1 6 Mile Alignment 1.7 Miles of Tunnel 8 Stations (6 At-grade & 2 Underground) Park & Ride Facility Direct Connection to the Pasadena Metro Gold Line $898.8 million On-Time/Within Budget Over 4 million Safe Work Hours Opened to the public on November 15, 2009 Metro Gold Line Eastside Extension Review Advisory Committee March 11, 2010 Metro Gold Line Eastside Extension Review Advisory Committee March 11, 2010 Gold Line
Transcript
Page 1: Metro Gold Line Eastside Extension

1

6 Mile Alignment

1.7 Miles of Tunnel

8 Stations (6 At-grade & 2 Underground)

Park & Ride Facility

Direct Connection to the Pasadena Metro Gold Line

$898.8 million

On-Time/Within Budget

Over 4 million Safe Work Hours

Opened to the public on November 15, 2009

Metro Gold Line Eastside Extension Review Advisory Committee

March 11, 2010

Metro Gold Line Eastside Extension Review Advisory Committee

March 11, 2010

Gold Line

Page 2: Metro Gold Line Eastside Extension

2

Gold Line

Metro Gold Line Eastside ExtensionMetro Gold Line Eastside Extension

Ad-Hoc Sub Committee Activities Update

Ad-Hoc Sub Committee Activities Update

Page 3: Metro Gold Line Eastside Extension

3

Final Recommendations: January 10, 2008Final Recommendations: January 10, 2008

Gold Line

Recommendation Status

Grave Markers: •12”x24”

•Charcoal gray granite

•Individual PIN that correlates to Cogstone Report

•Chinese remains and artifacts will have Chinese couplets

•All others will have English and Spanish verses

•There will be 2 grave markers (burials) per full size plot)

•All of the English and Spanish grave markers have been placed.

•There were some challenges with the accuracy of the Chinese couplets. They have been reviewed, corrected and word-processed. Angi Ma Wong is reviewing for final engraving. They will be completed within 1-2 months.

•All grave markers are on 12”x24”

granite in charcoal gray, have an individual PIN correlating to the final report and have a verse based on remain type; there are 2 grave markers per full size plot.

Page 4: Metro Gold Line Eastside Extension

4

Gold Line

Recommendation Status

Headstones to be used on memorial wall:

•E1, 13E TE Buzbee

•E1, 12E Willie Smoot

•E1, 14E Anna Ludeman

•111B-33 HB83-33

•HB101 Catalog #160C-13

•164C Catalog #E1 164C

•217C Catalog #E1 217C

•19NP Catalog #E1 19NP

Done.

Use Chinese calligraphy rather than font on the tribute plaque.

Done, a renowned Chinese calligrapher recommended by the Committee was hired.

Final Recommendations: January 10, 2008Final Recommendations: January 10, 2008

Page 5: Metro Gold Line Eastside Extension

5

Gold Line

Final Recommendations: January 10, 2008Final Recommendations: January 10, 2008

Recommendation Status

Use a “dedication”

on the plaque. Done.

Place a timeframe in the dedication.

Done.

Use agreed upon language for historical plaque on memorial wall.

Done.

Use agreed upon language for tribute plaque at 1st/Lorena.

Done.

Hold a site dedication and memorial wall unveiling on auspicious date.

Done.

Announce event in local papers and invite elected officials.

Done.

Page 6: Metro Gold Line Eastside Extension

6

Gold Line

Final Recommendations: January 10, 2008Final Recommendations: January 10, 2008

Recommendation Status

County Chaplain to lead event. Done.

Invite other denominations to participate, making it an interfaith celebration.

Done.

While the commencement of the reinterment is not public, it should commence on an auspicious date.

It did.

Erect a memorial wall with the following elements:

•Tribute plaque

•Historical copy in 3 languages

•Art panels from Crematorium

•Recovered headstones

Done.

Page 7: Metro Gold Line Eastside Extension

7

Gold Line

Final Recommendations: January 10, 2008Final Recommendations: January 10, 2008

Recommendation Status

Place two benches in front of the memorial wall.

These have been procured and will be placed after all the Chinese grave markers have been placed.

Place a stella in front of the memorial wall for placement of incense or flowers.

These have been procured and will be placed after all the Chinese grave markers have been placed.

Reinter all remains and artifacts at Evergreen Cemetery next to the Chinese Historical Shrine.

All of the remains and artifacts have been re-buried.

Place trees behind memorial wall to serve as a buffer to the Crematorium.

Six Mediterranean Cypress trees have been planted behind the wall and upon final placement of all furniture, Evergreen Cemetery will re-sod and water the area

Page 8: Metro Gold Line Eastside Extension

8

Gold Line

Final Recommendations: January 10, 2008Final Recommendations: January 10, 2008

Recommendation Status

When preparing burial records, use a local mortuary company.

Bagues Mortuary in process of preparing the final record report.

Curate all project files at Fowler Museum.

Cogstone has turned over all project files to Fowler for curation.

Create 3 sets of replicas of significant artifacts

Done.

Page 9: Metro Gold Line Eastside Extension

9

Gold Line

Metro Gold Line Eastside ExtensionMetro Gold Line Eastside Extension

Descendants of T.E. Buzbee and Yee Hay

Page 10: Metro Gold Line Eastside Extension

10

RAC and Ad-Hoc Sub Committee Members pay tribute to the remains and artifacts discoveredduring construction of the Edward R. Roybal Metro Gold Line Eastside Extension

Metro Gold Line Eastside ExtensionMetro Gold Line Eastside Extension

Gold Line

Page 11: Metro Gold Line Eastside Extension

11

3rd

Street & Mariana

Metro Gold Line Eastside ExtensionMetro Gold Line Eastside Extension

Residents concerns regarding trespassing at former pedestrian crossing

Metro monitored location July 25th

and August 1st

from 6a.m.-6p.m.

Page 12: Metro Gold Line Eastside Extension

12

3rd

Street & Mariana-Implementation

-CPUC & Metro’s Corporate Safety reviewed and concluded the following:

-Minimal pedestrian's crossing-No fencing due to emergency vehicular access -LA County DPW will remove crosswalk markings-Metro will evaluate additional signage

Metro Gold Line Eastside ExtensionMetro Gold Line Eastside Extension

Page 13: Metro Gold Line Eastside Extension

13

Introduction of Outreach teamLuzmaria

Chavez & Frank Villalobos (Barrio Planners, Inc.) & Henry Gonzalez (Metro)

In December 2009, the Metro Board Directed Staff to take the necessary steps to install rail crossing gates or “quad gates”

at 24 intersections as an additional safety

enhancement.

Gold Line

Metro Gold Line Eastside ExtensionMetro Gold Line Eastside Extension

Four Quadrant Gate Project

Page 14: Metro Gold Line Eastside Extension

14

Gold Line

Metro Gold Line Eastside Extension 24 Intersection Crossings

Metro Gold Line Eastside Extension 24 Intersection Crossings

Page 15: Metro Gold Line Eastside Extension

15

Implementation StrategyInstall gates at 5 initial intersections to serve as “Demonstrations”No “EIR” study for initial 5 intersectionsExpedited schedule: 6 months for design and agency approvals and then begin installations in early 2011.

City of Los Angeles County of Los AngelesCalifornia Public Utilities Commission (CPUC)

Gold Line

Metro Gold Line Eastside ExtensionMetro Gold Line Eastside Extension

Page 16: Metro Gold Line Eastside Extension

16

Gold Line

Metro Gold Line Eastside Extension Initial 5 Intersections

Metro Gold Line Eastside Extension Initial 5 Intersections

Page 17: Metro Gold Line Eastside Extension

17

Gold Line

Metro Gold Line Eastside ExtensionMetro Gold Line Eastside Extension

Remaining 19 Intersections:“EIR” study to analyze potential impacts to traffic, noise and property from installing gates at all intersectionsPublic Outreach: work with communities to identify issues and concerns and best locations for quad gatesWork with City, County & CPUC to gain approvalsConstruction in late 2011

Page 18: Metro Gold Line Eastside Extension

18

Metro Gold Line Eastside Extension Standard Intersection before “Quad Gates”

Metro Gold Line Eastside Extension Standard Intersection before “Quad Gates”

Gold Line

Page 19: Metro Gold Line Eastside Extension

19

Metro Gold Line Eastside Extension Standard Intersection after “Quad Gates”

Metro Gold Line Eastside Extension Standard Intersection after “Quad Gates”

Gold Line

Page 20: Metro Gold Line Eastside Extension

20

Metro Gold Line Eastside ExtensionMetro Gold Line Eastside Extension

Gold Line

Page 21: Metro Gold Line Eastside Extension

21

Metro Gold Line Eastside ExtensionMetro Gold Line Eastside Extension

Gold Line

Page 22: Metro Gold Line Eastside Extension

22

Gold Line

Metro Gold Line Eastside ExtensionMetro Gold Line Eastside Extension

Page 23: Metro Gold Line Eastside Extension

23

Metro Gold Line Eastside ExtensionMetro Gold Line Eastside Extension

Questions and Answers…Q: Is Metro installing gates at all 24 intersections?A: No. We are evaluating gates at “up to” 24 intersections, but may do less.

Q: Why did Metro select 3rd & Civic Center Way and 3rd & La Verne for initial installations?A: Impacts on property and traffic are minimized at these locations and they can be done without an “EIR” study.

Q: Why not start with Mednik or Rowan where there are schools located next to the intersections?A: Traffic impacts at these locations would require and EIR study and we are sensitive to noise levels at Rowan due to the Church. We are proposing to install traffic warning lights (“Runway lights”) as demonstrations at these

intersections.

Page 24: Metro Gold Line Eastside Extension

24

Gold Line

Metro Gold Line Eastside ExtensionMetro Gold Line Eastside Extension

Next Steps/Meetings:RAC (September)Community Meeting (October)Next 6 months…(Luzmaria)

Contact Information:Eric Carlson, Project Manager (213) 922-3052 or [email protected] Chavez, Barrio Planners, Inc. (323) 726-7734 or [email protected]