+ All Categories
Home > Documents > Method Statement for Butt Fusion Welding 13Apr14

Method Statement for Butt Fusion Welding 13Apr14

Date post: 25-Nov-2015
Category:
Upload: ansarisaeed
View: 581 times
Download: 118 times
Share this document with a friend
Description:
Detail of HDPE Wielding. This covers only Butt Fusion. it includes manpower required, the type of machine used, a very detailed process of butt fusion including precaution that need to be taken. It also contain technical manual of the machine itself.
Embed Size (px)
of 69 /69
Recommended