Mekong River Commission 1 I. General 1. Project Information The MRC has established a unit named the Project Coordination and Monitoring Unit (PCMU) at the Planning Division of the MRCS. The responsibilities of the PCMU would be: (i) implementing Component 1, including coordination with the relevant programs and section(s) of the MRC, and (ii) serving as a secretariat to the RPSC to compile an overall progress report and organize RPSC meetings. The World Bank will support the Component 1 that would complement the current regional component of the Mekong Integrated Water Resources Management Project (M- IWRMP), being financed by the AusAID, which supports: (i) upgrading of the regional trans- boundary datasets and linked modeling; (ii) finalizing the water utilization procedures and guidelines initiated by the WUP; and (iii) supporting technical cooperation with China including developing a unified trans-boundary dataset and respective models, and publishing a joint report on the current basin status. The Component 1 of Regional Water Resources Management (estimated cost: US$7.2 million) will be financed by the WB under the APL1 for the MRCS to implement the following objectives that is to increase dialogue, cooperation and understanding on IWRM principles among the LMB countries. Implemented through MRC, the component would support: (1-1) Regional Support for Trans-boundary IWRM Dialogue. This subcomponent aims to facilitate dialogue and implementation of pilot activities that address acute trans- boundary issues involving more than one country (e.g., wetland management, Mekong Delta water resource management, water quality monitoring, and fisheries management) through engagement of the MRC. The activities would be jointly implemented by the respective concerned countries and the Mekong River Commission Secretariat (MRCS); (1-2) Support for Establishing an Approach for Environment Impact Risk and Disaster Risk Assessment in the LMB. This subcomponent supports the following two activities: (i) establishing an approach to identifying the areas vulnerable to impacts from water resources development; and (ii) starting preparation for establishing a regional database for disaster risk exposure and requirements for regional risk modelling; (1-3) (1-3) Communication Outreach. This subcomponent facilitates dialogue on and communication of IWRM principles to different stakeholders – including governments, private sector, civil society and local communities – using a range of different and adapted communications strategies; and (1-4) Project Monitoring, Facilitation and Oversight. This subcomponent includes coordination and implementation of Component 1 as well as coordination and facilitation of Components 2 and 3 to maintain the coherence and consistency of the activities in Lao PDR and Cambodia and to ensure the achievement of the overall project objective. 73673 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized
Transcript
Page 1: Mekong River Commission - World Bank · 2016-07-14 · Mekong River Commission 2 2. Date of General Procurement Notice: To be advertised in 1st Quarter of 2011. 3. Period covered

Mekong River Commission

1

I. General

1. Project Information

The MRC has established a unit named the Project Coordination and Monitoring Unit (PCMU) at

the Planning Division of the MRCS. The responsibilities of the PCMU would be: (i) implementing

Component 1, including coordination with the relevant programs and section(s) of the MRC, and

(ii) serving as a secretariat to the RPSC to compile an overall progress report and organize RPSC

meetings. The World Bank will support the Component 1 that would complement the current

regional component of the Mekong Integrated Water Resources Management Project (M-

IWRMP), being financed by the AusAID, which supports: (i) upgrading of the regional trans-

boundary datasets and linked modeling; (ii) finalizing the water utilization procedures and

guidelines initiated by the WUP; and (iii) supporting technical cooperation with China including

developing a unified trans-boundary dataset and respective models, and publishing a joint

report on the current basin status.

The Component 1 of Regional Water Resources Management (estimated cost: US$7.2 million) will be financed by the WB under the APL1 for the MRCS to implement the following objectives that is to increase dialogue, cooperation and understanding on IWRM principles among the LMB countries. Implemented through MRC, the component would support:

(1-1) Regional Support for Trans-boundary IWRM Dialogue. This subcomponent aims to

facilitate dialogue and implementation of pilot activities that address acute trans-boundary issues involving more than one country (e.g., wetland management, Mekong Delta water resource management, water quality monitoring, and fisheries management) through engagement of the MRC. The activities would be jointly implemented by the respective concerned countries and the Mekong River Commission Secretariat (MRCS);

(1-2) Support for Establishing an Approach for Environment Impact Risk and Disaster Risk Assessment in the LMB. This subcomponent supports the following two activities: (i) establishing an approach to identifying the areas vulnerable to impacts from water resources development; and (ii) starting preparation for establishing a regional database for disaster risk exposure and requirements for regional risk modelling;

(1-3) (1-3) Communication Outreach. This subcomponent facilitates dialogue on and communication of IWRM principles to different stakeholders – including governments, private sector, civil society and local communities – using a range of different and adapted communications strategies; and

(1-4) Project Monitoring, Facilitation and Oversight. This subcomponent includes coordination and implementation of Component 1 as well as coordination and facilitation of Components 2 and 3 to maintain the coherence and consistency of the activities in Lao PDR and Cambodia and to ensure the achievement of the overall project objective.

73673 P

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

ed

Page 2: Mekong River Commission - World Bank · 2016-07-14 · Mekong River Commission 2 2. Date of General Procurement Notice: To be advertised in 1st Quarter of 2011. 3. Period covered

Mekong River Commission

2

2. Date of General Procurement Notice:

To be advertised in 1st Quarter of 2011.

3. Period covered by this procurement plan: From 2011 to 2016

II. Goods and Works and non-consulting services.

1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.]

Procurement Method Prior Review Threshold

US$

Comments

1. ICB and LIB (Goods) [1] Above US$ 500,000 All

2. NCB (Goods) [1] Above US$ 100,000 First contract

3. ICB (Works) [1] Above US$ 15 million All

4. NCB (Works) [1] Above US$ 5 million All

5. (Non-Consultant Services) [1] Below US$ 100,000 First contract

[Add other methods if necessary]

[1] None expected under this project

2. Prequalification.

Not applicable.

3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines:

Not applicable

Page 3: Mekong River Commission - World Bank · 2016-07-14 · Mekong River Commission 2 2. Date of General Procurement Notice: To be advertised in 1st Quarter of 2011. 3. Period covered

Mekong River Commission

3

4. Reference to (if any) Project Operational/Procurement Manual: The Joint Committee has endorsed the use of this manual and its basic policies. Application and interpretation of this manual within the approved policies are the responsibility of the CEO under delegated authority from the Joint Committee. In the interests of efficiency, procedures may be reviewed and updated by the Secretariat on the approval of the CEO if developments or work requirements so demand. Where a policy revision is required, the approval from the JC will be obtained prior to implementation. The procurement is handled by HRS (Personnel Unit) for services offered by individual consultants and by Procurement Unit (FAS) for services offered by firms. For both type of services open and competitive recruitment is the norm. There are however exceptions possible and these are summarized below. More details are available in the Procurement Manual of the MRCS. Below are summary of the procurement. Services offered by firms: recruitment request (Purchase requisition form) is sent to FAS. Procurement method:

- Procurement Unit will obtain minimum of 3 quotations. - Procurement Unit will identify a minimum of 5 potential suppliers. - Procurement Unit will follow international tendering procedures.

Waiver of competitive bidding or above methods is possible in exceptional cases. The waiver request should be addressed to:

- CEO for all services exceeding US$ 20,000 to be submitted through Chief, FAS. - Chief, FAS for services from US$ 2,000 up to US$ 20,000. - Procurement and Contract officer for services up to US$ 2,000.

Note that if an individual consultant offers its services through a firm the procurement will be conducted according to the above methods and procedures. Services offered by individual consultants: recruitment request is sent to HRS Procurement method:

- Short term services of less than one month: single sourcing may be applied. - Short term services between one month and three months: a. Value less than US$ 1,500 per month: single sourcing may be applied. b. Value more than US$ 1,500 per month: comparison of at least three qualified

candidates is required. The candidates may be identified directly by the divisions,

Page 4: Mekong River Commission - World Bank · 2016-07-14 · Mekong River Commission 2 2. Date of General Procurement Notice: To be advertised in 1st Quarter of 2011. 3. Period covered

Mekong River Commission

4

sections or programmes, from the MRC roster or through anannouncement on MRC’s website.

- Services of more than three months: open and competitive recruitment. Waiver of competitive bidding or above methods is possible in exceptional cases. The waiver request should be addressed to:

- CEO for all services exceeding SU$ 20,000 to be submitted through Chief, FAS. - Chief, FAS for services from US$ 2,000 up to US$ 20,000. - Personnel Officer for services up to US$ 2,000.

5. Any Other Special Procurement Arrangements:

Unless otherwise agreed between the Recipient (MRCS/M-IWRMP) and the World Bank, the

MRCS will apply the MRCS internal procurement rule and regulation which is match almost

perfectly with the World Bank’s procurement manual. Some retroactive procurement can only

be carry out in prior agreement with the World Bank. Some activities are envisaged to hire

consultant to kick start the APL2 from now on which will required seed money from the world

Bank.

6. Summary of the Procurement Packages planned during the first 18

months after project effectiveness ( including those that are subject to

retroactive financing and advanced procurement)

1 2 4 5 6 7

Ref. No.

Description

Packages

Domesti

c

Preferen

ce

(yes/no)

Review

by Bank

(Prior /

Post)

Comments

A1-1-2 Demonstration

materials under

Fisheries (Lao-

Cam)

1Y=40,000

& TBD for

Year 2

Shopping

A1-1-3 Demonstration

materials under

1Y=30,000 Shopping

Page 5: Mekong River Commission - World Bank · 2016-07-14 · Mekong River Commission 2 2. Date of General Procurement Notice: To be advertised in 1st Quarter of 2011. 3. Period covered

Mekong River Commission

5

WRM

Sesan/Srepok

(Cam-VN)

& TBD for

Year 2

onwards

A1-1-4 Demonstration

materials under

wetland

management

(Lao-Thai)

1Y=30,000

& TBD for

Year 2

onwards

Shopping

A1-1-5 Demonstration

materials under

delta WRM

(Cam-VN)

1Y=30,000

& TBD for

Year 2

onwards

Shopping

B1-2-1-2 Demonstration

equipment

&mapping

analysis of

country level

assessment

1Y=30,000

& TBD for

Year 2

Shopping

D1-3-1a Computer Shopping

D1-3-1b Printing for

disseminating

information kits

on knowledge

acquired by MRC

to local

stakeholder

1Y=30,000

& TBD

onwards

Shopping

D1-3-1c Printing of

simplified kits for

member

countries

Shopping

D1-3-2 Printing

brochure

Shopping

D1-3-3a Printing of

extremely event

1Y=30,000

& TBD

Shopping

Page 6: Mekong River Commission - World Bank · 2016-07-14 · Mekong River Commission 2 2. Date of General Procurement Notice: To be advertised in 1st Quarter of 2011. 3. Period covered

Mekong River Commission

6

onwards

D1-3-3b Camera

equipment

Shopping

D1-3-3c Airtime purchase 1Y=30,000

& TBD for

year 2

onwards

Shopping

E1 Office

equipment

Shopping

III. Selection of Consultants

1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants:

Selection Method Prior Review Threshold Comments

1. Competitive Methods (Firms) Above US$ 100,000

2. Single Source (Firms) All

3. Individual Above US$ 50,000

2. Short list comprising entirely of national consultants: Short list of consultants

for services, estimated to cost less than $_300,000_equivalent per contract, may

comprise entirely of national consultants in accordance with the provisions of

paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: [including advance procurement and

retroactive financing, if applicable or delete if not applicable]

Page 7: Mekong River Commission - World Bank · 2016-07-14 · Mekong River Commission 2 2. Date of General Procurement Notice: To be advertised in 1st Quarter of 2011. 3. Period covered

Mekong River Commission

7

4. Consultancy Assignments with Selection Methods and Time Schedule

1 2 4 5 6

Ref. No.

Description of

Assignment

Packages

Review

by Bank

(Prior /

Post)

Comments

A 1-1-2 Fisheries

specialist

(Lao-Cam)

International

& Individual

selection

A1-1-3 WRM

specialist

Sesan&Srepok

(Cam-VN)

International

& Individual

selection

A1-1-4 Wetland magt

specialist

(Lao-Thai)

International

& Individual

selection

A1-1-5 Delta mangt

specialist

(Cam-VN)

International

& Individual

selection

B1-2-1a Int Consultant

for risk

assessment

approach

TBD during

the 1st year

of

implemment

ation

B1-2-1b Nat

Consultant for

National &

Individual

Page 8: Mekong River Commission - World Bank · 2016-07-14 · Mekong River Commission 2 2. Date of General Procurement Notice: To be advertised in 1st Quarter of 2011. 3. Period covered

Mekong River Commission

8

risk

assessment

approach

selection

B1-2-2a Int Consultant

for country

level baseline

assessment

International

& Individual

selection

B1-2-2b Nat

Consultant for

country level

baseline

assessment

National &

Individual

selection

B1-2-2c Nat training

consultant on

field work and

country level

assessment

National &

Individual

selection

B1-2-3a Int Consultant

for joint risk

assessment

validation and

mitigation

measure

International

& Individual

selection

B1-2-3b Nat Consulta

for joint risk

assessment

validation and

mitigation

measure

National &

Individual

selection

B1-2-3c Nat training

consultant for

joint risk

assessment

validation and

mitigation

National &

Individual

selection

Page 9: Mekong River Commission - World Bank · 2016-07-14 · Mekong River Commission 2 2. Date of General Procurement Notice: To be advertised in 1st Quarter of 2011. 3. Period covered

Mekong River Commission

9

measure

C1-2-2-1a Int Consultant

for the

preparation of

the LMB risk

model

(seed money)

International

& Individual

selection

C1-2-2-1b Int Consultant

for developing

the LMB risk

model

Y1=50,000

& TBD for

year 2

onwards

International

& Individual

selection

C1-2-2-1c Institutional

development

expert for the

risk model

Y1=50,000

& TBD for

year 2

International

& Individual

selection

C1-2-2-1d National /reg

expert for the

risk model

National &

Individual

selection

D1-3-1a Int Consultant

for

communicatio

n outreach

(Seed money)

International

& Individual

selection

D1-3-1b Int Consultant

for designing

the

knowledge

acquired by

MRCS to local

stakeholders

1Y=50,000

& TBD for

year 2

onwards

International

& Individual

selection

D1-3-1c Consultant for

writing &

International

& Individual

Page 10: Mekong River Commission - World Bank · 2016-07-14 · Mekong River Commission 2 2. Date of General Procurement Notice: To be advertised in 1st Quarter of 2011. 3. Period covered

Mekong River Commission

10

oversee

simplied inf

ormation kits

selection

D1-3-1d Int Consultant

for DVD

production

International

& Individual

selection

D1-3-1e Consultant for

preparation of

simplied

information

kits for

member

countries

International

& Individual

selection

D1-3-2a Int Consultant

for

disseminating

IWRM status

International

& Individual

selection

D1-3-2b Consultant to

oversee

brochure

preparation

International

& Individual

selection

D1-3-3a Int Consultant

for analysis &

dissemination

on the

outcome of

extremely

events

International

& Individual

selection

D1-3-3b Nat

Consultant for

analysis &

dissemination

on the

outcome of

extremely

Regional &

Individual

selection

Page 11: Mekong River Commission - World Bank · 2016-07-14 · Mekong River Commission 2 2. Date of General Procurement Notice: To be advertised in 1st Quarter of 2011. 3. Period covered

Mekong River Commission

11

events

D1-3-4a Int Consultant

for feedback

opinion from

local

stakeholders

to refine MRC

activities

1Y=40,000

& TBD for

year 2

D1-3-4b Nat

trainers/speci

alist for

feedback

opinion from

local

stakeholders

to refine MRC

activities

1Y=20,000

& TBD for

year 2

Regional &

Individual

selection

D1-3-5 M&E for the

activity of the

flood risk

model set up

Regional &

Individual

selection

E1a Project M&E

for project

coordination,

monitoring

and technical

supports

1Y=50,000

& TBD for

year 2

onwards

International

& Individual

selection

E1b Int & Reg

experts for

project

coordination,

monitoring

and technical

supports

1Y=20,000

& TBD for

year 2

onwards

International

& Individual

selection

Page 12: Mekong River Commission - World Bank · 2016-07-14 · Mekong River Commission 2 2. Date of General Procurement Notice: To be advertised in 1st Quarter of 2011. 3. Period covered

Mekong River Commission

12

F1a Riparian

coordinator

Sole source

F1b PCMU

staff/coordina

tor

Sole source


Recommended