Metal Garden Shed
OWNER'S MANUAL
Instructions for Assembly
Quick & Easy Assembly
Ridge Reinforced Walls
9820007
Requires two people take at least 2-3 hours for installation
Overall Size: L89 x W153 x H178cm Overall Size: L2.9 x W5 x H5.8 Feet
BEFORE YOU START
Owner's Manual
Prior to installation, it is important that you contact your local government authority to
determine if building approval is required. Study and understand this owner's manual.
Important information and helpful tips will make your construction easier and more
enjoyable.
Assembly instructions
Instructions are supplied in this manual and contain all appropriate information for your
building model. Review all instructions before you begin. During assembly, follow the
step sequence carefully for correct results .Please be aware: this unit takes two people
about one full day to complete.
Parts
Check to be sure that you have all the necessary parts for the building.
Separate contents of the carton by the part number while reviewing parts list.
Familiarize yourself with the hardware and fasteners for easier use during
construction. These are packaged within the carton. Note that extra fasteners have been
supplied for your convenience.
TOOLS MAY REQUIRED
Use heavy duty gloves when handling steel sheets and flashing
PLAN AHEAD
Watch the weather:
Please be sure the day you select for installation is dry and calm.
DO NOT attempt to assemble your shed in windy weather
because of risk of damage to panels, or personal injury. Be careful
of wet or muddy ground.
Teamwork:
Whenever possible, two or more people should work together to
assemble the building. One person can position parts or panels
while the other is able to handle the fasteners and the tools.
3M
1/10"
1/5"
5/16"
PLAN AHEAD
Site Selection
l Avoid overhanging trees as much as possible as leaves will make regular cleaning
necessary and broken branches are a potential hazard.
l Small trees,bushes or fences nearby can be helpful,acting as a wind break.
Site Preparation
The site must be prepared so that the base of the shed is level all round and checking
with a spirit level is required.
The base can be constructed by treated timber or concrete,in order to stop the moisture
getting into the shed.The shed is not designed to be built onto lawn directly.Also the
ground will get muddy during rainy days.
If a concrete pad is made,it is important that this slopes towards the edges to prevent
water ingress.
Time must be allowed for any concrete or cement to dry before building the shed on top.
Bases can also be constructed from bricks,blocks,or mounted on a concrete pad.
The bricks or blocks should be cemented onto firm and level concrete footings and the
greenhouse frame drilled and screwed to the base.
IMPORTANT NOTES:
l Find someone to help you:it is much easier with someone to hold parts,pass tools
ect.Also some steps require two people to lift structures together.This is not very
heavy work so would suit most able-bodied people.
l Allow plenty of time:rushing often causes errors and the re-doing of incorrect
assemblies.If you have never built a shed before,it can take most of a day to carefully
complete the construction.
l Have the right tools to hand.
l Safety clothing as recommended in the 'Tools' section.
l Ideally lat out the parts and check that all are present before commencing
construction.Lay on cloths or plastic sheets if there is any risk of scratching the parts.
l Tighten all nuts carefully,being sure not to miss any.Check the frame is square and
using a spirit level to check that it is upright.
sharp edges
when assembling or performing.
wear work gloves, long sleeves and eye glasses,
Pay attention to the sharp edges. Please
PARTNO. Qty.
S3
144
S2
90
1
PARTNO. Qty.
2
1
1
2
3
2
9
4
29
4
29-1
2
B1
2
13
1
4L
1
4R
4
30
1
31
1
32
1
33
1
34
1
20
2
15
17L
17R
2
2
1
Q
1
H
P1
P4
3
4
D1 2
P5
P6
2
2
20
260
28
F3
F1
F2
1GB
H22
6B6
J14
4
GC
GE 2
PARTNO. Qty.
2
GJ
W1
1
1355mm/53.34"
2
40637mm/25.07"
2
41
752mm/29.6"
1394mm/54.9"
766mm/30.15"
572mm/22.51"
1583mm/62.3"
876mm/34.5"
760mm/29.92"
1583mm/62.3"
1583mm/62.3"
1583mm/62.3"
876mm/34.5"
760mm/29.92"
#8AB-18x2/13
#8-32x2/13
#8-32x2/13
114mm/4.48"
1600mm/63.99"
766mm/30.15"
1600mm/63.99"
1582mm/62.28"
760mm/29.92"
1600mm/63.99"
1600mm/63.99"
760mm/29.92"
637mm/25.07"
1394mm/54.9"
1
1
2
3
J1
J1
9
9
13
13
B1
B1
Q
H
4L
4R
P1
P1
P1
P4
P4
P4
P4
20
P6
P5
P6
P5
15
15
17L
17R
17L
17R
GE
GE
GC
GC
GC
GC
GJ
GJ
J1
J1
W1
40
40
41
41
B6
29
29
29
29
29-1
29-1
29-1
29-1
D1
30
30
30
30
31
GB
34
33
32
H2
H2
B6
B6
B6
B6
B6
D1
When diagonal measurements are
F1
-6-
1
PARTNO. Qty.
2
1
1
2
3
2
3
1
1
PARTNO.Qty.
J14
F1
1、equal,the frame is square.
2、The Floor Frame must beBOTH square AND level or theholes will not line up properly.
J1
J1
3
F18
F1
16
Base Assembly
Anchor Installation
Inspection
Left Side Wall Panel Installation
-7-
PARTNO. Qty.
F1
S3
P4 1
PARTNO.Qty.
P1 3
F1
S3
F2
S3
PARTNO. Qty.
P4 1
F1
S3
F2
S3
3
3
3
P4
P1
P1
P1
P4
F1
3
S3
3
F1 12
S3 15
F2
3
F1
4
S3
5
F2
1
Right Side Wall Panel Installation
Back Wall Panels Installation
-8-
F1
S3
PARTNO. Qty.
P41
PARTNO.Qty.
P4 1
F1
S3
F2
S3
F1
S3
F1
S3
F2
S3
PARTNO. Qty.
1
4L
1
4R
F1
S3
F1
F1
S3
F1
S3
F2
4L
4R
3
3
3
P4
P4
F1
4
S3
5
F2
1
F1
4
S3
5
F2
1
F1
4
S3
4
F2
2
Door Posts Installation
-9-
PARTNO. Qty.
2
9
S3
F1
9
9
9
PARTNO.Qty.
1
Q
F1
F1
S3
Q
PARTNO. Qty.
1
H
H
F1
F1
S3
F1
2GJ
H
GJ
F114
S314
F1
4
S3
4
F1
19
S3
15
Left and Right Upper Beam Installation
Triangle Panel Installation
Back Upper Beam InstallationTools Hook InstallationFront Tri-angle Panel Installation
Roof Beam Installation
Roof Beam Assembly
-10-
PARTNO. Qty.
2
13
F1
13
13
PARTNO.Qty.
2
B1
F1
F1
F1
S3
F1
S3
PARTNO. Qty.
P5
P6
1
1
B1
B1
13
F1
S3
P5
P6
F1
4
F112
S3
8
F1
14
S3
14
Roof Panels Instllation
-11-
PARTNO. Qty.
P5
P6
1
1
P5
P6
F1
S3
PARTNO. Qty.
1
20
17L
17R
2
2
17R
17L
17R
17L
20
F1
F1
S3
PARTNO.
Qty.
4
GC
GE2
215
17L&17R
GC
F1
F1
GE
GE
GE
GC
GC
GC
GC
15
15
20
F1
14
S3
14
F1
4
F1
10
S3
4
Roof Cover Installation
Eaves and Plastic Ends
Installation
-12-
PARTNO. Qty.
4
29
4
29-1
4
30
29
29-1
30
x4
F1
PARTNO.Qty.
D1 1
1
31
1
32
32
31
D1
F2
S3
F1 S3
F2
S3
32
31D1
F1
32
S3
2
F2
2
PARTNO. Qty.
S3
14
F2
2
F1 12
Corner Connector Installation
Door Panels Connection
Door Panels and Frames Assembly
Right Door Panels and Frames Assembly
PARTNO.Qty.
D1 1
1
33
1
34
F1 S3
F2
S3
34
33
D1
F2
S3
34
33
D1
-13-
PARTNO. Qty.
1
40
1
41
3B6
F3
40
41
S3
2
F2
2
F3
6
F1 16
PARTNO. Qty.
S3
14
F2
2
F1 12
Reinforcement Installation
and Screws Tightening.
Right Door Panels Connection
Turn to Opposite
Locker and bolts Installation
(uninstallation right now)
-14-
PARTNO.Qty.
1GB
H22
F1
F1
F3
GB
H2
H2
PARTNO. Qty.
1
40
1
41
3B6
F3
40
41
F1
8
F3
12
F3
F1
6
16
Reinforcement Installation and Screws Tightening.
Doors Installation
Turn to Opposite
-15-
PARTNO.Qty.
W1
1
1355mm
W1
3
W1
Fundation Installation