______________________________________ PROGRAM OF REQUIREMENTS Office/Support spaces for 400 Staff Tempered Parking for up to 100 fleet vehicles DESIGN OBJECTIVES Support Mission of the MTPD Refreshed Presence and New Gateway to Campus High Performance Building Metro Transit Police Department Facility Update 1
Transcript
Page 1: Metro Transit Police Department Facility Update€¦ · DESIGN OBJECTIVES Support Mission of the MTPD Refreshed Presence and New Gateway to Campus High Performance Building Metro

______________________________________

PROGRAM OF REQUIREMENTS

Office/Support spaces for 400 Staff

Tempered Parking for up to 100 fleet vehicles

DESIGN OBJECTIVES

Support Mission of the MTPD

Refreshed Presence and New Gateway to Campus

High Performance Building

Metro Transit Police Department Facility Update

1

Page 2: Metro Transit Police Department Facility Update€¦ · DESIGN OBJECTIVES Support Mission of the MTPD Refreshed Presence and New Gateway to Campus High Performance Building Metro

Site

2

Page 3: Metro Transit Police Department Facility Update€¦ · DESIGN OBJECTIVES Support Mission of the MTPD Refreshed Presence and New Gateway to Campus High Performance Building Metro

Massing of Building

3

Page 4: Metro Transit Police Department Facility Update€¦ · DESIGN OBJECTIVES Support Mission of the MTPD Refreshed Presence and New Gateway to Campus High Performance Building Metro

Public Interface

4

Page 5: Metro Transit Police Department Facility Update€¦ · DESIGN OBJECTIVES Support Mission of the MTPD Refreshed Presence and New Gateway to Campus High Performance Building Metro

Three Schemes

5

Page 6: Metro Transit Police Department Facility Update€¦ · DESIGN OBJECTIVES Support Mission of the MTPD Refreshed Presence and New Gateway to Campus High Performance Building Metro

Hybrid Concept

6

Page 7: Metro Transit Police Department Facility Update€¦ · DESIGN OBJECTIVES Support Mission of the MTPD Refreshed Presence and New Gateway to Campus High Performance Building Metro

Entry Plaza

7

Page 8: Metro Transit Police Department Facility Update€¦ · DESIGN OBJECTIVES Support Mission of the MTPD Refreshed Presence and New Gateway to Campus High Performance Building Metro

MTPD – Project Schedule

8

2015 MTPD Award

Design Contract February

Heywood Campus Master plan and MTPD

update

FTH 2 Design RFP Issue

Month

Land Acquisition

Second Quarter

2016 MTPD Bid

Construction First Quarter

MTPD Construction Start Second

Quarter

2017 MTPD

Construction Completed November

2018 FTH 2

Construction Completed Summer

8


Recommended