INDEX TO EXECUTIVE COMMITTEE MEETING #11/10 Friday, January 14, 2011 MINUTES Minutes of Meeting #10/10, held on December 3, 2010 591 SUSTAINABLE NEIGHBOURHOOD RETROFIT ACTION PLAN County Court, Brampton, Phase 3 Consultant Selection 591 BLUFFER'S PARK DAY MOORING DOCK REPAIR PROJECT Tender RSD10-59 594 AQUATIC PLANTS PROPAGATION MATERIALS Contract for Supply for 2011 Projects and Programs 596 ROUGE PARK ALLIANCE Chair's Per Diem 599 CONTRACT EMPLOYMENT OF RETIRED STAFF 599 ONTARIO REGULATION 166/06 Bell Canada 600 Hydro One Brampton Networks Inc. 601 MTS Allstream 602 Q9 Networks Inc. 602 Real Spaces Inc. 602 Mississauga, City of 603 Toronto, City of 603, 606, 616, 617 202 Riverside Drive 604 87 Brule Gardens 604 62 Langmuir Crescent 604 80 Baby Point Road 605 18 Sunnycrest Road 605 Scarboro Golf and Country Club 607 205 Ava Road 607 16 Woodvale Crescent 607 Enbridge Gas Distribution Inc. 608, 611, 620
Transcript
Page 1: Meeting - Executive Committee · 2011. 1. 17. · Belmont Properties (Weston) Inc. 612 Huntington Landowners Group 612 ... zfuture scenario analysis to identify strategic actions

INDEX TO

EXECUTIVE COMMITTEE MEETING #11/10

Friday, January 14, 2011

MINUTESMinutes of Meeting #10/10, held on December 3, 2010 591

SUSTAINABLE NEIGHBOURHOOD RETROFIT ACTION PLANCounty Court, Brampton, Phase 3 Consultant Selection 591

BLUFFER'S PARK DAY MOORING DOCK REPAIR PROJECTTender RSD10-59 594

AQUATIC PLANTS PROPAGATION MATERIALSContract for Supply for 2011 Projects and Programs 596

ROUGE PARK ALLIANCEChair's Per Diem 599

CONTRACT EMPLOYMENT OF RETIRED STAFF 599

ONTARIO REGULATION 166/06Bell Canada 600Hydro One Brampton Networks Inc. 601MTS Allstream 602Q9 Networks Inc. 602Real Spaces Inc. 602Mississauga, City of 603Toronto, City of 603, 606, 616, 617202 Riverside Drive 60487 Brule Gardens 60462 Langmuir Crescent 60480 Baby Point Road 60518 Sunnycrest Road 605Scarboro Golf and Country Club 607205 Ava Road 60716 Woodvale Crescent 607Enbridge Gas Distribution Inc. 608, 611, 620

Page 2: Meeting - Executive Committee · 2011. 1. 17. · Belmont Properties (Weston) Inc. 612 Huntington Landowners Group 612 ... zfuture scenario analysis to identify strategic actions

ONTARIO REGULATION 166/06 Cont'd575 Royalpark Way 608121 Rosebury Lane 60815275 Regional Road 50 6097 Lakeside Crescent 609127 May Avenue 6091281216 Ontario Inc. 610Blackforest Estates (Mosaik Homes) 610Ontario Realty Corporation 6112609 Lake Shore Boulevard West 612Belmont Properties (Weston) Inc. 612Huntington Landowners Group 612436 King Street East 613Tangelko Productive Developments Inc. 6139725 Warden Avenue 613King Dufferin Developments CR Inc. 614, 615King North Developments CR Inc. 615The Country Day School 616Peel, Regional Municipality of 618, 619109 Latania Boulevard 620490 Main Street North 621Ascot Properties Inc. 6211825 Fairport Drive 621Logos Apostolic Church 62117 The Palisades 622Canadian College of Naturopathic Medicine 62244 George Henry Boulevard 62299 Citation Drive 62391 Dunmurray Boulevard 623440 Lake Front 62385 Cooks Mill Crescent 623133 Moraine Hill Drive 62467 Partridge Circle 62415488 the Gore Road 62417 Frank Court 62413316 Tenth Line 625335 Webb Road 6251260 Concession No. 3 625Markham, Town of 626

Page 3: Meeting - Executive Committee · 2011. 1. 17. · Belmont Properties (Weston) Inc. 612 Huntington Landowners Group 612 ... zfuture scenario analysis to identify strategic actions

591

MEETING OF THE EXECUTIVE COMMITTEE #11/10January 14, 2011

The Executive Committee Meeting #11/10, was held be conference call, on Friday, January 14, 2011. The Chair Gerri Lynn O'Connor, called the meeting to order at 9:32 a.m.

PRESENT VIA TELECONFERENCEMaria Augimeri Vice ChairDavid Barrow MemberGay Cowbourne MemberGlenn De Baeremaeker MemberColleen Jordan MemberGerri Lynn O'Connor ChairAnthony Perruzza MemberRichard Whitehead Member

ABSENTJack Heath Member

RES.#B161/10 - MINUTES

Moved by: Gay CowbourneSeconded by: Richard Whitehead

THAT the Minutes of Meeting #10/10, held on December 3, 2010, be approved. CARRIED

_________________________________________

SECTION II - ITEMS FOR EXECUTIVE ACTION

RES.#B162/10 - SUSTAINABLE NEIGHBOURHOOD RETROFIT ACTION PLANCounty Court, Brampton, Phase 3 Consultant Selection. Award of contract for the preparation of Phase 3 of the Sustainable Neighbourhood Retrofit Action Plan for the County Court neighbourhood in Brampton.

Moved by: David BarrowSeconded by: Colleen Jordan

Page 4: Meeting - Executive Committee · 2011. 1. 17. · Belmont Properties (Weston) Inc. 612 Huntington Landowners Group 612 ... zfuture scenario analysis to identify strategic actions

592

THAT the contract for the preparation of Phase 3 of the Sustainable Neighbourhood Retrofit Action Plan (SNAP) for the County Court neighbourhood in Brampton be awarded to the consulting team lead by Dillon Consulting, at a total cost not to exceed $149,500.00, plus HST;

AND FURTHER THAT authorized Toronto and Region Conservation Authority (TRCA) officials be directed to take the necessary action to implement the contract including obtained needed approvals and signing and execution of documents.

CARRIEDBACKGROUNDIn follow-up to watershed plans and directions toward catchment-based, neighbourhood scale implementation planning, TRCA is initiating a pilot program of SNAP projects in collaboration with municipal partners. The purpose of this initiative is to identify ways to accelerate the transformation of existing communities to improve sustainability and increase their contributions to climate change mitigation and adaptation. The SNAPs will showcase a broad range of innovative sustainability initiatives of TRCA and its partners, and support the implementation of various watershed and community planning initiatives within a retrofit context.

The first SNAP pilot project is located in Brampton, Ontario and is focused on a neighbourhood called “County Court”. The community is bounded by Hurontario Street to the west, Steeles Avenue East and the Etobicoke Creek to the north, Kennedy Road to the east, and Highway 407 to the south.

At Executive Committee Meeting #8/09, held on October 9, 2009, Resolution #B143/09 awarded Phases 1 and 2 of the SNAP development to a consultant team led by LURA and Planning Alliance with ARUP, ERA Architects, Aquafor Beech and Beacon Environmental.

Phases 1 and 2 have identified a series of key neighbourhood actions and projects for further analysis in Phase 3. These include a suite of low impact development (LID) stormwater management measures and eco-landscaping on single family lots and innovative end-of-pipe facilities for further analysis (e.g. use of neighbourhood stormwater for golf course irrigation); and an enhanced public space at the County Court Park and Upper Nine Stormwater facility. The development of the SNAP has been managed by the TRCA and guided by a Project Management Team comprised of representatives from the TRCA, Region of Peel and City of Brampton. Technical staff, the community and other partners have been engaged throughout the process.

This Phase 1 and 2 contract is now complete and has resulted in:establishment of an existing condition baseline for energy and water consumption, natural heritage and stormwater systems; a sustainability framework of goals, indicators and working targets to guide SNAP development and future monitoring; future scenario analysis to identify strategic actions to meet working targets; and identification of key actions and projects with estimates of expected performance.

Page 5: Meeting - Executive Committee · 2011. 1. 17. · Belmont Properties (Weston) Inc. 612 Huntington Landowners Group 612 ... zfuture scenario analysis to identify strategic actions

593

Consulting services are now required to undertake the final Phase 3 to fully develop the SNAP for County Court so partners can begin implementation. The selected consultant team will engage TRCA, Region of Peel, City of Brampton, and the community in:

developing engaging visuals and detailed concept plan mapping;integrating and refining technical work to detail and assess actions;building a strategy for community behaviour change;creating a community engagement plan to allow for input to SNAP development;creating a concept plan for County Court Park retrofit through a Preliminary Feasibility Study (optional City of Brampton funded item);developing the business case for actions requiring significant investment;identifying innovative approaches and developing an Implementation and Financing Strategy; andfacilitating partner discussions in support of monitoring plan development.

RATIONALEThe consultant selection process for the Phase 3 contract involved a Request for Proposal (RFP) as outlined below. To solicit bids for Phase 3 work, TRCA staff made use of the list of qualified consultants including those identified through the previous Request for Expression of Interest (REOI) and RFP process for Phases 1 and 2.

Request for Proposal process – Phase 3 contractBased on TRCA staff’s review of the top previously submitted EOIs and consulting firms with the required qualifications to undertake the work, the RFP for Phase 3 of the County Court SNAP was sent to the following five (5) teams on November 23, 2010:

AECOM; Dillon Consulting; LANDinc; Planning Alliance and LURA Consulting; andXCG Consulting.

Proposals were received on December 13, 2010 from the following teams, at a value of:Team Fees and expenses

(Plus HST)LANDinc with Enermodal Engineering and N. Barry Lyon Consultants

$149,835.00

Dillon Consulting with urbanMetrics and Aquafor Beech $149,500.00XCG Consulting with The Planning Partnership, Hardy Stevenson and Assoc. Ltd. and RMSi

$138,331.00

Proposals were reviewed by a selection committee comprised of TRCA staff, as well as staff from engineering, environmental planning, water conservation and education from the City of Brampton and Region of Peel.

Proposals were reviewed based on the following selection criteria:approach to developing an integrated, action-oriented SNAP to achieve neighbourhood objectives and targets;understanding of Phase 3 requirements (knowledge of Phases 1 and 2 studies and local technical and environmental conditions);

Page 6: Meeting - Executive Committee · 2011. 1. 17. · Belmont Properties (Weston) Inc. 612 Huntington Landowners Group 612 ... zfuture scenario analysis to identify strategic actions

594

work plan that streamlines and integrates technical refinement and analysis, community input and social marketing research; past experience with similar projects; qualifications of individual team members and ability to manage complex projects with multiple partner involvement; overall quality of proposal; and cost.

The selection committee conducted interviews on December 20, 2010 with the two consultant teams scoring highest; those lead by Dillon Consulting and XCG Consulting.

The committee felt that the team led by Dillon Consulting with urbanMetrics and Aquafor Beech best met the work requirements for integrated technical analysis and assessment; community engagement and behaviour change strategy; and business case and implementation plan development. In addition, this team’s proposal and interview conveyed significant enthusiasm and a compelling vision which demonstrated their understanding of the unique nature of the project. They set out a clear and innovative workplan that gave the selection committee confidence that immediate start-up and efficient delivery of Phase 3 would occur. Several of the consultant team members have previous experience with the City of Brampton.

As a result, the selection committee is recommending award of the contract to the consulting team lead by Dillon Consulting for the development of Phase 3 of the County Court SNAP in Brampton, at a total cost not to exceed $149,500, plus HST.Funds for the consulting contract are available from the Region of Peel under the TRCA’s 2010 Capital Budget (account 416-10) and a recently awarded grant of $86,625 under the Federation of Canadian Municipalities (FCM) Green Municipal Fund (GMF). Staff will continue to pursue innovative partnerships and funding opportunities to secure resources and financial support for plan development and implementation.

Report prepared by: Shannon Logan, extension 5708Emails: [email protected] Information contact: Shannon Logan, extension 5708 or Sonya Meek extension 5253Emails: [email protected] or [email protected]: December 21, 2010

_________________________________________

RES.#B163/10 - BLUFFER'S PARK DAY MOORING DOCK REPAIR PROJECTTender RSD10-59. Award of contract RSD10-59 for repairs to the day mooring dock at Bluffer’s Park, in the City of Toronto.

Moved by: David BarrowSeconded by: Colleen Jordan

Page 7: Meeting - Executive Committee · 2011. 1. 17. · Belmont Properties (Weston) Inc. 612 Huntington Landowners Group 612 ... zfuture scenario analysis to identify strategic actions

595

THAT Contract RSD10-59 for repairs to the day mooring dock at Bluffer’s Park be awarded to McPherson-Andrews Contracting Limited at a total cost not to exceed $97,226.00, plus a contingency amount of $5,000.00 to be expended as authorized by Toronto and Region Conservation Authority (TRCA) staff, plus HST, it being the lowest bid that meets TRCA staff cost estimates and specifications;

AND FURTHER THAT authorized TRCA officials be directed to take the necessary action to implement the contract including obtained needed approvals and signing and execution of documents.

CARRIEDBACKGROUNDBluffer’s Park is a large waterfront park located at the southern limit of Brimley Road South, south of Kingston Road in the City of Toronto. Bluffer’s Park was created to increase public access to Lake Ontario, increase the amount of lakefront recreational facilities present along Toronto’s east waterfront and promote further commercial and residential developments within the surrounding area. Construction of the park began in 1971 and by 1981 the facility was opened to the public. In October of 2010 the City of Toronto approached TRCA to assist with the planning, design, approvals and implementation of repairs to the Day Mooring Docks at Bluffers Park. The failing dock was identified to TRCA by the City of Toronto as an area of concern due to severe erosion of the Gabion baskets underneath the concrete dock, therefore the entire front face of the dock wall is undermined. The City of Toronto requested that TRCA develop a plan to address the issue, while providing long-term protection to the dock. The repairs to the Day Mooring Dock will improve safety for pedestrian traffic and recreational activities within Bluffer’s Park.

The Tender for the repair of the Day Mooring Dock at Bluffer’s Park was issued on December 6,

2010, based on a design provided by Brown and Co. Engineering Limited.

RATIONALETender packages were sent to five suppliers as follows:

Somerville Construction Ltd.;Serve Construction Ltd.;McPherson-Andrews Contracting Ltd.; Hobden Construction Ltd.; andBryron Contracting Ltd.

Tenders were opened by Restoration Services staff (Mark Preston, Joe Delle Fave and James Dickie) on Tuesday, December 21, 2010 with the following results:

Contract RSD10-59Bluffer’s Park, Day Mooring Dock Repairs

BIDDERS TOTAL(Plus HST)

McPherson-Andrews Contracting Ltd. $102,226.00Hobden Construction Ltd. $112,566.07

Page 8: Meeting - Executive Committee · 2011. 1. 17. · Belmont Properties (Weston) Inc. 612 Huntington Landowners Group 612 ... zfuture scenario analysis to identify strategic actions

596

Based on the bids received, staff recommends that Contract RSD10-59 be awarded to McPherson-Andrews Contracting Limited for the total cost not to exceed $102,226.00, plus HST, which includes a contingency amount of $5,000.00 to be expended as authorized by TRCA staff, it being the lowest bid that meets TRCA staff cost estimates and specifications.

FINANCIAL DETAILSFunds are available within account 185-50 which is 100% recoverable from the City of Toronto Parks budget.

Report prepared by: James Dickie, 416-392-9702 Emails: [email protected] Information contact: Mark Preston, 416-392-9722 Emails: [email protected]: January 04, 2011

_________________________________________

RES.#B164/10 - AQUATIC PLANTS PROPAGATION MATERIALSContract for Supply for 2011 Projects and Programs. Award of contract for the supply of 2011 aquatic plant propagation materials.

Moved by: David BarrowSeconded by: Colleen Jordan

THAT the contract for supply of aquatic plant propagation materials for 2011 projects and programs be awarded to Acorus Restoration at a cost not to exceed $70,000.00 including delivery, plus HST, it being the quotation that best meets Toronto and Region Conservation Authority (TRCA) specifications;

AND FURTHER THAT authorized TRCA officials be directed to take the necessary action to implement the contract including obtained needed approvals and signing and execution of documents.

CARRIEDBACKGROUNDFor many years the TRCA Nursery has undertaken the collection, propagation and supply of aquatic plants to facilitate the implementation of a variety of regeneration projects across TRCA's watersheds. Over the past several years Nursery staff has diversified the range of products by adding a limited selection of wet meadow herbaceous plants to this product line. From the early outset of aquatic plant propagation activities, the Nursery has seen growth in annual demand from fewer than 15,000 plants to an ongoing demand of 40,000 or more units per year. More recent changes in Restoration Services program focus has pushed the demand for aquatic and herbaceous plants to over 60,000 in 2010. Staff project the same level of demand for the 2011 season. This demand is again predominantly comprised of needs related Tommy Thompson Park wetland habitat development and shoreline enhancement projects. Demand is anticipated to subside to 40,000 units annually in subsequent years based on current project plans and known build out schedules.

Page 9: Meeting - Executive Committee · 2011. 1. 17. · Belmont Properties (Weston) Inc. 612 Huntington Landowners Group 612 ... zfuture scenario analysis to identify strategic actions

597

In late 2006, staff surveyed the marketplace to obtain proposals from potential growers for the supply of the specified propagating materials. On the basis of the outcome of that market survey, TRCA has purchased the required propagation materials from Acorus Restoration, they being the only regionally local supplier that could both provide the range of species and quantities at the specified time lines necessary to allow TRCA's Nursery to deliver the products on time. Each successive year since 2007 yielded a similar outcome and conclusion - the result being that annual supply contracts were awarded to Acorus Restoration on the basis of price and availability.

RATIONALEOver the past five years, some growers have expanded and/or entered this market and as a result staff again sent out Requests for Proposals to supply for the 2011 season and to confirm how the supply landscape had changed as a result of evolving environmental restoration project demands. TRCA Nursery staff contacted the following five potential suppliers of aquatic plants and propagation materials covering local, regional and international representation to review the suitability and compatibility of these grower's supplies and techniques to our own:

Acorus Restoration; Wild Canada; Native Plant Source; Taylor Creek Restoration Nurseries; Environmental Concern.

All of the potential grower/suppliers were requested to provide their quotation for the supply and delivery of specific items in terms of species, quantity, size, condition (eg. bare root, plugs, pot, etc.), timing and price in accordance with TRCA’s known 2011 requirements.

The results of these enquiries yielded the following result:

Grower Location Proposal compatibility with

TRCA specification?

Quotation(Plus HST)

Acorus Restoration Walsingham, ON YES $54,219.95Native Plant Source Kitchener, ON YES $52,380.00Wild Canada Wasaga Beach, ON N/A No bid - change in

area of businessTaylor Creek Restoration Nurseries

Brodhead, Wisconsin NO $29,030.00US funds -

delivery/taxes/import tariff/brokerage costs

unknownEnvironmental Concern

St. Michaels,Maryland

N/A unable to bid - MD State law prohibits export out of state

Page 10: Meeting - Executive Committee · 2011. 1. 17. · Belmont Properties (Weston) Inc. 612 Huntington Landowners Group 612 ... zfuture scenario analysis to identify strategic actions

598

Within the last two years, significant improvements in nursery facilities and crop scheduling have enhanced the ability to supply bio-regionally appropriate materials in the required quantities. However, current demands on physical propagation space and staff resources by the expansion of project demands continues to put a strain on current production limits. Coupled with TRCA's inability to deal with inconsistent weather in the early spring period, it further hampers our ability to produce the product to the required stage of development requested by internal client groups to meet optimal time lines for out-planting and successful establishment.

Based on the responses received, Acorus Restoration and Native Plant Source are the only two local sources that claim the ability to supply the materials from regionally acceptable genetic sources.

Prior attempts to obtain similar materials from Native Plant Source based on quoted lowest price have met with disappointing results, requiring TRCA to procure from alternative sources in order to fulfill project commitments made by the Nursery. Any such repeat performance failure would undoubtedly result in significant setbacks in project implementation schedules and may incur additional cost to mitigate - making TRCA subject to prevailing market retail pricing and limited species/quantity availability in order to meet commitments for project completion timelines.

Procuring materials through a distant American supplier, solely on the basis of lowest unit cost and unknown cross-border duties/tariffs/taxes, carries with it a significant element of risk given that these materials are highly perishable and subject to abiotic stresses during shipment, notwithstanding TRCA’s stated focus on locally sourced, genetically adapted and bio-regionally appropriate plant materials. TRCA's projects are based on this ecological precept and our partners have come to accept and respect this important principle.

Therefore, based on TRCA's past experiences in procuring these materials, staff recommend award of the contract to Acorus Restoration, as they have a proven track record of supplying regionally appropriate materials - on time, to specification and at a cost effective price. They comply with the seed collection standards set out by the Forest Gene Conservation Association. Further, the quality of the materials received to date gives staff confidence in their ability to supply what TRCA needs in the required time period. The price differential between Acorus and the lowest bidder is quite modest.

Furthermore, staff recommend that the contract value be set at a maximum of $70,000 (plus HST) for the year ending December 31, 2011, in order to have flexibility to adapt quickly to changing project requirements throughout the balance of 2011.

TRCA Nursery staff believe that procuring materials in this manner is the simplest way and remains a cost effective approach to achieve the required unit production. This procurement approach also allows existing staff resources to be focused on other priority woody plant production during the critical and short spring season.

Page 11: Meeting - Executive Committee · 2011. 1. 17. · Belmont Properties (Weston) Inc. 612 Huntington Landowners Group 612 ... zfuture scenario analysis to identify strategic actions

599

FINANCIAL DETAILSFunds in the amount of $16,265.00 are available to provide for the 30% deposit payment to secure the Acorus Restoration order from account 125-17-230.

The balance of the order cost, $37,954.50 plus HST will be paid on delivery and confirmation in spring 2011. Individual projects receiving plants will be billed for the materials they receive following delivery next year. Costs are recoverable from various project budgets as materials are delivered to individual projects in 2011.

Further material orders, should they be required, will be assigned under the balance of the purchase contract to a maximum upset limit of $70,000 plus HST.

Report prepared by: Dave Rogalsky, extension 5378Emails: [email protected] Information contact: Dave Rogalsky, extension 5378, Tim Mathers, extension 6401Emails: [email protected], [email protected]: January 04, 2011

_________________________________________

RES.#B165/10 - ROUGE PARK ALLIANCEChair's Per Diem

Moved by: David BarrowSeconded by: Colleen Jordan

THAT confidential item EX8.4 - Rouge Park Alliance, be approved.CARRIED

_________________________________________

RES.#B166/10 - CONTRACT EMPLOYMENT OF RETIRED STAFF

Moved by: David BarrowSeconded by: Colleen Jordan

THAT confidential item EX8.5 - Contract Employment of Retired Staff, be approved.CARRIED

_________________________________________

Page 12: Meeting - Executive Committee · 2011. 1. 17. · Belmont Properties (Weston) Inc. 612 Huntington Landowners Group 612 ... zfuture scenario analysis to identify strategic actions

600

ONTARIO REGULATION 166/06

RES.#B167/10 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO REGULATION 166/06Development, Interference with Wetlands and Alterations to Shorelines and Watercourses. Pursuant to Ontario Regulation 166/06, written permission from the Authority is required for:

a) straightening, changing, diverting or interfering in any way with the existing channel of a river, creek, stream or watercourse, or for changing or interfering in any way with a wetland;

b) development, if in the opinion of the authority, the control of flooding, erosion, dynamic beaches or pollution or the conservation of land may be affected by the development.

A permit may be refused through a Hearing Process, if in the opinion of the Authority, the control of flooding, erosion, dynamic beaches, pollution or the conservation of land is affected.

Moved by: Glenn De BaeremaekerSeconded by: Richard Whitehead

THAT permits be granted in accordance with Ontario Regulation 166/06 for the applications (EX10.1 - EX10.24, with the exception of EX10.15 - City of Toronto, and EX10.68) which are listed below.

CARRIEDRES.#B168/10 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO

REGULATION 166/06

Moved by: Glenn De BaeremaekerSeconded by: Gay Cowbourne

THAT a permit be granted in accordance with Ontario Regulatio 166/06 for the application EX10.15 - City of Toronto, subject to the plans for restoration works and/or cash-in-lieu contribution to future works being confirmed to the satisfaction of Toronto and Region Conservation Authority's Chief Administrative Officer.

CARRIEDCITY OF BRAMPTON

EX10.1 BELL CANADATo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Castlemore Road between Fines Avenue and Highway 50 in the City of Brampton, Humber River Watershed as located on the property owned by City of Brampton under agreement with Bell Canada. The purpose is to construct (3) 100 mm diameter ducts under Rainbow Creek on both the north and south side of Castlemore Road between Fines Avenue and Highway 50. The warmwater fisheries timing window will be applied and a Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO).

Page 13: Meeting - Executive Committee · 2011. 1. 17. · Belmont Properties (Weston) Inc. 612 Huntington Landowners Group 612 ... zfuture scenario analysis to identify strategic actions

601

CFN: 43977 - Application #: 0333/10/BRAMReport Prepared by: Ben Krul, extension 5769For information contact: Ben Krul, extension 5769Date: January 4, 2011

EX10.2 BELL CANADATo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Castlemore Road between Clarkway Drive and The Gore Road in the City of Brampton, Humber River Watershed as located on the property owned by City of Brampton under agreement with Bell Canada. The purpose is to install (3) 100 mm HDPE ducts under Clarkway Drive Tributary on Castlemore Road between Clarkway Drive and The Gore Road. The warmwater fisheries timing window will be applied and a Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO).

CFN: 43966 - Application #: 0334/10/BRAMReport Prepared by: Ben Krul, extension 5769For information contact: Ben Krul, extension 5769Date: January 4, 2011

EX10.3 HYDRO ONE BRAMPTON NETWORKS INC.To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on 9513 Goreway Drive near Castlemore Road in the City of Brampton, Humber River Watershed as located on the property owned by Hydro One Brampton Networks Inc. and Toronto and Region Conservation Authority. The purpose is to construct two parallel concrete encased ductbanks to provide additional electrical power to distribution facilities and prevent a system overload at 9513 Goreway Drive in the City of Brampton. A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO).

CFN: 43920 - Application #: 0290/10/BRAMReport Prepared by: Ben Krul, extension 5769For information contact: Ben Krul, extension 5769Date: January 4, 2011

Page 14: Meeting - Executive Committee · 2011. 1. 17. · Belmont Properties (Weston) Inc. 612 Huntington Landowners Group 612 ... zfuture scenario analysis to identify strategic actions

602

EX10.4 MTS ALLSTREAMTo site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Rutherford Road South and Selby Road from 22 Selby Road to Glidden Road in the City of Brampton, Etobicoke Creek Watershed as located on the property owned by the City of Brampton under agreement with MTS Allstream. The purpose is to construct an underground fibre optic cable on Rutherford Road South and Selby Road from Glidden Road to 22 Selby Road in the City of Brampton. A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO).

CFN: 44820 - Application #: 0961/10/BRAMReport Prepared by: Ben Krul, extension 5769For information contact: Ben Krul, extension 5769Date: January 3, 2011

EX10.5 Q9 NETWORKS INC.To construct, reconstruct, erect or place a building or structure and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on (30 Bramtree Court), in the City of Brampton, Mimico Creek Watershed as located on the property owned by Q9 Networks Incorporated. The purpose is to undertake works within a TRCA Regulated Area of the Mimico Creek Watershed in order to facilitate the installation of buried hydro servicing associated with a municipal building permit.

CFN: 44903 - Application #: 1004/10/BRAMReport Prepared by: Jason Wagler, extension 5743For information contact: Jason Wagler, extension 5743Date: January 5, 2011

EX10.6 REAL SPACES INC.To construct, reconstruct, erect or place a building or structure and site grade on Part Block H, Plan 518, (80 Eastern Avenue and 90 Eastern Avenue), in the City of Brampton, Etobicoke Creek Watershed as located on the property owned by Real Spaces Incorporated. The purpose is to undertake works within a TRCA Regulated Area of the Etobicoke Creek Watershed in order to facilitate the construction of two multi-tenant commercial buildings associated with a municipal site plan application.

CFN: 44979 - Application #: 1040/10/BRAMReport Prepared by: Jason Wagler, extension 5743For information contact: Jason Wagler, extension 5743Date: January 5, 2011

Page 15: Meeting - Executive Committee · 2011. 1. 17. · Belmont Properties (Weston) Inc. 612 Huntington Landowners Group 612 ... zfuture scenario analysis to identify strategic actions

603

CITY OF MISSISSAUGA

EX10.7 CITY OF MISSISSAUGATo construct, reconstruct, erect or place a building or structure and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Burnhamthorpe Road east of Corbet Drive near Dixie Road in the City of Mississauga, Etobicoke Creek Watershed as located on the property owned by City of Mississauga. The purpose is to rehabilitate a bridge located on Burnhamthorpe Road over the Little Etobicoke Creek east of Corbert Drive in the City of Mississauga. The warmwater fisheries timing window will be applied and a Letter of Advice will be written on behalf of Fisheries and Oceans Canada (DFO).

CFN: 44467 - Application #: 0716/10/MISSReport Prepared by: Ben Krul, extension 5769For information contact: Ben Krul, extension 5769Date: January 4, 2011

CITY OF TORONTO

EX10.8 CITY OF TORONTOTo construct, reconstruct, erect or place a building or structure, change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units and site grade (Colborne Lodge Drive - near The Queensway and Parkside Drive), in the City of Toronto (Etobicoke York Community Council Area), Waterfront Watershed as located on the property owned by City of Toronto. The purpose is to construct a one storey community kitchen facility on the footprint of an existing picnic shelter in High Park in the City of Toronto. In addition, a 1.5m wide concrete ramp is to be constructed between the existing road and the building. Due to the proximity of the proposed works in relation to the watercourse, a Letter of Advice on behalf of Department of Fisheries Oceans Canada (DFO) is not required for this project.

CFN: 44970 - Application #: 1035/10/TORReport Prepared by: Jonathan Pounder, extension 5304For information contact: Renee Afoom-Boateng, extension 5714Date: January 3, 2011

Page 16: Meeting - Executive Committee · 2011. 1. 17. · Belmont Properties (Weston) Inc. 612 Huntington Landowners Group 612 ... zfuture scenario analysis to identify strategic actions

604

CITY OF TORONTO [ETOBICOKE YORK COMMUNITY COUNCIL AREA]

EX10.9 202 RIVERSIDE DRIVETo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 189, Plan M-356, (202 Riverside Drive), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to reconstruct existing retaining walls, replace existing pool deck, and associated hard and soft landscaping in the rear yard of the existing single family detached dwelling at 202 Riverside Drive in the City of Toronto (Etobicoke York Community Council Area).

CFN: 44904 - Application #: 1005/10/TORReport Prepared by: Nicole Moxley, extension 5284For information contact: Steve Heuchert, extension 5311Date: January 5, 2011

EX10.10 87 BRULE GARDENSTo change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 64, 65, Plan M-536, (87 Brule Gardens), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to construct a one-storey addition to the southeast side of the existing single family detached dwelling at 87 Brule Gardens in the City of Toronto (Etobicoke York Community Council Area).

CFN: 45180 - Application #: 0002/11/TORReport Prepared by: Nicole Moxley, extension 5284For information contact: Steve Heuchert, extension 5311Date: January 5, 2011

EX10.11 62 LANGMUIR CRESCENTTo construct, reconstruct, erect or place a building or structure, change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 2, Plan 2458, (62 Langmuir Crescent), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to construct a new two-storey single family detached dwelling with integral garage at 62 Langmuir Crescent in the City of Toronto (Etobicoke York Community Council Area). The existing dwelling is to be demolished.

Page 17: Meeting - Executive Committee · 2011. 1. 17. · Belmont Properties (Weston) Inc. 612 Huntington Landowners Group 612 ... zfuture scenario analysis to identify strategic actions

605

CFN: 44826 - Application #: 0952/10/TORReport Prepared by: Nicole Moxley, extension 5284For information contact: Steve Heuchert, extension 5311Date: January 5, 2011

EX10.12 80 BABY POINT ROADTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 3, Concession HUMBER RANGE 2 Lot 5, Plan 2313, (80 Baby Point Road), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to construct an in-ground pool and associated hard and soft landscaping in the rear yard of the existing single family detached dwelling at 80 Baby Point Road in the City of Toronto (Etobicoke York Community Council Area).

CFN: 45022 - Application #: 1059/10/TORReport Prepared by: Nicole Moxley, extension 5284For information contact: Steve Heuchert, extension 5311Date: January 5, 2011

CITY OF TORONTO [NORTH YORK COMMUNITY COUNCIL AREA]

EX10.13 18 SUNNYCREST ROADTo construct, reconstruct, erect or place a building or structure, change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 24, Plan R-14636, (18 Sunnycrest Road), in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to develop within a Regulated Area of the Don River watershed to facilitate construction of a pool enclosure structure surrounding the existing in-ground swimming pool in the rear yard of the existing dwelling.

CFN: 42425 - Application #: 0334/09/TORReport Prepared by: Michelle Stafford, extension 5250For information contact: Steve Heuchert, extension 5311Date: January 5, 2011

Page 18: Meeting - Executive Committee · 2011. 1. 17. · Belmont Properties (Weston) Inc. 612 Huntington Landowners Group 612 ... zfuture scenario analysis to identify strategic actions

606

CITY OF TORONTO [SCARBOROUGH COMMUNITY COUNCIL AREA]

EX10.14 CITY OF TORONTOTo construct, reconstruct, erect or place a building or structure and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on , (North from F.J. Horgan Water Treatment Plant across City lands to Coronation Drive, North on Manse Road to U of T lands, West - on the South side of Highland Creek, North along Morningside Avenue and West along Ellesmere Road), in the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed as located on the property owned by City of Toronto/Easements from University of Toronto Scarborough Campus. The purpose is to construct a 2250 mm watermain from the F. J. Horgan Water Treatment Plant to the Ellesmere Pumping Station. The proposed watermain will be constructed using both open cut trench technology and tunneling to minimize construction impacts on adjacent natural heritage features and traffic conditions. A Letter of Advice regarding mitigation of negative impacts will be written by TRCA staff on behalf of the Fisheries and Oceans Canada (DFO).

CFN: 42787 - Application #: 0586/09/TORReport Prepared by: Renee Afoom-Boateng, extension 5714For information contact: Renee Afoom-Boateng, extension 5714Date: January 3, 2011

EX10.15 CITY OF TORONTOTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 4 TO 27, Concession 2-3, (Sheppard Avenue East between West Highland Creek and Lamont Avenue), in the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed as located on the property owned by City of Toronto. The purpose is to construct a new grade separation between Sheppard Avenue East and the existing GO Uxbridge Rail line that crosses Sheppard Avenue in the area of Highland Creek, Agincourt Drive and Lamont Avenue. The proposed grade separation will constitute the first major component of the proposed Sheppard Avenue Light Rail Transit (LRT) project and will involve lowering of Sheppard Avenue to form an underpass underneath the rail line. TRCA staff will prepare a Letter of Advice on behalf of Fisheries and Oceans Canada for the proposed work.

CFN: 44694 - Application #: 0877/10/TORReport Prepared by: Leah Chishimba, extension 5774For information contact: Renee Afoom-Boateng, extension 5714Date: January 3, 2011

Page 19: Meeting - Executive Committee · 2011. 1. 17. · Belmont Properties (Weston) Inc. 612 Huntington Landowners Group 612 ... zfuture scenario analysis to identify strategic actions

607

EX10.16 SCARBORO GOLF AND COUNTRY CLUBTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 15, Concession D, (321 Scarborough Golf Club Road), in the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed as located on the property owned by Scarboro Golf and Country Club. The purpose is to construct a new irrigation reservoir adjacent to the west tributary of the Highland Creek.

CFN: 44553 - Application #: 0772/10/TORReport Prepared by: Mark Rapus, extension 5259For information contact: Mark Rapus, extension 5259Date: December 30, 2010

CITY OF TORONTO [TORONTO AND EAST YORK COMMUNITY COUNCIL AREA]

EX10.17 205 AVA ROADTo construct, reconstruct, erect or place a building or structure, change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units and site grade on Part Lot 951, 952, Plan M-1870, (205 Ava Road), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. The purpose is to a new two-storey single family detached dwelling at 205 Ava Road in the City of Toronto (Toronto and East York Community Council Area). The existing dwelling is to be demolished.

CFN: 45182 - Application #: 0003/11/TORReport Prepared by: Nicole Moxley, extension 5284For information contact: Steve Heuchert, extension 5311Date: January 5, 2011

EX10.18 16 WOODVALE CRESCENTTo construct, reconstruct, erect or place a building or structure and change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 8, Plan M-1741, (16 Woodvale Crescent), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. The purpose is to construct a two-storey addition and a covered terrace with partial second storey addition to the rear (west) of the existing single family detached dwelling at 16 Woodvale Crescent in the City of Toronto (Toronto and East York Community Council Area).

Page 20: Meeting - Executive Committee · 2011. 1. 17. · Belmont Properties (Weston) Inc. 612 Huntington Landowners Group 612 ... zfuture scenario analysis to identify strategic actions

608

CFN: 44908 - Application #: 1009/10/TORReport Prepared by: Nicole Moxley, extension 5284For information contact: Steve Heuchert, extension 5311Date: January 5, 2011

CITY OF VAUGHAN

EX10.19 ENBRIDGE GAS DISTRIBUTION INC.To construct, reconstruct, erect or place a building or structure on Kirby Road - approx. 700m west of Highway 27, in the City of Vaughan, Humber River Watershed as located on the property owned by Orlando Quistini. The purpose is to permit the installation of a new gas service below a tributary of the East Humber River via directional drill. A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). The Ministry of Natural Resources (MNR) cold water fisheries timing window will apply to the work.

CFN: 44815 - Application #: 0953/10/VAUGReport Prepared by: Brian Storozinski, extension 5744For information contact: Brian Storozinski, extension 5744Date: January 4, 2011

EX10.20 575 ROYALPARK WAYTo construct, reconstruct, erect or place a building or structure and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 14, Plan 65R20621, (575 Royal Park Way), in the City of Vaughan, Humber River Watershed. The purpose is to permit the continued construction of an inground pool within a Regulated Area of the Humber River watershed at 575 Royalpark Way in the City of Vaughan.

CFN: 44613 - Application #: 0821/10/VAUGReport Prepared by: Anthony Sun, extension 5724For information contact: Kevin Huang, extension 5307Date: December 7, 2010

EX10.21 121 ROSEBURY LANETo construct, reconstruct, erect or place a building or structure on , (121 Rosebury Lane), in the City of Vaughan, Humber River Watershed. The purpose is to construct a shed within a Regulated Area of the Humber River watershed at 121 Rosebury Lane in the City of Vaughan.

CFN: 44959 - Application #: 1029/10/VAUGReport Prepared by: Anthony Sun, extension 5724For information contact: Kevin Huang, extension 5307Date: December 7, 2010

Page 21: Meeting - Executive Committee · 2011. 1. 17. · Belmont Properties (Weston) Inc. 612 Huntington Landowners Group 612 ... zfuture scenario analysis to identify strategic actions

609

TOWN OF CALEDON

EX10.22 15275 REGIONAL ROAD 50To construct, reconstruct, erect or place a building or structure on Lot 17, Concession 7, (15275 Regional Road 50), in the Town of Caledon, Humber River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a 292.65 square metre (3,150 sq. ft.) ancillary garage structure associated with a municipal site plan application.

CFN: 44947 - Application #: 0005/11/CALReport Prepared by: Jason Wagler, extension 5743For information contact: Jason Wagler, extension 5743Date: January 5, 2011

TOWN OF RICHMOND HILL

EX10.23 7 LAKESIDE CRESCENTTo construct, reconstruct, erect or place a building or structure on Part Lot 12, Plan 184, (7 Lakeside Crescent), in the Town of Richmond Hill, Humber River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a single family dwelling on an undeveloped lot of record associated with a municipal building permit.

CFN: 45013 - Application #: 1048/10/RHReport Prepared by: Jason Wagler, extension 5743For information contact: Quentin Hanchard, extension 5324Date: January 5, 2011

EX10.24 127 MAY AVENUETo construct, reconstruct, erect or place a building or structure on Lot 37, Plan 1987, (127 May Avenue), in the Town of Richmond Hill, Don River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Don River Watershed in order to demolish an existing home and facilitate the construction of a replacement home..

CFN: 45146 - Application #: 1070/10/RHReport Prepared by: Uton Samuels, extension 5386For information contact: Uton Samuels, extension 5386Date: January 5, 2011

Page 22: Meeting - Executive Committee · 2011. 1. 17. · Belmont Properties (Weston) Inc. 612 Huntington Landowners Group 612 ... zfuture scenario analysis to identify strategic actions

610

PERMIT APPLICATIONS EX10.25 - EX10.40 WERE ERRATA ITEMS:

RES.#B169/10 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO REGULATION 166/06 - ERRATA APPLICATIONS

Moved by: Glenn De BaeremaekerSeconded by: Richard Whitehead

THAT permits be granted in accordance with Ontario Regulation 166/06 for the applications (EX10.24 - EX10.40, inclusive), that had been scheduled on the agenda as errata applications, for which all the required information was received and finalized.

CARRIEDCITY OF BRAMPTON

EX10.25 1281216 ONTARIO INC.To alter a watercourse on Lot 15, Concession 7 NDS, (west of Goreway Drive and north of Jacksonville Drive), in the City of Brampton, Humber River Watershed as located on the property owned by 1281216 Ontario Inc.. The purpose is to undertake works within a regulated area to facilitate the partial realignment of a stream corridor.

CFN: 45185 - Application #: 0014/11/BRAMReport Prepared by: Quentin Hanchard, extension 5324For information contact: Quentin Hanchard, extension 5324Date: January 4, 2011

EX10.26 BLACKFOREST ESTATES (MOSAIK HOMES)To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 10, Concession 10, (Clarkway Drive - near Castlemore Road and Clarkway Drive), in the City of Brampton, Humber River Watershed as located on the property owned by Blackforest Estates (Mosaik Homes). The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate topsoil stripping and earthworks associated with a residential draft approved plan of subdivision.

CFN: 44975 - Application #: 1054/10/BRAMReport Prepared by: Adam Miller, extension 5244For information contact: Adam Miller, extension 5244Date: January 5, 2011

Page 23: Meeting - Executive Committee · 2011. 1. 17. · Belmont Properties (Weston) Inc. 612 Huntington Landowners Group 612 ... zfuture scenario analysis to identify strategic actions

611

EX10.27 ENBRIDGE GAS DISTRIBUTION INCTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Castlemore Road approximately 1420 m west of Highway 50 in the City of Brampton, Humber River Watershed as located on the property owned by the City of Brampton under franchise agreement with Enbridge Gas Distribution Inc. The purpose is to install a gas main along Castlemore Road between Gardenbrooke Trail and Clarkway Drive. All work will be conducted during the warmwater fisheries timing window and Enbridge Gas Distribution Inc. will be using the Fisheries and Oceans Canada (DFO) Operational Statement for Horizontal Directional Drilling.

CFN: 44451 - Application #: 0852/10/BRAMReport Prepared by: Ben Krul, extension 5769For information contact: Ben Krul, extension 5769Date: January 4, 2011

CITY OF PICKERING

EX10.28 ONTARIO REALTY CORPORATIONTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 17, 18, Concession 3, (2665 Brock Road), in the City of Pickering, Duffins Creek Watershed as located on the property owned by Ontario Realty Corporation. The purpose is to construct a stormwater management pond and associated outlet channel/wetland flow spreader and emergency spillway.

CFN: 44382 - Application #: 0644/10/PICKReport Prepared by: Steve Heuchert, extension 5311For information contact: Steve Heuchert, extension 5311Date: January 4, 2011

Page 24: Meeting - Executive Committee · 2011. 1. 17. · Belmont Properties (Weston) Inc. 612 Huntington Landowners Group 612 ... zfuture scenario analysis to identify strategic actions

612

CITY OF TORONTO [ETOBICOKE YORK COMMUNITY COUNCIL AREA]

EX10.29 2609 LAKE SHORE BOULEVARD WESTTo construct, reconstruct, erect or place a building or structure, change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Block G, Plan M-328, (2609 Lake Shore Boulevard West), in the City of Toronto (Etobicoke York Community Council Area), Waterfront Watershed. The purpose is to construct a new two-storey single family detached dwelling with integral rear terracing and pool/spa area at 2609 Lake Shore Boulevard West in the City of Toronto (Etobicoke York Community Council Area). The existing dwelling and detached garage are to be demolished.

CFN: 43611 - Application #: 0063/10/TORReport Prepared by: Nicole Moxley, extension 5284For information contact: Steve Heuchert, extension 5311Date: January 5, 2011

CITY OF VAUGHAN

EX10.30 BELMONT PROPERTIES (WESTON) INC.To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Lot 22, Concession 6, (Northwest of Major Mackenzie Drive and Weston Road), in the City of Vaughan, Humber River Watershed as located on the property owned by Belmont Properties (Weston) Inc. The purpose is to conduct site grading and construct a temporary sediment pond in order to facilitate the servicing and development of a proposed residential subdivision for Belmont Properties (Phase 3), in Planning 40 South, in the City of Vaughan.

CFN: 45128 - Application #: 1068/10/VAUGReport Prepared by: Kevin Huang, extension 5307For information contact: Kevin Huang, extension 5307Date: January 5, 2011

EX10.31 HUNTINGTON LANDOWNERS GROUPTo site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Lot 16 - 20, Concession 9, 10, (Huntington Road and Major Mackenzie Drive), in the City of Vaughan, Humber River Watershed as located on the property owned by Huntington Landowners Group. The purpose is to conduct site grading in order to install a sanitary sewer line and crossing, which will facilitate the servicing of nearby developments including Planning Block 61, in the City of Vaughan.

Page 25: Meeting - Executive Committee · 2011. 1. 17. · Belmont Properties (Weston) Inc. 612 Huntington Landowners Group 612 ... zfuture scenario analysis to identify strategic actions

613

CFN: 45151 - Application #: 1073/10/VAUGReport Prepared by: Kevin Huang, extension 5307For information contact: Kevin Huang, extension 5307Date: January 5, 2011

TOWN OF CALEDON

EX10.32 436 KING STREET EASTTo construct, reconstruct, erect or place a building or structure on Lot 8, Plan, (436 King Street East), in the Town of Caledon, Humber River Watershed. The purpose is to undertake works within a TRCA Regulated Area in order to facilitate the construction of an addition to an existing residential dwelling associated with a municipal building permit.

CFN: 44977 - Application #: 1038/10/CALReport Prepared by: Jason Wagler, extension 5743For information contact: Jason Wagler, extension 5743Date: January 5, 2011

EX10.33 TANGELKO PRODUCTIVE DEVELOPMENTS INC.To construct, reconstruct, erect or place a building or structure and site grade on Lot A, Block 3, Plan BOL - 7, (0 Queen Street South), in the Town of Caledon, Humber River Watershed as located on the property owned by Tangelko Productive Developments Incorporated. The purpose is to recognize the recent reconstruction of a 1.82 metre (6 ft.) armourstone retaining wall within a TRCA Regulated Area of the Humber River Watershed in order to resolve an outstanding TRCA violation.

CFN: 44914 - Application #: 1012/10/CALReport Prepared by: Jason Wagler, extension 5743For information contact: Jason Wagler, extension 5743Date: January 5, 2011

TOWN OF MARKHAM

EX10.34 9725 WARDEN AVENUETo construct, reconstruct, erect or place a building or structure on (9725 Warden Avenue), in the Town of Markham, Rouge River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of three minor additions and an ancillary deck structure to an existing residential dwelling associated with a municipal building permit.

Page 26: Meeting - Executive Committee · 2011. 1. 17. · Belmont Properties (Weston) Inc. 612 Huntington Landowners Group 612 ... zfuture scenario analysis to identify strategic actions

614

CFN: 44905 - Application #: 1006/10/MARKReport Prepared by: Jason Wagler, extension 5743For information contact: Jason Wagler, extension 5743Date: January 5, 2011

TOWNSHIP OF KING

EX10.35 KING DUFFERIN DEVELOPMENTS CR INC.To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Lots 4 & 5, Concession 3, (south side of King Road, west of Dufferin Street), in the Township of King, Humber River Watershed as located on the property owned by King Dufferin Developments CR Inc. The purpose is to conduct site grading in order to construct a culvert crossing over a tributary of the Humber River (Spring Hill Drive), which will facilitate the servicing and development of a residential subdivision in King City East, in the Township of King.

CFN: 42992 - Application #: 0736/09/KINGReport Prepared by: Kevin Huang, extension 5307For information contact: Kevin Huang, extension 5307Date: January 5, 2011

EX10.36 KING DUFFERIN DEVELOPMENTS CR INC.To site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and interfere with a wetland on Lots 4 & 5, Concession 3, (south side of King Road, west of Dufferin Street), in the Township of King, Humber River Watershed as located on the property owned by King Dufferin Developments CR Inc. The purpose is to conduct site grading in order to remove an isolated pond feature and create an amphibian pond/wetland habitat on the King Dufferin residential subdivision, in King City East, in the Township of King.

CFN: 42994 - Application #: 0738/09/KINGReport Prepared by: Kevin Huang, extension 5307For information contact: Kevin Huang, extension 5307Date: January 5, 2011

Page 27: Meeting - Executive Committee · 2011. 1. 17. · Belmont Properties (Weston) Inc. 612 Huntington Landowners Group 612 ... zfuture scenario analysis to identify strategic actions

615

EX10.37 KING DUFFERIN DEVELOPMENTS CR INC.To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Lot 4, 5, Concession 3, (south side of King Road, west of Dufferin Street), in the Township of King, Humber River Watershed as located on the property owned by King Dufferin Developments CR Inc. The purpose is to conduct site grading in order to construct a culvert crossing over a tributary of the Humber River (Lavender Valley Road), which will facilitate the servicing and development of a residential subdivision in King City East, in the Township of King.

CFN: 42995 - Application #: 0739/09/KINGReport Prepared by: Kevin Huang, extension 5307For information contact: Kevin Huang, extension 5307Date: January 5, 2011

EX10.38 KING NORTH DEVELOPMENTS CR INC.To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse (north of King Road, west of Dufferin Street), in the Township of King, Humber River Watershed as located on the property owned by King North Developments CR Inc. The purpose is to conduct site grading in order to install a culvert crossing which will convey flows from a tributary of the Humber River under King Road. The proposed works will facilitate the development of the King North residential subdivision, in King City East, in the Township of King.

CFN: 43718 - Application #: 0135/10/KINGReport Prepared by: Kevin Huang, extension 5307For information contact: Kevin Huang, extension 5307Date: January 5, 2011

EX10.39 KING NORTH DEVELOPMENTS CR INC.To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Part of Lot 6, Concession 3, (north of King Road, west of Dufferin Street), in the Township of King, Humber River Watershed as located on the property owned by King North Developments CR Inc. The purpose is to conduct site grading in order to install a culvert which will convey flows from a tributary of the Humber River under the GO-Transit (CN Rail) tracks. The proposed works will facilitate the development of the King North residential subdivision, in King City East, in the Township of King.

Page 28: Meeting - Executive Committee · 2011. 1. 17. · Belmont Properties (Weston) Inc. 612 Huntington Landowners Group 612 ... zfuture scenario analysis to identify strategic actions

616

CFN: 43722 - Application #: 0139/10/KINGReport Prepared by: Kevin Huang, extension 5307For information contact: Kevin Huang, extension 5307Date: January 5, 2011

EX10.40 THE COUNTRY DAY SCHOOLTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 8, Concession 2 Lot 8, Plan 64R-8121, (13415 Dufferin Street), in the Township of King, Humber River Watershed as located on the property owned by The Country Day School. The purpose is to conduct site grading works associated with the construction of an air-supported sports structure and outdoor tennis courts within a Regulated Area of the Humber River watershed at 13415 Dufferin Street in the Township of King.

CFN: 45144 - Application #: 1072/10/KINGReport Prepared by: Anthony Sun, extension 5724For information contact: Kevin Huang, extension 5307Date: January 5, 2011

PERMIT APPLICATIONS EX10.41 - EX10.48 ARE PERMISSION FOR ROUTINE INFRASTRUCTURE WORKS:

RES.#B170/10 - PERMISSION FOR ROUTINE INFRASTRUCTURE WORKS PURSUANT TO ONTARIO REGULATION 166/60

Moved by: Glenn De BaeremaekerSeconded by: Richard Whitehead

THAT permission for routine infrastructure granted by Toronto and Region Conservation Authority staff in accordance with applications (EX10.41 - EX10.48, inclusive), which are listed below, be received.

CARRIED

CITY OF TORONTO [TORONTO AND EAST YORK COMMUNITY COUNCIL AREA]

EX10.41 CITY OF TORONTOTo undertake sewer and watermain or utility installation or maintenance within an existing roadway on Scadding Avenue from Aitken Place to Hahn Place, in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed as located on the property owned by City of Toronto. The purpose is to construct a new 150mm diameter PVC watermain, hydrants and valves along Scadding Avenue in East York, in the City of Toronto. A Letter of Advice on behalf of Fisheries and Oceans Canada (DFO) is not required for this project as there are no watercourse in close proximity to the project area.

Page 29: Meeting - Executive Committee · 2011. 1. 17. · Belmont Properties (Weston) Inc. 612 Huntington Landowners Group 612 ... zfuture scenario analysis to identify strategic actions

617

CFN: 44513 - Application #: 0746/10/TORReport Prepared by: Renee Afoom-Boateng, extension 5714For information contact: Renee Afoom-Boateng, extension 5714Date: December 3, 2010

EX10.42 CITY OF TORONTOTo undertake sewer and watermain or utility installation or maintenance within an existing roadway on Labatt Avenue from River Street to Bayview Avenue, in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed as located on the property owned by City of Toronto. The purpose is to construct a new 150mm diameter PVC watermain, hydrants and valves along Labatt Avenue, East York in the City of Toronto. A Letter of Advice on behalf of Fisheries and Oceans Canada (DFO) is not required for this project as the proposed work will be limited to the existing road right-of-way and located some distance from the Don River.

CFN: 44514 - Application #: 0748/10/TORReport Prepared by: Renee Afoom-Boateng, extension 5714For information contact: Renee Afoom-Boateng, extension 5714Date: December 3, 2010

EX10.43 CITY OF TORONTOTo undertake road/pathway resurfacing or reconstruction on Alder Road access to Taylor Creek Park - near O'Connor Drive and St. Clair Avenue East, in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed as located on the property owned by City of Toronto. The purpose is to remove and replace the existing Taylor Creek Stairs located near Alder Road. The proposed works will involve the installation of pre-cast cement stairs, new steel railings, and a bike trough. Due to the proximity of the proposed works in relation to Taylor Creek, a Letter of Advice on behalf of Fisheries and Oceans Canada (DFO) is not required for this project.

CFN: 44834 - Application #: 0968/10/TORReport Prepared by: Jonathan Pounder, extension 5304For information contact: Renee Afoom-Boateng, extension 5714Date: January 4, 2011

Page 30: Meeting - Executive Committee · 2011. 1. 17. · Belmont Properties (Weston) Inc. 612 Huntington Landowners Group 612 ... zfuture scenario analysis to identify strategic actions

618

REGION OF PEEL

EX10.44 REGIONAL MUNICIPALITY OF PEELTo undertake borehole investigations north from approximately King Street West along the east side of Duffy's Lane for approximately 350 m along the limits of the future proposed Bolton Arterial Road, in the Town of Caledon, Humber River Watershed, as located on property owned by the Toronto and Region Conservation Authority (TRCA) and privately owned lands which the Region of Peel has obtained permission to enter. The purpose is to undertake borehole investigations and install piezometers or monitoring wells along the proposed limits of the future Bolton Arterial Road (BAR) north from approximately King Street West along the east side of Duffy's Lane for approximately 350 m. No in-water works will take place and no fisheries timing window will be applied. A Letter of Advice written on behalf of Fisheries and Oceans Canada (DFO) will be issued for the proposed works.

CFN: 44657 - Application #: 0847/10/CALReport Prepared by: Sharon Lingertat, extension 5717For information contact: Sharon Lingertat, extension 5717Date: December 3, 2010

EX10.45 REGIONAL MUNICIPALITY OF PEELTo undertake borehole investigations approximately 920 m north of King Street West near Duffy's Lane (near the main branch of the Humber River) along the limits of the future proposed Bolton Arterial Road, in the Town of Caledon, Humber River Watershed, as located on property owned by the Toronto and Region Conservation Authority (TRCA) and privately owned lands which the Region of Peel has obtained permission to enter. The purpose is to undertake borehole investigations and install piezometers or monitoring wells along the proposed limits of the future Bolton Arterial Road (BAR) approximately 920 m north of King Street West near Duffy's Lane (close to the main branch of the Humber River). No in-water works will take place and no fisheries timing window will be applied. A Letter of Advice written on behalf of Fisheries and Oceans Canada (DFO) will be issued for the proposed works.

CFN: 44750 - Application #: 0921/10/CALReport Prepared by: Sharon Lingertat, extension 5717For information contact: Sharon Lingertat, extension 5717Date: December 3, 2010

Page 31: Meeting - Executive Committee · 2011. 1. 17. · Belmont Properties (Weston) Inc. 612 Huntington Landowners Group 612 ... zfuture scenario analysis to identify strategic actions

619

EX10.46 REGIONAL MUNICIPALITY OF PEELTo undertake borehole investigations between Duffy's Lane and Highway 50, approximately 2 km north of King Street West along the limits of the future proposed Bolton Arterial Road, in the Town of Caledon, Humber River Watershed, as located on property owned by the Toronto and Region Conservation Authority (TRCA) and privately owned lands which the Region of Peel has obtained permission to enter. The purpose is to undertake borehole investigations and install piezometers or monitoring wells along the proposed limits of the future Bolton Arterial Road (BAR) between Duffy's Lane and Highway 50, approximately 2 km north of King Street West. No in-water works will take place and no fisheries timing window will be applied. A Letter of Advice written on behalf of Fisheries and Oceans Canada (DFO) will be issued for the proposed works.

CFN: 44751 - Application #: 0922/10/CALReport Prepared by: Sharon Lingertat, extension 5717For information contact: Sharon Lingertat, extension 5717Date: December 3, 2010

EX10.47 REGIONAL MUNICIPALITY OF PEELTo undertake borehole investigations along King Street West from approximately Coleraine Drive to Queen Street, north on Queen Street to Columbia Way and along Temperance Street and Sterne Street, in the Town of Caledon, Humber River Watershed, as located on property owned by the Regional Municipality of Peel and the Town of Caledon. The purpose is to undertake borehole investigations along King Street West from approximately Coleraine Drive to Queen Street, north on Queen Street to Columbia Way and along Temperance Street and Sterne Street, in the Town of Caledon, Humber River Watershed, as located on property owned by the Regional Municipality of Peel and the Town of Caledon. No timing window will be applied to this project and a Letter of Advice on behalf of Fisheries and Oceans Canada (DFO) is not required for the proposed works.

CFN: 44862 - Application #: 0988/10/CALReport Prepared by: Sharon Lingertat, extension 5717For information contact: Sharon Lingertat, extension 5717Date: November 25, 2010

Page 32: Meeting - Executive Committee · 2011. 1. 17. · Belmont Properties (Weston) Inc. 612 Huntington Landowners Group 612 ... zfuture scenario analysis to identify strategic actions

620

TOWN OF MARKHAM

EX10.48 ENBRIDGE GAS DISTRIBUTION INC.To undertake sewer and watermain or utility watercourse by trenchless technology at 8 Cumberland Court - approx. 731 m west of Warden Avenue, in the Town of Markham, in a Regulated Area of the Rouge River Watershed as located on the property owned by Joun Tsang. The purpose is to permit the installation of a gas-line via directional drill to connect a residence at 8 Cumberland Court to the existing gas service. A Letter of Advice on behalf of Fisheries and Oceans Canada (DFO) is not required since the work will be completed in accordance with the DFO Operational Statement for High Pressure Directional Drilling and no fisheries timing window will be applied to the project.

CFN: 44696 - Application #: 0878/10/MARKReport Prepared by: Brian Storozinski, extension 5744For information contact: Brian Storozinski, extension 5744Date: November 26, 2010

PERMIT APPLICATIONS EX10.49 - EX10.67 ARE MINOR WORKS LETTER OF APPROVAL:

RES.#B171/10 - MINOR WORKS LETTER OF APPROVAL PURSUANT TO ONTARIO REGULATION 166/60

Moved by: Glenn De BaeremaekerSeconded by: Richard Whitehead

THAT minor works letter of approval granted by Toronto and Region Conservation Authority staff in accordance with applications (EX10.49 - EX10.67, inclusive), which are listed below, be received.

CARRIEDCITY OF BRAMPTON

EX10.49 109 LATANIA BOULEVARDTo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 23, Plan 43M-1761, (109 Latania Boulevard), in the City of Brampton, Humber River Watershed.

CFN: 44842 - Application #: 0969/10/BRAMReport Prepared by: Jason Wagler, extension 5743For information contact: Quentin Hanchard, extension 5324Date: December 3, 2010

Page 33: Meeting - Executive Committee · 2011. 1. 17. · Belmont Properties (Weston) Inc. 612 Huntington Landowners Group 612 ... zfuture scenario analysis to identify strategic actions

621

EX10.50 490 MAIN STREET NORTHTo change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Lot 9, Concession 1, (490 Main Street North), in the City of Brampton, Etobicoke Creek Watershed.

CFN: 44877 - Application #: 0995/10/BRAMReport Prepared by: Leilani Lee-Yates, extension 5370For information contact: Leilani Lee-Yates, extension 5370Date: December 2, 2010

CITY OF PICKERING

EX10.51 ASCOT PROPERTIES INC.To undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on , (1441 Rougemount Drive), in the City of Pickering, Petticoat Creek Watershed as located on the property owned by Ascot Properties Inc..

CFN: 44872 - Application #: 0990/10/PICKReport Prepared by: Michelle Stafford, extension 5250For information contact: Michelle Stafford, extension 5250Date: December 7, 2010

EX10.52 1825 FAIRPORT DRIVETo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on , (1825 Fairport Dirve), in the City of Pickering, Petticoat Creek Watershed.

CFN: 44954 - Application #: 1024/10/PICKReport Prepared by: Chris Jones, extension 5718For information contact: Chris Jones, extension 5718Date: December 3, 2010

CITY OF TORONTO [ETOBICOKE YORK COMMUNITY COUNCIL AREA]

EX10.53 LOGOS APOSTOLIC CHURCHTo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on , (380 Albion Road), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed as located on the property owned by Logos Apostolic Church.

Page 34: Meeting - Executive Committee · 2011. 1. 17. · Belmont Properties (Weston) Inc. 612 Huntington Landowners Group 612 ... zfuture scenario analysis to identify strategic actions

622

CFN: 44837 - Application #: 0967/10/TORReport Prepared by: Nicole Moxley, extension 5284For information contact: Steve Heuchert, extension 5311Date: November 24, 2010

EX10.54 17 THE PALISADESTo undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Lot 16, Plan M-457, (17 The Palisades), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed.

CFN: 44876 - Application #: 0994/10/TORReport Prepared by: Nicole Moxley, extension 5284For information contact: Steve Heuchert, extension 5311Date: November 24, 2010

CITY OF TORONTO [NORTH YORK COMMUNITY COUNCIL AREA]

EX10.55 CANADIAN COLLEGE OF NATUROPATHIC MEDICINETo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 15, Concession 2 EYS Part Lot 2, Plan 64R - 15916, (1255 Sheppard Avenue East), in the City of Toronto (North York Community Council Area), Don River Watershed as located on the property owned by Canadian College of Naturopathic Medicine.

CFN: 44934 - Application #: 1019/10/TORReport Prepared by: Michelle Stafford, extension 5250For information contact: Michelle Stafford, extension 5250Date: December 7, 2010

EX10.56 44 GEORGE HENRY BOULEVARDTo construct a ground floor addition or structure greater than 50 sq. m (538 sq. ft) but less than 150 sq. m (1614 sq. ft) on Lot 74, Plan 6311, (44 George Henry Boulevard), in the City of Toronto (North York Community Council Area), Don River Watershed.

CFN: 44974 - Application #: 1037/10/TORReport Prepared by: Michelle Stafford, extension 5250For information contact: Michelle Stafford, extension 5250Date: January 4, 2011

Page 35: Meeting - Executive Committee · 2011. 1. 17. · Belmont Properties (Weston) Inc. 612 Huntington Landowners Group 612 ... zfuture scenario analysis to identify strategic actions

623

EX10.57 99 CITATION DRIVETo on Lot 166, Plan M676, (99 Citation Drive), in the City of Toronto (North York Community Council Area), Don River Watershed.

CFN: 44660 - Application #: 0848/10/TORReport Prepared by: Michelle Stafford, extension 5250For information contact: Steve Heuchert, extension 5311Date: December 7, 2010

CITY OF TORONTO [SCARBOROUGH COMMUNITY COUNCIL AREA]

EX10.58 91 DUNMURRAY BOULEVARDTo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 234, Plan M1204, (91 Dunmurray Boulevard), in the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed.

CFN: 44976 - Application #: 1047/10/TORReport Prepared by: Michelle Stafford, extension 5250For information contact: Michelle Stafford, extension 5250Date: December 14, 2010

CITY OF TORONTO [TORONTO AND EAST YORK COMMUNITY COUNCIL AREA]

EX10.59 440 LAKE FRONTTo change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Lot 51, Plan 389 E, (440 Lake Front), in the City of Toronto (Toronto and East York Community Council Area), Waterfront Watershed.

CFN: 44878 - Application #: 0996/10/TORReport Prepared by: Nicole Moxley, extension 5284For information contact: Steve Heuchert, extension 5311Date: November 24, 2010

CITY OF VAUGHAN

EX10.60 85 COOKS MILL CRESCENTTo undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads), construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) and construct a ground floor addition up to 50 sq. m (538 sq. ft) on Lot 16, 17, Concession 2 Plan 65R-28995, (85 Cooks Mill Crescent), in the City of Vaughan, Don River Watershed.

Page 36: Meeting - Executive Committee · 2011. 1. 17. · Belmont Properties (Weston) Inc. 612 Huntington Landowners Group 612 ... zfuture scenario analysis to identify strategic actions

624

CFN: 45003 - Application #: 1045/10/VAUGReport Prepared by: Anthony Sun, extension 5724For information contact: June Little, extension 5756Date: December 20, 2010

EX10.61 133 MORAINE HILL DRIVETo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 42, Plan 65M4135, (133 Moraine Hill Drive), in the City of Vaughan, Don River Watershed.

CFN: 44930 - Application #: 1015/10/VAUGReport Prepared by: Anthony Sun, extension 5724For information contact: Anthony Sun, extension 5724Date: November 30, 2010

EX10.62 67 PARTRIDGE CIRCLETo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 47, Plan 65M-2115, (67 Partridge Circle), in the City of Vaughan, Humber River Watershed.

CFN: 44956 - Application #: 1026/10/VAUGReport Prepared by: Anthony Sun, extension 5724For information contact: Anthony Sun, extension 5724Date: December 20, 2010

TOWN OF CALEDON

EX10.63 15488 THE GORE ROADTo on Lot 18, Concession 3 Lot 18, Plan 43R, (15488 The Gore Road), in the Town of Caledon, Humber River Watershed.

CFN: 44955 - Application #: 1025/10/CALReport Prepared by: Jason Wagler, extension 5743For information contact: Jason Wagler, extension 5743Date: December 21, 2010

TOWN OF RICHMOND HILL

EX10.64 17 FRANK COURTTo install a swimming pool on (17 Frank Court), in the Town of Richmond Hill, Rouge River Watershed.

Page 37: Meeting - Executive Committee · 2011. 1. 17. · Belmont Properties (Weston) Inc. 612 Huntington Landowners Group 612 ... zfuture scenario analysis to identify strategic actions

625

CFN: 44442 - Application #: 0695/10/RHReport Prepared by: Jason Wagler, extension 5743For information contact: Quentin Hanchard, extension 5324Date: November 24, 2010

TOWN OF WHITCHURCH-STOUFFVILLE

EX10.65 13316 TENTH LINETo undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Lot 8, Concession 9, (13316 Tenth Line), in the Town of Whitchurch-Stouffville, Duffins Creek Watershed.

CFN: 44933 - Application #: 1018/10/WSReport Prepared by: Chris Jones, extension 5718For information contact: Chris Jones, extension 5718Date: November 30, 2010

TOWNSHIP OF UXBRIDGE

EX10.66 335 WEBB ROADTo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) and construct a ground floor addition up to 50 sq. m (538 sq. ft) on Part Lot 5, Concession 3, (335 Webb Road), in the Township of Uxbridge, Duffins Creek Watershed.

CFN: 44985 - Application #: 1042/10/UXBReport Prepared by: Chris Jones, extension 5718For information contact: Chris Jones, extension 5718Date: December 9, 2010

EX10.67 1260 CONCESSION NO. 3To construct a ground floor addition or structure greater than 50 sq. m (538 sq. ft) but less than 150 sq. m (1614 sq. ft) on Lot 2, Concession 2, (1260 Concession No. 3), in the Township of Uxbridge, Duffins Creek Watershed.

CFN: 45028 - Application #: 1063/10/UXBReport Prepared by: Chris Jones, extension 5718For information contact: Chris Jones, extension 5718Date: December 16, 2010

Page 38: Meeting - Executive Committee · 2011. 1. 17. · Belmont Properties (Weston) Inc. 612 Huntington Landowners Group 612 ... zfuture scenario analysis to identify strategic actions

626

TOWN OF MARKHAM

EX10.68 TOWN OF MARKHAMTo construct, reconstruct, erect or place a building or structure on Reesor Road between 14th Avenue and Given Road, north of Steeles Avenue East, in the Town of Markham, Rouge River Watershed as located on property owned by the Town of Markham. The purpose is to permit the rehabilitation of the existing concrete bridge. A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). The Ministry of Natural Resources (MNR) warm water fisheries timing window will apply to the works.

CFN: 45198 - Application #: 0017/11/MARKReport Prepared by: Brian Storozinski, extension 5744For information contact: Brian Storozinski, extension 5744Date: January 12, 2011

_________________________________________

TERMINATION

ON MOTION, the meeting terminated at 9:47 a.m., on Friday, January 14, 2011.

Gerri Lynn O'ConnorChair