MANUAL ON
SPECIAL ENERGY METER, DATA
COLLECTING & PROCESSING
IN
EASTERN REGION
EASTERN REGIONAL LOAD DESPATCH CENTRE
POWER GRID CORPORATION OF INDIA LIMITED
14, Golf Club Road, Tollygunge, Kolkata-700033
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 2/65
SPECIAL ENERGY METER, DATA
COLLECTING & PROCESSING
FEBRUARY 2010
COMMERCIAL & OPERATION SERVICESDEPARTMENT
EASTERN REGIONAL LOAD DESPATCH CENTRE
POWER GRID CORPORATION OF INDIA LIMITED
14, Golf Club Road, Tollygunge, Kolkata-700033
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 3/65
CONTENTS
Title Page No.
1.0 General 1
1.1. Objective
1.2. Ownership
1.3. Facilities to be provided at metering location
1.4. Right to install energy meter
2.0 Special energy meter and its technical specification
2.1 Special Energy Meter
2.1.1 About SEM2.1.2 SEM dimension
2.1.3 Display list
2.1.4 SEM: Technical Specification2.1.5 Data Storage
2.2 Data Collecting Device (DCD)
3.0 Metering Configuration
3.1 General
3.2 Types of Meters
3.3 Metering arrangement
3.3.1 Metering arrangement for NTPC stations
3.3.2 Metering arrangement for ICTs
3.3.3 Metering arrangement for inter-State transmission lines.3.3.4 Metering arrangement for POWERGRID lines
3.4 Maintenance of Special Energy Meters
3.4.1 Testing and Calibration
3.4.2 Periodic testing of accuracy
3.4.3 Meter Calibration
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 4/65
3.5 Constituent wise location & quantity
3.5.1 Meter location of interconnected system
3.5.2 Location wise list of Meters
3.6 Pairs.dat file
3.7 Fictitious meters
4.0 Scheme for collection & dissemination of data
4.1 General
4.2 Data collection from different location
4.3 Data collection location & contact details
4.4 Saving of data
5.0 Processing and Computation of data
5.1 Conversion in text file/ Software used for viewing of data
5.2 Viewing of npc file/structure of npc file
5.3 Modification/Editing in Text file
5.4 Availability checking
5.5 Methods in case of non availability of data
5.6 Final processing
5.7 Data checking and Validation
5.8 Discrepancies
5.9 Data forwarding to ERPC
5.10 Uploading of data on ERLDC web
5.11 Data archive
Annexure: A
Annexure: B
Annexure: C
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 5/65
1.0 GENERAL
1.1 Objective
This document is intended to provide the required details of a metering system together
with the capabilities of the special energy meters along with meter configuration, data
collection, availability checking, processing etc, provided to meet the regional energy
metering requirements of the commercial mechanism adopted for bulk power supplies
and inter-State exchanges within and across a Region.
1.2 Ownership
These energy meters are owned by the CTU. All agencies/constituents ensure the
security of the energy meters installed in their respective premises.
1.3 Facilities to be provided at Metering Locations
Each agency/constituent makes available the required space and the required outputs of
the specified current and voltage transformers, to facilitate installation of energy meters
in their premises by CTU for regional energy metering.
1.4 Right to install energy meters
Each constituent/agency extends the necessary assistance to CTU for installation of the
energy meters by providing the required access to their premises and equipments. As and
when requested by CTU, the constituent’s agencies enable the representatives of CTU to
access, inspect, replace, and test etc. any of these energy meters installed in their
premises in the presence of an authorized representative of the constituent’s agencies if
deputed.
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 6/65
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 7/65
2.1 Special Energy Meter (SEM)
2.1.1 About SEM
Special Energy Meter (SEM) is a Microprocessor based Energy Meter. For
metering and data logging it is a handful tool along with data collecting device
(DCD) and personal computer. With the use of application software it allows the
user to process metered data.
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 8/65
2.1.2 SEM dimension
2.1.3 Display List
Display Parameters Display Form
i) Meter Serial No
ii) Date (year month day) yymm
iii) Time ( hour min. sec. ) hhmm
iv) Cumulative Wh reading xxxxx
v) Average frequency of the last block xx.xx
vi) Net Wh transmitted in last block xx.xx
vii) Average % voltage
viii) Reactive power (VAR) xxxx.x
ix) Voltage - high VARh register reading xxxx.x H
x) Voltage - low VARh register reading xxxx.x
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 9/65
xi) Real time indication rtC Fit
xi) Low battery indication L
2.1.4 SEM : Technical Specification
The energy metering system is used for region, inter-regional energy metering for
bulk, inter-utility power exchanges. Static type composite meter is installed for each EHV
circuit, as a self-contained device for measurement of active energy (MWh) transmittals
in each successive 15-minutes time block and certain other functions, as described in the
following paragraphs.
Special energy meter of a uniform technical specification is provided on the electrical
periphery of each regional constituent to determine its actual net interchange with the
regional grid. Each interconnection shall have one (1) main meter. In addition one
check/standby has been provided such that the correct computation of net interchange of a
constituent is possible even when a main meter, a CT, or a VT has a problem.
The special energy meters is static type, composite meters installed circuit-wise,
as a self-contained device for measurement of active and reactive energy and certain
other parameters as described in following paragraphs. The meter is suitable to be
connected directly to voltage transformers (VTs) having rated secondary line-to- line
voltage of 110 V and to current transformer (CTs) having a rated secondary current of 1A
(model-A) or 5A (model-B). The reference frequency shall be 50 Hz.
The active energy (Wh) measurement is being carried out on 3-phase, 4 wire
principle, with an accuracy as per class 0.2 S of IEC-687/IEC-62053-22. In model-A,
energy is being computed directly in CT and VT secondary quantities and indicated in
Watt-hours. In model-B the energy display and recording is one fifth of Wh computed in
CT or VT secondary quantities.
Further the meter continuously integrate and display on demand the net
cumulative active energy sent out from the station bus bars up to that time. The
cumulative Wh reading at each midnight is stored in the meter's memory. The register
moves backward when active power flow back to station bus bars.
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 10/65
The three line-to-neutral voltages are continuously monitored, and in case any of
these voltages falls below 70%, the condition is suitably indicated and recorded. The
meters operate with the power drawn from the secondary circuits, without the need of any
auxiliary power supply.
The VAr and reactive energy measurement is also be on 3-phase, 4-wire principle,
with an accuracy as per class 2 of IEC-62053-23 or better. In Model-A, the VAr and
VArh computation is directly in CT or VT secondary quantities. In Model-B these are
displayed and recorded as one fifth of those in CT and VT secondary quantities.
There are two reactive energy registers, one for the period when average RMS
voltage is above 103% and the other for the period the voltage is below 97%.
The meters fully comply with the stipulations of IEC Publication 687 for 0.2S class
Static watt-hour meters, except those specifically modified here. The reference
ambient temperature is taken to be 30'C.
Errors are reasonable for all power factor angles from 0' to 360'.
The 15 min Wh have a +ve sign when there is a net Wh export from a substation bus
bars and –ve sign when there is a net Wh import. The integrating (cumulative)
registers for Wh and VArh move forward when there is Wh/VArh export from
substation bus bars and backward when there is an import.
The meters store all the above listed data in the memories for a period of 10 days. The
data older than 10 days get erased automatically. Each meter has an optical port on its
front for tapping all data stored in its memory using a hand held data collecting device.
The meters normally operate with the power drawn from the VT secondary circuits
without the need of any auxiliary power supply. Each meter have a built in calendar and
clock having an accuracy of 30 seconds per month or better.
Each meter has an electronic panel for display, on demand, the metered
information/data as specified by CTU.
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 11/65
Each meter has a non-volatile memory in which the followings are automatically
stored:
i) Average frequency for each successive 15-minute time block, as a two- digit code.
ii) Net Wh transmittal during each successive 15-minute time block.
iii) Cumulative Wh transmittal at each midnight.
iv) Cumulative VARH transmittal for voltage high condition, at each midnight.
v) Cumulative V.Arh transmittal for voltage low condition, at each midnight.
vi) Date and time blocks of failure of VT supply on any phase, as a star Mark.
The harmonics are filtered out while measuring Wh, VAR and VARH, and only
fundamental frequency quantities shall be measured/computed.
Each meter has an optical port on its front for tapping all data stored in its memory.
Portable or hand held data collection devices are used to serve as the interface
between the meters and the local personal computers (PC). The overall intention is to
tap the data stored in the meter's memories once a week, and transmit the same to a
remote central computer through a local PC. It is also possible to obtain a print out
(Hard copy) of all data collected from the meters, using the local PC.
2.1.6 Data storage
This 0.2 class accuracy static energy meter can record integrated average frequency and
active energy over every 15 min blocks. The SEM also stores the daily reactive energy
flows in low voltage & high voltage conditions. SEM can store data for 10 days. The text
file (*.NPC) made from coded files (*.MRI,*.DAT, *.DCD) etc includes data of one
complete day corresponding to the day on which reading is taken and 9 days of complete
data for the previous days.
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 12/65
2.2 Data Collecting Device (DCD)
It is basically data collecting device and used to transfer the tapped data from SEM to
PC. It has bi -communication with special energy meter along with personnel computer.
all these is done with communication cable one at DCD end and other at PC.
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 13/65
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 14/65
3.0 Metering Configuration
3.1 General
Meters have been installed so as to enable the measurement/computation of electrical
energy and other specified parameters. Additional 'check / standby' meters have been
provided at appropriate locations so as to facilitate the preparation of weekly regional
energy accounts in case any of the 'main' meters become unsuitable for the purpose.
3.2 Types of Meters
I) Interface Meter: Interface Meter is connected at the point of interconnection
with inter-state transmission system (ISTS) for the purpose of electricity accounting and
billing. Meter shall be owned by CTU.
II) Consumer Meter: Consumer meter means a meter used for accounting and
billing of electricity supplied to the consumer. Meter shall be owned by Licensee.
III) Energy Accounting Meter:Energy Accounting and Audit Meter means Meter
used for accounting of electricity to various segments of electrical system. Meter shall be
owned by generating company or Licensee.
3.3 Metering Arrangement
3.3.1 Metering arrangement for NTPC stations
Three sets of energy meter i.e. Main, Check and Stand-by energy meters are provided to
calculate the energy sent-out. One set each of Main & Check Meters is provided on all
outgoing feeders and stand-by meters are provided on the EHV side of the generator
transformer (GT) and station supply transformers
3.3.2 Metering arrangement for ICTs
For measurement of energy supply to a constituent/agency through an ICT, the Main
meter is provided on the HV side of the ICT and the Standby meter on the LV side of the
same ICT.
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 15/65
3.3.3 Metering arrangement for inter-State transmission lines.
In case of SEB-owned Inter-State transmission lines, say between State 'A' and State ‘B.',
the energy meters are provided at both the ends of the lines. The meter installed at end 'A'
is the Main meter for working out net drawal of SEB 'A' and that installed at other end 'B'
acts as check meter for SEB 'A', and vice-versa.
3.3.4 Metering arrangement for POWERGRID lines
On POWERGRID lines, unless an end is a regional energy accounting point, an Energy
Meter is provided only at one end of each line. The readings recorded by these meters are
being used for information and analysis only, and not for the energy accounting purposes.
3.4 Maintenance of Special Energy Meters
3.4.1 Testing and Calibration
All equipments are duly tested. In particular, each and every meter is being subjected to
acceptance tests as specified by CTU, at the manufacturer's works, before dispatch.
3.4.2 Periodic testing of accuracy
i) In-situ functional checking and rough testing of accuracy are being carried out for allmeters once a year by the CTU, with portable test equipment complying with IEC-60736,
for type and acceptance testing of energy meters of 1.0 class.
ii) Full testing for accuracy for every meter is being carried out by the CTU at an
accredited laboratory once every five (5) yrs.
The constituents/agencies may depute one authorized representative to witness the tests.
3.4.3 Meter Calibration
The meters normally need not to be recalibrated. However in case a meter is found to
violate any of its accuracy , functional requirements during the above periodic accuracy
checks, the same is replaced by CTU by a duly tested/certified meter, and the defective
meter is sent back to the manufacturer for appropriate recalibration and re-certification
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 16/65
3.5 CONSTITUENT WISE LOCATION AND QUANTITY
Total no of location in Eastern region has 111 and out of which power grid has 23locations. Total no of real meters are 449(including tie line with NR, NER, WR, SR end)
in the region at different locations.S. NO. CONSTITUENT NO. OF LOCATION A-TYPE B-TYPE TOTAL
1 FSTPP (NTPC) 1 27 - 27
2 KhSTPP(NTPC) 1 41 - 41
3 TSTPP(NTPC) 1 27+9 - 27+9
4 BARH (NTPC) 1 2 - 2
5 BSEB 16 29 5 34
6 JSEB 11 20 5 25
7 DVC 12 3 12 15
8 GRIDCO 13 24 1 25
9 WBSETCL 13 18 1 19
10 SIKKIM 1 5 - 5
11 POWERGRID 23 161 - 161
12 WR 4 8 - 8
13 NR 6 13 - 13
14 SR 1 4 - 4
15 NER 3 6 - 6
16 RANGIT 1 9 - 9
17 TEESTA 1 7 - 7
18 BHUTAN 3 18 - 18
TOTAL 111 431 24 455
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 17/65
3.5.1 METER LOCATION OF INTER CONNECTED SYSTEM
Details of meter location of interconnected system and constituent wise metering
arrangement and metering arrangement at inter state generating stations are shown in
Annexure-A
3.5.2 LOCATION WISE LIST OF METERS
Eastern region has total 111 location and total no of real meter is 455 including Bhutan
till date. Power grid has 23 locations.
S.No. LOC_IDMETER
NO. CTR PTR PLACE OF INSTALLATION
A
METERS INSTALLED IN FSTPP
1 FK-01 NP-0430-A 500 3636.3636 400 KV SIDE OF FARAKKA GT-1
2 FK-02 NP-0599-A 500 3636.3636 400 KV SIDE OF FARAKKA GT-2
3 FK-03 NP-0432-A 500 3636.3636 400 KV SIDE OF FARAKKA GT-34 FK-04 NP-0421-A 1000 3636.3636 400 KV SIDE OF FARAKKA GT-4
5 FK-05 NP-0419-A 1000 3636.3636 400 KV SIDE OF FARAKKA GT-5
6 FK-06 NP-0575-A 500 3636.3636 400 KV SIDE OF FARAKKA TIE TRANS.-1
7 FK-07 NP-0565-A 500 3636.3636 400 KV SIDE OF FARAKKA TIE TRANS.-2
8 FK-08 NP-5202-A 1000 3636.3636 400 KV FARAKKA (NTPC) - KAHALGAON (NTPC)
9 FK-09 NP-5200-A 1000 3636.3636 400 KV FARAKKA (NTPC) - KAHALGAON (NTPC)
10 FK-10 NP-5228-A 1000 3636.3636 400 KV FARAKKA (NTPC) - DURGAPUR (PG) -1
11 FK-11 NP-5208-A 1000 3636.3636 400 KV FARAKKA (NTPC) - DURGAPUR (PG) -2
12 FK-12 NP-5204-A 1000 3636.3636 400 KV FARAKKA (NTPC) - MALDA (PG) -1
13 FK-13 NP-5223-A 1000 3636.3636 400 KV FARAKKA (NTPC) - MALDA (PG) -2
14 FK-14 NP-5211-A 1000 2000.0000 220 KV FARAKKA (NTPC) - LALMATIA (JSEB)
15 FK-15 NP-5221-A 1000 3636.3636 400 KV FARAKKA (NTPC) - JEERAT (WBSEB)16 FK-16 NP-5213-A 1000 3636.3636 400 KV FARAKKA (NTPC) – SAGARDIGHI(WBSEB
17 FK-17 NP-5210-A 500 3636.3636 400 KV SIDE OF 400/220 KV FARAKKA ATR
18 FK-18 NP-0576-A 500 3636.3636 400 KV SIDE OF FARAKKA TIE TRANS.-3
19 FK-21 NP-5220-A 1000 3636.3636 400 KV FARAKKA (NTPC) - JEERAT (WBSEB) -1 (
20 FK-22 NP-5214-A 1000 3636.3636 400 KV FARAKKA (NTPC) - SUBHASGRAM (CHK
21 FK-23 NP-5222-A 1000 3636.3636 400 KV FARAKKA (NTPC) - DURGAPUR (PG) -1 (C
22 FK-24 NP-5209-A 1000 3636.3636 400 KV FARAKKA (NTPC) - DURGAPUR (PG) -2 (C
23 FK-25 NP-5203-A 1000 3636.3636400 KV FARAKKA (NTPC) - KAHALGAON (NTPC) -MTR)
24 FK-26 NP-5201-A 1000 3636.3636400 KV FARAKKA (NTPC) - KAHALGAON (NTPC) -MTR)
25 FK-27 NP-5212-A 500 3636.3636 400 KV SIDE OF 400/220 KV FARAKKA ATR (CHK
26 FK-28 NP-5229-A 1000 3636.3636 400 KV FARAKKA (NTPC) - MALDA (PG) -1 (CHK M
27 FK-29 NP-5224-A 1000 3636.3636 400 KV FARAKKA (NTPC) - MALDA (PG) -2 (CHK M
B METERS INSTALLED IN KHSTPP
28 KH-01 NP-5851-A 500 3636.3636 400 KV SIDE OF KAHALGAON GT-1
29 KH-02 NP-5250-A 500 3636.3636 400 KV SIDE OF KAHALGAON GT-2
30 KH-03 NP-5850-A 500 3636.3636 400 KV SIDE OF KAHALGAON GT-3
31 KH-04 NP-0517-A 500 3636.3636 400 KV SIDE OF KAHALGAON GT-4
32 KH-05 NP-5262-A 500 1200.0000 132 KV SIDE OF KAHALGAON STN TRANS-1
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 18/65
33 KH-06 NP-5256-A 500 1200.0000 132 KV SIDE OF KAHALGAON STN TRANS-2
34 KH-07 NP-5258-A 1000 3636.3636 400 KV KAHALGAON (NTPC) - FARAKKA (NTPC)
35 KH-08 NP-5254-A 1000 3636.3636 400 KV KAHALGAON (NTPC) - FARAKKA (NTPC)
36 KH-09 NP-5247-A 1000 3636.3636 400 KV KAHALGAON (NTPC) - MAITHON (PG) -1
37 KH-10 NP-5257-A 1000 3636.3636 400 KV KAHALGAON (NTPC) - MAITHON (PG) -2
38 KH-11 NP-5246-A 1000 3636.3636 400 KV KAHALGAON (NTPC) - BIHARSHARIF(PG)
39 KH-12 NP-5240-A 1000 3636.3636 400 KV KAHALGAON (NTPC) - BIHARSHARIF(PG)40 KH-13 NP-5239-A 500 1200.0000 132 KV KAHALGAON (NTPC) - SABOUR (BSEB)
41 KH-14 NP-5244-A 500 1200.0000 132 KV KAHALGAON (NTPC) - LALMATIA (BSEB)
42 KH-15 NP-5252-A 500 3636.3636 400 KV SIDE OF K'GAON 400/132 ATR-I 200 MVA
43 KH-16 NP-5251-A 500 3636.3636 400 KV SIDE OF K'GAON 400/132 ATR-II 200MVA
44 KH-17 NP-5255-A 500 1200.0000 132 KV SIDE OF COLONY TRANSFORMER-I
45 KH-18 NP-5267-A 500 1200.0000 132 KV SIDE OF COLONY TRANSFORMER-II
46 KH-19 NP-5261-A 500 1200.0000 132 KV KAHALGAON (NTPC) - KAHALGAON (BSE
47 KH-21 NP-5259-A 1000 3636.3636 400 KV KAHALGAON (NTPC) - FARAKKA (NTPC)
48 KH-22 NP-5260-A 1000 3636.3636 400 KV KAHALGAON (NTPC) - FARAKKA (NTPC)
49 KH-23 NP-5242-A 1000 3636.3636 400 KV KAHALGAON (NTPC) - MAITHON (PG) -1 (
50 KH-24 NP-5253-A 1000 3636.3636 400 KV KAHALGAON (NTPC) - MAITHON (PG) -2 (
51 KH-25 NP-5248-A 1000 3636.3636 400 KV KAHALGAON (NTPC) - BIHARSHARIF(PG)52 KH-26 NP-5241-A 1000 3636.3636 400 KV KAHALGAON (NTPC) - BIHARSHARIF(PG)
53 KH-27 NP-5263-A 500 3636.3636 400 KV SIDE OF K'GAON 400/132 ATR-I 200 MVA
54 KH-28 NP-5265-A 500 3636.3636 400 KV SIDE OF K'GAON 400/132 ATR-II 200MVA
55 KH-31 NP-5245-A 1000 3636.3636 400 KV KAHALGAON-BIHARSARIFF-3
56 KH-32 NP-5117-A 1000 3636.3636 400 KV KAHALGAON-BIHARSARIFF-4
57 KH-33 NP-5235-A 1000 3636.3636 400 KV KAHALGAON-BIHARSARIFF-3 (CHK)
58 KH-34 NP-5118-A 1000 3636.3636 400 KV KAHALGAON-BIHARSARIFF-4 (CHK)
59 KH-35 NP-5269-A 2000 3636.3636 400 KV KAHALGAON-PATNA-1
60 KH-36 NP-5266-A 2000 3636.3636 400 KV KAHALGAON-PATNA-2
61 KH-37 NP-5264-A 2000 3636.3636 400 KV KAHALGAON-PATNA-1 (CHECK)
62 KH-38 NP-5268-A 2000 3636.3636 400 KV KAHALGAON-PATNA-2 (CHECK)
63 KG-01 NP-5116-A 1000 3636.3636 400 KV SIDE OF KAHALGAON GT-564 KG-02 NP-5852-A 1000 3636.3636 400 KV SIDE OF KAHALGAON GT-6
65 KG-03 NP-5857-A 1000 3636.3636 400 KV SIDE OF KAHALGAON GT-7
66 KG-04 NP-5862-A 500 1200.0000 132 KV SIDE OF KAHALGAON STN TRANS-3
67 KG-05 NP-5863-A 500 1200.0000 132 KV SIDE OF KAHALGAON STN TRANS-4
68 KG-06 NP-5856-A 500 1200.0000 132 KV SIDE OF KAHALGAON STN TRANS-5
C METERS INSTALLED IN TSTPP
69 TL-01 NP-5107-A 1000 3636.3636 400 KV SIDE OF TALCHER GT-1
70 TL-02 NP-5105-A 1000 3636.3636 400 KV SIDE OF TALCHER GT-2
71 TL-03 NP-5108-A 500 3636.3636 400 KV SIDE OF TALCHER 315MVA 400/220KV AT
72 TL-04 NP-5109-A 500 3636.3636 400 KV SIDE OF TALCHER 315MVA 400/220KV AT
73 TL-05 NP-5083-A 1000 3636.3636 400 KV TALCHER (NTPC) - ROURKELA (PG) -1
74 TL-06 NP-5084-A 1000 3636.3636 400 KV TALCHER (NTPC) - ROURKELA (PG) -2
75 TL-07 NP-5085-A 1000 3636.3636 400 KV TALCHER (NTPC) - RENGALI (PG) -1
76 TL-08 NP-5106-A 1000 3636.3636 400 KV TALCHER (NTPC) - RENGALI (PG) -2
77 TL-09 NP-5103-A 1000 2000.0000 220 KV TSTPP (NTPC) - TTPS (GRIDCO)
78 TL-10 NP-5102-A 1000 2000.0000 220 KV TSTPP (NTPC) - RENGALI HPS (GRIDCO)
79 TL-11 NP-5112-A 1000 2000.0000 220 KV TSTPP (NTPC) - M'MUNDALI (GRIDCO) -1
80 TL-12 NP-5101-A 1000 2000.0000 220 KV TSTPP (NTPC) - M'MUNDALI (GRIDCO) -2
81 TL-13 NP-5081-A 200 2000.0000 220 KV SIDE OF 220/11 KV STATION TRANS. -1
82 TL-14 NP-5066-A 1000 3636.3636 400 KV TSTPP STG-I - STG-II-1
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 19/65
83 TL-15 NP-5076-A 1000 3636.3636 400 KV TSTPP STG-I - STG-II-2
84 TL-16 NP-5069-A 1000 3636.3636 400 KV TSTPP STG-II - STG-I -1
85 TL-17 NP-5070-A 1000 3636.3636 400 KV TSTPP STG-II - STG-I -2
86 TL-18 NP-5114-A 1000 3636.3636 400 KV TALCHER (NTPC) - M'MUNDALI-1 (GRIDC
87 TL-19 NP-5067-A 1000 3636.3636 400 KV TALCHER (NTPC) - M'MUNDALI-2 (GRIDC
88 TL-21 NP-5082-A 1000 3636.3636 400 KV TALCHER (NTPC)- ROURKELA (PG) -1 (C
89 TL-22 NP-5115-A 1000 3636.3636 400 KV TALCHER (NTPC) - ROURKELA (PG) -2 (C90 TL-23 NP-5110-A 1000 3636.3636 400 KV TALCHER (NTPC) - RENGALI (PG) -1 (CHK
91 TL-24 NP-5972-A 1000 3636.3636 400 KV TALCHER (NTPC) - RENGALI (PG) -2 (CHK
92 TL-25 NP-5077-A 500 3636.3636 400 KV SIDE OF TALCHER 400/220KV ATR-1 (C
93 TL-26 NP-5113-A 500 3636.3636 400 KV SIDE OF TALCHER 400/220KV ATR-2 (C
94 TL-27 NP-5078-A 1000 3636.3636 400 KV TALCHER (NTPC) - M'MUNDALI-1 (GRID)-
95 TL-28 NP-5104-A 1000 3636.3636 400 KV TALCHER (NTPC) - M'MUNDALI-2 (GRID)-
96 TL-31 NP-4094-A 2000 3636.3636 400 KV TSTPP HVDC FDR-1(MAIN)
97 TL-32 NP-4095-A 2000 3636.3636 400 KV TSTPP HVDC FDR-2(MAIN)
98 TL-33 NP-4090-A 2000 3636.3636 400 KV TSTPP HVDC FDR-3(MAIN)
99 TL-34 NP-4097-A 2000 3636.3636 400 KV TSTPP HVDC FDR-4(MAIN)
100 TL-45 NP-4009-A 1000 3636.3636 400 KV SIDE OF TALCHER GT-3
101 TL-47 NP-4003-A 1000 3636.3636 400 KV SIDE OF TALCHER GT-4102 TL-49 NP-4001-A 1000 3636.3636 400 KV SIDE OF TALCHER GT-5
103 TL-51 NP-4068-A 1000 3636.3636 400 KV SIDE OF TALCHER GT-6
104 TL-57 NP-4064-A 100 3636.3636 220 KV SIDE OF 220/11 KV STN TRANS. -1
D METERS INSTALLED IN TSTPP
105 BH-01 NP-6111-A 3000 3636.3636 400 KV BARH (NTPC) – KAHALGAON (NTPC) -2
106 BH-02 NP-6080-A 3000 3636.3636 400 KV BARH (NTPC) – PATNA (PG) -2
EMETERS INSTALLED IN CHUKHA
HPC
107 CU-01 NP-2529-A 600 2000.0000 220 KV CHUKHA (CHPC) - BIRPARA (PG) -1
108 CU-02 NP-2520-A 600 2000.0000 220 KV CHUKHA (CHPC) - BIRPARA (PG) -2
109 CU-03 NP-2377-A 600 2000.0000 220 KV CHUKHA (CHPC) - MALBASE (CHPC)110 CU-04 NP-0580-A 600 2000.0000 220 KV MALBASE (CHPC) - BIRPARA (PG)
111 CU-05 NP-0571-A 600 2000.0000 CHUKHA (CHPC) GENERATOR -I
112 CU-06 NP-0596-A 600 2000.0000 CHUKHA (CHPC) GENERATOR -II
113 CU-07 NP-0483-A 600 2000.0000 CHUKHA (CHPC) GENERATOR -III
114 CU-08 NP-0408-A 600 2000.0000 CHUKHA (CHPC) GENERATOR -IV
115 TH-01 NP-5828-A 2000 3636.3636 400 KV TALA (BHUTAN)- BINAGURI - I
116 TH-02 NP-5829-A 2000 3636.3636 400 KV TALA (BHUTAN)- BINAGURI - II
FMETERS INSTALLED IN MALBASE
(BHUTAN)
117 BT-33 NP-5096-A 800 2000.0000 220 KV MALBASE (BHUTAN) – CHUKHA (BHUTAN
118 BT-34 NP-5097-A 800 2000.0000 220 KV MALBASE (BHUTAN) – SINGHIGAON (BHU
119 BT-35 NP-5099-A 800 2000.0000 220 KV MALBASE (BHUTAN) – SINGHIGAON (BHU120 BT-36 NP-5098-A 800 2000.0000 220 KV SIDE OF MALBASE (BHUTAN) ICT
121 BT-37 NP-5095-A 1000 3636.3636 400 KV SIDE OF MALBASE (BHUTAN) ICT
122 BT-38 NP-5100-A 1000 3636.3636 400 KV MALBASE (BHUTAN) – TALA (BHUTAN)
123 BT-39 NP-5869-A 1000 3636.3636 400 KV MALBASE (BHUTAN) – BINAGURI (PG)
124 BT-40 NP-5867-A 800 2000.0000 220 KV MALBASE (BHUTAN)- BIRPARA (PG)
GMETERS INSTALLED IN RANGIT
HEP(NHPC)
125 RG-01 NP-5919-A 150 1200.0000 132 KV SIDE OF RANGIT GEN.TRANS.- 1
126 RG-02 NP-5920-A 150 1200.0000 132 KV SIDE OF RANGIT GEN.TRANS.- 2
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 20/65
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 21/65
174 ER-34 NP-5957-A 500 2000.0000 220 KV JEYPORE (PG) - JEYNAGAR (GRIDCO) -1
175 ER-35 NP-5958-A 500 2000.0000 220 KV JEYPORE (PG) - JEYNAGAR (GRIDCO) -2
176 ER-36 NP-5959-A 1000 3636.3636 400 KV JEYPORE (PG) - INDRAVATI (PG)
177 ER-37 NP-5884-A 1000 3636.3636 400 KV BINAGURI (PG) - BONGAIGAON (NER)-1
178 ER-38 NP-5960-A 1600 3636.3636 400 KV JEYPORE (PG) - M'MUNDALI (GRIDCO)
179 ER-39 NP-6465-A 800 2000.0000 220 KV BIRPARA (PG) - CHUKHA (CHPC) -1
180 ER-40 NP-6464-A 800 2000.0000 220 KV BIRPARA (PG) - CHUKHA (CHPC) -2181 ER-41 NP-6490-A 800 2000.0000 220 KV BIRPARA (PG) - MALBASE
182 ER-42 NP-6462-A 800 2000.0000 220 KV BIRPARA (PG) - SALAKATI (PG) -1
183 ER-43 NP-6463-A 800 2000.0000 220 KV BIRPARA (PG) - SALAKATI (PG) -2
184 ER-44 NP-6469-A 600 1200.0000 132 KV BIRPARA (PG) - BIRPARA (WBSEB) -1
185 ER-45 NP-5881-A 1600 2000.0000 220 KV BINAGURI (PG) - JALPAIGURI(WBSEB)-2
186 ER-46 NP-6491-A 800 2000.0000 220 KV BIRPARA (PG) - SILIGURI (PG) -1
187 ER-47 NP-6468-A 800 2000.0000 220 KV BIRPARA (PG) - SILIGURI (PG) -2
188 ER-48 NP-6083-A 600 1200.0000 132 KV PURNEA (PG) - PURNEA (BSEB) -3
189 ER-49 NP-6084-A 600 1200.0000 132 KV PURNEA (PG) - DALKHOLA (WBSEB)
190 ER-50 NP-5949-A 800 2000.0000 220 KV SILIGURI (PG) - DALKHOLA (PG) -1
191 ER-51 NP-5948-A 800 2000.0000 220 KV SILIGURI (PG) - DALKHOLA (PG) -2
192 ER-52 NP-5945-A 600 1200.0000 132 KV SILIGURI (PG) - NBU (WBSEB) -2193 ER-53 NP-5946-A 600 1200.0000 132 KV SILIGURI (PG) - NBU-(WBSEB) -1
194 ER-54 NP-5947-A 600 1200.0000 132 KV SILIGURI (PG) - RANGIT (NHPC)-1&2
195 ER-55 NP-6093-A 800 2000.0000 220 KV PUSAULI (PG) - DEHRI (BSEB)
196 ER-56 NP-6092-A 800 2000.0000 220 KV PUSAULI (PG) - SAHUPURI (NR)
197 ER-57 NP-5950-A 600 1200.0000 132 KV SILIGURI (PG) - MELLI (SIKKIM)
198 ER-58 NP-6476-A 600 1200.0000 132 KV MALDA (PG) - MALDA (WBSEB) -1
199 ER-59 NP-6478-A 600 1200.0000 132 KV MALDA (PG) - MALDA (WBSEB) -2
200 ER-60 NP-6477-A 800 2000.0000 220 KV MALDA (PG) - DALKHOLA (PG) -1
201 ER-61 NP-6479-A 800 2000.0000 220 KV MALDA (PG) - DALKHOLA (PG) -2
202 ER-62 NP-6081-A 800 1200.0000 132 KV PURNEA (PG) - PURNEA (BSEB) -1
203 ER-63 NP-6082-A 800 1200.0000 132 KV PURNEA (PG) - PURNEA (BSEB) -2
204 ER-64 NP-0415-A 800 2000.0000 220 KV PURNEA (PG) - DALKHOLA (PG) -1205 ER-65 NP-0389-A 800 2000.0000 220 KV PURNEA (PG) - DALKHOLA (PG) -2
206 ER-66 NP-6460-A 500 3636.3636 400 KV SIDE OF DURGAPUR 400/220 KV ICT -1
207 ER-67 NP-6461-A 500 3636.3636 400 KV SIDE OF DURGAPUR 400/220 KV ICT -2
208 ER-68 NP-5831-A 1000 3636.3636 400 KV DURGAPUR(PG) - PURULIA PPS
209 ER-69 NP-6453-A 500 3636.3636 400 KV SIDE OF MAITHON (PG) 400/220 KV ICT -
210 ER-70 NP-6449-A 500 3636.3636 400 KV SIDE OF MAITHON (PG) 400/220 KV ICT -2
211 ER-71 NP-5927-A 500 3636.3636 400 KV SIDE OF ROURKELA (PG) 400/220 KV ICT
212 ER-72 NP-5930-A 500 3636.3636 400 KV SIDE OF ROURKELA (PG) 400/220 KV ICT
213 ER-73 NP-5992-A 500 3636.3636 400 KV SIDE OF RENGALI (PG) 400/220 KV ICT -1
214 ER-74 NP-5988-A 500 3636.3636 400 KV SIDE OF RENGALI (PG) 400/220 KV ICT -2
215 ER-75 NP-5955-A 500 3636.3636 400 KV SIDE OF JEYPORE (PG) 400/220 KV ICT -
216 ER-76 NP-5951-A 800 2000.0000 220 KV SIDE OF SILIGURI (PG) 220/132 KV ICT -1217 ER-77 NP-5956-A 600 3636.3636 400 KV SIDE OF JEYPORE (PG) 400/220 KV ICT -2
218 ER-78 NP-6095-A 300 1200.0000 132 KV PUSAULI(PG)-DEHRI(BSEB)
219 ER-79 NP-6094-A 300 1200.0000 132 KV PUSAULI(PG)-KARMANASA(BSEB)
220 ER-80 NP-5943-A 2000 3636.3636 400 KV ROURKELA-RAIPUR - I
221 ER-81 NP-5928-A 2000 3636.3636 400 KV ROURKELA-RAIPUR - II
222 ER-82 NP-2375-A 2000 3636.3636 400 KV SASARAM (PG) EAST BUS-1
223 ER-83 NP-0167-A 2000 3636.3636 400 KV SASARAM (PG) EAST BUS-2
224 ER-84 NP-5961-A 1000 3636.3636 400 KV JEYPORE (PG) - GAJUWAKA (PG) -1
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 22/65
225 ER-85 NP-5962-A 1000 3636.3636 400 KV JEYPORE (PG) - GAJUWAKA (PG) -2
226 ER-86 NP-5966-A 1000 3636.3636 400 KV INDRAVATI (PG) - INDRAVATI P/H)
227 ER-87 NP-5890-A 800 2000.0000 220 KV SIDE OF BINAGURI 400/220 KV ICT-2
228 ER-88 NP-6475-A 1000 3636.3636 400 KV MALDA (PG) - PURNEA (PG)
229 ER-89 NP-6064-A 1000 3636.3636 400 KV BIHARSARIFF (PG) - SASARAM (NR) -1
230 ER-90 NP-6062-A 1000 3636.3636 400 KV BIHARSARIFF (PG) - SASARAM (NR) -2
231 ER-94 NP-2372-A 600 3636.3636 400 KV SIDE OF PUSAULI 400/220KV ICT-2232 ER-95 NP-6058-A 300 2000.0000 220 KV SIDE OF ARAH 220/132 KV 100 MVA ICT-1
233 ER-96 NP-6059-A 300 2000.0000 220 KV SIDE OF ARAH 220/132 KV 100 MVA ICT-2
234 ER-97 NP-2367-A 600 3636.3636 400 KV SIDE OF PUSAULI 400/220KV ICT-1
235 ER-98 NP-5916-A 400 1200.0000 132 KV BARIPADA - BARIPADA (GRIDCO)
236 ER-99 NP-5912-A 400 1200.0000 132 KV BARIPADA - RAIRANGPUR (GRIDCO)
237 EM-01 NP-6026-A 300 1200.0000 132 KV GANGTOK(PG) - MELLI (SIKKIM)
238 EM-02 NP-6027-A 300 1200.0000 132 KV GANGTOK(PG) - RANGIT (NHPC)
239 EM-03 NP-6029-A 300 1200.0000 132 KV SIDE OF GANGTOK 132/66 KV ICT-1
240 EM-04 NP-6030-A 300 1200.0000 66 KV SIDE OF GANGTOK 132/66 KV ICT-1
241 EM-05 NP-6028-A 300 1200.0000 132 KV SIDE OF GANGTOK 132/66 KV ICT-2
242 EM-06 NP-6025-A 300 1200.0000 66 KV SIDE OF GANGTOK 132/66 KV ICT-2
243 EM-07 NP-5086-A 1000 3636.3636 400 KV BINAGURI (PG)-TALA (THP)-1244 EM-08 NP-5087-A 1000 3636.3636 400 KV BINAGURI (PG)-TALA (THP)-2
245 EM-09 NP-5088-A 1000 3636.3636 400 KV BINAGURI (PG)-MALBASE(PG)-3
246 EM-10 NP-5888-A 1000 3636.3636 400 KV BINAGURI (PG)-TALA (THP)-4
247 EM-11 NP-5090-A 1000 3636.3636 400 KV BINAGURI-PURNEA-1
248 EM-12 NP-5091-A 1000 3636.3636 400 KV BINAGURI-PURNEA-2
249 EM-13 NP-5092-A 2000 3636.3636 400 KV BINAGURI-PURNEA-3
250 EM-14 NP-5093-A 1000 3636.3636 400 KV BINAGURI-PURNEA-4
251 EM-15 NP-5848-A 600 36,363,636 400 KV SIDE OF SUBHASGRAM ICT-1
252 EM-16 NP-5845-A 600 36,363,636 400 KV SIDE OF SUBHASGRAM ICT-2
253 EM-17 NP-5360-A 2000 3636.3636 400 KV SUBHASGRAM-JEERAT (WBSEB)
254 EM-18 NP-5080-A 1600 2000.0000 220 KV SUBHASGRAM-SUBHASGRAM-1 (WBSEB
255 EM-19 NP-5847-A 1600 2000.0000 220 KV SUBHASGRAM-SUBHASGRAM-2 (WBSEB256 EM-21 NP-6061-A 3000 3636.3636 400 KV BIHARSARIFF-BALIA (NR)-1
257 EM-22 NP-6065-A 3000 3636.3636 400 KV BIHARSHARIFF-BALIA (NR)-2
258 EM-23 NP-5071-A 1000 3636.3636 400 KV MZ'PUR (PG)-BIHARSARIFF-1
259 EM-24 NP-5230-A 1000 3636.3636 400 KV MZ'PUR (PG)-BIHARSARIFF-2
260 EM-25 NP-5074-A 2000 3636.3636 400 KV MZ'PUR (PG)-GORAKHPUR(NR)-1
261 EM-26 NP-9981-A 2000 3636.3636 400 KV MZ'PUR (PG)-GORAKHPUR(NR)-2
262 EM-27 NP-5075-A 2000 3636.3636 400 KV MZ'PUR - PURNEA-1
263 EM-28 NP-5062-A 2000 3636.3636 400 KV MZ'PUR - PURNEA-2
264 EM-29 NP-5073-A 600 3636.3636 400/220 KV MZ'PUR ICT-2
265 EM-30 NP-9983-A 600 3636.3636 400/220 KV MZ'PUR ICT-1
266 EM-31 NP-5063-A 800 2000.0000 220 KV MZ'PUR(PG) - KANTI(BASEB)-1
267 EM-32 NP-5061-A 800 2000.0000 220 KV MZ'PUR(PG) - KANTI(BASEB)-2268 EM-41 NP-5871-A 1000 3636.3636 400 KV RANCHI-MAITHON-2
269 EM-42 NP-5873-A 600 3636.3636 400 KV SIDE OF RANCHI ICT-2
270 EM-43 NP-5872-A 800 2000.0000 220 KV SIDE OF RANCHI ICT-2
271 EM-44 NP-5879-A 800 2000.0000 220 KV RANCHI - PATRATU (JSEB)
272 EM-45 NP-5874-A 800 2000.0000 220 KV RANCHI - CHANDIL (JSEB)
273 EM-46 NP-5877-A 1000 3636.3636 400 KV RANCHI-MAITHON-1
274 EM-47 NP-5835-A 1000 3636.3636 400 KV RANCHI – SIPAT -I
275 EM-48 NP-5836-A 1000 3636.3636 400 KV RANCHI – SIPAT -II
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 23/65
276 EM-50 NP-6086-A 600 1200.0000 220/132 KV PURNEA ICT-1
277 EM-51 NP-2517-A 600 1200.0000 220/132 KV PURNEA ICT-2
278 EM-52 NP-2518-A 600 1200.0000 220/132 KV PURNEA ICT-3
279 EM-53 NP-5273-A 2000 3636.3636 400 KV PATNA (ER) - BALIA (NR)-2
280 EM-54 NP-5272-A 2000 3636.3636 400 KV PATNA - KAHALGAON-1
281 EM-55 NP-5270-A 600 3636.3636 400 KV SIDE OF PATNA ICT-1
282 EM-56 NP-5271-A 1000 3636.3636 220 KV SIDE OF PATNA ICT-1283 EM-57 NP-5274-A 2000 3636.3636 400 KV PATNA (ER) - BALIA (NR)-1
284 EM-58 NP-5914-A 400 1200.0000 132 KV BARIPADA (PG) - BALASORE (GRIDCO)
285 EM-59 NP-5911-A 800 2000.0000 132 KV SIDE OF BARIPADA 220/132 KV ICT
286 EM-60 NP-5878-A 600 3636.3636 400 KV SIDE OF RANCHI ICT-1
287 EM-61 NP-5870-A 800 2000.0000 220 KV SIDE OF RANCHI ICT-1
288 EM-62 NP-5839-A 600 3636.3636 400 KV SIDE OF PATNA ICT-2
289 EM-63 NP-5866-A 1000 2000.0000 220 KV SIDE OF PATNA ICT-2
290 EM-64 NP-5865-A 800 2000.0000 220 KV PATNA - FATUA-1
291 EM-65 NP-5832-A 800 2000.0000 220 KV PATNA - KHAGAUL-2
292 EM-66 NP-5913-A 800 2000.0000 220 KV BARIPADA (PG) - BALASORE (GRIDCO)-2
293 EM-67 NP-5886-A 1000 3636.3636 400 KV BINAGURI – TEESTA- V- I
294 EM-68 NP-5887-A 1000 3636.3636 400 KV BINAGURI – TEESTA- V- II295 EM-69 NP-5909-A 1200 3636.3636 315 MVA ICT AT BARIPADA
296 EM-71 NP-5838-A 2000 3636.3636 400 KV PATNA – KAHALGAON-2
297 EM-72 NP-6056-A 800 2000.0000 220 KV ARAH – KHAGAUL - 1
298 EM-73 NP-6057-A 800 2000.0000 220 KV ARAH – KHAGAUL - 2
299 EM-74 NP-5846-A 2000 3636.3636 400 KV SUBHASHGRAM – SAGARDIGHI (WBSEB
300 EM-75 NP-6470-A 300 1200.0000 132 KV BIRPARA (PG) – BIRPARA (WBSEB) -2
301 EM-76 NP-5072-A 1000 3636.3636 400 KV JAMSHEDPUR (PG)- MEJIA (DVC)
J METERS INSTALLED IN BSEB
302 BI-01 NP-5841-A 1200 2000.0000 220 KV BIHARSHARIF(BSEB) - BIHARSHARIF(PG
303 BI-02 NP-5840-A 1200 2000.0000 220 KV BIHARSHARIF(BSEB) - BIHARSHARIF(PG
304 BI-03 NP-6088-A 600 1200.0000 132 KV PURNEA (BSEB) - PURNEA (PG) -1305 BI-04 NP-6089-A 600 1200.0000 132 KV PURNEA (BSEB) - PURNEA (PG) -2
306 BI-07 NP-0531-A 600 1200.0000 132 KV SABOUR (BSEB) - KAHALGAON (NTPC)
307 BI-10 NP-0540-A 150 1200.0000 132 KV KAHALGAON (BSEB) - KAHALGAON (NTP
308 BI-11 NP-6052-A 200 1200.0000 132 KV ARAH (BSEB) - ARAH (PG)
309 BI-12 NP-0538-A 200 1200.0000 132 KV DUMRAON (BSEB) - ARAH (PG)
310 BI-13 NP-6053-A 800 2000.0000 220 KV KHAGAUL(BSEB) - ARAH (PG)-1
311 BI-14 NP-6060-A 800 2000.0000 220 KV KHAGAUL(BSEB) - ARAH (PG)-2
312 BI-20 NP-5236-A 600 1200.0000 132 KV KISHANGANJ (BSEB) – PURNEA (PG)
313 BI-21 NP-6085-A 600 1200.0000 132 KV KISHANGANJ (BSEB) – DALKHOLA (WB)
314 BI-48 NP-6070-A 600 1200.0000 132 KV BIHARSHARIFF (BSEB ) TIE AT RAJGIR
315 BI-49 NP-6099-A 300 1200.0000 132 KV MOHANIA (BSEB) – PUSAULI (PG)
316 BI-50 NP-6098-A 300 1200.0000 132 KV DEHRI (BSEB) – PUSAULI (PG)317 BI-51 NP-6090-A 600 1200.0000 132 KV PURNEA (BSEB) – PURNEA (PG) -3
318 BI-52 NP-0480-A 600 2000.0000 220 KV BODHGAYA(BSEB) - PATRATU -1 (JSEB)
319 BI-53 NP-0426-A 600 2000.0000 220 KV BODHGAYA(BSEB) - PATRATU -2 (JSEB)
320 BI-54 NP-0537-A 600 2000.0000 220 KV BODHGAYA(BSEB) - PATRATU -3 (JSEB)
321 BI-55 NP-6066-A 600 1200.0000 132 KV RAJGIR (BSEB) - BARHI (DVC)
322 BI-56 NP-5842-A 600 1200.0000 132 KV BIHARSHARIF (BSEB) - BARHI (DVC)
323 BI-57 NP-5844-A 1200 2000.0000 220 KV BIHARSARIFF (BSEB) - TENUGHAT (JSEB
324 BI-58 NP-6078-A 600 1200.0000 132 KV SULTANGANJ(BS)-SABOUR -LALMATIA (J
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 24/65
325 BI-59 NP-6073-A 600 1200.0000 132 KV SULTANGANJ (BSEB) - LALMATIA (JSEB)
326 BI-60 NP-6015-B 120 1200.0000 132 KV SONENAGAR (BSEB) - GARWAH (JSEB)
327 BI-61 NP-6047-B 40 1200.0000 132 KV SULTANGANJ (BSEB) - DEOGARH (JSEB)
328 BI-62 NP-6097-A 600 2000.0000 220 KV DEHRI (BSEB) - PUSAULII (PG)
329 BI-63 NP-6017-B 60 1200.0000 132 KV KARMANASHA(BSEB) - CHANDAULI (UPS
330 BI-64 NP-6018-B 60 1200.0000 132 KV KARMANASHA(BSEB) - SAHUPURI(UPSE
331 BI-66 NP-6013-B 120 1200.0000 132 KV SONENAGAR(BSEB) - RIHAND(UPSEB)332 BI-67 NP-5843-A 800 2000.0000 220 KV BIHARSHARIF(BSEB) - BIHARSHARIF(PG
333 BI-68 NP-5064-A 600 2000.0000 200 KV KANTI (BSEB)-MZ'PUR (PG)-1
334 BI-69 NP-5065-A 600 2000.0000 200 KV KANTI (BSEB)-MZ'PUR (PG)-2
335 BI-70 NP-6077-A 600 2000.0000 132 KV SULTANGANJ(BS)-SABOUR -LALMATIA (J
K
METERS INSTALLED IN JSEB
336 JS-01 NP-6103-A 1200 2000.0000 220 KV RAMCHANDRAPUR(JSEB) - JAMSHEDPU
337 JS-02 NP-5119-A 1200 2000.0000 220 KV RAMCHANDRAPUR(JSEB) - JAMSHEDPU
338 JS-03 NP-6108-A 600 1200.0000 132 KV LALMATIA (JSEB) - KAHALGAON (NTPC)
339 JS-04 NP-6109-A 800 2000.0000 220 KV LALMATIA (JSEB) - FARAKKA (NTPC)
340 JS-05 NP-6116-A 1200 2000.0000 220 KV CHANDIL (JSEB) – RANCHI (PG)
341 JS-06 NP-6121-A 1200 2000.0000 220 KV CHANDIL (JSEB) – CHANDIL (JSEB)342 JS-07 NP-6122-A 1200 2000.0000 220 KV HATIA (JSEB) – RANCHI (PG)
343 JS-08 NP-6118-A 1200 2000.0000 220 KV CHANDIL (JSEB) – CHANDIL (JSEB)
344 JS-40 NP-6605-B 120 1200.0000 132 KV PATRATU (JSEB) – PATRATU (DVC)-2
345 JS-51 NP-6102-A 600 2000.0000 220 KV RAMCHANDRAPUR (JSEB) - JODA (GRID
346 JS-52 NP-6117-A 300 1200.0000 132 KV KENDOPOSI (JSEB) - JODA (GRIDCO)
347 JS-53 NP-6009-B 60 1200.0000 132 KV GOELKERA (JSEB) - ROURKELA (GRIDCO
348 JS-54 NP-6004-B 120 1200.0000 132 KV PATRATU (JSEB) - PATRATU (DVC) -1
349 JS-55 NP-6003-B 120 1200.0000 132 KV PATRATU (JSEB) - RAMGARH (DVC) -TR.
350 JS-56 NP-6104-A 600 1200.0000 132 KV CHANDIL (JSEB) - MANIQUE (DVC)
351 JS-57 NP-6119-A 800 2000.0000 220 KV CHANDIL (JSEB) - SANTALDIH (WBSEB)
352 JS-58 NP-6113-A 400 1200.0000 132 KV GARWA (JSEB) - RIHAND (UPSEB)
353 JS-59 NP-0425-A 600 2000.0000 220 KV PATRATU(JSEB) - BODHGAYA -1 (BSEB)354 JS-60 NP-0434-A 600 2000.0000 220 KV PATRATU(JSEB) - BODHGAYA -2 (BSEB)
355 JS-61 NP-0431-A 1200 2000.0000 220 KV PATRATU(JSEB) - BODHGAYA -3 (BSEB)
356 JS-62 NP-6115-A 1600 2000.0000 220 KV TENUGHAT (JSEB) - BIHARSARIFF (BSEB
357 JS-63 NP-6107-A 600 1200.0000 132 KV LALMATIA (JSEB) - SABOUR (BSEB)
358 JS-64 NP-0000-A 400 1200.0000 132 KV JAPLA (JSEB) - SONENAGAR (BSEB)
359 JS-65 NP-6048-B 40 1200.0000 132 KV DEOGARH (JSEB) - SULTANGANJ (BSEB)
360 JS-66 NP-6110-A 200 1200.0000 132 KV JAMTARA (JSEB) - MAITHON (DVC
L
METERS INSTALLED IN DVC
361 DV-01 NP-6563-B 160 2000.0000 220 KV PARULIA (DVC) - PARULIA (PG) -1&2(SUM
362 DV-03 NP-6561-B 320 2000.0000 220 KV K'NESWARI (DVC) - MAITHON (PG) -1&2(S
363 DV-04 NP-6507-A 2000 3636.3636 400 KV MEJIA (DVC)- MAITHON(PG)364 DV-05 NP-6508-A 2000 3636.3636 400 KV MEJIA (DVC)- JAMSHEDPUR (PG)
365 DV-51 NP-6007-B 160 1200.0000 132 KV BARHI (DVC) - RAJGIR/BSF (BSEB)
366 DV-53 NP-6006-B 120 1200.0000 132 KV PATRATU (DVC)-PATRATU(JSEB)-1&2(SU
367 DV-55 NP-6011-B 120 1200.0000 132 KV MANIQUE (DVC) - CHANDIL (JSEB)
368 DV-56 NP-6562-B 40 1200.0000 132 KV MAITHON (DVC) - JAMTARA (JSEB)
369 DV-57 NP-6008-B 160 2000.0000 220 KV JAMSHEDPUR (DVC) - JINDAL(GRIDCO)
370 DV-58 NP-0633-B 160 1200.0000 132 KV WARIA (DVC) - DPL (WBSEB) -1&2(SUM)
371 DV-60 NP-6564-B 320 2000.0000 220 KV WARIA (DVC) - BIDHANNAGAR (WBSEB)-
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 25/65
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 26/65
419 WB-60 NP-0612-B 240 1200.0000 132 KV DPL (WBSEB) - WARIA (DVC) -1&2(SUM)
O
METERS INSTALLED IN SIKKIM
420 SM-01 NP-6481-A 300 600 66 KV MELLI (SIKKIM) - RANGIT (NHPC)
421 SM-02 NP-5995-A 300 1200.0000 132 KV MELLI (SIKKIM) - SILIGURI (PG)
422 SM-03 NP-5996-A 150 1200.0000 132 KV MELLI (SIKKIM) - GANGTOK (PG)
423 SM-04 NP-5997-A 300 2000.0000 132 KV MELLI (SIKKIM) - RANGIT (NHPC)424 SM-51 NP-5849-A 300 600.0000 66 KV MELLI (SIKKIM) - KALIMPONG (WBSEB
P
METERS INSTALLED IN NER-ER
425 NE-81 NP-5304-A 800 2000.0000 220 KV SALAKATI (PG) - BIRPARA(PG)-1
426 NE-82 NP-5303-A 800 2000.0000 220 KV SALAKATI (PG) - BIRPARA(PG)-2
427 NE-83 NP-5305-A 300 1200.0000 132 KV SALAKATI (PG) - GELEPHU (BHUTAN)
428 NE-84 NP-0364-A 300 1200.0000 132 KV GELEPHU (BHUTAN) - SALAKATI (PG)
429 NE-85 NP-5313-A 1000 3636.3636 400 KV BONGAIGAON (PG) - BINAGURI -1
430 NE-86 NP-5318-A 1000 3636.3636 400 KV BONGAIGAON (PG) - BINAGURI-2
Q
METERS INSTALLED IN SR-ER
431 DC-01 NP-5376-A 2000 3636.3636 GAJUWAKA (PG) HVDC STN (SOUTH BUS) -1432 DC-02 NP-5377-A 2000 3636.3636 GAJUWAKA (PG) HVDC STN (SOUTH BUS) -2
433 DC-03 NP-5378-A 2000 3636.3636 GAJUWAKA (PG) HVDC STN (EAST BUS) -1
434 DC-04 NP-5379-A 2000 3636.3636 GAJUWAKA (PG) HVDC STN (EAST BUS) -2
R METERS INSTALLED IN NR-ER
435 NR-01 NP-5341-A 2000 3636.3636 400 KV BALIA (NR)- PATNA (ER)-1
436 NR-02 NP-5043-A 2000 3636.3636 400 KV BALIA (NR)- PATNA (ER)-2
437 NR-03 NP-1530-A 800 2000.0000 220 KV SAHUPURI (NR) - PUSAULI (PG)
438 NR-05 NP-1529-A 400 1200.0000 132 KV SAHUPURI (NR) - K'NASA (BSEB)-2
439 NR-06 NP-1292-A 400 1200.0000 132 KV CHANDAULI (NR) - K'NASA
440 NR-07 NP-1295-A 400 1200.0000 132 KV RIHAND(NR) - SONENAGAR (BSEB)
441 NR-08 NP-1296-A 400 1200.0000 132 KV RIHAND(NR) - GARWA (JSEB)
442 NR-09 NP-6101-A 2000 3636.3636 SASARAM (PG) NORTH BUS-1 SARNATH443 NR-10 NP-6091-A 2000 3636.3636 SASARAM (PG) NORTH BUS-2 ALLAHABAD
444 NR-11 NP-5010-A 2000 3636.3636 400 KV G'RKPUR(NR) - MZ'PUR(ER)-1
445 NR-12 NP-5009-A 2000 3636.3636 400 KV G'RKPUR(NR) - MZ'PUR(ER)-2
446 NR-13 NP-5406-A 2000 3636.3636 400 KV BALIA - BIHARSHARIFF (ER)-1
447 NR-14 NP-5345-A 2000 3636.3636 400 KV BALIA - BIHARSHARIFF (ER)--2
S
METRS INSTALLED IN WR-ER
448 CS-54 NP-2122-A 800 2000.0000 220 KV KORBA (WR) - BUDIPADAR (ER)-2
449 CS-55 NP-2133-A 800 2000.0000 220 KV KORBA (WR) - BUDIPADAR (ER)-3
450 CS-56 NP-2104-A 600 2000.0000 220 KV RAIGAR(WR) - BUDIPADAR (ER)
451 CS-57 NP-5713-A 1000 3636.3636 400 KV RAIGAR(WR) - ROURKELA (ER)-1
452 CS-58 NP-5714-A 1000 3636.3636 400 KV RAIGAR(WR) - ROURKELA (ER)-2453 CS-59 NP-2465-A 1000 3636.3636 400 KV KORBA (WR) - VINDHYACHAL (WR)
454 CS-60 NP-6245-A 2000 3636.3636 400 KV SIPAT (WR) – RANCHI- 1
455 CS-61 NP-6253-A 2000 3636.3636 400 KV SIPAT (WR) – RANCHI- 2
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 27/65
3.6 PAIRS.DAT file
This file gives the LOC-ID of main meter and standby meter and the permitted
pair tolerance for each pair. Main meters are those which are connected on 400 kV side
of ICT or generator side of power station or sending end of inter state lines. The
standby/check meters are on the other end. Standby meters are connected in reverse
polarity so that sum of both MWh is zero in ideal condition. Suppose the power flow is
from main meter to standby meter, the main meter gives a +ve value and standby meter
gives a –ve value and vice versa. Tolerance value in MWh for a 15 min block in +ve
direction & -ve direction is given in this PAIRS.DAT, depending upon transformer /Line
loses & CT/PT errors.
The given tolerance value towards +ve side is called X value. The tolerance valuetowards –ve side is called Y value.
PAIRS.DAT
MAIN STANDBY X Y LINE DETAILS
-----------------------------------------------------------------------
BI-01 ER-01 2.0 1.5 BIHARS'F-BIHARSARIFF-1 |
BI-02 ER-02 2.0 1.5 BIHARS'F-BIHARSARIFF-2 | BSEB
BI-67 ER-03 2.0 1.5 BIHARS'F-BIHARSARIFF-3 |
ER-62 BI-03 2.0 1.5 PURNIA-PURNIA-1 |
ER-63 BI-04 2.0 1.5 PURNIA-PURNIA-2 |
ER-48 BI-51 1.5 1.0 PURNEA-PURNEA-3
KH-13 BI-07 2.0 1.5 KAHALGAON-SABOUR |
KH-19 BI-10 2.0 1.5 KAHALGAON-KAHALGAON |
ER-09 BI-11 1.5 1.0 ARAH-ARAH |
ER-10 BI-12 1.5 1.0 ARAH-DUMRAON |
JS-01 ER-17 2.0 1.5 RAMCH'PUR-JAMSHEDPUR-1 |
JS-02 ER-18 2.0 1.5 RAMCH'PUR-JAMSHEDPUR-2 |JSEB
FK-14 JS-04 2.0 1.5 FARAKKA-LALMATIA |
KH-14 JS-03 2.0 1.5 KAHALGAON-LALMATIA |
ER-91 DV-01 2.0 1.5 PARULIA-PARULIA | DVC
ER-92 DV-03 2.5 1.5 MAITHON-KALYANSWARI |
ER-23 OR-01 1.5 1.5 ROURKELA-TARKERA-1 |
ER-24 OR-02 1.5 1.5 ROURKELA-TARKERA-2 |TL-10 OR-11 2.0 2.0 TSTPP-RENGALI PH |
TL-09 OR-12 1.5 1.0 TSTPP-TTPS |
TL-11 OR-09 2.0 1.5 TSTPP-MERAMNDLI-1 | GRIDCO
TL-12 OR-10 2.0 1.5 TSTPP-MERAMNDLI-2 |
ER-30 OR-03 2.0 1.5 RENGALI-RENGALI-1 |
ER-31 OR-04 2.0 1.5 RENGALI-RENGALI-2 |
ER-34 OR-05 2.0 1.5 JEYPORE-JAYNAGAR-1 |
ER-35 OR-06 2.0 1.5 JEYPORE-JAYNAGAR-2 |
ER-86 OR-13 2.0 2.0 INDRAVATI-INDRAVATI|
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 28/65
ER-38 OR-14 2.0 1.5 JEYP-MMNDLI |
ER-44 WB-01 1.5 1.5 BIRPARA-BIRPARA |
ER-52 WB-04 2.0 1.5 NJP-NBU-2 |
ER-53 WB-03 2.0 1.5 NJP-NBU-1 |
ER-58 WB-05 1.0 1.5 MALDA-MALDA-1 |
ER-59 WB-06 1.0 1.5 MALDA-MALDA-2 | WBSEB
ER-07 WB-07 2.5 1.5 PARULIA-BID'NAGAR |
ER-42 NE-81 1.5 1.5 BIRPARA-SALAKATI-1 |ER-43 NE-82 1.5 1.5 BIRPARA-SALAKATI-2 | NER
ER-37 NE-85 2.0 1.5 BINAGURI-BONGAIGAON|
ER-21 NE-86 2.0 1.5 PURNEA-BONGAIGAON |
ER-84 DC-03 2.0 1.5 JEYPORE-GAJUWAKA-1 |
ER-85 DC-04 2.0 1.5 JEYPORE-GAJUWAKA-2 |
SR-91 SR-92 1.5 2.5 GAJK(EAST)-GAJK(SOUTH)
ER-82 ER-89 2.0 1.0 SASARAM(E)-BIHARSARIF-1 |
ER-83 ER-90 2.0 1.0 SASARAM(E)-BIHARSARIF-2 |
NR-03 ER-56 1.5 1.0 SAHUPURI-PUSAULI |
NR-05 BI-64 1.5 1.0 SAHUPURI-KARMANASA |NR
NR-06 BI-63 1.5 1.0 CHANDAULI-KARMANASA |
NR-07 BI-66 1.5 1.0 RIHAND-SONENAGAR |
NR-08 JS-58 1.5 1.0 RIHAND-GARWA |
ER-55 BI-62 1.5 1.0 PUSAULI-DEHRI
EM-17 WB-09 3.0 2.5 SUBHASGRAM-JEERAT
FK-70 FK-27 2.0 1.5 FARAKKA-ATR-400KVSID|
FK-12 FK-68 2.0 2.0 FKK-MLD-1 MAIN-CHK |
FK-08 FK-65 1.5 1.5 FKK-KHL-1 MAIN-CHK | FARAKKA
FK-09 FK-66 1.5 1.5 FKK-KHL-2 MAIN-CHK |
FK-10 FK-63 1.5 1.5 FKK-DGP-1 MAIN-CHK |
FK-11 FK-64 1.5 1.5 FKK-DGP-2 MAIN-CHK |
FK-15 FK-61 1.5 1.5 FKK-JRT-1 MAIN-CHK |
FK-16 FK-62 1.5 1.5 FKK-JRT-1 MAIN-CHK |
FK-13 FK-69 1.5 1.5 FKK-MLD-2 MAIN-CHK |
KH-09 KH-63 1.5 1.5 KHL-MTN-1 MAIN-CHK | KAHALGAON
KH-10 KH-64 1.5 1.5 KHL-MTN-2 MAIN-CHK |
KH-11 KH-65 1.5 1.5 KHL-BSF-1 MAIN-CHK |KH-12 KH-66 1.5 1.5 KHL-BSF-2 MAIN-CHK |
KH-15 KH-67 1.5 1.5 KHL ATR-1 MAIN-CHK |
KH-16 KH-68 1.5 1.5 KHL-ATR-2 MAIN-CHK |
KH-31 KH-69 1.5 1.0 KHL-BSF-3 MAIN-CHK
KH-32 KH-70 1.5 1.0 KHL-BSF-4 MAIN-CHK
KH-35 EM-54 1.5 1.0 KHL-PAT-1
TL-81 TL-82 2.0 1.5 TALCHER-ATR/LINE |
TL-03 TL-65 1.5 1.5 TAL-ATR-1 MAIN-CHK |
TL-04 TL-66 1.5 1.5 TAL-ATR-2 MAIN-CHK |
TL-05 TL-61 1.5 1.5 TAL-RKL-1 MAIN-CHK | TALCHER
TL-06 TL-62 1.5 1.5 TAL-RKL-2 MAIN-CHK |
TL-07 TL-63 1.5 1.5 TAL-REN-2 MAIN-CHK |
TL-08 TL-64 1.5 1.5 TAL-REN-1 MAIN-CHK |
CU-91 CU-92 1.0 1.5 CHUKHA RCPT-BIRP OUT
RG-04 ER-54 1.0 1.0 RANGIT - SILIGURI
RG-07 SM-01 1.0 1.0 RANGIT - MELLI
RG-06 WB-11 1.0 1.0 RANGIT - RAMMAM
OR-56 CS-56 1.5 1.0 BUDIPADAR - RAIGARH 1
OR-57 CS-54 1.5 1.0 BUDIPADAR - KORBA 2
OR-59 CS-55 1.5 1.0 BUDIPADAR - KORBA 3
ER-80 CS-57 1.5 1.0 ROURKELA - RAIPUR 1
ER-81 CS-58 1.5 1.0 ROURKELA - RAIPUR 2
NR-61 NR-62 2.0 1.0 SASARAM EAST_SASARAM NORTH
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 29/65
ER-57 SM-02 1.5 1.0 SILIGURI-MELLI
EM-01 SM-03 1.0 1.0 GANGTOK-MELLI
RG-11 EM-02 1.5 1.O RANGIT-GANGTOK
EM-31 BI-68 1.5 1.0 MUZAFFARPUR-KANTI-1
EM-32 BI-69 1.5 1.0 MUZAFFARPUR-KANTI-2
EM-25 NR-11 1.5 1.0 MUZZAFARPUR-GORAKHPUR-1
EM-26 NR-12 1.5 1.0 MUZZAFARPUR-GORAKHPUR-2
EM-39 EM-09 1.5 1.0 MALBASE-BINAGURIEM-40 ER-41 1.5 1.0 MALBASE-BIRPARA
EC-62 EC-61 1.5 1.0 SUBHAS ICTS-SUBHAS 220 KV
EM-38 EC-63 2.0 1.0 TALA MALBASE-MALBASE ICT MAL BINA
FK-16 EC-64 2.0 1.0 FARAKKA-SUBHAS 400 KV BUS
KH-35 EM-54 1.5 1.0 KAHALGAON-PATNA-2
EM-53 NR-02 1.5 1.0 PATNA - BALIA-2
EM-57 NR-01 1.5 1.0 PATNA - BALIA-1
EM-55 EM-56 1.0 0.5 PATNA ICT_400 - PATNA ICT_220
EC-66 EC-68 1.5 1.0 MTN_RAN_FDR-RANCHI ICTS(400)
EC-66 EC-65 1.0 0.5 MTN_RAN_FDR-RANCHI 220 KV FDRS
EC-68 EC-69 1.0 0.5 RANCHI 400 ICTS-RANCHI 220 ICTS
EC-67 EC-70 1.0 0.5 ARA 220 XTN-ARA 132 KV FEEDERS
EM-37 EM-36 0.5 0.5 MALBASE 400KV ICT-220 KV ICT
EM-21 NR-13 1.5 0.5 400 KV BIHARSHARIFF-BALIA-1
EM-22 NR-14 1.5 0.5 400 KV BIHARSHARIFF-BALIA-2
EC-71 EC-72 1.0 0.5 GANGTOK 132/66 KV ICTS
EC-73 EC-74 1.0 0.5 PATNA 400/220 KV ICTS
TS-05 TS-07 1.5 1.0 TEESTA-BINAGURI-1
TS-06 TS-08 1.5 1.0 TEESTA-BINAGURI-2
EM-47 CS-60 2.0 2.0 RANCHI – SIPAT -1
EM-48 CS-61 2.0 2.0 RANCHI – SIPAT -2
----------------------------------------------------------------------
JS-57 WB-53 2.0 1.5 CHANDIL-SANTALDIH | WB-JSEB
WB-52 BI-51 1.5 1.0 DALKHOLA-PURNEA | WB-BSEB
DV-51 BI-81 1.5 1.0 BARHI-RAJGIR/BSF | DVC-BSEB
JS-51 OR-53 3.0 3.0 RAMCHANDRAPUR-JODA |
JS-53 OR-51 1.0 1.0 GOILKERA-ROURKELA |JSEB-GRIDCOOR-52 JS-52 1.0 1.0 JODA-KENDPOSI |
JS-54 DV-53 1.0 1.0 PATRATU-PATRATU |JSEB-DVC
DV-57 OR-54 1.5 2.0 JAMSHEDPUR-JODA | DVC-GRIDCO
DV-60 WB-51 1.5 2.0 BIDHANNAGAR-WARIA | DVC-WB
WB-10 ER-27 2.0 2.0 KOLAGHAT-BARIPADA | WB-GRIDCO
BI-57 JS-62 1.0 1.0 B'SARIFF-TENUGHAT |
BI-83 JS-63 1.0 1.0 SBR/SLTGNJ-LALMATIA |
BI-60 JS-64 1.0 1.0 SONENAGAR-GARWA |
BI-61 JS-65 2.0 2.0 DEOGARH-SULTANGANJ |
JS-66 DV-56 1.0 1.0 JAMTARA-MAITHON |
WB-59 SM-51 1.0 1.0 KALIMPONG-MELLI
-----------------------------------------------------------------------
-
END
-----------------------------------------------------------------------
---------
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 30/65
3.7 FICTITIOUS METERS
Sometimes it is required to treat a combination of METERS as a single entity. e.g.
(i) Total drawal of an SEB
(ii) Total relief from a generating station
(iii) Total transaction of energy between two regions.
In this case, these items can be treated as just like a single meter, we call it as
FICTITIOUS METER (FICTMTRS). The following listed meters are called
FICTMTRS used to simplify the calculation process. Every fictitious meter consists
and basically summation of certain no of Real meters. Real meters are the actualmeters which are placed at different location and store the raw data. E.g.
START
01 (FK-92) M9
+(FK-08) +(FK-09) +(FK-10) +(FK-11)
+(FK-12) +(FK-13) +(FK-17) +(FK-15) +(FK-16)
………………………..
100 (RN-97) M2
+(RN-95) -(RN-96)
101 (RN-99) M1
(RN-95)*3.8/100
END
------------------------------------------------------------------------------------------------------------
The detail list of FICTITIOUS METERS are given in ANNEXURE-B
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 31/65
4.0 Scheme for collection and dissemination of data
4.1 General
While CTU has the overall responsibility for supplying the meter data to ERLDC
on a weekly basis, the respective constituent’s agencies, in whose premises the energy
meters are installed, normally down-load the metered data from each of the meters on a
weekly basis or as and when requested by the ERLDC. The respective constituent’s
agency ensures that the data is down loaded in the specified time schedule. ERLDC, in
consultation with the constituents, prepares a scheme for the timely collection of the
metered data from each meter location and its further transmission to the ERLDC. The
constituent/agency shall also ensure the security of the metered data up to its delivery to
the ERLDC and seven days thereafter. All constituents shall provide the required
assistance/co-operation to ERLDC. Each station is also requested to keep back up of all
data systematically that are sent to ERLDC.
4.2 Data Collection from different location
At each metering locations data is to be collected from SEM once in a week. With
one data collecting device, data of about ten SEM can be collected sequentially and at
once dumped into PC. For dumping into PC the software given by supplier of SEM has to
be used. After downloading the metered data of seven days from each meter location, the
respective constituent’s agencies send the data normally through e-mail from specific
location to ERLDC. These data should reach ERLDC latest by Tuesday so that it doesn’t
cause any delay in processing. Special energy meters are either SECURE METERS
LIMITED (SML) or L&T Make. These raw metered data are non readable type (non
editable and naturally tamperproof). SML make meters have *.MRI or *.AMR file and
L&T make metres have *.DAT file. Since these files are non readable files, so these files
have to be converted to *.NPC file which is readable and editable. It is better to make
NPC file at RLDC to reduce human error.
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 32/65
4.3 Saving of Raw Data
Data after downloading attachments is saved in computer in a folder (e.g.
SEM_DATA). Since these data are in MRI or DAT file these files need conversion into
TEXT file (although some location sends NPC files along with both MRI and DAT files).But it is better to convert MRI and DAT file into NPC file at ERLDC to reduce human
error. After converting into NPC file these are stored in a folder called as ‘READINGS’.
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 33/65
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 34/65
5.0 PROCESSING & COMPUTATION OF DATA
5.1 Conversion into Text File/Software for Data Viewing
After receiving the data, MRI file and DAT file is converted into TEXT file called NPC.
This conversion is done with the help of respective software. MRI file is converted into
NPC with the software called SMARTGRID supplied by the Manufacturers and DAT file
is converted into NPC with the help of VINCOM software.
For Secure Meter: SMARTGRID
For L&T Meter: VINCOM
A) SECURE METER (SMARTGRID Software): All mri files are
transferred to SEM_DATA folder in C: drive before converting to text file(i.e
NPC file). Following are the steps to convert mri file into text file
.Step-I : Login the SMARTGRID software after click on SMARTGRID icon on desktop.
Step-II: Go to Data option on menu & click to Convert for conversion of mri file into
npc file.
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 35/65
Step-III: Select all mri file to be converted into text file
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 36/65
After conversion mri files along with npc files are transferred into respective location
wise folder in C:\READINGS\Mmyy\....
A) L&T METER (VINCOM Software): All *.DAT files are transferred
to SEM_DATA folder in C: drive before converting to text file (i.e NPC file).
Following are the steps to convert dat file into text file.
Step-I : Login the VINCOM software after click on VINCOM icon on desktop
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 37/65
Step-II: Click on Import from Data option on menu.
Step-III: Browse button to select the file and import one selected dat file at a time.
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 38/65
Step-IV: After importing convert into text file.
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 39/65
Step V: Finally conversion takes place. And click on ok and after each import and
conversion finally close the application software.
After conversion dat files along with npc files are transferred into respective location
wise folder in C:\READINGS\Mmyy\....
5.2 Viewing of npc file/structure of npc file
(i) There is one week heading for each meter data which gives the start date and end
date for which data is available e.g.
WEEK FROM 0000 HRS OF 12-10-07 TO 1230 HRS OF 22-10-07
(ii) For every day data there is a day heading that gives METER NO, three register
readings at 0000 HRS of the day, and date of the day e.g.
NP-4201-A 63895.0 97845.8 74358.6 12-10-07
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 40/65
Three cumulative registers are (i) WH register (ii) VAR register at high voltage (>103%)
(iii) VAR register at low voltage (<97%).
METER NO is of 9 characters, usually starting with NP (e.g. NP-0139-A). Character A
or B depending upon whether the meter is with 1 AMP CT or 5 Amp CT
(iii) One day data consists of 96 blocks. Each for 15 min is organised in 6 lines e.g.
WEEK FROM 0000 HRS OF 12-10-07 TO 1230 HRS OF 22-10-07
NP-4201-A 63895.0 97845.8 74358.6
00 14 +11.50 00 +11.10 08 +10.89 04 +10.34 01 +10
+10.56 00 +10.48 06 +10.20 11 +10.33 00 +10.05
+10.68 02 +10.66 12 +10.65 05 +11.01
………. …….. ……….. ………….. ………………….
Each line contains 16 blocks i.e. data for 4 hours. Time is followed by 16 blocks and
starting Time is in HOURS (2 digits) is given at the start of each line. Each block
contains a frequency code and WH for the 15 min. Freq code is of 2 digits and range is
from 00 to 99.
In between frequency code and WH there may be a “*” mark if there is any voltage
problem (V<70% during any instant in the 15 min). If any correction is done during the
15 min, there may be a “aa” or “rr” corresponding to advance or retard of the clock.
There may also be a case of voltage problem and time correction occurring in the same
15 min block.
At the end of 96 blocks the algebraic SUM of WH of all block is also given. One NPC
file may consist of data for one meter or more than one meter. Data for each meter startswith a week heading. After receiving the data from all locations for a week, they can be
combined to make a complete file for the week. A program APPEND.EXE is given for
that purpose.
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 41/65
5.3 Modification/Editing in Text file
After conversion into Text file (NPC file) every file is renamed as ddmm.NPC
where dd and mm correspond to the week for which data is being processed. Also extra
meter readings to be deleted from the text file which is not required and if somecorrection of date etc is required it is done in the text file and saved into corresponding
folder from where data have been received. These are normally saved in folder named as
“READINGS”.
5.4 Availability Checking
This is done to ensure whether data from all location has received or not. This is
checked by running software called REA2006 and we check for location from where data
has received or not received, if the data has not received, then the concerned agency or
person is contacted telephonically to send the data.
5.5 Methods used in case of Non availability of data
In case of non availability of data from any location, there are different alternative
methods to evaluate the data.
I. If Main meter reading is not available then check meter reading is used as
substitute for any particular location in FICTMTRS.CFG file.
II. Another alternative is to use other end data in case of non availability of data.
III. There is another approach to evaluate data by applying Kirchhof’s law at BUS
from where data is not available but this approach is not always valid..
Sometimes data are sent from different location by email attachment but required
proper data is not found in attachment. In that case the concerned agency or person is
asked to resend the data again.
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 42/65
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 43/65
(iv) Energy in MWH and MVARH is computed from WH and VARH using
corresponding CTR and PTRs. Wherever a pair is available (e.g. 400 KV and 220
kV side of ICT) computed energy is compared and data correction is done,
accordingly (for “*” marked blocks). Load curve can be plotted if required,
Drawal, share and overdrawal/underdrawal are computed using the FICTMTRS
(fictitious meters) concept.
(v) Output file can be made as desired by the user by making appropriate
configuration file.
(vi) Option is made available to change the freq code tolerance (temporarily) for
frequency analysis and to modify temporarily each pairs to get approximate pairs
tolerance value for analysis of each pair.
Following are the activities before creating data base.
First it is checked for the location from where data has not been received. If data is not
received from some location then it is asked to send the data. After receiving all the data
from each and every location, again all NPC file is combined together by
APPEND.EXE command and SREA file is created. After that it is gone through data
correctness stage. If status is not found ok then corresponding data file is edited that hascaused the error. Then Data base is created.
So finally by running REA2006 software we go through final processing with the
following steps.
I. Location of data not received
II. Data Correctness
III. Create Data base
IV. Compute ENERGY
V. Compute FICTMTRS
VI. MWH output
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 44/65
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 45/65
5.8 Discrepancies
If there is any discrepancy in the week’s data processing, it is listed out in register
for every week and these are used during final processing of data. These discrepancies
are forwarded to ERPC (Eastern Regional Power Committee) along with Raw andprocessed data. These discrepancies are also uploaded on ERLDC web along with ISGS
injection and Constituent’s drawl.
5.9 Data forwarding to ERPC
Processed data of the week along with raw data and discrepancies is forwarded to
Eastern regional Power committee (ERPC). Contents of the data which is forwarded to
ERPC are:
1) Raw data of each location
2) Constituent wise processed data
3) Processed MWH data
4) Day wise meter data
5) Configuration file of the week
6) Discrepancies, if any
7) Any other information, if required
6.8 Uploading of data on ERLDC web
Constituent wise net drawl and central sector Net generation along with region
loss and discrepancies if any, is uploaded on the ERLDC web site (http://www.erldc.org)
for the concerned week. Weekly UI calculations are being done by ERPC. As requested
by constituents, processed meter data as per calculations of ERLDC are being uploaded
just for the sake of gross comparison only.
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 46/65
6.9 Data Archives
A data archive for processed data along with raw data of every week is
maintained on PC to take care of any future dispute. Back up for Data Archive is also
maintained either on CD or Hard disc. The data archive structure is as follows:
Meter Archive
Year1 Year2 Year...n
Month1 Month2 Month..12
Week1 Week2 Week3 Week4
Readings Dist Sembase
Location wise raw meter data
Constituent wise processed data
Processed MWH Data Day wise meter data
DATA ARCHIVE STRUCTURE
Discrepancies
Relevant SREAfile
RelevantFICTMTRS data
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 47/65
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 48/65
B’SARIFF
SASARAM(E)
B
S
E
B
J
S
E
B
C
.
S
E
C
T
O
R
E
R
N
E
R
D
V
C
SR
BHUTAN
GALEGPHU
BONGAIGAON
SALAKATIBIRPARA
NE84
NE83
NE85
NE86/
NE81
NE82ER 43
ER 42
ER 01BI 01
ER 02BI 02
PURNIAPURNIA
ER 62BI 03
ER 63BI 04
K’GAON
K’GAONK’GAON
SABOUR
BI 07
BI 10
KH 13
KH 19
DC-01
DC-02
GAJUWAKAGAJUWAKA(S)
ER 06
ER 05 DV 01
DV 03
ER 12
ER 11
KALYANESWARIMAITHON
PARULIAPARULIA
BINAGURI
(M C
(C) (M)
(M(C)
C
(C)
C
C
C
M
M
M
M
M
METER LOCATIONS IN C. SECTOR
INTER-CONNECTED SYSTEM
ER 21
ER 87
N
R
ER 83
ER 82
WRER-8 0
ER-8 1
ROURKELA RAIPURC
B’SARIFF
M
NR-09
NR-10
(M
CS-57
CS-58
ER 48
ER 03BI 67
DEHRI (C) (M PUSAULI
BI 62 ER 55
KHAGAUL (C) ARRAH(MBI 13
BI 14
ARRAH (C) ARRAH
BI 11
BI 12
DUMRAO (C) ARRAH
ER 09
ER 10
(M
(M
BI 62 ER 78
MOHANIA PUSAULI
ER 79
SASARAM(N)C
DEHRI (C)
DC-03
DC-04
ER-56 NR-03
PUSAULI SAHUPURI
400 KV
220 KV
132 KV
(M) ---- MAIN
(C) ----- CHECK
FARAKKALALMATIA
K’GAONLALMATIA
FK 14JS 04
JS 03 KH 14
(C) (M
MC
JS 01 ER 17
JS 02
R’CHANDRAPUR JAM’PUR
ER 18
C(M
PATRATU C RANCHI(M
EM 44
CHANDIL (C) RANCHI(MEM 45
BI 68 EM 31
KANTI (M MUZ’PUR(C)
BI 69 EM 32
KHAGAUL (C) (M PATNA
FATUAH (C) (M PATNA
MUZ’PUR GORKH’PURM C
EM-25 NR-11
EM-26 NR-12
PATNA BALIA(M (C)EM-57 NR-01
EM-53 NR-02
ANNEXURE-A
(C) BALIAB’SF (MNR-13
NR-14
EM-21
EM-22
CS-60
CS-61
EM-47
EM-48
RANCHI (M) C) SIPAT
BI 51
BI 49
EM 64
EM 65
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 49/65
G
R
I
D
C
O
C
.
S
E
C
T
O
R
E
R
W
B
S
E
B
ER 23OR 01
ER 24OR 02
OR 9
TL 12
TL 11
OR 10
TARKERA
TSTPPMERAMUNDALI
ROURKELA
TL 10OR 11
TL 09OR 12
OR 04
OR03
ER 31
ER 30
ER 34
ER 35OR 05
OR 06
ER 86OR 13
TALCHER TPS TSTPP
JEYPORE
INDRAVATIINDRAVATI
TSTPP
RENGALIRENGALI
JAYNAGAR
RENGALI PH
WB 11RG 06
BARIPADA KOLAGHAT
ER 27 WB 10
RANGIT
WB 08FK 15
FK 16
JEERATFARAKKA
WB 05
WB 06
WB 07
ER 58
ER 59
ER 07
MALDA MALDA
PARULIA B’NAGAR
C M
C
(C)
(C)
(C)
C
C
C
(C)
(C)
(C)
WB 01ER 44
NJP NBU
BIRPARABIRPARA
WB 03
WB 04ER 52
ER 53
C
C
M
M
M
(M
(M
(M
M
(M
M
(M
M
(M
METER LOCATIONS IN C. SECTOR
INTER-CONNECTED SYSTEM
NJPBINAGURI MER 19
S
I
K
K
I
M
RG 07 SM 01
RANGIT MELLIM (C)
BARIPADABARIPADA
BARIPADAR’RANGPUR
RG 10
MERAMUNDALI TSTPPMCTL 27
TL 28
OR 07
OR 08
ER 99
ER 98
ER 38OR 14
MERAMUNDALI JEYPORE
66kV
400 KV
220 KV
132 KV
(M) ---- MAIN
(C) ----- CHECK
MELL
NJP MELL
GANGTOK
ER-57
SM 03
EM 04EM 03
EM 05 EM 06
GANGTOK
132/66k
RANGIT MELLIM C
FARAKKA (C) SAGARDIGHI
SUBHASGRAM JEERATMC
EM 17 WB 09
SUBHASGRAM SUBHASGRAM(C)(MEM 18
SUBHASGRAMEM 19
(C)(M
ER 45
BARIPADABALASORE (MC
OR 60 ER 20
OR 61
OR 62
BARIPADABALASOREEM 58
WB 12
SAGARDIGHISUBHASHGRAM M C
WB 13EM 74PPSPPARULIA
EM 01
ER 68
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 50/65
B’SARIFF B’SARIFF
N
R
C
E
N
T
R
A
L
S
E
C
T
O
R
B
S
E
B
D
V
C
RAJGIR
BSF
BARHI
PURNIAPURNIA
K’GAON K’GAON
K’GAONSABOUR
CHANDAULI KARMNASA
SONENAGAR
BI 66
BI 63
BI 64
ER 01
BI 57JS 62
BI 01
ER 02BI 02
BI 10 KH 19
ER 62BI 03
ER 63BI 04
BI 07 KH 13
BI 56
BI 55DV 51
RIHAND
400 KV
220 KV
132 KV
(M) ---- MAIN
(C) ----- CHECK
(M(C)
(M(C)
(C)(M
(M(C)
C (M(C) (M
(M
J
S
E
B
BODHGAYAPATRATU
B’SFTENUGHAT
LALMATIA SABOUR
SULTANGANJ
SONENAGAR
DEOGARH SULTANGANJ
JAPLABI 60JS 64
BI 58
BI 59
JS 63
BI 61JS 65
BI 54
BI 53
JS 61
JS 60
BI 52JS 59
(M(C)
(M
(M
(M
(M
(M
(M
(C)
(C)
(C)
(C)
(C)
SAHUPURI (C)
NR 06
NR 05
METER LOCATIONS IN BSEB
INTER-CONNECTED SYSTEM
ER 48
BI 67 ER 03
ARRAH (C) ARRAH
BI 11
BI 12
DUMRAO (C) ARRAH
ER 09
ER 10
(M
(M
KHAGAUL (C) ARRAH(MBI 13
BI 14
DEHRI (C) (M PUSAULI
BI 62 ER 55
NR 07ER 78
PUSAULIMOHANIA
DEHRI (C)
KARMNASA(M
BI 68 EM 31
KANTI (M MUZ’PUR(C)
BI 69 EM 32
KHAGAUL (C) (M PATNA
FATUAH (C)(M PATNA
ER 79BI 49
BI 50
EM 65
EM 64
W
B
DALKHOLA KISHANGANJ
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 51/65
G
R
I
D
C
O
B
S
E
B
NR
C
E
N
T
R
AL
S
E
C
T
O
R
J
S
E
B
GOELKERAROURKELA
KENDPOSIJODA
RAMCHANDRAPURJODA
WBSEB
SANTALDIH CHANDIL
D
V
C
PATRATU
BODHGAYA PATRATU
B’SFTENUGHAT
PATRATU
JAMTARMAITHON
CHANDILMANIQUE
FARAKKALALMATIA
K’GAONLALMATIA
SONENAGAR JAPLA
DEOGARHSULTANGANJ
GARWA
JS 58
JS 01 ER 17
JS 02 ER 18
FK 14JS 04
JS 03 KH 14
WB 53
JS 59
JS 60BI 53
BI 52
JS 61BI 54
JS 62BI 57
BI 58 JS 63
JS 64BI 60
JS 65BI 61
JS 57
JS 66DV 56
JS 54
JS 55
JS 56
JS 51
JS 52 /
JS 53
DV 53
DV 55
OR 53
OR 52
OR 51
RIHAND
R’CHANDRAPUR
R’CHANDRAPUR JAM’PUR
400 KV
220 KV
132 KV
(M) ---- MAIN
(C) ----- CHECK
BC
(C)
(M
(M
(M(C)
(M
(M
(M
M(C)
(MC
(M(C)
(M
(M
(C)
(C)
(C) (M
JAM’PUR
(C)
SABOUR LALMATIA
SULTANGANJ BI 59
(C) (M)
(C) (M)
(C) (M)
(C)
(M)(C)
(M)(C)
METER LOCATIONS IN JSEB
INTER-CONNECTED SYSTEM
FARAKKALALMATIA
K’GAONLALMATIA
FK 14JS 04
JS 03 KH 14
C (M
(MC
PATRATU (C) RANCHIMEM 44
CHANDIL C RANCHIMEM 45
NR- 08
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 52/65
W
B
S
E
B
C
E
N
T
RA
L
S
E
C
T
O
R
BS
E
B
J
SE
B
D
V
C
GR
I
D
C
O
JAMSHEDPURJINDAL
KH’PURKHARAGPUR
DPL WARIA
WARIABIDHANNAGAR
PURULIA PURULIA
DV 53
JS 55
JS 54
JS 56
JS 66
BC
DV 55
BI 56
BI 55 DV 51
DV 56
ER 06
ER 05DV 01
DV 03
ER 12
ER 11
KOLAGHAT KOLAGHAT
DV 62
DV 61
DV 60WB 51
DV 65
DV 58
DV 57
WB 60
OR 54
PATRATUPATRATU
RAJGIR
BSF
BARHI
BARHI
JAMTARA MAITHON
CHANDIL MANIQUE
KALYANESWARI MAITHON
PARULIAPARULIA
400 KV
220 KV
132 KV
(M) ---- MAIN
(C) ----- CHECK
M
(M
(M
(C M
C M
C(M)
(MC
(M)
M
(C M
M(C
(M)
C
C
M
M
METER LOCATIONS IN DVC
INTER-CONNECTED SYSTEM
WB 54 DV 64
MEJIAMAITHON
MEJIA JAMSHEDPUR
DV 04
DV 05 EM 76
ER 15
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 53/65
C
E
N
T
RA
L
S
E
C
T
O
R
CS
E
B
D
V
C
G
R
I
D
C
O
J
S
E
B
GOELKERA
RAIGARH
KORBA
BUDHIPADAR
ROURKELA
KENDPOSI
RAMCHANDRAPUR JODA
OR 55
JODA
JODA
OR 53
OR 52
JS 51
JS 52
JS 53 OR 51
BC
DV 57
ER 23OR 01
ER 24OR 02
OR 9
TL 12
TL 11
OR 10
OR 54
TL 10OR 11
TL 09OR 12
OR 04
OR 03
ER 31
ER 30
ER 34
ER 35
OR 05
OR 06
OR 56
OR 59
OR 57
JAMSHEDPUR JINDAL
TARKERA
TALCHER TPS TSTPP
JEYPORE
TSTPP
TSTPP
RENGALIRENGALI
JAYANAGAR
RENGALI PH
MERAMUNDALI
ROURKELA
400 KV
220 KV
132 KV
(M) ---- MAIN
(C) ---- CHECK
(M(C)
(M
(M(C)
(C)
(M
(M
(C) (M(C)
(M(C)
(C)
(M(C)
(M (M(C)(C)
(C)
(M
(M
(C)
(C)
METER LOCATIONS IN GRIDCO
INTER-CONNECTED SYSTEM
OR 13 ER 86
INDRAVATIINDRAVATI
CS 56
CS 54
KORBA (C)CS 55
(M
BARIPADABALASORE
BARIPADABARIPADA
BARIPADAR’RANGPUR
TSTPPMERAMUNDALI
TSTPPMERAMUNDALI
OR 14 ER-38
JEYPOREMERAMUNDALI (M(C)
TL 27
TL 28
OR 07
OR 08
ER 98
ER 99
BUDHIPADAR
BUDHIPADAR
ER 20
OR 62
OR 61
OR 60
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 54/65
W
B
S
E
B
C
E
N
T
R
AL
S
E
C
T
O
R
J
SE
B
SANTALDCHANDI
S
I
K
K
I
MKALINGPO
MELLI
WB 59SM 51 66 kv
WB 53JS 57
DV 62
DV 61
WB 01
WB 03
WB 04
WB 05
WB 06
WB 07
WB 08
WB 11 RG 06WB 54
ER 44
ER 52
ER 53
ER 58
ER 59
ER 07
FK 15BARIPADAKOLAGHAT
ER 27WB 10
DV 64
DV 65
WB 60DV 58
D
V
C
KHARAGP KHARAGPUR
WARIA BIDHANNAGAR
KOLAGHAT KOLAGHAT
PURULIPURULI
MALDA
JEERAT
RANGITRAMAM
FARAKA
MALDA
PARULIAB’NAGAR
NJPNBU
BIRPARABIRPARA
400 KV
220 KV
132 KV
(M) ----- MAIN
C ----- CHECK
DPLWARIA
METER LOCATIONS IN WBSEB
INTER-CONNECTED SYSTEM
(M(C)
(M(C)(C) (M
(M(C)
(M)
(M
(M
(M
(M(M
(M
(C)
(C)
(M(C)
(M
(C)
(C)(C)
(M
(C)
BINAGURI(MNEW JALPAIGURI
ER 19WB 51DV 60
WARIA BIDHANNAG(M(C)
SUBHASGRAMJEERAT M C
EM 17WB 09
SUBHASGRAMS”GRAM(C (M
EM 18
S”GRAM EM 19MC
ER 45
E M 75WB 02
SUBHASGRAMSAGARDIGHI C (M
EM 74WB 13PPSP PARULIA
ER 68
SAGARDIGIHI 400KVFarakka
WB-12 FK-16
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 55/65
S
I
K
K
I
M
C
E
N
T
R
A
L
S
E
C
T
O
R
RANGITMELLI
SM 04
RG 07
(M(C) 66
132
W
B
S
E
B
KALINGPONGMELL
WB 59SM 51 66 kv
(M(C)
METER LOCATIONS IN SIKKIM
INTER-CONNECTED SYSTEM
400 KV
220 KV
132 KV
(M) ---- MAIN
(C) ----- CHECK
MELLI (C) RANGIT(M
MELLI NJP
MELLI
GANGTOK
132/66
EM 04
EM 06
EM 03
EM 05
SM 02
SM 03
SM 01
ER 57
EM 01
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 56/65
ER 03
ER 60
ER 61
LALMATIA
ER 41
ER 42
MALDA
ER 44
ER 46ER 47
ER 43
ER 40 ER 39
ER 59ER 58
KAHALGAON(B)
BIR.(W)
BIRPARA
MALDA(W)
KH 07
KH 08
KH 13
KH 09
ER 02 ER 01
KH 12 KH 11
KH 16
KH 19
KH 15
KH 06KH 05
KH 10
KH04KH 03KH 02KH 01 KH 14
KH 18KH 17
BS 09
BSF
B’SHARIFF(BSEB)
KAHALGAON
SABOUR
CU02CU 03
CU 07 CU 08CU06CU05
CU 01SINGHIGAON
METER LOCATIONS IN CENTRAL SECTOR TRANSMISSION SYSTEM
SARNATH
ER 89/2374AER 90/2375A
ER 82ER 83
BINAGURI
SASARAM (N)
SASARAM (E)
ALLAHABAD
ARRAH
SAHUPURI
ER 88ER 14 ER 13ER 56
EM 39
ER 23
MAITHON
ER 33
SALAKATI
ARRAH DUMRAO
ER 10ER 9BI 13BI 14
KH 32KH 31
ER 55DEHRI
KARMANASAER 79
DEHRI ER 78
NE 86
NE 85
ER 37
BONGAIGAON
RAMAM
RG 04
MELLI
RANGIT
RG03
RG 09RG06
RG08
RG02RG 01
ER 51 ER50
ER76
ER52 ER 53
SILIGURI
ER54
NBU
GANGTOK
RG 07
66 kV
PART-
FARAKKA
ER 64
415A
ER 65
389A
ER 63 ER 62411A
PUR(B)
PURNEA
ER 49
415A
ER 09 / 4153A
DALKHOLA
BINAGURI
NJP (WBSEB)
MUZAFFARPUR
NR
RG10 RG11
EM02
EM01
FATUAKH 35 KH 36
EM 54EM 55
EM 56
BALIA
PATNAEM 53EM 57
NR 02
NR 01
SM03SM04
KANTI (BS)
EM25EM26 EM27 EM28
EM 7 EM 7 EM 10 EM 9
EM38 EM37 EM36 EM33
EM40
EM34EM35
ER 22
EM23 EM24EM29EM30
TALA
EM 06EM 04
EM 05EM 03
KHAGAUL
TEESTA
TS01 TS01 TS03
BALIA
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 57/65
FARAKKA FK 09FK17
FK 08
FK 11 FK 10
FK 01
FK12
FK14
559A
FK 13
FK15
FK 05FK 04FK 03FK 02
FK 16
FK 18FK 07FK 06
TIE
TRA
ER70ER69
ER 67ER 66
ER 06
ER 23
ER 72ER 71
ER 24
ER 05
ER 11 ER 12
ER 08
ER 25
ER 28 / 600A / 1000
ER29
469A
ER 84
SR
SR
ER 85
ER 36
ER75
ER 35ER 34
TL06 TL08
TL 02 TL 01
TL07TL05
ER 31
WB 10/476A
ER 74/ 556A
ER 30
ER 73
K’SWARI
MAITHON
PARULIA
JAMSHEDPUR
ROURKELA
TARKERA
MERAMUNDALI
TTPS
TALCHER STPP
JEERAT
KOLAGHAT
RENGALI(G)
RENGALI
RENGALI PS
JEYPORE
JEYNAGAR
ER16ER 15
ER 07
ER 86
DURGAPUR
BIDHAN’NGR
TL 09
INDRAVATI PG
INDRAVATI PG
ER 17BS1 05BS 06
ER18
TL 04TL 10
TL 13 TL 12
TL 03
400 KV
220 KV
132 KVER77
ER 26
RAIGARH
ER 80ER 81
GAJUWAKA(S)
GAJUWAKA(E)
DC-3
DC-4
KAHALGAON
BARIPADA
BALASORE(GR)
BARIPADA(GR)
RAIRANGPUR(GR
ER 27
TL 11
TL 27 TL 28
TL 38
PART-
EM 46 EM 41
EM 42
RANCHI
EM 43
HATIA CHANDIL
EM 44 EM 45
MALDAKAHALGAON
WB 08/397A
WB 09/471A
SUBHASGRAM
EM 17
WB 09
EM 15 EM 16
EM 19
EM 18
SIPAT
PPSP
ER 68
SUBHASGRAM
RAMCHANDAR PUR
BALASORE(GR)
EM 69
MEJIA
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 58/65
METERING ARRANGEMENT AT
FARAKKA STPS (3X200 + 2X500 MW)
G-2G-1
LALMATIA
FK-14
FK-02FK-01
DGPR
1
MALDA
2JEERAT-1
FK-13
FK-28
FK-16
FK-22
FK-09
FK-26
400 KV
FK-08
FK-25
G-4G-3
FK-04FK-03
FK-11
FK-24
FK-10
FK-23
220 KV
DGPR
2
FK-15
FK-21
JEERAT-2
FK-05
AUX TRANS (TIE)
FK-06 FK-07 FK-17
FK-27
K'GAON
1K'GAON
2
FK-18
G-5
FK-12
FK-29
MALDA
1
METERING ARRANGEMENT AT
KAHALGAON STPS (4 X 210 MW)
132 KV
G-2 G-1
KH-27
KH-15
KH28
KH-16
LALMATIA SABOUR
KH-13KH-06KH-05 KH-14 KH-17 KH-18
KH-02 KH-01
FARAKKA-2 FARAKKA-1 MAITHON-2MAITHON-1
B’SHARIFF-1
B’SHARIFF-2
KH-11KH-25
KH-12KH-26
KH-08 KH-22 400 KV
KH-07 KH-21
COLONY
G-4G-3
KH-04KH-03
KH-10KH-24
KH-09 KH-23
132 KV
11KV AUX
KAHALGAON
Barh-2Patna-1 B’SF-4 B’SF-3
KH-36
KH-38
KH-35 KH-37
KH-32 KH-24
KH-31KH-33
G-5
KH-05
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 59/65
METERING ARRANGEMENT AT
TALCHER STPS (2 X 500 MW)
G-2G-1
TL-03
TL-25TL-04
TL-26
DUBURI-2
TL-12TL-10
TL-13
TL-09
TL-02TL-01
RENGALI-2RENGALI-1
ROURKELA-2
ROURKELA-1
TL-07
TL-23
TL-08
TL-24
TL-06
TL-22
220KV
TL-05
TL-21
RENGALI
PS
TTPS-111 KV
(AUX)
TL-15TL-14 TL-17 TL-16
TL-31
TL-41
TL-32
TL-42
TL-33
TL-43TL-34
400KV
Stage -II
FDR-I FDR-II FDR-III FDR-IV
400KV
Stage -I
TL-11
DUBURI-1
TO HVDC STATION TALCHER
RAMAMSILIGURI
132 KV
66 KV
MELLI
G-1 G-2 G-3
RG 01
RG 09
RG 07
RG 06
RG 08
RG 02 RG 03 RG 04
11 KV
METERING ARRANGEMENT AT
RANGIT HEP (3X20 MW)
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 60/65
ANNEXURE-B
FICTITIOUS METERS (FICTMTRS.CFG) START
01 (FK-92) M9
+(FK-08) +(FK-09) +(FK-10) +(FK-11)
+(FK-12) +(FK-13) +(FK-17) +(FK-15) +(FK-16)
02 (FK-93) M9
+(FK-21) +(FK-22) +(FK-23) +(FK-24)
+(FK-25) +(FK-26) +(FK-27) +(FK-28) +(FK-29)
03 (KH-81) M4
+(KH-01) +(KH-02) +(KH-03) +(KH-04)
04 (KG-81) M2
-(KG-03) -(KG-06)
05 (KH-82) M6
+(KH-81) +(KH-15) +(KH-16) -(KH-13)
-(KH-14) -(KH-19)
06 (KH-83) M2
+(KH-81) +(KG-81)
07 (KH-84) M2
+(KH-83) -(KH-82)
08 (KH-85) M13+(KH-07) +(KH-08) +(KH-09) +(KH-10) +(KH-11) +(KH-12)
+(KH-31) +(KH-32) +(KH-35) +(KH-36) +(KH-13) +(KH-14) +(KH-19)
09 (KH-86) M13
+(KH-21) +(KH-22) +(KH-23) +(KH-24) +(KH-25) +(KH-26)
+(KH-33) +(KH-34) +(KH-37) +(KH-38) +(KH-13) +(KH-14) +(KH-19)
10 (KG-92) M1
(KG-81)
11 (KH-92) M2
(KH-85) -(KG-92)
12 (TL-81) M3
+(TL-03) +(TL-04) -(TL-13)
13 (TL-82) M4
-(TL-09) -(TL-10) -(TL-11) -(TL-12)
14 (TL-92) M9+(TL-81) +(TL-05) +(TL-06) +(TL-07) +(TL-08)
+(TL-14) +(TL-15) +(TL-18) +(TL-19)
15 (TL-93) M11
+(TL-21) +(TL-22) +(TL-23) +(TL-24) +(TL-25)
+(TL-26) -(TL-13) +(TL-16) +(TL-17) +(TL-27) +(TL-28)
16 (CU-91) M3
+(ER-39) +(ER-40) +(BT-33)
17 (CU-92) M6
+(ER-42) +(ER-43) +(ER-44) +(ER-46) +(ER-47) +(EM-75)
18 (RG-91) M4
+(RG-01) +(RG-02) +(RG-03) +(RG-08)
19 (RG-92) M5
+(RG-04) +(RG-06) +(RG-07) +(RG-10) +(RG-11)
20 (BI-81) M3
+(BI-55) +(BI-56) +(BI-48)
21 (BI-82) M18
+(BI-01) +(BI-02) +(BI-67) -(ER-62) -(ER-63) -(ER-48)
-(ER-78) -(ER-79) -(ER-55) -(ER-09) -(ER-10) +(BI-13)
+(BI-14) +(BI-68) +(BI-69) -(EM-55) -(EM-62) -(ER-49)
22 (BI-83) M2
+(BI-58) +(BI-59)
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 61/65
23 (BI-84) M6
-(JS-59) -(JS-60) +(BI-57) +(BI-58) +(BI-60) +(BI-61)
24 (BI-85) M3
+(BI-63) +(BI-64) +(BI-66)
25 (BI-91) M7
+(BI-21) +(BI-81) +(BI-82) +(BI-84) +(BI-85) -(KH-19) -(KH-13)
26 (JS-81) M4
+(JS-01) +(JS-02) -(EM-44) -(EM-45)
27 (JS-82) M2
-(FK-14) -(KH-14)
28 (JS-83) M3
+(JS-51) -(OR-52) +(JS-53)
29 (JS-84) M3
+(JS-54) -(DV-55) -(JS-66)
30 (JS-85) M6
+(JS-59) +(JS-60) +(JS-62) +(JS-63) -(BI-60) +(JS-65)
31 (JS-91) M7
+(JS-81) +(JS-82) +(JS-83) +(JS-84)
+(JS-85) +(JS-57) +(JS-58)
32 (ER-91) M2
+(ER-05) +(ER-06)
33 (ER-92) M2
+(ER-11) +(ER-12)
34 (DV-81) M4
+(DV-51) +(DV-55) +(DV-56) +(DV-53)
35 (DV-82) M6+(DV-60) +(DV-64) +(DV-61) +(DV-62) +(DV-65) +(DV-58)
36 (DV-91) M5
-(ER-91) -(ER-92) +(DV-81) +(DV-82) +(DV-57)
37 (SM-91) M7
+(SM-51) -(RG-07) -(RG-10) +(SM-02) +(SM-03)
-(EM-03) -(EM-05)
38 (OR-81) M9
-(ER-23) -(ER-24) -(ER-30) -(ER-31)
-(ER-34) -(ER-35) -(ER-86) -(ER-20) -(EM-58)
39 (OR-82) M5
+(OR-51) +(OR-52) +(OR-53) -(ER-98) -(ER-99)
40 (OR-83) M3
+(OR-56) +(OR-57) +(OR-59)
41 (OR-91) M8+(OR-81) +(OR-82) +(OR-83) +(TL-82)
+(OR-07) +(OR-08) -(DV-57) -(ER-38)
42 (WB-81) M12
-(ER-44) -(ER-52) -(ER-53) -(ER-58) -(ER-59) -(ER-07)
-(ER-19) -(ER-45) -(ER-68) -(EM-18) -(EM-19) -(EM-75)
43 (WB-82) M6
+(WB-08) +(WB-09) +(WB-10) +(WB-11) +(WB-12) +(WB-13)
44 (WB-84) M6
-(DV-61) -(DV-62) -(DV-65) +(WB-51) +(WB-54) +(WB-60)
45 (WB-91) M6
(WB-81) +(WB-82) +(WB-84) +(WB-53) +(WB-59) +(WB-52)
46 (NE-71) M2
+(NE-81) +(NE-82)
47 (NE-72) M2
+(NE-85) +(NE-86)
48 (NE-91) M3
+(NE-83) +(NE-71) +(NE-72)
49 (SR-91) M4
+(DC-03) +(DC-04) -(TL-14) -(TL-15)
50 (SR-92) M4
+(DC-01) +(DC-02) +(TL-14) +(TL-15)
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 62/65
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 63/65
81 (EC-61) M2
-(EM-18) -(EM-19)
82 (EC-62) M2
(EM-15) +(EM-16)
83 (EC-63) M2
(BT-37) +(BT-39)
84 (EC-64) M2
-(EC-62) -(EM-17)
85 (EC-65) M2
(EM-44) +(EM-45)
86 (EC-66) M2
(EM-41) +(EM-46)
87 (EC-67) M2
(ER-95) -(ER-96)
88 (EC-68) M2
(EM-42) +(EM-60)
89 (EC-69) M2
(EM-43) +(EM-61)
90 (EC-70) M2
-(ER-09) -(ER-10)
91 (EC-71) M2
(EM-03) +(EM-05)
92 (EC-72) M2
(EM-04) +(EM-06)
93 (EC-73) M2
(EM-55) +(EM-62)94 (EC-74) M2
(EM-56) +(EM-63)
95 (TC-91) M7
(EM-07) +(EM-08) +(EM-09) +(EM-10)
(ER-39) +(ER-40) +(ER-41)
96 (TS-92) M2
(TS-05) +(TS-06)
97 (FK-91) M8
+(FK-01) +(FK-02) +(FK-03) +(FK-04) +(FK-05)
+(FK-06) +(FK-07) +(FK-18)
98 (RN-95) M9
+(FK-92) +(KH-92) +(KG-92) +(TL-92) -(CU-91)
-(TH-91) -(NE-83) +(RG-92) +(TS-92)
99 (RN-96) M10-(BI-91) -(JS-91) -(DV-91) -(OR-91) -(WB-91)
-(SM-91) -(NE-91) -(SR-91) -(WR-91) -(NR-91)
100 (RN-97) M2
+(RN-95) -(RN-96)
END
------------------------------------------------------------------------------------------------------------
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 64/65
ANNEXURE-C
DATA COLLECTING LOCATION IN EASTERN REGION & CONTACT NO DETAILS
S.No Stn Name Contact No. Concerned Person Contact No.
POWERGRID
1 Ara 06182-234125/233085 Sudip das (9431820255) 9431821129/Amit
2 Baripada 06792-279298/279280 Mr. Behra (9437575638) 9437575657( S.P.Kar)
3 Birpara03563-266222/ 266224/ 266196,
S.K.Sil / Soumen Ray 9434748294
4 Biharsarif 06112-290607 Manager (9431821126)
5 Durgapur 0343-2562915/ 2563297 M.S.Data (9434740025) 9434748028/8031 (Mana singh
6 Gangtok 03592-250181/251259 Tapan Bahera 9434748318
7 Indravati06673-252296/ 252301/252429
Mr.Ekka 9937651156
8 Jeypore 06854-231634/ 232155 Eshwar rao 9437962178/1769 Jamshedpur 0657-3294096/ 3293751 D kumar 9431815722
10 Malda03512-278447/ 278355/ 278715
Anjani kumar (9434748261) 9434748031(santosh)
11 Maithon0341-2531489/ 9434740039(CM)
N Kumar (9434740039) 9434748285(sarkar)/943474830
12 Malbase 00975-17604606 Mr. Phuntshok(07032) 009755272805(Khatri)
13 Muzaffarpur 0621-2273166 M.K.jha (9431820298) 9431820294( A srivastav)
14 Patna 9431820234 9431820252 Jagat Ram Enayat shameem(9939624037)
15 Purnea 06454-222409/ 222363, Prasad (9431815713) 9431820310(Sr Engin
16 Ranchi 0651-6450205/204 Pradeep Verma 9431820337
17 Rengali 06760-277258/ 277254 S. Naik ( 9437962194) Ratra (9437962197)
18 Rourkela0661-2600009/ 2600202/ 94370 41202
G Malick (9437962208) 9437575652 (S K CHAND )
19 Siliguri0353-2568851/ 2568801/03561-248001
S Basu (9434748266), TDas (9474379038)
9434748230(Bhaskar)/94347482Mani)
20 Sasaram 06187-225527/ 225737 Pankaj kumar 9431820322 9431820327(sumit kumar)
21 subhashgram B.S.Raut Ray(9434748254)
22 Salakati(NER) 03661-282309/282407 S.K. Singh 9434740009
23 Rihand 05446-252042 Sunil Kumar(DGM) Shailendra(9415458662)24 NERLDC
0364-2231933/2231714(Comml)
M Husain/ Mr. saha 9436335371
25 WRLDC 022-28302209 Usha (735022) 9869404458
28202690/28314609 EPABX
26 NRLDC 011-26854585 9910907949 (neeraj) 9650009856
8/7/2019 Metering_Manual _Eastern_region
http://slidepdf.com/reader/full/meteringmanual-easternregion 65/65