MERIT Installation at CERN K. McDonald For the MERIT Collaboration April 13, 2007
Transcript
Page 1: MERIT Installation at CERNmcdonald/mumu/target/cern_04… · M. Lazzaroni. Check of Integrity of Fiberoptics using a Laser Pointer All fibers OK, tho image from fibers 1 and 3 less

MERIT Installation at CERN

K. McDonaldFor the MERIT Collaboration

April 13, 2007

Page 2: MERIT Installation at CERNmcdonald/mumu/target/cern_04… · M. Lazzaroni. Check of Integrity of Fiberoptics using a Laser Pointer All fibers OK, tho image from fibers 1 and 3 less

MERIT control room

• Located in building 272– 272 S-002– Equipped with 12 Ethernet ports (currently 4 PCs installed and 2 portable

outlets)

• Communicates with the experimental setup in TT2/A ONLY via Ethernet (no hard wires).

30th March 2007 A.Fabich, CERN AB-ATB 2

MCR

TT2A

Page 3: MERIT Installation at CERNmcdonald/mumu/target/cern_04… · M. Lazzaroni. Check of Integrity of Fiberoptics using a Laser Pointer All fibers OK, tho image from fibers 1 and 3 less

TT2A

• TT2A: Ready for goods reception.

30th March 2007 A.Fabich, CERN AB-ATB 3

Page 4: MERIT Installation at CERNmcdonald/mumu/target/cern_04… · M. Lazzaroni. Check of Integrity of Fiberoptics using a Laser Pointer All fibers OK, tho image from fibers 1 and 3 less

Magnet and Mercury System Arrive at CERN 16 May 2007

Stored in West Hall (Bldg 180/183)

Page 5: MERIT Installation at CERNmcdonald/mumu/target/cern_04… · M. Lazzaroni. Check of Integrity of Fiberoptics using a Laser Pointer All fibers OK, tho image from fibers 1 and 3 less

Cryo System Exercised in Bldg 180 via Control from Bldg 272

Test magnet with cryo systemin Bldg 180 starting 10 April.

Page 6: MERIT Installation at CERNmcdonald/mumu/target/cern_04… · M. Lazzaroni. Check of Integrity of Fiberoptics using a Laser Pointer All fibers OK, tho image from fibers 1 and 3 less

Kirk T McDonald, Princeton. M. Palm, CERN

6

HiPot Test of Magnet @ 800 V• Measure resistance

between different points (I/V measurement). Slight bending of the middle coil might cause leakage current.

• Equipment:– Power supply: Caen

N470 • Current monitor at

μA accuracy– Current meter:

Keithley 2001 • Tens of nA Coil #1 Coil #2 Coil #3

“Shorting cable”Contact points

Each coil ~ 100 GΩ, magnet ~ 30 GΩ (and “shorting cable” ~ 400 MΩ.

Page 7: MERIT Installation at CERNmcdonald/mumu/target/cern_04… · M. Lazzaroni. Check of Integrity of Fiberoptics using a Laser Pointer All fibers OK, tho image from fibers 1 and 3 less

Room-Temperature Pressure Test of Magnet to 12.5 Bar

“Antler” of pressure relief valves added.Cryostat held 12.5 bar of He gas for 1 hour.No leaks detected with sniffer.

Cryocomp valve operatorremoved from vacuum jacket for proper operation of thepressure relief valve.

Page 8: MERIT Installation at CERNmcdonald/mumu/target/cern_04… · M. Lazzaroni. Check of Integrity of Fiberoptics using a Laser Pointer All fibers OK, tho image from fibers 1 and 3 less

West Area power converter8000Adc, 1000Vdc

Converter topology 18 kV cellPower

transformers(in an oil tank)

2x4 Rectifier bridges

Passive LC filterCROWBAR

Connect midpoint of power supply to ground thru 1Ω, so magnet runs at ±350 V.

Page 9: MERIT Installation at CERNmcdonald/mumu/target/cern_04… · M. Lazzaroni. Check of Integrity of Fiberoptics using a Laser Pointer All fibers OK, tho image from fibers 1 and 3 less

Mercury “Snout” Turnbuckles Worked Loose During Transport ⇒ Snout Fell 10 cmRubber Collar Stretched by ~ 5 cm.¿Damage to the Primary Containment?

Snoutguy wiresrestored byM. Lazzaroni

Page 10: MERIT Installation at CERNmcdonald/mumu/target/cern_04… · M. Lazzaroni. Check of Integrity of Fiberoptics using a Laser Pointer All fibers OK, tho image from fibers 1 and 3 less

Check of Integrity of Fiberoptics using a Laser Pointer

All fibers OK, tho image from fibers 1 and 3less bright than those from 2 and 4.

Page 11: MERIT Installation at CERNmcdonald/mumu/target/cern_04… · M. Lazzaroni. Check of Integrity of Fiberoptics using a Laser Pointer All fibers OK, tho image from fibers 1 and 3 less

Sumptank

CV1

VT

VDHgCylinder

Secondary Containment

QD1

QD2

QD3

QD4

CV2

F1

F2

F3

Hg Containment Schematic8Feb2007

P1

T1L1

F4

B1

VV

Primary Containment Vessel Still Passes the 1-PSI Pressure Test

Removed rubber collar to inspect flexible Hg connectors. They still look good.

Top view Side view

Beam

Page 12: MERIT Installation at CERNmcdonald/mumu/target/cern_04… · M. Lazzaroni. Check of Integrity of Fiberoptics using a Laser Pointer All fibers OK, tho image from fibers 1 and 3 less

1. Baseplate on wedge

2. Solenoid on baseplate4. Wedge removed, traverse down TT2

3. Baseplate towed up slope with tractor “VOLK”

Installation of MERIT Equipment in TT2/TT2A Tunnels ~ 1 May


Recommended