SUSTENTO DE METRADOS
1.00.00 OBRAS PROVISIONALES
1.03.00 DEPOSITO PARA AGUA UND
UND SUB TOTAL 1 N° VECES SUB TOTAL 2
1.00 1.00 1.00 1.00
TOTAL 1.00
2.00.00 OBRAS PRELIMINARES
2.01.00 LIMPIEZA DE TERRENO MANUAL M2
LONGITUD ANCHO SUB TOTAL 1 N° VECES SUB TOTAL 2
200.00 1.00 200.00
TOTAL 200.00
2.02.00 TRAZO, NIVEL Y REPLANTEO DURANTE OBRA M2
LONGITUD ANCHO SUB TOTAL 1 N° VECES SUB TOTAL 2
AREA TERRENO 23.00 10.00 230.00 1.00 230.00
TOTAL 230.00
3.00.00 MOVIMIENTO DE TIERRAS
3.01.00 EXCAVACION DE ZANJAS MANUAL H= 1.30m. !"m#$. M3
LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
CIMIENTOS
CORTE 1-1 19.23 0.6 1.05 12.11 1.00 12.11
CORTE 2-2 6.88 0.7 1.05 5.06 1.00 5.06
ZAPATAS
ZAPATA -1 1.8 1 1.05 1.89 1.00 1.89
ZAPATA -2 1.20 1.20 1.05 1.512 8.00 12.096
ZAPATA-3 1.50 1.00 1.05 1.575 2.00 3.15
ZAPATA-4 0.60 0.60 1.05 0.378 2.00 0.756
ESCALERA 1.00 0.55 0.8 0.44 1.00 0.44
TOTAL 3%.%0
7/18/2019 Metrados William
http://slidepdf.com/reader/full/metrados-william 2/17
3.02.00 CORTE HASTA EL NIVEL DE SUBRASANTE EN VEREDAS & INC. U'AS( Y PISOS M3
LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
VEREDAS
veredas 21.00 0.10 2.10 1.00 2.10
UÑA 15.00 0.15 0.35 0.79 2.00 1.58
TOTAL 3.)*
3.02.00 COMPACTACION EN SUB RASANTE DE VEREDA Y PISOS MANUAL M2
LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
VEREDAS
VEREDAS EN AREA COMERCIAL 9.53 9.53 1.00 9.53
PISO 59.38 59.38 1.00 59.38
TOTAL )*.+1
3.03.00 RELLENO CON MATERIAL TRANSPORTADO AIRMADO M3
LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
VEREDAS 9.3 !.1 1.429 1 1.429
PISOS 9.3" !.1 ".9!# 1 ".9!#
CIMIENTOS
CORTE 1-1 19.23 0.6 0.2 12.11 1.00 12.11
CORTE 2-2 6.88 0.7 0.2 0.96 1.00 0.96
ESCALERA 1.00 0.55 0.2 0.11 1.00 0.11
TOTAL 23.%2
3.04.00 RELLENO CON MATERIAL TRANSPORTADO HORMIGON M3
LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
CORTE 1-1 19.23 0.6 0.2 2.31 1.00 2.31
CORTE 2-2 6.88 0.7 0.2 0.96 1.00 0.96
TOTAL 3.2-
3.05.00 RELLENO COMPACTADO CE/UIPO, MATERIAL PROPIO M3
LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
CIMIENTOS
CORTE 1-1 19.23 0.6 0.15 1.73 1.00 1.73
CORTE 2-2 6.88 0.7 0.15 0.72 1.00 0.72
ZAPATAS
ZAPATA -1 1.8 1 0.15 0.27 1.00 0.27
ZAPATA -2 1.20 1.20 0.15 0.216 8.00 1.728
ZAPATA-3 1.50 1.00 0.15 0.225 2.00 0.45
ZAPATA-4 0.60 0.60 0.15 0.054 2.00 0.108
PISOS
SALA COMEDOR 34.33 0.15 5.15 1.00 5.15
COCINA 11.44 0.15 1.72 1.00 1.72
SS.$$ 4.18 0.15 0.63 1.00 0.63
ESTUDIO 9.43 0.15 1.41 1.00 1.41
TOTAL 13.92
FACTOR ESPON. 1.25
TOTAL 1-.0
7/18/2019 Metrados William
http://slidepdf.com/reader/full/metrados-william 3/17
3.06.00 ELIMINACION DE MATERIAL EXEDENTE CON E/UIPO M3
LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
E%CAVACION 35.50 1.00 35.50
CORTE 3.68 1.00 3.68
RELLENO CON MATERIAL PROPIO 17.40 !1.00 !17.40
TOTAL 21.78
FACTOR ESPON. 1.25
TOTAL
2-.22
4.00.00 OBRAS DE CONCRETO SIMPLE
4.01.00 CONCRETO 110 30 P.G. CIMIENTO CORRIDO M2
LONITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
CIMIENTOS
CORTE 1-1 19.23 0.6 0.7 8.08 1.00 8.08
CORTE 2-2 6.88 0.7 0.7 3.37 1.00 3.37
ESCALERA 1.00 0.55 0.8 0.44 1.00 0.44
TOTAL 11.*+
4.02.00 ALSO PISO MEZCLA 1* & CH( , #=4 M2
AREA ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
PISOS
AREA 59.38 59.38 1.00 59.38
TOTAL %+.3*
4.03.00 SOLADO DE CONCRETO 112 CH #=0.10 m M2
LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
ZAPATAS
ZAPATA -1 1.8 1 1.8 1.00 1.8
ZAPATA -2 1.20 1.20 1.44 8.00 11.52
ZAPATA-3 1.50 1.00 1.5 2.00 3
ZAPATA-4 0.60 0.60 0.36 2.00 0.72
TOTAL 1-.0
4.04.02 CONCRETO 567=10897m2 E=0.1%M EN U'AS M3
LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
VEREDAS
VEREDAS 15.00 0.15 0.45 1.01 2.00 2.03
TOTAL 2.03
4.04.03 ENCORADO Y DESENCORADO U'AS M2
LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
VEREDAS
VEREDAS 15.00 0.45 6.75 4.00 27.00
TOTAL 2-.00
7/18/2019 Metrados William
http://slidepdf.com/reader/full/metrados-william 4/17
5.00.00 OBRAS DE CONCRETO ARMADO
5.02.01 CONCRETO 67=1-% 897m2 ZAPATAS M3
LONGUITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
ZAPATA -1 1.8 1 0.5 0.90 1.00 0.9
ZAPATA -2 1.20 1.20 0.5 0.72 8.00 5.76
ZAPATA-3 1.50 1.00 0.5 0.75 2.00 1.5
ZAPATA-4 0.60 0.60 0.5 0.18 2.00 0.36
TOTAL *.%2
5.02.02 ACERO 6:=200 897m2 ; ZAPATAS 8G
LONGUITUD N" DE ELE#ENTOS FACTOR $G%# SUB TOTAL 1 N° VECES SUB TOTAL 2
ZAPATA 1 1.80 9.00 1.02 16.52 1.00 16.52
1.00 5.00 1.02 5.10 1.00 5.10
ZAPATA 2 1.20 6.00 1.02 7.34 8.00 58.75
ZAPATA 3 1.50 7.50 1.02 11.48 2.00 22.95
1.00 5.00 1.02 5.10 1.00 5.10
ZAPATA 4 0.60 3.00 1.02 1.84 2.00 3.67
TOTAL 112.10
7/18/2019 Metrados William
http://slidepdf.com/reader/full/metrados-william 5/17
5.03.01 CONCRETO 7=1-% <97m2 SOBRECIMIENTO M3
LARGO ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
CIMIENTOSCORTE 1-1 19.23 0.15 0.6 1.73 1.00 1.73
CORTE 2-2 6.88 0.15 0.6 0.62 1.00 0.62
TOTAL 2.3%
5.03.02 ENCORADO Y DESENCORADO SOBRECIMIENTO M2
LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
CORTE 1-1 19.23 0.15 0.6 11.54 2.00 23.08
CORTE 2-2 6.88 0.15 0.6 4.13 2.00 8.26
TOTAL 31.33
5.03.03 ACERO 6:=200 897m2 ; SOBRECIMIENTO 8G
LONGUITUD N" DE ELE#ENTOS FACTOR $G%# SUB TOTAL 1 N° VECES SUB TOTAL 2
CORTE 1-1 19.23 6.00 0.56 64.61 1.00 64.61
1.45 96 0.25 34.85 1.00 34.85
CORTE 2-2 6.88 6.00 0.56 23.12 1.00 23.12
1.45 34 0.25 12.47 1.00 12.47
TOTAL 13%.0%
5.04.01 CONCRETO 7=210 <97m2 COLUMNAS M3
LARGO ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
PRIMER & SE'UNDO PISO
C - 1 0.15 0.15 7.10 0.16 10.00 1.60
C - 2 0.30 0.15 7.10 0.32 2.00 0.64
C - 3 7.10
C - 4 0.60 0.15 7.10 0.64 3.00 1.92
C - 0.50 0.15 7.10 0.53 3.00 1.60
C - ( 0.80 0.80 7.10 4.54 2.00 9.09
C - # 0.30 0.10 7.10 0.21 1.00 0.21 TERCER PISO
C - 1 0.25 0.25 2.80 0.18 3.00 0.53
C - 2 0.40 0.15 2.80 0.17 15.00 2.52
COLUMNETAS DEL SE'UNDO PISO 0.20 0.15 2.80 0.08 5.00 0.42
COLUMNETAS DEL TERCER PISO 0.20 0.15 2.80 0.08 5.00 0.42
TOTAL 1*.+
5.04.02 ENCORADO Y DESENCORADO COLUMNAS M2
LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
PRIMER & SE'UNDO PISO
C - 1 0.25 0.25 7.15 7.15 4.00 28.60
C - 2 0.40 0.15 7.15 5.72 17.00 97.24
C - 3
C - 4 0.30 0.15 4.00 2.40 8.00 19.20
C - 0.50 0.15 4.00 5.20 1.00 5.20
C - ( 0.50 0.10 4.00 4.80 1.00 4.80
C - # 0.30 0.10 4.00 3.20 1.00 3.20
C - " 0.20 0.15 2.00 1.40 1.00 1.40
TERCER PISO
C - 1 0.25 0.25 2.80 2.80 3.00 8.40
C - 2 0.40 0.15 2.80 2.24 15.00 33.60
COLUMNETAS DEL SE'UNDO PISO 0.20 0.15 2.80 1.12 5.00 5.60
COLUMNETAS DEL TERCER PISO 0.20 0.15 2.80 1.12 5.00 5.60
TOTAL 212.*
7/18/2019 Metrados William
http://slidepdf.com/reader/full/metrados-william 6/17
5.04.03 ACERO 6:=200 897m2 COLUMNAS 8G
LONGITUD N° DE ELE#ENTOS $G SUB TOTAL 1 N° VECES SUB TOTAL 2
PRIMER & SE'UNDO PISO
C - 1 8.25 4.00 1.55 51.15 4.00 204.60
ESTRIVO 0.95 56.00 0.56 29.79 4.00 119.17
C - 2 8.25 6.00 1.02 50.49 17.00 858.33
ESTRIVO 1.05 56.00 0.56 32.93 17.00 559.78
C - 3 5.10 4.00 1.02 20.81 2.00 41.62
ESTRIVO 0.85 38.00 0.25 8.08 2.00 16.15
C - 4 5.10 4.00 0.56 11.42 8.00 91.39
ESTRIVO 0.85 38.00 0.25 8.08 8.00 64.60
C - 5.10 6.00 1.02 31.21 1.00 31.21
ESTRIVO 1.15 38.00 0.25 10.93 1.00 10.93
C - ( 5.10 6.00 1.02 31.21 1.00 31.21
ESTRIVO 1.05 38.00 0.25 9.98 1.00 9.98
C - # 5.10 4.00 0.56 11.42 1.00 11.42
ESTRIVO 0.75 38.00 0.25 7.13 1.00 7.13
C - " 3.10 4.00 0.56 6.94 1.00 6.94
ESTRIVO 0.65 38.00 0.25 6.18 1.00 6.18
PRIMER & SE'UNDO PISO 0.00
C - 1 4.00 4.00 1.55 24.80 3.00 74.40
ESTRIVO 0.95 28.00 0.56 14.90 3.00 44.69
C - 2 4.00 6.00 1.02 24.48 15.00 367.20
ESTRIVO 1.05 28.00 0.56 16.46 15.00 246.96
COLUMNETA DEL 2 PISO 3.10 4.00 0.56 6.94 5.00 34.72
ESTRIVO 0.65 23.00 0.25 3.74 5.00 18.69
COLUMNETA DEL 3 PISO 3.10 4.00 0.56 6.94 5.00 34.72
ESTRIVO 0.65 23.00 0.25 3.74 5.00 18.69
TOTAL 2+10.)+
5.05.01 CONCRETO 7=210 <97m2 ; VIGAS M3
LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
PRIMER PISO & SE'UNDO PISO
V-1!1)2!1 3.70 0.25 0.25 0.23 2.00 0.46
V-1!2)2!2 26.77 0.15 0.40 1.61 2.00 3.21
V-1!3)2!3 5.00 0.25 0.20 0.25 2.00 0.50
V-1!4)2!4 14.05 0.25 0.20 0.70 2.00 1.41
V-1!)2! 18.02 0.15 0.30 0.81 2.00 1.62
V-1!()2!( 15.75 0.20 0.20 0.63 2.00 1.26
V-1!#)2!# 12.45 0.15 0.20 0.37 2.00 0.75
V-1!" 16.75 0.15 0.25 0.63 1.00 0.63
V-1!9 1.60 0.10 0.25 0.04 1.00 0.04
PRIMER TERCER PISO
V-3!1 3.70 0.25 0.25 0.23 1.00 0.23
V-3!2 22.95 0.15 0.40 1.38 1.00 1.38
V-3!3 2.20 0.25 0.20 0.11 1.00 0.11
V-3!4 11.55 0.25 0.20 0.58 1.00 0.58
V-3! 16.62 0.15 0.30 0.75 1.00 0.75
V-3!( 11.36 0.20 0.20 0.45 1.00 0.45
V-3!# 8.40 0.15 0.20 0.25 1.00 0.25
TOTAL 13.)3
7/18/2019 Metrados William
http://slidepdf.com/reader/full/metrados-william 7/17
5.05.02 ENCORADO Y DESENCORADO VIGAS M2
LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
PRIMER PISO & SE'UNDO PISO
V-1!1)2!1 3.70 0.25 0.25 2.78 2.00 5.55
V-1!2)2!2 26.77 0.15 0.40 25.43 2.00 50.86
V-1!3)2!3 5.00 0.25 0.20 3.25 2.00 6.50
V-1!4)2!4 14.05 0.25 0.20 9.13 2.00 18.27
V-1!)2! 18.02 0.15 0.30 8.1 2.00 16.22
V-1!()2!( 15.75 0.20 0.20 6.30 2.00 12.60
V-1!#)2!# 12.45 0.15 0.20 4.36 2.00 8.72
V-1!" 16.75 0.15 0.25 10.89 1.00 10.89
V-1!9 1.60 0.10 0.25 0.96 1.00 0.96
PRIMER TERCER PISO 0.00 0.00
V-3!1 3.70 0.25 0.25 2.78 1.00 2.78
V-3!2 22.95 0.15 0.40 12.6 1.00 12.62
V-3!3 2.20 0.25 0.20 0.88 1.00 0.88
V-3!4 11.55 0.25 0.20 5.20 1.00 5.20
V-3! 16.62 0.15 0.30 7.48 1.00 7.48
V-3!( 11.36 0.20 0.20 6.82 1.00 6.82
V-3!# 8.40 0.15 0.20 4.62 1.00 4.62
TOTAL 1-0.+%
5.05.03 ACERO 6:=200 897m2 ; VIGAS 8G
LONGITUD N° DE ELE#ENTOS $G&# SUB TOTAL 1 N° VECES SUB TOTAL 2
PRIMER & SE'UNDO PISO
V-1!1 4.30 4.00 1.55 26.66 2.00 53.32
ESTRIVOS 0.83 30 0.56 13.99 2.00 27.98
V-1!2 29.16 4.00 1.02 118.97 2.00 237.95
ESTRIVOS 1.15 204 0.56 131.45 2.00 262.91
V-1!3 5.60 6.00 1.02 34.27 2.00 68.54
ESTRIVOS 0.85 39 0.56 18.66 2.00 37.32
V-1!4 15.25 5.00 1.02 77.78 2.00 155.55
ESTRIVOS 0.85 107 0.56 50.81 2.00 101.63
V-1! 19.22 4.00 1.02 78.42 2.00 156.84
ESTRIVOS 1.05 135 0.25 35.32 2.00 70.63
V-1!( 17.55 4.00 1.02 71.60 2.00 143.21
ESTRIVOS 0.95 123 0.56 65.36 2.00 130.71
V-1!# 13.65 4.00 0.56 30.58 2.00 61.15
ESTRIVOS 0.65 96 0.25 15.53 2.00 31.05
V-1!" 18.55 4.00 1.02 75.68 1.00 75.68
ESTRIVOS 0.75 130 0.25 24.35 1.00 24.35
V-1!9 2.20 4.00 1.02 8.98 1.00 8.98
ESTRIVOS 0.65 15 0.25 2.50 1.00 2.50
TERCER PISO
V-3!1 4.30 4.00 1.55 26.66 1.00 26.66
ESTRIVOS 0.83 30 0.56 13.99 1.00 13.99
V-3!2 25.35 4.00 1.02 103.43 1.00 103.43
ESTRIVOS 1.15 177 0.56 114.28 1.00 114.28
V-3!3 3.40 6.00 1.02 20.81 1.00 20.81
ESTRIVOS 0.85 24 0.56 11.33 1.00 11.33
V-3!4 12.15 5.00 1.02 61.97 1.00 61.97
ESTRIVOS 0.85 85 0.56 40.48 1.00 40.48
V-3! 18.42 4.00 1.02 75.15 1.00 75.15
ESTRIVOS 1.05 129 0.25 33.85 1.00 33.85
V-3!( 13.13 4.00 1.02 53.57 1.00 53.57
ESTRIVOS 0.85 92 0.56 43.75 1.00 43.75
V-3!# 9.00 4.00 0.56 20.16 1.00 20.16
ESTRIVOS 0.65 63 0.25 10.24 1.00 10.24
TOTAL 22-+.+)
5.06.01 CONCRETO EN LOSAS ALIGERADAS 6C=2108GCM2 M3
AREA #3%#2 SUB TOTAL 1 N° VECES SUB TOTAL 2
1 & 2 * NIVEL 120.10 0.0875 10.51 2.00 21.02
3* NIVEL 25.50 0.0875 2.23 1.00 2.23
TOTAL 23.2%
5.06.02 ENCORADO Y DESENCORADO LOSA ALIGERADA M2
AREA ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
1 & 2 * NIVEL 120.10 120.10 2.00 240.20
3* NIVEL 25.50 25.50 1.00 25.50
TOTAL 2)%.-0
5.06.03 ACERO 6:=200 897m2 ; VIGUETAS LOSA ALIGERADA 8G
LONGITUD N" DE ELE#ENTOS $G&# SUB TOTAL 1 N° VECES SUB TOTAL 2
PRIMER & SEUNDO PISO
A+er, ,s/v, 0.85 3 1.02 2.17 2 4.34
A+er, 0ea/v, 1.5 3 1.02 4.59 2 9.18
A+er, Teera/ra 1.00 3 0.25 0.85 2.00 1.70
A+er, ,s/v, 6.74 18 1.02 120.31 2 240.62
A+er, 0ea/v, 4.2 12 1.02 51.41 2 102.82
A+er, Teera/ra 7.00 27 0.25 47.18 2.00 94.36
A+er, ,s/v, 0.87 5 1.02 4.22 2 8.43
A+er, 0ea/v, 1.07 5 1.02 5.18 2 10.37
A+er, Teera/ra 1.90 3 0.25 1.65 2.00 3.31
A+er, ,s/v, 3.91 5 1.02 20.44 2 40.88
A+er, 0ea/v, 2.1 5 1.02 10.98 2 21.96
A+er, Teera/ra 2.05 16 0.25 8.02 2.00 16.03
A+er, ,s/v, 3.8 14 1.02 53.39 2 106.78
A+er, 0ea/v, 3.44 14 1.02 48.33 2 96.67
A+er, Teera/ra 5.51 15 0.25 20.94 2.00 41.88
7/18/2019 Metrados William
http://slidepdf.com/reader/full/metrados-william 8/17
TERCER PISO
A+er, ,s/v, 0.85 3 1.02 2.17 1 2.17
A+er, 0ea/v, 1.5 3 1.02 4.59 1 4.59
A+er, Teera/ra 1.00 3 0.25 0.85 1.00 0.85
A+er, ,s/v, 5.4 6 1.02 32.36 1 32.36
A+er, 0ea/v, 3.45 6 1.02 21.11 1 21.11
A+er, Teera/ra 2.35 22 0.25 12.69 1.00 12.69
A+er, ,s/v, 5.4 7 1.02 37.18 1 37.18
A+er, 0ea/v, 4.11 7 1.02 28.30 1 28.30
A+er, Teera/ra 2.70 22 0.25 14.58 1.00 14.58
A+er, ,s/v, 3.95 5 1.02 20.65 1 20.65
A+er, 0ea/v, 2.1 5 1.02 10.98 1 10.98
A+er, Teera/ra 2.05 16 0.25 8.10 1.00 8.10
A+er, ,s/v, 6.74 5 1.02 36.95 1 36.95
A+er, 0ea/v, 4.2 12 1.02 51.41 1 51.41
A+er, Teera/ra 2.15 27 0.25 14.49 1.00 14.49
A+er, ,s/v, 3.8 6 1.02 23.26 1 23.26
A+er, 0ea/v, 3.44 6 1.02 21.05 1 21.05
A+er, Teera/ra 2.40 15 0.25 9.12 1.00 9.12
TOTAL 11+.1
7/18/2019 Metrados William
http://slidepdf.com/reader/full/metrados-william 9/17
5.06.04 COLOCACION DE LADRILLO DE TECHO 30X1%X30 UND
AREA LADRILL%#2 SUB TOTAL 1 N° VECES SUB TOTAL 2
AREA TOTAL 145.60 8.33 1212.85 1.00 1212.85
TOTAL 1212.*%
5.07.01 CONCRETO 6C= 1-% 8GCM2 LOSA DE ARMADA M3
LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
LOSA 6.70 0.60 0.10 0.40 1.00 0.40
1.50 1.00 0.10 0.15 1.00 0.15
0.95 0.65 0.10 0.06 1.00 0.06
CISTERNA 2.05 2.05 0.10 0.42 1.00 0.42
TOTAL 1.03
5.07.02 ENCORADO Y DESENCORADO LOSA DE ARMADA M2
LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
LOSA DE C 6.70 0.60 4.02 1.00 4.02
1.50 1.00 1.50 1.00 1.50
0.95 0.65 0.62 1.00 0.62
CISTERNA 2.05 2.05 4.20 1.00 4.20
TOTAL 10.3
5.07.03 ACERO 6Y= 200 8GCM2 LOSA DE ARMADA 8G
LONGITUD N° DE ELE#ENTOS $G&# SUB TOTAL 1 N° VECES SUB TOTAL 2
9.15 15 0.56 76.86 1.00 76.86
2.25 61 0.56 76.86 1.00 76.86
1.80 12 0.56 12.10 2.00 24.19
TOTAL 1--.+1
5.07.01 CONCRETO 7=210 <97m2 ; ESCALERA M3
AREA ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
1er Tra, 0.56 1.00 0.56 1.00 0.56
2" Tra, 0.39 1.00 0.39 3.00 1.17
4# TRAMO 0.50 1.00 0.50 2.00 1.00
3(9 Tra, 0.48 1.00 0.48 3.00 1.44
TOTAL .1-
5.07.02 ENCORADO Y DESENCORADO ESCALERA M2
LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
1er Tra, 1.90 1.00 1.90 1.00 1.90
2" Tra, 2.31 1.000 2.31 3.00 6.93
4# TRAMO 2.50 1.00 2.50 2.00 5.00
3(9 Tra, 2.27 1.000 2.27 3.00 6.81
1.93 1.93 1.00 1.93
0.18 0.18 52.00 9.10
TOTAL 31.)-
5.07.03 ACERO 6:=200 897m2 ; ESCALERA 8G
LONGITUD N° DE ELE#ENTOS $G&# SUB TOTAL 1 N° VECES SUB TOTAL 2
1er Tra, 3.58 5 0.56 10.02 2 20.05
1 18 0.56 10.08 2 20.16
2" Tra, 2.86 5 0.56 8.01 6 48.05
1 15 0.56 8.40 6 50.40
4# TRAMO 3.23 5 0.56 9.04 4 36.18
1.00 17 0.56 9.52 4 38.08
3(9 Tra, 3.03 5 0.56 8.48 6 50.90
1.00 17 0.56 9.52 6 57.12
TOTAL 320.+
7/18/2019 Metrados William
http://slidepdf.com/reader/full/metrados-william 10/17
6.00.00 MUROS DE ALBAÑILERIA
6.01.00 MUROS DE LADRILLLO DE ARCILLA 88 DE SOGA M".C". &1( M2
LONGUITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
PRIMER PISO
MUROS 37.68 2.9 109.27 1.00 109.27
SE'UNDO PISO
MUROS 50.93 2.7 137.51 1.00 137.51
TERCER PISO
MUROS 32.64 2.7 88.13 1.00 88.13
PARAPETOS 0.90 0.00 1.00 0.00
CISTERNA 8.20 2.00 16.40 1.00 16.40
VANOS
VENTANAS
M1 2.05 2.50 5.13 !1.00 !5.13
M3 3.20 2.50 8.00 !3.00 !24.00
M4 3.05 2.50 7.63 !1.00 !7.63
M 2.30 2.50 5.75 !1.00 !5.75
M" 2.95 2.50 7.38 !1.00 !7.38
V1 2.15 1.40 3.01 !1.00 !3.01
V2 0.90 1.40 1.26 !1.00 !1.26
V3 2.65 1.40 3.71 !1.00 !3.71
V4 2.20 1.40 3.08 !2.00 !6.16
V 2.20 1.40 3.08 !2.00 !6.16
V( 0.45 1.40 0.63 !1.00 !0.63
V# 1.70 1.40 2.38 !1.00 !2.38
V9 3.05 1.40 4.27 !1.00 !4.27
PUERTAS
P1 1.00 2.50 2.50 !1.00 !2.50
P2 3.00 2.50 7.50 !1.00 !7.50
P3 0.90 2.10 1.89 !6.00 !11.34
P4 0.80 2.10 1.68 !4.00 !6.72
P
P(TOTAL 2%.-+
7.00.00 REVOQUES Y ENLUCIDOS
7.01.00 TARRAJEO RAYADO PRIMARIO, M". 1 #=1.% 7m. M2
LONGUITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
S.S.$$ PRIMER PISO (.1 1.55 9.46 1.00 9.46
COCINA #. 1.55 11.70 1.00 11.70
S.S.$$ SE'UNDO PISO5 sa de d,s 6a7,s8 12.9 2.1 27.09 1.00 27.09
S.S.$$ TERCER PISO .1 2.1 10.82 1.00 10.82
LAVANDERIA 2.3 2.1 4.83 1.00 4.83
CONTRAZOCALOS 22(.3" 0.1 22.64 1.00 22.64
TOTAL *).%3
7.02.00 TARRAJEO EN SUPERICIES INTERIORES Y EXTERIORES , M". 1 #=1.% 7m. M2
LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
PRIMER PISOEE A ) EE D 10.15 2.5 25.38 1.00 25.38
EE :; 2.7 2.5 6.75 1.00 6.75
EE : 0.5 2.5 1.25 1.00 1.25
ENTRE EE :-EE C; 2.3 1.72 3.96 1.00 3.96
EE C; 1.9 2.5 4.75 1.00 4.75
EE C 2.05 1.86 3.81 1.00 3.81
EE D 4 2.5 10.00 1.00 10.00
EE 1 4.5 2.5 11.25 1.00 11.25
EE 1; 1 2.5 2.50 1.00 2.50
EE 2 6.96 2.5 17.40 1.00 17.40
EE 3 5.43 2.5 13.58 1.00 13.58
EE 3; 0.3 2.5 0.75 1.00 0.75
EE 4 2.65 2.5 6.63 1.00 6.63
EE 4; 2.3 2.5 5.75 1.00 5.75
SEGUNDO PISO
EE A 8.65 2.6 22.49 1.00 22.49
ENTRE EE A; - EE :; 2.95 2.6 7.67 1.00 7.67
EE :; 3.35 2.6 8.71 1.00 8.71
ENTRE EE :;-EE : 1.5 2.6 3.90 1.00 3.90
EE C 3.05 2.6 7.93 1.00 7.93
EE D; 8.15 2.6 21.19 1.00 21.19
EE 1;; 4.04 2.6 10.50 1.00 10.50
EE 2 3.9 2.6 10.14 1.00 10.14
ENTRE EE 2 - EE 3 2.9 2.6 7.54 1.00 7.54
2.93 2.6 7.62 1.00 7.62
EE 3 2.55 2.6 6.63 1.00 6.63
EE 3; 1.34 2.6 3.48 1.00 3.48
ENTRE EE 3; - EE 4 2.03 2.6 5.28 1.00 5.28
EE 4; 3.75 2.6 9.75 1.00 9.75
EE 4.34 2.6 11.28 1.00 11.28
TERCER PISO
EE A 8.65 2.6 22.49 1.00 22.49
EE A; 0.94 2.6 2.44 1.00 2.44
EE :; 3.35 2.6 8.71 1.00 8.71
ENTRE EE A -EE :; 2.35 2.6 6.11 1.00 6.11
EE :; 3.7 2.6 9.62 1.00 9.62
ENTRE EE : - EE C; 3.35 2.6 8.71 1.00 8.71
EE C 2.15 2.6 5.59 1.00 5.59
EE D; 8.25 2.2 18.15 1.00 18.15
EE 1;; 4.04 2.6 10.50 1.00 10.50
EE 2 3.9 2.6 10.14 1.00 10.14
ENTRE EE 2 - EE 3 4.54 2.6 11.80 1.00 11.80
EE 3; 7.78 2.6 20.23 1.00 20.23
EE 4 4 2.6 10.40 1.00 10.40
EE 4.34 2.2 9.55 1.00 9.55
VANOS
7/18/2019 Metrados William
http://slidepdf.com/reader/full/metrados-william 11/17
MANPARAS
M1 3.65 2.60 9.49 !2.00 !18.98
M4 1.90 2.60 4.94 !1.00 !4.94
VENTANAS
V 1.90 1.50 2.85 !1.00 !2.85
V( 1.60 2.00 3.20 !1.00 !3.20
V11 1.15 1.50 1.73 !4.00 !6.90
V13 0.80 0.50 0.40 !12.00 !4.80
V1 0.43 0.50 0.22 !1.00 !0.22
PUERTAS
P3 1.20 2.10 2.52 !1.00 !2.52
P 1.00 2.60 2.60 !1.00 !2.60
P( 0.90 2.60 2.34 !3.00 !7.02
P# 0.90 2.10 1.89 !1.00 !1.89
P" 0.85 2.60 2.21 !3.00 !6.63
P9 0.80 2.60 2.08 !1.00 !2.08
P1! 0.70 2.60 1.82 !1.00 !1.82
P11 0.65 2.60 1.69 0.70 1.18
TARRAEO PRIMARIO 86.53 1.00 86.53
COLUMNAS 133.95 1.00 133.95
TOTAL 220.*
7.02.00 TARRAJEO EN SUPERICIES DE VIAS Y COLUMNAS , M". 1 #=1.% 7m. M2
AREA ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
COLUMNAS 212.84 212.84 1.00 212.84
VI'AS 170.95 170.95 1.00 170.95
TOTAL 3*3.-+
7.03.00 DERRAME DE VANOS, M". 1 #=1.% 7m. ML
LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
VENTANAS
V 1.90 1.50 2.85 !1.00 !2.85
V( 1.60 2.00 3.20 !1.00 !3.20
V11 1.15 1.50 1.73 !4.00 !6.90
V13 0.80 0.50 0.40 !12.00 !4.80
V1 0.43 0.50 0.22 !1.00 !0.22
PUERTAS
P3 1.20 2.10 2.52 !1.00 !2.52
P 1.00 2.60 2.60 !1.00 !2.60
P( 0.90 2.60 2.34 !3.00 !7.02
P# 0.90 2.10 1.89 !1.00 !1.89
P" 0.85 2.60 2.21 !3.00 !6.63
P9 0.80 2.60 2.08 !1.00 !2.08
P1! 0.70 2.60 1.82 !1.00 !1.82
P11 0.65 2.60 1.69 0.70 1.18
TOTAL ;1.3
8.00.00 PISO Y CONTRAPISOS
8.01.00 CONTRAPISO C". 1% #=2.% 7m M2
AREA ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
PRIMER PISO 59.38 59.38 1.00 59.38
SEUNDO PISO 72.97 72.97 1.00 72.97
TERCER PISO 33.29 33.29 1.00 33.29
TOTAL 1)%.)
8.03.00 PISO DE CERAMICO ANTIDESLIZANTE DE ALTO TRANSITO COLOR 30 30 7m 1ERA.> 1 M2
AREA ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
AREA DE PISOS 120.95 120.95 1.00 120.95
TOTAL 120.+%
8.03.00 PISO PORCELANATO ANTIDESLIZANTE COLOR %0 %0 7m 1ERA.> 1 M2
AREA ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
AREA DE PISOS 44.69 44.69 1.00 44.69
TOTAL .)+
8.03.00 PISO DE CEMENTO PULIDO E=2.% CM M2
AREA ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
AREA DE AZOTEA & TENDAL 35.72 35.72 1.00 35.72
TOTAL 3%.-2
7/18/2019 Metrados William
http://slidepdf.com/reader/full/metrados-william 12/17
8.03.00 PISO DE BLO/UETA X10X20 CM M2
AREA ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
VEREDA 9.50 9.50 1.00 9.50
TOTAL +.%0
.00.00 !OCALOS Y CONTRA!OCALOS
.01.00 CONTRAZOCALO CERAMICO H=0.10M ML
LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
PRIMER PISO 202.19 202.19 1.00 202.19
TOTAL 202.1+
.01.00 CONTRAZOCALO PORCELANATO H=0.10M ML
LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
PRIMER PISO 24.19 24.19 1.00 24.19
TOTAL 2.1+
0.02.00 ZOCALO CERAMICO DE 20X207m 1ERA.> 1 M2
LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
TARRAEO PRIMARIO 63.89 63.89 1.00 63.89
TOTAL )3.*+
10.00.00 REVESTIMIENTOS
10.01.00 PROTECCION CRODOPLAST ML
LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
20.00 1.00 20.00
TOTAL 20.00
10.02.00 CIELORASO CON YESO M2
AREA ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
265.70 1.00 265.70
TOTAL 2)%.-0
10.03.00 IMPERMEABILIZANTE PTECHOS 12,# = 0.02m M2
AREA ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
TEC$OS 68.53 1.00 68.53
CISTERNA 9.73 1.00 9.73
TOTAL -*.2)
11.00.00 CARPINTERIA DE MADERA
11.01.00 SUMINISTRO E INSTALACION PUERTAS DE MADERA CONTRAPLACADA INC. ACCES. Y PINTURA M2
LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
P1 1.00 2.10 2.10 1.00 2.1
P2 5.00 2.40 12.00 1.00 12
P3 1.00 2.60 2.60 1.00 2.6
P4 0.90 2.10 1.89 9.00 17.01
P 0.90 2.10 1.89 1.00 1.89
P( 0.70 2.10 1.47 5.00 7.35
TOTAL 2.+%
7/18/2019 Metrados William
http://slidepdf.com/reader/full/metrados-william 13/17
12.00.00 CERRA"ERIA
12.01.00 COLOCACION DE CERRADURA PUERTA EXTERIOR 2 GOLPES UND
LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
1.00 1.00 1.00
12.02.00 COLOCACION DE CERRADURA PUERTA INTERIOR PERILLA UNA LLAVE BOTON UND
LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
17.00 1.00 17.00
12.03.00 CCOLOCACION DE BISAGRA A" CAPUCHINA 34 UND
LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
54.00 1.00 54.00
13.00.00 CARPINTERIA METALICA Y ALUMINIO
13.01.00 SUMINISTRO E INSTALACION VENTANAS DE ALUMINIO INC. ACCES. PINTURA ANTICORROSIVO M2
LARGO ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
V1 2.00 1.70 3.40 1.00 3.40
V2 1.00 3.60 3.60 1.00 3.60
V3 1.00 3.60 3.60 1.00 3.60
V4 1.50 1.60 2.40 5.00 12.00
V 1.90 1.60 3.04 2.00 6.08
V( 0.85 1.60 1.36 1.00 1.36
V# 0.80 0.50 0.40 4.00 1.60
V" 0.80 0.50 0.40 1.00 0.40
V9 1.50 1.10 1.65 1.00 1.65
V1! 0.40 0.40 0.16 5.00 0.80
3.+
13.02.00 SUMINISTRO E INSTALACION DE MAMPARA DE ALUMINIO M2
LONGUITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
M1 3.85 2.60 10.01 1.00 10.01
M2 2.00 2.60 5.20 3.00 15.60
TOTAL 2%.)1
13.03.00 SUMINISTRO E INSTALACION DE TUBO CROMADO DE 24 E=1.%MM ML
LONGUITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
35.96 35.96 2.00 71.92
1.00 1.00 18.00 18.00
TOTAL *+.+2
14.00.00 VIDRIOS#CRISTALES Y SIMILARES
14.01.00 VIDRIO TEMPLADO GRIS, PROVISION Y COLOCACION P2
LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
V1 2.00 1.70 3.40 1.00 3.40
V2 1.00 3.60 3.60 1.00 3.60
V3 1.00 3.60 3.60 1.00 3.60
V4 1.50 1.60 2.40 5.00 12.00
V 1.90 1.60 3.04 2.00 6.08
V( 0.85 1.60 1.36 1.00 1.36
V# 0.80 0.50 0.40 4.00 1.60
V" 0.80 0.50 0.40 1.00 0.40
V9 1.50 1.10 1.65 1.00 1.65
V1! 0.40 0.40 0.16 5.00 0.80
M1 3.85 2.60 10.01 1.00 10.01
M2 2.00 2.60 5.20 3.00 15.60
TOTAL )-.3
15.00.00 PINTURA LATE$ 2 MANOS EN CIELORRASO# MUROS#VIGAS Y COLUMNAS
15.01.00 APLICACI?N DE PINTURA LATEX DEL TIPO DECORATIVO EN CIELORRASO &LIMPIEZA, LIJADO Y RASPADO( CBASE IMPRIMANTE M2
AREA ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
265.70 265.70 1.00 265.7
TOTAL 2)%.-0
7/18/2019 Metrados William
http://slidepdf.com/reader/full/metrados-william 14/17
7/18/2019 Metrados William
http://slidepdf.com/reader/full/metrados-william 15/17
18.07.02 SUMIDERO DE B! 24 UND
UND ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
5.00 1.00 5.00
TOTAL %.00
18.07.03 CONEXI?N PARA RED DE DESAGUE, INC. ACCESORIOS UND
UND ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
1.00 1.00 1.00
TOTAL 1.00
18.08.00 SISTEMA DE AGUA RIA
18.08.01 SALIDA DE AGUA RIA PVC PTO
UND ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
18.00 1.00 18.00
TOTAL 1*.00
18.0.00 LLAVES Y VALVULAS
18.0.01 VALVULA CHEC8 B! 124 UND
LONGUITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
2.00 1.00 2.00
TOTAL 2.00
18.0.02 VALVULA CHEC8 B! 14 UND
LONGUITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
2.00 1.00 2.00
TOTAL 2.00
18.0.03 VALVULA COMPUERTA B! 124 UND
LONGUITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
7.00 1.00 7.00
TOTAL -.00
18.0.04 VALVULA COMPUERTA B! 34 UND
LONGUITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
4.00 1.00 4.00
TOTAL .00
18.0.05 VALVULA COMPUERTA B! 14 UND
LONGUITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
4.00 1.00 4.00
TOTAL .00
18.10.00 ACCESORIOS
18.10.01 TAN/UE ELEVADO DE POLIETILENO 1100 LTS INC. ACCESORIOS UND
LONGUITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
1.00 1.00 1.00
TOTAL 1.00
18.10.02 CISTERNA DE POLIETILENO INCY ACCESORIOS UND
LONGUITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
1.00 1.00 1.00
TOTAL 1.00
18.10.03 CODO DE .G. @ 124 ; +0 UND
LONGUITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
18.00 1.00 18.00
TOTAL 1*.00
18.10.04 CONEXION E INSTALACION DE RED DE AGUA INC.MEDIDOR UND
LONGUITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
1.00 1.00 1.00
TOTAL 1.00
1.00.00 INSTALACIONES ELECTRICAS
1.01.00 SALIDA O CENTRO DE LUZ PTO
PTO ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
35.00 35.00 1.00 35.00
TOTAL 3%.00
1.02.00 ARTEACTO LUOR. CREJILLA ALUMINIO 2X0 ATTS UND
PTO ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
12.00 12.00 1.00 12.00
TOTAL 12.00
1.03.00 ARTEACTOS ELEC.TCON PANTALLA ACRIL CIRCULAR 1 3) UND
PTO ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
14.00 14.00 1.00 14.00
TOTAL 1.00
7/18/2019 Metrados William
http://slidepdf.com/reader/full/metrados-william 16/17
1.04.00 ARTEACTOS ELEC.SPOT LIGHT UND
PTO ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
9.00 9.00 1.00 9.00
TOTAL +.00
1.05.00 INTERRUPTOR,SIMPLE 1)A,2%0, )0H
PTO ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
20.00 20.00 1.00 20.00
TOTAL 20.00
1.06.00 INTERRUPTOR,DOBLE 1)A,2%0, )0H UND
PTO ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
2.00 2.00 1.00 2.00
TOTAL 2.00
1.06.00 INTERRUPTOR,TRIPLE 1)A,2%0, )0H UND
PTO ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
1.00 1.00 1.00 1.00
TOTAL 1.00
1.08.00 TOMACORRI#NTE BIPOLAR,DOBLE,PBA/UELITA, 1%A, 220V UND
PTO ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
35.00 35.00 1.00 35.00
TOTAL 3%.00
1.0.00 TABLERO GENERAL &TG( UND
PTO ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
1.00 1.00 1.00 1.00
TOTAL 1.00
1.0.00 SUB TABLERO TERMOMANGNETICO&TD1( UND
PTO ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
3.00 3.00 1.00 3.00
TOTAL 3.00
1.10.00 POZO A TIERRA ; INCLUYE CAJA CON TAPA, DE CONCRETO UND
PTO ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
1.00 1.00 1.00
TOTAL 1.00
7/18/2019 Metrados William
http://slidepdf.com/reader/full/metrados-william 17/17
1.11.00 RED DATA
1.11.02 SALIDA PARA TELEONO E INTERCOMUNICADORES 7PLACA DE ALUMINIO UND
PTO ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
7.00 1.00 7.00
TOTAL -.00
20.00.00 OTROS
20.01.00 CAJA DE MADERA 1%2% CM VALVULA UND
LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
11.00 1.00 11.00
TOTAL 11.00
20.02.00 BAJADA DE EVACUACION PLUVIAL CON TUBERIA DE 34 PTO
LONGITUD ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
4.00 1.00 4.00
TOTAL .00
20.03.00 LIMPIEZA GENERAL DE OBRA M2
AREA ANCHO ALTURA SUB TOTAL 1 N° VECES SUB TOTAL 2
200.00 1.00 200.00
TOTAL 200.00