Project OverviewPhase 1 of the Metro Exposition Transit Corridor project is an 8.6-mile extension of the 73 station Metro Rail System from the existing station at 7th St/Metro Center.
It will include ten new stations and upgrades to two existing stations. The alignment will be primarily at-grade, parallel to I-10, and will end in Culver City. The estimated travel time between Downtown LA and Culver City will be less than 30 minutes.
Phase 1 will share a track and two stations (7th St/Metro Center and Pico) with the existing Metro Blue Line through Downtown LA. It will then travel along the Exposition right-of-way to the Culver City Station near downtown. Phase 1 includes new stations at:
> 23rd Street
> Je=erson/USC
> Expo Park/USC
> Expo/Vermont
> Expo/Western
> Expo/Crenshaw
> Farmdale
> Expo/La Brea
> La Cienega/Je=erson
> Culver City
An Alternatives Analysis Study was completed for the “Mid-City/ Westside Transit Corridor” in February.
Un estudio de Análisis de Alternativas fue completado para el Corredor de Transporte de Mid-City/Westside en febrero.
A Draft Environmental Impact Statement/Environmental Impact Report (Draft EIS/EIR) was completed. As a result of this analysis, light rail was adopted as the preferred mode for the Exposition Corridor.
Un Borrador de la Declaración/Reporte de Impacto Ambiental (Borrador EIS/EIR) fue completado. Como resultado de este análisis, el tren ligero fue adoptado como el medio preferido para el Corredor de Exposition.
The Final Environmental Impact Statement/Report (Final EIS/EIR) was certified by the Metro Board in December.
La Declaración/Reporte Final de Impacto Ambiental (Final EIS/EIR) fue certificado por la Junta Directiva de Metro en diciembre.
A Record of Decision was issued by the Federal Transit Administration (FTA) in February.
Un registro de decisión fue emitido por la administración de tránsito federal (FTA) en febrero.
Información general del proyectoLa primera fase del Corredor de Transporte Exposition de Metro es una extensión de 8.6 millas del sistema de Metro Rail que actualmente tiene 73 estaciones. Esta extensión comenzará desde la estación existente 7th St/Metro Center.
Incluirá diez estaciones nuevas y actualizaciones a dos estaciones existentes. El alineamiento será principalmente a nivel de la calle, paralelo a la autopista 10 y terminará en Culver City. El tiempo estimado de viaje entre el centro de Los Angeles y Culver City será de menos de 30 minutos.
La primera fase compartirá las vías y dos estaciones (7th St/Metro Center y Pico) con la existente Metro Blue Line a través del centro de Los Angeles. Luego viajará a lo largo del derecho de paso de Exposition a la estación Culver City cerca del centro de la ciudad. La primera fase incluye estaciones nuevas en:
> 23rd Street
> Je=erson/USC
> Expo Park/USC
> Expo/Vermont
> Expo/Western
> Expo/Crenshaw
> Farmdale
> Expo/La Brea
> La Cienega/Je=erson
> Culver City
Project Milestones Acontecimientos principales del proyecto
2006 2011 2012Construction of Phase 1 began in the fall.
En el otoño empezó la construcción de la primera fase.
Service on Phase 1 is expected to begin in 2011.
Se espera que para el 2011 el servicio en la primera fase comenzará.
By 2012, completion of Phase 1 to Culver City is expected to be completed.
Se espera que para el 2012 la primera fase a Culver City sea completada.
Exposition Transit Corridor Phase 1 Corredor de Transporte Exposition, Fase 1
SEPULVEDA
METRO
SILV
ER
MET
RO S
ILVE
R LI
NE
METRO SILV E R LINE
LINE
SilverLakeRes.
Los Angeles R
iver
Kenneth Hahn StateRecreation
Area
Elysian Park
USC
West Los AngelesCollege
Los AngelesCity College
BaldwinHills
CrenshawPlaza
DodgerStadium
Exposition Park
WEST HOLLYWOOD HOLLYWOOD
CULVERCITY
BEVERLYHILLS
110
2
2
2
110101
101
10
405
10
5
10
110
RO
BER
TSO
N A
V
JEFF
ERSO
N
LA C
IEN
EGA
BL
LA C
IEN
EGA
FAIR
FAX
AV
LA B
REA
A
V
HIG
HLA
ND
AV
VIN
E S
TR
OSS
MO
RE
WIL
TON
PL
WIL
TON
WES
TER
N
NO
RM
AN
DIE
N
OR
MA
ND
IE
WES
TER
N
AR
LIN
GTO
N
VER
MO
NT
FIG
UER
OA
ST
HO
OVE
R
BR
OA
DW
AY
MA
IN
AVA
LON
CEN
TRA
L
CO
MP
TON
AV
LON
G B
EAC
H A
V
SAN
TA F
E
ALA
MED
A
WASHINGTON VE
RM
ON
T
FAIR
FAX
SUNSET BL
BEVERLY BL
BEVERLY BLWILSHIRE
WILSHIRE
3RD
OLYMPIC
VENICE BLPICO
NATIONAL
SAN VICENTE
3RD
MELROSE AV
HOLLYWOOD BL
FRANKLIN AV
HOLLYWOOD BL
SAN FERNANDO RD
SANTA MONICA BL
WASHINGTON BL
ADAMS
ADAMS
9TH
JEFFERSON
JEFFERSON
RODEO RD
CREN
SHAW
BL
CR
ENSH
AW
BL
HAU
SER
DO
HEN
Y D
R
MLK JR BLMARTIN LUTHER KING JR BL
EXPOSITION
VERNON AV
ANGELES VISTA
SLAUSON AV
VERNON AV
41ST
GRAN
D A
VBR
OADW
AY
SAN
PED
RO P
L
FLOW
ER S
T
FIGU
EROA
ST
ALVA
RADO
RAM
PART
SILVER
LAKE
BL
GLE
ND
ALE
BLV
D
SLAUSON AV
Expo/Western
Expo/Crenshaw
Expo/La Brea
Culver City
La Cienega/Jefferson Farmdale Jefferson/USC
23rd Street
7th St/Metro Center
Union Station
Pico
Expo/Vermont
Expo Park/USC
Expo Line & Station
Aerial Section
Undercrossing
Metro Rail/ Metro Liner Station
Metro Gold Line
Metro Red Line
Metro Purple Line
Metro Blue Line
Metro Silver Line
Metro Rapid Line
Metrolink & Amtrak
Parking
11-0152 ©2010 LACMTA
Subject to ChangeOCT 2010
Metro ExpoLine & Station
Metro Rail/ Metro Liner Station
Metro Gold Line
Metro Red Line
Metro Purple Line
Metro Blue Line
Metro Silver Line
Metro Rapid Line
Metrolink Station
Amtrak Station
FlyAway
Parking
Major Facility10-1852 ©2010 LACMTA
Subject to ChangeDEC 2009
11-0
831c
mc
©20
11 l
acm
ta
Contact InformationFor more information, please call the Exposition Construction Authority at 213.922.EXPO or visit metro.net/expo.
Para información adicionalPara más información, llame a Exposition Construction Authority al 213.922.3976 o visite metro.net/expo.