Date post: | 14-Jan-2016 |
Category: |
Documents |
Upload: | airgil-daviss |
View: | 94 times |
Download: | 5 times |
7/18/2019 Method Statement for Installation of Geotextiles
http://slidepdf.com/reader/full/method-statement-for-installation-of-geotextiles 1/17
Method Statement for Installation of Geotextiles
and Rock for Slope Protection
Rev
IssueDate
Issue Status Prepared by Reviewed by Approved by
7/18/2019 Method Statement for Installation of Geotextiles
http://slidepdf.com/reader/full/method-statement-for-installation-of-geotextiles 2/17
Document Revision istory
Revision
Summary of !han"es # Detailsof Issue
Date!RS $if applicable%
Ref& 'o& Rev
7/18/2019 Method Statement for Installation of Geotextiles
http://slidepdf.com/reader/full/method-statement-for-installation-of-geotextiles 3/17
(able of !ontents
)&* Purpose and Scope&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&+
,&* Document !ontrol&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&+
-&* Reference Documents&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&+
+&* De.nitions/ (erms and Abbreviations&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&0
0&* Responsibility&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&0
1&* Materials and 23uipment&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&0
4&* Resources&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&1
5&* Methodolo"y # Procedure&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&4
6&* ealth/ Safety and 2nvironment&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&5
Appendices:
Appendix A : HSE Risk Assessment.
Appendix B : Drawing
Appendix C : Photos
7/18/2019 Method Statement for Installation of Geotextiles
http://slidepdf.com/reader/full/method-statement-for-installation-of-geotextiles 4/17
)&* Purpose and Scope
Furnish a!or" materias" e#uipment and incidentas necessar$ to insta geotextie
%a!ric. &se the 'eotextie in erosion contro appications Back(ed sope Area. )he
'eotextie sha !e designed to aow passage o% water whie retaining insitu soi
without cogging.
*.* )he scope o% works comprises the %oowing separate operations:
• +o!ii,ation o% main and auxiiar$ e#uipment and personne
• +ateria dei-er$ to irku/Speci%$ isand
• )ransportation o% materia to site
• 0nstaation o% 'eotexties
,&* Document !ontrol
1.*)he document go-erning the preparation" registration" appro-a" distri!ution and
amendment 2 re-ision o% this method statement wi !e according to re#uirement
speci(ed in /Speci%$ $our document re%erence 343*56P+'6PSP6333*2)6343*56
ARC76AD+A633**/ procedure for !ontrol of Documents and Records7
1.1)he re#uirements %or document num!ering are addressed in the pro8ect speci(c
procedure /Speci%$ $our document re%erence 9
1.;343*56P+'6PSP633312)6343*56ARC76AD+A633**" %or Pro8ect <um!ering o%
Documents and Records1.=)his method statement is a controed document" and wi !e distri!uted as such to
those detaied on the 0nterna Distri!ution o% Documents +atrix maintained !$ the
Document Controer" whie externa distri!ution wi !e -ia the Secretar$.
-&* Reference Documents
*.* )he %oowing documents de(ne the re#uirements to !e empo$ed to
demonstrate compiance o% the works de(ned in this method Statement:
• Drawings
Ref& (itle
/Speci%$ 343*567D6CS6
3**=6S3*633
/Speci%$ Recamation at ADC7 >ett$
+&* De.nitions/ (erms and Abbreviations
=.*De(nition and )erms
• /Speci%$ ARC7 ; EPC Contractor ?Archirodon Construction 7-erseas Co.S.A@
• A
7/18/2019 Method Statement for Installation of Geotextiles
http://slidepdf.com/reader/full/method-statement-for-installation-of-geotextiles 5/17
• D+A67PC7 ; C7+PA< ?A!u Dha!i +arine 7perating Compan$@
• ADC7 ; A&+ De-eopment Authorit$
0&* Responsibility
5.*)he Pro8ect +anager is responsi!e to appoint site super-isor$ personne to
organi,e" coordinate" and o-ersee the execution o% the work detaied in this
method statement.
5.1
5.)he Construction +anager is responsi!e %or the organi,ation and coordination o%
the entire work detaied in this method statement.
5.=)he responsi!e Engineer is responsi!e %or the execution o% the works detaied in
this method statement. He wi !e responsi!e %or instructing the Foremen 2
Superintendent a!out the re#uirements o% the contract" incuding a restrictions"sa%et$ reguations" scope o% work and time schedue. 0n addition" he wi !e
responsi!e %or reated ogistic matters and a matters reated to HSE and the
#uait$ o% the works.
5.5)he Superintendent2Foreman is responsi!e %or the da$6to6da$ impementation and
super-ision o% the works detaied in this method statement.
5.Assigned HSE sta is responsi!e to assist the construction team to de-eop sa%e
methods o% working and to monitor impementation o% the contros as re#uired.
5.Assigned A2C sta is responsi!e to ensure a works comp$ with speci(ed
Pro8ect re#uirements and to monitor impementation o% the contros as re#uired. )he$ sha coordinate with C7+PA< %or -isua inspection acti-ities.
• )he A2C sta reports direct$ to Pro8ect C +anager
• Re-iew and attend inspection o% the works
• Pro-ide guidance and assistance to a site sta
• +onitor the impementation o% this method statement
1&* Materials and 23uipment
.*+aterias
)he main materia to !e utii,ed %or instaation o% 'eotextie is as %oow
• <on 7-en 'eotexties.
• Hand )oos
4& Resources.* Pant:
7/18/2019 Method Statement for Installation of Geotextiles
http://slidepdf.com/reader/full/method-statement-for-installation-of-geotextiles 6/17
.1Personne 2 Gork%orce:
Description
Ci-i engineer
HSE ocer
+arine Foreman
Di-ing Super-isor
Di-ers
Ia!or
5&* Methodolo"y # Procedure
5&) Mobili8ation
+o!ii,ation o% e#uipment aread$ paced in work site.
5&, Installation
J.1.* )he geotextie sha !e paced in a!o-e !ack(ed materia with trimmed sope areaon a smooth graded sur%ace. )he geotextie sha !e paced in such a manner thatpacement o% the o-er$ing materias wi not excessi-e$ stretch so as to tear thegeotextie. Anchoring o% the termina ends o% the geotextie sha !e accompished
through the use o% sand !ags crest and toe o% sope.
J.1.1 =53 mm ?*J in@ anchoring pins paced on 33 to *J33 mm ?1= to =5 in@ centers"depending on the sope o% the co-ered area" ma$ !e used to expedite construction.
Auxiliary 23uipment
Di-ing Ca!in
Exca-ator Iong Boom
)rucks
Ioader
7/18/2019 Method Statement for Installation of Geotextiles
http://slidepdf.com/reader/full/method-statement-for-installation-of-geotextiles 7/17
J.1. )he geotextie sha !e paced with the machine direction parae to the direction o% water Kow which is norma$ parae to the sope %or erosion contro runo and wa-eaction. 7-erapping sha 8oin ad8acent geotextie sheets. 7-erapped seams o% ro endssha !e a minimum o% *333 mm ? %t@ except where paced under water. 0n suchinstances the o-erap sha !e a minimum o% * m ? %t@. 7-eraps o% ad8acent ros sha!e a minimum o% *333 mm ? %t@ in a instances.
J.1.= Ghen o-erapping" successi-e sheets o% the geotextie sha !e o-erappedupstream o-er downstream" and2or upsope o-er downsope. 0n cases where wa-eaction or mutidirectiona Kow is anticipated" a seams perpendicuar to the direction o% Kow sha !e sewn.
J.1.5 Care sha !e taken during instaation so as to a-oid damage occurring to thegeotextie as a resut o% the instaation process. Shoud the geotextie !e damagedduring instaation" a geotextie patch sha !e paced o-er the damaged area extending* m ? %t@ !e$ond the perimeter o% the damage.
J.1. )he Core materia pacement sha !egin o-er the geotextie at the toe and proceedup the sope. Pacement sha take pace so as to a-oid stretching and su!se#uenttearing o% the geotextie.
J.1. Sope protection and smaer si,es o% stone (ing sha not !e dropped %rom aheight exceeding * m ? %t@" or a demonstration pro-ided showing that the pacementprocedures wi not damage the geotextie. 0n underwater appications" the geotextieand !ack( materia sha !e paced the same da$. A -oid spaces in the Core materiasha !e !ack(ed with sma stone to ensure %u co-erage.
J.1.J Fied monitoring sha !e per%ormed to -eri%$ that the Core +ateria pacement doesnot damage the geotextie.
J.1.*3 An$ geotextie damaged during !ack( pacement sha !e repaced as directed!$ the Engineer" at the ContractorLs expense.
J.1.** Snorke aowed in depth o% +aximum 1.5m .
6&* ealth/ Safety and 2nvironment
4.* )he works sha !e carried out in compiance with the appica!e HSE ega and
contractua re#uirements.
4.1)he signi(cant HSE ha,ards and risks reated to the works co-ered !$ this document
ha-e !een identi(ed" and documented in MHSE Risk Assessment9 attached in
Attachment A.
4. )he identi(ed ha,ards and associated risks and mitigation contros sha !e
communicated to the work%orce through registered Pre6task !rie(ngs at the
!eginning o% each shi%t.
6666 E<D 7F )EN) 6666
7/18/2019 Method Statement for Installation of Geotextiles
http://slidepdf.com/reader/full/method-statement-for-installation-of-geotextiles 8/17
A9: DA9I MARI'2;P2RA(I'G !;MPA'<
$ADMA=;P!;%
Method Statement for
Installation of
Geotextiles and Rock
for Slope Protection
AR!IR;D;'!;'S(R:!(I;'
$;>2RS2AS% !o& S& A&
SA(A A? RA@9;;( $SAR9%PR;2!( = 2P! Borks for2arly Site Preparation/ etty
C Seawater Intake
!ompanyProect'o&
AD*54AR!;
Proect'o&
343*5Doc&!lass
Distribution !ode
*
!ompanyDoc&'o
AD*546*333*6'6PR'63**J
AR!;Doc& 'o&
343*56C7<6PSP63*6D3*6333=Rev&
3Pa"e J o%
*
Appendix AHSE Risk Assessment
SR.O Document <o. Description Re-
*343*56HSE6PSP6*36F316
3333
0nstaation o% 'eotexties and (ing
on sope protectionB
7/18/2019 Method Statement for Installation of Geotextiles
http://slidepdf.com/reader/full/method-statement-for-installation-of-geotextiles 9/17
A9: DA9I MARI'2;P2RA(I'G !;MPA'<
$ADMA=;P!;%
Method Statement for
Installation of
Geotextiles and Rock
for Slope Protection
AR!IR;D;'!;'S(R:!(I;'
$;>2RS2AS% !o& S& A&
SA(A A? RA@9;;( $SAR9%PR;2!( = 2P! Borks for2arly Site Preparation/ etty
C Seawater Intake
!ompanyProect'o&
AD*54AR!;
Proect'o&
343*5Doc&!lass
Distribution !ode
*
!ompanyDoc&'o
AD*546*333*6'6PR'63**J
AR!;Doc& 'o&
343*56C7<6PSP63*6D3*6333=Rev&
3Pa"e 4 o%
*
Appendix B
Drawings
7/18/2019 Method Statement for Installation of Geotextiles
http://slidepdf.com/reader/full/method-statement-for-installation-of-geotextiles 10/17
A9: DA9I MARI'2;P2RA(I'G !;MPA'<
$ADMA=;P!;%
Method Statement for
Installation of
Geotextiles and Rock
for Slope Protection
AR!IR;D;'!;'S(R:!(I;'
$;>2RS2AS% !o& S& A&
SA(A A? RA@9;;( $SAR9%PR;2!( = 2P! Borks for2arly Site Preparation/ etty
C Seawater Intake
!ompanyProect'o&
AD*54AR!;
Proect'o&
343*5Doc&!lass
Distribution !ode
*
!ompanyDoc&'o
AD*546*333*6'6PR'63**J
AR!;Doc& 'o&
343*56C7<6PSP63*6D3*6333=Rev&
3Pa"e
*3o% *
Appendix C
Photos
7/18/2019 Method Statement for Installation of Geotextiles
http://slidepdf.com/reader/full/method-statement-for-installation-of-geotextiles 11/17
A9: DA9I MARI'2;P2RA(I'G !;MPA'<
$ADMA=;P!;%
Method Statement for
Installation of
Geotextiles and Rock
for Slope Protection
AR!IR;D;'!;'S(R:!(I;'
$;>2RS2AS% !o& S& A&
SA(A A? RA@9;;( $SAR9%PR;2!( = 2P! Borks for2arly Site Preparation/ etty
C Seawater Intake
!ompanyProect'o&
AD*54AR!;
Proect'o&
343*5Doc&!lass
Distribution !ode
*
!ompanyDoc&'o
AD*546*333*6'6PR'63**J
AR!;Doc& 'o&
343*56C7<6PSP63*6D3*6333=Rev&
3Pa"e
**o% *
7/18/2019 Method Statement for Installation of Geotextiles
http://slidepdf.com/reader/full/method-statement-for-installation-of-geotextiles 12/17
A9: DA9I MARI'2;P2RA(I'G !;MPA'<
$ADMA=;P!;%
Method Statement for
Installation of
Geotextiles and Rock
for Slope Protection
AR!IR;D;'!;'S(R:!(I;'
$;>2RS2AS% !o& S& A&
SA(A A? RA@9;;( $SAR9%PR;2!( = 2P! Borks for2arly Site Preparation/ etty
C Seawater Intake
!ompanyProect'o&
AD*54AR!;
Proect'o&
343*5Doc&!lass
Distribution !ode
*
!ompanyDoc&'o
AD*546*333*6'6PR'63**J
AR!;Doc& 'o&
343*56C7<6PSP63*6D3*6333=Rev&
3Pa"e
*1o% *
7/18/2019 Method Statement for Installation of Geotextiles
http://slidepdf.com/reader/full/method-statement-for-installation-of-geotextiles 13/17
A9: DA9I MARI'2;P2RA(I'G !;MPA'<
$ADMA=;P!;%
Method Statement for
Installation of
Geotextiles and Rock
for Slope Protection
AR!IR;D;'!;'S(R:!(I;'
$;>2RS2AS% !o& S& A&
SA(A A? RA@9;;( $SAR9%PR;2!( = 2P! Borks for2arly Site Preparation/ etty
C Seawater Intake
!ompanyProect'o&
AD*54AR!;
Proect'o&
343*5Doc&!lass
Distribution !ode
*
!ompanyDoc&'o
AD*546*333*6'6PR'63**J
AR!;Doc& 'o&
343*56C7<6PSP63*6D3*6333=Rev&
3Pa"e
*o% *
7/18/2019 Method Statement for Installation of Geotextiles
http://slidepdf.com/reader/full/method-statement-for-installation-of-geotextiles 14/17
A9: DA9I MARI'2;P2RA(I'G !;MPA'<
$ADMA=;P!;%
Method Statement for
Installation of
Geotextiles and Rock
for Slope Protection
AR!IR;D;'!;'S(R:!(I;'
$;>2RS2AS% !o& S& A&
SA(A A? RA@9;;( $SAR9%PR;2!( = 2P! Borks for2arly Site Preparation/ etty
C Seawater Intake
!ompanyProect'o&
AD*54AR!;
Proect'o&
343*5Doc&!lass
Distribution !ode
*
!ompanyDoc&'o
AD*546*333*6'6PR'63**J
AR!;Doc& 'o&
343*56C7<6PSP63*6D3*6333=Rev&
3Pa"e
*=o% *
7/18/2019 Method Statement for Installation of Geotextiles
http://slidepdf.com/reader/full/method-statement-for-installation-of-geotextiles 15/17
A9: DA9I MARI'2;P2RA(I'G !;MPA'<
$ADMA=;P!;%
Method Statement for
Installation of
Geotextiles and Rock
for Slope Protection
AR!IR;D;'!;'S(R:!(I;'
$;>2RS2AS% !o& S& A&
SA(A A? RA@9;;( $SAR9%PR;2!( = 2P! Borks for2arly Site Preparation/ etty
C Seawater Intake
!ompanyProect'o&
AD*54AR!;
Proect'o&
343*5Doc&!lass
Distribution !ode
*
!ompanyDoc&'o
AD*546*333*6'6PR'63**J
AR!;Doc& 'o&
343*56C7<6PSP63*6D3*6333=Rev&
3Pa"e
*5o% *
7/18/2019 Method Statement for Installation of Geotextiles
http://slidepdf.com/reader/full/method-statement-for-installation-of-geotextiles 16/17
A9: DA9I MARI'2;P2RA(I'G !;MPA'<
$ADMA=;P!;%
Method Statement for
Installation of
Geotextiles and Rock
for Slope Protection
AR!IR;D;'!;'S(R:!(I;'
$;>2RS2AS% !o& S& A&
SA(A A? RA@9;;( $SAR9%PR;2!( = 2P! Borks for2arly Site Preparation/ etty
C Seawater Intake
!ompanyProect'o&
AD*54AR!;
Proect'o&
343*5Doc&!lass
Distribution !ode
*
!ompanyDoc&'o
AD*546*333*6'6PR'63**J
AR!;Doc& 'o&
343*56C7<6PSP63*6D3*6333=Rev&
3Pa"e
*o% *
7/18/2019 Method Statement for Installation of Geotextiles
http://slidepdf.com/reader/full/method-statement-for-installation-of-geotextiles 17/17
A9: DA9I MARI'2;P2RA(I'G !;MPA'<
$ADMA=;P!;%
Method Statement for
Installation of
Geotextiles and Rock
for Slope Protection
AR!IR;D;'!;'S(R:!(I;'
$;>2RS2AS% !o& S& A&
SA(A A? RA@9;;( $SAR9%PR;2!( = 2P! Borks for2arly Site Preparation/ etty
C Seawater Intake
!ompanyProect'o&
AD*54AR!;
Proect'o&
343*5Doc&!lass
Distribution !ode
*
!ompanyDoc&'o
AD*546*333*6'6PR'63**J
AR!;Doc& 'o&
343*56C7<6PSP63*6D3*6333=Rev&
3Pa"e
*o% *