Mejoras en los sistemas de Agua Potable y Saneamiento en San Benito, Texas
Water and Wastewater Facility Improvements in San Benito, Texas
Project Location
Ubicación del Proyecto
Population year 2000: 27,686 Population year 2025: 40,240Population growth rate: 17% between 2000-2010 14% between 2010-2025 Average Water Consumption: 126 gpcd
Infrastructure coverage:
Potable Water 100%
Sewer Collection 100%
Wastewater treatment 100%
BECC General Criteria
Criterio General de COCEF
1. Water and Wastewater Treatment 2. Project located within 62 miles of the
U.S./Mexico border3. The WTP and WWTP will provide a
secure water supply and a safe wastewater treatment to the citizens of San Benito, Texas
Background
Antecedentes
Water Treatment Plant
Background
Antecedentes
Water Treatment Plant
Project Components
Componentes del Proyecto
• Construction of a 10 MGD WTP (6 MGD first phase)
• Construction of two 16-inch transmission lines
• 1 MG elevated storage tank
• Construction of a 5 MGD WWTP ( 2.5 MGD first phase)
WTP
planta potabilizadora
Water Treatment Plant
Project Components
Componentes del proyecto
Elevated Storage Tank
Jefferson St.
Project Components
Componentes del proyecto
Wastewater Treatment Plant (lagoon)
Human Health & Environment Criteria
Criterio de Salud Humana y Medio Ambiente
1. Human Health and Environmental need
The WTP exceeded maximum permitted treatment capacity, with a resulting TNRCC issuance of an Enforcement Order. An EPA Administrative Order for violation of permitted treatment parameters for BOD and TSS has been issued for the WWTP. Existing elevated storage facilities, doesn’t meet TNRCC’s minimum standards.
Human Health & Environment Criteria
Criterio de Salud Humana y Medio Ambiente
Reported Waterborne Disease Cases (Cameron County)
Disease Cases
Year
1997 1998 1999
Amebiasis 24 20 0
Campylobacteriosis 13 12 28
Salmonelosis 41 51 48
Shigelosis 59 134 77
Hepatitis A 273 217 184
Hepatitis B 26 25 17
Hepatitis C 4 13 0
Human Health & Environment Criteria
Criterio de Salud Humana y Medio Ambiente
2. Environmental Assesment
An EID was prepared in accordance with State and Federal requirements. The USEPA reviewed the EID. The FONSI was issued on August 8, 2002.
3. Compliance with ApplicableEnvironmental and Cultural ResourceLaws and Regulations
Coordination with relevant State and Federal Agencies was made. Project approval responses were obtained from all agencies contacted. The project is in compliance with all applicable environmental and cultural resource laws and regulations.
Human Health & Environment Criteria
Criterio de Salud Humana y Medio Ambiente
Wastewater Treatment Plant discharge
Human Health & Environment Criteria
Criterio de Salud Humana y Medio Ambiente
Elevated Storage Tank
Jefferson St.
1. Appropriate Technology
Both WTP and WWTP will utilize standard treatment process. WTP will include coagulation, sedimentation, clarification, filtration, and chlorination. WWTP will be an extended aeration system adjacent to the existing lagoon.
2. O & M PlanThe consultant will be responsible for the development of the O&M manuals. These manuals will be completed prior to completion of construction. Operation personel will receive training prior to the start up of the WTP and WWTP.
3. Compliance with applicable design norms and regulations
The TNRCC and TWDB will review the design of the entire project, which must meet State design criteria. Permits will be required for both WTP and WWTP.
Technical Feasibility
Factibilidad Técnica
Technical Feasibility
Factibilidad Técnica
Existing WTP
Existing elevated storage
tank
New elevated storage tank
New WTP
Financial Feasibility
Factibilidad Financiera
Concept Amount US$ Water Treatment Plant
Elevated Storage Tank
18,069,852
3,861,447
Wastewater Treatment Plant 10,512,936
Total $32,444,235
Financial Feasibility
Factibilidad Financiera
Source Amount (US$)
%
Texas Water Development Board (loan)
BEIF construction (grant)
17,533,351 54
14,910,884 46
Total $32,444,235 100%
BEIF Transition Assistance funds $2,999,341
Financial Feasibility
Factibilidad Financiera
Single Family RatesYEAR WATER SEWER TOTAL
2003 $ 18.01 $ 15.50 $ 33.51
2004 $ 21.26 $ 16.42 $ 37.68
2005 $ 24.66 $ 17.41 $ 42.07
2006 $ 28.60 $ 18.46 $ 47.06
2007 $ 30.03 $ 19.57 $ 49.60
2008 $ 31.54 $ 20.54 $ 52.08
Average water bill 33 US$ for 8,000 gal/month
1. Comprehensive Public Participation Plan
• Steering Committee formed on January, 2002.• Public Participation Plan submitted and approved by BECC in January 2002.
2. Public Information
•Facility Plan and Step II Document available for public review at City Hall and local library 30 days prior to the first public meeting. •Committee carried out 28 presentations to local organizations. •Fact sheets available at meetings, handed to customers, and delivered via mail. •Newspaper and television coverage of project. •Public meetings held in February, June and July 2002.
Community Participation
Participación Comunitaria
Community Participation
Participación Comunitaria
Public meeting
Community Participation
Participación Comunitaria
Steering Committee
• The project complies with BECC’s definition of Sustainable Development.
Sustainable Development
Desarrollo Sustentable
2. Institutional and Human Building
• The project will build institutional capacity by the creation of fund reserves for any potential emergencies, and training to the plant operators.
3. Conformance with Applicable Local/Regional Conservation and Development Plans
•The project is in conformance with the Water and Wastewater Master Plan developed by the city in 1998. The city has a Water Conservacion and Drought Contingency Plan.
1. Definition and Principles
4. Natural Resources Conservation • The project will improve the water quality in the
discharge to the Arroyo Colorado.
5. Community Development
• The project will provide sufficient capacity to serve exisiting customers and the city will be able to manage growth within its available resources.
Staff Recommendation
Recomendación del Personal
Considering the previous information based on the project developed, BECC Staff recommends:the “Water and Wastewater Facility Improvements in San Benito, Texas” for certification
Sustainable Development
Desarrollo Sustentable
Front view of the Water Treatment Plant