Test result of Brick
Sr No.Identification
of mark
Size of brickCompressive Strength
in N / mm% of waterabsorption
L B H mm mm mm Dry bricks
1 Nil 230 x 90 x 75 5.15 10.13
2 Nil 230 x 90 x 75 5.25 10.233 Nil 230 x 90 x 75 5.25 10.12
4 Nil 230 x 90 x 75 5.00 10.08
5 Nil 230 x 90 x 75 5.15 10.12
7/28/2019 Metal and Sand 1
2/153
2
ROAD,
MIDC INDALA, GADCHIROLI. PIN CODE 442605 ( MS )
DEPARTMENT OF APPLIED MECHANICSPh. No. : (07132) 222687 email : [email protected]
No GPG/ APM/ T RTo, Date
Deputy EngineerNRHM, Gadchiroli.
Subject ; :Testing of Materials for the of C/o ofAgreement no : ------------- Nil -----------Inword no : GPG /824 Date :- 25/03/2013Reference no : NRHM/DIHFWS/1216/13 Date;- 6/03/2012Name of Agency :--------------Nil------------Testing Charges : Rs 1203/- One Thousand two hundred three only
Receipt no 9616583 Date:- 24/03/2013
(Test Result No.500)Test result of concrete cubes
Sr.
No.
Grade of
Concrete
Cube
Size of Cube
in mm
Date of
casting
Period of
curing
Compressive Strength at
28 days in
N / mm
Date
of testing
Identification
Mark
1 M-20 150 x 150 x150 20/12/2013 21 days 24.00 30/03/2013 Nil
Note;- Result pertaining to the sample received in the laboratory
Testing In charge Head of Deptt PrincipalG P Gadchiroli G P Gadchiroli G P Gadchiroli
7/28/2019 Metal and Sand 1
3/153
3
MIDC ROAD, INDALA, GADCHIROLI. PIN CODE 442605 ( MS )
DEPARTMENT OF APPLIED MECHANICSPh. No. : (07132) 222687 email : [email protected]
No GPG/ APM/ T RTo, Date
The. Junior EngineerPanchayat SamitiPauni
Subject ; :Testing of Materials for the of C/o of Cement Concrete road atPathri tah Pauni
Agreement no : B R G F. 129 Date 08/2/2012Inword no : GPG /3048/ Date31/08/2012
Reference no : P S Pauni /B RG F/155/2012 Date;- 2/04/2012Name of Agency : Grampanchayat Pathi Tah PauniTesting Charges : Rs 1933/- One Thousand Nine hundred and thirty three only
Receipt no 9616374Date 31/08/2012
(Test result no.184)Testresult of concrete cubes
Test on Metal 80mm
Sr. No. Type of test conducted Result
1. Crushing Strength 19.65 %
2. Water absorption test 0.56%
Test on Metal40mm
Sr. No. Type of test conducted Result
1. Crushing Strength 19.67 %
2. Water absorption test 0.45 %
Test on Metal20mm
Sr. No. Type of test conducted Result
1. Crushing Strength 20.38 %
2. Water absorption test 0.54 %Test on Sand
Sr.No.
Test Performed Result
1Silt Content
2.50%
Cont
7/28/2019 Metal and Sand 1
4/153
4
MIDC ROAD, INDALA, GADCHIROLI. PIN CODE 442605 ( MS )
DEPARTMENT OF APPLIED MECHANICS
Ph. No. : (07132) 222687 email : [email protected] GPG/ APM/ T R
To, DateThe. Sub Divisional EngineerZillha parishad (pw)Sub Div
BhandaraSubject ; :Testing of Materials for the work of Special repaint to m o Quantel
rbtb Staff Qtr at PHC BhuyarAgreement no : Nil --------------------Inword no : GPG /3051/ Date31/08/2012Reference no : SUB/ZP(PW)37/ Date;-28/08/201`2Name of Agency : tyoti m ss SawauiTesting Charges : Rs 1708/-one thousand seven hundred and eight only
Receipt no 9616371 Date 31/08/2012
(Test result no.185)(A) Testing of cement mosaic tiles
Sr .no Type of test conducted Result
1 Flexural Strength 51.20 N/mno22 Water absorption 7.18%
(B) Test on Metal40mm
Sr. No. Type of test conducted Result
1. Crushing Strength 18.67 %
2. Water absorption test 0.45 %
(C) Test on Sand
Sr.No.
Test Performed Result
1Fineness modulus
2.50%
Note ;- Result pertaining to the sample received in the laboratory
Testing In charge Head of Deptt Principal
7/28/2019 Metal and Sand 1
5/153
5
G P Gadchiroli G P Gadchiroli G P Gadchiroli
MIDC ROAD, INDALA, GADCHIROLI. PIN CODE 442605 ( MS )DEPARTMENT OF APPLIED MECHANICS
Ph. No. : (07132) 222687 email : [email protected]
No GPG/ APM/T RTo , Date
Sub Divisional Officer,Zilla Parishad (works)Sub Division Dhanora
Subject ; Testing of materials for the C/o of Const ofkrush Gadown at RagiAgreement no ; B./233/2013 Date:-08/02/2013
Reference no : DE/ZP/(works)140/ 2011 Date:-07/02/2013Inword no : GPG/676/Date 7/3/2013Name of Agency : -----------Nil--------Testing Charges : Rs1203/-One thousand two hundred and three only Receipt no 96164542 Date 7/3/2013
(Test result no.444)(Test result concrete cubes)
Sr.
No.
Grade of
Concrete
Cube
Size of Cube
in mm
Date of
casting
Period of
curing
Compressive
Strength at 28 days
in
N / mm
Date of
testing
Identification
Mark
1 M 20 150 x 150 x150 10/02/2013 28 days
30.00
26/03/2013 RCC Column30.11
30.66
2 M 20 150 x 150 x150 28/02/2013 28 days
31.00
26/03/2013 RCC Slab31.11
32.00
Test on Bricks
SrNo.
Identification ofmark
Size of brickCompressive Strength
in N / mm% of waterabsorptionL B H mm mm
mmDry bricks
1 Nil 230 x 90 x 75 5.15 10.09
2 Nil 230 x 90 x 75 5.25 9.98
3 Nil 230 x 90 x 75 5.25 10.78
4 Nil 230 x 90 x 75 5.00 10.08
5 Nil 230 x 90 x 75 5.15 10.12
Note;- Result pertaining to the sample received in the laboratory
Testing In charge Head of Deptt PrincipalG P Gadchiroli G P Gadchiroli G P Gadchiroli
7/28/2019 Metal and Sand 1
6/153
6
MIDC ROAD, INDALA, GADCHIROLI. PIN CODE 442605 ( MS )DEPARTMENT OF APPLIED MECHANICS
Ph. No. : (07132) 222687 email : [email protected]
No GPG/ APM/T R
To , DateDeputy Engineer
NRHM, Gadchiroli.
Subject ; Testing of materials for the C/o of Extra Delivery at SC GogaonTah& Distt, Gadchiroli
Agreement no ;---------Nil----------Reference no : NRHM/DIHWS/1377/2013 date : 19/03/2013Inword no : GPG/696/ Date 26/03/2013Name of Agency : -----------Nil--------Testing Charges : Rs. 1103/- One thousand one hundred and three only
Receipt no 96164587 Date 26/3/2013
(Test result no.483)(Test result concrete cubes)
Sr.
No.
Grade of
Concrete
Cube
Size of Cube
in mm
Date of
casting
Period of
curing
Compressive
Strength at 28 days
in
N / mm
Date of
testing
Identification
Mark
1 M 20 150 x 150 x150 9/01/2013 21 days
26.31
29/03/2013 Nil26.44
26.53
2 M 20 150 x 150 x150 9/01/2013 21 days
27.00
29.03/2013 Nil28.11
28.11
Test on Bricks
SrNo.
Identification ofmark
Size of brickCompressive Strength
in N / mm% of waterabsorptionL B H mm mm
mmDry bricks
1 Nil 230 x 90 x 75 5.35 10.39
2 Nil 230 x 90 x 75 5.48 11.12
3 Nil 230 x 90 x 75 5.48 10.98
4 Nil 230 x 90 x 75 5.35 10.95
5 Nil 230 x 90 x 75 5.15 11.00
Note;- Result pertaining to the sample received in the laboratory
Testing In charge Head of Deptt Principal
7/28/2019 Metal and Sand 1
7/153
7
G P Gadchiroli G P Gadchiroli G P Gadchiroli
MIDC ROAD, INDALA, GADCHIROLI. PIN CODE 442605 ( MSDEPARTMENT OF APPLIED MECHANICS
Ph. No. : (07132) 222687 email : [email protected]
No/GPG/APM/TR/To, Date
Deputy Engineer,NRHM, Gadchiroli
Subject ; Testing of Materials for the C/o of New Delivery and laboratory roam at PHC-Karwaffa Tah Dhanora
Agreement no ; -------------Nil--------------Reference no : NRHM/DIHFWS/8/2013 Date:- 06/03/2013Inword no : GPG/688/ Date 8/132013
Name of Agency :----------------- Nil----------Testing Charges ;Rs 2776/- Two thousand seven hundred only Receipt no 9616585 Date8/3/2013
(Test report no 484)Test result of concrete cubes
Sr.
No.
Grade of
Concrete
Cube
Size of Cube
in mm
Date of
casting
Period of
curing
Compressive
Strength at 28 days
in
N / mm
Date of
testing
Identification
Mark
1 M 20 150 x 150 x150 07/01/2013 21days
28.00
29/03/2013 Nil28.77
29.00
2 M 20 150 x 150 x150 07/01/2013 21 days
29.11
29/03/2013 Nil30.00
29.00
Test on Bricks
SrNo.
Identification ofmark
Size of brickCompressive Strength
in N / mm
% of water absorptionL B H mm mm
mmDry bricks
1 Nil 230 x 90 x 75 5.15 10.09
2 Nil 230 x 90 x 75 5.13 10.12
3 Nil 230 x 90 x 75 5.25 10.23
4 Nil 230 x 90 x 75 5.00 10.085 Nil 230 x 90 x 75 5.15 10.12
Test on Steel
Type ofsteel
NominalDiameter
mm
ActualDiameter in
mm
C/s areamm
2
SectionalWeight in
Kg/ m
TensileStress
in N/mm2
YieldStress
N / mm2
% ofElongation
MildSteel/
8 8.22 53.40 0.411 608.97 502.40 27.50
7/28/2019 Metal and Sand 1
8/153
8
TorSteel
10 10.29 60.65 0.710 600.00 495.00 27.00
Cont..
Test result of Cement :- (Ultratech )
Sr No. TestResult
1 Fineness3.00%
2 Normal Consistency31.00 %
3 Initial Setting time129 Minutes
4 Final Setting time333 Minutes
5 Soundness of Cement02 mm
6 Compressive strength at 3 days 16.00, 16.00, 16.00, N / mm
Note ;- Result pertaining to the sample received in the laboratory
Testing In charge Head of Deptt PrincipalG P Gadchiroli G P Gadchiroli G P Gadchiroli
7/28/2019 Metal and Sand 1
9/153
7/28/2019 Metal and Sand 1
10/153
10
MIDC ROAD, INDALA, GADCHIROLI. PIN CODE 442605 ( MS
DEPARTMENT OF APPLIED MECHANICSPh. No. : (07132) 222687 email : [email protected]
No/GPG/APM/TR/To, Date
Deputy Engineer,NRHM, Gadchiroli
Subject ; Testing of Materials for the C/o of Extra Delivery roam & Laboratory roam at PHC.Potegaon Tah Gadchiroli
Agreement no ; -------------Nil----------------Reference no : NRHM/DIHFWS/1217/2013 Date:- 06/03/2013Inword no : GPG/713/Date:- 11/03/2013Name of Agency :----------------- Nil----------Testing Charges ;Rs2607/- Two thousand six hundred and seven only Receipt no9616446Date11/3/13
(Test report no 449)Test result of concrete cubes
Sr.
No.
Grade of
Concrete
Cube
Size of Cube
in mm
Date of
casting
Period of
curing
Compressive
Strength at 28 days
in
N / mm
Date of
testing
Identification
Mark
1 M 20 150 x 150 x150 05/02/2013 21days
28.00
25/03/2013 Nil28.77
29.00
2 M 20 150 x 150 x150 05/02/2013 21 days
29.11
25.03/2013 Nil30.00
29.00
Test on Bricks
SrNo.
Identification ofmark
Size of brickCompressive Strength
in N / mm
% of water absorptionL B H mm mm
mmDry bricks
1 Nil 230 x 90 x 75 5.15 10.092 Nil 230 x 90 x 75 5.13 10.12
3 Nil 230 x 90 x 75 5.25 10.23
4 Nil 230 x 90 x 75 5.00 10.08
5 Nil 230 x 90 x 75 5.15 10.12
Test on Steel
Type ofsteel
NominalDiameter
mm
ActualDiameter
in mm
C/s areamm
2
SectionalWeight in
Kg/ m
TensileStress
in N/mm2
YieldStress
N / mm2
% ofElongation
7/28/2019 Metal and Sand 1
11/153
11
Mild/Steel/Tor/Steel
12 12.0 113.04 0.888 610.40 516.70 28.50
Cont.
Test result of Cement :- (Ultratech)
Sr No. TestResult
1 Fineness3.00%
2 Normal Consistency31.00 %
3 Initial Setting time129 Minutes
4 Final Setting time333 Minutes
5 Soundness of Cement02 mm
6 Compressive strength at 3 days 16.00, 16.00, 16.00, N / mm
7 Compressive strength at 7 days 32.00,33.00,33.00, N / mm
Note ;- Result pertaining to the sample received in the laboratory
Testing In charge Head of Deptt PrincipalG P Gadchiroli G P Gadchiroli G P Gadchiroli
7/28/2019 Metal and Sand 1
12/153
12
MIDC ROAD,INDALA,GADCHIROLI. PIN CODE 442605 (MS)
DEPARTMENT OF APPLIED MECHANICSPh. No. : (07132) 222687 email : [email protected]
No/GPG/APM/TR
To, Date :-Sub Divisional Officer,
Z.P.( Irrigation)Sub DivisionWadsa.
Subject ; Testing of Cement concrete for S/R toex mal tank kh no 87/88 at SalmaraTah Armori Distt, Gadchiroli
Agreement no ; -----------Nil--------Reference no ; 916/2013 Office Sub Div Engg Date :-11/03/2013Inword no : GPG/800 Date :- 15/03/2013Name of Agency : -----------Nil---------Testing Charges ; Rs585/-five hundred eighty five only Receipt no 9616568 Date15/03/2012
(Test report no. 481)Test result ofConcrete cubes
Sr.
No.
Grade of
Concrete Cube
Size of Cube
in mm
Date of
casting
Period of
curing
Compressive Strength at
28 days in
N / mm
Date of
testing
Identification
Mark
1 1:4:8 150 x 150 x150 25/06/2011 21 days
17.11
25/03/2013 Nil17.33
16.31
2 1:4:8 150 x 150 x150 25/06/2011 21 days16.44
25/03/2013 Nil16.57
16.66
3 1:4:8 150 x 150 x150 25/06/2011 21 days
16.57
25/03/2013 Nil16.6616.44
4 1:3:6 150 x 150 x150 28/02/2013 21 days
16.57
25/03/2013 Nil14.88
15.11
5 1:3:6 150 x 150 x150 28/02/2013 21 days15.02
25/03/2013 Nil15.33
15.47
6 1:3:6 150 x 150 x150 28/02/2013 21 days15.55
25/03/2013 Nil16.88
16.97
Note;- Result pertaining to the sample received in the laboratory
Testing In charge Head of Deptt PrincipalG P Gadchiroli G P Gadchiroli G P Gadchiroli
7/28/2019 Metal and Sand 1
13/153
13
MIDC ROAD,INDALA,GADCHIROLI. PIN CODE 442605 (MS)
DEPARTMENT OF APPLIED MECHANICS
Ph. No. : (07132) 222687 email : [email protected] , No/GPG/APM/TR
Sub Divisional Engineer,RWS (ZP) Sub-Division
Kurkheda
Subject ; Testing of materials for the C/o of Pipe water supply scheme at.DewulgaonTah Armori Distt, Gadchiroli
Agreement no ; ---------------Nil_----------------Reference no ; ZPGad/SDE/RWS/KUR/TB/7/2013 Date:-15/02/2013Inword no : GPG763/Date 13/03/2013Name of Agency : Villege water supply & Sanitation committee GP Dewulgaon tah Armori distt, GadchiroliTesting Charges : Rs 585/- Five hundred eighty five only Receipt 9616562 Date 13/03/2013
(Test Report on 476)
Test Result Concrete Cubes)Sr.
No.
Grade of
Concrete
Cube
Size of Cube
in mm
Date of
casting
Period of
curing
Compressive Strength at 28
days in
N / mm
Date of
testing
Identification
Mark
1 M 20 150 x 150 x150 01/02/2013 28 days
24.75
25/03/3013FoundationRing Beam
24.88
24.97
2 M-20 150 x 150 x150 07/02/201328 days
24.0025/03/3013 Reinforceme24.44
24.66
Note ;- Result pertaining to the sample received in the laboratory
Testing In charge Head of Deptt PrincipalG P Gadchiroli G P Gadchiroli G P Gadchiroli
7/28/2019 Metal and Sand 1
14/153
14
MIDC ROAD,INDALA,GADCHIROLI. PIN CODE 442605 (MS)DEPARTMENT OF APPLIED MECHANICSPh. No. : (07132) 222687 email : [email protected]
To , No/GPG/APM/TRSub Divisional Engineer,
RWS Sub Division Kurkheda
Subject ; Testing of materials for the C/o of Water supply Scheme at. Kulkuli Tah ArmoriAgreement no ; ---------------Nil_----------------Reference no ; ZPGad/SDE/RWS/KUR/TB/9/2012 date:- 25/02/2013Inword no : GPG/758/Date 13/03/2013Name of Agency : Villege water Supply & Sanitation GP Kulkuli Tah ArmoriTesting Charges : Rs 585/- Five hundred eighty five only Receipt 9616561 Date 13/03/2013
(Test Report on 470)
Test Result Concrete Cubes)Sr.
No.
Grade of
Concrete
Cube
Size of Cube
in mm
Date of
casting
Period of
curing
Compressive Strength at 28
days in
N / mm
Date of
testing
Identification
Mark
1 M 20 150 x 150 x150 15/01/2013 28 days
30.00
25/03/3013 Nil29.25
29/25
2 M-20 150 x 150 x150 25/01/201328 days
30.0025/03/3013 Nil29.00
29.21
Note ;- Result pertaining to the sample received in the laboratory
Testing In charge Head of Deptt Principal
G P Gadchiroli G P Gadchiroli G P Gadchiroli
7/28/2019 Metal and Sand 1
15/153
15
MIDC ROAD,INDALA,GADCHIROLI. PIN CODE 442605 (MS)
DEPARTMENT OF APPLIED MECHANICSPh. No. : (07132) 222687 email : [email protected]
To , No/GPG/APM/TRSub Divisional Engineer, Date:-
RWS Sub Division Kurkheda
Subject ; Testing of materials for the C/o of Water supply scheme at. Mohazari Tah:- ArmoriDistt, Gadchiroli.
Agreement no ; ---------------Nil_----------------Reference no ; ZPGad/SDE/RWS/KUR/TB/20/2012 Date:- 3/03/2013Inword no : GPG/761/Date 13/03/2013
Name of Agency : Villege water supply & Saniation committee GP. Mohazari Tah Armori Distt, GadchiroliTesting Charges : Rs 877/- eight hundred seventy seven only Receipt 9616560 Date 13/03/2013
(Test Report on 484)
Test Result Concrete Cubes)Sr.
No.
Grade of
Concrete
Cube
Size of Cube
in mm
Date of
casting
Period of
curing
Compressive Strength at 28
days in
N / mm
Date of
testing
Identification
Mark
1 M 20 150 x 150 x150 15/01/2013 28 days
30.11
26/03/2013FoundationRing Beam
30.88
31.11
2 M-20 150 x 150 x150 20/01/2013 28 days
32.00
26/03/2013 Column abovGL
32.0031.88
3 M-20 150 x 150 x150 05/02/2013 28 days
30.8826/03/2013 G L Brase32.00
31.00
Note;- Result pertaining to the sample received in the laboratory
Testing In charge Head of Deptt PrincipalG P Gadchiroli G P Gadchiroli G P Gadchiroli
7/28/2019 Metal and Sand 1
16/153
16
MIDC ROAD,INDALA,GADCHIROLI. PIN CODE 442605 (MS)
DEPARTMENT OF APPLIED MECHANICSPh. No. : (07132) 222687 email : [email protected]
To , No/GPG/APM/TRAssistant Engineer,Grade-1ZP (works) Sub Division,
AheriSubject ; Testing of materials for the C/o of Internal cement concrete road GP CC drain
At. Narayanpur G.P Narayanpur Tah SironchaAgreement no ; B-1/154/EE/ 2012-13 Date 24/2/2012
Reference no ; -------Nil--------
Inword no : GPG/ 737/Date 17/03/2012Name of Agency: Grampanchayat NarayanpurTesting Charges; Rs/-2837/- Two thousand eight hundred thirty seven only
Receipt no 9616551 Date;- 12/03/2013
(Test report of 451)
(Test result of Concrete cubes)Sr.
No.
Grade of
Concrete
Cube
Size of Cube
in mm
Date of
casting
Period of
curing
Compressive Strength at 28
days in
N / mm
Date of
testing
Identification
Mark
1 M 15 150 x 150 x150 04/02/2013 28 days
20.00
26/03/2013 Nil20.08
20,22
2 M-15 150 x 150 x150 04/02/2013 28 days
20.4426/03/2013 Nil20.66
20.80
3 M-15 150 x 150 x150 04/02/2013 28 days
20.8826/03/2013 Nil21.11
21.33
4 M-20 150 x 150 x150 07/02/2013 28 days
24.0026/03/2013 Nil24.44
24.66
5 M-20 150 x 150 x150 07/02/2013 28 days
24.7526/03/2013 Nil24.88
24.88
6 M-20 150 x 150 x150 07/02/2013 28 days
25.11
26/03/2013 Nil25.2025.20
7 M-20 150 x 150 x150 07/02/2013 28 days
25.3326/03/2013 Nil25.42
25.55
8 M-20 150 x 150 x150 07/02/2013 28 days
26.6626/03/2013 Nil26.75
27.64
Note;- Result pertaining to the sample received in the laboratory
7/28/2019 Metal and Sand 1
17/153
17
Testing In charge Head of Deptt Principal
G P Gadchiroli G P Gadchiroli G P Gadchiroli
MIDC ROAD,INDALA,GADCHIROLI. PIN CODE 442605 (MS)
DEPARTMENT OF APPLIED MECHANICSPh. No. : (07132) 222687 email : [email protected]
To , No/GPG/APM/TRAssistant Engineer,Grade-1ZP (works) Sub Division,
AheriSubject ; Testing of materials for the C/o of Internal cement concrete road GP CC drain at
Madikunta G.P Madikunta Tah Sironcha
Agreement no ; B-1/153/EE/ 2012-13 Date 24/2/2012Reference no ; -------Nil--------Inword no : GPG/ 737/Date 17/03/2012Name of Agency: Grampanchayat Madikunta.Testing Charges; Rs/-2837/- Two thousand eight hundred thirty seven only
Receipt no 9616551 Date;- 12/03/2013
(Test report of 452)
(Test result of Concrete cubes)Sr.
No.
Grade of
Concrete
Cube
Size of Cube
in mm
Date of
casting
Period of
curing
Compressive Strength at 28
days in
N / mm
Date of
testing
Identification
Mark
1 M 15 150 x 150 x150 04/02/2013 28 days20.00
25/03/2013 Nil20.08
20.22
2 M-15 150 x 150 x150 04/02/2013 28 days
20.4425/03/2013 Nil20.66
21.11
3 M-15 150 x 150 x150 04/02/2013 28 days
21.3325/03/2013 Nil21.42
21.66
4 M-20 150 x 150 x150 07/02/2013 28 days
24.0025/03/2013 Nil24.44
24.75
5 M-20 150 x 150 x150 07/02/2013 28 days
24.8825/03/2013 Nil24.97
25.18
6 M-20 150 x 150 x150 07/02/2013 28 days
25.2025/03/2013 Nil25.33
25.44
7 M-20 150 x 150 x150 07/02/2013 28 days
25.6425/03/2013 Nil25.77
25.86
8 M-20 150 x 150 x150 07/02/2013 28 days
26.0025/03/2013 Nil26.08
26.17
Note;- Result pertaining to the sample received in the laboratory
7/28/2019 Metal and Sand 1
18/153
18
Testing In charge Head of Deptt PrincipalG P Gadchiroli G P Gadchiroli G P Gadchiroli
MIDC ROAD,INDALA,GADCHIROLI. PIN CODE 442605 (MS)
DEPARTMENT OF APPLIED MECHANICSPh. No. : (07132) 222687 email : [email protected]
To , No/GPG/APM/TRAssistant Engineer(C)CCCM S.Dn.MSEDCL,
Gadchiroli
Subject ; Testing of materials for the C/o of Type III Type IV staff quarters at. 33 Ku s/s Pendri.Agreement no ; ------------Nil----------
Reference no ; AEC/CCCM/S/DN/Groli-021 Date: - 24/01/2013Inword no : GPG/ 773/Date 12/03/2012Name of Agency: ------------Nil----------Testing Charges; Rs/- 2045/- Two thousand forty five only Receipt no 9616552 Date;- 12/03/2013
(Test report of 458)
(Test result of Concrete cubes)Sr.
No.
Grade of
Concrete
Cube
Size of Cube
in mm
Date of
casting
Period of
curing
Compressive Strength at 28
days in
N / mm
Date of
testing
Identification
Mark
1 M 20 150 x 150 x150 ---- 28 days
24.00
25/03/2013 Footing24.44
24.66
2 M-20 150 x 150 x150 ---- 28 days
24.7525/03/2013 Footing24.88
24.97
3 M-20 150 x 150 x150 ---- 28 days
25.1125/03/2013 Footing25.20
25.33
4 M-20 150 x 150 x150 --- 28 days
25.3325/03/2013 Column25.42
25.45
5 M-20 150 x 150 x150 ---- 28 days
25.45
25/03/2013 Column26.3126.44
6 M-20 150 x 150 x150 ---- 28 days
26.4425/03/2013 Plinth26.53
26.33
7 M-20 150 x 150 x150 ---- 28 days
26.6625/03/2013 Plinth26.64
27.77
Note;- Result pertaining to the sample received in the laboratory
7/28/2019 Metal and Sand 1
19/153
19
Testing In charge Head of Deptt Principal
G P Gadchiroli G P Gadchiroli G P Gadchiroli
7/28/2019 Metal and Sand 1
20/153
20
MIDC ROAD,INDALA,GADCHIROLI. PIN CODE 442605 (MS)
DEPARTMENT OF APPLIED MECHANICSPh. No. : (07132) 222687 email : [email protected]
To , No/GPG/APM/TRSub Divisional Engineer Date /Public Works Sub Division
Armori
Subject ; Testing of materials for C/o of major bridge on Armori Ramala roadVR 26 in km 3/00 across Gadhavi River in taluka Armori
Agreement no ; B-129/11/ Date 25/03/2012Reference no ; S D E/PWSD 798/Armori Date 2808/2012Inword no : GPG/ 3280/date 17/09/2012Name of Agency: M/S Prashant Construction Co NagpurTesting Charges; Rs/- 675 Six hundred seventy five only Receipt no 9616387 Date;- 17/09/2012
(Test report no.xxx)
Test result of Steel
Typeof
steel
NominalDiameter
mm
ActualDiameter
in mm
C/s areamm2
SectionalWeight
inKg/ m
TensileStress
inN/mm2
Yield StressN / mm2
% ofElongation
MildSteel/Tor
Steel
10 10.29 60.65 0.710 600.00 495.00 27.00
16 16.00 201 1.578 616.92 508.95 22.50
25 24.189 459.34 3 .728 608.48 505.03 20.40
Note ;- Result pertaining to the sample received in the laboratory
Testing In charge Head of Deptt Principal
G P Gadchiroli G P Gadchiroli G P Gadchiroli
7/28/2019 Metal and Sand 1
21/153
21
MIDC ROAD,INDALA,GADCHIROLI. PIN CODE 442605 (MS)
DEPARTMENT OF APPLIED MECHANICSPh. No. : (07132) 222687 email : [email protected]
To , No/GPG/APM/TRSub Divisional Engineer Date /Z P ( Works) Sub Division
Aheri
Subject ; Testing of CC M15 cubes of PCC Drain for Improvement to Navegaon Kishtapurroad V.R.06 Km 1/00 to 1/800 Tah Aheri
Agreement no ; B1/130/2010-11 Date 25/03/12012Reference no ; Nil Inword no : GPG /APM/ 3079/Date 27/09/2012Name of Agency: Nil .Testing Charges; Rs:-1461/- One thousand for hundred and sixty one only
Receipt no 9616398 Date;- 27/09/2012
(Test report no.216)Test result on cubes
Sr.
No.
Grade of
Concrete
Cube
Size of Cube
in mm
Date of
casting
Period of
curing
Compressive
Strength at 28
days in
N / mm
Date of
testing
Identification
Mark
1 M15 150 x 150 x150 28/03/2011 28 Days
23.11
28/09/2012M 15 DNK1/1.1/2,/1/3
22.00
22.00
2 M15 150 x 150 x150 29/03/2012 28 Days
22.44
28/09/2012M15 DNK2/12/2,2/3
23.11
22.44
3 M20 150 x 150 x150 29/03/2011 28 Days
29.66
28/09/2012 M20 DNK3/1,3/2,3/3
30.00
30.00
4 M20 150 x 150 x150 30/03/2011 28 Days29.22
28/09/2012M2041,4/2,4/3.28.22
29.00
5 M15 150 x 150 x150 30/03/2011 28 Days
23.00
28/09/2012
M155/1,5/2/,5/323.00
22.88
Note ;- Result pertaining to the sample received in the laboratory
Testing In charge Head of Deptt PrincipalG P Gadchiroli G P Gadchiroli G P Gadchiroli
7/28/2019 Metal and Sand 1
22/153
22
MIDC ROAD,INDALA,GADCHIROLI. PIN CODE 442605 (MS)
DEPARTMENT OF APPLIED MECHANICSPh. No. : (07132) 222687 email : [email protected]
To , No/GPG/APM/TRSub Divisional Engineer Date /Z P ( Works) Sub Division
AheriSubject ; Testing of CC M15 cubes & CC M20 cubes for Improvement to Brukmallampalli
Approach road V.R.91 km 0/00 to 0/800 Tah AheriAgreement no ; B1/132/201011/Date:- 25/03/2011Reference no ; Nil Inword no : GPG /APM/ 3081/Date 27/09/2012Name of Agency: Nil .Testing Charges; Rs:-2337/- two thousand three hundred and thirty seven only
Receipt no 9616397 Date;- 27/09/2012(Test report no.217)
Test result on cubesSr.
No.
Grade of
Concrete
Cube
Size of Cube
in mm
Date of
casting
Period of
curing
Compressive
Strength at 28
days in
N / mm
Date of
testing
Identification
Mark
1 M15 150 x 150 x150 27/03/2011 28 Days
22.66
28/09/2012M 15 SDB1/1.1/2,/1/3
23.00
22.66
2 M15 150 x 150 x150 28/03/2011 28 Days
22.66
28/09/2012
M15 SDB
2/12/2,2/321.8821.88
3 M20 150 x 150 x150 30/03/2012 28 Days
30.00
28/09/2012 M20 SDB1/1.1/2,1/3
29.22
29.22
4 M20 150 x 150 x150 30/03/2012 28 Days
30.44
28/09/2012 M20 SDB2/1.2/2.,2/3
30.00
29.88
5 M15150 x 150 x150 18/03/2011 28 Days
22.88
28/09/2012M15 Drain1/1.1/2,1/3
23.00
23.00
6 M15 150 x 150 x150 19/03/2011 28 Days
21.88
01/10/2012
M15 Drain2/1,2/2,2/322.00
21.23
7 M15 150 x 150 x150 20/03/2011 28 Days
22.88
01/10/2012
M15 Drain3/1,3/2,,3/323.00
23.00
8 M15 150 x 150 x150 21/03/201128 Days
21.88
01/10/2012
M15 Drain4/1,4/2,4/321.88
23.00
Note ;- Result pertaining to the sample received in the laboratory
Testing In charge Head of Deptt Principal
7/28/2019 Metal and Sand 1
23/153
23
G P Gadchiroli G P Gadchiroli G P Gadchiroli
MIDC ROAD,INDALA,GADCHIROLI. PIN CODE 442605 (MS)
DEPARTMENT OF APPLIED MECHANICSPh. No. : (07132) 222687 email : [email protected]
To , No/GPG/APM/TR/2012/Sub Divisional Engineer Date /Z P ( Works) Sub Division
AheriSubject ; Testing of CCM15 cubes & M20 cubes for Improvement to Dechali harijan
Basti road V,R 53 km 0/00 to 0.700 Tah AheriAgreement no ; B1/120/2010-11 Date:- 09/03/2012Reference no ; Nil Inword no : GPG /APM/ 3083/Date 27/09/2012Name of Agency: Nil .Testing Charges; Rs;- 2045/- Two thousand and forty five only
Receipt no 9616396 Date;- 27/09/2012
(Test report no.218)Test result on cubes
Sr
.
N
o.
Grade of
Concret
e Cube
Size of Cube
in mm
Date of
casting
Period of
curing
Compressive
Strength at 28
days in
N / mm
Date of
testing
Identification
Mark
1 M15 150 x 150 x150 14/03/2011 28 Days
23.22
28/09/2012M15 SDD
1/1,1/2,1/3.23.23
22.00
2 M15 150 x 150 x150 14/03/2011 28 Days
21.88
28/09/2012M15 SDD21/,2/2,2/3
22.88
22.00
3 M15 150 x 150 x150 15/03/2011 28 Days
22.00
28/09/2012
M20 SDD1/1.1/2,1/323.00
21.88
4 M15 150 x 150 x150 15/03/2011 28 Days23.22
28/09/2012M 15 SDD4/1,4/2,4/323.00
22.00
5 M15 150 x 150 x150 16/03/2011 28 Days21.88
28/09/2012M15 SDD
5/1,5/2,5/3.21.66
22.88
6 M20 150 x 150 x150 17/03/2011 28 Days30.00
01/10/2012M20 SDD1/1,1/2,1/329.22
29.00
7 M20 150 x 150 x150 17/03/2011 28 Days30.00
01/10/2012M20 SDD2/1.2/2.2/330.00
29.88
Note ;- Result pertaining to the sample received in the laboratory
7/28/2019 Metal and Sand 1
24/153
24
Testing In charge Head of Deptt PrincipalG P Gadchiroli G P Gadchiroli G P Gadchiroli
MIDC ROAD,INDALA,GADCHIROLI. PIN CODE 442605 (MS)
DEPARTMENT OF APPLIED MECHANICSPh. No. : (07132) 222687 email : [email protected]
To , No/GPG/APM/TR/2012/Sub Divisional Engineer Date /Z.P (Works) Sub Division
AheriSubject ; Testing of Bitumen 60/70, 40mm HB Metal, O.G.P.M,C. Sample ,Murum & Sand
for Improvement to Navegaon Kishtapur Approach road V.R 06 km 1/00 to 1/800Tah Aheri
Agreement no ; B1/130/2010-11 date 25/03/2011Reference no ; Nil Inword no : GPG / 3436/Date 04/10/2012Name of Agency: Nil .Testing Charges; Rs3090/- Three thousand and ninety only Receipt no 9616400 Date;- 03/10/2012
(Test report no.222)40 mm Metal
TestSr no
Sample Test Performed Result
Sp Gravity 1.00 Gm/cc
SrNo.
Type of Test Coarse Aggragetes - 40 mm
Crushing Strength 20.83%
Impact Test 20.16%
Srno.
IS Seive SizeWeight
retained Kg
Cummulativeweight
retainedKg
Cummulativepercentage
retained
Cummulative percentagepassing
1 80 0 0 0 100
2 40 3638 3638 72.76 27.24
3 20 1362 5000 100 0
4 10 0 5000 100 0
5 4.75 0 5000 100 0
6 pan 0 5000 100 0
7/28/2019 Metal and Sand 1
25/153
25
1 Bitumen 60/70 Grade Penetration test 67.00 mm
Softening point 44c
2 O G P M CCold mix 1/200 1/600
BitumenExtraction
3.60%
3 Admixture Murum & Sand Plasticity
Index
4.60%
Note; - Result pertaining to the sample received in the laboratory
Testing In charge Head of Deptt PrincipalG P Gadchiroli G P Gadchiroli G P Gadchiroli
MIDC ROAD,INDALA,GADCHIROLI. PIN CODE 442605 (MS)
DEPARTMENT OF APPLIED MECHANICSPh. No. : (07132) 222687 email : [email protected]
To , No/GPG/APM/TRChief Officer Date /Muncipal Council
BhandaraSubject ; Testing of material for C/o & Devlopment of Sabhamadap Shed, at Smashan
Bhum Near Wainganga River under B.R.G.FAgreement no ; NilReference no : PWD/CO/MCB/1506/2012 Date 16/05/2012Inword no : GPG / 3047/Date 24/09/2012Name of Agency:Testing Charges; Rs4382/- For thousand three hundred and eighty two only
Receipt 9616392 Date 24/9/2012
(Test report no.223)Test result on Metal 80mm
Sr. No. Type of test conducted Result
1. Water absorption test 0.54%
3 Flackiness Index 8.42
Test on cubes
Sr
.
N
o.
Grade of
Concrete
Cube
Size of Cube
in mm
Date of
casting
Period
of curing
Compressive
Strength at 28
days in
N / mm
Date of
testing
Identification
Mark
1 M20 150 x 150 x150 11/04/2012 28 Days
28.66
08/10/2012 .28.66
30.00
Test on Sand
7/28/2019 Metal and Sand 1
26/153
26
Sr.No.
Test Performed Result
1Fineness Charest
2.50%
Test on cubes
Sr.
No.
Grade of
Concrete
Cube
Size of Cube
in mm
Date of
casting
Period of
curing
Compressive
Strength at 28
days in
N / mm
Date of
testing
Identificati
on Mark
11;3;6 150 x 150 x150 11/1/2012 28 Days
20.00
08/10/201218.66
18.66
Test result on concrete cubes
Sr.
No.
Grade of
Concrete
Cube
Size of Cube
in mm
Date of
casting
Period of
curing
Compressive
Strength at 28 days
in
N / mm
Date of
testing
Identifica
tion Mark
1 M-20 150 x 150 x150 16/4/2012 28 Days30.00
28/09/2012 Pile Cap30.00
29.88
2 M-20 150 x 150 x150 20/4/2012 28 Days
30.00
28/09/2012BeamRCC-
30.00
30.00
3 M-20 150 x 150 x150 24/4/2012 28 Days
29.66
28/09/2012 GollumRCC
29.66
31.00
Test on Steel
Typeof steel
NominalDiameter
mm
ActualDiameter in
mmC/s area mm
SectionalWeight in
Kg/ m
TensileStress
in N/mm2
Yield StressN / mm
2
% ofElongation
MildSteel/Tor
Steel
6 6.29 31.05 0.233 615.13 507.35 28.50
10 10.29 60.65 0.710 600.00 495.00 27.00
12 12.0 113.04 0.888 619.24 510.87 27.50
Test on Cement
SrNo.
Identification ofmark
Size of brickCompressive Strength
in N / mm% of waterabsorption
L B H mm mm mm Dry bricks
1 Nil 230 x 90 x 75 5.15 9.98
2 Nil 230 x 90 x 75 5.25 9.68
3 Nil 230 x 90 x 75 5.25 9.78
4 Nil 230 x 90 x 75 5.00 10.08
5 Nil 230 x 90 x 75 5.15 10.12
Test on Cement
7/28/2019 Metal and Sand 1
27/153
27
Sr No. Test Result
1 Fineness 4.50%
2 Normal Consistancy 31%
3 Initial Setting time 118 Minutes
4 Final Setting time 335 Minutes
5 Soundness of Cement 02 mm
6 Compressive Strength 3days 18 N / mm
7 Compressive Strength 7days 34.00 N / mm
Note; - Result pertaining to the sample received in the laboratory
Testing In charge Head of Deptt PrincipalG P Gadchiroli G P Gadchiroli G P Gadchiroli
MIDC ROAD,INDALA,GADCHIROLI. PIN CODE 442605 (MS)
DEPARTMENT OF APPLIED MECHANICSPh. No. : (07132) 222687 email: [email protected]
To , No/GPG/APM/TR/2012/Deputy Engineer Date /NRHM Gadchiroli
Subject ; Testing of material for C/o of New Delivery roam & lab roam to P.H.CPermili Tah Aheri Distt, Gadchiroli
Agreement no ; Nil
Reference no : NRHM/DIHFWS/512/Date 28/09/2012Inword no : GPG / 3081/Date 05/10/2012Name of Agency: Grampanchayat PermiliTesting Charges; Rs1821/One thousand eighty hundred and twenty-one only
Receipt 9616204 Date 05/10/2012(Test report no.224)
Test result concrete cubes
Sr.
No.
Grade of
Concrete
Size of Cube
in mm
Date of
casting
Period of
curing
Compressive
Strength at 28
Date of
testing
Identificati
on Mark
7/28/2019 Metal and Sand 1
28/153
28
Cube days in
N / mm
1 M-20 150 x 150 x150 Nil 21 Days
30.00
08/10/2012 Nil30.00
29.66
2 M-20 150 x 150 x150 Nil 21 Days
30.00
09/10/2012 Nil28.88
30.00
Test on Bricks
SrNo.
Identification ofmark
Size of brickCompressive Strength
in N / mm% of waterabsorption
L B H mm mm mm Dry bricks
1 Nil 230 x 90 x 75 5.15 9.98
2 Nil 230 x 90 x 75 5.25 9.68
3 Nil 230 x 90 x 75 5.25 9.78
4 Nil 230 x 90 x 75 5.00 10.08
5 Nil 230 x 90 x 75 5.15 10.12
Note ;- Result pertaining to the sample received in the laboratory
Testing In charge Head of Deptt PrincipalG P Gadchiroli G P Gadchiroli G P Gadchiroli
MIDC ROAD,INDALA,GADCHIROLI. PIN CODE 442605 (MS)DEPARTMENT OF APPLIED MECHANICSPh. No. : (07132) 222687 email : [email protected]
To , No/GPG/APM/TR/2012/Sub Divisional Officer Date /Z .P. (W) Sub Division
Chamorshi
Subject ; Testing of Sample for C/o of Gram Panchayat Building at MulcheraAgreement no ; B1/EEZPGAD/246/2011-12/Date 17/10/2012Reference no : SDE/cha/Z.P(works) 2012 Da.Inword no : GPG / 3476/Date 05/10/2012Name of Agency: Grampanchayat Mulchera
Testing Charges; Rs618/-Six hundred and eighteen onlyReceipt no.9616401 Date 05/10/2012(Test report no 225)Test on Bricks
Sr No.Identification of
mark
Size of brickCompressive
Strengthin N / mm % of water
absorptionL B H mm mm
mmDry bricks
1 Nil 230 x 90 x 75 5.15 9.98
2 Nil 230 x 90 x 75 5.25 9.68
7/28/2019 Metal and Sand 1
29/153
29
3 Nil 230 x 90 x 75 5.25 9.78
4 Nil 230 x 90 x 75 5.00 10.08
5 Nil 230 x 90 x 75 5.15 10.12
Note; - Result pertaining to the sample received in the laboratory
Testing In charge Head of Deptt PrincipalG P Gadchiroli G P Gadchiroli G P Gadchiroli
DC ROAD,INDALA,GADCHIROLI. PIN CODE 442605 (MS)
DEPARTMENT OF APPLIED MECHANICSPh. No. : (07132) 222687 email : [email protected]
To , No/GPG/APM/TR/2012/Sub Divisional Officer Date /Z .P .(Irrigation) Sub Division
Wadsa
Subject ; Testing of concrete cubes for S/R to exmal tank at Chihali kh no 67/68Tah Wadsa Distt, Gadchiroli
Agreement no ; B1/122/2011/Date 14/03/2011Reference no : SDO/355/2012 Date;07/08/2012Inword no : GPG / 3484/Date 06/10/2012Name of Agency: Nil--------------------Testing Charges; Rs585/- Five hundred eighty five only Receipt no 9616403 Date6/10/12
(Test report no 226)Test result of cubes
.
.
Grade of
Concrete
Cube
Size of Cube
in mm
Date of
casting
Period of
curing
Compressive
Strength at 28 days
in
N / mm
Date of
testing
Identification
Mark
7/28/2019 Metal and Sand 1
30/153
30
1;3;6 150 x 150 x150 15/5/2012 21 Days
20.00
16/10/2012 Nil21.66
21.66
1;4;8 150 x 150 x150 15/5/2012 21 Days
15.1116/10/2012 Nil16.00
16.00
Note; - Result pertaining to the sample received in the laboratory
Testing In charge Head of Deptt Principal
G P Gadchiroli G P Gadchiroli G P Gadc
DC ROAD, INDALA, GADCHIROLI. PIN CODE 442605 (MS)
DEPARTMENT OF APPLIED MECHANICSPh. No. : (07132) 222687 email : [email protected]
To , No/GPG/APM/TR/2012/Executive Engineer Date:-S.S.A.Z.P Gadchiroli
Subject ; Testing of HYSD Bar sample in Constn of K.G.B.V. at Dhanora Distt, GadchiroliAgreement no ; B1/1/2011/2012Reference no : Office of S.S.A. Z.P GadchiroliInword no : GPG /3959/Date 29/10/2012
Name of Agency: Nil--------------------Testing Charges; Rs787/-Seven hundred eighty seven only Receipt no 9616412 Date 28/10/2012
(Test report no 229)Test result of Steel
Typeof
steel
NominalDiameter
mm
ActualDiameter in
mm
C/s areamm
2
SectionalWeight in
Kg/ m
TensileStress
in N/mm2
Yield StressN / mm
2
% ofElongation
MildSteel/
8 8.22 53.40 0.411 608.97 502.40 27.50
7/28/2019 Metal and Sand 1
31/153
31
TorSteel 10 10.29 60.65 0.710 600.00 495.00 27.00
12 12.0 113.04 0.888 619.24 510.87 27.50
16 16.00 201 1.578 616.92 508.95 22.50
Note; - Result pertaining to the sample received in the laboratory
Testing In charge Head of Deptt PrincipalG P Gadchiroli G P Gadchiroli G P Gadchiroli
DC ROAD, INDALA, GADCHIROLI. PIN CODE 442605 (MS)
DEPARTMENT OF APPLIED MECHANICSPh. No. : (07132) 222687 email : [email protected]
To, No/ GPG/APM/TR/2012/Sectional Engineer Date :-Panchayat Samiti
Kurkheda
Subject ; Testing of materials for the C/o of cement concrete road at MaldugiAgreement no ; .. Nil Reference no : PSK/WD/Se/Bar /92/12/Date 22/10/2012Inword no : GPG/3366 /Date 9/10/2012Name of Agency: Grampanchayat MaldugiTesting Charges; Rs293/- Two hundred and ninety three only Receipt no 9616414 Date 29/10/12
7/28/2019 Metal and Sand 1
32/153
32
(Test report no 230)Test result of cubes
. Grade of
Concrete
Cube
Size of Cube
in mm
Date of
casting
Period of
curing
Compressive Strength
at 28 days in
N / mm
Date of
testing
Identification
Mark
M20 150 x 150 x150 3/10/2012 28 Days
30.0030/10/2012 Nil30.00
29.66
M20 150 x 150 x150 4/10/2012 28 Days
30.003010/2012 Nil28.88
30.00
Note; - Result pertaining to the sample received in the laboratory
Testing In charge Head of Deptt PrincipalG P Gadchiroli G P Gadchiroli G P Gadchiroli
MI DC ROAD, INDALA, GADCHIROLI. PIN CODE 442605 (MS)
DEPARTMENT OF APPLIED MECHANICSPh. No. : (07132) 222687 email : [email protected]
To, No/ GPG/APM/TR/2012/Sectional Engineer Date :-Panchayat Samiti
Kurkheda
Subject ; Testing of materials for the C/o of cement concrete road at ShivariAgreement no ; .. Nil Reference no : PSK/WD/SE/Bar/9/12 Date 22/10/2012Inword no : GPG/335 /Date 9/10/2012Name of Agency: Grampanchayat ShivariTesting Charges; Rs293/- Two hundred and ninety three only Receipt no 9616413 Date 29/10/12
(Test report no 231)Test result of cubes
7/28/2019 Metal and Sand 1
33/153
33
. Grade of
Concrete
Cube
Size of Cube
in mm
Date of
casting
Period of
curing
Compressive Strength
at 28 days in
N / mm
Date of
testing
Identification
Mark
M20 150 x 150 x150 11/10/2012 7 Days
30.0030/10/2012 Nil29.66
29.66
M20 150 x 150 x150 12/10/2012 7 Days30.00
3010/2012 Nil29.88
30.00
Note; - Result pertaining to the sample received in the laboratory
Testing In charge Head of Deptt PrincipalG P Gadchiroli G P Gadchiroli G P Gadchiroli
MI DC ROAD, INDALA, GADCHIROLI. PIN CODE 442605 (MS)
DEPARTMENT OF APPLIED MECHANICSPh. No. : (07132) 222687 email : [email protected]
To, No/ GPG/APM/TR/2012/The Chief OfficerMuncipal Council
Bhandara
Subject ; Testing of materials for the C/o & Development of C-C drain Kasturba GandhiWard no. 32 under I.H.S.D.P,M .C BhandaraAgreement no ; Nil Reference no : PWD /CO/MCB/3200/2012/Date 29/10/2012Inword no : GPG/4684 /Date 29/10/2012Name of Agency: NilTesting Charges; Rs 2866/- Two thousand eight hundred and sixty only
Receipt no 9616415 Date 30/10/12 s(Test report no 232)
Test result Metal Sand Steel cube80 MM Metal
Sr. No. Type of Test Result
7/28/2019 Metal and Sand 1
34/153
34
3. Flackiness Index 17 %
4. Water Absorption 0.58 %
(Test result of Metal 20MM)Sr.
No.
Type of test conducted Result
1. Flakiness Index 19.55 %
2. Water absorption test 0.55 %
Test on Cement (Ultratech )
Sr No. Test Result
1 Fineness 4.50%
2 Normal Consistency 31%
3 Initial Setting time 118 Minutes
4 Final Setting time 335 Minutes
5 Soundness of Cement 02 mm
6 Compressive Strength 3days 18 N / mm
7 Compressive Strength 7days 34.00 N / mm
Continue----
Test on Steel
Type ofsteel
NominalDiameter
mm
ActualDiameter
in mm
C/sareamm
2
SectionalWeight in
Kg/ m
TensileStress
in N/mm2
YieldStress
N / mm2
% ofElongation
MildSteel/ tor
Seel10 10.29 60.65 0.710 600.00 495.00 27.00
Test on Sand
Srno
Sieve Weightretained
Cummulative weightretained
% Cummulativeweight retained
% Cummulativeweight passing
1 4.75 15 15 0.75 99.252 2.36 40 55 2.75 97.253 1.18 210 265 13.25 86.754 600 320 585 29.25 70.755 300 1270 1855 92.75 7.256 150 130 1985 99.25 0.757 75 5 2000 100 08 Pan 0 2000 100 0
Fineness Modulus =2.38
Test on cube
7/28/2019 Metal and Sand 1
35/153
35
Sr
No.
Grade of
Concrete
Cube
Size of Cube
in mm
Date of
casting
Period of
curing
Compressive
Strength at 28
days in
N / mm
Date of
testing
Identificat
ion Mark
1 M15 150 x 150 x150 7/10/12 28 Days23.22
1/11/2012 Nil23.23
22.00
Test on cube
Sr
No.
Grade of
Concrete
Cube
Size of Cube
in mm
Date of
casting
Period of
curing
Compressive
Strength at 28
days in
N / mm
Date of
testing
Identification
Mark
1 M10 150 x 150 x1506/10/2012
28 Days16.00
1/11/2012 Nil17.6617.66
Note; - Result pertaining to the sample received in the laboratory
Testing In charge Head of Deptt PrincipalG P Gadchiroli G P Gadchiroli G P Gadchiroli
MI DC ROAD, INDALA, GADCHIROLI. PIN CODE 442605 (MS)
DEPARTMENT OF APPLIED MECHANICSPh. No. : (07132) 222687 email : [email protected]
To, No/ GPG/APM/TR/2012/
The Chief Officer Date ;-Municipal CouncilBhandara
Subject ; Testing of materials C/o & Development of C-C drain Indira GandhiWard no. 17 under I.H.S.D.P,M .C Bhandara
Agreement no ; Nil Reference no : PWD /CO/MCB/3177/2012/Date 29/10/2012Inword no : GPG/4684 /Date 29/10/2012Name of Agency: NilTesting Charges; Rs 2866/- Two thousand eight hundred and sixty only
7/28/2019 Metal and Sand 1
36/153
36
Receipt no 9616415 Date 30/10/12 s(Test report no 233)
Test result Metal Sand Steel cube80 MM Metal
Sr. No. Type of Test Result
3. Flakiness Index 17 %
4. Water Absorption 0.58 %
(Test result of Metal 20MM)
Sr. No. Type of test conducted Result
1. Flakiness Index 19.55 %
2. Water absorption test 0.55 %
Test on Cement ( Ultratech )
Sr No. Test Result
1 Fineness 4.50%
2 Normal Consistency 31%
3 Initial Setting time 118 Minutes
4 Final Setting time 335 Minutes
5 Soundness of Cement 02 mm
6 Compressive Strength 3days 18 N / mm
7 Compressive Strength 7days 34.00 N / mm
Continue----
Test on Steel
Typeof
steel
NominalDiameter
mm
ActualDiameter in
mm
C/s areamm
2
SectionalWeight in
Kg/ m
TensileStress
in N/mm2
YieldStress
N / mm2
% of Elongation
MildSteel/
torSeel
10 10.29 60.65 0.710 600.00 495.00 27.00
Test on Sand
Sr noSieve Weight
retainedCummulativeweight retained
% Cummulativeweight retained
%Cummulativeweightpassing
1 4.75 15 15 0.75 99.252 2.36 40 55 2.75 97.253 1.18 210 265 13.25 86.754 600 320 585 29.25 70.755 300 1270 1855 92.75 7.25
7/28/2019 Metal and Sand 1
37/153
37
6 150 130 1985 99.25 0.757 75 5 2000 100 08 Pan 0 2000 100 0
Fineness Modulus =2.38
Test on cube
Sr
No.
Grade of
Concrete
Cube
Size of Cube
in mm
Date of
casting
Period of
curing
Compressive
Strength at 28
days in
N / mm
Date of
testing
Identificat
ion Mark
1 M15 150 x 150 x150 7/10/2012 28 Days23.22
1/11/2012 Nil23.2322.00
Test on cube
Sr
No.
Grade of
Concrete
Cube
Size of Cube
in mm
Date of
casting
Period of
curing
Compressive
Strength at 28
days in
N / mm
Date of
testing
Identificat
ion Mark
1 M10 150 x 150 x150 6/10/2012 28 Days16.00
1/11/2012 Nil17.6617.66
Note; - Result pertaining to the sample received in the laboratory
Testing In charge Head of Deptt PrincipalG P Gadchiroli G P Gadchiroli G P Gadchiroli
MI DC ROAD, INDALA, GADCHIROLI. PIN CODE 442605 (MS)
DEPARTMENT OF APPLIED MECHANICS
Ph. No. : (07132) 222687 email : [email protected], No/ GPG/APM/TR/2012/
The Chief Officer Date ;-Municipal CouncilBhandara
Subject ; Testing of materials C/o & Development of C-C road at Kasturba Gandhi wardNo .32.Under I.H.S.D.P,M.C Bhandara
Agreement no ; Nil Reference no : PWD /CO/MCB/320/2012/Date 29/10/2012Inword no : GPG/4684 /Date 29/10/2012Name of Agency: Nil
7/28/2019 Metal and Sand 1
38/153
38
Testing Charges; Rs 2304/- Two thousand three hundred and for onlyReceipt no 9616415 Date 30/10/12
(Test report no 234)Test result of cube
Sr
No.
Grade of
Concrete
Cube
Size of Cube
in mm
Date of
casting
Period of
curing
Compressive
Strength at 28
days in
N / mm
Date of
testing
Identificat
ion Mark
1 M15 150 x 150 x150 20/10/2012 28 Days23.22
1/11/2012 Nil23.2322.00
Test on cube
Sr
No.
Grade of
Concrete
Cube
Size of Cube
in mm
Date of
casting
Period of
curing
Compressive
Strength at 28
days in
N / mm
Date of
testing
Identificat
ion Mark
1 M10 150 x 150 x150 19/10/2012 28 Days 16.00 1/11/2012 Nil17.6617.66
Test on Sand
Sr noSieve Weight
retainedCummulative
weight retained% Cummulativeweight retained
%Cummulative
weightpassing
1 4.75 15 15 0.75 99.252 2.36 40 55 2.75 97.253 1.18 210 265 13.25 86.754 600 320 585 29.25 70.755 300 1270 1855 92.75 7.256 150 130 1985 99.25 0.757 75 5 2000 100 08 Pan 0 2000 100 0
Fineness Modulus =2.38
Test on cement ( Ultratech )
Sr No. Test Result
1 Fineness 4.50%
2 Normal Consistency 31%
3 Initial Setting time 118 Minutes
4 Final Setting time 335 Minutes
5 Soundness of Cement 02 mm
6 Compressive Strength 3days 18 N / mm
7/28/2019 Metal and Sand 1
39/153
39
7 Compressive Strength 7days 34.00 N / mm
Test on Steel
Type ofsteel
NominalDiametermm
ActualDiameter inmm
C/s areamm
2
SectionalWeight inKg/ m
TensileStressin N/mm
2
YieldStressN / mm
2
% ofElongation
MildSteel / tor
Steel10 10.29 60.65 0.710 600.00 495.00 27.00
Note; - Result pertaining to the sample received in the laboratory
Testing In charge Head of Deptt PrincipalG P Gadchiroli G P Gadchiroli G P Gadchiroli
MI DC ROAD, INDALA, GADCHIROLI. PIN CODE 442605 (MS)
DEPARTMENT OF APPLIED MECHANICSPh. No. : (07132) 222687 email : [email protected]
No/ GPG/APM/TR/2012/Date ;
To,The Chief OfficerMunicipal CouncilBhandara
7/28/2019 Metal and Sand 1
40/153
40
Subject ; Testing of materials C/o & Development of C-C road at Kasturba GandhiWard No 32 under I.H.S.D.P.M.C, Bhandara
Agreement no ; Nil Reference no : PWD /CO/MCB/3202/2012/Date 29/10/2012Inword no : GPG/4684 /Date 29/10/2012Name of Agency: NilTesting Charges; Rs 955/- Nine hundred ninety five only
Receipt no 9616415 Date 30/10/12.
(Test report no 235)Test result of cube
80 MM MetalSr. No. Type of Test Result
3. Flakiness Index 17 %
4. Water Absorption 0.58 %
Test on Metal 40mm
Sr. No. Type of test conducted Result
1. Flakiness Index 18.67 %
2. Water absorption test 0.45 %
Test on Murum
Rs no Type of Sample Plasticity index
1 Soft Murum 6.92%
Note ; Result pertaining to the sample received in the laboratory.
Testing In charge Head of Deptt PrincipalG P Gadchiroli G P Gadchiroli G P Gadchiroli
MI DC ROAD, INDALA, GADCHIROLI. PIN CODE 442605 (MS)
DEPARTMENT OF APPLIED MECHANICSPh. No. : (07132) 222687 email : [email protected]
To, No/ GPG/APM/TR/2012/The Chief Officer Date ;-Muncipal Council
Gadchiroli
Subject ; Testing of materials for the C/o of Cement concrete road Babhary no.5
7/28/2019 Metal and Sand 1
41/153
41
Shri Bharodkar to Atram HouseAgreement no ; MEG/10/10/2012 Date 23/7/2012Reference no : NGP/Gadchiroli date 23/7/2012Inword no : GPG/5038/Date 31/10/2012Name of Agency: Shri K S ReddyTesting Charges; Rs 293/Two hundred ninety three only Receipt no9616416 Date 31/10/12
(Test report no 236)
Test result of cube
Sr
No.
Grade of
Concrete
Cube
Size of Cube
in mm
Date of
casting
Period of
curing
Compressive
Strength at 28
days in
N / mm
Date of
testing
Identificat
ion Mark
1 M20 150 x 150 x150 24/08/2012 28 Days29.88
7/11/2012 Nil30.0030.00
Note; - Result pertaining to the sample received in the laboratory
Testing In charge Head of Deptt PrincipalG P Gadchiroli G P Gadchiroli G P Gadchiroli
MI DC ROAD, INDALA, GADCHIROLI. PIN CODE 442605 (MS) DEPARTMENT OF APPLIED MECHANICS
Ph. No. : (07132) 222687 email : [email protected]
To, No/ GPG/APM/TR/2012/The Chief Officer Date ;-Muncipal Council
Gadchiroli
7/28/2019 Metal and Sand 1
42/153
42
Subject ; Testing of materials for the Cement Concrete road Babhry no.5 Shri Pardeshhouse to Bhangare house
Agreement no ; CGW/1011/ Date23/7/2012Reference no : NGP/Gadchiroli/1140/12 Date 23/7/2012Inword no : GPG/5039/Date 31/11/2012Name of Agency: Shri K S ReddyTesting Charges; Rs 293/Two hundred ninety three only Receipt no9616416 Date 31/10/12
(Test report no 237)Test result of cube
Sr
No.
Grade of
Concrete
Cube
Size of Cube
in mm
Date of
casting
Period of
curing
Compressive
Strength at 28
days in
N / mm
Date of
testing
Identificat
ion Mark
1 M20 150 x 150 x150 18/8/2012 28 Days29.66
7/11/2012 Nil29.8830.00
Note; - Result pertaining to the sample received in the laboratory
Testing In charge Head of Deptt PrincipalG P Gadchiroli G P Gadchiroli G P Gadchiroli
MI DC ROAD, INDALA, GADCHIROLI. PIN CODE 442605 (MS)
DEPARTMENT OF APPLIED MECHANICSPh. No. : (07132) 222687 email : [email protected]
To, No/ GPG/APM/TR/2012/
7/28/2019 Metal and Sand 1
43/153
43
The Chief Officer Date ;-Muncipal Council
Gadchiroli
Subject ; Testing of materials for the C/o Cement Concrete drain to 23Kolhe house to Bodhole house
Agreement no ; ORD/No.1092/Date 20/9/2012Reference no : NGP/Gadchiroli/1107/2012 Date 5/10/2012
Inword no : GPG/ 5063/Date 2/11/2012Name of Agency: N V GavandeTesting Charges; Rs 293/Two hundred ninety three only Receipt no9616418Date 2/11/12
(Test report no 238)Test result of cube
Sr
No.
Grade of
Concrete
Cube
Size of Cube
in mm
Date of
casting
Period of
curing
Compressive
Strength at 28
days in
N / mm
Date of
testing
Identificat
ion Mark
1 M15 150 x 150 x150 1/11/2012 28 Days21.00
7/11/2012 Nil21.0022.00
Note; - Result pertaining to the sample received in the laboratory
Testing In charge Head of Deptt Principal
G P Gadchiroli G P Gadchiroli G P Gadchiroli
MI DC ROAD, INDALA, GADCHIROLI. PIN CODE 442605 (MS)
DEPARTMENT OF APPLIED MECHANICSPh. No. : (07132) 222687 email : [email protected]
7/28/2019 Metal and Sand 1
44/153
44
To, No/ GPG/APM/TR/2012/The Chief Officer Date ;-Muncipal Council
Gadchiroli
Subject ; Testing of materials for the Cement concrete drain ward No.18from Kalash Dhandre to tijare house under M C God
Agreement no ; Order/ no. 1093 Date 20/9/2012
Reference no : NGP/Gadchiroli/1106/2012 Date 5/10/2012Inword no : GPG/ 5064/Date 2/11/2012Name of Agency: NilTesting Charges; Rs 585/Five hundred eighty five only Receipt no9616419Date 2/11/12
(Test report no 239)Test result of cube
Sr
No.
Grade of
Concrete
Cube
Size of Cube
in mm
Date of
casting
Period of
curing
Compressive
Strength at 28
days in
N / mm
Date of
testing
Identificat
ion Mark
1 M15 150 x 150 x150 9/10/2012 28 Days21.00
7/11/2012 Nil21.0022.00
2 M15 150x150x150 1/10/2012 28Days21.00
7/11/2012 Nil22.6623.00
Note; - Result pertaining to the sample received in the laboratory
Testing In charge Head of Deptt PrincipalG P Gadchiroli G P Gadchiroli G P Gadchiroli
MI DC ROAD, INDALA, GADCHIROLI. PIN CODE 442605 (MS)
DEPARTMENT OF APPLIED MECHANICSPh. No. : (07132) 222687 email : [email protected]
To, No/ GPG/APM/TR/2012/Sub Divisional Officer Date ;-Z P (PW)Sub Division
7/28/2019 Metal and Sand 1
45/153
45
SakoliSubject : Testing of materials for the C/o of Compound wall to P.H.C. sub centre building
At Jaitpur under 8 P.H.C. 2012-13Agreement no ; B1/102/EE/2012 Date 24/7/2012Reference no : SDO/PWD/ Sakoli / / 12Inword no : GPG/5025/Date 7/11/2012Name of Agency: Grampanchayt JaitpurTesting Charges; RS=1922/- One thousand nine hundred twenty two only
Receipt no 9616423 Date 07/1/2012
(Test report no 240)
(Test result Metal;
(Test result of Metal 20MM)Sr. No. Type of test conducted Result
1. Crushing Strength 19.55 %
2. Water absorption test 0.55 %Test on Bricks
SrNo.
Identification ofmark
Size of brickCompressive Strength
in N / mm% of water absorption
L B H mm mm mm Dry bricks
1 Nil 230 x 90 x 75 5.15 9.98
2 Nil 230 x 90 x 75 5.25 9.68
3 Nil 230 x 90 x 75 5.25 9.78
4 Nil 230 x 90 x 75 5.00 10.08
5 Nil 230 x 90 x 75 5.15 10.12
Test on steel
Type ofsteel
NominalDiameter
mm
ActualDiameter in
mmC/s area mm
2
SectionalWeight in
Kg/ m
TensileStress
in N/mm2
Yield StressN / mm
2
% ofElongation
Mild Steel/Tor Steel
6 6.29 31.05 0.233 615.13 507.35 28.50
8 8.22 53.40 0.411 608.97 502.40 27.50
12 12.0 113.04 0.888 619.24 510.87 27.50
Test on cube
Sr
No.
Grade of
Concrete Cube
Size of Cube
in mm
Date of
casting
Period of
curing
Compressive
Strength at 28
days in
N / mm
Date of
testing
Identific
ation
Mark
1 M20 150 x 150 x150 Nil 28 Days28.88
7/11/2012 Nil29.0030.00
Note; - Result pertaining to the sample received in the laboratory
Testing In charge Head of Deptt PrincipalG P Gadchiroli G P Gadchiroli G P Gadchiroli
MI DC ROAD, INDALA, GADCHIROLI. PIN CODE 442605 (MS)
DEPARTMENT OF APPLIED MECHANICSPh. No. : (07132) 222687 email : [email protected]
To, No/ GPG/APM/TR/2012/
7/28/2019 Metal and Sand 1
46/153
46
Sub Divisional Officer Date ;-Z P (PW)Sub Division
SakoliSubject : Testing of materials for the C/o of C/o of Malomitiy home Odjsion to F.P.S.C. Building
At madeghal Under 8. PHC 2010-11 Tah LakhandurAgreement no ; B1/446/EE/10-11 Date 31/3/2012Reference no : SDO/PWD/ Sakoli / / 12 Date ;-Inword no : GPG/5026/Date 7/11/2012Name of Agency: Grampanchayt maddeghal
Testing Charges; RS=1922/- One thousand nine hundred twenty two onlyReceipt no 9616423 Date 07/1/2012(Test report no 241)(Test result Metal ;
(Test result of Metal 20MM)Sr. No. Type of test conducted Result
1. Crushing Strength 19.55 %
Test on Bricks
SrNo.
Identification ofmark
Size of brickCompressive Strength
in N / mm% of water absorption
L B H mm mm mm Dry bricks
1 Nil 230 x 90 x 75 5.15 9.98
2 Nil 230 x 90 x 75 5.25 9.683 Nil 230 x 90 x 75 5.25 9.78
4 Nil 230 x 90 x 75 5.00 10.08
5 Nil 230 x 90 x 75 5.15 10.12
Test on steel
Type ofsteel
NominalDiameter
mm
ActualDiameter in
mmC/s area mm
2
SectionalWeight in
Kg/ m
TensileStress
in N/mm2
Yield StressN / mm
2
% ofElongation
Mild Steel/Tor Steel
6 6.29 31.05 0.233 615.13 507.35 28.50
8 8.22 53.40 0.411 608.97 502.40 27.50
12 12.0 113.04 0.888 619.24 510.87 27.50
Test on cube
Sr
No.
Grade of
Concrete Cube
Size of Cube
in mm
Date of
casting
Period of
curing
Compressive
Strength at 28
days in
N / mm
Date of
testing
Identific
ation
Mark
1 M20 150 x 150 x150 Nil 28 Days29.88
7/11/2012 Nil30.6631.00
Note; - Result pertaining to the sample received in the laboratory
Testing In charge Head of Deptt PrincipalG P Gadchiroli G P Gadchiroli G P Gadchiroli
MI DC ROAD, INDALA, GADCHIROLI. PIN CODE 442605 (MS)
DEPARTMENT OF APPLIED MECHANICS
7/28/2019 Metal and Sand 1
47/153
47
Ph. No. : (07132) 222687 email : [email protected]
To, No/ GPG/APM/TR/2012/Sub Divisional Officer Date ;-Z P (PW)Sub Division
SakoliSubject : Testing of materials for the C/o Anganwadi building at Madeghal under
D.P.C 2011 Tha LakhandirAgreement no ; B1486/EE/11-12 Date 31/8/12Reference no : SDO/PWD/ Sakoli / / 12 Date ;-
Inword no : GPG/5027/Date 7/11/2012Name of Agency: Grampanchayt MadeghalTesting Charges; RS=1922/- One thousand nine hundred twenty two only
Receipt no 9616423 Date 07/1/2012(Test report no 242)
(Test result Metal ;(Test result of Metal 20MM)
Sr. No. Type of test conducted Result
1. Crushing Strength 19.55 %
Test on Bricks
SrNo.
Identification ofmark
Size of brickCompressive Strength
in N / mm% of water absorption
L B H mm mm mm Dry bricks
1 Nil 230 x 90 x 75 5.15 9.98
2 Nil 230 x 90 x 75 5.25 9.68
3 Nil 230 x 90 x 75 5.25 9.78
4 Nil 230 x 90 x 75 5.00 10.08
5 Nil 230 x 90 x 75 5.15 10.12
Test on steel
Type ofsteel
NominalDiameter
mm
ActualDiameter in
mmC/s area mm
2
SectionalWeight in
Kg/ m
TensileStress
in N/mm2
Yield StressN / mm
2
% ofElongation
Mild Steel/Tor Steel
6 6.29 31.05 0.233 615.13 507.35 28.50
8 8.22 53.40 0.411 608.97 502.40 27.50
12 12.0 113.04 0.888 619.24 510.87 27.50
test on cube
Sr
No.
Grade of
Concrete Cube
Size of Cube
in mm
Date of
casting
Period of
curing
Compressive
Strength at 28
days in
N / mm
Date of
testing
Identific
ation
Mark
1 M20 150 x 150 x150 Nil 28 Days29.88
8/11/2012 Nil30.6631.00
Note; - Result pertaining to the sample received in the laboratory
Testing In charge Head of Deptt PrincipalG P Gadchiroli G P Gadchiroli G P Gadchiroli
7/28/2019 Metal and Sand 1
48/153
48
MI DC ROAD, INDALA, GADCHIROLI. PIN CODE 442605 (MS)
DEPARTMENT OF APPLIED MECHANICSPh. No. : (07132) 222687 email : [email protected]
To, No/ GPG/APM/TR/2012/Sub Divisional Engineer Date ;-Z P (PW)Sub Division
SakoliSubject : Testing of materials for the C/o of building M.S. grill ward from fraent side of
Main PHC building at Baruhar under 8.PHC 2012-13
Agreement no ; B1/49/EE/2012-13 Date 7/6/12Reference no : SDO/PWD/ Sakoli / / 12 Date ;-Inword no : GPG/508/Date 7/11/2012Name of Agency: Grampanchayt MadeghalTesting Charges; RS=1922/- One thousand nine hundred twenty two only
Receipt no 9616423 Date 07/1/2012(Test report no 243)
(Test result Metal ;(Test result of Metal 20MM)
Sr. No. Type of test conducted Result
1. Crushing Strength 19.55 %
Test on Bricks
SrNo. Identification ofmark
Size of brickCompressive Strength
in N / mm % of water absorptionL B H mm mm mm Dry bricks
1 Nil 230 x 90 x 75 5.15 9.98
2 Nil 230 x 90 x 75 5.25 9.68
3 Nil 230 x 90 x 75 5.25 9.78
4 Nil 230 x 90 x 75 5.00 10.08
5 Nil 230 x 90 x 75 5.15 10.12
Test on steel
Type ofsteel
NominalDiameter
mm
ActualDiameter in
mmC/s area mm
2
SectionalWeight in
Kg/ m
TensileStress
in N/mm2
Yield StressN / mm
2
% ofElongation
Mild Steel/Tor Steel
6 6.29 31.05 0.233 615.13 507.35 28.50
12 12.0 113.04 0.888 619.24 510.87 27.50
Test on cube
Sr
No.
Grade of
Concrete Cube
Size of Cube
in mm
Date of
casting
Period of
curing
Compressive
Strength at 28
days in
N / mm
Date of
testing
Identific
ation
Mark
1 M20 150 x 150 x150 Nil 28 Days29.88
8/11/2012 Nil30.6631.00
Note; - Result pertaining to the sample received in the laboratory
Testing In charge Head of Deptt PrincipalG P Gadchiroli G P Gadchiroli G P Gadchiroli
7/28/2019 Metal and Sand 1
49/153
49
MI DC ROAD, INDALA, GADCHIROLI. PIN CODE 442605 (MS)
DEPARTMENT OF APPLIED MECHANICSPh. No. : (07132) 222687 email : [email protected]
To, No/ GPG/APM/TR/2012/Sub Divisional Officer Date ;-Z P (PW)Sub Division
SakoliSubject : Testing of materials for the C/o of Anganwadi building at Murmodi No 2Tah Lakhandur
Agreement no ; Q/85/EE/2012/13 Date 28/9/2012Reference no : SDO/PWD/ Sakoli / / Q / 12 Date ;- 26/7/2012Inword no : GPG/5028/Date 7/11/2012Name of Agency: NILTesting Charges; RS=1472/- One thousand four hundred seventy two only
Receipt no 9616423 Date 07/1/2012(Test report no 244)
(Test result Metal ;Test on Bricks
SrNo.
Identification ofmark
Size of brickCompressive Strength
in N / mm% of water absorption
L B H mm mm mm Dry bricks1 Nil 230 x 90 x 75 5.15 9.98
2 Nil 230 x 90 x 75 5.25 9.68
3 Nil 230 x 90 x 75 5.25 9.78
4 Nil 230 x 90 x 75 5.00 10.08
5 Nil 230 x 90 x 75 5.15 10.12
Test on steel
Type ofsteel
NominalDiameter
mm
ActualDiameter in
mmC/s area mm
2
SectionalWeight in
Kg/ m
TensileStress
in N/mm2
Yield StressN / mm
2
% ofElongation
Mild Steel/
Tor Steel
6 6.29 31.05 0.233 615.13 507.35 28.50
8 8.22 53.40 0.411 608.97 502.40 27.50
12 12.0 113.04 0.888 619.24 510.87 27.50
test on cube
Sr
No.
Grade of
Concrete Cube
Size of Cube
in mm
Date of
casting
Period of
curing
Compressive
Strength at 28
days in
N / mm
Date of
testing
Identific
ation
Mark
1 M20 150 x 150 x15016/9/2012
28 Days28.88
8/11/2012 Nil29.0030.00s
Note; - Result pertaining to the sample received in the laboratory
Testing In charge Head of Deptt PrincipalG P Gadchiroli G P Gadchiroli G P Gadchiroli
7/28/2019 Metal and Sand 1
50/153
50
MI DC ROAD, INDALA, GADCHIROLI. PIN CODE 442605 (MS)
DEPARTMENT OF APPLIED MECHANICSPh. No. : (07132) 222687 email : [email protected]
To, No/ GPG/APM/TR/2012/Sub Divisional Officer Date ;-Z P (PW)Sub Division
SakoliSubject : Testing of materials for the C/o of Angonwadi building at Dhegagaon Tah Lakhndur
Agreement no ; B1/86/EE/2012-13 Date 28/6/2012Reference no : SDO/PWD/ Sakoli / 1 / 12 Date;- 26/9/2012Inword no : GPG/5030/Date 7/11/2012Name of Agency: NILTesting Charges; Rs1472/- One thousand four hundred seventy two only
Receipt no 9616423 Date 07/1/2012(Test report no 245)
(Test result Metal ;Test on Bricks
SrNo.
Identification ofmark
Size of brickCompressive Strength
in N / mm% of water absorption
L B H mm mm mm Dry bricks
1 Nil 230 x 90 x 75 5.15 9.98
2 Nil 230 x 90 x 75 5.25 9.68
3 Nil 230 x 90 x 75 5.25 9.78
4 Nil 230 x 90 x 75 5.00 10.08
5 Nil 230 x 90 x 75 5.15 10.12
Test on steel
Type ofsteel
NominalDiameter
mm
ActualDiameter in
mmC/s area mm
2
SectionalWeight in
Kg/ m
TensileStress
in N/mm2
Yield StressN / mm
2
% ofElongation
Mild Steel/Tor Steel
6 6.29 31.05 0.233 615.13 507.35 28.50
8 8.22 53.40 0.411 608.97 502.40 27.50
12 12.0 113.04 0.888 619.24 510.87 27.50
test on cube
Sr
No.
Grade of
Concrete Cube
Size of Cube
in mm
Date of
casting
Period of
curing
Compressive
Strength at 28
days in
N / mm
Date of
testing
Identific
ation
Mark
1 M20 150 x 150 x15010/9/2012
28 Days29.88
9/11/2012 Nil30.6631.00
Note; - Result pertaining to the sample received in the laboratory
Testing In charge Head of Deptt PrincipalG P Gadchiroli G P Gadchiroli G P Gadchiroli
7/28/2019 Metal and Sand 1
51/153
51
MI DC ROAD, INDALA, GADCHIROLI. PIN CODE 442605 (MS)
DEPARTMENT OF APPLIED MECHANICSPh. No. : (07132) 222687 email : [email protected]
To, No/ GPG/APM/TR/2012/Sub Divisional Officer Date ;-Z P (PW)Sub Division
ChamorshiSubject : Testing of materials for the C/o of Grampanchayat at Mulchera
Agreement no ; B1/EE/ZPGAD/246/2011-12,Date17/10/2012Reference no : SDE/Cha/Z.P/(wrks/7/ 2012 Date -Inword no : GPG/5031/Date 7/11/2012Name of Agency: Grampanchayat MulcheaTesting Charges; Rs1461/-One thousand four hundred and sixty one only
Receipt no 9616424 Date 07/1/2012(Test report no 246)Test result cub ;
Sr
No.
Grade of
Concrete
Cube
Size of Cube
in mm
Date of
casting
Period of
curing
Compressive Strength at
28 days in
N / mm
Date of
testing
Identification
Mark
1M20 150 x 150 x150 12/11/11 28 Days
30.008/11/2012
RCCColumn
30.0030.66
2 M20 150 x 150 x150 20/11/11 28 Days30.00 8/11/2012
R CC Beam29.7729.77
3 M20 150 x 150 x150 22/11/1 28 Days30.66 8/11/2012
R CC Lintel30.8830.88
4 M20 150 x 150 x150 22/12/11 28 Days30.66 8/11/2012
R CC Slabs31.11
31.11
5 M20 150 x 150 x150 22/12/11 28 Days30.66 8/11/2012
R CC Slabs30.8831.11
Note; - Result pertaining to the sample received in the laboratory
Testing In charge Head of Deptt PrincipalG P Gadchiroli G P Gadchiroli G P Gadchiroli
7/28/2019 Metal and Sand 1
52/153
52
MI DC ROAD, INDALA, GADCHIROLI. PIN CODE 442605 (MS)
DEPARTMENT OF APPLIED MECHANICSPh. No. : (07132) 222687 email : [email protected]
To, No/ GPG/APM/TR/2012/Sub Divisional Officer Date ;-Z P (PW)Sub Division
Chamorshi
Subject : Testing of materials for the C/o of extra Delivery roam ot S C Vlsora tah WadsaAgreement no ; NilReference no : NRHM/DIHFWS 653/12Inword no : GPG/5004/Date 6/11/2012Name of Agency: NilTesting Charges; Rs1202/- One thousand two hundred and two only
Receipt no 9616420 Date 6
Test on test
SrNo.
Identification ofmark
Size of brickCompressive Strength
in N / mm% of water absorption
L B H mm mm mm Dry bricks
1 Nil 230 x 90 x 75 5.15 9.98
2 Nil 230 x 90 x 75 5.25 9.68
3 Nil 230 x 90 x 75 5.25 9.78
4 Nil 230 x 90 x 75 5.00 10.08
5 Nil 230 x 90 x 75 5.15 10.12
7/28/2019 Metal and Sand 1
53/153
53
MI DC ROAD, INDALA, GADCHIROLI. PIN CODE 442605 (MS)
DEPARTMENT OF APPLIED MECHANICSPh. No. : (07132) 222687 email : [email protected]
To, No/ GPG/APM/TR/2012/The Chief officer Date ;-
Municipal CouncilGadchiroli
Subject : Testing of materials for the C/o of Cement concrete road ward no.3 ChandrapurRoad to padmshali house to Gedam to Bhoyar house
Agreement no ; MCG/Works/ 929/Date 28/06/2012Reference no : NGP/Gad/ 1153/2012 Date 06/11.2012Inword no : GPG 3073/Date 6/11/2012Name of Agency: Shri K.S. ReddyTesting Charges; Rs1169/- One thousand one hundred and sixty nine only
Receipt no 9616421 Date 06/11/2012(Test report 247)
Test on result cube
Sr
No.
Grade of
Concrete
Cube
Size of Cube
in mm
Date of
casting
Period of
curing
Compressive Strength at
28 days in
N / mm
Date of
testing
Identificati
on Mark
11:4:8 150 x 150 x150 3/8/2012 28 Days
16.0026/11/2012 Nil16.44
16.88
2 1:4:8 150 x 150 x150 3/8/2012 28 Days16.00
26/11/2012 Nil16.4416.88
3 1:2:4 150 x 150 x150 5/9/2012 28 Days16.00
26/11/2012 Nil16.0016.44
4 M20 150 x 150 x150 5/9/2012 28 Days
30.00
26/11/2012 WearingCoat30.6630.88
Note; - Result pertaining to the sample received in the laboratory
Testing In charge Head of Deptt PrincipalG P Gadchiroli G P Gadchiroli G P Gadchiroli
7/28/2019 Metal and Sand 1
54/153
54
MI DC ROAD, INDALA, GADCHIROLI. PIN CODE 442605 (MS)
DEPARTMENT OF APPLIED MECHANICSPh. No. : (07132) 222687 email : [email protected]
To, No/ GPG/APM/TR/2012Sub Divisional officer Date ;-Z.P P.W.D.Sub Division
Sakoli
Subject : Testing of materials for the C/o of Shiwaji Vachanalay Bldg at GhodezhariTah Lakhani
Agreement no ; B1/227/CE/2012-13 Date 25/09/2012Reference no : SDO/PWD/SUB/ DV ZPQ/200 Date 12/11/2012Inword no : GPG 5094/Date 21/11/2012Name of Agency: -----------NIL----------
Testing Charges; Rs2371/Two thousand three hundred and seventy one onlyReceipt no 9616425 Date 21/11/2012
(Test report 248)Test Result Metal 20mm
sr. No.Type of test conducted Result
1. Crushing Strength 19.55 %
2. Water absorption test 0.55 %
Metal 80 mm
Sr. No. Type of test conducted Result1. Crushing Strength 19.65 %
2 Water absorption test 0.56%
Test on Bricks
SrNo.
Identification ofmark
Size of brickCompressive
Strengthin N / mm
% of waterabsorption
L B H mm mm mm Dry bricks
1 Nil 230 x 90 x 75 5.15 9.98
2 Nil 230 x 90 x 75 5.25 9.68
3 Nil 230 x 90 x 75 5.25 9.78
4 Nil 230 x 90 x 75 5.00 10.08
5 Nil 230 x 90 x 75 5.15 10.12
7/28/2019 Metal and Sand 1
55/153
55
sTest on steel
Type ofsteel
NominalDiameter
mm
ActualDiameter
in mm
C/s areamm
2
SectionalWeight in
Kg/ m
TensileStress
in N/mm2
Yield StressN / mm
2
% ofElongation
Mild/Steel
Tor Steel
6 6.29 31.05 0.233 615.13 507.35 28.50
8 8.22 53.40 0.411 608.97 502.40 27.50
12 12.0 113.04 0.888 619.24 510.87 27.50
Test on cube
Sr
No.
Grade of
Concrete
Cube
Size of Cube
in mm
Date of
casting
Period of
curing
Compressive Strength
at 28 days in
N / mm
Date of
testing
Identific
ation
Mark
1 1:4:8 150 x 150 x150 12/11/2012 28Days21.00
23/11?2012 Nil21.6621.88
Note; - Result pertaining to the sample received in the laboratory
Testing In charge Head of Deptt PrincipalG P Gadchiroli G P Gadchiroli G P Gadchiroli
7/28/2019 Metal and Sand 1
56/153
56
MI DC ROAD, INDALA, GADCHIROLI. PIN CODE 442605 (MS)
DEPARTMENT OF APPLIED MECHANICSPh. No. : (07132) 222687 email : [email protected]
To, No/GPG/APM/ TR/2012Sub Divisional Officer Date ;-Z.P P.W.D.Sub Division
SakoliSubject : Testing of materials for the C/o of Sabha Mandap Sabha grah at BhugarAgreement no ; B1/227/CE/2012-13 Date 25/09/2012Reference no : SDO/PWD/SUB/ DV ZPQ/200 Date 12/11/2012Inword no : GPG 5094/Date 21/11/2012 ssName of Agency: -----------NIL----------Testing Charges; Rs2371/Two thousand three hundred and seventy one only
Receipt no 9616425 Date 21/11/2012
(Test report 249)Test Result Metal 20mm
sr. No.Type of test conducted Result
1. Crushing Strength 19.55 %
2. Water absorption test 0.55 %
Metal 80 mm
Sr. No. Type of test conducted Result
1. Crushing Strength 19.65 %
2 Water absorption test 0.56%
Test on test
SrNo.
Identification ofmark
Size of brickCompressive
Strengthin N / mm
% of waterabsorption
L B H mm mm mm Dry bricks
1 Nil 230 x 90 x 75 5.15 9.98
2 Nil 230 x 90 x 75 5.25 9.68
3 Nil 230 x 90 x 75 5.25 9.78
4 Nil 230 x 90 x 75 5.00 10.08
5 Nil 230 x 90 x 75 5.15 10.12
7/28/2019 Metal and Sand 1
57/153
57
Test on steelType of
steel
NominalDiameter
mm
ActualDiameter in
mm
C/s areamm
2
SectionalWeight in
Kg/ m
TensileStress
in N/mm2
YieldStress
N / mm2
% ofElongation
MildSteel/Tor
Steel
6 6.29 31.05 0.233 615.13 507.35 28.50
8 8.22 53.40 0.411 608.97 502.40 27.50
12 12.0 113.04 0.888 619.24 510.87 27.50
Test on Cube
Sr
No.
Grade of
Concrete
Cube
Size of Cube
in mm
Date of
casting
Period of
curing
Compressive Strength
at 28 days in
N / mm
Date of
testing
Identific
ation
Mark
1 1:4:8 150 x 150 x150 15/11/2012 28Days21.00
26/11/2012 Nil21.6621.88
Note; - Result pertaining to the sample received in the laboratory
Testing In charge Head of Deptt PrincipalG P Gadchiroli G P Gadchiroli G P Gadchiroli
7/28/2019 Metal and Sand 1
58/153
58
MI DC ROAD, INDALA, GADCHIROLI. PIN CODE 442605 (MS)DEPARTMENT OF APPLIED MECHANICS
Ph. No. : (07132) 222687 email : [email protected]
To, No/GPG/APM/TR/2012Sub Divisional officer Date ;-Z.P P.W.D.Sub Division
SakoliSubject : Testing of materials for the C/o of Sabha Mandap Sabha grah at BhugarAgreement no ; B1/227/CE/2012-13 Date 25/09/2012Reference no : SDO/PWD/SUB/ DV ZPQ/200 Date 12/11/2012Inword no : GPG 5094/Date 21/11/2012Name of Agency: -----------NIL----------Testing Charges; Rs2371/Two thousand three hundred and seventy one only
Receipt no 9616425 Date 21/11/2012
(Test report 249)Test Result Metal 20mm
sr. No.Type of test conducted Result
1. Crushing Strength 19.55 %
2. Water absorption test 0.55 %
Metal 80 mmSr. No. Type of test conducted Result
1. Crushing Strength 19.65 %
2 Water absorption test 0.56%
Test on test
SrNo.
Identification ofmark
Size of brickCompressive Strength
in N / mm % of waterabsorption
L B H mm mm mm Dry bricks
1 Nil 230 x 90 x 75 5.15 9.98
2 Nil 230 x 90 x 75 5.25 9.68
3 Nil 230 x 90 x 75 5.25 9.78
4 Nil 230 x 90 x 75 5.00 10.08
7/28/2019 Metal and Sand 1
59/153
59
Test on Steel
Type ofsteel
NominalDiameter
mm
ActualDiameter in
mm
C/s areamm
2
SectionalWeight in
Kg/ m
TensileStress
in N/mm2
YieldStress
N / mm2
% ofElongation
MildSteel/Tor
Steel
6 6.29 31.05 0.233 615.13 507.35 28.50
8 8.22 53.40 0.411 608.97 502.40 27.50
12 12.0 113.04 0.888 619.24 510.87 27.50
Test on Cube
Sr
No.
Grade of
Concrete
Cube
Size of Cube
in mm
Date of
casting
Period of
curing
Compressive Strength
at 28 days in
N / mm
Date of
testing
Identific
ation
Mark
1 1:4:8 150 x 150 x150 12/11/2012 28Days21.00
26/11/2012 Nil21.6621.88
Note; - Result pertaining to the sample received in the laboratory
Testing In charge Head of Deptt PrincipalG P Gadchiroli G P Gadchiroli G P Gadchiroli
7/28/2019 Metal and Sand 1
60/153
60
MI DC ROAD, INDALA, GADCHIROLI. PIN CODE 442605 (MS)DEPARTMENT OF APPLIED MECHANICS
Ph. No. : (07132) 222687 email : [email protected]
To, No/GPG/APM/TR/2012Sub Divisional Officer Date;-Z.P (P.W.)Sub Division
SakoliSubject : Testing of materials for the C/o of R.C.W.on. Kitadi to Kitadi Pahadi
Shio Mandir road (Balaji Killa)Under Paryatan Vikas
Agreement no ; B1/no22/EE/12.13Date 25/9/2012Reference no : SDO/PWD/SUB/DV.ZP/1478/2/11/2012Inword no : GPG 5096/Date 21/11/2012Name of Agency: -----------NIL----------Testing Charges; Rs1304/-One thousand three hundred and four only
Receipt no 9616425 Date 21/11/2012(Test report 250)
Test on Metal 40mm
Sr. No. Type of test conducted Result
1. Crushing Strength 18.67 %
2. Water absorption test 0.45%
Test on Murum
Sample Murum Plasticity Index
murum 7.12%
Test on Steel
Type ofsteel
NominalDiameter
mm
ActualDiameter in
mm
C/s areamm
2
SectionalWeight in
Kg/ m
TensileStress
in N/mm2
YieldStress
N / mm2
% ofElongation
Mild/steel/tor
steel8 8.22 53.40 0.411 608.97 502.40 27.50
Test on Cube
Sr
No.
Grade of
Concrete
Cube
Size of Cube
in mm
Date of
casting
Period of
curing
Compressive Strength
at 28 days in
N / mm
Date of
testing
Identific
ation
Mark
1 1:2:4 150 x 150 x150 24/10/2012 28Days21.00
26/11/2012 Nil21.6621.88
Note; - Result pertaining to the sample received in the laboratory
7/28/2019 Metal and Sand 1
61/153
61
Testing In charge Head of Deptt PrincipalG P Gadchiroli G P Gadchiroli G P Gadchiroli
MI DC ROAD, INDALA, GADCHIROLI. PIN CODE 442605 (MS)DEPARTMENT OF APPLIED MECHANICS
Ph. No. : (07132) 222687 email : [email protected]
To, No/GPG/APM/TR/2012Sub Divisional Officer Date;-Z.P (P.W.D)Sub Division
SakoliSubject : Testing of materials for the C/o of Providing (S.T.) W.B.M
Surface no khamba Shankarpur road
Agreement no ; B1/36/EE/2012-13 Date 30/05/2012Reference no : SDO/PWD/SUB/DV.ZP/1432/2012 Date 25/10/2012Inword no : GPG 5212/Date 27/11/2012Name of Agency: Secretary G.P. Khamba / RengeparTesting Charges; Rs1180/One thousand one hundred and eighty only
Receipt no 9616428 Date 29/11/2012(Test report 255)
Test result of MetalTest
Resultof
Gradation 40 mm
SrNo.
Type of Test Coarse Aggregates - 40 mm
1 Crushing Strength 20.83%
Srno.
IS Seive Size Weightretained Kg
Cummulative
weightretained
Kg
Cummulativepercentageretained
Cummulative percentagepassing
1 80 0 0 0 100
2 40 3638 3638 72.76 27.24
3 20 1362 5000 100 0
4 10 0 5000 100 0
7/28/2019 Metal and Sand 1
62/153
62
Test on Murum
Sample Murum Plasticity Index
murum 7.12%Note; - Result pertaining to the sample received in the laboratory
Testing In charge Head of Deptt PrincipalG P Gadchiroli G P Gadchiroli G P Gadchiroli
MI DC ROAD, INDALA, GADCHIROLI. PIN CODE 442605 (MS)DEPARTMENT OF APPLIED MECHANICS
Ph. No. : (07132) 222687 email : [email protected]
To, No/GPG/APM/TR/2012Sub Divisional Officer Date;-Z.P (P.W.)Sub Division
Sakoli
Subject : Testing of materials for the C/o of Providing W.B.M. SurfaceOn Wadegaon Kindi road
Agreement no ; B1/38/EE/2012-13 Date 30/05/2012Reference no : SDO/PWD/SUB/DV.ZP/14/2012 Date 25/10/2012Inword no : GPG 5214/Date 27/11/2012Name of Agency: Secretary G.P. Wadegaon.Testing Charges; Rs1180/One thousand one hundred and eighty only
Receipt no 9616428 Date 29/11/2012
(Test report 256)
Test result of MetalTest
Resultof
Gradation 40 mm
5 4.75 0 5000 100 0
6 pan 0 5000 100 0
SrNo.
Type of Test Coarse Aggragetes - 40 mm
1 Crushing Strength 20.83%
Srno.
IS Seive SizeWeight
retained Kg
Cummulativeweight
retainedKg
Cummulativepercentage
retained
Cummulative percentagepassing
1 80 0 0 0 100
2 40 3638 3638 72.76 27.24
7/28/2019 Metal and Sand 1
63/153
63
Test on Murum
Sample Murum Plasticity Index
murum 7.12%
Note; - Result pertaining to the sample received in the laboratory
Testing In charge Head of Deptt Principal
G P Gadchiroli G P Gadchiroli G P Gadchiroli
MI DC ROAD, INDALA, GADCHIROLI. PIN CODE 442605 (MS)DEPARTMENT OF APPLIED MECHANICS
Ph. No. : (07132) 222687 email : [email protected]
To, No/GPG/APM/TR/2012Sub Divisional Officer Date;-Z.P (P.W.D)Sub Division
SakoliSubject : Testing of materials for the C/o of Providing W.B.M. Surface
on Tudamapuri Kinhi roadAgreement no ; B1/34/EE/2012-13 Date 30/05/2012Reference no : SDO/PWD/SUB/DV.ZP/1449/2012 Date 25/10/2012Inword no : GPG 5214/Date 27/11/2012
Name of Agency: Secretary G.P. Tudamapuri.Testing Charges; Rs1180/One thousand one hundred and eighty only
Receipt no 9616428 Date 29/11/2012
(Test report 257)
Test result of MetalTest
Resultof
Gradation 40 mm
3 20 1362 5000 100 0
4 10 0 5000 100 0
5 4.75 0 5000 100 0
6 pan 0 5000 100 0
SrNo.
Type of Test Coarse Aggragetes - 40 mm
1 Crushing Strength 20.83%
7/28/2019 Metal and Sand 1
64/153
64
Test on Murum
Sample Murum Plasticity Index
murum 7.12%
Note; - Result pertaining to the sample received in the laboratory
Testing In charge Head of Deptt PrincipalG P Gadchiroli G P Gadchiroli G P Gadchiroli