MIAMI Presented by: CH. SAI SWAROOP A. SUDHIR KUMAR A. RAGHU VIKAS S. NIKHILRAJ
Transcript

MIAMI

Presented by:CH. SAI SWAROOPA. SUDHIR KUMARA. RAGHU VIKAS S. NIKHILRAJ

MOSCOW & SHANGHAI METRO

Presented byCh. Sai Swaroop

Opened in 1935 with 11 km line and 13

stations

Fourth largest rapid transit system

First underground railway system in soviet union

Mostly Under ground

MOSCOW METRO

Consists 12 lines and 195 stations

7 million ridership on weekdays and 9 million on weekends

Min interval between trains 90 sec

Male and female voice announcements

MOSCOW METRO

Russian gauge

Third rail

825 V DC

16 depots

MOSCOW METRO

Funded by Russian government

Metrostroy company

Cut and cover method

SHANGHAI METRO

OPENED IN 1993

Longest operating route in world

3rd in world annual ridership

329 stations – 14 lines

SHANGHAI METRO

Standard gauge

Operating route 538 km

OHE – 1500V DC

Ridership: 6.86 million 9.38 million (record)

SHANGHAI METRO

• Distance based Fare

system

• Platforms with doors

• Owner: shanghai shentong metro group

• Coach manufactured by BOMBARDIER

MIAMI AND TORONTO METRO

Presented by,

A. Sudhir kumar

MAY 20, 1984 ( Pinecrest/Dadeland to Overtown)

OPERATORS BY MIAMI DADE TRANSIT(MDT)

ELEVATED SYSTEM

FEDERAL TRANSIT ADMINISTRATION (PPP) 

MIAMI METRO

MIAMI METRO

SYSTEM LENGTH : 24.4MILES

NUMBER OF STATIONS : 23

4 -6 CAR TRAINSETS

3 ½ -5 MINUTES.

STANDARD GAUGE

43 KMPH -50KMPH & 93 KMPH

113,000 PPD.

MIAMI METRO

ON MARCH 30, 1954 (WITH 12 STATIONS).

UNDER GROUND AND ELEVATED

OPERATED BY TORONTO TRANSIT COMMISSION

(TTC)

TORONTO METRO

.

TORONTO METRO

SYSTEM LENGTH: 68.3 KM

STATIONS AND LINES: 69 & 4

4-6 CAR TRAINS

1495 mm AND STANDARD GAUGE

2 MIN 21 SEC - 5MIN 30 SEC AND 6 MIN 45 SEC

1,084,600 PPD.

THIRD RAIL 600 V DC

65-70 kmph & 85 kmph

TORONTO METRO

DELHI AND CHENNAI METRO

Presented byNikhilraj.S

DELHI METRO

India’s second urban mass transit system

Total distance is 192.81 km with 141 stations

Daily ridership 2.4 million ppdpd

Construction started in 1998

The first section, on the RED LINE, opened in 2002

Followed by the YELLOW LINE in 2004, the BLUE

LINE in 2005, its branch line in 2009

GREEN and VIOLET LINES in 2010, and the DELHI

AIRPORT METRO EXPRESS in 2011

DELHI METRO

The GoI and the Government of Delhi jointly set

up the DMRC registered on 3 May 1995

Electrification Single phase 25 kV, 50 Hz AC

through overhead catenary

Began operation: 24 December 2002

First underground metro line in India was in yellow

line

DELHI METRO

Gauge distance 1,676 mm (5 ft 6 in) (Indian gauge

) 1,435 mm (4 ft 8 1⁄2 in) (Standard gauge)

Feeder buses are used to commute people from

different points to the major metro stations

Automatic fare collection system are used

DELHI METRO

CHENNAI METRO

Corridor – 1Washermen Pet – Chennai Central –Airport- 23.085km & 18 Stns (11U/G) Corridor – 2 Chennai Central – Anna Nagar – St.Thomas Mount - 21.961kms & 18Stns(9U/G) Capital costs workout at March 2007 price level as

described hereunder Corridor 1 Rs. 5,997 Crores Corridor 2 Rs. 5,106 Crores

CHENNAI METRO

Gauge distance 1,435 mm (4 ft 8 1⁄2 in) standard gauge

Electrification 25 kV, 50 Hz AC through overhead

catenary

It is built under PUBLIC PRIVATE PARTICIPATION

Administrations are done by CHENNAI METRO RAIL

LIMITED

CHENNAI METRO

Completed test runs and received

certifications from RDSO

It is expected to start running by November

Automatic fare collection system will be used

CHENNAI METRO

ALGERIA AND CAIRO METRO

Presented byRaghu vikas

• MRTS in Algeria – Metro , Tram and

Suburban Rail• Which Metro did Algeria choose –9.5 km

Underground Metro because of Irregular topography

• Funding and how did they construct the metro– Metro of Algiers Company (EMA) has given contract to French ’Systra-Sgte’ for project management, and Agéro-German ’GAAMA’ for construction worth 380 million.

• When did Metro Start and what are its phases—First line is from El Hamma - Haï El Badr section.

Algeria Metro

Metro Gauge: Standard Gauge (1435mm) Track Design: Third Rail Power Supply: 750 V DC power supply Signaling: Runs with CBTC

(Communication Based Train Control) Technology

Speed: 72 km/hr Headway: 110 seconds Passenger Capacity:-TRAMS: 150,000 -

185,000 per day METRO: 41,000 per hr, 300,000 per day

Technical Details

MRTS in Cairo – Metro and Light Rail Which Metro did Cairo choose – Mixed

Underground and Elevated How many KMS– Line 1 – 44.3km including

Underground -4.7Km , Line 2 – 21.6km including Underground –

13km, Line 3– 12km When did Metro Start and what are its

phases— Line 1 started in 1987, Line 2 in 1999 and 2004, Line 3 in 2011

Cairo Metro

Metro Gauge : Standard Gauge (1435mm) Track Design: Line 1 – OHE, Line 2,3 – Third Rail Speed: Line 1– 80km/hr Headway: Line 1 – 3.30 to 4 min , Line 2 – 2 to 3 min Passenger Capacity: Line 1 – 60,000

passengers per hour

Technical Details