    Project: SonicLocation: Troy, OH

    Isbell Engineering GroupEngineer: RCM

    ate: !"#$#%!!&

    Codes:

    Building Code: 2003 IBC

    Structural Concrete: ACI 318 Latest Edition

    Structural Steel: AISC ASD 9th EditionWood Framing: 1997 NDS

    Design Loads:

    1. Live Loads:

    a. Roof: 20 psf

    b. Snow: 20 psf

    c.

    Basic Wind Speed: 90 mph

    !posure: C

    "mportance Factor: 1.00

    d.

    Site Factor D

    0.284

    0.132 !"0.04

    #: #.97 $ips

    a. Ceiling $ %ec&anical at Roof: 10psf

    b. Roofing and Rigid "nsulation: 8psf

    Wind Lateral Load on Structural Frame is based on t&efollowing:

    Seismic Lateral Load on Structural Frame is based on t&efollowing:

    SDS

    SD1

    '. Dead Loads including t&e self weig&t of t&e structural elements

    and t&e

  • 7/25/2019 Meridian Id

    2/105

    Store: 1256 CHA PROJECT #: 20155

    Location: Sand Springs O!

    Codes:

    Building Code: 2009 IBC

    Structural Concrete: ACI 318 %0&

    Structural Steel: ANSI'AISC 3#0%0& 14th Edition

    Wood Framing: 200& NDS

    Design Loads:

    1. Roof Live Loads:

    a. Roof: 20 psf

    b. Snow: 10 psf

    10 psf c. Wind Lateral Load on Structural Frame is based on t&e following:

    Basic Wind Speed: 90 mph

    !posure: C

    "mportance Factor: 1.00

    d. Seismic Lateral Load on Structural Frame is based on t&e following:

    Site Factor D

    0.304

    0.1#3

    Cs: 0.047

    #: #.9#7 $ips

    a. Ceiling $ %ec&anical at Roof: 10 psf

    b. Roofing and Rigid "nsulation: 8psf

    (g)

    (f)

    SDS

    SD1

    '. Dead Loads including t&e self weig&t of t&e structural elements

    and t&e following superimposed loads:

  • 7/25/2019 Meridian Id

    3/105

    Son c Dr ve-In Bu ng: Se sm c Loa s

    Code: ASCE 7-05

    Method: Equivalent Lateral Force Procedure

    Assumptions: Site Class ! Seismic "se #roup $! S%&0'75

    "npts: Res$ts:

    SS 0%2&1 Cs 0.0467S1 0%102 V 4.4388

    Site C$ass '(se )rop "'esign Categor* +R 6%5

    " 112,t

    -eig.t &5 !ips

    'esign Categor* Ca$cs:

    +ased on S'S +ased on S'1S'S 0%/0 S'1 0%16/A O A O+ O' + OC O C O'' O ' O

    T aCt 0%02 0 1%63 0%45 0%25 1%6

    Ta 0%12&5 0%5 1%0%45 1%2

    1 1%11%25 1

    Cs Ss 0%2&1Pre$iinar* Cs 0%0642 a 1%565&7t not greater t.a 0%1&2&2nor $ess t.an 0%01//6 S8S 0%5556ina$ Cs 0%0642 S'S 0%/0/41

    9Lig.t raed a$$ss.eat.ed it. oodStrctra$ Pane$s;

    .

  • 7/25/2019 Meridian Id

    4/105

    e to ri-ge ori;* istance

    Mini.u. loa- calculations:

    (! ps3 D6 GO4, use tis as p3

    Rain on Sno8 surcarge

    oes Rain on sno8 surcarge applyF

    Is roo3 slope D 05"! in -egreesF es

    Is groun- sno8 loa- D6 %! ps3F es

    Rain on Sno8 @pplies

    Rain on Sno8 surcarge to be a--e- "

    ps6Cs=p3 BE

  • 7/25/2019 Meridian Id

    14/105

    &now oad !alculations 6Input cells

    6Output cells

    Roo3 Slope Roo3 type 0 93t

    !*(%" in53t M +!*)/

    ?lat Roo3 Sno8 Loa- @pplies ?lat Roo3 Sno8 Loa-s 9Slope less tan " -eg* 9( in53t

    B@SCE !% # &*/

    ( BTable $

    (!ps3 B?igure (

    ( BTable %

    ( BTable /

    Parapet Hgt*, H + 3t

    p36!*&=Ce=Ct=I=pgBEalues are applicable 8en .onoslope roo3 D (" -eg*

    ?or pg D %! ps3: p36I=pg , ip an- gable roo3s 85 slope D6 &!50A!*"

    ?or pg %! ps3: p36I=%! 0 6 ea>e to ri-ge ori;* istance

    Mini.u. loa- calculations:

    (! ps3 D6 GO4, use tis as p3

    Rain on Sno8 surcarge

    oes Rain on sno8 surcarge applyF

    Is roo3 slope D 05"! in -egreesF es

    Is groun- sno8 loa- D6 %! ps3F es

    Rain on Sno8 @pplies

    Rain on Sno8 surcarge to be a--e- "

    ps6Cs=p3 BE

  • 7/25/2019 Meridian Id

    15/105

    Canop* Design

    Loads:

    Dead: Roofing and Rigid "nsulation: 8psf

    Live: Roof 20psf

    Snow 12psf

    +Wind ,Lateral- 1#.2psf

    + Wind ,plift- %23.1psf

    + Refer attac&ed Wind Load Design.

    Cantilevered Column Design:

    Lateral Load:

    Wc) Canop* Widt& 14 feet

    Fs)Frame Spacing: 11 feet

    /p)/eig&t of lig&ting parapet 1.& feet

    Wind (oint Load) /p+Fs+Wind 2#7.&9 ()s

    %oment ) Wind + /eig&t of Canop* 3184.33()s*ft

    /eig&t of canop* 11.90 feet

    nbalanced Live Load %oment ) 10780 ()s*ft

    plift %oment %#229.## ()s*ft

    /ori0ontal Loading

    S!)%+1'2.3+F* 1.384 +$

    F* 4# ,si

    plift Loading

    S!)%+1'2.3+F* 2.709 +$

    F* 4# ,si

    nbalanced Live Loading

    S!)%+1'2.3+F* 4.#87 +$

    F* 4# ,si

    Sp-o! " 4.53

    6&erefore /SS 3757813 ade9uate

    in3

    in3

    in3

    in3

  • 7/25/2019 Meridian Id

    16/105

    Roof oist Design

    Loads:

    Dead: Ceiling $ %ec&anical at Roof: 10psf

    Roofing and Rigid "nsulation: 8 psf

    Live: Roof 20psf

    Snow ,;o Drift- 10psf

    Snow ,Drift- 41psf

    Wind plift %23.1psf

    oist Spacing: 2 feet

    oist Span: 23.00 feet

    C&ec< plift

    ;et uplift ),DL=WL- %12.31 psf

    oist Design plift %24.#3121 p(f

    plift at nds %283 ()s

    0eigt o3 RTJ 1&00 ()s

  • 7/25/2019 Meridian Id

    17/105

  • 7/25/2019 Meridian Id

    18/105

  • 7/25/2019 Meridian Id

    19/105

  • 7/25/2019 Meridian Id

    20/105

  • 7/25/2019 Meridian Id

    21/105

  • 7/25/2019 Meridian Id

    22/105

  • 7/25/2019 Meridian Id

    23/105

  • 7/25/2019 Meridian Id

    24/105

  • 7/25/2019 Meridian Id

    25/105

  • 7/25/2019 Meridian Id

    26/105

  • 7/25/2019 Meridian Id

    27/105

  • 7/25/2019 Meridian Id

    28/105

  • 7/25/2019 Meridian Id

    29/105

  • 7/25/2019 Meridian Id

    30/105

  • 7/25/2019 Meridian Id

    31/105

  • 7/25/2019 Meridian Id

    32/105

  • 7/25/2019 Meridian Id

    33/105

  • 7/25/2019 Meridian Id

    34/105

  • 7/25/2019 Meridian Id

    35/105

  • 7/25/2019 Meridian Id

    36/105

  • 7/25/2019 Meridian Id

    37/105

  • 7/25/2019 Meridian Id

    38/105

  • 7/25/2019 Meridian Id

    39/105

  • 7/25/2019 Meridian Id

    40/105

  • 7/25/2019 Meridian Id

    41/105

  • 7/25/2019 Meridian Id

    42/105

  • 7/25/2019 Meridian Id

    43/105

  • 7/25/2019 Meridian Id

    44/105

  • 7/25/2019 Meridian Id

    45/105

  • 7/25/2019 Meridian Id

    46/105

  • 7/25/2019 Meridian Id

    47/105

  • 7/25/2019 Meridian Id

    48/105

  • 7/25/2019 Meridian Id

    49/105

  • 7/25/2019 Meridian Id

    50/105

  • 7/25/2019 Meridian Id

    51/105

  • 7/25/2019 Meridian Id

    52/105

  • 7/25/2019 Meridian Id

    53/105

  • 7/25/2019 Meridian Id

    54/105

  • 7/25/2019 Meridian Id

    55/105

    Wood Beam Si0es

    /eader /DR1

    em)e- /pe B

    ate-ia( / ) ! EE " 1#00000 psi ((am 27#0 1& 1900000

    ) " 103& psi /im)e- 103& 207 1#00000

    ! " 207 psi 1.1& D-ation fato- in-ease

    ) " 4.& in

    d " 11.2& in

    L " 9.& ft

    DL " 18psf

    LL " 20psf

    /-i) " 11.& ft

    DL tota( " 207 p(f

    LL tota( " 230 p(f

    is " &&8.3&p(f

    /ota( Load " 99&.3& p(f

    I " &33.9 in4

    S " 94.9 in3

    A " &0.# in2

    " 11229 ft%()s

    5 " 4727.912& ()sdef(etion -atio " ('3#0

    de(ta a((o6 " 0.317 in

    f) " 1420 psi N 137 A((o6a)(e St-ess

    f! " 140 psi +$ #8 A((o6a)(e St-ess

    de(ta " 0.21 in +$

    se 4.&00 11.2& Dimensiona( Lm)e-

  • 7/25/2019 Meridian Id

    56/105

    Wood Beam Si0es

    /eader /DR'

    em)e- /pe B

    ate-ia( ) ! EE " 1900000 psi ((am 27#0 27# 1900000

    ) " 27#0 psi /im)e- 103& 207 1#00000

    ! " 27# psi 1.1& D-ation fato- in-ease

    ) " & in

    d " 13 in

    L " 12.& ft

    DL " 18psf

    LL " 20psf

    /-i) " 13.& ft

    DL tota( " 243 p(f

    LL tota( " 270 p(f

    is " 7&0p(f

    /ota( Load " 12#3 p(f

    I " 91&.4 in4

    S " 140.8 in3

    A " #&.0 in2

    " 24##8 ft%()s

    5 " 7893.7& ()sdef(etion -atio " ('3#0

    de(ta a((o6 " 0.417 in

    f) " 2102 psi +$ 7# A((o6a)(e St-ess

    f! " 182 psi +$ ## A((o6a)(e St-ess

    de(ta " 0.40 in +$

    se &.000 13.00 24%54 ((am Beam

  • 7/25/2019 Meridian Id

    57/105

    Load Bearing Stud Walls

    Loads:

    Dead: Ceiling $ %ec&anical at Roof: 10 psf

    Roofing and Rigid "nsulation: 8psf

    Live: Roof 20 psf

    Snow 10 psf

    oist Span: 23.0 feetStud Spacing: 1#.0 inhes

    Wind 20.0psf

    6ributar* >rea ,oist Span' ! stud spacing-: 1&.33

    >!ial (oint Load for Studs &83()s.

    F)(> 70.#3 psi

    33.4& psi

    %odel Stud as a Column:

    Species: D%L:2

    : 1;200;000psi

    11.00 feet

    d &.&0 inhes

    1.&0 inhes

    2034.97psi

    8&0.00psi

    1.#0

    1.00

    1.00

    1.00

    1.30

    1.00

    1.1&

    ?ravit* Loads @nl*

    .31 psi +$ 13&0.00psi

    1.1&

    1

    1

    1.1

    0.333

    #2&

    1708

    0.3##

    0.8&4

    c 0.8

    0.3Bearing on Stud Wall (lates

    1.2&

    &20psi

    #&0 psi +$

    ?ravit* Loads A Lateral Forces

    w),Wind+stud spacing- 2#.#p(f

    403ft%()s

    #39 psi +$

    Combined Stresses

    0.23 +$

    6&erfore '73 at 13 o.c. studs are acceptable.

    ft2

    FDL

    )(>

    le

    lb

    Fb) F

    b+C

    D+C

    %+C

    6+C

    L+C

    F+C

    #+C

    R

    Fb:

    CD

    C%

    C6

    CL

    CF

    C#

    CR

    Fc"")Fc""+CD+C%+C6+C(+CFFc

    "":

    CD

    C%

    C6

    CF

    C(),1AF

    cF

    c+'c-=,,1AFcFc+'c-'=,F

    cFc+c--1'

    Fc

    )Ece

    +,led-'

    Fc+)F

    c""+C

    F+C

    D+C

    %+C

    F

    Fc

    Fc+)

    ,1AFc

    Fc+-,'c- )

    Ece

    Cb )

    ,lbA2.84-l

    b

    Fcperp

    :

    Fcperp

    )Fcperp

    +C%

    +C6+C

    b

    %),w+L'G-

    fb) ,%l

    b+d'3-

    ,fcF

    c-'A,1,1=f

    cF

    c--+f

    bF

    bH1.2

  • 7/25/2019 Meridian Id

    58/105

    Load Bearing Stud Walls

    Loads:

    Dead: Ceiling $ %ec&anical at Roof: 10 psf

    Roofing and Rigid "nsulation: 8psf

    Live: Roof 20 psf

    Snow 10 psf

    oist Span: 23.0 feetStud Spacing: 114.0 inhes

    Wind 20.0psf

    6ributar* >rea ,oist Span' ! stud spacing-: #2.29

    >!ial (oint Load for Studs 23#7()s.

    F)(> 143.4# psi

    #7.9& psi

    %odel Stud as a Column:

    Species: D%L:2

    : 1;200;000psi

    11.00 feet

    d &.&0 inhes

    : of f(( ht stds " 2 3.00 inhes

    17#8.00psi

    8&0.00psi

    1.#0

    1.00

    1.00

    1.00

    1.30

    1.00

    1.00

    ?ravit* Loads @nl*

    .31 psi +$ 13&0.00psi

    1.1&

    1

    1

    1.1

    0.333

    #2&

    1708

    0.3##

    0.8&4

    c 0.8

    0.3Bearing on Stud Wall (lates

    1.12&

    &20psi

    &8& psi +$

    ?ravit* Loads A Lateral Forces

    w),Wind+stud spacing- 108.2 p(f

    1#3# ft%()s

    1298 psi +$

    Combined Stresses

    0.&7 +$

    6&erfore use '='73 full &eig&t studs openings up to I=3

    ft2

    FDL

    )(>

    le

    lb

    Fb) F

    b+C

    D+C

    %+C

    6+C

    L+C

    F+C

    #+C

    R

    Fb:

    CD

    C%

    C6

    CL

    CF

    C#

    CR

    Fc"")Fc""+CD+C%+C6+C(+CFFc

    "":

    CD

    C%

    C6

    CF

    C(),1AF

    cF

    c+'c-=,,1AFcFc+'c-'=,F

    cFc+c--1'

    Fc

    )Ece

    +,led-'

    Fc+)F

    c""+C

    F+C

    D+C

    %+C

    F

    Fc

    Fc+)

    ,1AFc

    Fc+-,'c- )

    Ece

    Cb )

    ,lbA2.84-l

    b

    Fcperp

    :

    Fcperp

    )Fcperp

    +C%

    +C6+C

    b

    %),w+L'G-

    fb) ,%l

    b+d'3-

    ,fcF

    c-'A,1,1=f

    cF

    c--+f

    bF

    bH1.2

  • 7/25/2019 Meridian Id

    59/105

    S&ear Walls $ Roof Diap&rams

    Loads:

    Dead: Roofing and Rigid "nsulation: 18psf

    Live: Roof 20psf

    Snow 10psf

    +Wind ,Walls- 1#.22psf

    +Wind ,Roof- %23.12psf

    +Wind ,(arapet- 3#.#9psf

    + Refer attac&ed Wind Load Design.

    S&ear Wall Design ,Wind = (erp to Long Direction-

    Lateral Load:

    832.22

    1G2.22

    18.17 feet

    12.&0 feet

    (arapet) &.&4 feet

    W)Widt& 4#.33 feet

    @verall S&earwall Lengt& 12.83 feet&8.&0 feet

    12.83 feet

    0.00 feet

    12.00psf

    S&ear Load at Roof Diap&ram: ,12.'4 Long S&earwall-

    ()Wind ,Walls-+6ributar* >rea 1'.55 Eips

    I3I.G' plf

    144.45 E+ft

    12. E+ft

    1'.'5 Eips

    S&ear Load at Roof Diap&ram: ,I.G8 Long S&earwall-

    6ributar* >rea ,Walls- ) ,1'+/1-+,1'+W

    1-

    6ributar* >rea ,(arapet- ) ,(arapet-+,1'+W1-

    /1)/eig&t

    /')/eig&t to Diap&ram

    L)@verall Lengt&

    L1)Lengt& of S&ear Wall

    L')Lengt& of S&ear Wall

    Fwall

    )Weig&t of Wall

    S&earflow ) (L'

    @verturning %oment ) (+/'

    Restoring %oment ) /1+2.3+DL

    tot+L

    '

    ''

    (up

    )@6%=R%L'

  • 7/25/2019 Meridian Id

    60/105

    ()Wind ,Walls-+6ributar* >rea 2.22 Eips

    JD"#2K plf

    2.22E+ft

    2.22E+ft

    2.22Eips

    6&erefore use t&e following for timber s&ear walls:

    * (rovide 148' >(> >pproved (l*wood or @SB on e!terior side of wall

    >llowable SWS for specified construction ) 355p(f

    (er 6able '823.5.1

    * (rovide 12d nails at 5o.c. edge 1' o.c. field at (l*wood s&eat&ing

    * (rovide Simpson /66'' &olddowns at eac& s&ear wall segment.

    * B* "nspection Wind governs perpindicular to long direction

    * >nc&or bolt spacing to be 22.$ inc4es

    127 Dia capactiy 8 (!!! pl3

    S&earflow ) (L'

    @verturning %oment ) (+/'

    Restoring %oment ) /1+2.3+DL

    tot+L

    '

    ''

    (up)@6%=R%L'

  • 7/25/2019 Meridian Id

    61/105

    S&ear Walls $ Roof Diap&rams

    S&ear Wall Design ,Wind = S&ort Direction-

    Lateral Load:

    1G'.G1

    131.IG

    18.17 feet

    12.&0 feet

    W)Widt& 24.00 feet

    4#.33 feet

    30.83 feet

    % feet12.00 psf

    S&ear Load at Roof Diap&ram:

    ()Wind ,Walls-+6ributar* >rea G.I1 Eips

    'GG.I5 plf

    111.84 E+ft

    5G.8I E+ft

    '.25Eips

    S&ear Wall Design ,Seismic = Long Direction-

    Lateral Load:

    Cs ) 0.04#723927

    #)Cs+W #.21 $ips

    R #.&

    1

    W 132.8 $ips

    Roof 20.0 $ips

    Walls 20.# $ips

    Stone #&.1 $ips

    Stucco 0 $ips

    6ributar* >rea ,Walls- ) ,1'+/1-+,1'+W

    1-

    6ributar* >rea ,(arapet- ) ,(arapet-+,1'+W1-

    /1)/eig&t

    /')/eig&t to Diap&ram

    L)@verall Lengt&

    L1)Lengt& of S&ear Wall

    L')Lengt& of S&ear WallF

    wall)Weig&t of Wall

    S&earflow ) %a!,(-L'

    @verturning %oment ) %a!,(-+/'

    Restoring %oment ) 2.3+DLtot

    +L1

    ''+

    (up),@6%=R%-L1

    "

  • 7/25/2019 Meridian Id

    62/105

    Snow ,'2- 27.1 $ips

    S&ear Walls $ Roof Diap&rams ,Contd-

    6&erefore use t&e following for timber s&ear walls:

    * (rovide 148' >(> >pproved (l*wood or @SB on one side of wall.

    * (rovide Gd nails at 3o.c. edge 1' o.c. field

    >llowable SWS for specified construction ) 834p(f

    (er SD(WS 6able 5.8>

    Roof Diap&ram

    %a!imum S&earflow 451 plf

    6&erefore use t&e following for pl*wood roof diap&ram:

    >llowable SWS for n=Blocllowable SWS for Bloc(> >pproved (l*wood or @SB on one side of wall.

    * (rovide 12d nails at 3o.c. edge 1' o.c. field

  • 7/25/2019 Meridian Id

    63/105

  • 7/25/2019 Meridian Id

    64/105

  • 7/25/2019 Meridian Id

    65/105

  • 7/25/2019 Meridian Id

    66/105

  • 7/25/2019 Meridian Id

    67/105

    S&ear Walls $ Roof Diap&rams

    Loads:

    Dead: Roofing and Rigid "nsulation: 18psf

    Live: Roof 20psf

    Snow 10psf

    +Wind ,Walls- 1#.22psf

    +Wind ,Roof- %23.12psf

    +Wind ,(arapet- 3#.#9psf

    + Refer attac&ed Wind Load Design.

    S&ear Wall Design ,Wind = (erp to Long Direction-

    Lateral Load:

    3G.4

    32.I'

    18.17 feet

    12.&0 feet

    (arapet) &.&4 feet

    W)Widt& 22.00 feet

    @verall S&earwall Lengt& 11.&8feet&8.&0 feet

    11.&8 feet

    0.00 feet

    12.00psf

    S&ear Load at Roof Diap&ram: ,12.'4 Long S&earwall-

    ()Wind ,Walls-+6ributar* >rea 8.84 Eips

    'GI.'1 plf

    51.GG E+ft

    G.GE+ft

    8.18Eips

    S&ear Load at Roof Diap&ram: ,I.G8 Long S&earwall-

    6ributar* >rea ,Walls- ) ,1'+/1-+,1'+W

    1-

    6ributar* >rea ,(arapet- ) ,(arapet-+,1'+W1-

    /1)/eig&t

    /')/eig&t to Diap&ram

    L)@verall Lengt&

    L1)Lengt& of S&ear Wall

    L')Lengt& of S&ear Wall

    Fwall

    )Weig&t of Wall

    S&earflow ) (L'

    @verturning %oment ) (+/'

    Restoring %oment ) /1+2.3+DL

    tot+L

    '

    ''

    (up

    )@6%=R%L'

  • 7/25/2019 Meridian Id

    68/105

    ()Wind ,Walls-+6ributar* >rea 2.22 Eips

    JD"#2K plf

    2.22E+ft

    2.22E+ft

    2.22Eips

    6&erefore use t&e following for timber s&ear walls:

    * (rovide 148' >(> >pproved (l*wood or @SB on e!terior side of wall

    >llowable SWS for specified construction ) 355p(f

    (er 6able '823.5.1

    * (rovide 12d nails at 5o.c. edge 1' o.c. field at (l*wood s&eat&ing

    * (rovide Simpson /66'' &olddowns at eac& s&ear wall segment.

    * B* "nspection Wind governs perpindicular to long direction

    * >nc&or bolt spacing to be 92.$ inc4es

    127 Dia capactiy 8 (!!! pl3

    S&earflow ) (L'

    @verturning %oment ) (+/'

    Restoring %oment ) /1+2.3+DL

    tot+L

    '

    ''

    (up)@6%=R%L'

  • 7/25/2019 Meridian Id

    69/105

    S&ear Walls $ Roof Diap&rams

    S&ear Wall Design ,Wind = S&ort Direction-

    Lateral Load:

    1G'.G1

    131.IG

    18.17 feet

    12.&0 feet

    W)Widt& 24.00 feet

    22.00 feet

    30.83 feet

    % feet12.00 psf

    S&ear Load at Roof Diap&ram:

    ()Wind ,Walls-+6ributar* >rea G.I1 Eips

    'GG.I5 plf

    111.84 E+ft

    5G.8I E+ft

    '.25Eips

    S&ear Wall Design ,Seismic = Long Direction-

    Lateral Load:

    Cs ) 0.04#723927

    #)Cs+W 4.02 $ips

    R #.&

    1

    W 8#.0 $ips

    Roof 9.& $ips

    Walls 1&.3 $ips

    Stone 48.3 $ips

    Stucco 0 $ips

    6ributar* >rea ,Walls- ) ,1'+/1-+,1'+W

    1-

    6ributar* >rea ,(arapet- ) ,(arapet-+,1'+W1-

    /1)/eig&t

    /')/eig&t to Diap&ram

    L)@verall Lengt&

    L1)Lengt& of S&ear Wall

    L')Lengt& of S&ear WallF

    wall)Weig&t of Wall

    S&earflow ) %a!,(-L'

    @verturning %oment ) %a!,(-+/'

    Restoring %oment ) 2.3+DLtot

    +L1

    ''+

    (up),@6%=R%-L1

    "

  • 7/25/2019 Meridian Id

    70/105

    Snow ,'2- 12.9 $ips

    S&ear Walls $ Roof Diap&rams ,Contd-

    6&erefore use t&e following for timber s&ear walls:

    * (rovide 148' >(> >pproved (l*wood or @SB on one side of wall.

    * (rovide Gd nails at 3o.c. edge 1' o.c. field

    >llowable SWS for specified construction ) 834p(f

    (er SD(WS 6able 5.8>

    Roof Diap&ram

    %a!imum S&earflow 153 plf

    6&erefore use t&e following for pl*wood roof diap&ram:

    >llowable SWS for n=Blocllowable SWS for Bloc(> >pproved (l*wood or @SB on one side of wall.

    * (rovide 12d nails at 3o.c. edge 1' o.c. field

  • 7/25/2019 Meridian Id

    71/105

  • 7/25/2019 Meridian Id

    72/105

  • 7/25/2019 Meridian Id

    73/105

  • 7/25/2019 Meridian Id

    74/105

  • 7/25/2019 Meridian Id

    75/105

    S&ear Walls $ Roof Diap&rams

    Loads:

    Dead: Roofing and Rigid "nsulation: 18psf

    Live: Roof 20psf

    Snow 10psf

    +Wind ,Walls- 1#.22psf

    +Wind ,Roof- %23.12psf

    +Wind ,(arapet- 3#.#9psf

    + Refer attac&ed Wind Load Design.

    S&ear Wall Design ,Wind = (erp to Long Direction-

    Lateral Load:

    I3.22

    54.54

    18.17 feet

    1#.00 feet

    (arapet) 3.79 feet

    W)Widt& 24.00 feet

    @verall S&earwall Lengt& 1#.00 feet&8.&0 feet

    1#.00 feet

    0.00 feet

    12.00psf

    S&ear Load at Roof Diap&ram: ,12.'4 Long S&earwall-

    ()Wind ,Walls-+6ributar* >rea 8.'' Eips

    '21.45 plf

    41.4I E+ft

    13.5 E+ft

    '.8'Eips

    S&ear Load at Roof Diap&ram: ,I.G8 Long S&earwall-

    6ributar* >rea ,Walls- ) ,1'+/1-+,1'+W

    1-

    6ributar* >rea ,(arapet- ) ,(arapet-+,1'+W1-

    /1)/eig&t

    /')/eig&t to Diap&ram

    L)@verall Lengt&

    L1)Lengt& of S&ear Wall

    L')Lengt& of S&ear Wall

    Fwall

    )Weig&t of Wall

    S&earflow ) (L'

    @verturning %oment ) (+/'

    Restoring %oment ) /1+2.3+DL

    tot+L

    '

    ''

    (up

    )@6%=R%L'

  • 7/25/2019 Meridian Id

    76/105

    ()Wind ,Walls-+6ributar* >rea 2.22 Eips

    JD"#2K plf

    2.22E+ft

    2.22E+ft

    2.22Eips

    6&erefore use t&e following for timber s&ear walls:

    * (rovide 148' >(> >pproved (l*wood or @SB on e!terior side of wall

    >llowable SWS for specified construction ) 355p(f

    (er 6able '823.5.1

    * (rovide 12d nails at 5o.c. edge 1' o.c. field at (l*wood s&eat&ing

    * (rovide Simpson /66'' &olddowns at eac& s&ear wall segment.

    * B* "nspection Wind governs perpindicular to long direction

    * >nc&or bolt spacing to be 96.$ inc4es

    127 Dia capactiy 8 (!!! pl3

    S&earflow ) (L'

    @verturning %oment ) (+/'

    Restoring %oment ) /1+2.3+DL

    tot+L

    '

    ''

    (up)@6%=R%L'

  • 7/25/2019 Meridian Id

    77/105

    S&ear Walls $ Roof Diap&rams

    S&ear Wall Design ,Wind = S&ort Direction-

    Lateral Load:

    '85.22

    112.I

    18.17 feet

    1#.00 feet

    W)Widt& 24.00 feet

    24.00 feet

    30.83 feet

    % feet12.00 psf

    S&ear Load at Roof Diap&ram:

    ()Wind ,Walls-+6ributar* >rea .G3 Eips

    '45.I4 plf

    1'4.3 E+ft

    5G.8I E+ft

    '.41Eips

    S&ear Wall Design ,Seismic = Long Direction-

    Lateral Load:

    Cs ) 0.04#723927

    #)Cs+W 4.20 $ips

    R #.&

    1

    W 89.8 $ips

    Roof 10.4 $ips

    Walls 1&.7 $ips

    Stone 49.7 $ips

    Stucco 0 $ips

    6ributar* >rea ,Walls- ) ,1'+/1-+,1'+W

    1-

    6ributar* >rea ,(arapet- ) ,(arapet-+,1'+W1-

    /1)/eig&t

    /')/eig&t to Diap&ram

    L)@verall Lengt&

    L1)Lengt& of S&ear Wall

    L')Lengt& of S&ear WallF

    wall)Weig&t of Wall

    S&earflow ) %a!,(-L'

    @verturning %oment ) %a!,(-+/'

    Restoring %oment ) 2.3+DLtot

    +L1

    ''+

    (up),@6%=R%-L1

    "

  • 7/25/2019 Meridian Id

    78/105

    Snow ,'2- 14.0 $ips

    S&ear Walls $ Roof Diap&rams ,Contd-

    6&erefore use t&e following for timber s&ear walls:

    * (rovide 148' >(> >pproved (l*wood or @SB on one side of wall.

    * (rovide Gd nails at 3o.c. edge 1' o.c. field

    >llowable SWS for specified construction ) 834p(f

    (er SD(WS 6able 5.8>

    Roof Diap&ram

    %a!imum S&earflow 152 plf

    6&erefore use t&e following for pl*wood roof diap&ram:

    >llowable SWS for n=Blocllowable SWS for Bloc

  • 7/25/2019 Meridian Id

    79/105

  • 7/25/2019 Meridian Id

    80/105

  • 7/25/2019 Meridian Id

    81/105

  • 7/25/2019 Meridian Id

    82/105

  • 7/25/2019 Meridian Id

    83/105

    S&ear Walls $ Roof Diap&rams

    Loads:

    Dead: Roofing and Rigid "nsulation: 18psf

    Live: Roof 20psf

    Snow 10psf

    +Wind ,Walls- 1#.22psf

    +Wind ,Roof- %23.12psf

    +Wind ,(arapet- 3#.#9psf

    + Refer attac&ed Wind Load Design.

    S&ear Wall Design ,Wind = (erp to Long Direction-

    Lateral Load:

    1.I5

    133.G4

    18.17 feet

    12.17 feet

    (arapet) &.70 feet

    W)Widt& &8.&0 feet

    @verall S&earwall Lengt& 17.#7 feet4#.33 feet

    17.#7 feet

    0.00 feet

    12.00psf

    S&ear Load at Roof Diap&ram: ,12.'4 Long S&earwall-

    ()Wind ,Walls-+6ributar* >rea I.21 Eips

    42I.G plf

    12I.32 E+ft

    '2.5' E+ft

    4.84Eips

    S&ear Load at Roof Diap&ram: ,I.G8 Long S&earwall-

    6ributar* >rea ,Walls- ) ,1'+/1-+,1'+W

    1-

    6ributar* >rea ,(arapet- ) ,(arapet-+,1'+W1-

    /1)/eig&t

    /')/eig&t to Diap&ram

    L)@verall Lengt&

    L1)Lengt& of S&ear Wall

    L')Lengt& of S&ear Wall

    Fwall

    )Weig&t of Wall

    S&earflow ) (L'

    @verturning %oment ) (+/'

    Restoring %oment ) /1+2.3+DL

    tot+L

    '

    ''

    (up

    )@6%=R%L'

  • 7/25/2019 Meridian Id

    84/105

    ()Wind ,Walls-+6ributar* >rea 2.22 Eips

    JD"#2K plf

    2.22E+ft

    2.22E+ft

    2.22Eips

    6&erefore use t&e following for timber s&ear walls:

    * (rovide 148' >(> >pproved (l*wood or @SB on e!terior side of wall

    >llowable SWS for specified construction ) 355p(f

    (er 6able '823.5.1

    * (rovide 12d nails at 5o.c. edge 1' o.c. field at (l*wood s&eat&ing

    * (rovide Simpson /66'' &olddowns at eac& s&ear wall segment.

    * B* "nspection Wind governs perpindicular to long direction

    * >nc&or bolt spacing to be 31.$ inc4es

    127 Dia capactiy 8 (!!! pl3

    S&earflow ) (L'

    @verturning %oment ) (+/'

    Restoring %oment ) /1+2.3+DL

    tot+L

    '

    ''

    (up)@6%=R%L'

  • 7/25/2019 Meridian Id

    85/105

    S&ear Walls $ Roof Diap&rams

    S&ear Wall Design ,Wind = S&ort Direction-

    Lateral Load:

    152.I'

    18'.15

    18.17 feet

    12.17 feet

    W)Widt& 24.00 feet

    &8.&0 feet

    30.83 feet

    % feet12.00 psf

    S&ear Load at Roof Diap&ram:

    ()Wind ,Walls-+6ributar* >rea .18 Eips

    '81.8I plf

    G3.G2 E+ft

    5G.8I E+ft

    1.'4Eips

    S&ear Wall Design ,Seismic = Long Direction-

    Lateral Load:

    Cs ) 0.04#723927

    #)Cs+W #.97 $ips

    R #.&

    1

    W 149.1 $ips

    Roof 2&.3 $ips

    Walls 23.2 $ips

    Stone 73.& $ips

    Stucco 0 $ips

    6ributar* >rea ,Walls- ) ,1'+/1-+,1'+W

    1-

    6ributar* >rea ,(arapet- ) ,(arapet-+,1'+W1-

    /1)/eig&t

    /')/eig&t to Diap&ram

    L)@verall Lengt&

    L1)Lengt& of S&ear Wall

    L')Lengt& of S&ear WallF

    wall)Weig&t of Wall

    S&earflow ) %a!,(-L'

    @verturning %oment ) %a!,(-+/'

    Restoring %oment ) 2.3+DLtot

    +L1

    ''+

    (up),@6%=R%-L1

    "

  • 7/25/2019 Meridian Id

    86/105

    Snow ,'2- 27.1 $ips

    S&ear Walls $ Roof Diap&rams ,Contd-

    6&erefore use t&e following for timber s&ear walls:

    * (rovide 148' >(> >pproved (l*wood or @SB on one side of wall.

    * (rovide Gd nails at 3o.c. edge 1' o.c. field

    >llowable SWS for specified construction ) 834p(f

    (er SD(WS 6able 5.8>

    Roof Diap&ram

    %a!imum S&earflow 8I' plf

    6&erefore use t&e following for pl*wood roof diap&ram:

    >llowable SWS for n=Blocllowable SWS for Bloc

  • 7/25/2019 Meridian Id

    87/105

  • 7/25/2019 Meridian Id

    88/105

  • 7/25/2019 Meridian Id

    89/105

  • 7/25/2019 Meridian Id

    90/105

  • 7/25/2019 Meridian Id

    91/105

    S&ear Walls $ Roof Diap&rams

    Loads:

    Dead: Roofing and Rigid "nsulation: 18psf

    Live: Roof 20psf

    Snow 10psf

    +Wind ,Walls- 1#.22psf

    +Wind ,Roof- %23.12psf

    +Wind ,(arapet- 3#.#9psf

    + Refer attac&ed Wind Load Design.

    S&ear Wall Design ,Wind = (erp to Long Direction- Bacrea G.34 Eips

    3G'.II plf

    114.4' E+ft

    12.42 E+ft

    I.22Eips

    S&ear Load at Roof Diap&ram: ,I.G8 Long S&earwall-

    6ributar* >rea ,Walls- ) ,1'+/1-+,1'+W

    1-

    6ributar* >rea ,(arapet- ) ,(arapet-+,1'+W1-

    /1)/eig&t

    /')/eig&t to Diap&ram

    L)@verall Lengt&

    L1)Lengt& of S&ear Wall

    L')Lengt& of S&ear Wall

    Fwall

    )Weig&t of Wall

    S&earflow ) (L'

    @verturning %oment ) (+/'

    Restoring %oment ) /1+2.3+DL

    tot+L

    '

    ''

    (up

    )@6%=R%L'

  • 7/25/2019 Meridian Id

    92/105

    ()Wind ,Walls-+6ributar* >rea 2.22 Eips

    JD"#2K plf

    2.22E+ft

    2.22E+ft

    2.22Eips

    6&erefore use t&e following for timber s&ear walls:

    * (rovide 148' >(> >pproved (l*wood or @SB on e!terior side of wall

    >llowable SWS for specified construction ) 354p(f

    (er SD(WS 6able 5.'C

    * (rovide 12d nails at 5o.c. edge 1' o.c. field at (l*wood s&eat&ing

    * (rovide Simpson /D3 &olddowns at eac& s&ear wall segment.

    * B* "nspection Wind governs perpindicular to long direction

    S&earflow ) (L'

    @verturning %oment ) (+/'

    Restoring %oment ) /1+2.3+DL

    tot+L

    '

    ''

    (up)@6%=R%L'

  • 7/25/2019 Meridian Id

    93/105

  • 7/25/2019 Meridian Id

    94/105

  • 7/25/2019 Meridian Id

    95/105

  • 7/25/2019 Meridian Id

    96/105

  • 7/25/2019 Meridian Id

    97/105

  • 7/25/2019 Meridian Id

    98/105

  • 7/25/2019 Meridian Id

    99/105

    S&ear Walls $ Roof Diap&rams

    Loads:

    Dead: Roofing and Rigid "nsulation: 18psf

    Live: Roof 20psf

    Snow 10psf

    +Wind ,Walls- 1#.22psf

    +Wind ,Roof- %23.12psf

    +Wind ,(arapet- 3#.#9psf

    + Refer attac&ed Wind Load Design.

    S&ear Wall Design ,Wind = (erp to Long Direction = #estibule end-

    Lateral Load:

    883.15

    18.17 feet

    13.3& feet(arapet) 4.82feet

    W)Widt& &8.&0 feet

    @verall S&earwall Lengt& 8.##feet

    23.00 feet

    #.33 feet

    2.33 feet

    0.00 feet

    0.00 feet

    12.00psf

    0.9#,ips

    ()Wind ,Walls-+6ributar* >rea I.82 Eips

    Sum of (ier Lengt&s ) : Walls 8 % G.33 ft

    S&earflow ) (Sum Walls 128.5I plf

    (ull=out Force ,(iers J1 $ J'-

    5G.8E+ft

    8.22 ft

    4.85 ft

    18.''E+ft

    '.8Eips

    (ull=out Force ,(iers J8 $ J5-

    2.28E+ft

    8.22 ft

    4.85 ft

    2.22E+ft

    2.21Eips

    6&erefore use t&e following for timber s&ear walls:

    *(rovide 148' >(> >pproved (l*wood or @SB on eac& side of wall

    >llowable SWS for specified construction ) I'2p(f

    (er 6able '823.5.1

    *(rovide 12d nails at 5o.c. edge 1' o.c. field at (l*wood s&eat&ing

    *(rovide SimpsonMMMMMMMMMMM &oldowns as noted on t&e plans*B* "nspection Wind governs perpindicular to long direction

    *>nc&or bolt spacing to be 22.$ inc4es

    6ributar* >rea ) ,1'+/1A (arapet-+,1'+W

    1- ft'

    /1)/eig&t

    /')/eig&t to Diap&ram

    L)@verall Lengt&

    L1)Lengt& of (ier J1

    L')Lengt& of (ier J'

    L8)Lengt& of (ier J1

    L5)Lengt& of (ier J'

    Fwall

    )Weig&t of Wall

    (Drive6&ru 6ower

    @verturning %oment ) (+/'

    /opening1

    ) Window /eig&t

    Wopening1

    ) Window Widt&

    Restoring %oment ) ,2.3+DLtot

    -+,Wopening1A

    L1AL

    '-'

    (up

    )@6%=R%Ltotal

    @verturning %oment ) (+/opening

    /opening'

    ) Window /eig&t

    Wopening') Window Widt&

    Restoring %oment ) /1+2.3+DL

    tot+,L

    8AL

    5-

    ''

    (up

    )@6%=R%Ltotal

  • 7/25/2019 Meridian Id

    100/105

    project by seet no*

    location -ate

    client job no*

    F@RC 6R>;SFR S/>RW>LL (>;L >;>LNS"S ,S/>R @;LN-

    Building 6*pe:

    Loading Direction:

    Description: Front S&earwall ;ear D6

    Load application: Wind

    5 " App(ied Load " 3#&0 :

    L " /ota( =a(( Len>th " 19.33

    ? " /ota( =a(( ?ei>ht " 13.7&

    7.00 ft 3.00 ft 3.00 ft #.33 ft 19.33

    5

    118& : #97 : #97 : 1071 :

    #.

    &2

    ft

    1&14

    :

    %1&14:

    1&14

    :

    %1&14:

    1&14

    :

    %1&14:

    13I plf '8' plf '8' plf 13I plf

    %1917 : %#97 : @ / @ C #97 : %1733 :

    %1104 : %411 : 411 : 1104 :

    @ / 1917 : @ / @ C 1733 : @ C

    1.

    &0

    ft

    +ENIN

    '5 plf '5 plf

    %1917 : %1733 :%1&14 : 1&14 :

    @ / 1917 : 1733 : @ C

    1.

    &0

    ft

    '5 plf '5 plf

    %1917 : @ C @ / %1733 :

    %192& : 411 : %411 : 192& :

    @ / 1917 : 800 : @ C @ / %77# : 1733 : @ C

    3.8

    3

    ft

    1022

    :

    %102

    2:

    1022

    :%99

    0:

    99

    0

    :

    %99

    0:14 plf '3 plf '4I plf 14 plf

    %1227 : 800 : %77# : %1109 :

    13.3& %2&9# : 2&9# :

    @ / @ C

    aimm Shea- " '5p(f

    ?eade- St-ap Load " 3I ()s

    Si(( St-ap Load " G22 ()s

    +!e-t-nin> o-e " '4I3 ()s

    aimm ?'L -atio " 2.1

  • 7/25/2019 Meridian Id

    101/105

    project by seet no*

    location -ate

    client job no*

    F@RC 6R>;SFR S/>RW>LL (>;L >;>LNS"S ,S/>R @;LN-

    Building 6*pe:

    Loading Direction:

    Description: Front S&earwall >wa* From D6

    Load application: Wind

    5 " App(ied Load " 2 :

    L " /ota( =a(( Len>th " &.34

    ? " /ota( =a(( ?ei>ht " 12.7&

    0.00 ft 2.#7 ft 2.#7 ft 0.00 ft &.34

    5

    0 : 1 : 1 : 0 :

    &.

    92

    ft

    3

    :

    %3:

    3

    :

    %3:

    3

    :

    %3:'1 plf 1 plf 1 plf '1 plf

    %1 : %1 : @ / @ C 1 : %1 :

    1#07 : %1#10 : 1#10 : %1#07 :

    @ C 1 : @ / @ C 1 : @ /

    1.

    &0

    ft

    +ENIN

    128 plf 128 plf

    %1 : %1 :%3 : 3 :

    @ / 1 : 1 : @ C

    1.

    &0

    ft

    128 plf 128 plf

    %1 : @ C @ / %1 :

    %1#13 : 1#10 : %1#10 : 1#13 :

    @ / 1 : 1 : @ C @ / %1 : 1 : @ C

    3.8

    3

    ft

    2

    :

    %2

    :2

    :

    %2

    :2

    :

    %2

    :

    5'2 plf 1 plf 1 plf 5'2 plf

    0 : 1 : %1 : 0 :

    12.7& %& : & :

    @ / @ C

    aimm Shea- " 128p(f

    ?eade- St-ap Load " 1 ()s

    Si(( St-ap Load " 1 ()s

    +!e-t-nin> o-e " 4 ()s

    aimm ?'L -atio " 8222.22 3.& ;?

  • 7/25/2019 Meridian Id

    102/105

    Concrete

    ?rade Beam Design

    Loads: ,Worst Case-

    Dead: .

    Walls 12.00 psf

    Roofing and "nsulation 10psf

    Ceiling and %ec&anical 8psf

    niform Dead Line Load ) ,S'-+,RAC-A/+W 5'4.22 plf

    S ) Span 23.00 feet

    / ) Wall /eig&t 18.17 feet

    W)Walls Weig&t 12.00 psfR)Roofing Weig&t 10psf

    C)Ceiling and %ec&anical Weig&t 8psf

    Slab ,>ssume 5=2 tributar* slab load O 142 pcf- '22.2 plf

    Stone 6rib Wall /t ,ft- ) 1#.& 3'.2 plf

    6otal Dead ) 1'4'.2

    Live:

    Roof 20psf

    Snow 20psf

    niform Live Line Load '82.2 plf

    Sn)Snow Load

    Restaurant Floor ,42A'2-psf 'G2.2 plf

    6otal Live ) 412.2 plf

    Slab Loads

    >ssume grade beam carries 5 foot tributar* load.

    ?rade Beam Design ,Contd-

    1&00psf

    25.G2 psf

    1&.0 ft

    9all

    9act

    Lgrade beam

    )

  • 7/25/2019 Meridian Id

    103/105

    % ) 41.0 ,%ft

    >s) %u,5+d- 1.2

    0.3#

    b ) grade beam widt& 30 inhes

    & ) grade beam &eig&t 12 inhesd ) grade beam dept& to centroid of steel 8.#9 inhes

    Bar Si0e J4

    : Ba-s " 4 1.'8

    6&erefore 5=J4 acceptable

    in2

    >stemp

    ) 2.2215+bd in2

    >sactual

    ) in'