1
•
6 Mile Alignment
•
1.7 Miles of Tunnel
•
8 Stations (6 At-grade & 2 Underground)
•
Park & Ride Facility
•
Direct Connection to the Pasadena Metro Gold Line
•
$898.8 million
•
On-Time/Within Budget
•
Over 4 million Safe Work Hours
•
Opened to the public on November 15, 2009
Metro Gold Line Eastside Extension Review Advisory Committee
March 11, 2010
Metro Gold Line Eastside Extension Review Advisory Committee
March 11, 2010
Gold Line
2
Gold Line
Metro Gold Line Eastside ExtensionMetro Gold Line Eastside Extension
Ad-Hoc Sub Committee Activities Update
Ad-Hoc Sub Committee Activities Update
3
Final Recommendations: January 10, 2008Final Recommendations: January 10, 2008
Gold Line
Recommendation Status
Grave Markers: •12”x24”
•Charcoal gray granite
•Individual PIN that correlates to Cogstone Report
•Chinese remains and artifacts will have Chinese couplets
•All others will have English and Spanish verses
•There will be 2 grave markers (burials) per full size plot)
•All of the English and Spanish grave markers have been placed.
•There were some challenges with the accuracy of the Chinese couplets. They have been reviewed, corrected and word-processed. Angi Ma Wong is reviewing for final engraving. They will be completed within 1-2 months.
•All grave markers are on 12”x24”
granite in charcoal gray, have an individual PIN correlating to the final report and have a verse based on remain type; there are 2 grave markers per full size plot.
4
Gold Line
Recommendation Status
Headstones to be used on memorial wall:
•E1, 13E TE Buzbee
•E1, 12E Willie Smoot
•E1, 14E Anna Ludeman
•111B-33 HB83-33
•HB101 Catalog #160C-13
•164C Catalog #E1 164C
•217C Catalog #E1 217C
•19NP Catalog #E1 19NP
Done.
Use Chinese calligraphy rather than font on the tribute plaque.
Done, a renowned Chinese calligrapher recommended by the Committee was hired.
Final Recommendations: January 10, 2008Final Recommendations: January 10, 2008
5
Gold Line
Final Recommendations: January 10, 2008Final Recommendations: January 10, 2008
Recommendation Status
Use a “dedication”
on the plaque. Done.
Place a timeframe in the dedication.
Done.
Use agreed upon language for historical plaque on memorial wall.
Done.
Use agreed upon language for tribute plaque at 1st/Lorena.
Done.
Hold a site dedication and memorial wall unveiling on auspicious date.
Done.
Announce event in local papers and invite elected officials.
Done.
6
Gold Line
Final Recommendations: January 10, 2008Final Recommendations: January 10, 2008
Recommendation Status
County Chaplain to lead event. Done.
Invite other denominations to participate, making it an interfaith celebration.
Done.
While the commencement of the reinterment is not public, it should commence on an auspicious date.
It did.
Erect a memorial wall with the following elements:
•Tribute plaque
•Historical copy in 3 languages
•Art panels from Crematorium
•Recovered headstones
Done.
7
Gold Line
Final Recommendations: January 10, 2008Final Recommendations: January 10, 2008
Recommendation Status
Place two benches in front of the memorial wall.
These have been procured and will be placed after all the Chinese grave markers have been placed.
Place a stella in front of the memorial wall for placement of incense or flowers.
These have been procured and will be placed after all the Chinese grave markers have been placed.
Reinter all remains and artifacts at Evergreen Cemetery next to the Chinese Historical Shrine.
All of the remains and artifacts have been re-buried.
Place trees behind memorial wall to serve as a buffer to the Crematorium.
Six Mediterranean Cypress trees have been planted behind the wall and upon final placement of all furniture, Evergreen Cemetery will re-sod and water the area
8
Gold Line
Final Recommendations: January 10, 2008Final Recommendations: January 10, 2008
Recommendation Status
When preparing burial records, use a local mortuary company.
Bagues Mortuary in process of preparing the final record report.
Curate all project files at Fowler Museum.
Cogstone has turned over all project files to Fowler for curation.
Create 3 sets of replicas of significant artifacts
Done.
9
Gold Line
Metro Gold Line Eastside ExtensionMetro Gold Line Eastside Extension
Descendants of T.E. Buzbee and Yee Hay
10
RAC and Ad-Hoc Sub Committee Members pay tribute to the remains and artifacts discoveredduring construction of the Edward R. Roybal Metro Gold Line Eastside Extension
Metro Gold Line Eastside ExtensionMetro Gold Line Eastside Extension
Gold Line
11
3rd
Street & Mariana
Metro Gold Line Eastside ExtensionMetro Gold Line Eastside Extension
Residents concerns regarding trespassing at former pedestrian crossing
Metro monitored location July 25th
and August 1st
from 6a.m.-6p.m.
12
3rd
Street & Mariana-Implementation
-CPUC & Metro’s Corporate Safety reviewed and concluded the following:
-Minimal pedestrian's crossing-No fencing due to emergency vehicular access -LA County DPW will remove crosswalk markings-Metro will evaluate additional signage
Metro Gold Line Eastside ExtensionMetro Gold Line Eastside Extension
13
Introduction of Outreach teamLuzmaria
Chavez & Frank Villalobos (Barrio Planners, Inc.) & Henry Gonzalez (Metro)
In December 2009, the Metro Board Directed Staff to take the necessary steps to install rail crossing gates or “quad gates”
at 24 intersections as an additional safety
enhancement.
Gold Line
Metro Gold Line Eastside ExtensionMetro Gold Line Eastside Extension
Four Quadrant Gate Project
14
Gold Line
Metro Gold Line Eastside Extension 24 Intersection Crossings
Metro Gold Line Eastside Extension 24 Intersection Crossings
15
Implementation StrategyInstall gates at 5 initial intersections to serve as “Demonstrations”No “EIR” study for initial 5 intersectionsExpedited schedule: 6 months for design and agency approvals and then begin installations in early 2011.
City of Los Angeles County of Los AngelesCalifornia Public Utilities Commission (CPUC)
Gold Line
Metro Gold Line Eastside ExtensionMetro Gold Line Eastside Extension
16
Gold Line
Metro Gold Line Eastside Extension Initial 5 Intersections
Metro Gold Line Eastside Extension Initial 5 Intersections
17
Gold Line
Metro Gold Line Eastside ExtensionMetro Gold Line Eastside Extension
Remaining 19 Intersections:“EIR” study to analyze potential impacts to traffic, noise and property from installing gates at all intersectionsPublic Outreach: work with communities to identify issues and concerns and best locations for quad gatesWork with City, County & CPUC to gain approvalsConstruction in late 2011
18
Metro Gold Line Eastside Extension Standard Intersection before “Quad Gates”
Metro Gold Line Eastside Extension Standard Intersection before “Quad Gates”
Gold Line
19
Metro Gold Line Eastside Extension Standard Intersection after “Quad Gates”
Metro Gold Line Eastside Extension Standard Intersection after “Quad Gates”
Gold Line
20
Metro Gold Line Eastside ExtensionMetro Gold Line Eastside Extension
Gold Line
21
Metro Gold Line Eastside ExtensionMetro Gold Line Eastside Extension
Gold Line
22
Gold Line
Metro Gold Line Eastside ExtensionMetro Gold Line Eastside Extension
23
Metro Gold Line Eastside ExtensionMetro Gold Line Eastside Extension
Questions and Answers…Q: Is Metro installing gates at all 24 intersections?A: No. We are evaluating gates at “up to” 24 intersections, but may do less.
Q: Why did Metro select 3rd & Civic Center Way and 3rd & La Verne for initial installations?A: Impacts on property and traffic are minimized at these locations and they can be done without an “EIR” study.
Q: Why not start with Mednik or Rowan where there are schools located next to the intersections?A: Traffic impacts at these locations would require and EIR study and we are sensitive to noise levels at Rowan due to the Church. We are proposing to install traffic warning lights (“Runway lights”) as demonstrations at these
intersections.
24
Gold Line
Metro Gold Line Eastside ExtensionMetro Gold Line Eastside Extension
Next Steps/Meetings:RAC (September)Community Meeting (October)Next 6 months…(Luzmaria)
Contact Information:Eric Carlson, Project Manager (213) 922-3052 or [email protected] Chavez, Barrio Planners, Inc. (323) 726-7734 or [email protected]