Klaipeda LNG Forum
16.09.2010
Mecklenburg Initiatives forLNG Technologies
andCryo Tank Systems
Anatoli BeifertEU Project Manager
7/28/2019 Mecklenburg Initiatives for LNG_Anatoli Beifert
2/12
2Klaipeda LNG Forum
Mecklenburg LNG stakeholders / players (1)
Nordic Yards
Products portfolio:
Ice-breaking and Ice-going Tonnage
(former Aker Yards Wismar, Wadan Yard
Offshore constructions Specialized tankers
Passenger vessels projects RoRo and RoPax projectsContainer Ships
7/28/2019 Mecklenburg Initiatives for LNG_Anatoli Beifert
3/12
3Klaipeda LNG Forum
Mecklenburg LNG stakeholders / players (1)
Nordic Yards
Production capacities
Rostock
Location
Substantial space available for transportation andinterim storage (850,000 sq. m. total shipyard area,thereof 85,000 sq. m. roofed)
High steel throughput (up to 55,000 t/p.a.)Large space available at the final assembly
Large offshore projects can be built by specialassembly procedures at the dry dock
Long water edge, close to the open sea
Wismar
Location
Manufacturing and production completelyindependent from weather conditions
* High steel throughput (up to approx.
60,000 t/p.a.)Crane capacity (up to 1,000 t)
Large vessel and offshore projects can be builtwith standard assembly procedures at the drydock
(dry dock surface: 340 x 67 x 13.2 m.,
completely roofed)
7/28/2019 Mecklenburg Initiatives for LNG_Anatoli Beifert
4/12
4Klaipeda LNG Forum
Research and Development
During the past 10 years extensive investments in
research and development have been made at the yards.
Products innovations / optimization
Arctic ships / LNG tankers
Offshore WEA Jack-ups
LNG containment systems
E.g. ADBT Aluminium Double Barrier Tank
Procedures
Numerical simulation
Holistic optimization
Risk-based design
Welding and manufacturing techniques
Page 4
7/28/2019 Mecklenburg Initiatives for LNG_Anatoli Beifert
5/12
5Klaipeda LNG Forum
Products portfolio
- Concept development for new shipyards / terminals
- Development and production of technical equipment for
shipbuilding yards- Specialized mechanical engineering, incl. ship and oversize
transport systems
- Feasibility studies
- Logistics and software solutions
- Installation, maintenance and after-sale service
Mecklenburg LNG stakeholders / players (2)
7/28/2019 Mecklenburg Initiatives for LNG_Anatoli Beifert
6/12
6Klaipeda LNG Forum
Products portfolio
Mecklenburg LNG stakeholders / players (3)
7/28/2019 Mecklenburg Initiatives for LNG_Anatoli Beifert
7/12
7Klaipeda LNG Forum
77
cooperative project of 8 companies and 2 researchcooperative project of 8 companies and 2 research
institutionsinstitutions
duration 3 years (2007duration 3 years (2007 -- 2009)2009)
CTS goals:CTS goals:
development of a new LNGdevelopment of a new LNG--containment system withcontainment system with
low production costs and timelow production costs and time
low boil off ratelow boil off rate
high operating safety (sloshing, grounding)high operating safety (sloshing, grounding)
CTS results:CTS results:
development of adevelopment of a new membranenew membrane typetype LNG containment systemLNG containment system-- approval in principle (LR)approval in principle (LR)
-- mock up builtmock up built
development of adevelopment of a prismatic LNG containment system (ADBT)prismatic LNG containment system (ADBT)
-- approval in principle (ABS, BV, DNV, LR)approval in principle (ABS, BV, DNV, LR)
-- general/design approval (BV, DNV)general/design approval (BV, DNV)-- mock up builtmock up built
CTS financing:CTS financing:
co financiered by German governmentco financiered by German government
total project costs ca. 15,5 Miototal project costs ca. 15,5 Mio
Mecklenburg LNG relevant Projects (1)
7/28/2019 Mecklenburg Initiatives for LNG_Anatoli Beifert
8/12
8Klaipeda LNG Forum
88
cooperative project of 11 companies and 3 researchcooperative project of 11 companies and 3 research
institutionsinstitutions
duration 3 years (2010duration 3 years (2010 -- 2013)2013)
POLAR goals:POLAR goals:
System Solutions for Harsh and Arctic EnvironmentSystem Solutions for Harsh and Arctic Environment
-- development of:development of:
-- ice going/breaking LNG Carrier, FPSO and Platforms (ARC 7ice going/breaking LNG Carrier, FPSO and Platforms (ARC 7--8)8)
-- living quarters for arctic regionsliving quarters for arctic regions
-- high lifetime corrosion protectionhigh lifetime corrosion protection-- anti icing systemsanti icing systems
-- maintenance, access and rescue devicesmaintenance, access and rescue devices
-- optimization of:optimization of:
-- production processesproduction processes
-- transportation equipmenttransportation equipment-- topside LNGtopside LNG--equipmentequipment
-- LNG pipe systemsLNG pipe systems
POLAR financing:POLAR financing:
co financiered by German governmentco financiered by German government
total project costs ca. 21,5 Miototal project costs ca. 21,5 Mio
Mecklenburg LNG relevant Projects (2)
7/28/2019 Mecklenburg Initiatives for LNG_Anatoli Beifert
9/12
9Klaipeda LNG Forum
ADBT
General information:
Double wall LNG tank for
marine application
GBS tank and barges
Self carrying structure
Tank top
Tank walls
Tank bottom
7/28/2019 Mecklenburg Initiatives for LNG_Anatoli Beifert
10/12
10Klaipeda LNG Forum
1010
layouts for LNG containment fabricationlayouts for LNG containment fabrication
Moss spherical, Mark III, NO 96 System:Moss spherical, Mark III, NO 96 System:
-- different general layouts for prefabrication shopsdifferent general layouts for prefabrication shops
-- specification of main equipmentspecification of main equipment
-- estimation of investment costsestimation of investment costs
ADBT System:ADBT System: -- general layouts of stand alone andgeneral layouts of stand alone andyard integrated fabrication sitesyard integrated fabrication sites
-- estimation of investment costsestimation of investment costs
-- specification of main equipmentspecification of main equipment
-- basic design for friction steerbasic design for friction steer
welding equipmentwelding equipment
-- evaluation of transportationevaluation of transportation
operations and workflowoperations and workflow
7/28/2019 Mecklenburg Initiatives for LNG_Anatoli Beifert
11/12
11Klaipeda LNG Forum
Mock up / Prototype
Carrier FPSO Platform
1111
Conceptual Design
Material Tests
Development Tank system
arctic LNG
todaytoday
GroGrotanksystemetanksysteme**
* planned* plannedDIFFERENT PILOT PROJECTSDIFFERENT PILOT PROJECTS
Proje
ct
Proje
ctsprogress
sprogres
s
Prod
uctmaturity
Prod
uctmaturity
first conceptsfirst concepts
ready to start productionready to start production
of LNG containmentof LNG containment
systemsystem
ready to start productionready to start production
of arctic LNG systemsof arctic LNG systems
If reality doesn't fit the theory, change the reality.Albert Eistein
7/28/2019 Mecklenburg Initiatives for LNG_Anatoli Beifert
12/12
12Klaipeda LNG Forum
Contacts
Nordic YardsWismar GmbH
Wendorfer Weg 5D-23966 Wismar
Tel.: +49 3841 77-0Fax: +49 3841 76 36 24
Nordic YardsWarnemnde GmbHWerftallee 10D-18119 Rostock-WarnemndeTel.: +49 381 510-0Fax: +49 381 5 25 74
IMG - Ingenieurtechnik undMaschinenbau GmbHIndustriestrae 8D-18069 Rostock
Reinhart KnyTel.: +49 3841 77-0Fax: +49 3841 76 36 24
E-Mail: [email protected]
Hochschule Wismar
University of Applied SciencesPhilipp-Mller StraeD-23966 Wismar
Anatoli BeifertTel.: +49 3841 753 634Fax: +49 3841 753 131
E-Mail: [email protected]