATEFAILURE ALARM TO THE BAS.

TEMPERATURES CONTROLS GENERAL NOTES:

1. THE TEMPERATURE CONTROLS CONTRACTOR SHALL BE RESPONSIBLE FOR ALL POWER SUPPLIESREQUIRED FOR TC SYSTEM UNLESS OTHERWISE NOTED. REFER TO ELECTRICAL PANEL SCHEDULESFOR SPARE CIRCUITS OR CIRCUITS DEDICATED TO TEMPERATURE CONTROLS. COORDINATE CIRCUITUSE WITH ELECTRICAL CONTRACTOR.

2. ALL CONTROL VALVES, CONTROL DAMPERS, AND ASSOCIATED CONTROL ACTUATORS IDENTIFIED ONTC DRAWINGS SHALL BE FURNISHED BY TC CONTRACTOR UNLESS OTHERWISE NOTED. DAMPER SIZEAND LOCATIONS ARE INDICATED ON MECHANICAL FLOOR PLAN DRAWINGS.

3. ALL CONTROL VALVES, CONTROL DAMPERS FURNISHED BY THE TC CONTRACTOR SHALL BEINSTALLED BY THE MECHANICAL CONTRACTOR. ALL PIPE PENETRATIONS AND BASIC FITTINGSREQUIRED FOR SENSOR INSTALLATIONS SHALL BE PROVIDED BY MECHANICAL CONTRACTOR.ELECTRIC DAMPER ACTUATORS AND LIMIT SWITCHES SHALL BE INSTALLED BY TC CONTRACTOR.

4. TC CONTRACTOR SHALL PROVIDE AS-BUILT DOCUMENTS OF FINAL SEQUENCE OF OPERATIONSAFTER COMPLETION OF COMMISSIONING PROCESS. TC CONTRACTOR SHALL COORDINATE SUBMITTALSWITH OWNERS COMMISSIONING AGENT.

CHILLER NOTES:

1. CHILLED WATER SYSTEM CONTROL DEVICES FURNISHED BY CHILLER MANUFACTURER AND WIREDBY TC CONTRACTOR.

2. TC CONTRACTOR SHALL COORDINATE START/STOP AND STATUS INTERFACE POINTS WITH SIDESTREAM SEPARATOR SUPPLIER.

3 COOLING TOWER VIBRATION SWITCHES TO BE HARDWIRED TO VFD SAFETY CIRCUIT.

DS

DS

(E) COOLINGTOWER

CH-1

N.C.

N.O.

TOWERBYPASSFULLY

MODUL.

BACNET CONTROLLER/COMMUNICATION CARDINTERFACE TO BACNET

NETWORK

CHILLED WATERTO BUILDING

CHILLED WATERFROM BUILDING

C.

CT HIGHWATERLEVELALARM

CT LOWWATERLEVELALARM

COND.SUPPLY

TEMP

TOWERC.W.

RETURNTEMP

DS

DS

SUPPLYTEMP.

START/STOP

VFD HOAIN HAND

POSITION

FAULTSPEEDCONTROL

RUNNINGSTATUS

THESE POINTS PROVIDED VIACOMMUNICATION CARD INTERFACE TO DDC

START/STOP

VFD HOAIN HAND

POSITION

FAULTSPEEDCONTROL

RUNNINGSTATUS

THESE POINTS PROVIDED VIACOMMUNICATION CARD INTERFACE TO DDC

DIFFERENTIAL PRESSURE TRANSMITTER.PROVIDE 3 VALVE MANIFOLD WITHTRANSMITTER. LOCATIONS SHOWN ONPLANS.

DIFF.PRESS

HHWSFLOW

CHLR.CTRL.PANEL

RELIEFAIR

EXHAUST FAN

OPEN/CLOSED

HIGHSPEEDSTART/STOP

LOW-SPEED

STATUS

LOUVER

(E)OUTDOORDAMPER

HIGH-SPEED

STATUS

LOWSPEEDSTART/STOP

1

ISSUE:

CHECKED:

SCALE:

© 2010 SHW Group

SHW Project:

SHEET TITLE:

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

C:\

Revit

Lo

calF

iles\7

1108000

CH

M12_C

EN

TR

AL

_K

sim

on

eau

x.r

vt

3/5

/2013

6:1

0:0

5P

M

1/4" = 1'-0"

CJZ

PETER AND PAT COOKACADEMIC HALL

RENOVATION

GRAND RAPIDS, MI

CONTROLS DIAGRAM

M7027111.080.00

2338 COOLIDGE, BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

DJT

02-20-2013 BIDS

03-05-2013 ADDENDUM 2

Page 37: MECHANICAL SYMBOLS MECHANICAL DRAWING LEGEND111841/AN~2...MECHANICAL SYMBOLS MECHANICAL SYSTEM INDICATION HEAVY LINE-WEIGHT INDICATES NEW WORK LIGHT LINE WEIGHT-INDICATES EXISTING

DPS

M

DI

M

MAO

HOA

CS

M

DI

HOA

DPS

DI

DPS

DI

HOA

CS

M

DI

M

DPT

HC

AODO

VFD

ES

M

ES

M

DI

ES

HC

AI

AI

AO

MES

AI

DO

STR ES

CC

STR

DO

ES

DI

AO

M ES

STR

DO

ES

TS

AO

M ES

STR

DO

ES

TS FZ

TS

TS

DD

DD

AI

OUTDOORAIR

RELIEFAIR

RETURNAIR

FILTERSTATUS

FREEZESTATSTATUS/ALARM

SUPPLY FAN

SPEEDCONTROL

START/STOP

RETURN FAN

FULLYMODUL.

RATEMP.

COLDDECK TEMP

STATUS

DS

START/STOP

1. REMOVE CONTROL SENSORS AND DEVICES SHOWN IN CROSS-HATCHED AREAS.

2. REMOVE CONTROLS POINT DATABASE, TREND DATA COLLECTION AND TRENDGRAPHS, AND DETAILS ON B.A.S. GRAPHICS SHOWN IN CROSS-HATCHED AREAS.

3. CONVERT SPACE STATIC PRESSURE SENSOR POINT TO DUCT STATIC PRESSURESENSOR POINT. LOCATE PRESSURE TRANSMITTER IN DDC OR AUX. CONTROL PANEL.

4. CAPTURE EXISTING DATABASE FOR RE-USE AND REMOVE UPCM CONTROLLER ANDRETURN TO OWNER.

MIXED AIRTEMP.

DS

FULLYMODUL.

START/STOP

HHWS

HHWRN.C.

SUPPLYAIR

SUPPLYAIR

FANSTATUS

LH HL

FANSTATUS

H L

STATUS

DS

START/STOP

HHWR

HHWS

CHWR

CHWS

N.C.

N.O.COM

HOTDECKTEMP

FULLYMODUL.

FULLYMODUL.

HARDWIREINTERLOCK

FOR AHUSHUTDOWN

TO ZONEALARMMODULE

DUCTSMOKE

DETECTOR

HARDWIREINTERLOCK

FOR AHUSHUTDOWN

TO ZONEALARMMODULE

DUCTSMOKE

DETECTOR

START/STOP

N.O.

C.

AIR HANDLING UNIT AHU-2, 3, 4 DEMOLITIONCONTROL DIAGRAM

SPACESTATICPRESS

H L

IDENTIFY DEVICE AND TAG "DO NOT DEMO"OR PLAN ON REPLACING SENSOR.

1

ISSUE:

CHECKED:

SCALE:

© 2010 SHW Group

SHW Project:

SHEET TITLE:

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

C:\

Revit

Lo

calF

iles\7

1108000

CH

M12_C

EN

TR

AL

_K

sim

on

eau

x.r

vt

3/5

/2013

6:1

0:0

7P

M

1/4" = 1'-0"

CJZ

PETER AND PAT COOKACADEMIC HALL

RENOVATION

GRAND RAPIDS, MI

CONTROLS DIAGRAM

M7037111.080.00

2338 COOLIDGE, BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

DJT

02-20-2013 BIDS

03-05-2013 ADDENDUM 2

Page 38: MECHANICAL SYMBOLS MECHANICAL DRAWING LEGEND111841/AN~2...MECHANICAL SYMBOLS MECHANICAL SYSTEM INDICATION HEAVY LINE-WEIGHT INDICATES NEW WORK LIGHT LINE WEIGHT-INDICATES EXISTING

DI

M

DI DI

M

CS

AO

HOA

CS

M

DI

DI

AFS

AFS

AFS

DPT

DPS

M

CS

DI

DPT

HC

AO

ES

M

ES

M

AI

DI

M ES

AI

AI

AODO

VFD ES

STR

DO

ES

CC

AI

AI

AO

M ES

TS

TSAI

ES

AI

ES

FZ

TS

TS

AI

ES

DD

DD

AODO

VFD ES

AI

OUTDOORAIR

AIR HANDLING UNIT AHU-2, 3, 4 NEWCONTROL DIAGRAM

RELIEFAIR

RETURNAIR

FILTERSTATUS

STATUS

DS

FULLYMODUL.

START/STOP

FREEZESTATSTATUS/ALARM

SUPPLY FAN

OATEMP.

VFDFAULTALARM

SPEEDCONTROL

VFD HOAIN HAND

POSITION

START/STOP

THESE POINTSPROVIDED VIA

COMMUNICATION CARDINTERFACE TO DDC

STATUS

RETURN FAN

FULLYMODUL.

RATEMP.

DISCHAIR TEMP

SPACESTATICPRESS

MIXED AIRTEMP.

HHWS

HHWR

CHWR

CHWS

N.C.

C.

RELIEFFLOW

RAFLOW

N.O.

C.

SAFLOW

HARDWIREINTERLOCK

FOR AHUSHUTDOWN

TO ZONEALARMMODULE

DUCTSMOKE

DETECTOR

HARDWIREINTERLOCK

FOR AHUSHUTDOWN

TO ZONEALARMMODULE

DUCTSMOKE

DETECTOR

H LLH

RENAMED COLDDECK TEMP

SPEEDCONTROL

START/STOP

STATUS

GLOBALSYSTEM

O.A. TEMP.

TEMPERATURE CONTROLS GENERAL NOTES:

1. TEMPERATURE CONTROL CONTRACTOR (TCC) SHALL PROVIDE DUCT SMOKE DETECTOR WIRING INTERLOCK TO MOTORSTARTERS OR VFDS.

2. TCC SHALL BE RESPONSIBLE FOR ALL POWER SUPPLIES REQUIRED FOR TC SYSTEM UNLESS OTHERWISE NOTED. RE-USE THEEXISTING POWER FEEDS TO CONTROL PANELS.

3. ALL CONTROL VALVES, CONTROL DAMPERS AND ASSOCIATED CONTROL ACTUATORS IDENTIFIED ON DRAWINGS SHALL BEFURNISHED BY TCC UNLESS OTHERWISE NOTED.

4. THE MECHANICAL CONTRACTOR SHALL INSTALL ALL CONTROL VALVES FURNISHED BY THE TCC. TCC SHALL INSTALL DAMPERACTUATORS.

5. THE TCC SHALL PROVIDE AS-BUILT DOCUMENTS OF FINAL SEQUENCE OF OPERATIONS AFTER COMPLETION OFCOMMISSIONING PROCESS.

6. THE TCC SHALL PROVIDE NEW BACNET COMMUNICATION WIRING TO ALL NEW BACNET CONTROLLERS TO NEW IP NETWORKPANEL. COORDINATE PANEL LOCATION WITH OWNER'S IT GROUP. PROVIDE POWER TO PANEL AS REQUIRED.

AIR HANDLING UNIT - SEQUENCE OF OPERATION

1. UNIT LAYOUT IS DIAGRAMMATIC IN NATURE. FIELD VERIFY DEVICE PHYSICAL ORIENTATION.

2. ALL SETPOINTS, DEADBANDS, AND TIME DELAY INTERVALS DESCRIBED IN SEQUENCE SHALL BE ADJUSTABLE BY SYSTEM OPERATORS.

3. APPROPRIATE DEADBANDS AND TIME DELAYS SHALL BE USED TO PREVENT SHORT CYCLING SITUATIONS.

4. ALL CONTROL LOOPS ARE PROPORTIONAL-INTEGRAL-DERIVATIVE TYPE (PID) AND REQUIRE "LOOP TUNING" DURING NORMAL BUILDING LOADS.

5. ALL HAND-OFF-AUTO (H-O-A) SWITCHES NORMALLY REMAIN IN THE "AUTO" POSITION AND THE "HAND" AND "OFF" POSITIONS ARE USED FORMAINTENANCE SITUATIONS.

OPERATIONAL MODE:

1. IN OCCUPIED MODE, DETERMINED BY THE TIME-OF-DAY SCHEDULE, THE FANS RUN CONTINUOUSLY. TIME-OF-DAY SCHEDULE IS UNIQUE FOR THE5TH FLOOR SYSTEM. IN UNOCCUPIED MODE, THE FANS CYCLE ON/OFF BASED ON AVERAGING THE VAV SPACE TEMPERATURE SENSORS ANDCOMPARING TO THE UNOCCUPIED TEMPERATURE SETPOINTS.

2. WITH THE SUPPLY FAN VARIABLE FREQUENCY DRIVE (VFD) H-O-A SWITCH IN THE "AUTO" POSITION, THE SUPPLY FAN IS AUTOMATICALLYSTARTED AND STOPPED BASED ON THE TIME OF DAY OCCUPANCY SCHEDULE AS PROGRAMMED THROUGH THE DDC/BAS SYSTEM. UPON INITIALSTART, DISABLE ALL TEMPERATURE, HUMIDITY, AND AIRFLOW ALARMS FOR A PERIOD OF 5 MINUTES (ADJUSTABLE). SAFETY RELATED DEVICESWILL STILL REPORT ALARMS.

3. WITH THE RETURN FAN VFD H-O-A SWITCH IN THE "AUTO" POSITION, THE RETURN FAN IS HARDWIRE INTERLOCKED TO RUN WITH THE SUPPLYFAN. WHEN THE SUPPLY FAN IS STARTED, THE SUPPLY FAN AND RETURN FAN VFD SPEED RAMPS TO SETPOINT (ADJUSTABLE).

4. UPON START-UP, THE SUPPLY AND RETURN FAN VFD STARTS AT A MINIMUM LOADING OF 20 TO 25% AND THEN RAMPS SLOWLY AND LINEARLYOVER A 120 SECOND TIME PERIOD (ADJUSTABLE) TO REACH SETPOINT IN AN ORDERLY AND CONTROLLED MANNER. THE VFDS REQUIREMINIMUM/MAXIMUM HZ SPEED SETTINGS, BI-DIRECTIONAL AUTO-SPEED SEARCH TO ALLOW STARTING INTO ROLLING LOADS IN EITHER DIRECTION,AND AUTOMATIC RESET/RESTART FOR THREE RESTARTS BEFORE SHUTTING DOWN FOR MANUAL RESET OR FAULT CORRECTION.

5. UPON FAN SYSTEM START-UP, DDC SHALL HOLD OUTDOOR AIR DAMPERS CLOSED FOR 300 SECONDS (ADJUSTABLE), AND THEN SLOWLYMODULATE THE DAMPERS OPEN TO EITHER BASE VENTILATION RATE OR ECONOMIZER MODE BASED ON CONDITIONS.

6. THE SUPPLY DUCT STATIC PRESSURE SENSOR, THROUGH THE DDC SYSTEM, MODULATES THE SUPPLY FAN VFD SPEED TO MAINTAIN SUPPLY AIRDUCT STATIC PRESSURE SETPOINT (ADJUSTABLE), INITIALLY SET AT 1.5" W.G. AND IS RESET BASED ON FEEDBACK FROM ALL THE VAV AIRTERMINAL UNIT DDC CONTROLLERS TO MAINTAIN THE CRITICAL ZONE VAV DAMPER POSITION ALMOST WIDE OPEN.

7. 5TH FLOOR SPACE STATIC PRESSURE CONTROL SHALL BE MAINTAINED BY MODULATING RETURN FAN (SPEED) CFM AS DETERMINED BY THEBUILDING STATIC PRESSURE SENSOR. INITIAL SETPOINT SHALL BE +0.02 INCHES W.C. AND ADJUSTED AFTER AIR SYSTEM BALANCER PROVIDESMEASUREMENTS.

8. THE SUPPLY AIR TEMPERATURE SENSOR SHALL MODULATE THE HEATING COIL CONTROL VALVE AND THE COOLING COIL CONTROL VALVE INSEQUENCE TO MAINTAIN SUPPLY AIR TEMPERATURE SETPOINT 55° F (ADJUSTABLE). CONTROL OF BOTH COILS SHALL NOT OVERLAP. DDC SHALLPROVIDE A SUPPLY AIR TEMPERATURE RESET BETWEEN 55° F AND 60° F (ADJUSTABLE) BASED ON HALF OF THE VAV TERMINAL DAMPERS ATMINIMUM CFM AND IN HEATING MODE.

9. THE DDC SYSTEM MONITORS THE PRESSURE DROP ACROSS THE AIR FILTER AND SHALL ACTIVATE AN ALARM UPON HIGH DIFFERENTIALPRESSURE. INITIAL SETPOINT SHALL BE 1.25 INCHES W.C. (ADJUSTABLE).

10. DDC MONITORS RELIEF AIRFLOW, RETURN AIRFLOW, AND SUPPLY AIRFLOW WITH AIRFLOW MEASURING STATIONS. DDC MONITORS MIXED AIRTEMPERATURE. OUTDOOR AIR CANNOT BE MEASURED DUE TO PHYSICAL ARRANGEMENT AT LOUVER. AIR SYSTEM BALANCER TO PROVIDEOFFSET CFM FOR CONTROL BASED ON EXHAUST AIR NEEDS AND PRESSURIZATION OF SPACE.

10A. AT MAXIMUM SUPPLY FAN RATED CAPACITY, THE RETURN AIR FAN SHALL TRACK SUPPLY FAN AIR CFM MINUS EXHAUST AIRCFM MINUSPRESSURIZATION AIR CFM. RETURN AIR CFM (MEASURED AT AFMS) MINUS RELIEF AIR CFM (MEASURED AT AFMS), WILL EQUAL THE CALCULATEDRETURN AIR CFM. SUPPLY AIR CFM (MEASURED AT AFMS) MINUS RETURN AIR CFM (CALCULATED) EQUALS CALCULATED OUTDOOR AIR FLOWCFM.

11. THE DDC SYSTEM MONITORS THE INDIVIDUAL FAN MOTOR CURRENT SWITCH. WHEN COMMANDED TO RUN AND IF APPROPRIATE CURRENT ISNOT SENSED WITHIN 120 SECONDS (ADJUSTABLE), DDC SHALL ACTIVATE FAILURE ALARM TO THE BAS. WHEN COMMANDED TO STOP AND IF THECURRENT IS NOT ZERO WITHIN 120 SECONDS (ADJUSTABLE), DDC SHALL ACTIVATE FAILURE ALARM TO THE BAS.

12. SHUT DOWN THE AIR HANDLING SYSTEM IF THE SUPPLY AIR TEMPERATURE SENSOR, DUCT STATIC PRESSURE SENSOR, OR SPACE STATICPRESSURE SENSOR FAILS. SEE SHUTDOWN MODE OF CONTROL.

13. THE FOLLOWING ALARMS ARE SENT TO THE BAS:

A. SUPPLY/RETURN FAN MOTOR FAILUREB. SUPPLY/RETURN FAN VFD FAULTC. SUPPLY/RETURN FAN VFD IN HAND POSITIOND. FREEZESTAT TRIPE. SUPPLY/RETURN DUCT SMOKE DETECTORF. HIGH AIR FILTER PRESSURE DROPG. CONTROLLING SENSOR DIAGNOSTIC FAILURE

14. SETPOINTS FOR CONTROL:

SEE AIR TERMINAL CONTROL DIAGRAMS FOR SPACE TEMEPRATURE SETPOINTS.

AIR HANDLING UNIT - SEQUENCE OF OPERATION (CONTINUED)

HEATING COIL FREEZE PROTECTION PUMP:

1. WHEN THE OUTDOOR AIR TEMPERATURE IS BELOW 40° F (ADJUSTABLE) OR WHENEVER THE HEATING COIL CONTROL VALVE ISMODULATED TO AN OPEN POSITION, THE HEATING COIL CIRCULATING PUMP SHALL BE ENERGIZED BY THE DDC SYSTEM AND SHALL RUNUNTIL IT IS NOT NEEDED.

2. STATUS OF THE FREEZE PROTECTION PUMP SHALL BE PROVEN BY A CURRENT SENSOR ON THE PUMP MOTOR STARTER. THE DDCSYSTEM MONITORS THE PUMP'S MOTOR CURRENT SWITCH. WHEN COMMANDED TO RUN, IF APPROPRIATE CURRENT IS NOT SENSEDWITHIN 120 SECONDS (ADJUSTABLE), DDC SHALL ACTIVATE A FAILURE ALARM TO THE BAS. WHEN COMMANDED TO STOP AND CURRENT ISNOT ZERO WITHIN 120 SECONDS (ADJUSTABLE), DDC SHALL ACTIVATE A FAILURE ALARM TO THE BAS.

ECONOMIZER MODE:

1. IF OUTDOOR AIR TEMPERATURE IS LESS THAN RETURN AIR TEMPERATURE AND OUTDOOR AIR TEMPERATURE IS LESS THAN 70° F(ADJUSTABLE), THE MIXED AIR DAMPER CONTROL SHALL MODULATE THE DAMPERS TO MAINTAIN SUPPLY AIR TEMPERATURE SETPOINT(ADJUSTABLE). ABOVE OUTDOOR AIR TEMPERATURE OF 72° F (ADJUSTABLE), THE DAMPERS SHALL MODULATE TO THE MINIMUM OUTDOORAIR FLOW RATE DETERMINED BY AIR SYSTEM BALANCING PER THE EQUIPMENT SCHEDULES. MECHANICAL COOLING MAY BE USED DURINGECONOMIZER TO OFFSET SPACE HEAT GAINS. HEATING SHALL NOT BE PROVIDED UNTIL ECONOMIZER IS INCAPABLE OF MAINTAININGSETPOINT.

SAFETY CONTROL MODE:

1. IF SMOKE IS DETECTED IN THE AIRSTREAM BY A DUCT SMOKE DETECTOR, THE SUPPLY AND RETURN FANS SHALL BE DE-ENERGIZED,DAMPERS SHALL CLOSE. IF THE FIRE ALARM ZONE MODULE INDICATES A ZONE ALARM, THE DDC SHALL SHUTDOWN THE ENTIRE AIRHANDLING SYSTEM IN AN ORDERLY MANNER AND NOT RE-START UNTIL THE ZONE ALARM IS BACK TO NORMAL. SEE SHUTDOWN MODE OFCONTROL.

2. IF FREEZESTAT SETPOINT 35° F (ADJUSTABLE LOCALLY) IS REACHED, THE SUPPLY AND RETURN FANS SHALL BE DE-ENERGIZED.FREEZESTATS SHALL BE MANUAL RESET-TYPE ONLY. SEE SHUTDOWN MODE OF CONTROL.

SYSTEM SHUTDOWN MODE:

1. THE SYSTEM IS DE-ENERGIZED VIA COMMAND FROM THE DDC/BAS, TIME-OF-DAY PROGRAM, FREEZESTAT, SMOKE DETECTOR, HIGH STATICPRESSURE SWITCH, ETC.

2. WHEN THIS OCCURS, THE OUTDOOR AIR AND RELIEF DAMPER CLOSES FULLY, THE RETURN AIR DAMPER OPENS FULLY, THE COOLINGCOIL CONTROL VALVE CLOSES, AND THE HEATING COIL CONTROL VALVE OPENS FULLY.

UNOCCUPIED CONTROL MODE:

1. THE AIR HANDLING UNIT SUPPLY AND RETURN FANS ARE DE-ENERGIZED AND RUN ONLY TO MAINTAIN UNOCCUPIED HEATING ANDCOOLING TEMPERATURE SETPOINTS. (SEE SHUTDOWN MODE OF CONTROL).

2. DDC SHALL AVERAGE ALL VAV ROOM SENSORS SO THAT WHENEVER THE AVERAGE VALUE DECREASES 1° F (ADJUSTABLE) BELOW THEUNOCCUPIED HEATING TEMPERATURE SETPOINT, THE AIR HANDLING UNIT RUNS TO PROVIDE HEATING. SIMILARLY, WHENEVER THEAVERAGE VALUE INCREASES 1° F (ADJUSTABLE) ABOVE THE UNOCCUPIED HEATING TEMPERATURE SETPOINT, THE AIR HANDLING UNITSTOPS. WHEN RUNNING, THE OUTDOOR AIR DAMPER REMAINS CLOSED AND ALL OTHER CONTROL ALGORITHMS ARE ACTIVE. SUPPLY AIRTEMPERATURE WHEN RUNNING FOR HEATING IS SET-UP TO 85° F (ADJUSTABLE). SEE SHUTDOWN MODE FOR WHEN AIR HANDLER ISCOMMANDED TO STOP.

3. DDC SHALL AVERAGE ALL VAV ROOM SENSORS SO THAT WHENEVER THE AVERAGE VALUE INCREASES 1° F (ADJUSTABLE) ABOVE THEUNOCCUPIED COOLING TEMPERATURE SETPOINT, THE AIR HANDLING UNIT RUNS TO PROVIDE COOLING. SIMILARLY, WHENEVER THEAVERAGE VALUE DECREASES 1° F (ADJUSTABLE) BELOW THE UNOCCUPIED COOLING TEMPERATURE SETPOINT, THE AIR HANDLING UNITSTOPS. WHEN RUNNING, THE OUTDOOR AIR DAMPER REMAINS CLOSED AND ALL OTHER CONTROL ALGORITHMS ARE ACTIVE. SUPPLY AIRTEMPERATURE WHEN RUNNING FOR COOLING IS SET TO 55° F (ADJUSTABLE). SEE SHUTDOWN MODE FOR WHEN AIR HANDLER ISCOMMANDED TO STOP.

4. IF CHILLED WATER IS NOT AVAILABLE FOR UNOCCUPIED COOLING CONTROL, AND AS LONG AS OUTDOOR AIR IS BELOW ECONOMIZERENABLE SETPOINT (ADJUSTABLE), THE ECONOMIZER IS USED TO PROVIDE COOLING. IF OUTDOOR AIR IS ABOVE SETPOINT FOR CONTROL,AND CHILLED WATER IS UNAVAILABLE, UNIT WILL REMAIN OFF.

DUCTSTATICPRESS

H

L

CEILING REFERENCE POINT,REFER TO DRAWINGS FOR

LOCATION

SUPPLYAIR

NEW WORK NOTES:

1. PROVIDE NEW TRANE DDC CONTROLLER.

FULLYMODUL.

1

ISSUE:

CHECKED:

SCALE:

© 2010 SHW Group

SHW Project:

SHEET TITLE:

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

C:\

Revit

Lo

calF

iles\7

1108000

CH

M12_C

EN

TR

AL

_K

sim

on

eau

x.r

vt

3/5

/2013

6:1

0:1

0P

M

1/4" = 1'-0"

CJZ

PETER AND PAT COOKACADEMIC HALL

RENOVATION

GRAND RAPIDS, MI

CONTROLS DIAGRAM

M7047111.080.00

2338 COOLIDGE, BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

DJT

02-20-2013 BIDS

03-05-2013 ADDENDUM 2

Page 39: MECHANICAL SYMBOLS MECHANICAL DRAWING LEGEND111841/AN~2...MECHANICAL SYMBOLS MECHANICAL SYSTEM INDICATION HEAVY LINE-WEIGHT INDICATES NEW WORK LIGHT LINE WEIGHT-INDICATES EXISTING

M

CS

DI

M

M

CS

AO

DI

AFS

AFS

AFS

AFS

AFS

AFS

AFS

AFSDPT

DI

HOA

CS

M

DI

DPS

HOA

CS

M

DI

HOA

M

DI

DPS

DPTHOA

HOA

HC

AODO

VFD

ES

M

ES

M

AIAI

AODO

VFD

CC

ES

AI

ES

DIDI

TS FZ

AI

ES

AI

ES

AI

ES

TS

AI

ES

AI

ES

AI

ES

DD

DD

AI

AO

M ES

STR

DO

ES

AO

M ES

STR

DO

ES

STR

DO

ES

AO

M ES

AI

ES

ES

AI

TS

AO

MES

OUTDOORAIR

AIR HANDLING UNIT AHU-5CONTROL DIAGRAM

RELIEFAIR RETURN AIR

SUPPLY FAN

SPEEDCONTROL

START/STOP

STATUS

SPEEDCONTROL

START/STOPSTATUS

RETURN FAN

FULLYMODUL.

DISCHAIR TEMP SA

FLOW

RELIEFFLOW

FREEZESTATSTATUS/ALARM

MIXED AIRTEMP.

RAFLOW

SAFLOW

SAFLOW

SAFLOW

SAFLOW

SAFLOW

HARDWIREINTERLOCK

FOR AHUSHUTDOWN

TO ZONEALARMMODULE

DUCTSMOKE

DETECTOR

HARDWIREINTERLOCK

FOR AHUSHUTDOWN

TO ZONEALARMMODULE

DUCTSMOKE

DETECTOR

DUCTSTATICPRESS

H

L

CEILING REFERENCE POINT,REFER TO DRAWINGS FOR

LOCATION

1. REMOVE CONTROL SENSORS AND DEVICES SHOWN IN CROSS-HATCHED AREAS.

2. REMOVE CONTROLS POINT DATABASE, TREND DATA COLLECTIONAND TREND GRAPHS, AND DETAILS FROM B.A.S. GRAPHICS SHOWN INCROSS-HATCHED AREAS.

3. CONVERT SPACE STATIC PRESSURE SENSOR POINT TO DUCTSTATIC PRESSURE SENSOR POINT. LOCATE PRESSURETRANSMITTER IN DDC OR AUX. CONTROL PANEL.

4. CAPTURE EXISTING DATABASE FOR RE-USE AND REMOVE UPCMCONTROLLER AND RETURN TO OWNER.

5. PROVIDE NEW TRANE DDC CONTROLLER.

FILTERSTATUS

STATUS

DS

FULLYMODUL.

START/STOP HHWS

HHWRN.C.

N.O.

C.

LH

STATUS

DS

START/STOP

CHWR

CHWS

N.C.

N.O.COM

FULLYMODUL.

STATUS DS START/STOP

HHWS FROMG2 LEVEL

N.C.

N.O.

COM

FULLYMODUL.

HHWR TOG2 LEVEL

HHWS TOVAV REHEAT

HHWS FROMVAV REHEAT

LH

SPACESTATICPRESS

H L

AIR HANDLING UNIT AHU-5 DEMOLITION AND NEW WORKCONTROL DIAGRAM

AIR HANDLING UNIT - SEQUENCE OF OPERATION (CONTINUED):

SYSTEM SHUTDOWN MODE:

1. THE SYSTEM IS DE-ENERGIZED VIA COMMAND FROM THE DDC/BAS, TIME-OF-DAY PROGRAM, FREEZESTAT, SMOKE DETECTOR,HIGH STATIC PRESSURE SWITCH, ETC.

2. WHEN THIS OCCURS, THE OUTDOOR AIR AND RELIEF DAMPER CLOSES FULLY, THE RETURN AIR DAMPER OPENS FULLY, THECOOLING COIL CONTROL VALVE CLOSES, AND THE HEATING COIL CONTROL VALVE OPENS FULLY.

UNOCCUPIED CONTROL MODE:

1. THE AIR HANDLING UNIT SUPPLY AND RETURN FANS ARE DE-ENERGIZED AND RUN ONLY TO MAINTAIN UNOCCUPIED HEATINGAND COOLING TEMPERATURE SETPOINTS. (SEE SHUTDOWN MODE OF CONTROL).

2. DDC SHALL AVERAGE ALL VAV ROOM SENSORS SO THAT WHENEVER THE AVERAGE VALUE DECREASES 1° F (ADJUSTABLE)BELOW THE UNOCCUPIED HEATING TEMPERATURE SETPOINT, THE AIR HANDLING UNIT RUNS TO PROVIDE HEATING. SIMILARLY,WHENEVER THE AVERAGE VALUE INCREASES 1° F (ADJUSTABLE) ABOVE THE UNOCCUPIED HEATING TEMPERATURE SETPOINT,THE AIR HANDLING UNIT STOPS. WHEN RUNNING, THE OUTDOOR AIR DAMPER REMAINS CLOSED AND ALL OTHER CONTROLALGORITHMS ARE ACTIVE. SUPPLY AIR TEMPERATURE WHEN RUNNING FOR HEATING IS SET-UP TO 85° F (ADJUSTABLE). SEESHUTDOWN MODE FOR WHEN AIR HANDLER IS COMMANDED TO STOP.

3. DDC SHALL AVERAGE ALL VAV ROOM SENSORS SO THAT WHENEVER THE AVERAGE VALUE INCREASES 1° F (ADJUSTABLE)ABOVE THE UNOCCUPIED COOLING TEMPERATURE SETPOINT, THE AIR HANDLING UNIT RUNS TO PROVIDE COOLING. SIMILARLY,WHENEVER THE AVERAGE VALUE DECREASES 1° F (ADJUSTABLE) BELOW THE UNOCCUPIED COOLING TEMPERATURE SETPOINT,THE AIR HANDLING UNIT STOPS. WHEN RUNNING, THE OUTDOOR AIR DAMPER REMAINS CLOSED AND ALL OTHER CONTROLALGORITHMS ARE ACTIVE. SUPPLY AIR TEMPERATURE WHEN RUNNING FOR COOLING IS SET TO 55° F (ADJUSTABLE). SEESHUTDOWN MODE FOR WHEN AIR HANDLER IS COMMANDED TO STOP.

4. IF CHILLED WATER IS NOT AVAILABLE FOR UNOCCUPIED COOLING CONTROL, AND AS LONG AS OUTDOOR AIR IS BELOWECONOMIZER ENABLE SETPOINT (ADJUSTABLE), THE ECONOMIZER IS USED TO PROVIDE COOLING. IF OUTDOOR AIR IS ABOVESETPOINT FOR CONTROL, AND CHILLED WATER IS UNAVAILABLE, UNIT WILL REMAIN OFF.

TEMPERATURE CONTROLS GENERAL NOTES:

1. TEMPERATURE CONTROL CONTRACTOR (TCC) SHALL PROVIDE DUCT SMOKE DETECTOR WIRING INTERLOCK TO MOTORSTARTERS OR VFDS.

2. TCC SHALL BE RESPONSIBLE FOR ALL POWER SUPPLIES REQUIRED FOR TC SYSTEM UNLESS OTHERWISE NOTED. RE-USETHE EXISTING POWER FEEDS TO CONTROL PANELS.

3. ALL CONTROL VALVES, CONTROL DAMPERS AND ASSOCIATED CONTROL ACTUATORS IDENTIFIED ON DRAWINGS SHALL BEFURNISHED BY TCC UNLESS OTHERWISE NOTED.

4. THE MECHANICAL CONTRACTOR SHALL INSTALL ALL CONTROL VALVES FURNISHED BY THE TCC. TCC SHALL INSTALL DAMPERACTUATORS.

5. THE TCC SHALL PROVIDE AS-BUILT DOCUMENTS OF FINAL SEQUENCE OF OPERATIONS AFTER COMPLETION OFCOMMISSIONING PROCESS.

6. THE TCC SHALL PROVIDE NEW BACNET COMMUNICATION WIRING TO ALL NEW BACNET CONTROLLERS TO NEW IP NETWORKPANEL. COORDINATE PANEL LOCATION WITH OWNER'S IT GROUP. PROVIDE POWER TO PANEL AS REQUIRED.

AIR HANDLING UNIT - SEQUENCE OF OPERATION

1. UNIT LAYOUT IS DIAGRAMMATIC IN NATURE. FIELD VERIFY DEVICE PHYSICAL ORIENTATION.

2. ALL SETPOINTS, DEADBANDS, AND TIME DELAY INTERVALS DESCRIBED IN SEQUENCE SHALL BE ADJUSTABLE BY SYSTEM OPERATORS.

3. APPROPRIATE DEADBANDS AND TIME DELAYS SHALL BE USED TO PREVENT SHORT CYCLING SITUATIONS.

4. ALL CONTROL LOOPS ARE PROPORTIONAL-INTEGRAL-DERIVATIVE TYPE (PID) AND REQUIRE "LOOP TUNING" DURING NORMAL BUILDING LOADS.

5. ALL HAND-OFF-AUTO (H-O-A) SWITCHES NORMALLY REMAIN IN THE "AUTO" POSITION AND THE "HAND" AND "OFF" POSITIONS ARE USED FORMAINTENANCE SITUATIONS.

OPERATIONAL MODE:

1. IN OCCUPIED MODE, DETERMINED BY THE TIME-OF-DAY SCHEDULE, THE FANS RUN CONTINUOUSLY. TIME-OF-DAY SCHEDULE IS UNIQUE FOR THE5TH FLOOR SYSTEM. IN UNOCCUPIED MODE, THE FANS CYCLE ON/OFF BASED ON AVERAGING THE VAV SPACE TEMPERATURE SENSORS ANDCOMPARING TO THE UNOCCUPIED TEMPERATURE SETPOINTS.

2. WITH THE SUPPLY FAN VARIABLE FREQUENCY DRIVE (VFD) H-O-A SWITCH IN THE "AUTO" POSITION, THE SUPPLY FAN IS AUTOMATICALLY STARTEDAND STOPPED BASED ON THE TIME OF DAY OCCUPANCY SCHEDULE AS PROGRAMMED THROUGH THE DDC/BAS SYSTEM. UPON INITIAL START,DISABLE ALL TEMPERATURE, HUMIDITY, AND AIRFLOW ALARMS FOR A PERIOD OF 5 MINUTES (ADJUSTABLE). SAFETY RELATED DEVICES WILL STILLREPORT ALARMS.

3. WITH THE RETURN FAN VFD H-O-A SWITCH IN THE "AUTO" POSITION, THE RETURN FAN IS HARDWIRE INTERLOCKED TO RUN WITH THE SUPPLY FAN.WHEN THE SUPPLY FAN IS STARTED, THE SUPPLY FAN AND RETURN FAN VFD SPEED RAMPS TO SETPOINT (ADJUSTABLE).

4. UPON START-UP, THE SUPPLY AND RETURN FAN VFD STARTS AT A MINIMUM LOADING OF 20 TO 25% AND THEN RAMPS SLOWLY AND LINEARLY OVERA 120 SECOND TIME PERIOD (ADJUSTABLE) TO REACH SETPOINT IN AN ORDERLY AND CONTROLLED MANNER. THE VFDS REQUIREMINIMUM/MAXIMUM HZ SPEED SETTINGS, BI-DIRECTIONAL AUTO-SPEED SEARCH TO ALLOW STARTING INTO ROLLING LOADS IN EITHER DIRECTION,AND AUTOMATIC RESET/RESTART FOR THREE RESTARTS BEFORE SHUTTING DOWN FOR MANUAL RESET OR FAULT CORRECTION.

5. UPON FAN SYSTEM START-UP, DDC SHALL HOLD OUTDOOR AIR DAMPERS CLOSED FOR 300 SECONDS (ADJUSTABLE), AND THEN SLOWLYMODULATE THE DAMPERS OPEN TO EITHER BASE VENTILATION RATE OR ECONOMIZER MODE BASED ON CONDITIONS.

6. THE SUPPLY DUCT STATIC PRESSURE SENSOR, THROUGH THE DDC SYSTEM, MODULATES THE SUPPLY FAN VFD SPEED TO MAINTAIN SUPPLY AIRDUCT STATIC PRESSURE SETPOINT (ADJUSTABLE), INITIALLY SET AT 1.5" W.G. AND IS RESET BASED ON FEEDBACK FROM ALL THE VAV AIR TERMINALUNIT DDC CONTROLLERS TO MAINTAIN THE CRITICAL ZONE VAV DAMPER POSITION ALMOST WIDE OPEN.

7. 5TH FLOOR SPACE STATIC PRESSURE CONTROL SHALL BE MAINTAINED BY MODULATING RETURN FAN (SPEED) CFM AS DETERMINED BY THEBUILDING STATIC PRESSURE SENSOR. INITIAL SETPOINT SHALL BE +0.02 INCHES W.C. AND ADJUSTED AFTER AIR SYSTEM BALANCER PROVIDESMEASUREMENTS.

8. THE SUPPLY AIR TEMPERATURE SENSOR SHALL MODULATE THE HEATING COIL CONTROL VALVE AND THE COOLING COIL CONTROL VALVE INSEQUENCE TO MAINTAIN SUPPLY AIR TEMPERATURE SETPOINT 55° F (ADJUSTABLE). CONTROL OF BOTH COILS SHALL NOT OVERLAP. DDC SHALLPROVIDE A SUPPLY AIR TEMPERATURE RESET BETWEEN 55° F AND 60° F (ADJUSTABLE) BASED ON HALF OF THE VAV TERMINAL DAMPERS AT MINIMUMCFM AND IN HEATING MODE.

9. THE DDC SYSTEM MONITORS THE PRESSURE DROP ACROSS THE AIR FILTER AND SHALL ACTIVATE AN ALARM UPON HIGH DIFFERENTIAL PRESSURE.INITIAL SETPOINT SHALL BE 1.25 INCHES W.C. (ADJUSTABLE).

10. DDC MONITORS RELIEF AIRFLOW, RETURN AIRFLOW, AND SUPPLY AIRFLOW WITH AIRFLOW MEASURING STATIONS. DDC MONITORS MIXED AIRTEMPERATURE. OUTDOOR AIR CANNOT BE MEASURED DUE TO PHYSICAL ARRANGEMENT AT LOUVER. AIR SYSTEM BALANCER TO PROVIDE OFFSETCFM FOR CONTROL BASED ON EXHAUST AIR NEEDS AND PRESSURIZATION OF SPACE.

10A. AT MAXIMUM SUPPLY FAN RATED CAPACITY, THE RETURN AIR FAN SHALL TRACK SUPPLY FAN AIR CFM MINUS EXHAUST AIR CFM MINUSPRESSURIZATION AIR CFM. RETURN AIR CFM (MEASURED AT AFMS) MINUS RELIEF AIR CFM (MEASURED AT AFMS), WILL EQUAL THE CALCULATEDRETURN AIR CFM. SUPPLY AIR CFM (MEASURED AT AFMS) MINUS RETURN AIR CFM (CALCULATED) EQUALS CALCULATED OUTDOOR AIR FLOW CFM.

AIR HANDLING UNIT - SEQUENCE OF OPERATION (CONTINUED):

11. THE DDC SYSTEM MONITORS THE INDIVIDUAL FAN MOTOR CURRENT SWITCH. WHEN COMMANDED TO RUN AND IF APPROPRIATE CURRENTIS NOT SENSED WITHIN 120 SECONDS (ADJUSTABLE), DDC SHALL ACTIVATE FAILURE ALARM TO THE BAS. WHEN COMMANDED TO STOP ANDIF THE CURRENT IS NOT ZERO WITHIN 120 SECONDS (ADJUSTABLE), DDC SHALL ACTIVATE FAILURE ALARM TO THE BAS.

12. SHUT DOWN THE AIR HANDLING SYSTEM IF THE SUPPLY AIR TEMPERATURE SENSOR, DUCT STATIC PRESSURE SENSOR, OR SPACE STATICPRESSURE SENSOR FAILS. SEE SHUTDOWN MODE OF CONTROL.

13. THE FOLLOWING ALARMS ARE SENT TO THE BAS:

A. SUPPLY/RETURN FAN MOTOR FAILUREB. SUPPLY/RETURN FAN VFD FAULTC. SUPPLY/RETURN FAN VFD IN HAND POSITIOND. FREEZESTAT TRIPE. SUPPLY/RETURN DUCT SMOKE DETECTORF. HIGH AIR FILTER PRESSURE DROPG. CONTROLLING SENSOR DIAGNOSTIC FAILURE

14. SETPOINTS FOR CONTROL:

SEE AIR TERMINAL CONTROL DIAGRAMS FOR SPACE TEMEPRATURE SETPOINTS.

HEATING COIL FREEZE PROTECTION PUMP:

1. WHEN THE OUTDOOR AIR TEMPERATURE IS BELOW 40° F (ADJUSTABLE) OR WHENEVER THE HEATING COIL CONTROL VALVE IS MODULATEDTO AN OPEN POSITION, THE HEATING COIL CIRCULATING PUMP SHALL BE ENERGIZED BY THE DDC SYSTEM AND SHALL RUN UNTIL IT IS NOTNEEDED.

2. STATUS OF THE FREEZE PROTECTION PUMP SHALL BE PROVEN BY A CURRENT SENSOR ON THE PUMP MOTOR STARTER. THE DDC SYSTEMMONITORS THE PUMP'S MOTOR CURRENT SWITCH. WHEN COMMANDED TO RUN, IF APPROPRIATE CURRENT IS NOT SENSED WITHIN 120SECONDS (ADJUSTABLE), DDC SHALL ACTIVATE A FAILURE ALARM TO THE BAS. WHEN COMMANDED TO STOP AND CURRENT IS NOT ZEROWITHIN 120 SECONDS (ADJUSTABLE), DDC SHALL ACTIVATE A FAILURE ALARM TO THE BAS.

ECONOMIZER MODE:

1. IF OUTDOOR AIR TEMPERATURE IS LESS THAN RETURN AIR TEMPERATURE AND OUTDOOR AIR TEMPERATURE IS LESS THAN 70° F(ADJUSTABLE), THE MIXED AIR DAMPER CONTROL SHALL MODULATE THE DAMPERS TO MAINTAIN SUPPLY AIR TEMPERATURE SETPOINT(ADJUSTABLE). ABOVE OUTDOOR AIR TEMPERATURE OF 72° F (ADJUSTABLE), THE DAMPERS SHALL MODULATE TO THE MINIMUM OUTDOOR AIRFLOW RATE DETERMINED BY AIR SYSTEM BALANCING PER THE EQUIPMENT SCHEDULES. MECHANICAL COOLING MAY BE USED DURINGECONOMIZER TO OFFSET SPACE HEAT GAINS. HEATING SHALL NOT BE PROVIDED UNTIL ECONOMIZER IS INCAPABLE OF MAINTAININGSETPOINT.

SAFETY CONTROL MODE:

1. IF SMOKE IS DETECTED IN THE AIRSTREAM BY A DUCT SMOKE DETECTOR, THE SUPPLY AND RETURN FANS SHALL BE DE-ENERGIZED,DAMPERS SHALL CLOSE. IF THE FIRE ALARM ZONE MODULE INDICATES A ZONE ALARM, THE DDC SHALL SHUTDOWN THE ENTIRE AIRHANDLING SYSTEM IN AN ORDERLY MANNER AND NOT RE-START UNTIL THE ZONE ALARM IS BACK TO NORMAL. SEE SHUTDOWN MODE OFCONTROL.

2. IF FREEZESTAT SETPOINT 35° F (ADJUSTABLE LOCALLY) IS REACHED, THE SUPPLY AND RETURN FANS SHALL BE DE-ENERGIZED.FREEZESTATS SHALL BE MANUAL RESET-TYPE ONLY. SEE SHUTDOWN MODE OF CONTROL.

DS

DS

OATEMP.

GLOBALSYSTEM

O.A. TEMP.

CHWR

CHWS

N.C.

N.O.COM

FULLYMODUL.

IDENTIFY DEVICE ANDTAG "DO NOT DEMO"

OR PLAN ON REPLACINGSENSOR.

1

ISSUE:

CHECKED:

SCALE:

© 2010 SHW Group

SHW Project:

SHEET TITLE:

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

C:\

Revit

Lo

calF

iles\7

1108000

CH

M12_C

EN

TR

AL

_K

sim

on

eau

x.r

vt

3/5

/2013

6:1

0:1

2P

M

1/4" = 1'-0"

CJZ

PETER AND PAT COOKACADEMIC HALL

RENOVATION

GRAND RAPIDS, MI

CONTROLS DIAGRAM

M7057111.080.00

2338 COOLIDGE, BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

DJT

02-20-2013 BIDS

03-05-2013 ADDENDUM 2

Page 40: MECHANICAL SYMBOLS MECHANICAL DRAWING LEGEND111841/AN~2...MECHANICAL SYMBOLS MECHANICAL SYSTEM INDICATION HEAVY LINE-WEIGHT INDICATES NEW WORK LIGHT LINE WEIGHT-INDICATES EXISTING

AIAI

M

M

ES

M

TS

AI

AO DO AO

TS

DPT

ES

ES

ES

H

C

SUPPLEMENTALHEAT

NOTE: TC CONTRACTOR SHALL PROVIDE 24VAC POWER SUPPLY AND COMMUNICATION WIRING TOEACH ATU CONTROLLER.

SUPPLY AIR

FULLYMODUL.

SPACETEMP.

FULLYMODUL.

FULLYMODUL.

SUPPLYAIR TEMP.

ATUCONTROLLER

TO LONNETWORK

AIRFLOW

HHWS

HHWS

HHWR

DUCTED AIR

TYPICAL ATU SEQUENCE OF OPERATION

HHWR

2W OR 3WVALVE BASEDON SCHEDULES

NOTES:

1. ALL CONTROL SETPOINTS, TIME INTERVAL SETPOINTS, AND CONTROL DEADBANDS DESCRIBED INSEQUENCE SHALL BE ADJUSTABLE BY BUILDING AUTOMATION SYSTEM (BAS) OPERATORS. CREATEREQUIRED VIRTUAL DATABASE POINTS DISPLAYABLE AT THE BAS.

2. THE SUPPLY AIR TERMINAL UNITS MINIMUM AND MAXIMUM VOLUME AIRFLOW SETTINGS SHALL BE ASINDICATED ON THE ATU SCHEDULE. ATU TERMINAL UNITS SHALL OPERATE AS CONSTANT VOLUME WHERESCHEDULED MINIMUM AND MAXIMUM AIRFLOW SETTINGS ARE EQUAL. THE ACTUAL ATU AIRFLOW SHALL BETOTALED UP. THERE SHALL BE A TOTAL AIRFLOW FOR EACH AHU, EACH FLOOR, AND TOTAL FOR THEBUILDING.

3. INSTALL DDC ATU CONTROLLERS AND ALL OTHER DEVICES, SENSORS, SWITCHES, RELAYS, POWER,WIRING, ETC., NECESSARY FOR A COMPLETE AND OPERATIONAL CONTROL SYSTEM ACCORDING TO THESEQUENCE OF OPERATIONS, DIAGRAMS, AND MANUFACTURER'S INSTRUCTIONS. (CONTROLLERS MAY BEFACTORY INSTALLED).

SEQUENCE FOR VARIABLE AIR VOLUME BOX CONTROL WITHOUT OCCUPANCY SENSOR(S):

A. UNOCCUPIED MODE:

1. THE VAV DAMPER WILL BE CLOSED AND THE AIRFLOW SETPOINT SHALL BE ZERO CFM. IF THE SPACETEMPERATURE RISES TO THE UNOCCUPIED COOLING SETPOINT, THE VAV CONTROLLER SHALL CALL FORAIRFLOW AND MODULATE THE VAV CFM UP TO MAXIMUM DESIGN COOLING AIRFLOW SETPOINT, TOMAINTAIN SPACE TEMPERATURE AT SETPOINT.

2. WHEN SPACE TEMPERATURE FALLS SUFFICIENTLY BELOW THE UNOCCUPIED COOLING SETPOINT(ADJUSTABLE) THE VAV CONTROLLER SHALL CALL FOR ZERO CFM AIRFLOW. IF THE SPACE TEMPERATUREFALLS TO THE UNOCCUPIED HEATING SETPOINT (ADJUSTABLE), THE VAV CONTROLLER SHALL CALL FORAIRFLOW AND MODULATE THE VAV DAMPER TO MAINTAIN AIRFLOW AT THE MINIMUM/REHEAT MINIMUM CFMSETPOINT (ADJUSTABLE). THE HOT WATER REHEAT COIL CONTROL VALVE SHALL MODULATE TO MAINTAINSPACE TEMPERATURE AT SETPOINT. WHEN SPACE TEMPERATURE RISES SUFFICIENTLY ABOVE THEUNOCCUPIED HEATING SETPOINT THE VAV CONTROLLER SHALL CALL FOR ZERO CFM AIRFLOW AND THEHOT WATER REHEATING COIL CONTROL VALVE SHALL CLOSE.

3. SUPPLEMENTAL HEAT VALVE SHALL CONTROL FROM THE ATU THERMOSTAT AND SETPOINTS.

B. OCCUPIED MODE:

1. THE VAV DAMPER SHALL MODULATE TO MAINTAIN AIRFLOW AT THE MINIMUM CFM SETPOINT ANDHEATING VALVE(S) (IF APPLICABLE) WILL BE CLOSED. IF THE SPACE TEMPERATURE RISES TO THEOCCUPIED COOLING SETPOINT THE VAV CONTROLLER SHALL CALL FOR ADDITIONAL AIRFLOW, UP TOMAXIMUM AIRFLOW, AND MODULATE THE VAV CFM TO MAINTAIN SPACE TEMPERATURE AT SETPOINT.

2. WHEN SPACE TEMPERATURE FALLS SUFFICIENTLY BELOW THE OCCUPIED COOLING SETPOINT THE VAVCONTROLLER SHALL RETURN TO MINIMUM AIRFLOW. IF THE SPACE TEMPERATURE FALLS TO THEOCCUPIED HEATING SETPOINT THE VAV CONTROLLER SHALL MODULATE THE VAV DAMPER TO MAINTAINAIRFLOW AT THE REHEAT MINIMUM CFM SETPOINT. THE HOT WATER REHEAT COIL CONTROL VALVE SHALLMODULATE TO MAINTAIN SPACE TEMPERATURE AT SETPOINT. WHEN SPACE TEMPERATURE RISESSUFFICIENTLY ABOVE THE OCCUPIED HEATING SETPOINT THE VAV CONTROLLER SHALL CALL FOR MINIMUMCFM AIRFLOW AND THE HOT WATER REHEAT COIL CONTROL VALVE SHALL CLOSE.

3. SUPPLEMENTAL HEAT VALVE SHALL CONTROL FROM THE ATU THERMOSTAT AND SETPOINTS.

ALL VARIABLE AIR VOLUME BOXES:

1. WARM-UP MODE: IF A WARM-UP MODE IS DESIRED IT SHALL BE INITIATED BY CHANGING THE AHUDISCHARGE AIR TEMPERATURE SETPOINT.

2. ZONE SPACE TEMPERATURE SETPOINTS SHALL BE AS FOLLOWS:

HEATING UN-OCCUPIED SPACE TEMPERATURES SETPOINT = 60 °F (ADJUSTABLE)HEATING OCCUPIED SPACE TEMPERATURE SETPOINT = 70 °F (ADJUSTABLE)COOLING OCCUPIED SPACE TEMPERATURE SETPOINT = 74 °F (ADJUSTABLE)COOLING UN-OCCUPIED SPACE TEMPERATURE SETPOINT = 80 °F (ADJUSTABLE)

3. THE DDC TERMINAL UNIT CONTROLLER SHALL CONTINUOUSLY CALIBRATE THE AIRFLOW SENSOR.

4. ATU'S SHALL BE PROGRAMMED SUCH THAT ALL ATU'S SUPPLIED BY A PARTICULAR AHU CAN BE DRIVENTO MAXIMUM FLOW WITH A SINGLE COMMAND FROM THE BAS.

1

ISSUE:

CHECKED:

SCALE:

© 2010 SHW Group

SHW Project:

SHEET TITLE:

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

C:\

Revit

Lo

calF

iles\7

1108000

CH

M12_C

EN

TR

AL

_K

sim

on

eau

x.r

vt

3/5

/2013

6:1

0:1

4P

M

1/4" = 1'-0"

CJZ

PETER AND PAT COOKACADEMIC HALL

RENOVATION

GRAND RAPIDS, MI

CONTROLS DIAGRAM

M7067111.080.00

2338 COOLIDGE, BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

DJT

02-20-2013 BIDS

03-05-2013 ADDENDUM 2

Page 41: MECHANICAL SYMBOLS MECHANICAL DRAWING LEGEND111841/AN~2...MECHANICAL SYMBOLS MECHANICAL SYSTEM INDICATION HEAVY LINE-WEIGHT INDICATES NEW WORK LIGHT LINE WEIGHT-INDICATES EXISTING

HOA

M

LS

M

DI

HOAM

M

CS

DO

HOA

HOA

M

LS

M

DI

CS

CS

ES

ES

AI

TS

TS

DI

DI

PS

STR

ES

DO

ES

STR

M

AS

ES

TES

TS

AI DI

STR ES

PT

ES

FM

DI

STR

ES

DO

ES

DO

AI

TS

DI

DI

M

DI DI

PT

PT

CT

CT

CT

AI

DI

PS

DI

PS

PS

TYPICAL FREEZESTAT ELEMENTINSTALLATION DETAIL

FZ

FREEZESTAT OR DDCTEMPERATURESENSOR

CROSS SECTION OF DUCTOR AIR HANDLING UNIT

BULB STRAP ORCAPILLARY CLIP (TYP.)

NOTES:

1. ONE LINEAR FOOT OR GREATER OF FREEZESTAT SHALL BE APPLIED FOR EVERYTWO SQUARE FEET OF COIL FACE AREA.

2. DDC AVERAGING TEMPERATURE SENSORS OVER 4-FEET IN LENGTH SHALL USETHE SAME INSTALLATION DETAIL.

DENTAL AND GENERAL SERVICECOMPRESSED AIR SYSTEM

MONITOR DIAGRAM

COMPRESSEDAIR PRESSURE

ALARM

NOTE:

1. DRAWING IS DIAGRAMMATIC. REFER TO THE OTHER MECHANICAL DRAWINGS ANDMANUFACTURER'S EQUIPMENT DIAGRAMS FOR DETAILS.

SEQUENCE OF OPERATION:

1. THE DDC MONITORS THE DENTAL AND GENERAL SERVICE COMPRESSED AIRSYSTEM'S PRESSURE SENSORS AND PROVIDES AN ALARM WHEN AIR PRESSUREDROPS BELOW LOW ALARM LEVEL SETPOINT (ADJUSTABLE).

2. PRESSURE SENSOR FOR CONTROL PANELS WAS ADDED; TO BE WIRED BYCONTROLS.

1. SENSORS ARE PROVIDED BY AIR COMPRESSORSYSTEMS MANUFACTURER.

2. QUANTITIES AND LOCATIONS ARE SHOWN ONPIPING DIAGRAMS.

TYPICAL EXHAUST FANCONTROL DIAGRAM

SHUT-OFFDAMPER

N.C.

OPEN/START

STATUS

AIR FROMSPACE

EXHAUSTAIR

NOTE:

1. DRAWING IS DIAGRAMMATIC. REFER TO THE OTHER MECHANICAL DRAWINGS ANDMANUFACTURER'S EQUIPMENT DIAGRAMS FOR DETAILS.

2. ALL SETPOINTS AND TIME INTERVALS DESCRIBED IN SEQUENCE SHALL BE ADJUSTABLE.

3. THE FAN MOTOR STARTER HAND/OFF/AUTO SWITCH SHALL NORMALLY BE IN THE "AUTO"POSITION.

SEQUENCE OF OPERATION:

1. THE DDC COMMANDS THE FAN TO RUN THROUGH THE DDC/BAS TIME-OF-DAY PROGRAM.WHEN ENERGIZED, THE EXHAUST FAN DAMPER OPENS, MAKING THE DAMPER THE LIMITSWITCH, WHICH ENERGIZES THE FAN STARTER AND RUNS THE FAN.

2. WHEN THE DDC COMMANDS THE FAN TO STOP THROUGH THE DDC/BAS TIME-OF-DAYPROGRAM, THE EXHAUST FAN STOPS RUNNING AND THE DAMPER CLOSES.

3. WHENEVER THE EXHAUST FAN IS COMMANDED TO RUN OR STOP, A CURRENT SWITCHMONITORS THE PROPER CURRENT LEVEL IN THE MOTOR WIRING, AND AFTER 120 SECONDS(ADJUSTABLE) PROVIDES AN ALARM IF NOT CORRECT.

DS

TYPICAL HOT WATER UNIT HEATERAND CABINET UNIT HEATER

CONTROL DIAGRAM

H

C

THERMOSTAT

NOTE:

1. DRAWING IS DIAGRAMMATIC. REFER TO THE OTHER MECHANICAL DRAWINGS ANDMANUFACTURER'S EQUIPMENT DIAGRAMS FOR DETAILS.1.

2. ALL SETPOINTS AND TIME INTERVALS DESCRIBED IN SEQUENCE SHALL BE ADJUSTABLE.

3. THE UNIT HEATER FAN MOTOR STARTER HAND/OFF/AUTO SWITCH SHALL NORMALLY BE INTHE "AUTO" POSITION.

SEQUENCE OF OPERATION:

1. UPON SENSING THE SPACE TEMPERATURE DROP BELOW SETPOINT (ADJUSTABLELOCALLY), THE ELECTRIC ROOM THERMOSTAT OR INTEGRAL RETURN AIR THERMOSTATSHALL OPEN THE TWO-POSITION HEATING CONTROL VALVE AND PROVIDE HOT WATER TOTHE UNIT HEATING COIL. THE FAN SHALL ACTIVATE UPON PROOF OF HOT WATER FLOW BYTHE AQUASTAT AND FAN OPERATES CONTINUOUSLY.

2. UPON SENSING THE SPACE TEMPERATURE RISE ABOVE SETPOINT, THE ELECTRIC ROOMTHERMOSTAT OR INTEGRAL RETURN AIR THERMOSTAT SHALL CLOSE THE TWO-POSITIONHEATING CONTROL VALVE AND STOP PROVIDING HOT WATER TO THE UNIT HEATING COIL.THE FAN SHALL DE-ACTIVATE UPON LOSS OF PROOF OF HOT WATER FLOW BY THEAQUASTAT.

3. THE THERMOSTAT SHALL MAINTAIN A SETPOINT OF 65° F (THERMOSTAT ADJUSTABLE) WITH2° F MINIMUM DEADBAND.

SUPPLYAIR

DSWATERTEMP.

DOMESTIC HOTWATER SYSTEM

NOTES:

1. DRAWING IS DIAGRAMMATIC. REFER TO THE OTHER MECHANICAL DRAWINGS ANDMANUFACTURER'S EQUIPMENT DIAGRAMS FOR DETAILS.

2. ALL SETPOINTS AND TIME INTERVALS DESCRIBED IN SEQUENCE SHALL BEADJUSTABLE.

3. THE FAN MOTOR STARTER HAND/OFF/AUTO SWITCH SHALL NORMALLY BE IN THE"AUTO" POSITION.

SEQUENCE OF OPERATION:

1. DDC/BAS MONITORS THE DOMESTIC HOT WATER SUPPLY TEMPERATURE ANDALARMS IF THE WATER TEMPERATURE EXCEEDS THE HIGH TEMPERATURE ALARMSETPOINT INITIALLY SET FOR 115° F (ADJUSTABLE). THE WATER HEATING UNIT ISCONTROLLED BY ITS OWN SELF-CONTAINED CONTROL SYSTEM TO MAINTAIN THEDESIRED DOMESTIC HOT WATER TEMPERATURE.

2. THE DDC/BAS GENERATES HIGH/LOW TEMPERATURE ALARMS. LOW ALARM SHALL BESET INITIALLY FOR 105° F (ADJUSTABLE).

RECIRCULATINGPUMP

RUNNINGSTATUS

SUPPLY TOBUILDING

COND.

LPS.

DOMESTIC HOT WATERCONTROL DIAGRAM

RETURN FROMBUILDING

START/STOP

DS

BUILDING DUPLEX CONDENSATE RETURN PUMPCONTROL DIAGRAM

TROUBLEALARM

CONDENSATERECEIVER

GRAVITYCONDENSATETO RECEIVER

PACKAGED DUPLEXCONDENSATE RETURNPUMP

PUMPEDCONDENSATE

SEQUENCE OF OPERATION:

1. DDC MONITORS DUPLEX CONDENSATE RECEIVER TROUBLE AND HIGH LEVELALARM.

2. DDC MONITORS CONDENSATE FLOW RATE METER AND PROVIDES BAS WITHINSTANTANEOUS FLOW RATE VALUE; WEEKLY, MONTHLY, AND YEARLY FLOWTOTALS.

RETURN TOCAMPUSSTEAMPLANT

HIGHLEVELALARM

ELEVATOR ROOM EXHAUST FANCONTROL DIAGRAM

SHUT-OFFDAMPER

N.C.

START/STOP

STATUS

OUTDOORAIR

EXHAUSTAIR

NOTE:

1. DRAWING IS DIAGRAMMATIC. REFER TO THE OTHER MECHANICAL DRAWINGS ANDMANUFACTURER'S EQUIPMENT DIAGRAMS FOR DETAILS.

2. ALL SETPOINTS AND TIME INTERVALS DESCRIBED IN SEQUENCE SHALL BE ADJUSTABLE.

3. THE FAN MOTOR STARTER HAND/OFF/AUTO SWITCH SHALL NORMALLY BE IN THE "AUTO" POSITION.

SEQUENCE OF OPERATION:

1. THE DDC COMMANDS THE FAN TO RUN BASED ON THE SPACE TEMPERATURE AND THE OUTDOOR AIR SENSOR(GLOBAL SENSOR FROM SYSTEM). WHENEVER THE OUTDOOR AIR TEMPERATURE IS LESS THAN 80° F (ADJUSTABLE),AND THE SPACE TEMPERATURE RISES ABOVE 82° F (ADJUSTABLE), DDC COMMANDS THE EXHAUST FAN TO RUN.WHEN ENERGIZED, THE EXHAUST FAN DAMPER OPENS, MAKING THE DAMPER LIMIT SWITCH, WHICH ENERGIZES THEFAN STARTER AND RUNS THE FAN.

2. THE EXHAUST FAN SHALL RUN UNTIL THE SPACE TEMPERATURE IS LESS THAN 65° F (ADJUSTABLE). WHEN DE-ENERGIZED, THE EXHAUST FAN STOPS RUNNING AND THE DAMPER CLOSES.

3. WHEN THE EXHAUST FAN IS COMMANDED TO START OR STOP, A CURRENT SWITCH MONITORS THE PROPERCURRENT LEVEL IN THE MOTOR WIRING, AND AFTER 120 SECONDS (ADJUSTABLE) PROVIDES AN ALARM IF NOTCORRECT.

4. WHENEVER THE OUTDOOR AIR TEMPERATURE IS MORE THAN 82° F (ADJUSTABLE), DDC COMMANDS THE EXHAUSTFAN TO STOP AND ENABLES THE A/C SPLIT SYSTEM TO MAINTAIN ROOM SETPOINT OF 80° F (ADJUSTABLE AT SPLITSYSTEM THERMOSTAT).

5. CONTROL WIRING IS REQUIRED BETWEEN PACKAGED COOLING UNIT AND THE ROOF-TOP MOUNTED CONDENSING UNITCONTROLLER.

DS

ROOM AIR

PACKAGED COOLING UNIT CONTROL PANEL(WITH INTEGRAL CONDENSATE PAN FLOAT FORSHUTOFF CONTROL)

PACKAGEDCOOLING UNIT

REMOTECONDENSING UNIT

CONTROLLER

REFRIGERANT LINES

ROOF

ROOMTEMP.ENABLE/

DISABLE

OATEMP.

GLOBALSYSTEM

O.A. TEMP.

EMERGENCY PUSHBUTTONSHUT-OFF SWITCH LOCATEDAT ROOM EXIT (INTERIOR TO

ROOM). MAY BE MORE THAN ONEROOM. SEE PLANS FOR LOCATIONS.

CR2-A

N.O.

EPO-1

CR-2

DEDICATED 120 VAC BREAKER.LOCKOUT AFTER WIRING

CR1-A

EPO CIRCUITPOWER OK

CR-1

DENTAL VACUUM (2) AND DENTAL COMPRESSED AIR (2)SOURCE EMERGENCY SHUT-OFF CONTROL

H N

EPO-1N.O.

MED.VAC.OR

MED.AIR

TOROOMS

SHUTDOWNALARM

SOLENOID VALVE,SEE PLANS FOR LOCATIONS.SEE 230900 FOR SPECIFICATION.

EPO-N

QUANTITY. ONPLANS

NOTES:

1. DRAWING IS DIAGRAMMATIC. REFER TO THE OTHER MECHANICAL DRAWINGS ANDMANUFACTURER'S EQUIPMENT DIAGRAMS FOR DETAILS.

SEQUENCE OF OPERATION:

1. LOCAL EMERGENCY POWER OFF (EPO) PUSHBUTTONS ARE LOCATED IN DENTAL SPACES FORMANUAL SHUTOFF OF SERVICES (DENTAL COMPRESSED AIR AND DENTAL VACUUM). MULTIPLEPUSHBUTTONS CONTROL EACH SHUTOFF VALVE.

2. PUSHBUTTON LOCATIONS ARE SHOWN ON PLANS. TWO SOURCES (1 DENTAL VACUUM AND ONEDENTAL COMPRESSED AIR) ON TWO FLOORS SHALL HAVE SOURCE SHUTOFF VALVES (LOCATED ABOVETHE CEILING GRID).

2. DDC/BAS GENERATES AN ALARM IF THE POWER TO ANY OF THESE EMERGENCY OVERRIDEPUSHBUTTONS IS INADVERTENTLY TURNED OFF.

COMMERCIAL POWER MONITORCONTROL DIAGRAM

POWERSTATUS

SEQUENCE OF OPERATION:

1. THE DDC MONITORS THE INCOMING COMMERCIAL AC POWER TO THE BUILDING ANDPROVIDE A STATUS AND COMMON ALARM POINT TO THE BAS.

2. THE METER PROVIDES POWER RATE (KILOWATTS) AND TOTALIZES POWER CONSUMPTION(KILOWATT-HOURS) ON A DAILY, WEEKLY, MONTHLY, AND YEARLY TOTAL BASIS.

TBN-NN

POWERALARM

TBN-NN

2ND, 3RD, 4TH, & 5TH FLOOR POWER MONITORCONTROL DIAGRAM

SEQUENCE OF OPERATION:

1. BAS MONITORS THE COMMERCIAL AC POWER TO THE FLOORS IN THE BUILDING ANDPROVIDE INFORMATION TO THE BAS.

2. THE METER PROVIDES POWER RATE (KILOWATTS) AND TOTALIZES POWERCONSUMPTION (KILOWATT-HOURS) ON A DAILY, WEEKLY, MONTHLY, AND YEARLY TOTALBASIS.

3. EACH FLOOR MAY HAVE MORE THAN ONE METER, REFER TO ELECTRICAL ONE-LINEDRAWING.

POWERMETER

(BY OTHERS) BACNET

POWERMETER

INSUBSTATION(BY OTHERS)

BACNET

NOTE: SOME EXHAUST FANS ARE CONTROLLED FROM THE DDC/BAS, SEESCHEDULES AND ELECTRICAL PLANS.

CONDENSATEFLOW

FLOATALARM

DIGITAL METERING PROVIDEDAND INSTALLED IN MAINELECTRICAL SWITCHGEAR BYOTHERS

DIGITAL METERINGPROVIDED AND INSTALLEDON FLOOR ELECTRICAL BUSSBY OTHERS

HHWS

HHWR

CITYWATER

CP

COMPRESSORCONTROL

PANEL

SEE SCHEDULES FORQUANTITIES AND

PLANS FOR LOCATIONS

DENTAL AND GENERAL SERVICEVACUUM SYSTEM

MONITOR DIAGRAM

VACUUMPRESSURE

ALARM

NOTE:

1. DRAWING IS DIAGRAMMATIC. REFER TO THE OTHER MECHANICAL DRAWINGS ANDMANUFACTURER'S EQUIPMENT DIAGRAMS FOR DETAILS.

SEQUENCE OF OPERATION:

1. THE DDC MONITORS THE DENTAL AND GENERAL SERVICE VACUUM SYSTEM'S PRESSURESENSORS AND PROVIDES AN ALARM WHEN AIR PRESSURE DROPS BELOW LOW ALARMLEVEL SETPOINT (ADJUSTABLE).

2. PRESSURE SENSOR FOR CONTROL PANELS WAS ADDED; TO BE WIRED BY CONTROLS.

1. SENSORS ARE PROVIDED BY AIR VACUUMSYSTEM MANUFACTURER.

2. QUANTITIES AND LOCATIONS ARE SHOWN ONPIPING DIAGRAMS.

VACUUMCONTROL

PANEL

SEE SCHEDULES FORQUANTITIES AND

PLANS FOR LOCATIONS

1

ISSUE:

CHECKED:

SCALE:

© 2010 SHW Group

SHW Project:

SHEET TITLE:

Final Plans for Bidding and Construction

2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

DRAWN:

C:\

Revit

Lo

calF

iles\7

1108000

CH

M12_C

EN

TR

AL

_K

sim

on

eau

x.r

vt

3/5

/2013

6:1

0:1

7P

M

1/4" = 1'-0"

CJZ

PETER AND PAT COOKACADEMIC HALL

RENOVATION

GRAND RAPIDS, MI

CONTROLS DIAGRAM

M7077111.080.00

2338 COOLIDGE, BERKLEY, MICHIGAN 48072

P 248.336.4700F 248.336.4701

DJT

02-20-2013 BIDS

03-05-2013 ADDENDUM 2