 MANUAL ON SPECIAL ENERGY METER, DATA COLLECTING & PROCESSING IN EASTERN REGION      EASTERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED 14, Golf Club Road, Tollygunge, Kolkata-700033
Transcript
Page 1: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 1/65

 

MANUAL ON

SPECIAL ENERGY METER, DATA

COLLECTING & PROCESSING

IN

EASTERN REGION

 

 

 

 

 

EASTERN REGIONAL LOAD DESPATCH CENTRE

POWER GRID CORPORATION OF INDIA LIMITED

14, Golf Club Road, Tollygunge, Kolkata-700033

Page 2: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 2/65

 

SPECIAL ENERGY METER, DATA

COLLECTING & PROCESSING 

   

FEBRUARY 2010 

COMMERCIAL & OPERATION SERVICESDEPARTMENT

 

EASTERN REGIONAL LOAD DESPATCH CENTRE

POWER GRID CORPORATION OF INDIA LIMITED 

14, Golf Club Road, Tollygunge, Kolkata-700033

 

Page 3: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 3/65

 

CONTENTS 

 Title                   Page No.

 

 1.0  General                 1 

1.1. Objective

1.2. Ownership

1.3. Facilities to be provided at metering location

1.4. Right to install energy meter

 

2.0 Special energy meter and its technical specification 

2.1   Special Energy Meter

 

2.1.1 About SEM2.1.2 SEM dimension

2.1.3 Display list

2.1.4 SEM: Technical Specification2.1.5 Data Storage

 

2.2 Data Collecting Device (DCD)

 

 

3.0 Metering Configuration 

3.1 General

3.2 Types of Meters

3.3 Metering arrangement

3.3.1 Metering arrangement for NTPC stations

3.3.2 Metering arrangement for ICTs

3.3.3 Metering arrangement for inter-State transmission lines.3.3.4 Metering arrangement for POWERGRID lines

3.4 Maintenance of Special Energy Meters

3.4.1 Testing and Calibration

3.4.2 Periodic testing of accuracy

3.4.3 Meter Calibration

Page 4: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 4/65

 

3.5 Constituent wise location & quantity

3.5.1 Meter location of interconnected system

3.5.2 Location wise list of Meters

3.6 Pairs.dat file

3.7 Fictitious meters

 

4.0  Scheme for collection & dissemination of data 

4.1 General

4.2 Data collection from different location

4.3 Data collection location & contact details

4.4 Saving of data

 5.0  Processing and Computation of data 

5.1  Conversion in text file/ Software used for viewing of data

5.2  Viewing of npc file/structure of npc file

5.3  Modification/Editing in Text file

5.4  Availability checking

5.5  Methods in case of non availability of data

5.6  Final processing

5.7  Data checking and Validation

5.8  Discrepancies

5.9  Data forwarding to ERPC

5.10  Uploading of data on ERLDC web

5.11  Data archive

 

Annexure: A

Annexure: B

Annexure: C

 

 

Page 5: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 5/65

 

1.0 GENERAL  

1.1     Objective

 This document is intended to provide the required details of a metering system together

with the capabilities of the special energy meters along with meter configuration, data

collection, availability checking, processing etc, provided to meet the regional energy

metering requirements of the commercial mechanism adopted for bulk power supplies

and inter-State exchanges within and across a Region.  

1.2     Ownership

These energy meters are owned by the CTU. All agencies/constituents ensure the

security of the energy meters installed in their respective premises.

1.3     Facilities to be provided at Metering Locations

Each agency/constituent makes available the required space and the required outputs of 

the specified current and voltage transformers, to facilitate installation of energy meters

in their premises by CTU for regional energy metering.  

1.4  Right to install energy meters

Each constituent/agency extends the necessary assistance to CTU for installation of the

energy meters by providing the required access to their premises and equipments.  As and

when requested by CTU, the constituent’s agencies enable the representatives of CTU to

access, inspect, replace, and test etc. any of these energy meters installed in their 

premises in the presence of an authorized representative of the constituent’s agencies if 

deputed.  

 

 

 

Page 6: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 6/65

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 7: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 7/65

 

2.1 Special Energy Meter (SEM)

 

2.1.1  About SEM

Special Energy Meter (SEM) is a Microprocessor based Energy Meter. For

metering and data logging it is a handful tool along with data collecting device

(DCD) and personal computer. With the use of application software it allows the

user to process metered data.

Page 8: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 8/65

 

2.1.2  SEM dimension

 

2.1.3  Display List

 Display Parameters                          Display Form

i) Meter Serial No                                                      

ii) Date (year month day)                                            yymm

iii) Time ( hour min. sec. )                                                hhmm

iv) Cumulative Wh reading                                              xxxxx

v) Average frequency of the last block                xx.xx        

vi) Net Wh transmitted in last block                          xx.xx        

vii) Average % voltage                                                  

viii) Reactive power (VAR)                                              xxxx.x

ix) Voltage - high VARh register reading        xxxx.x       H

x) Voltage - low VARh register reading                xxxx.x      

Page 9: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 9/65

 

xi)  Real time indication                         rtC Fit

xi) Low battery indication                               L

2.1.4   SEM : Technical Specification 

 The energy metering system is used for region, inter-regional energy metering for

bulk, inter-utility power exchanges. Static type composite meter is installed for each EHV

circuit, as a self-contained device for measurement of active energy (MWh) transmittals

in each successive 15-minutes time block and certain other functions, as described in the

following paragraphs.

 Special energy meter of a uniform technical specification is provided on the electrical

periphery of each regional constituent to determine its actual net interchange with the

regional grid. Each interconnection shall have one (1) main meter. In addition one

check/standby has been provided such that the correct computation of net interchange of a

constituent is possible even when a main meter, a CT, or a VT has a problem.

  The special energy meters is static type, composite meters installed circuit-wise,

as a self-contained device for measurement of active and reactive energy and certain

other parameters as described in following paragraphs. The meter is suitable to be

connected directly to voltage transformers (VTs) having rated secondary line-to- line

voltage of 110 V and to current transformer (CTs) having a rated secondary current of 1A

(model-A) or 5A (model-B). The reference frequency shall be 50 Hz.

  The active energy (Wh) measurement is being carried out on 3-phase, 4 wire

principle, with an accuracy as per class 0.2 S of IEC-687/IEC-62053-22. In model-A,

energy is being computed directly in CT and VT secondary quantities and indicated in

Watt-hours. In model-B the energy display and recording is one fifth of Wh computed in

CT or VT secondary quantities.

  Further the meter continuously integrate and display on demand the net

cumulative active energy sent out from the station bus bars up to that time. The

cumulative Wh reading at each midnight is stored in the meter's memory. The register

moves backward when active power flow back to station bus bars.

Page 10: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 10/65

 

  The three line-to-neutral voltages are continuously monitored, and in case any of 

these voltages falls below 70%, the condition is suitably indicated and recorded. The

meters operate with the power drawn from the secondary circuits, without the need of any

auxiliary power supply.

 The VAr and reactive energy measurement is also be on 3-phase, 4-wire principle,

with an accuracy as per class 2 of IEC-62053-23 or better. In Model-A, the VAr and

VArh computation is directly in CT or VT secondary quantities. In Model-B these are

displayed and recorded as one fifth of those in CT and VT secondary quantities.

There are two reactive energy registers, one for the period when average RMS

voltage is above 103% and the other for the period the voltage is below 97%.

 The meters fully comply with the stipulations of IEC Publication 687 for 0.2S class

Static watt-hour meters, except those specifically modified here. The reference

ambient temperature is taken to be 30'C.

 Errors are reasonable for all power factor angles from 0' to 360'.

 The 15 min Wh  have a +ve sign when there is a net Wh export from a substation bus

bars and –ve sign when there is a net Wh import. The integrating (cumulative)

registers for Wh and VArh move forward when there is Wh/VArh export from

substation bus bars and backward when there is an import.

 The meters store all the above listed data in the memories for a period of 10 days. The

data older than 10 days get erased automatically. Each meter has an optical port on its

front for tapping all data stored in its memory using a hand held data collecting device.

 The meters normally operate with the power drawn from the VT secondary circuits

without the need of any auxiliary power supply. Each meter have a built in calendar and

clock having an accuracy of 30 seconds per month or better.

 Each meter has an electronic panel for display, on demand, the metered

information/data as specified by CTU.

Page 11: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 11/65

 

 Each meter has a non-volatile memory in which the followings are automatically

stored:

i)       Average frequency for each successive 15-minute time block, as a two- digit code.

ii)      Net Wh transmittal during each successive 15-minute time block.

iii)     Cumulative Wh transmittal at each midnight.

iv)     Cumulative VARH transmittal for voltage high condition, at each midnight.

v)      Cumulative V.Arh transmittal for voltage low condition, at each midnight.

vi)     Date and time blocks of failure of VT supply on any phase, as a star Mark.

 The harmonics are filtered out while measuring Wh, VAR and VARH, and only

fundamental frequency quantities shall be measured/computed.

 Each meter has an optical port on its front for tapping all data stored in its memory.

Portable or hand held data collection devices are used to serve as the interface

between the meters and the local personal computers (PC). The overall intention is to

tap the data stored in the meter's memories once a week, and transmit the same to a

remote central computer through a local PC. It is also possible to obtain a print out

(Hard copy) of all data collected from the meters, using the local PC.

2.1.6 Data storage

This 0.2 class accuracy static energy meter can record integrated average frequency and

active energy over every 15 min blocks. The SEM also stores the daily reactive energy

flows in low voltage & high voltage conditions. SEM can store data for 10 days. The text

file (*.NPC) made from coded files (*.MRI,*.DAT, *.DCD) etc includes data of one

complete day corresponding to the day on which reading is taken and 9 days of complete

data for the previous days.

 

 

 

Page 12: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 12/65

 

2.2 Data Collecting Device (DCD)

 

It  is basically data collecting device and used to transfer the tapped  data from SEM to

PC.  It has bi -communication with special energy meter along with personnel computer.

all these is done with communication cable one at DCD end and other at PC.

 

 

 

 

Page 13: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 13/65

 

      

    

       

  

     

           

        

Page 14: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 14/65

 

3.0 Metering Configuration

3.1 General

Meters have been installed so as to enable the measurement/computation of electrical

energy and other specified parameters. Additional 'check / standby' meters have been

provided at appropriate locations so as to facilitate the preparation of weekly regional

energy accounts in case any of the 'main' meters become unsuitable for the purpose.  

3.2 Types of Meters

I) Interface Meter: Interface Meter is connected at the point of interconnection

with inter-state transmission system (ISTS) for the purpose of electricity accounting and

billing. Meter shall be owned by CTU.

II)   Consumer Meter: Consumer meter means a meter used for accounting and

billing of electricity supplied to the consumer. Meter shall be owned by Licensee.

III)   Energy Accounting Meter:Energy Accounting and Audit Meter means Meter

used for accounting of electricity to various segments of electrical system. Meter shall be

owned by generating company or Licensee.

3.3    Metering Arrangement

3.3.1 Metering arrangement for NTPC stations

Three sets of energy meter i.e. Main, Check and Stand-by energy meters are provided to

calculate the energy sent-out. One set each of Main & Check Meters is provided on all

outgoing feeders and stand-by meters are provided on the EHV side of the generator

transformer (GT) and station supply transformers

3.3.2 Metering arrangement for ICTs  

For measurement of energy supply to a constituent/agency through an ICT, the Main

meter is provided on the HV side of the ICT and the Standby meter on the LV side of the

same ICT.

Page 15: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 15/65

 

3.3.3 Metering arrangement for inter-State transmission lines.  

In case of SEB-owned Inter-State transmission lines, say between State 'A' and State ‘B.',

the energy meters are provided at both the ends of the lines. The meter installed at end 'A'

is the Main meter for working out net drawal of SEB 'A' and that installed at other end 'B'

acts as check meter for SEB 'A', and vice-versa.

3.3.4 Metering arrangement for POWERGRID lines

On POWERGRID lines, unless an end is a regional energy accounting point, an Energy

Meter is provided only at one end of each line. The readings recorded by these meters are

being used for information and analysis only, and not for the energy accounting purposes.

 

3.4   Maintenance of Special Energy Meters

3.4.1    Testing and Calibration

All equipments are duly tested. In particular, each and every meter is being subjected to

acceptance tests as specified by CTU, at the manufacturer's works, before dispatch.

3.4.2  Periodic testing of accuracy

i)     In-situ functional checking and rough testing of accuracy are being carried out for allmeters once a year by the CTU, with portable test equipment complying with IEC-60736,

for type and acceptance testing of energy meters of 1.0 class.

ii)       Full testing for accuracy for every meter is being carried out by the CTU at an

accredited laboratory once every five (5) yrs.

The constituents/agencies may depute one authorized representative to witness the tests.

3.4.3  Meter Calibration

The meters normally need not to be recalibrated. However in case a meter is found to

violate any of its accuracy , functional requirements during the above periodic accuracy

checks, the same is replaced by CTU by a duly tested/certified meter, and the defective

meter is sent back to the manufacturer for appropriate recalibration and re-certification 

 

 

Page 16: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 16/65

 

3.5 CONSTITUENT WISE LOCATION AND QUANTITY  

Total no of location in Eastern region has 111 and out of which power grid has 23locations. Total no of real meters are 449(including tie line with NR, NER, WR, SR end)

in the region at different locations.S. NO. CONSTITUENT NO. OF  LOCATION A-TYPE B-TYPE TOTAL

1 FSTPP (NTPC) 1 27 - 27

2 KhSTPP(NTPC) 1 41 - 41

3 TSTPP(NTPC) 1 27+9 - 27+9

4 BARH (NTPC) 1 2 - 2

5 BSEB 16 29 5 34

6 JSEB 11 20 5 25

7 DVC 12 3 12 15

8 GRIDCO 13 24 1 25

9 WBSETCL 13 18 1 19

10 SIKKIM 1 5 - 5

11 POWERGRID 23 161 - 161

12 WR 4 8 - 8

13 NR 6 13 - 13

14 SR 1 4 - 4

15 NER 3 6 - 6

16 RANGIT 1 9 - 9

17 TEESTA 1 7 - 7

18 BHUTAN 3 18 - 18

TOTAL 111 431 24 455

 

Page 17: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 17/65

 

3.5.1 METER LOCATION OF INTER CONNECTED SYSTEM

  Details of meter location of interconnected system and constituent wise metering

arrangement and metering arrangement at inter state generating stations are shown in

Annexure-A

3.5.2    LOCATION WISE LIST OF METERS

Eastern region has total 111 location and total no of real meter is 455 including Bhutan

till date.  Power grid has 23 locations.

S.No. LOC_IDMETER

NO. CTR PTR PLACE OF INSTALLATION

METERS INSTALLED IN FSTPP  

1 FK-01 NP-0430-A 500 3636.3636 400 KV SIDE OF FARAKKA GT-1

2 FK-02 NP-0599-A 500 3636.3636 400 KV SIDE OF FARAKKA GT-2

3 FK-03 NP-0432-A 500 3636.3636 400 KV SIDE OF FARAKKA GT-34 FK-04 NP-0421-A 1000 3636.3636 400 KV SIDE OF FARAKKA GT-4

5 FK-05 NP-0419-A 1000 3636.3636 400 KV SIDE OF FARAKKA GT-5

6 FK-06 NP-0575-A 500 3636.3636 400 KV SIDE OF FARAKKA TIE TRANS.-1

7 FK-07 NP-0565-A 500 3636.3636 400 KV SIDE OF FARAKKA TIE TRANS.-2

8 FK-08 NP-5202-A 1000 3636.3636 400 KV FARAKKA (NTPC) - KAHALGAON (NTPC)

9 FK-09 NP-5200-A 1000 3636.3636 400 KV FARAKKA (NTPC) - KAHALGAON (NTPC)

10 FK-10 NP-5228-A 1000 3636.3636 400 KV FARAKKA (NTPC) - DURGAPUR (PG) -1

11 FK-11 NP-5208-A 1000 3636.3636 400 KV FARAKKA (NTPC) - DURGAPUR (PG) -2

12 FK-12 NP-5204-A 1000 3636.3636 400 KV FARAKKA (NTPC) - MALDA (PG) -1

13 FK-13 NP-5223-A 1000 3636.3636 400 KV FARAKKA (NTPC) - MALDA (PG) -2

14 FK-14 NP-5211-A 1000 2000.0000 220 KV FARAKKA (NTPC) - LALMATIA (JSEB)

15 FK-15 NP-5221-A 1000 3636.3636 400 KV FARAKKA (NTPC) - JEERAT (WBSEB)16 FK-16 NP-5213-A 1000 3636.3636 400 KV FARAKKA (NTPC) – SAGARDIGHI(WBSEB

17 FK-17 NP-5210-A 500 3636.3636 400 KV SIDE OF 400/220 KV FARAKKA ATR

18 FK-18 NP-0576-A 500 3636.3636 400 KV SIDE OF FARAKKA TIE TRANS.-3

19 FK-21 NP-5220-A 1000 3636.3636 400 KV FARAKKA (NTPC) - JEERAT (WBSEB) -1 (

20 FK-22 NP-5214-A 1000 3636.3636 400 KV FARAKKA (NTPC) - SUBHASGRAM (CHK

21 FK-23 NP-5222-A 1000 3636.3636 400 KV FARAKKA (NTPC) - DURGAPUR (PG) -1 (C

22 FK-24 NP-5209-A 1000 3636.3636 400 KV FARAKKA (NTPC) - DURGAPUR (PG) -2 (C

23 FK-25 NP-5203-A 1000 3636.3636400 KV FARAKKA (NTPC) - KAHALGAON (NTPC) -MTR)

24 FK-26 NP-5201-A 1000 3636.3636400 KV FARAKKA (NTPC) - KAHALGAON (NTPC) -MTR)

25 FK-27 NP-5212-A 500 3636.3636 400 KV SIDE OF 400/220 KV FARAKKA ATR (CHK

26 FK-28 NP-5229-A 1000 3636.3636 400 KV FARAKKA (NTPC) - MALDA (PG) -1 (CHK M

27 FK-29 NP-5224-A 1000 3636.3636 400 KV FARAKKA (NTPC) - MALDA (PG) -2 (CHK M

B METERS INSTALLED  IN KHSTPP  

28 KH-01 NP-5851-A 500 3636.3636 400 KV SIDE OF KAHALGAON GT-1

29 KH-02 NP-5250-A 500 3636.3636 400 KV SIDE OF KAHALGAON GT-2

30 KH-03 NP-5850-A 500 3636.3636 400 KV SIDE OF KAHALGAON GT-3

31 KH-04 NP-0517-A 500 3636.3636 400 KV SIDE OF KAHALGAON GT-4

32 KH-05 NP-5262-A 500 1200.0000 132 KV SIDE OF KAHALGAON STN TRANS-1

Page 18: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 18/65

 

33 KH-06 NP-5256-A 500 1200.0000 132 KV SIDE OF KAHALGAON STN TRANS-2

34 KH-07 NP-5258-A 1000 3636.3636 400 KV KAHALGAON (NTPC) - FARAKKA (NTPC)

35 KH-08 NP-5254-A 1000 3636.3636 400 KV KAHALGAON (NTPC) - FARAKKA (NTPC)

36 KH-09 NP-5247-A 1000 3636.3636 400 KV KAHALGAON (NTPC) - MAITHON (PG) -1

37 KH-10 NP-5257-A 1000 3636.3636 400 KV KAHALGAON (NTPC) - MAITHON (PG) -2

38 KH-11 NP-5246-A 1000 3636.3636 400 KV KAHALGAON (NTPC) - BIHARSHARIF(PG)

39 KH-12 NP-5240-A 1000 3636.3636 400 KV KAHALGAON (NTPC) - BIHARSHARIF(PG)40 KH-13 NP-5239-A 500 1200.0000 132 KV KAHALGAON (NTPC) - SABOUR (BSEB)

41 KH-14 NP-5244-A 500 1200.0000 132 KV KAHALGAON (NTPC) - LALMATIA (BSEB)

42 KH-15 NP-5252-A 500 3636.3636 400 KV SIDE OF K'GAON 400/132 ATR-I 200 MVA

43 KH-16 NP-5251-A 500 3636.3636 400 KV SIDE OF K'GAON 400/132 ATR-II 200MVA

44 KH-17 NP-5255-A 500 1200.0000 132 KV SIDE OF COLONY TRANSFORMER-I

45 KH-18 NP-5267-A 500 1200.0000 132 KV SIDE OF COLONY TRANSFORMER-II

46 KH-19 NP-5261-A 500 1200.0000 132 KV KAHALGAON (NTPC) - KAHALGAON (BSE

47 KH-21 NP-5259-A 1000 3636.3636 400 KV KAHALGAON (NTPC) - FARAKKA (NTPC)

48 KH-22 NP-5260-A 1000 3636.3636 400 KV KAHALGAON (NTPC) - FARAKKA (NTPC)

49 KH-23 NP-5242-A 1000 3636.3636 400 KV KAHALGAON (NTPC) - MAITHON (PG) -1 (

50 KH-24 NP-5253-A 1000 3636.3636 400 KV KAHALGAON (NTPC) - MAITHON (PG) -2 (

51 KH-25 NP-5248-A 1000 3636.3636 400 KV KAHALGAON (NTPC) - BIHARSHARIF(PG)52 KH-26 NP-5241-A 1000 3636.3636 400 KV KAHALGAON (NTPC) - BIHARSHARIF(PG)

53 KH-27 NP-5263-A 500 3636.3636 400 KV SIDE OF K'GAON 400/132 ATR-I 200 MVA

54 KH-28 NP-5265-A 500 3636.3636 400 KV SIDE OF K'GAON 400/132 ATR-II 200MVA

55 KH-31 NP-5245-A 1000 3636.3636 400 KV KAHALGAON-BIHARSARIFF-3

56 KH-32 NP-5117-A 1000 3636.3636 400 KV KAHALGAON-BIHARSARIFF-4

57 KH-33 NP-5235-A 1000 3636.3636 400 KV KAHALGAON-BIHARSARIFF-3 (CHK)

58 KH-34 NP-5118-A 1000 3636.3636 400 KV KAHALGAON-BIHARSARIFF-4 (CHK)

59 KH-35 NP-5269-A 2000 3636.3636 400 KV KAHALGAON-PATNA-1

60 KH-36 NP-5266-A 2000 3636.3636 400 KV KAHALGAON-PATNA-2

61 KH-37 NP-5264-A 2000 3636.3636 400 KV KAHALGAON-PATNA-1 (CHECK)

62 KH-38 NP-5268-A 2000 3636.3636 400 KV KAHALGAON-PATNA-2 (CHECK)

63 KG-01 NP-5116-A 1000 3636.3636 400 KV SIDE OF KAHALGAON GT-564 KG-02 NP-5852-A 1000 3636.3636 400 KV SIDE OF KAHALGAON GT-6

65 KG-03 NP-5857-A 1000 3636.3636 400 KV SIDE OF KAHALGAON GT-7

66 KG-04 NP-5862-A 500 1200.0000 132 KV SIDE OF KAHALGAON STN TRANS-3

67 KG-05 NP-5863-A 500 1200.0000 132 KV SIDE OF KAHALGAON STN TRANS-4

68 KG-06 NP-5856-A 500 1200.0000 132 KV SIDE OF KAHALGAON STN TRANS-5

C METERS INSTALLED IN TSTPP  

69 TL-01 NP-5107-A 1000 3636.3636 400 KV SIDE OF TALCHER GT-1

70 TL-02 NP-5105-A 1000 3636.3636 400 KV SIDE OF TALCHER GT-2

71 TL-03 NP-5108-A 500 3636.3636 400 KV SIDE OF TALCHER 315MVA 400/220KV AT

72 TL-04 NP-5109-A 500 3636.3636 400 KV SIDE OF TALCHER 315MVA 400/220KV AT

73 TL-05 NP-5083-A 1000 3636.3636 400 KV TALCHER (NTPC) - ROURKELA (PG) -1

74 TL-06 NP-5084-A 1000 3636.3636 400 KV TALCHER (NTPC) - ROURKELA (PG) -2

75 TL-07 NP-5085-A 1000 3636.3636 400 KV TALCHER (NTPC) - RENGALI (PG) -1

76 TL-08 NP-5106-A 1000 3636.3636 400 KV TALCHER (NTPC) - RENGALI (PG) -2

77 TL-09 NP-5103-A 1000 2000.0000 220 KV TSTPP (NTPC) - TTPS (GRIDCO)

78 TL-10 NP-5102-A 1000 2000.0000 220 KV TSTPP (NTPC) - RENGALI HPS (GRIDCO)

79 TL-11 NP-5112-A 1000 2000.0000 220 KV TSTPP (NTPC) - M'MUNDALI (GRIDCO) -1

80 TL-12 NP-5101-A 1000 2000.0000 220 KV TSTPP (NTPC) - M'MUNDALI (GRIDCO) -2

81 TL-13 NP-5081-A 200 2000.0000 220 KV SIDE OF 220/11 KV STATION TRANS. -1

82 TL-14 NP-5066-A 1000 3636.3636 400 KV TSTPP STG-I - STG-II-1

Page 19: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 19/65

 

83 TL-15 NP-5076-A 1000 3636.3636 400 KV TSTPP STG-I - STG-II-2

84 TL-16 NP-5069-A 1000 3636.3636 400 KV TSTPP STG-II - STG-I -1

85 TL-17 NP-5070-A 1000 3636.3636 400 KV TSTPP STG-II - STG-I -2

86 TL-18 NP-5114-A 1000 3636.3636 400 KV TALCHER (NTPC) - M'MUNDALI-1 (GRIDC

87 TL-19 NP-5067-A 1000 3636.3636 400 KV TALCHER (NTPC) - M'MUNDALI-2 (GRIDC

88 TL-21 NP-5082-A 1000 3636.3636 400 KV TALCHER (NTPC)- ROURKELA (PG) -1 (C

89 TL-22 NP-5115-A 1000 3636.3636 400 KV TALCHER (NTPC) - ROURKELA (PG) -2 (C90 TL-23 NP-5110-A 1000 3636.3636 400 KV TALCHER (NTPC) - RENGALI (PG) -1 (CHK

91 TL-24 NP-5972-A 1000 3636.3636 400 KV TALCHER (NTPC) - RENGALI (PG) -2 (CHK

92 TL-25 NP-5077-A 500 3636.3636 400 KV SIDE OF TALCHER  400/220KV ATR-1 (C

93 TL-26 NP-5113-A 500 3636.3636 400 KV SIDE OF TALCHER  400/220KV ATR-2 (C

94 TL-27 NP-5078-A 1000 3636.3636 400 KV TALCHER (NTPC) - M'MUNDALI-1 (GRID)-

95 TL-28 NP-5104-A 1000 3636.3636 400 KV TALCHER (NTPC) - M'MUNDALI-2 (GRID)-

96 TL-31 NP-4094-A 2000 3636.3636 400 KV TSTPP HVDC FDR-1(MAIN)

97 TL-32 NP-4095-A 2000 3636.3636 400 KV TSTPP HVDC FDR-2(MAIN)

98 TL-33 NP-4090-A 2000 3636.3636 400 KV TSTPP HVDC FDR-3(MAIN)

99 TL-34 NP-4097-A 2000 3636.3636 400 KV TSTPP HVDC FDR-4(MAIN)

100 TL-45 NP-4009-A 1000 3636.3636 400 KV SIDE OF TALCHER GT-3

101 TL-47 NP-4003-A 1000 3636.3636 400 KV SIDE OF TALCHER GT-4102 TL-49 NP-4001-A 1000 3636.3636 400 KV SIDE OF TALCHER GT-5

103 TL-51 NP-4068-A 1000 3636.3636 400 KV SIDE OF TALCHER GT-6

104 TL-57 NP-4064-A 100 3636.3636 220 KV SIDE OF 220/11 KV STN TRANS. -1

 D METERS INSTALLED IN TSTPP  

105 BH-01 NP-6111-A 3000 3636.3636 400 KV BARH (NTPC) – KAHALGAON (NTPC) -2

106 BH-02 NP-6080-A 3000 3636.3636 400 KV BARH (NTPC) – PATNA (PG) -2

EMETERS INSTALLED IN CHUKHA

HPC  

107 CU-01 NP-2529-A 600 2000.0000 220 KV CHUKHA (CHPC) - BIRPARA (PG) -1

108 CU-02 NP-2520-A 600 2000.0000 220 KV CHUKHA (CHPC) - BIRPARA (PG) -2

109 CU-03 NP-2377-A 600 2000.0000 220 KV CHUKHA (CHPC) - MALBASE (CHPC)110 CU-04 NP-0580-A 600 2000.0000 220 KV MALBASE (CHPC) - BIRPARA (PG)

111 CU-05 NP-0571-A 600 2000.0000 CHUKHA (CHPC) GENERATOR -I

112 CU-06 NP-0596-A 600 2000.0000 CHUKHA (CHPC) GENERATOR -II

113 CU-07 NP-0483-A 600 2000.0000 CHUKHA (CHPC) GENERATOR -III

114 CU-08 NP-0408-A 600 2000.0000 CHUKHA (CHPC) GENERATOR -IV

115 TH-01 NP-5828-A 2000 3636.3636 400 KV TALA (BHUTAN)- BINAGURI - I

116 TH-02 NP-5829-A 2000 3636.3636 400 KV TALA (BHUTAN)- BINAGURI - II

FMETERS INSTALLED IN MALBASE

(BHUTAN)  

117 BT-33 NP-5096-A 800 2000.0000 220 KV MALBASE (BHUTAN) – CHUKHA (BHUTAN

118 BT-34 NP-5097-A 800 2000.0000 220 KV MALBASE (BHUTAN) – SINGHIGAON (BHU

119 BT-35 NP-5099-A 800 2000.0000 220 KV MALBASE (BHUTAN) – SINGHIGAON (BHU120 BT-36 NP-5098-A 800 2000.0000 220 KV SIDE OF MALBASE (BHUTAN) ICT

121 BT-37 NP-5095-A 1000 3636.3636 400 KV SIDE OF MALBASE (BHUTAN) ICT

122 BT-38 NP-5100-A 1000 3636.3636 400 KV MALBASE (BHUTAN) – TALA (BHUTAN)

123 BT-39 NP-5869-A 1000 3636.3636 400 KV MALBASE (BHUTAN) – BINAGURI (PG)

124 BT-40 NP-5867-A 800 2000.0000 220 KV MALBASE (BHUTAN)- BIRPARA (PG)

GMETERS INSTALLED IN RANGIT

HEP(NHPC)  

125 RG-01 NP-5919-A 150 1200.0000 132 KV SIDE OF RANGIT GEN.TRANS.- 1

126 RG-02 NP-5920-A 150 1200.0000 132 KV SIDE OF RANGIT GEN.TRANS.- 2

Page 20: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 20/65

Page 21: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 21/65

 

174 ER-34 NP-5957-A 500 2000.0000 220 KV JEYPORE (PG) - JEYNAGAR (GRIDCO) -1

175 ER-35 NP-5958-A 500 2000.0000 220 KV JEYPORE (PG) - JEYNAGAR (GRIDCO) -2

176 ER-36 NP-5959-A 1000 3636.3636 400 KV JEYPORE (PG) - INDRAVATI (PG)

177 ER-37 NP-5884-A 1000 3636.3636 400 KV BINAGURI (PG) - BONGAIGAON (NER)-1

178 ER-38 NP-5960-A 1600 3636.3636 400 KV JEYPORE (PG) - M'MUNDALI (GRIDCO)

179 ER-39 NP-6465-A 800 2000.0000 220 KV BIRPARA (PG) - CHUKHA (CHPC) -1

180 ER-40 NP-6464-A 800 2000.0000 220 KV BIRPARA (PG) - CHUKHA (CHPC) -2181 ER-41 NP-6490-A 800 2000.0000 220 KV BIRPARA (PG) - MALBASE

182 ER-42 NP-6462-A 800 2000.0000 220 KV BIRPARA (PG) - SALAKATI (PG) -1

183 ER-43 NP-6463-A 800 2000.0000 220 KV BIRPARA (PG) - SALAKATI (PG) -2

184 ER-44 NP-6469-A 600 1200.0000 132 KV BIRPARA (PG) - BIRPARA (WBSEB) -1

185 ER-45 NP-5881-A 1600 2000.0000 220 KV BINAGURI (PG) - JALPAIGURI(WBSEB)-2

186 ER-46 NP-6491-A 800 2000.0000 220 KV BIRPARA (PG) - SILIGURI (PG) -1

187 ER-47 NP-6468-A 800 2000.0000 220 KV BIRPARA (PG) - SILIGURI (PG) -2

188 ER-48 NP-6083-A 600 1200.0000 132 KV PURNEA (PG) - PURNEA (BSEB) -3

189 ER-49 NP-6084-A 600 1200.0000 132 KV PURNEA (PG) - DALKHOLA (WBSEB)

190 ER-50 NP-5949-A 800 2000.0000 220 KV SILIGURI (PG) - DALKHOLA (PG) -1

191 ER-51 NP-5948-A 800 2000.0000 220 KV SILIGURI (PG) - DALKHOLA (PG) -2

192 ER-52 NP-5945-A 600 1200.0000 132 KV SILIGURI (PG) - NBU (WBSEB) -2193 ER-53 NP-5946-A 600 1200.0000 132 KV SILIGURI (PG) - NBU-(WBSEB) -1

194 ER-54 NP-5947-A 600 1200.0000 132 KV SILIGURI (PG) - RANGIT (NHPC)-1&2

195 ER-55 NP-6093-A 800 2000.0000 220 KV PUSAULI (PG) - DEHRI (BSEB)

196 ER-56 NP-6092-A 800 2000.0000 220 KV PUSAULI (PG) - SAHUPURI (NR)

197 ER-57 NP-5950-A 600 1200.0000 132 KV SILIGURI (PG) - MELLI (SIKKIM)

198 ER-58 NP-6476-A 600 1200.0000 132 KV MALDA (PG) - MALDA (WBSEB) -1

199 ER-59 NP-6478-A 600 1200.0000 132 KV MALDA (PG) - MALDA (WBSEB) -2

200 ER-60 NP-6477-A 800 2000.0000 220 KV MALDA (PG) - DALKHOLA (PG) -1

201 ER-61 NP-6479-A 800 2000.0000 220 KV MALDA (PG) - DALKHOLA (PG) -2

202 ER-62 NP-6081-A 800 1200.0000 132 KV PURNEA (PG) - PURNEA (BSEB) -1

203 ER-63 NP-6082-A 800 1200.0000 132 KV PURNEA (PG) - PURNEA (BSEB) -2

204 ER-64 NP-0415-A 800 2000.0000 220 KV PURNEA (PG) - DALKHOLA (PG) -1205 ER-65 NP-0389-A 800 2000.0000 220 KV PURNEA (PG) - DALKHOLA (PG) -2

206 ER-66 NP-6460-A 500 3636.3636 400 KV SIDE OF DURGAPUR 400/220 KV ICT -1

207 ER-67 NP-6461-A 500 3636.3636 400 KV SIDE OF DURGAPUR 400/220 KV ICT -2

208 ER-68 NP-5831-A 1000 3636.3636 400 KV DURGAPUR(PG) - PURULIA PPS

209 ER-69 NP-6453-A 500 3636.3636 400 KV SIDE OF MAITHON (PG) 400/220 KV ICT -

210 ER-70 NP-6449-A 500 3636.3636 400 KV SIDE OF MAITHON (PG) 400/220 KV ICT -2

211 ER-71 NP-5927-A 500 3636.3636 400 KV SIDE OF ROURKELA (PG) 400/220 KV ICT

212 ER-72 NP-5930-A 500 3636.3636 400 KV SIDE OF ROURKELA (PG) 400/220 KV ICT

213 ER-73 NP-5992-A 500 3636.3636 400 KV SIDE OF RENGALI (PG) 400/220 KV ICT -1

214 ER-74 NP-5988-A 500 3636.3636 400 KV SIDE OF RENGALI (PG) 400/220 KV ICT -2

215 ER-75 NP-5955-A 500 3636.3636 400 KV SIDE OF JEYPORE (PG) 400/220 KV ICT -

216 ER-76 NP-5951-A 800 2000.0000 220 KV SIDE OF SILIGURI (PG) 220/132 KV ICT -1217 ER-77 NP-5956-A 600 3636.3636 400 KV SIDE OF JEYPORE (PG) 400/220 KV ICT -2

218 ER-78 NP-6095-A 300 1200.0000 132 KV PUSAULI(PG)-DEHRI(BSEB)

219 ER-79 NP-6094-A 300 1200.0000 132 KV PUSAULI(PG)-KARMANASA(BSEB)

220 ER-80 NP-5943-A 2000 3636.3636 400 KV ROURKELA-RAIPUR - I

221 ER-81 NP-5928-A 2000 3636.3636 400 KV ROURKELA-RAIPUR - II

222 ER-82 NP-2375-A 2000 3636.3636 400 KV SASARAM (PG) EAST BUS-1

223 ER-83 NP-0167-A 2000 3636.3636 400 KV SASARAM (PG) EAST BUS-2

224 ER-84 NP-5961-A 1000 3636.3636 400 KV JEYPORE (PG) - GAJUWAKA (PG) -1

Page 22: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 22/65

 

225 ER-85 NP-5962-A 1000 3636.3636 400 KV JEYPORE (PG) - GAJUWAKA (PG) -2

226 ER-86 NP-5966-A 1000 3636.3636 400 KV INDRAVATI (PG) - INDRAVATI P/H)

227 ER-87 NP-5890-A 800 2000.0000 220 KV SIDE OF BINAGURI 400/220 KV ICT-2

228 ER-88 NP-6475-A 1000 3636.3636 400 KV MALDA (PG) - PURNEA (PG)

229 ER-89 NP-6064-A 1000 3636.3636 400 KV BIHARSARIFF (PG) - SASARAM (NR) -1

230 ER-90 NP-6062-A 1000 3636.3636 400 KV BIHARSARIFF (PG) - SASARAM (NR) -2

231 ER-94 NP-2372-A 600 3636.3636 400 KV SIDE OF PUSAULI 400/220KV ICT-2232 ER-95 NP-6058-A 300 2000.0000 220 KV SIDE OF ARAH 220/132 KV 100 MVA ICT-1

233 ER-96 NP-6059-A 300 2000.0000 220 KV SIDE OF ARAH 220/132 KV 100 MVA ICT-2

234 ER-97 NP-2367-A 600 3636.3636 400 KV SIDE OF PUSAULI 400/220KV ICT-1

235 ER-98 NP-5916-A 400 1200.0000 132 KV BARIPADA - BARIPADA (GRIDCO)

236 ER-99 NP-5912-A 400 1200.0000 132 KV BARIPADA - RAIRANGPUR (GRIDCO)

237 EM-01 NP-6026-A 300 1200.0000 132 KV GANGTOK(PG) - MELLI (SIKKIM)

238 EM-02 NP-6027-A 300 1200.0000 132 KV GANGTOK(PG) - RANGIT (NHPC)

239 EM-03 NP-6029-A 300 1200.0000 132 KV SIDE OF GANGTOK 132/66 KV ICT-1

240 EM-04 NP-6030-A 300 1200.0000 66 KV SIDE OF GANGTOK 132/66 KV ICT-1

241 EM-05 NP-6028-A 300 1200.0000 132 KV SIDE OF GANGTOK 132/66 KV ICT-2

242 EM-06 NP-6025-A 300 1200.0000 66 KV SIDE OF GANGTOK 132/66 KV ICT-2

243 EM-07 NP-5086-A 1000 3636.3636 400 KV BINAGURI (PG)-TALA (THP)-1244 EM-08 NP-5087-A 1000 3636.3636 400 KV BINAGURI (PG)-TALA (THP)-2

245 EM-09 NP-5088-A 1000 3636.3636 400 KV BINAGURI (PG)-MALBASE(PG)-3

246 EM-10 NP-5888-A 1000 3636.3636 400 KV BINAGURI (PG)-TALA (THP)-4

247 EM-11 NP-5090-A 1000 3636.3636 400 KV BINAGURI-PURNEA-1

248 EM-12 NP-5091-A 1000 3636.3636 400 KV BINAGURI-PURNEA-2

249 EM-13 NP-5092-A 2000 3636.3636 400 KV BINAGURI-PURNEA-3

250 EM-14 NP-5093-A 1000 3636.3636 400 KV BINAGURI-PURNEA-4

251 EM-15 NP-5848-A 600 36,363,636 400 KV SIDE OF SUBHASGRAM ICT-1

252 EM-16 NP-5845-A 600 36,363,636 400 KV SIDE OF SUBHASGRAM ICT-2

253 EM-17 NP-5360-A 2000 3636.3636 400 KV SUBHASGRAM-JEERAT (WBSEB)

254 EM-18 NP-5080-A 1600 2000.0000 220 KV SUBHASGRAM-SUBHASGRAM-1 (WBSEB

255 EM-19 NP-5847-A 1600 2000.0000 220 KV SUBHASGRAM-SUBHASGRAM-2 (WBSEB256 EM-21 NP-6061-A 3000 3636.3636 400 KV BIHARSARIFF-BALIA (NR)-1

257 EM-22 NP-6065-A 3000 3636.3636 400 KV BIHARSHARIFF-BALIA (NR)-2

258 EM-23 NP-5071-A 1000 3636.3636 400 KV MZ'PUR (PG)-BIHARSARIFF-1

259 EM-24 NP-5230-A 1000 3636.3636 400 KV MZ'PUR (PG)-BIHARSARIFF-2

260 EM-25 NP-5074-A 2000 3636.3636 400 KV MZ'PUR (PG)-GORAKHPUR(NR)-1

261 EM-26 NP-9981-A 2000 3636.3636 400 KV MZ'PUR (PG)-GORAKHPUR(NR)-2

262 EM-27 NP-5075-A 2000 3636.3636 400 KV MZ'PUR - PURNEA-1

263 EM-28 NP-5062-A 2000 3636.3636 400 KV MZ'PUR - PURNEA-2

264 EM-29 NP-5073-A 600 3636.3636 400/220 KV MZ'PUR ICT-2

265 EM-30 NP-9983-A 600 3636.3636 400/220 KV MZ'PUR ICT-1

266 EM-31 NP-5063-A 800 2000.0000 220 KV MZ'PUR(PG) - KANTI(BASEB)-1

267 EM-32 NP-5061-A 800 2000.0000 220 KV MZ'PUR(PG) - KANTI(BASEB)-2268 EM-41 NP-5871-A 1000 3636.3636 400 KV RANCHI-MAITHON-2

269 EM-42 NP-5873-A 600 3636.3636 400 KV SIDE OF RANCHI ICT-2

270 EM-43 NP-5872-A 800 2000.0000 220 KV SIDE OF RANCHI ICT-2

271 EM-44 NP-5879-A 800 2000.0000 220 KV RANCHI - PATRATU (JSEB)

272 EM-45 NP-5874-A 800 2000.0000 220 KV RANCHI - CHANDIL (JSEB)

273 EM-46 NP-5877-A 1000 3636.3636 400 KV RANCHI-MAITHON-1

274 EM-47 NP-5835-A 1000 3636.3636 400 KV RANCHI – SIPAT -I

275 EM-48 NP-5836-A 1000 3636.3636 400 KV RANCHI – SIPAT -II

Page 23: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 23/65

 

276 EM-50 NP-6086-A 600 1200.0000 220/132 KV PURNEA ICT-1

277 EM-51 NP-2517-A 600 1200.0000 220/132 KV PURNEA ICT-2

278 EM-52 NP-2518-A 600 1200.0000 220/132 KV PURNEA ICT-3

279 EM-53 NP-5273-A 2000 3636.3636 400 KV PATNA (ER) - BALIA (NR)-2

280 EM-54 NP-5272-A 2000 3636.3636 400 KV PATNA - KAHALGAON-1

281 EM-55 NP-5270-A 600 3636.3636 400 KV SIDE OF PATNA ICT-1

282 EM-56 NP-5271-A 1000 3636.3636 220 KV SIDE OF PATNA ICT-1283 EM-57 NP-5274-A 2000 3636.3636 400 KV PATNA (ER) - BALIA (NR)-1

284 EM-58 NP-5914-A 400 1200.0000 132 KV BARIPADA (PG) - BALASORE (GRIDCO)

285 EM-59 NP-5911-A 800 2000.0000 132 KV SIDE OF BARIPADA 220/132 KV ICT

286 EM-60 NP-5878-A 600 3636.3636 400 KV SIDE OF RANCHI ICT-1

287 EM-61 NP-5870-A 800 2000.0000 220 KV SIDE OF RANCHI ICT-1

288 EM-62 NP-5839-A 600 3636.3636 400 KV SIDE OF PATNA ICT-2

289 EM-63 NP-5866-A 1000 2000.0000 220 KV SIDE OF PATNA ICT-2

290 EM-64 NP-5865-A 800 2000.0000 220 KV PATNA - FATUA-1

291 EM-65 NP-5832-A 800 2000.0000 220 KV PATNA - KHAGAUL-2

292 EM-66 NP-5913-A 800 2000.0000 220 KV BARIPADA (PG) - BALASORE (GRIDCO)-2

293 EM-67 NP-5886-A 1000 3636.3636  400 KV BINAGURI – TEESTA- V- I

294 EM-68 NP-5887-A 1000 3636.3636  400 KV BINAGURI – TEESTA- V- II295 EM-69 NP-5909-A 1200 3636.3636  315 MVA ICT AT BARIPADA

296 EM-71 NP-5838-A 2000 3636.3636  400 KV PATNA – KAHALGAON-2

297 EM-72 NP-6056-A 800 2000.0000 220 KV ARAH – KHAGAUL - 1

298 EM-73 NP-6057-A 800 2000.0000 220 KV ARAH – KHAGAUL - 2

299 EM-74 NP-5846-A 2000 3636.3636 400 KV SUBHASHGRAM – SAGARDIGHI (WBSEB

300 EM-75 NP-6470-A 300 1200.0000 132 KV BIRPARA (PG) – BIRPARA (WBSEB) -2

301 EM-76 NP-5072-A 1000 3636.3636 400 KV JAMSHEDPUR (PG)- MEJIA (DVC)

J METERS INSTALLED IN BSEB  

302 BI-01 NP-5841-A 1200 2000.0000 220 KV BIHARSHARIF(BSEB) - BIHARSHARIF(PG

303 BI-02 NP-5840-A 1200 2000.0000 220 KV BIHARSHARIF(BSEB) - BIHARSHARIF(PG

304 BI-03 NP-6088-A 600 1200.0000 132 KV PURNEA (BSEB) - PURNEA (PG) -1305 BI-04 NP-6089-A 600 1200.0000 132 KV PURNEA (BSEB) - PURNEA (PG) -2

306 BI-07 NP-0531-A 600 1200.0000 132 KV SABOUR (BSEB) - KAHALGAON (NTPC)

307 BI-10 NP-0540-A 150 1200.0000 132 KV KAHALGAON (BSEB) - KAHALGAON (NTP

308 BI-11 NP-6052-A 200 1200.0000 132 KV ARAH (BSEB) - ARAH (PG)

309 BI-12 NP-0538-A 200 1200.0000 132 KV DUMRAON (BSEB) - ARAH (PG)

310 BI-13 NP-6053-A 800 2000.0000 220 KV KHAGAUL(BSEB) - ARAH (PG)-1

311 BI-14 NP-6060-A 800 2000.0000 220 KV KHAGAUL(BSEB) - ARAH (PG)-2

312 BI-20 NP-5236-A 600 1200.0000 132 KV KISHANGANJ (BSEB) – PURNEA (PG)

313 BI-21 NP-6085-A 600 1200.0000 132 KV KISHANGANJ (BSEB) – DALKHOLA (WB)

314 BI-48 NP-6070-A 600 1200.0000 132 KV BIHARSHARIFF (BSEB )  TIE AT RAJGIR

315 BI-49 NP-6099-A 300 1200.0000 132 KV MOHANIA (BSEB) – PUSAULI (PG)

316 BI-50 NP-6098-A 300 1200.0000 132 KV DEHRI (BSEB) – PUSAULI (PG)317 BI-51 NP-6090-A 600 1200.0000 132 KV PURNEA (BSEB) – PURNEA (PG) -3

318 BI-52 NP-0480-A 600 2000.0000 220 KV BODHGAYA(BSEB) - PATRATU -1 (JSEB)

319 BI-53 NP-0426-A 600 2000.0000 220 KV BODHGAYA(BSEB) - PATRATU -2 (JSEB)

320 BI-54 NP-0537-A 600 2000.0000 220 KV BODHGAYA(BSEB) - PATRATU -3 (JSEB)

321 BI-55 NP-6066-A 600 1200.0000 132 KV RAJGIR (BSEB) - BARHI (DVC)

322 BI-56 NP-5842-A 600 1200.0000 132 KV BIHARSHARIF (BSEB) - BARHI (DVC)

323 BI-57 NP-5844-A 1200 2000.0000 220 KV BIHARSARIFF (BSEB) - TENUGHAT (JSEB

324 BI-58 NP-6078-A 600 1200.0000 132 KV SULTANGANJ(BS)-SABOUR -LALMATIA (J

Page 24: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 24/65

 

325 BI-59 NP-6073-A 600 1200.0000 132 KV SULTANGANJ (BSEB) - LALMATIA (JSEB)

326 BI-60 NP-6015-B 120 1200.0000 132 KV SONENAGAR (BSEB) - GARWAH (JSEB)

327 BI-61 NP-6047-B 40 1200.0000 132 KV SULTANGANJ (BSEB) - DEOGARH (JSEB)

328 BI-62 NP-6097-A 600 2000.0000 220 KV DEHRI (BSEB) - PUSAULII (PG)

329 BI-63 NP-6017-B 60 1200.0000 132 KV KARMANASHA(BSEB) - CHANDAULI (UPS

330 BI-64 NP-6018-B 60 1200.0000 132 KV KARMANASHA(BSEB) - SAHUPURI(UPSE

331 BI-66 NP-6013-B 120 1200.0000 132 KV SONENAGAR(BSEB) - RIHAND(UPSEB)332 BI-67 NP-5843-A 800 2000.0000 220 KV BIHARSHARIF(BSEB) - BIHARSHARIF(PG

333 BI-68 NP-5064-A 600 2000.0000 200 KV KANTI (BSEB)-MZ'PUR (PG)-1

334 BI-69 NP-5065-A 600 2000.0000 200 KV KANTI (BSEB)-MZ'PUR (PG)-2

335 BI-70 NP-6077-A 600 2000.0000 132 KV SULTANGANJ(BS)-SABOUR -LALMATIA (J

METERS INSTALLED IN JSEB  

336 JS-01 NP-6103-A 1200 2000.0000 220 KV RAMCHANDRAPUR(JSEB) - JAMSHEDPU

337 JS-02 NP-5119-A 1200 2000.0000 220 KV RAMCHANDRAPUR(JSEB) - JAMSHEDPU

338 JS-03 NP-6108-A 600 1200.0000 132 KV LALMATIA (JSEB) - KAHALGAON (NTPC)

339 JS-04 NP-6109-A 800 2000.0000 220 KV LALMATIA (JSEB) - FARAKKA (NTPC)

340 JS-05 NP-6116-A 1200 2000.0000 220 KV CHANDIL (JSEB) – RANCHI (PG)

341 JS-06 NP-6121-A 1200 2000.0000 220 KV  CHANDIL (JSEB) – CHANDIL (JSEB)342 JS-07 NP-6122-A 1200 2000.0000 220 KV  HATIA (JSEB) – RANCHI (PG)

343 JS-08 NP-6118-A 1200 2000.0000 220 KV  CHANDIL (JSEB) – CHANDIL (JSEB)

344 JS-40 NP-6605-B 120 1200.0000 132 KV  PATRATU (JSEB) – PATRATU (DVC)-2

345 JS-51 NP-6102-A 600 2000.0000 220 KV RAMCHANDRAPUR (JSEB) - JODA (GRID

346 JS-52 NP-6117-A 300 1200.0000 132 KV KENDOPOSI (JSEB) - JODA (GRIDCO)

347 JS-53 NP-6009-B 60 1200.0000 132 KV GOELKERA (JSEB) - ROURKELA (GRIDCO

348 JS-54 NP-6004-B 120 1200.0000 132 KV PATRATU (JSEB) - PATRATU (DVC) -1

349 JS-55 NP-6003-B 120 1200.0000 132 KV PATRATU (JSEB) - RAMGARH (DVC) -TR.

350 JS-56 NP-6104-A 600 1200.0000 132 KV CHANDIL (JSEB) - MANIQUE (DVC)

351 JS-57 NP-6119-A 800 2000.0000 220 KV CHANDIL (JSEB) - SANTALDIH (WBSEB)

352 JS-58 NP-6113-A 400 1200.0000 132 KV GARWA (JSEB) - RIHAND (UPSEB)

353 JS-59 NP-0425-A 600 2000.0000 220 KV PATRATU(JSEB) - BODHGAYA -1 (BSEB)354 JS-60 NP-0434-A 600 2000.0000 220 KV PATRATU(JSEB) - BODHGAYA -2 (BSEB)

355 JS-61 NP-0431-A 1200 2000.0000 220 KV PATRATU(JSEB) - BODHGAYA -3 (BSEB)

356 JS-62 NP-6115-A 1600 2000.0000 220 KV TENUGHAT (JSEB) - BIHARSARIFF (BSEB

357 JS-63 NP-6107-A 600 1200.0000 132 KV LALMATIA (JSEB) - SABOUR (BSEB)

358 JS-64 NP-0000-A 400 1200.0000 132 KV JAPLA (JSEB) - SONENAGAR (BSEB)

359 JS-65 NP-6048-B 40 1200.0000 132 KV DEOGARH (JSEB) - SULTANGANJ (BSEB)

360 JS-66 NP-6110-A 200 1200.0000 132 KV JAMTARA (JSEB) - MAITHON (DVC

METERS INSTALLED IN DVC  

361 DV-01 NP-6563-B 160 2000.0000 220 KV PARULIA (DVC) - PARULIA (PG) -1&2(SUM

362 DV-03 NP-6561-B 320 2000.0000 220 KV K'NESWARI (DVC) - MAITHON (PG) -1&2(S

363 DV-04 NP-6507-A 2000 3636.3636 400 KV MEJIA (DVC)- MAITHON(PG)364 DV-05 NP-6508-A 2000 3636.3636 400 KV MEJIA (DVC)- JAMSHEDPUR (PG)

365 DV-51 NP-6007-B 160 1200.0000 132 KV BARHI (DVC) - RAJGIR/BSF (BSEB)

366 DV-53 NP-6006-B 120 1200.0000 132 KV PATRATU (DVC)-PATRATU(JSEB)-1&2(SU

367 DV-55 NP-6011-B 120 1200.0000 132 KV MANIQUE (DVC) - CHANDIL (JSEB)

368 DV-56 NP-6562-B 40 1200.0000 132 KV MAITHON (DVC) - JAMTARA (JSEB)

369 DV-57 NP-6008-B 160 2000.0000 220 KV JAMSHEDPUR (DVC) - JINDAL(GRIDCO)

370 DV-58 NP-0633-B 160 1200.0000 132 KV WARIA (DVC) - DPL (WBSEB) -1&2(SUM)

371 DV-60 NP-6564-B 320 2000.0000 220 KV WARIA (DVC) - BIDHANNAGAR (WBSEB)-

Page 25: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 25/65

Page 26: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 26/65

 

419 WB-60 NP-0612-B 240 1200.0000 132 KV DPL (WBSEB) - WARIA (DVC) -1&2(SUM)

METERS INSTALLED IN SIKKIM  

420 SM-01 NP-6481-A 300 600 66  KV MELLI (SIKKIM) - RANGIT (NHPC)

421 SM-02 NP-5995-A 300 1200.0000 132 KV MELLI (SIKKIM) - SILIGURI (PG)

422 SM-03 NP-5996-A 150 1200.0000 132 KV MELLI (SIKKIM) - GANGTOK (PG)

423 SM-04 NP-5997-A 300 2000.0000 132 KV MELLI (SIKKIM) - RANGIT (NHPC)424 SM-51 NP-5849-A 300 600.0000   66  KV MELLI (SIKKIM) - KALIMPONG (WBSEB

METERS INSTALLED IN NER-ER  

425 NE-81 NP-5304-A 800 2000.0000 220 KV SALAKATI (PG) - BIRPARA(PG)-1

426 NE-82 NP-5303-A 800 2000.0000 220 KV SALAKATI (PG) - BIRPARA(PG)-2

427 NE-83 NP-5305-A 300 1200.0000 132 KV SALAKATI (PG) - GELEPHU (BHUTAN)

428 NE-84 NP-0364-A 300 1200.0000 132 KV GELEPHU (BHUTAN) - SALAKATI (PG)

429 NE-85 NP-5313-A 1000 3636.3636 400 KV BONGAIGAON (PG) - BINAGURI -1

430 NE-86 NP-5318-A 1000 3636.3636 400 KV BONGAIGAON (PG) - BINAGURI-2

METERS INSTALLED IN SR-ER  

431 DC-01 NP-5376-A 2000 3636.3636 GAJUWAKA (PG) HVDC STN (SOUTH BUS) -1432 DC-02 NP-5377-A 2000 3636.3636 GAJUWAKA (PG) HVDC STN (SOUTH BUS) -2

433 DC-03 NP-5378-A 2000 3636.3636 GAJUWAKA (PG) HVDC STN (EAST BUS) -1

434 DC-04 NP-5379-A 2000 3636.3636 GAJUWAKA (PG) HVDC STN (EAST BUS) -2

R METERS INSTALLED IN NR-ER  

435 NR-01 NP-5341-A 2000 3636.3636 400 KV BALIA (NR)- PATNA (ER)-1

436 NR-02 NP-5043-A 2000 3636.3636 400 KV BALIA (NR)- PATNA (ER)-2

437 NR-03 NP-1530-A 800 2000.0000 220 KV SAHUPURI (NR) - PUSAULI (PG)

438 NR-05 NP-1529-A 400 1200.0000 132 KV SAHUPURI (NR) - K'NASA (BSEB)-2

439 NR-06 NP-1292-A 400 1200.0000 132 KV CHANDAULI (NR) - K'NASA

440 NR-07 NP-1295-A 400 1200.0000 132 KV RIHAND(NR) - SONENAGAR (BSEB)

441 NR-08 NP-1296-A 400 1200.0000 132 KV RIHAND(NR) - GARWA (JSEB)

442 NR-09 NP-6101-A 2000 3636.3636 SASARAM (PG) NORTH BUS-1 SARNATH443 NR-10 NP-6091-A 2000 3636.3636 SASARAM (PG) NORTH BUS-2 ALLAHABAD

444 NR-11 NP-5010-A 2000 3636.3636 400 KV G'RKPUR(NR) - MZ'PUR(ER)-1

445 NR-12 NP-5009-A 2000 3636.3636 400 KV G'RKPUR(NR) - MZ'PUR(ER)-2

446 NR-13 NP-5406-A 2000 3636.3636 400 KV BALIA - BIHARSHARIFF (ER)-1

447 NR-14 NP-5345-A 2000 3636.3636 400 KV BALIA - BIHARSHARIFF (ER)--2

METRS INSTALLED IN WR-ER  

448 CS-54 NP-2122-A 800 2000.0000 220 KV KORBA (WR) - BUDIPADAR (ER)-2

449 CS-55 NP-2133-A 800 2000.0000 220 KV KORBA (WR) - BUDIPADAR (ER)-3

450 CS-56 NP-2104-A 600 2000.0000 220 KV RAIGAR(WR) - BUDIPADAR (ER)

451 CS-57 NP-5713-A 1000 3636.3636 400 KV RAIGAR(WR) - ROURKELA (ER)-1

452 CS-58 NP-5714-A 1000 3636.3636 400 KV RAIGAR(WR) - ROURKELA (ER)-2453 CS-59 NP-2465-A 1000 3636.3636 400 KV KORBA (WR) - VINDHYACHAL (WR)

454 CS-60 NP-6245-A 2000 3636.3636 400 KV SIPAT (WR) – RANCHI- 1

455 CS-61 NP-6253-A 2000 3636.3636 400 KV SIPAT (WR) – RANCHI- 2

 

 

Page 27: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 27/65

 

3.6 PAIRS.DAT file

  This file gives the LOC-ID of main meter and standby meter and the permitted

pair tolerance for each pair. Main meters are those which are connected on 400 kV side

of ICT or generator side of power station or sending end of inter state lines. The

standby/check meters are on the other end. Standby meters are connected in reverse

polarity so that sum of both MWh is zero in ideal condition. Suppose the power flow is

from main meter to standby meter, the main meter gives a +ve value and standby meter

gives a –ve value and vice versa. Tolerance value in MWh for a 15 min block in +ve

direction & -ve direction is given in this PAIRS.DAT, depending upon transformer /Line

loses & CT/PT errors.

The given tolerance value towards +ve side is called X value. The tolerance valuetowards –ve side is called Y value.

 

 

PAIRS.DAT

 

MAIN     STANDBY      X       Y      LINE DETAILS

-----------------------------------------------------------------------

BI-01     ER-01       2.0      1.5   BIHARS'F-BIHARSARIFF-1  |

BI-02     ER-02       2.0      1.5   BIHARS'F-BIHARSARIFF-2  | BSEB

BI-67     ER-03       2.0      1.5   BIHARS'F-BIHARSARIFF-3  |

ER-62     BI-03       2.0      1.5   PURNIA-PURNIA-1         |

ER-63     BI-04       2.0      1.5   PURNIA-PURNIA-2         |

ER-48     BI-51       1.5      1.0   PURNEA-PURNEA-3

KH-13     BI-07       2.0      1.5   KAHALGAON-SABOUR        |

KH-19     BI-10       2.0      1.5   KAHALGAON-KAHALGAON     |

ER-09     BI-11       1.5      1.0   ARAH-ARAH               |

ER-10     BI-12       1.5      1.0   ARAH-DUMRAON            |

JS-01     ER-17       2.0      1.5   RAMCH'PUR-JAMSHEDPUR-1   |

JS-02     ER-18       2.0      1.5   RAMCH'PUR-JAMSHEDPUR-2   |JSEB

FK-14     JS-04       2.0      1.5   FARAKKA-LALMATIA         |

KH-14     JS-03       2.0      1.5   KAHALGAON-LALMATIA       |

ER-91     DV-01       2.0      1.5   PARULIA-PARULIA     | DVC

ER-92     DV-03       2.5      1.5   MAITHON-KALYANSWARI |

ER-23     OR-01       1.5      1.5   ROURKELA-TARKERA-1 |

ER-24     OR-02       1.5      1.5   ROURKELA-TARKERA-2 |TL-10     OR-11       2.0      2.0   TSTPP-RENGALI PH   |

TL-09     OR-12       1.5      1.0   TSTPP-TTPS         |

TL-11     OR-09       2.0      1.5   TSTPP-MERAMNDLI-1  | GRIDCO

TL-12     OR-10       2.0      1.5   TSTPP-MERAMNDLI-2  |

ER-30     OR-03       2.0      1.5   RENGALI-RENGALI-1  |

ER-31     OR-04       2.0      1.5   RENGALI-RENGALI-2  |

ER-34     OR-05       2.0      1.5   JEYPORE-JAYNAGAR-1 |

ER-35     OR-06       2.0      1.5   JEYPORE-JAYNAGAR-2 |

ER-86     OR-13       2.0      2.0   INDRAVATI-INDRAVATI|

Page 28: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 28/65

 

ER-38     OR-14       2.0      1.5   JEYP-MMNDLI        |

ER-44     WB-01       1.5      1.5   BIRPARA-BIRPARA   |

ER-52     WB-04       2.0      1.5   NJP-NBU-2         |

ER-53     WB-03       2.0      1.5   NJP-NBU-1         |

ER-58     WB-05       1.0      1.5   MALDA-MALDA-1     |

ER-59     WB-06       1.0      1.5   MALDA-MALDA-2     | WBSEB

ER-07     WB-07       2.5      1.5   PARULIA-BID'NAGAR |

ER-42     NE-81       1.5      1.5   BIRPARA-SALAKATI-1 |ER-43     NE-82       1.5      1.5   BIRPARA-SALAKATI-2 | NER

ER-37     NE-85       2.0      1.5   BINAGURI-BONGAIGAON|

ER-21     NE-86       2.0      1.5   PURNEA-BONGAIGAON  |

ER-84     DC-03       2.0      1.5   JEYPORE-GAJUWAKA-1   |

ER-85     DC-04       2.0      1.5   JEYPORE-GAJUWAKA-2   |

SR-91     SR-92       1.5      2.5   GAJK(EAST)-GAJK(SOUTH)

ER-82     ER-89       2.0      1.0   SASARAM(E)-BIHARSARIF-1  |

ER-83     ER-90       2.0      1.0   SASARAM(E)-BIHARSARIF-2  |

NR-03     ER-56       1.5      1.0   SAHUPURI-PUSAULI      |

NR-05     BI-64       1.5      1.0   SAHUPURI-KARMANASA    |NR

NR-06     BI-63       1.5      1.0   CHANDAULI-KARMANASA   |

NR-07     BI-66       1.5      1.0   RIHAND-SONENAGAR      |

NR-08     JS-58       1.5      1.0   RIHAND-GARWA          |

ER-55     BI-62       1.5      1.0   PUSAULI-DEHRI

EM-17     WB-09       3.0      2.5   SUBHASGRAM-JEERAT

FK-70     FK-27       2.0      1.5   FARAKKA-ATR-400KVSID|

FK-12     FK-68       2.0      2.0   FKK-MLD-1 MAIN-CHK  |

FK-08     FK-65       1.5      1.5   FKK-KHL-1 MAIN-CHK  | FARAKKA

FK-09     FK-66       1.5      1.5   FKK-KHL-2 MAIN-CHK  |

FK-10     FK-63       1.5      1.5   FKK-DGP-1 MAIN-CHK  |

FK-11     FK-64       1.5      1.5   FKK-DGP-2 MAIN-CHK  |

FK-15     FK-61       1.5      1.5   FKK-JRT-1 MAIN-CHK  |

FK-16     FK-62       1.5      1.5   FKK-JRT-1 MAIN-CHK  |

FK-13     FK-69       1.5      1.5   FKK-MLD-2 MAIN-CHK  |

KH-09     KH-63       1.5      1.5   KHL-MTN-1 MAIN-CHK    | KAHALGAON

KH-10     KH-64       1.5      1.5   KHL-MTN-2 MAIN-CHK    |

KH-11     KH-65       1.5      1.5   KHL-BSF-1 MAIN-CHK    |KH-12     KH-66       1.5      1.5   KHL-BSF-2 MAIN-CHK    |

KH-15     KH-67       1.5      1.5   KHL ATR-1 MAIN-CHK    |

KH-16     KH-68       1.5      1.5   KHL-ATR-2 MAIN-CHK    |

KH-31     KH-69       1.5      1.0   KHL-BSF-3 MAIN-CHK

KH-32     KH-70       1.5      1.0   KHL-BSF-4 MAIN-CHK

KH-35     EM-54       1.5      1.0   KHL-PAT-1

TL-81     TL-82       2.0      1.5   TALCHER-ATR/LINE    |

TL-03     TL-65       1.5      1.5   TAL-ATR-1 MAIN-CHK  |

TL-04     TL-66       1.5      1.5   TAL-ATR-2 MAIN-CHK  |

TL-05     TL-61       1.5      1.5   TAL-RKL-1 MAIN-CHK  | TALCHER

TL-06     TL-62       1.5      1.5   TAL-RKL-2 MAIN-CHK  |

TL-07     TL-63       1.5      1.5   TAL-REN-2 MAIN-CHK  |

TL-08     TL-64       1.5      1.5   TAL-REN-1 MAIN-CHK  |

CU-91     CU-92       1.0      1.5   CHUKHA RCPT-BIRP OUT

RG-04     ER-54       1.0      1.0   RANGIT - SILIGURI

RG-07     SM-01       1.0      1.0   RANGIT - MELLI

RG-06     WB-11       1.0      1.0   RANGIT - RAMMAM

OR-56     CS-56       1.5      1.0   BUDIPADAR - RAIGARH 1

OR-57     CS-54       1.5      1.0   BUDIPADAR - KORBA 2

OR-59     CS-55       1.5      1.0   BUDIPADAR - KORBA 3

ER-80     CS-57       1.5      1.0   ROURKELA - RAIPUR 1

ER-81     CS-58       1.5      1.0   ROURKELA - RAIPUR 2

NR-61     NR-62       2.0      1.0   SASARAM EAST_SASARAM NORTH

Page 29: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 29/65

 

ER-57     SM-02       1.5      1.0   SILIGURI-MELLI

EM-01     SM-03       1.0      1.0   GANGTOK-MELLI

RG-11     EM-02       1.5      1.O   RANGIT-GANGTOK

EM-31     BI-68       1.5      1.0   MUZAFFARPUR-KANTI-1

EM-32     BI-69       1.5      1.0   MUZAFFARPUR-KANTI-2

EM-25     NR-11       1.5      1.0   MUZZAFARPUR-GORAKHPUR-1

EM-26     NR-12       1.5      1.0   MUZZAFARPUR-GORAKHPUR-2

EM-39     EM-09       1.5      1.0   MALBASE-BINAGURIEM-40     ER-41       1.5      1.0   MALBASE-BIRPARA

EC-62     EC-61       1.5      1.0   SUBHAS ICTS-SUBHAS 220 KV

EM-38     EC-63       2.0      1.0   TALA MALBASE-MALBASE ICT MAL BINA

FK-16     EC-64       2.0      1.0   FARAKKA-SUBHAS 400 KV BUS

KH-35     EM-54       1.5      1.0   KAHALGAON-PATNA-2

EM-53     NR-02       1.5      1.0   PATNA - BALIA-2

EM-57     NR-01       1.5      1.0   PATNA - BALIA-1

EM-55     EM-56       1.0      0.5   PATNA ICT_400 - PATNA ICT_220

EC-66     EC-68       1.5      1.0   MTN_RAN_FDR-RANCHI ICTS(400)

EC-66     EC-65       1.0      0.5   MTN_RAN_FDR-RANCHI 220 KV FDRS

EC-68     EC-69       1.0      0.5   RANCHI 400 ICTS-RANCHI 220 ICTS

EC-67     EC-70       1.0      0.5   ARA 220 XTN-ARA 132 KV FEEDERS

EM-37     EM-36       0.5      0.5   MALBASE 400KV ICT-220 KV ICT

EM-21     NR-13       1.5      0.5   400 KV BIHARSHARIFF-BALIA-1

EM-22     NR-14       1.5      0.5   400 KV BIHARSHARIFF-BALIA-2

EC-71     EC-72       1.0      0.5   GANGTOK 132/66 KV ICTS

EC-73     EC-74       1.0      0.5   PATNA 400/220 KV ICTS

TS-05     TS-07       1.5      1.0   TEESTA-BINAGURI-1

TS-06     TS-08       1.5      1.0   TEESTA-BINAGURI-2

EM-47     CS-60       2.0      2.0   RANCHI – SIPAT -1

EM-48     CS-61       2.0      2.0   RANCHI – SIPAT -2

----------------------------------------------------------------------

JS-57     WB-53       2.0      1.5   CHANDIL-SANTALDIH   | WB-JSEB

WB-52     BI-51       1.5      1.0   DALKHOLA-PURNEA   | WB-BSEB

DV-51     BI-81       1.5      1.0   BARHI-RAJGIR/BSF  | DVC-BSEB

JS-51     OR-53       3.0      3.0   RAMCHANDRAPUR-JODA  |

JS-53     OR-51       1.0      1.0   GOILKERA-ROURKELA   |JSEB-GRIDCOOR-52     JS-52       1.0      1.0   JODA-KENDPOSI       |

JS-54     DV-53       1.0      1.0   PATRATU-PATRATU   |JSEB-DVC

DV-57     OR-54       1.5      2.0   JAMSHEDPUR-JODA  | DVC-GRIDCO

DV-60     WB-51       1.5      2.0   BIDHANNAGAR-WARIA  | DVC-WB

 

WB-10     ER-27       2.0      2.0   KOLAGHAT-BARIPADA | WB-GRIDCO

BI-57     JS-62       1.0      1.0   B'SARIFF-TENUGHAT   |

BI-83     JS-63       1.0      1.0   SBR/SLTGNJ-LALMATIA |

BI-60     JS-64       1.0      1.0   SONENAGAR-GARWA     |

BI-61     JS-65       2.0      2.0   DEOGARH-SULTANGANJ  |

JS-66     DV-56       1.0      1.0   JAMTARA-MAITHON     |

WB-59     SM-51       1.0      1.0   KALIMPONG-MELLI

-----------------------------------------------------------------------

-

END

-----------------------------------------------------------------------

---------

 

 

Page 30: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 30/65

 

3.7   FICTITIOUS METERS

  Sometimes it is required to treat a combination of METERS as a single entity. e.g.

(i)  Total drawal of an SEB

(ii)  Total relief from a generating station

(iii)  Total transaction of energy between two regions.

In this case, these items can be treated as just like a single meter, we call it as

FICTITIOUS METER (FICTMTRS). The following listed meters are called

FICTMTRS used to simplify the calculation process. Every fictitious meter consists

and basically summation of certain no of Real meters. Real meters are the actualmeters which are placed at different location and store the raw data. E.g.

 

START

01   (FK-92)     M9

+(FK-08)   +(FK-09)  +(FK-10)  +(FK-11)

+(FK-12)   +(FK-13)  +(FK-17)  +(FK-15)  +(FK-16)

………………………..

100  (RN-97)    M2

+(RN-95)   -(RN-96)

101  (RN-99)     M1

(RN-95)*3.8/100

END

------------------------------------------------------------------------------------------------------------  

The detail list of FICTITIOUS METERS are given in ANNEXURE-B

 

Page 31: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 31/65

 

4.0     Scheme for collection and dissemination of data

4.1  General 

  While CTU has the overall responsibility for supplying the meter data to ERLDC

on a weekly basis, the respective constituent’s agencies, in whose premises the energy

meters are installed, normally down-load the metered data from each of the meters on a

weekly basis or as and when requested by the ERLDC. The respective constituent’s

agency ensures that the data is down loaded in the specified time schedule.  ERLDC, in

consultation with the constituents, prepares a scheme for the timely collection of the

metered data from each meter location and its further transmission to the ERLDC. The

constituent/agency shall also ensure the security of the metered data up to its delivery to

the ERLDC and seven days thereafter. All constituents shall provide the required

assistance/co-operation to ERLDC. Each station is also requested to keep back up of all

data systematically that are sent to ERLDC.

4.2 Data Collection from different location

  At each metering locations data is to be collected from SEM once in a week. With

one data collecting device, data of about ten SEM can be collected sequentially and at

once dumped into PC. For dumping into PC the software given by supplier of SEM has to

be used. After downloading the metered data of seven days from each meter location, the

respective constituent’s agencies send the data normally through e-mail from specific

location to ERLDC. These data should reach ERLDC latest by Tuesday so that it doesn’t

cause any delay in processing. Special energy meters are either SECURE METERS

LIMITED (SML) or L&T Make. These raw metered data are non readable type (non

editable and naturally tamperproof). SML make meters have *.MRI or *.AMR file and

L&T make metres have *.DAT file. Since these files are non readable files, so these files

have to be converted to *.NPC file which is readable and editable. It is better to make

NPC file at RLDC to reduce human error.

 

 

Page 32: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 32/65

 

4.3 Saving of Raw Data

  Data after downloading attachments is saved in computer in a folder (e.g.

SEM_DATA). Since these data are in MRI or DAT file these files need conversion into

TEXT file (although some location sends NPC files along with both MRI and DAT files).But it is better to convert MRI and DAT file into NPC file at ERLDC to reduce human

error. After converting into NPC file these are stored in a folder called as ‘READINGS’.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 33: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 33/65

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 34: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 34/65

 

5.0 PROCESSING & COMPUTATION OF DATA

5.1 Conversion into Text File/Software for Data Viewing 

After receiving the data, MRI file and DAT file is converted into TEXT file called NPC.

This conversion is done with the help of respective software. MRI file is converted into

NPC with the software called SMARTGRID supplied by the Manufacturers and DAT file

is converted into NPC with the help of VINCOM software.

For Secure Meter: SMARTGRID 

For L&T Meter: VINCOM 

A) SECURE METER (SMARTGRID Software): All mri files are

transferred to SEM_DATA folder in C: drive before converting to text file(i.e

NPC file). Following are the steps to convert mri file into text file 

.Step-I : Login the SMARTGRID software after click on SMARTGRID icon on desktop.  

 

Step-II: Go to Data option on menu & click to Convert for conversion of mri file into

npc file.

Page 35: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 35/65

 

 

Step-III: Select all mri file to be converted into text file

 

 

Page 36: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 36/65

 

 

After conversion mri files along with npc files are transferred into respective location

wise folder in C:\READINGS\Mmyy\....

A) L&T METER (VINCOM Software): All *.DAT files are transferred 

to SEM_DATA folder in C: drive before converting to text file (i.e NPC file). 

Following are the steps to convert dat file into text file. 

Step-I : Login the VINCOM software after click on VINCOM icon on desktop

 

Page 37: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 37/65

 

Step-II: Click on Import from Data option on menu.

 

Step-III: Browse button to select the file and import one selected dat file at a time.

 

Page 38: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 38/65

 

Step-IV: After importing convert into text file.

 

 

 

Page 39: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 39/65

 

Step V: Finally conversion takes place. And click on ok and after each import and

conversion finally close the application software.

 

After conversion dat files along with npc files are transferred into respective location

wise folder in C:\READINGS\Mmyy\....

5.2 Viewing of npc file/structure of npc file

(i) There is one week heading for each meter data which gives the start date and end

date for which data is available e.g.

WEEK FROM 0000 HRS OF 12-10-07 TO 1230 HRS OF 22-10-07

(ii)  For every day data there is a day heading that gives METER NO, three register

readings at 0000 HRS of the day, and date of the day e.g.

NP-4201-A    63895.0    97845.8    74358.6    12-10-07

Page 40: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 40/65

 

Three cumulative registers are (i) WH register (ii) VAR register at high voltage (>103%)

(iii) VAR register at low voltage (<97%).

METER NO is of 9 characters, usually starting with NP (e.g. NP-0139-A). Character A

or B depending upon whether the meter is with 1 AMP CT or 5 Amp CT

(iii) One day data consists of 96 blocks. Each for 15 min is organised in 6 lines e.g.

WEEK FROM 0000 HRS OF 12-10-07 TO 1230 HRS OF 22-10-07

NP-4201-A          63895.0         97845.8         74358.6    

00  14   +11.50  00    +11.10  08    +10.89  04      +10.34  01    +10

+10.56  00    +10.48  06    +10.20  11      +10.33  00    +10.05  

+10.68  02    +10.66  12    +10.65  05      +11.01

……….     ……..    ………..       …………..    ………………….     

Each line contains 16 blocks i.e. data for 4 hours. Time is followed by 16 blocks and

starting Time is in HOURS (2 digits) is given at the start of each line. Each block 

contains a frequency code and WH for the 15 min. Freq code is of 2 digits and range is

from 00 to 99.

In between frequency code and WH there may be a “*” mark if there is any voltage

problem (V<70% during any instant in the 15 min). If any correction is done during the

15 min, there may be a “aa” or “rr” corresponding to advance or retard of the clock.

There may also be a case of voltage problem and time correction occurring in the same

15 min block.

At the end of 96 blocks the algebraic SUM of WH of all block is also given. One NPC

file may consist of data for one meter or more than one meter. Data for each meter startswith a week heading. After receiving the data from all locations for a week, they can be

combined to make a complete file for the week. A program APPEND.EXE is given for

that purpose.

 

Page 41: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 41/65

 

5.3   Modification/Editing in Text file

  After conversion into Text file (NPC file) every file is renamed as ddmm.NPC

where dd and mm correspond to the week for which data is being processed. Also extra

meter readings to be deleted from the text file which is not required and if somecorrection of date etc is required it is done in the text file  and saved into corresponding

folder from where data have been received. These are normally saved in folder named as

“READINGS”.

5.4   Availability Checking

  This is done to ensure whether data from all location has received or not. This is

checked by running software called REA2006 and we check for location from where data

has received or not received, if the data has not received, then the concerned agency or

person is contacted telephonically to send the data.

5.5 Methods used in case of Non availability of data

  In case of non availability of data from any location, there are different alternative

methods to evaluate the data.

I.  If Main meter reading is not available then check meter reading is used as

substitute for any particular location in FICTMTRS.CFG file.

II.  Another alternative is to use other end data in case of non availability of data.

III.  There is another approach to evaluate data by applying Kirchhof’s law at BUS

from where data is not available but this approach is not always valid..

Sometimes data are sent from different location by email attachment but required

proper data is not found in attachment. In that case the concerned agency or person is

asked to resend the data again.

 

 

Page 42: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 42/65

Page 43: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 43/65

 

(iv) Energy in MWH and MVARH is computed from WH and VARH using

corresponding CTR and PTRs. Wherever a pair is available (e.g. 400 KV and 220

kV side of ICT) computed energy is compared and data correction is done,

accordingly (for “*” marked blocks). Load curve can be plotted if required,

Drawal, share and overdrawal/underdrawal are computed using the FICTMTRS

(fictitious meters) concept.

(v)  Output file can be made as desired by the user by making appropriate

configuration file.

(vi) Option is made available to change the freq code tolerance (temporarily) for

frequency analysis and to modify temporarily each pairs to get approximate pairs

tolerance value for analysis of each pair.

Following are the activities before creating data base.

First it is checked for the location from where data has not been received. If data is not

received from some location then it is asked to send the data. After receiving all the data

from each and every location, again all NPC file is combined together by

APPEND.EXE command and SREA file is created. After that it is gone through data

correctness stage. If status is not found ok then corresponding data file is edited that hascaused the error. Then Data base is created.

So finally by running REA2006 software we go through final processing with the

following steps.

I.  Location of data not received

II.  Data Correctness

III.  Create Data base

IV.  Compute ENERGY

V.  Compute FICTMTRS

VI.  MWH output

Page 44: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 44/65

Page 45: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 45/65

 

5.8 Discrepancies

  If there is any discrepancy in the week’s data processing, it is listed out in register

for every week and these are used during final processing of data. These discrepancies

are forwarded to ERPC (Eastern Regional Power Committee) along with Raw andprocessed data. These discrepancies are also uploaded on ERLDC web along with ISGS

injection and Constituent’s drawl.

5.9 Data forwarding to ERPC

  Processed data of the week along with raw data and discrepancies is forwarded to

Eastern regional Power committee (ERPC). Contents of the data which is forwarded to

ERPC are:

1) Raw data of each location

2) Constituent wise processed data

3) Processed MWH data

4) Day wise meter data

5) Configuration file of the week 

6) Discrepancies,  if any

7) Any other information, if required

6.8 Uploading of data on ERLDC web

  Constituent wise net drawl and central sector Net generation along with region

loss and discrepancies if any, is uploaded on the ERLDC web site (http://www.erldc.org)

for the concerned week. Weekly UI calculations are being done by ERPC. As requested

by constituents, processed meter data as per calculations of ERLDC are being uploaded

just for the sake of gross comparison only.

 

Page 46: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 46/65

 

6.9 Data Archives 

A data archive for processed data along with raw data of every week is

maintained on PC to take care of any future dispute. Back up for Data Archive is also

maintained either on CD or Hard disc.  The data archive structure is as follows:

 

Meter Archive

Year1 Year2 Year...n

Month1 Month2 Month..12

Week1 Week2 Week3 Week4

Readings Dist Sembase

Location wise raw meter data

Constituent wise processed data

Processed MWH Data Day wise meter data

DATA ARCHIVE STRUCTURE

Discrepancies

Relevant SREAfile

RelevantFICTMTRS data

Page 47: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 47/65

 

 

 

 

 

 

  

 

 

 

 

 

 

 

  

 

Page 48: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 48/65

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

  

 

 

 

   

 

B’SARIFF

SASARAM(E)

 

 

 

  

 

B

 

S

 

E

 

 

 

J

S

E

B

 

 

 

 

 

C

 

S

E

C

T

O

 

E

 

N

E

R

D

 

C

SR

BHUTAN 

GALEGPHU

BONGAIGAON

SALAKATIBIRPARA

NE84

NE83

NE85

NE86/ 

NE81

NE82ER 43

ER 42

ER 01BI 01

ER 02BI 02

PURNIAPURNIA

ER 62BI 03

ER 63BI 04

K’GAON

K’GAONK’GAON

SABOUR

BI 07

BI 10

KH 13

KH 19

DC-01

DC-02

GAJUWAKAGAJUWAKA(S)

ER 06

ER 05 DV 01

DV 03

ER 12

ER 11

KALYANESWARIMAITHON

PARULIAPARULIA

BINAGURI

(M C

(C) (M)

(M(C)

C

(C)

C

C

C

M

M

M

M

M

METER LOCATIONS IN C. SECTOR

INTER-CONNECTED SYSTEM 

ER 21

ER 87

 

 

 

N

R

ER 83

ER 82

WRER-8 0

ER-8 1

ROURKELA RAIPURC

B’SARIFF

M

NR-09

NR-10

(M

CS-57

CS-58

ER 48

ER 03BI 67

DEHRI (C) (M PUSAULI

BI 62 ER 55

KHAGAUL (C) ARRAH(MBI 13

BI 14

ARRAH (C) ARRAH

BI 11

BI 12

DUMRAO (C) ARRAH

ER 09

ER 10

(M

(M

BI 62 ER 78

MOHANIA PUSAULI

ER 79

SASARAM(N)C

DEHRI (C)

DC-03

DC-04

ER-56 NR-03

PUSAULI SAHUPURI

 

400 KV

220 KV

132 KV

(M)  ----    MAIN

(C)   -----   CHECK

FARAKKALALMATIA

K’GAONLALMATIA

FK 14JS  04

JS 03 KH 14

(C) (M

MC

JS  01 ER 17

JS  02

R’CHANDRAPUR JAM’PUR

ER 18

C(M

PATRATU C RANCHI(M

EM 44

CHANDIL (C) RANCHI(MEM 45

BI 68 EM 31

KANTI (M MUZ’PUR(C)

BI 69 EM 32

KHAGAUL (C) (M PATNA

FATUAH (C) (M PATNA

MUZ’PUR GORKH’PURM C

EM-25 NR-11

EM-26 NR-12

PATNA BALIA(M (C)EM-57 NR-01

EM-53 NR-02

ANNEXURE-A

(C) BALIAB’SF (MNR-13

NR-14

EM-21

EM-22

CS-60

CS-61

EM-47

EM-48

RANCHI (M) C) SIPAT

BI 51

BI 49

EM 64

EM 65

Page 49: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 49/65

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

R

 

I

 

D

 

C

 O

 

 

 

 

C

 

S

E

C

T

O

 

E

 

 

 

 

 

 

 

 

W

 

B

 

S

 

E

 

B

 

ER 23OR 01

ER 24OR 02

OR 9

TL 12

TL 11

OR 10

TARKERA

TSTPPMERAMUNDALI

ROURKELA

TL 10OR 11

TL 09OR 12

OR 04

OR03

ER 31

ER 30

ER  34

ER  35OR 05

OR 06

ER 86OR 13

TALCHER TPS TSTPP

JEYPORE

INDRAVATIINDRAVATI

TSTPP

RENGALIRENGALI

JAYNAGAR

RENGALI  PH

WB 11RG 06

BARIPADA KOLAGHAT

ER 27 WB 10

RANGIT

WB  08FK 15

FK 16

JEERATFARAKKA

WB 05

WB 06

WB 07

ER 58

ER 59

ER 07

MALDA MALDA

PARULIA B’NAGAR

C   M

C

(C)

(C)

(C)

C

C

C

(C)

(C)

(C)

WB 01ER 44

NJP NBU

BIRPARABIRPARA

WB 03

WB 04ER 52

ER 53

C

C

M

M

M

(M

(M

(M

M

(M

M

(M

M

(M

METER LOCATIONS IN C. SECTOR

INTER-CONNECTED SYSTEM 

NJPBINAGURI MER 19

 

S

I

K

K

I

M

RG 07 SM 01

RANGIT MELLIM (C)

BARIPADABARIPADA

BARIPADAR’RANGPUR

RG 10

MERAMUNDALI TSTPPMCTL 27

TL 28

OR 07

OR 08

ER 99

ER 98

ER  38OR 14

MERAMUNDALI JEYPORE

66kV

 

400 KV

220 KV

132 KV

(M)  ----    MAIN

(C)   -----   CHECK

MELL

NJP MELL

GANGTOK

ER-57                             

SM 03

EM 04EM 03

EM 05 EM 06

GANGTOK

132/66k 

RANGIT MELLIM C

FARAKKA (C) SAGARDIGHI

SUBHASGRAM JEERATMC

EM 17 WB 09

SUBHASGRAM SUBHASGRAM(C)(MEM 18

SUBHASGRAMEM 19

(C)(M

ER 45

BARIPADABALASORE (MC

OR 60 ER  20

OR 61

OR 62

BARIPADABALASOREEM 58

WB  12

SAGARDIGHISUBHASHGRAM M C

WB  13EM 74PPSPPARULIA

EM 01

ER 68

Page 50: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 50/65

 

   

  

 

  

 

 

 

 

  

 

 

 

  

 

 

 

 

 

 

B’SARIFF B’SARIFF

 

 

N

R

  

 

C

E

N

T

R

A

 

 

S

E

C

T

O

R

  B

 

E

 

B

 

 

 

 

C

RAJGIR

BSF

BARHI

PURNIAPURNIA

K’GAON K’GAON

K’GAONSABOUR

CHANDAULI  KARMNASA

SONENAGAR

BI 66

BI 63

BI 64

ER 01

BI 57JS 62

BI 01

ER 02BI 02

BI 10 KH 19

ER 62BI 03

ER 63BI 04

BI 07 KH 13

BI 56

BI 55DV 51

RIHAND

 

400 KV

220 KV

132 KV

(M)  ----    MAIN

(C)   -----   CHECK

(M(C)

(M(C)

(C)(M

(M(C)

C (M(C) (M

(M

 

J

 

S

 

E

 

B

BODHGAYAPATRATU

B’SFTENUGHAT

LALMATIA SABOUR

SULTANGANJ

SONENAGAR

DEOGARH SULTANGANJ

JAPLABI 60JS 64

BI 58

BI 59

JS 63

BI 61JS 65

BI 54

BI 53

JS 61

JS 60

BI 52JS 59

(M(C)

(M

(M

(M

(M

(M

(M

(C)

(C)

(C)

(C)

(C)

SAHUPURI (C)

NR 06

NR 05

METER LOCATIONS IN BSEB

INTER-CONNECTED SYSTEM

ER 48

BI 67 ER 03

ARRAH (C) ARRAH

BI 11

BI 12

DUMRAO (C) ARRAH

ER 09

ER 10

(M

(M

KHAGAUL (C) ARRAH(MBI 13

BI 14

DEHRI (C) (M PUSAULI

BI 62 ER 55

NR 07ER 78

PUSAULIMOHANIA

DEHRI (C)

KARMNASA(M

BI 68 EM 31

KANTI (M MUZ’PUR(C)

BI 69 EM 32

KHAGAUL (C) (M PATNA

FATUAH (C)(M PATNA

ER 79BI 49

BI 50

EM 65

EM 64

W

B

DALKHOLA KISHANGANJ

Page 51: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 51/65

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

   

 

G

R

I

D

C

O

 

 

E

 

B

NR

 

  

 

 

C

E

N

T

R

AL

 

S

E

C

T

O

R

 

 J 

 

S

 

E

 

B

 

 

 

 

GOELKERAROURKELA

KENDPOSIJODA

RAMCHANDRAPURJODA

WBSEB

SANTALDIH CHANDIL

 

C

PATRATU

BODHGAYA PATRATU

B’SFTENUGHAT

PATRATU

JAMTARMAITHON

CHANDILMANIQUE

FARAKKALALMATIA

K’GAONLALMATIA

SONENAGAR JAPLA

DEOGARHSULTANGANJ

GARWA

JS 58

JS 01 ER 17

JS 02 ER 18

FK 14JS 04

JS 03 KH 14

WB 53

JS 59

JS 60BI 53

BI 52

JS 61BI 54

JS 62BI 57

BI 58 JS 63

JS 64BI  60

JS 65BI 61

JS 57

JS 66DV 56

JS 54

JS 55

JS 56

JS 51

JS 52 / 

JS 53

DV 53

DV 55

OR 53

OR 52

OR 51

RIHAND

R’CHANDRAPUR

R’CHANDRAPUR JAM’PUR

 

400 KV

220 KV

132 KV

(M)  ----    MAIN

(C)   -----   CHECK

BC

(C)

(M

(M

(M(C)

(M

(M

(M

M(C)

(MC

(M(C)

(M

(M

(C)

(C)

(C) (M

JAM’PUR

(C)

SABOUR LALMATIA

SULTANGANJ BI 59

(C) (M)

(C) (M)

(C) (M)

(C)

(M)(C)

(M)(C)

METER LOCATIONS IN JSEB

INTER-CONNECTED SYSTEM

FARAKKALALMATIA

K’GAONLALMATIA

FK 14JS  04

JS 03 KH 14

C (M

(MC

PATRATU (C) RANCHIMEM 44

CHANDIL C RANCHIMEM 45

NR- 08

Page 52: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 52/65

 

 

 

 

 

  

 

 

 

  

 

 

 

 

  

 

 

 

   

 

 

 

W

 

B

 

S

 

E

 

B

 

C

E

N

T

RA

L

 

S

E

C

T

O

R

 

BS

E

B

 

J

SE

B

 

  

 

 

D

 

 

 

GR

I

D

C

O

JAMSHEDPURJINDAL

KH’PURKHARAGPUR

DPL WARIA

WARIABIDHANNAGAR

PURULIA PURULIA

DV 53

JS 55

JS 54

JS 56

JS 66

BC

DV 55

BI 56

BI 55   DV 51

DV 56

ER 06

ER 05DV 01

DV 03

ER 12

ER 11

KOLAGHAT KOLAGHAT

DV 62

DV 61

DV 60WB 51

DV 65

DV 58

DV 57

WB 60

OR 54

PATRATUPATRATU

RAJGIR

BSF

BARHI

BARHI

JAMTARA MAITHON

CHANDIL MANIQUE

KALYANESWARI MAITHON

PARULIAPARULIA

 

400 KV

220 KV

132 KV

(M)   ----    MAIN

(C)     -----   CHECK

M

(M

(M

(C M

C M

C(M)

(MC

(M)

M

(C M

M(C

(M)

C

C

M

M

METER LOCATIONS IN DVC

INTER-CONNECTED    SYSTEM 

WB 54 DV 64

MEJIAMAITHON

MEJIA JAMSHEDPUR

DV 04

DV 05 EM 76

ER 15

Page 53: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 53/65

 

  

 

 

  

 

 

 

 

 

 

 

 

 

  

 

 

 

  

 

 

 

 

C

E

N

T

RA

L

 

S

E

C

T

O

R

 

CS

E

B

 

D

V

C

 

 

G

 

R

 

I

 

D

 

C

 O

 

 

 

 

  

 

J

S

E

B

 

GOELKERA

RAIGARH

KORBA

BUDHIPADAR

ROURKELA

KENDPOSI

RAMCHANDRAPUR JODA

OR 55

JODA

JODA

OR 53

OR 52

JS 51

JS  52

JS 53 OR 51

BC

DV 57

ER 23OR 01

ER 24OR 02

OR 9

TL 12

TL 11

OR 10

OR 54

TL 10OR 11

TL 09OR 12

OR 04

OR 03

ER 31

ER 30

ER  34

ER  35

OR 05

OR 06

OR 56

OR 59

OR 57

JAMSHEDPUR JINDAL

TARKERA

TALCHER TPS TSTPP

JEYPORE

TSTPP

TSTPP

RENGALIRENGALI

JAYANAGAR

RENGALI  PH

MERAMUNDALI

ROURKELA

400 KV

220 KV

132 KV

(M)     ----    MAIN

(C)      ----    CHECK

(M(C)

(M

(M(C)

(C)

(M

(M

(C) (M(C)

(M(C)

(C)

(M(C)

(M (M(C)(C)

(C)

(M

(M

(C)

(C)

METER LOCATIONS IN GRIDCO

INTER-CONNECTED SYSTEM 

OR 13   ER 86

INDRAVATIINDRAVATI

CS 56

CS 54

KORBA (C)CS 55

(M

BARIPADABALASORE

BARIPADABARIPADA

BARIPADAR’RANGPUR

TSTPPMERAMUNDALI

TSTPPMERAMUNDALI

OR 14 ER-38

JEYPOREMERAMUNDALI (M(C)

TL 27

TL 28

OR 07

OR 08

ER 98

ER 99

BUDHIPADAR

BUDHIPADAR

ER 20

OR 62

OR 61

OR 60

Page 54: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 54/65

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

W

 

B

 

S

 

E

 

B

 

 

 

C

E

N

T

R

AL

 

 

 

S

E

C

T

O

R

J

SE

B

SANTALDCHANDI

 

S

I

K

K

I

MKALINGPO

MELLI

WB 59SM 51 66 kv

WB 53JS 57

DV 62

DV 61

WB 01

WB 03

WB 04

WB 05

WB 06

WB 07

WB  08

WB 11   RG 06WB 54

ER 44

ER 52

ER 53

ER 58

ER 59

ER 07

FK 15BARIPADAKOLAGHAT

ER 27WB 10

DV 64

DV 65

WB 60DV 58

 

 

 

 

D

 

V

 

C

 

KHARAGP KHARAGPUR

WARIA BIDHANNAGAR

KOLAGHAT KOLAGHAT

PURULIPURULI

MALDA

JEERAT

RANGITRAMAM

FARAKA

MALDA

PARULIAB’NAGAR

NJPNBU

BIRPARABIRPARA

 

400 KV

220 KV

132 KV

(M)   -----      MAIN

C     -----     CHECK

DPLWARIA

METER LOCATIONS IN WBSEB

INTER-CONNECTED SYSTEM 

(M(C)

(M(C)(C) (M

(M(C)

(M)

(M

(M

(M

(M(M

(M

(C)

(C)

(M(C)

(M

(C)

(C)(C)

(M

(C)

BINAGURI(MNEW  JALPAIGURI

ER 19WB 51DV 60

WARIA BIDHANNAG(M(C)

SUBHASGRAMJEERAT M C

EM 17WB 09

SUBHASGRAMS”GRAM(C (M

EM 18

S”GRAM EM 19MC

ER 45

E M 75WB 02

SUBHASGRAMSAGARDIGHI C (M

EM 74WB 13PPSP PARULIA

ER 68

SAGARDIGIHI 400KVFarakka

WB-12 FK-16

Page 55: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 55/65

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

S

 

I

 

K

 

K

 I

 

 

C

E

N

T

R

A

L

 

 

S

E

C

T

O

R

RANGITMELLI

SM 04

RG 07 

(M(C) 66

132

 

W

B

S

E

B

KALINGPONGMELL

WB 59SM 51 66 kv

(M(C)

METER LOCATIONS IN SIKKIM

INTER-CONNECTED SYSTEM 

 

400 KV

220 KV

132 KV

(M)  ----    MAIN

(C)   -----   CHECK

MELLI (C) RANGIT(M

MELLI NJP

MELLI

GANGTOK

132/66

EM 04

EM 06

EM 03

EM 05

SM 02

SM 03 

SM 01 

ER 57

EM 01

Page 56: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 56/65

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

ER 03

ER 60

 ER 61

 

LALMATIA

ER 41

ER 42

MALDA

ER 44

ER 46ER 47

ER 43

ER 40 ER 39

ER 59ER 58

KAHALGAON(B)

BIR.(W)

BIRPARA

MALDA(W)

KH 07

KH 08

KH 13

KH 09

ER 02 ER 01

KH 12 KH 11

KH 16

KH 19

KH 15

KH 06KH 05

KH 10

KH04KH 03KH 02KH 01 KH 14

KH 18KH 17

BS 09

BSF

B’SHARIFF(BSEB)

KAHALGAON

SABOUR

CU02CU 03

CU 07 CU 08CU06CU05

CU 01SINGHIGAON

METER LOCATIONS IN CENTRAL SECTOR TRANSMISSION SYSTEM

SARNATH

ER 89/2374AER 90/2375A

ER 82ER 83

BINAGURI

SASARAM (N)

SASARAM (E)

ALLAHABAD

ARRAH

SAHUPURI

ER 88ER 14 ER 13ER 56

EM 39

ER 23

MAITHON

ER 33

SALAKATI

ARRAH DUMRAO

ER 10ER 9BI 13BI 14

KH 32KH 31

ER 55DEHRI

KARMANASAER 79

DEHRI ER 78

NE 86

NE 85

ER 37

BONGAIGAON

RAMAM

RG 04

MELLI

RANGIT

RG03

RG 09RG06

RG08

RG02RG 01

ER 51 ER50

ER76

ER52 ER 53

SILIGURI

ER54

NBU

GANGTOK

RG 07

66 kV

PART-

FARAKKA

ER 64

415A

ER 65

389A

ER 63 ER 62411A

PUR(B)

PURNEA

ER 49

415A

ER 09 / 4153A 

DALKHOLA

BINAGURI

NJP (WBSEB)

MUZAFFARPUR

NR

RG10 RG11

EM02

EM01

FATUAKH 35 KH 36

EM 54EM 55

EM 56

BALIA

PATNAEM 53EM 57

NR 02

NR 01

SM03SM04

KANTI (BS)

EM25EM26 EM27 EM28

EM 7 EM 7 EM 10 EM 9

EM38 EM37 EM36 EM33

EM40

EM34EM35

ER 22

EM23 EM24EM29EM30

TALA

EM 06EM 04

EM 05EM 03

KHAGAUL

TEESTA

TS01 TS01 TS03

BALIA

Page 57: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 57/65

 

 

FARAKKA  FK 09FK17

FK 08

FK 11 FK 10

FK 01

FK12

FK14

559A

FK 13

FK15

FK 05FK 04FK 03FK 02

FK 16

FK 18FK 07FK 06

TIE

TRA

ER70ER69

ER 67ER 66

ER 06

ER 23

ER 72ER 71

ER 24

ER 05

ER 11 ER 12

ER 08

ER 25

ER 28 / 600A / 1000

ER29

469A

ER 84

SR

SR

ER 85

ER 36

ER75

ER 35ER 34

TL06 TL08

TL 02 TL 01

TL07TL05

ER 31

WB 10/476A

ER 74/ 556A 

ER 30

ER 73

K’SWARI

MAITHON

PARULIA

JAMSHEDPUR

ROURKELA

TARKERA

MERAMUNDALI

TTPS

TALCHER STPP

JEERAT

KOLAGHAT

RENGALI(G)

RENGALI

RENGALI  PS

JEYPORE

JEYNAGAR

ER16ER 15

ER 07

ER 86

DURGAPUR

BIDHAN’NGR

TL 09

INDRAVATI PG

INDRAVATI PG

ER 17BS1 05BS 06

ER18

TL 04TL 10

TL 13 TL 12

TL 03

400 KV

220 KV

132 KVER77

ER 26

RAIGARH

ER 80ER 81

GAJUWAKA(S)

GAJUWAKA(E)

DC-3

DC-4

KAHALGAON

BARIPADA

BALASORE(GR)

BARIPADA(GR)

RAIRANGPUR(GR

ER 27

TL 11

TL 27 TL 28

TL 38

PART-

EM 46 EM 41

EM 42

RANCHI

EM 43

HATIA CHANDIL

EM 44 EM 45

MALDAKAHALGAON

WB 08/397A

WB 09/471A

SUBHASGRAM

EM 17

WB 09

 

EM 15 EM 16

EM 19

EM 18

SIPAT

PPSP

ER 68

SUBHASGRAM

RAMCHANDAR PUR

BALASORE(GR)

EM 69

MEJIA

Page 58: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 58/65

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

METERING ARRANGEMENT AT

FARAKKA  STPS (3X200 + 2X500 MW)

G-2G-1

LALMATIA

FK-14

FK-02FK-01

DGPR

1

MALDA

2JEERAT-1

FK-13

FK-28

FK-16

FK-22

FK-09

FK-26

400 KV

FK-08

FK-25

G-4G-3

FK-04FK-03

FK-11

FK-24

FK-10

FK-23

220 KV

DGPR

2

FK-15

FK-21

JEERAT-2

FK-05

AUX TRANS (TIE)

FK-06 FK-07 FK-17

FK-27

K'GAON

1K'GAON

2

FK-18

G-5

FK-12

FK-29

MALDA

1

METERING ARRANGEMENT AT

KAHALGAON STPS (4 X 210  MW)

132 KV

G-2 G-1 

KH-27

KH-15

KH28

KH-16

LALMATIA SABOUR

KH-13KH-06KH-05 KH-14 KH-17 KH-18

KH-02 KH-01 

FARAKKA-2 FARAKKA-1  MAITHON-2MAITHON-1

B’SHARIFF-1

B’SHARIFF-2

KH-11KH-25

KH-12KH-26

KH-08 KH-22 400 KV 

KH-07 KH-21 

COLONY

G-4G-3 

KH-04KH-03 

KH-10KH-24

KH-09 KH-23 

132 KV 

11KV AUX

KAHALGAON 

Barh-2Patna-1 B’SF-4 B’SF-3

KH-36

KH-38

KH-35 KH-37 

KH-32 KH-24 

KH-31KH-33

G-5

KH-05

Page 59: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 59/65

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

METERING ARRANGEMENT AT

TALCHER STPS (2 X 500 MW)

G-2G-1

TL-03

TL-25TL-04

TL-26

DUBURI-2

TL-12TL-10

TL-13

TL-09

TL-02TL-01

RENGALI-2RENGALI-1

ROURKELA-2

ROURKELA-1

TL-07

TL-23

TL-08

TL-24

TL-06

TL-22

220KV

TL-05

TL-21

RENGALI

PS

TTPS-111 KV

(AUX)

TL-15TL-14 TL-17 TL-16

TL-31

TL-41

TL-32

TL-42

TL-33

TL-43TL-34

400KV

Stage -II

FDR-I FDR-II FDR-III FDR-IV

400KV

Stage -I

TL-11

DUBURI-1

TO HVDC STATION TALCHER

RAMAMSILIGURI

132 KV

66 KV

MELLI

G-1 G-2 G-3

RG 01

RG 09

RG 07

RG 06

RG 08

RG 02 RG 03 RG 04

11 KV

METERING ARRANGEMENT AT

RANGIT HEP  (3X20 MW)

Page 60: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 60/65

 

 

 

ANNEXURE-B 

FICTITIOUS METERS (FICTMTRS.CFG)  START

 

01   (FK-92)     M9

+(FK-08)   +(FK-09)  +(FK-10)  +(FK-11)

+(FK-12)   +(FK-13)  +(FK-17)  +(FK-15)  +(FK-16)

02   (FK-93)     M9

+(FK-21)   +(FK-22)    +(FK-23)  +(FK-24)

+(FK-25)   +(FK-26)    +(FK-27)  +(FK-28) +(FK-29)

03   (KH-81)     M4

+(KH-01)   +(KH-02)    +(KH-03)    +(KH-04)

04   (KG-81)     M2

-(KG-03)  -(KG-06)

05   (KH-82)     M6

+(KH-81)   +(KH-15)  +(KH-16)    -(KH-13)

-(KH-14)   -(KH-19)

06   (KH-83)     M2

+(KH-81)   +(KG-81)

07   (KH-84)     M2

+(KH-83)    -(KH-82)

08   (KH-85)     M13+(KH-07)   +(KH-08)  +(KH-09)  +(KH-10)   +(KH-11)  +(KH-12)

+(KH-31)   +(KH-32)  +(KH-35)  +(KH-36)   +(KH-13)  +(KH-14)  +(KH-19)

09   (KH-86)     M13

+(KH-21)   +(KH-22)  +(KH-23)  +(KH-24)   +(KH-25)  +(KH-26)

+(KH-33)   +(KH-34)  +(KH-37)  +(KH-38)   +(KH-13)  +(KH-14)  +(KH-19)

10   (KG-92)     M1

(KG-81)

11   (KH-92)     M2

(KH-85)  -(KG-92)

12   (TL-81)     M3

+(TL-03)    +(TL-04)    -(TL-13)

13   (TL-82)     M4

-(TL-09)    -(TL-10)    -(TL-11)    -(TL-12)

14   (TL-92)     M9+(TL-81)   +(TL-05)  +(TL-06)   +(TL-07)    +(TL-08)

+(TL-14)   +(TL-15)   +(TL-18)   +(TL-19)

15   (TL-93)     M11

+(TL-21)    +(TL-22)    +(TL-23)   +(TL-24)   +(TL-25)

+(TL-26)    -(TL-13)    +(TL-16)   +(TL-17)   +(TL-27)  +(TL-28)

16   (CU-91)     M3

+(ER-39)    +(ER-40)    +(BT-33)

17   (CU-92)     M6

+(ER-42)    +(ER-43)    +(ER-44)    +(ER-46)  +(ER-47)  +(EM-75)

18   (RG-91)     M4

+(RG-01)    +(RG-02)    +(RG-03)   +(RG-08)

19   (RG-92)     M5

+(RG-04)   +(RG-06)   +(RG-07)   +(RG-10)   +(RG-11)

20   (BI-81)     M3

+(BI-55)   +(BI-56) +(BI-48)

21   (BI-82)     M18

+(BI-01)   +(BI-02)  +(BI-67)   -(ER-62)   -(ER-63)   -(ER-48)

-(ER-78)  -(ER-79)   -(ER-55)   -(ER-09)   -(ER-10)   +(BI-13)

+(BI-14)   +(BI-68)   +(BI-69)  -(EM-55)   -(EM-62)   -(ER-49)

22   (BI-83)     M2

+(BI-58)  +(BI-59)

Page 61: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 61/65

 

23   (BI-84)     M6

-(JS-59)   -(JS-60)    +(BI-57)   +(BI-58)    +(BI-60)   +(BI-61)

24   (BI-85)     M3

+(BI-63)   +(BI-64)    +(BI-66)

25   (BI-91)     M7

+(BI-21)   +(BI-81)    +(BI-82)   +(BI-84)   +(BI-85)  -(KH-19)  -(KH-13)

26   (JS-81)     M4

+(JS-01)   +(JS-02)  -(EM-44)  -(EM-45)

27   (JS-82)     M2

-(FK-14)   -(KH-14)

28   (JS-83)     M3

+(JS-51)   -(OR-52)    +(JS-53)

29   (JS-84)     M3

+(JS-54)   -(DV-55)    -(JS-66)

30   (JS-85)     M6

+(JS-59)   +(JS-60)   +(JS-62)  +(JS-63)   -(BI-60)    +(JS-65)

31   (JS-91)     M7

+(JS-81)   +(JS-82)   +(JS-83)   +(JS-84)

+(JS-85)   +(JS-57)   +(JS-58)

32   (ER-91)     M2

+(ER-05)   +(ER-06)

33   (ER-92)     M2

+(ER-11)   +(ER-12)

34   (DV-81)     M4

+(DV-51)   +(DV-55)   +(DV-56)   +(DV-53)

35   (DV-82)     M6+(DV-60)   +(DV-64)   +(DV-61)   +(DV-62)   +(DV-65)   +(DV-58)

36   (DV-91)     M5

-(ER-91)   -(ER-92)   +(DV-81)   +(DV-82)   +(DV-57)

37   (SM-91)     M7

+(SM-51)   -(RG-07)   -(RG-10)   +(SM-02)   +(SM-03)

-(EM-03)   -(EM-05)

38   (OR-81)     M9

-(ER-23)   -(ER-24)   -(ER-30)   -(ER-31)

-(ER-34)   -(ER-35)   -(ER-86)   -(ER-20)  -(EM-58)

39   (OR-82)     M5

+(OR-51)   +(OR-52)   +(OR-53)  -(ER-98)  -(ER-99)

40   (OR-83)     M3

+(OR-56)   +(OR-57)   +(OR-59)

41   (OR-91)     M8+(OR-81)   +(OR-82)  +(OR-83)  +(TL-82)

+(OR-07)   +(OR-08)  -(DV-57)  -(ER-38)

42   (WB-81)     M12

-(ER-44)   -(ER-52)  -(ER-53)   -(ER-58)   -(ER-59)   -(ER-07)

-(ER-19)   -(ER-45)  -(ER-68)   -(EM-18)   -(EM-19)   -(EM-75)

43   (WB-82)     M6

+(WB-08)   +(WB-09)   +(WB-10)  +(WB-11)   +(WB-12)   +(WB-13)

44   (WB-84)     M6

-(DV-61)   -(DV-62)    -(DV-65)   +(WB-51)   +(WB-54)    +(WB-60)

45   (WB-91)     M6

(WB-81)    +(WB-82)   +(WB-84)   +(WB-53)   +(WB-59)    +(WB-52)

46   (NE-71)     M2

+(NE-81)   +(NE-82)

47   (NE-72)     M2

+(NE-85)    +(NE-86)

48   (NE-91)     M3

+(NE-83)  +(NE-71)   +(NE-72)

49   (SR-91)     M4

+(DC-03)   +(DC-04)  -(TL-14)   -(TL-15)

50   (SR-92)     M4

+(DC-01)   +(DC-02)  +(TL-14)   +(TL-15)

Page 62: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 62/65

Page 63: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 63/65

 

81   (EC-61)     M2

-(EM-18)  -(EM-19)

82   (EC-62)     M2

(EM-15)  +(EM-16)

83   (EC-63)     M2

(BT-37)  +(BT-39)

84   (EC-64)     M2

-(EC-62)  -(EM-17)

85   (EC-65)     M2

(EM-44)  +(EM-45)

86   (EC-66)     M2

(EM-41)  +(EM-46)

87   (EC-67)     M2

(ER-95)  -(ER-96)

88   (EC-68)     M2

(EM-42)  +(EM-60)

89   (EC-69)     M2

(EM-43)  +(EM-61)

90   (EC-70)     M2

-(ER-09)  -(ER-10)

91   (EC-71)     M2

(EM-03)  +(EM-05)

92   (EC-72)     M2

(EM-04)  +(EM-06)

93   (EC-73)     M2

(EM-55)  +(EM-62)94   (EC-74)     M2

(EM-56)  +(EM-63)

95   (TC-91)     M7

(EM-07)   +(EM-08)   +(EM-09)   +(EM-10)

(ER-39)   +(ER-40)   +(ER-41)

96   (TS-92)     M2

(TS-05)   +(TS-06)

97   (FK-91)     M8

+(FK-01)   +(FK-02)  +(FK-03)  +(FK-04)   +(FK-05)

+(FK-06)   +(FK-07)  +(FK-18)

98   (RN-95)     M9

+(FK-92)   +(KH-92)   +(KG-92)   +(TL-92)  -(CU-91)

-(TH-91)   -(NE-83)   +(RG-92)   +(TS-92)

99   (RN-96)     M10-(BI-91)  -(JS-91)  -(DV-91)   -(OR-91)   -(WB-91)

-(SM-91)  -(NE-91)  -(SR-91)   -(WR-91)   -(NR-91)

100   (RN-97)    M2

+(RN-95)   -(RN-96)

END

------------------------------------------------------------------------------------------------------------

 

 

 

 

 

 

  

 

 

Page 64: Metering_Manual _Eastern_region

8/7/2019 Metering_Manual _Eastern_region

http://slidepdf.com/reader/full/meteringmanual-easternregion 64/65

 

ANNEXURE-C

DATA COLLECTING LOCATION IN EASTERN REGION & CONTACT NO DETAILS 

 

S.No Stn Name   Contact No. Concerned Person Contact No.

    POWERGRID    

1 Ara 06182-234125/233085 Sudip das (9431820255) 9431821129/Amit

2 Baripada 06792-279298/279280 Mr. Behra (9437575638) 9437575657( S.P.Kar)

3 Birpara03563-266222/ 266224/ 266196,

S.K.Sil / Soumen Ray   9434748294

4 Biharsarif 06112-290607 Manager   (9431821126)

5 Durgapur 0343-2562915/ 2563297 M.S.Data (9434740025)   9434748028/8031 (Mana singh

6 Gangtok 03592-250181/251259 Tapan Bahera 9434748318

7 Indravati06673-252296/ 252301/252429

Mr.Ekka   9937651156

8 Jeypore 06854-231634/ 232155   Eshwar rao 9437962178/1769 Jamshedpur 0657-3294096/ 3293751 D kumar     9431815722

10 Malda03512-278447/ 278355/ 278715

Anjani kumar (9434748261)   9434748031(santosh)

11 Maithon0341-2531489/ 9434740039(CM)

N Kumar (9434740039)   9434748285(sarkar)/943474830

12 Malbase 00975-17604606 Mr. Phuntshok(07032) 009755272805(Khatri)

13 Muzaffarpur 0621-2273166 M.K.jha (9431820298) 9431820294( A srivastav)

14 Patna 9431820234 9431820252 Jagat Ram Enayat shameem(9939624037)

15 Purnea 06454-222409/ 222363,            Prasad (9431815713)   9431820310(Sr Engin

16 Ranchi 0651-6450205/204 Pradeep Verma 9431820337

17 Rengali 06760-277258/ 277254 S. Naik ( 9437962194)   Ratra (9437962197)

18 Rourkela0661-2600009/ 2600202/ 94370 41202

G Malick (9437962208)   9437575652 (S K CHAND )

19 Siliguri0353-2568851/ 2568801/03561-248001

S Basu (9434748266), TDas (9474379038)

9434748230(Bhaskar)/94347482Mani)

20 Sasaram 06187-225527/ 225737 Pankaj  kumar 9431820322   9431820327(sumit kumar)

21 subhashgram B.S.Raut Ray(9434748254)

22 Salakati(NER) 03661-282309/282407 S.K. Singh   9434740009

23 Rihand 05446-252042 Sunil Kumar(DGM)   Shailendra(9415458662)24 NERLDC

0364-2231933/2231714(Comml)

M Husain/ Mr. saha   9436335371

25 WRLDC 022-28302209 Usha (735022)   9869404458

    28202690/28314609 EPABX

26 NRLDC 011-26854585 9910907949 (neeraj)   9650009856