Metro Pre-Board Meeting May 14, 2015
Transcript
Page 1: Metro Pre-Board Meeting May 14, 2015libraryarchives.metro.net/DB_Attachments/150514_I_210_Connected... · Area highlights Access to transit, limited construction, parallel arterials

Metro Pre-Board Meeting

May 14, 2015

Page 2: Metro Pre-Board Meeting May 14, 2015libraryarchives.metro.net/DB_Attachments/150514_I_210_Connected... · Area highlights Access to transit, limited construction, parallel arterials

System Management Model

Connected Corridors Pilot on I-210

Reorganizing for Corridor Management

Page 3: Metro Pre-Board Meeting May 14, 2015libraryarchives.metro.net/DB_Attachments/150514_I_210_Connected... · Area highlights Access to transit, limited construction, parallel arterials

Transportation Investments have more impact if built upon this foundation

Emphasized since 2006

RTP 2008 and 2012

Bigger bang for the buck

Page 4: Metro Pre-Board Meeting May 14, 2015libraryarchives.metro.net/DB_Attachments/150514_I_210_Connected... · Area highlights Access to transit, limited construction, parallel arterials

0

2

4

6

8

10

12

Large Capital Expansion Operational Improvements Transportation Management

Ben

efi

t C

ost

Rati

o (

B/

C)

High B/C

Range

Low B/C

Range

High B/C

Range

High B/C

Range

Low B/C

Range

Low B/C

Range

Page 5: Metro Pre-Board Meeting May 14, 2015libraryarchives.metro.net/DB_Attachments/150514_I_210_Connected... · Area highlights Access to transit, limited construction, parallel arterials

5

Item Rating Notes

Geometry Excellent Several Parallel arterials in close proximity of I-210; freeway frontage streets in Pasadena

Jurisdictional Environment

Good Possibility of doing pilot deployment within one or two cities

Freeway Traffic Detection Very Good Sensors on mainline and most ramps.

Arterial Traffic Detection Promising Many intersections already equipped with traffic sensors

Traffic Demand Patterns Very Good Westbound traffic during AM peak; eastbound traffic during PM peak, average % of trucks

Existing Freeway Control Excellent Existing HOV lanes; ramps and freeway interchanges metered

Existing Arterial Control Good Traffic responsive system already in place on some arterials, participation of key cities in IEN.

Existing Transit Services Very Good Metro Gold Line running parallel to I-210, in close proximity

Park-and-ride capabilities

Uncertain Many facilities exhibit high occupancy rates

ICM Opportunities – Peak Hour

Challenging High congestion level on freeway; some arterials with limited extra capacities at some intersections; incident response needs; different traffic pattern on Fridays

ICM Opportunities – Off Peak

Excellent Many large scale events; incident response needs

Page 6: Metro Pre-Board Meeting May 14, 2015libraryarchives.metro.net/DB_Attachments/150514_I_210_Connected... · Area highlights Access to transit, limited construction, parallel arterials

Area highlights ◦ Access to transit, limited construction, parallel arterials access,

local partnership opportunity, availability of parking facilities, regional attractions, high accident volumes, truck access, etc.

Freeway Interchange

Freeway

Arterial

N Not to

scale Colorado St

Colorado Pl

Longden Ave

Arrow Hwy

Orange Grove Blvd

Colorado Blvd

Foothill Blvd

Route 66 / Alosta Ave

Arrow Hwy

Gladstone St

Corson St

Ro

se

me

ad

Blv

d

Azu

sa

Ave

Las Tunas Dr

Del Mar Blvd

All

en

Ave

Hill A

ve

La

ke

Ave

Ma

ren

go

Ave

Fa

ir O

ak

s A

ve

Sa

n G

ab

rie

l B

lvd

Sierra

Madre Blvd

Arroyo

Pkwy

St John Ave

Walnut St

Green St Union St

Maple St

Myrt

le A

ve

Mo

un

tain

Ave

Bu

en

a V

ista

St

Citru

s A

ve

Gra

nd A

ve

San D

imas C

anyon R

d

San D

imas A

ve

Lone H

ill A

ve

Am

elia

Ave

Irw

indale

Ave

Pasadena Ave

Los R

oble

s

Mic

hili

linda A

ve

Sie

rra M

adre

Vill

a A

ve

Altadena A

ve

Phase 1

Page 7: Metro Pre-Board Meeting May 14, 2015libraryarchives.metro.net/DB_Attachments/150514_I_210_Connected... · Area highlights Access to transit, limited construction, parallel arterials

7

Bald

win

Allen

Hill

Lake

Los R

oble

s

Fair

Oaks

Alt

adena

Sie

rra M

adre

Myrt

l

Mounta

in

Buena V

ista

Cit

rus

Gra

nd

San D

imas C

anyon

San D

imas A

ve

Lone H

ill

Am

elia

Irw

indale

Azusa

Santa

Anit

a

San G

abri

el

6.8 5.0 3.2

5.6 3.7

2.9

15.7

3.8

1.9

6.7

2.8

1.2

5.9

8.2

3.9

8.5 2.

9

2.8

1.2

13.3 7.5

11.2 2.9 9.5

3.1 3.5 3.6

1.2

3.8 3.3

0.8 3.4

2.4

5.8 6.3

2.5

1.5

3.8 13.9

3.2 9.4

8.5

2.6 4.5 9.7

4.9

5.0 2.5

In 2013 a total of approximately 6,000 incidents were reported within the project limits. (500 per month)

Major Incidents on I-210 (2009 – 2013)

2.3 3.2

6.2 5.0 10.5

9.0 2.2

10.6

2.8

3.8

8.8

14.0

3.5

5.8

6.0

24.0

0.0 – 5.0 hrs.

5.1 – 10.0 hrs.

10.1 – 23.9 hrs.

24.0 + hrs.

Page 8: Metro Pre-Board Meeting May 14, 2015libraryarchives.metro.net/DB_Attachments/150514_I_210_Connected... · Area highlights Access to transit, limited construction, parallel arterials
Page 9: Metro Pre-Board Meeting May 14, 2015libraryarchives.metro.net/DB_Attachments/150514_I_210_Connected... · Area highlights Access to transit, limited construction, parallel arterials
Page 10: Metro Pre-Board Meeting May 14, 2015libraryarchives.metro.net/DB_Attachments/150514_I_210_Connected... · Area highlights Access to transit, limited construction, parallel arterials
Page 11: Metro Pre-Board Meeting May 14, 2015libraryarchives.metro.net/DB_Attachments/150514_I_210_Connected... · Area highlights Access to transit, limited construction, parallel arterials

ACCIDENT

AHEAD

ACCIDENT

AHEAD

ACCIDENT

AHEAD

ACCIDENT

AHEAD

ACCIDENT

AHEAD

ACCIDENT

AHEAD

ACCIDENT

AHEAD

ACCIDENT

AHEAD

ACCIDENT

AHEAD

ACCIDENT

AHEAD

ACCIDENT

AHEAD

ACCIDENT

AHEADFreeway CMS

DMS/Trailblazer

ACCIDENT

AHEAD

ACCIDENT

AHEAD

Adjust Upstream Ramp Meter Adjust Downstream Ramp Meter

Adjust Signal Timing Go 511

Page 12: Metro Pre-Board Meeting May 14, 2015libraryarchives.metro.net/DB_Attachments/150514_I_210_Connected... · Area highlights Access to transit, limited construction, parallel arterials

Improvements in travel time reliability and delay

Reduce incident response times

Likely reduction in secondary incidents, leading to improvements in safety

Enhanced coordination between agencies, traffic managers, transit managers, and first responders

Increased attractiveness of transit services

Improve traveler experience

New decision-making tools to improve corridor operations

Page 13: Metro Pre-Board Meeting May 14, 2015libraryarchives.metro.net/DB_Attachments/150514_I_210_Connected... · Area highlights Access to transit, limited construction, parallel arterials

Tremendous support by our Partners: ◦ Metro, Los Angeles County Dept. of Public Works, PATH

◦ Cities along project corridor

Pasadena

Arcadia

Duarte

Monrovia

Rail and Transit Operators

Metro Operations

Pasadena Transit

Foothill Transit

◦ CHP and other first responders

Page 14: Metro Pre-Board Meeting May 14, 2015libraryarchives.metro.net/DB_Attachments/150514_I_210_Connected... · Area highlights Access to transit, limited construction, parallel arterials

Transportation System Management ◦ Sustainability & Longevity

◦ Improve response for partners and users of the system

Caltrans Reorganization ◦ Paradigm Shift

◦ Mission of providing for a safe sustainable and integrated and efficient transportation system

Page 15: Metro Pre-Board Meeting May 14, 2015libraryarchives.metro.net/DB_Attachments/150514_I_210_Connected... · Area highlights Access to transit, limited construction, parallel arterials

Pilot Status ◦ Implementation by Spring of 2017

◦ Concept of Operations: completed as of end of April 2015

◦ Project Charter: Stakeholder Consensus completed (awaiting final execution)

15

Page 16: Metro Pre-Board Meeting May 14, 2015libraryarchives.metro.net/DB_Attachments/150514_I_210_Connected... · Area highlights Access to transit, limited construction, parallel arterials

Emphasize the importance of these initiatives to the region

Acknowledge stakeholder participation to date

Special thanks to Metro Highway Program for participation and support

Request an increase in Metro staff support as the pilot moves into the development of requirements and the design phase

Encourage Metro to investigate opportunities to identify funding to support the pilot


Recommended