2Los Angeles County One Gateway Plaza 2i3•9z2.2
Metropolitan Transportation Authority Los Angeles, CA 9ooi2-2952 metro.nez
MetroREVISED
PLANNING AND PROGRAMMING COMMITTEEJULY 16, 2014
SUBJECT: 2014 SHORT RANGE TRANSPORTATION PLAN
ACTION: ADOPTION OF 2014 SHORT RANGE TRANSPORTATION PLAN
RECOMMENDATION
Adopt the 2014 Short Range Transportation Plan for Los Angeles County with thechanges identified in Attachment A.
ISSUE
On October 2011, the Board passed a motion directing the Chief Executive Officer toprepare a Short Range Transportation Plan (the Plan) to lay out a realistic frameworkfor the transportation needs and challenges that Los Angeles County will face in theshort term period (Attachment B). A Draft Plan was completed in mid-March 2014 andcirculated for public comment from April 12 through June 18, 2014. Upon considerationof public comments, the Plan is submitted for Board action.
DISCUSSION
Metro is responsible for planning and programming in Los Angeles County and the Planimplements some of these responsibilities. The Plan is a ten-year action planidentifying project priorities and schedules with available resources for theFY2014-2024 time frame (Attachments C and D). Transportation projects in the Planwere approved through the Board-adopted 2009 Long Range Transportation Plan(LRTP) and require further Board approval as they progress through the projectdevelopment process, leading up to project implementation. The Plan addresses thechallenge of accommodating 750,000 more residents in the next 10 years with bettermobility options, demonstrates how we are keeping our existing system in a State ofGood Repair, outlines our Sustainability activities, contains strategies for how we areresponding to our financial challenges, and measures the benefits of the Plan.
Short Range Transportation Plan Content
After existing system needs are provided for, the Plan estimates total public investmentof $88.2 billion in local, state, and federal revenues for all aspects of the publicly-owned
transportation systems, from streets and freeways and from small transit to very largetransit systems, including their operations and maintenance, through 2024. Thisfinancial forecast supports the funding of multi-modal projects and programs, newoperating and maintenance needs, as well as the Countywide Call for Projects. ThePlan's financial forecast is intended to show our potential capital program fundingpartners, at state, federal and local levels, that we have financial and managementresources to meet our financial commitment to projects for which they may providefunds. While the Plan advocates for new funding strategies, it does not program anynew funds for any new projects not already included in the 2009 LRTP per federal airquality regulations, which stipulate that new projects be constrained to resources thatcan reasonably be expected to be available. Any new funding and new projects wouldbe addressed through Board approval of an amendment or update of the LRTP that issupported by legislative or voter approval as necessary.
The Plan also addresses the possibility of accelerating project delivery through variousfunding and financing mechanisms such as the proposed federal America Fast Forwardtax credit bonds and grants, facilitating private sector participation through Public-Private Partnerships (P3), and moving forward with a potential new sales tax measure.
' .WithoutCongressional authorization of the America Fast Forward tax credit bonds, theMeasure R amendment will not take effect, preventing any acceleration.
State of Good Repair
The Board motion specifically requested that the Plan address State of Good Repair(SGR). The Planning and Operations Departments coordinated extensively to updateour asset inventory and analyze the maintenance and rehabilitation needs for Metro'sbuilt rail network and countywide bus service. Through this effort we established SGRneeds that fall into three categories: safety, service delivery, and quality of service. ThePlan dedicates $4.8 billion for SGR over the next 10 years. The requirements forregular maintenance are annually included in Metro's operating and maintenancebudget. Metro needs to look beyond its annual needs, however, to ensure funds areset aside cover the costs of appropriately rehabilitating and replacing capital assets.
Sustainability and Other Plan Benefits
The Plan highlights Metro's role in Sustainability and how we are greening ouroperations and planning for sustainable communities. In a region once known for smogand the endless traffic that contributes to it, Metro is helping to lead a remarkable turn-around. Our agency is among the most environmentally progressive in the nation, andwe consider the environment in every aspect of our operations, construction and long-term regional planning.
2014 Short Range Transportation Plan Page 2
System performance is measured by assessing the benefits of the funded projects andprograms and how they will improve mobility and air quality on a countywide basis.Despite population growth, we hold the line on freeway and arterial speeds whilemoving more people more quickly through our system as we expand our transit system.The projects included in the Plan will reduce both five criteria pollutants as well asgreenhouse gas emissions. The Plan also provides improved access to transit and jobsfor low-income, transit-dependent and minority populations. It also measures the effecton the local economy by creating additional jobs and increasing economic output.
Draft Short Range Transportation Plan Highlights
The Plan is Metro's ten-year action plan identifying project priorities and schedules withavailable resources for the FY2014-2024 period. The following bullets highlight some ofthe Plan's key recommendations and findings:
• Creates almost 193,000 longer-term jobs from increased economic activity andgrows our County's economy by $33 billion
• Completes 6 major transit corridor projects that will expand Metro Rail by 32 miles oftrack, 110 stations and over 120 miles of service. Over 4,000 buses serveapproximately 1.6 million bus passengers daily in Los Angeles County
• Adds an additional 76 carpool lane-miles on the I-5, I-10, I-405 and the High DesertCorridor as well as funds interchange and highway operational improvements
• Dedicates $4.8 billion for State of Good Repair, which addresses safety, servicedelivery and quality of service
• Improves mobility by enhancing peak hour speeds and throughput
• Funds transportation capital improvements through the Biennial Countywide Call forProjects for regionally significant projects
• Invests in projects that enhance Sustainability and reduce greenhouse gasemissions as a majority of funds (87%) support transit, carpool lanes, ridesharingprograms, bikeway and pedestrian linkages
• Identifies possible future funding strategies in order to accelerate transit projecttimelines
Local Outreach
The Plan and its companion Technical Document were released for public review inmid-April, and an extensive local outreach process was initiated. Twenty-seven
2014 Short Range Transportation Plan Page 3
outreach meetings were held between April 12 and the close of public comments onJune 18, 2014. These meetings covered all the Subregions and Councils ofGovernments (COGs), seven community meetings across the County, Metro'sTechnical Advisory Committee and respective subcommittees, and other public andprivate stakeholder groups. A list of public outreach meetings is provided inAttachment ~E. Attachment ~F summarizes all comments and responses receivedduring the two-month public review period.
DETERMINATION OF SAFETY IMPACT
The Plan will not have any adverse safety impacts for our employees and patrons. ThePlan's dedicated State of Good Repair funding provides safety assets which are criticalto prevent accidents on our Metro Rail system that has been expanding since the BlueLine to Long Beach opened in 1991. There is a strong linkage between safety andmaintaining our system in State of Good Repair. As the individual parts of the system(the assets) age they can become prone to failure. By committing future SGR fundingin the years needed we can implement asset replacement projects on additional linessimilar to the current Blue Line Rehabilitation project. That project includesreplacement of rail, power, and train control assets. Managing our assets according tothis Plan will maintain our system in a SGR and help ensure that we offer safe,dependable and high quality service.
FINANCIAL IMPACT
The LRTP financial forecast has been updated for the Plan and incorporates Boardactions, capital program changes, updated revenue forecasts, and updated borrowingstrategies. The forecast includes approved capital project cost increases, increasedState of Good Repair costs, increased Federal Transit Administration Section 5337State of Good Repair revenues, minor updates to other revenues, and updatedborrowing assumptions and related debt service payments consistent with Board policyrestrictions on such borrowing. Major transit and highway project funding comparisonsshowing specific changes made since the last financial update in May 2013 wasprovided as a Board Box on April 16, 2014 and as an attachment to Item #51 of theregular Board Meeting of May 2014. All projects and services identified through thePlan will require further MTA Board approval at key milestones in the project andservice development processes leading up to their implementation.
ALTERNATIVES CONSIDERED
The Board can approve the staff recommended Plan, or choose a different combinationof projects and programs that the Board believes better meets future mobility needs ofLos Angeles County. For example, the Board could choose not to provide funding, orprovide a lesser amount to State of Good Repair. This would however, increase thelikelihood of operating and safety problems and is not recommended. The staffrecommendation is consistent with the Board-adopted 2009 LRTP and complies withthe SRTP Board motion.
2014 Short Range Transportation Plan Page 4
NEXT STEPS
Upon Board adoption of the Plan, a Final Plan will be prepared and will be available forpublic distribution in September. Individual projects will return to the Board for furtheraction at key milestones in the planning, environmental and project developmentprocess.
ATTACHMENTS
A. Summary of Proposed Revisions to the Draft SRTPB. Motion: Oct. 19, 2011 for Short Range Transportation PlanC. Public Transportation Recommended Plan (2014-2024)D. Highways Recommended Plan (2014-2024)
~. E. Summary of Public Outreach Meetings~. F. Public Comments and Responses (letters available upon request to BoardSecretary)
Prepared by: David Yale, Managing Executive Officer, 213-922-2469Brad McAllester, Executive Officer, 213-922-2814Heather Hills, Deputy Executive Office, 213-922-2821
2014 Short Range Transportation Plan Page 5
~~~~Martha Welborne, FAIAChief Planning Officer
C~ c\.
Arthur T. LeahyChief Executive Officer
2014 Short Range Transportation Plan Page 6
ATTACHMENT A
SUMMARY OF PROPOSED REVISIONS TO THE
DRAFT 201
4 SHORT RANGE TRANSPORTATION PLAN
NOTE: The Draft 201
4 SRTP was distributed for review and comment between Apr
il 12, 201
4 and Jun
e 18, 2014. Nearly 1,6
00copies wer
e distributed an
d comments wer
e re
ques
ted by
Jun
e 18, 2014. The following reflects al
l rev
isio
ns pro
pose
d for th
eFinal SRTP.
••
•
Glob
alReflect th
at the
201
4 Sh
ort Range Tr
ansp
orta
tion
Pla
n is no longer draft.
2Update Boa
rd Chair, First Vice Cha
ir and
Sec
ond Vice Cha
ir to reflect Ju
ly 1, 20
14 rotation.
5Add dis
cuss
ion on Nea
r-Te
rm Pri
orit
ies.
Honor the
near-term pri
orit
ies o
fthe
2009 LRTP. The Pla
n id
entifies tho
se pr
ojects and programs that
will
be implemented ov
er the
nex
t te
n ye
ars i
n ac
cord
ance
wit
h th
e project p
riorities and fun
ding
sche
dule
s of
the 2009 LRTP. W
hile the
Pla
n advocates for
newf
undi
ng st
rategies, i
t doe
s no
tpro
gram
any new fun
ds fo
r any new pr
ojects. Any new fun
ding
sources and their use
s would be
addressed
thro
ugh Board approval ofa
n amendment or update oft
he LRTP.
7Add lan
guag
e to add
ress
Board mot
ion on first Pri
orit
ies be
yond
LRTP Con
stra
ined
Tra
nsit
Projects.
But not
everything is
funded. The Metro Boa
rd is
see
king
additional fun
ding
for p
rojects be
yond
the
LRTP-fun
ded projects such as
the
Gold Li
ne Foo
thil
l Ext
ensi
on to Cl
arem
ont and numerous otherneeds
Coun
tywi
de.
8Include Regional Rail as
a component of t
he regional transportation sys
tem in the
firs
t paragraph.
8Add bullet ac
know
ledg
ing th
e sh
ift i
n Call fo
r Projects funding ove
r th
e la
st ten
years to promote a greater share
of ac
tive
tra
nspo
rtat
ion pr
ojec
ts.
9Show on pag
e 9,
Figure A, unf
unde
d strategic transit and hig
hway
projects.
9 & 13
Figu
res A and F maps wil
l be cor
rect
ed to reflect I -40
5 NB lane on NB sid
e of I -40
5.
9, 11 & 13
Figu
res A, C and F maps wil
l show ent
ire Lo
s An
gele
s County Uou
ndar
ies.
9, 11 & 13
Figures A, C and F maps wil
l add air
port
icons for the 4 Los
Ang
eles
County commercial airports.
10 & 11
figu
res Band C —add "Phase 2A" to the end of th
e name Metro Gold Line Fo
othi
ll LRT E~ension.
10
Figure B -add white line under Los Ang
eles/P
almd
ale Co
rrid
or (Enhanced Metrolink Service)
10
Figure B -remove "Incorporated" from Access Se
rvic
es
•-
• •
10
Figure B -remove foo
tnot
e 7 from pa
ge 10 and re-se
quen
ce foo
tnot
e chronology.
13Unbold pag
e number
18
Add dis
cuss
ion acknowledging th
e shift i
n Call fo
r Projects fun
ding
ove
r the last ten years to promote a gr
eate
rshare of ac
tive transportation pr
ojec
ts.
18-21
Add summary of ou
r wo
rk with SCAG on the Joint-Work Pl
an to he
lp SCAG in attaining th
eir gr
eenh
ouse
gas
reduction ta
rget
s.
18-21
Remove Figure H and add dis
cuss
ion of SCAG's methodology fo
r gr
eenh
ouse
gas reductions and gr
eenh
ouse
gas reduction target achievement.
18-21
Add lan
guag
e to
dis
cuss
Met
ro's
ridesharing and van
pool
ing pr
ogra
ms, mobility hubs and ot
her emerging
moUi
lity
opt
ions
.
21
Add dis
cuss
ion on Act
ive Transportation funding opp
ortu
niti
es.
21
Add dis
cuss
ion on Tra
nsit
Oriented Development Pl
anni
ng grants.
We are
als
o wo
rkin
g with local governments to
ado
ptlo
call
and use re
gula
tion
s supportive of
Tran
sit
Oriented Development (TOD). The TOD Pla
nnin
ggra
nts in
crea
se acc
ess to, and imp
rove
uti
liza
tion
of,
publ
ic transit while reducinggreenhousegas emi
ssio
ns and sup
port
ing su
stai
nabl
e de
velo
pmen
tpo
lici
es.
25
Clarify th
at the "Other Local" sl
ice of Fi
gure
K includes Propositions A and C.
25
Clarify th
at the "Local Return" sl
ice of Fi
gure K includes Propositions A and C, Me
asur
e R, and STP-
L.
26
Dele
te Figure M, "Possible Transit Project Ac
cele
rati
on".
27
Replace the last par
agra
ph on pag
e 27 in th
e section entitled "Me
tro is leading the
nat
ion in
to a new era
with
America Fa
st For
ward
" with a new par
agra
ph tha
t wi
ll dis
cuss
see
king
fiz
ndin
g fo
r Uoth pro
ject
acceleration and
unfunded pro
ject
s in the
ado
pted
200
9 Long Range Transportation Pl
an (LR
TP).
The par
agra
ph will re
ad as
foll
ows: "T
he new fu
nding souNCes listed abo
ve would help Metro serve a dua
l puNpose —
acce
lera
ting
proj
ects
curr
entl
y ex
pect
ed to be completed bet
ween
202
5 and 2040 and funding projects tha
t aN
e currently un
fund
edin
the
LRTP. Consistent with ado
pted
Metro Boa
rd po
licy
, Metro wi
ll con
tinu
e to ide
ntif
y, seek, and obtain
funding from all feas
ible
sources in or
der to
fund nee
ded tr
ansi
t and hig
hway
projects wi
thin
the
County. "
28-31
Remove reference to ac
cele
rate
d plan in performance metrics.
30
Revi
se Figure S to re
flec
t greenhouse gas re
duct
ions
in accordance with SCAG met
hodo
logy
.
G1oU
alRe
flec
t th
at the
201
4 Sh
ort Range Transportation Pl
an is no lon
ger dr
aft.
2Update Board Chair, Fi
rst Vi
ce Cha
ir and Second Vice Cha
ir to re
flec
t Ju
ly 1, 2
014 ro
tati
on.
6-1
1Add summary of ou
r work wit
h SCAG on the
Joint-Work Pla
n to
help SCAG in at
tain
ing their gr
eenh
ouse
gas reduction ta
rget
s.
6-1
1Add discussion of SCAG's met
hodo
logy
for greenhouse gas reductions and gre
enho
use gas reduction target
achievement.
7-8
Update Sustainability Pe
rfor
manc
e Me
tric
s to 202
4.
12
Add a paragraph to de
scri
Ue the
current fun
ding
situation unique to Los Ang
eles
as a re
sult
of l
ocal
funding, and the cha
ngin
g challenges and opportunities for federal, s
tate
, and oth
er funding.
16
Add discussion on Sur
face
Tra
nspo
rtat
ion Program -
Loca
l fu
nds.
Metro allocates a
por
tion
ofthe STP funds (designated as
STP-
L~ on a per ca
pita
basis to th
e County
ofLos An
gele
s and to th
e 88 jurisdictions i
n th
e County:
16
Add par
agra
ph describing the federal go
vern
ment
's Active Tr
ansp
orta
tion
Pro
gram
.
17
Add discussion of the th
reat
of a Fe
dera
l Highway Trust Fund shortfall for Los Angeles Cou
nty.
17
Add "Phase 2A" to
the end of the name Metro Gold Li
ne Foo
thil
l Ex
tens
ion un
der th
e Major Ex
pend
itur
eAssumptions discussion
18
Add "Ph
ase 2A" to
the end of the name Metro Gold Li
ne Foo
thil
l Ex
tens
ion un
der th
e Opening of Si
xTransit Co
rrid
ors discussion
20
Add "Phase 2A" to the end of the name Metro Gold Line Fo
othi
ll LRT Ext
ensi
on under the Rai
l Program
Assumptions and Light Rai
l Vehicles dis
cuss
ions
.
29
Change call out bo
xes for pr
ojec
ts included in
figure 4-5
to ensure the I (Interstate) i
s an "I" and not
a "1"
.
29
Corr
ect Fi
gure
4-5 to re
flec
t I-40
5 NB lane on NB side of I-40
5.
29 & 30
Figu
res 4-5
and 4-6
maps wil
l show ent
ire Lo
s An
gele
s County bou
ndar
ies.
29 & 30
Figures 4-5
and 4-6
maps wil
l ad
d ai
rpor
t ic
ons for th
e 4 Los
Ang
eles
County co
mmer
cial
air
port
s.
30
Figu
res 4-G
and 4-6
A ad
d "P
hase
2A" to
the
end of t
he name Met
ro Gold Line Foothill LRT Extension
40
Remove ref
eren
ce to ac
cele
rate
d pl
an.
ry~~il'.L~il_~1~~~~
rye~~L~J
Motion by Supervisor Mark Ridley-Thomas, Supervisor Don Knabe, SupervisorMichael Antonovich and Councilmember DuBois
Metro Planning and Programming CommitteeOctober 19, 2011
Metro Short Range Transportation Plan
The Metro Board (the Board) unanimously adopted the Long Range Transportation Plan
(LRTP) in October 2009 that provides regional rationality and equity with an appropriate
balance of projects and priorities. Over the past two years Metro has experienced
changes to its revenue projection from local sales taxes, the State budget and the
Federal budget. A Short Range Transportation Plan (SRTP) is warranted that lays out a
realistic framework for the next five years that prioritizes our needs and allocates
available resources.
A SRTP is a key element of Metro's planning process, identifying the short-term
transportation needs and challenges that Los Angeles County will face over the next
five years. It is imperative that Metro respond to changing circumstances, particularly at
the Federal level. The SRTP should be updated annually to ensure that we can
respond to changing conditions, whether it is funding shortfalls, emerging transportation
solutions, or other issues which cannot be anticipated.
The SRTP will provide the Board with a framework for decision-making by providing
financial context and potential impact from recommendations. The cost for priorities
should be defined and identified; the SRTP provides afive-year baseline for decision-
making. That ensures decisions will be made in a comprehensive manner and that short
term solutions can be fiscally sound and realistic.
WE THEREFORE MOVE, THAT:
1. Direct the CEO to report back to the Board, no later than 90 days, with a
Short Range Transportation Plan (SRTP) for Board consideration.
2014 Draft Short Range Transportation Plan Attachment B Pagel
2. The SRTP should examine the following, but not be limited to:
■ Status of Measure R and other major project initiatives.
■ State of good repair.
■ Review of industry practices and Federal Transit Administration best
practices on rehabilitation.
■ Revised five-year cash flow outlook.
■ Revised Federal assumptions.
■ Transportation Improvement Program (TIP) viability.
■ Status of New Starts assumptions and Federal assumptions.
■ Operations and Maintenance Funding Plan.
3. The CEO should return to the Board with any policy recommendations or
changes.
Attachment B Page 22014 Draft Short Range Transportation Plan
ATTACHMENT C
Here's our ten-year transit and highwayinvestment plan.
FIGURE B
TOTAL PROJECT COST $ IN MILLIONS OPEN YEARZESCALATED TO YEAR OF EXPENDITURE
BU$PS 3
Metro Bus $1,4113 2014-2024
Muni Bus "~5 $2,140.6 2014-2024
Transit Corridors'
Exposition LRT Phase II: Culver City to Santa Monica~R~ $1,511.2 2016
Metro Gold Line Foothill LRT Extension Phase ZA6.s~R~ $851.1 2016
East San Fernando Valley Transit Corridors ~R> $170.1 2018
Crenshaw/LAX Transit Corridor (LRT)'~~R~ $2,058.0 2019
Regional Connector~R~ $1,399.5 2021
Westside Purple Line Extension ~R~$2,485.7
Section 1 to La Cienega 2024
Regional Rail
Los Angeles/Palmdale Corridor (Enhanced Metrolink Service) $ 2019
High Speed Rail for Southern California Region 9 $225 ray
Metrolink-subsidy10~~R~ $1,T313 2014-2024
Other Miscellaneous Public Transportation Projects
Access Services Incorporated (paratransit)—Metro Subsidy $1,177.4 201A-2024
Safety Net (Immediate Needs) Program $114.7. 2014-2024
Metro State of Good Repair $4,769.6 2014-2024
Metro Rail System Improvements'•~R~ $257.5 201'4-2024
~ Listed by Open Year.z Fiscal Year Quly to June).
3 Capital costs only
° includes rehabilitation and capital costs.
5 Does not include Muni Operators Measure R potential acquisitions:
6 Measure R funds estimated to fund initial segment, including yard and vehicles~ ~:.... .,.:,..:.., c ..,..... r....a:.;,. ~;. ,.i,...~ ...... s:...a:..,...:.....
8 Funds included in Metrolink-subsidy line item.
9 Federal High Speed Rail funds assumed for Los Angeles County Region..
70 Includes rehabilitation and capital; does not include Metrolink fares and othernon-Metro funds:
~R> Projects included in Measure R.
Attachment C Page 1
ATTACHMENT C
SYLMAR t38 LANCASTER
?_
»sPALMDA~E
270 ~`s... _.._. _.. _... _ _.._ .. _. _.. ___ .138
'14 _-~ .. _._.
East San Fernando Valtey ~ ~~Y Nigh Speed Rail
Trens~t Corridor High Speed Rail '726
,-,..170_'~ SYLMAR5
WARNER ~o~ ~NORTH 134
PASADENA htetroGold~ineFoothiuExtension Phase 2A
CENTERHOLLYWOOD
405210
Westside Purple LineExtension to LaCienega EL MONTE "~~ "' `
".., to~-~
,y~._ +;
71~0SANTAMONICA rteyiona~
Connector
Exposition Phase 2 ~~ ~~~ 60 , ..to Santa Monica
605710 57
Crenshaw/LAXTransit Corridor 5
~
LAX. cos
NORWALK
170
LONG 97SAN BEACHPEDRO o a
~o
405
._..
LONGTwo HarborsBEACH
CATALINA ~ Hvaton SANPEDRO
FIGURE C
'9 ~I ~ ~"::. 9 A 9 9
Transit
SRTP Constrained Transit Projects (2014-2024)
Other
Existing Metro FixedGuideways/Transitways
Ferry
Metrolink
*~*µ~ High Speed Rail*
*enhanced Metrolink service
Attachment C Page 2
FIGURE D
ATTACHMENT D
TOTAL PROJECT COST $ IN MILLIONS OPEN YEARZESCALATED TO YEAR Of EXPENDITURE
Freeway Improvements and Gap Closures
1=5 Nor#h Capacity Enhancements: Phase 1 from SR-14 toPico Canyon' ~R~
SR-138 Widening (remaining 7segments)'~~R~
High Desert Corridor'
SR-138 Capacity Enhancements (additional segments)'~~R>
-710 Early Action Projeds',~a~Carpool Lanes
-405 NB Carpool Lanes: I-10 to US-101
-5 Carpool Lanes: SR-170 to SR-134
-5 Carpool Lanes: SR-118 to SR-170
-10 Carpool Lanes: Puente Av to Citrus Av
-10 Carpool Lanes: Citrus Av to SR-57
-5 Carpool &Mixed-Flow Lanes: I-605 to Orange County Line~R~
Freeway Interchanges
-5/Carmenita Rd Interchange Improvement~R~
-405, I-110, t-105 and SR-91 Ramp and Interchange Improvements in South Bay'•s,6,~R~
-605 Corridor "Hot Spot' Interchanges in Gateway Cities',6,~R~
Other Freeway Improvements
Countywide Soundwalls (Metro regional list and Monterey Park/SR-60) 3'6,7,(R)
Highway Operational Improvements in Arroyo Verdugo Subregion'•5,6,~R~
Highway Operational Improvements.in Las Virgenes/Malibu Subregion'~s,6,~R~
Freeway Rehabilitation
Caltrans-administered SHOPP
Highway Operations
Freeway Service Patrol
SAFE
Goods Movement
Alameda Corridor East (Metro Funds) Phase 16
Alameda Corridor East Grade Separations Phase 113.6,~R~
BNSF Grade Separations in Gateway Cities',b:~R~
1~` Grade SeparationRemaining three Grade Separations
~ Listed by Open Yeac
2 Fiscal Year duly to June).
The Plan assumes other local, State and federal funding, inducting opportunities to fund with fees,publio-private. partnerships or tolls. See Technical Document for more funding details.
4 Total project cost includes funding for all phases of project.
5 Subregions) COG project lists are periodically updated by the Subregional COGS and approved bythe Board.
6 Projects not mapped on Figure f.
~ Includes Measure R funding of $250 million.IRI Projects ~nduded m Measure R.
FIGURE E
$217.1
$3,004.0
$325.0
$720.0
$1,149.4
$608.4
$2293
$195.6
$234.9
$1,514.5
$379.8
$1,512.4
$3,050.8
$2,329.1
$259.6
$2533
$1,980.0
$288.0
$80
$541.8
$903.9
$270..
2017
2021
2022
2024
2014
2015
2015
2015
2015
2017
2015
2014+
2015-2024
2014-2024
2014+
2014+
2014-2024
2014-2024
2014-2024
2014
2018
2017+
MODAL CATEGORY CONSTRAINED PLAN
PER.. YEAR 207s~:202s}2
Regional Surface Transportation Improvements $29:2 $353.5
Goods Movement Improvements $26.2 $319.8:
Signal Synchronization &Bus Speed Fmprovements $339 $4039
Transportation Demand Management $6 $74.1
Bicycle Improvements $11.7 $134.6'
Pedestrian Improvements $11.7 $134.63
Transit Capital $15.7 $185.1
~ Unescalated dollars (in millions)Z Escalated dollars (in millions)3 Reduction ofthe Transportation Alternatives fund by federal legislation, Moving Ahead for Progress in the 21st Century Act (MAP-21),
technically reduces the total funding for these modes.
Attachment D Page 1
ATTACHMENT D
SYLMAR 738 LANCASTER
{= = ~ - } , t ~ ;~- High Desert Corridor
'ALE S~ ~3 aw, r
PALMDALE178
5
_... 270 _... _.... ..._.-
_... _... 138.._ _....{-5: Carpool Lanes 1-5 North Capacity Enhancements 14
(SR-118 to SR-1701 > Phase ! (SR-14 to Pico Canyon)
726 SR-138: Capacity
170 ` Enhancements
s I-5:Carpootlanes ` SYLMAR
fSR-134 to SR-170)'
WARNER ~~~CENTER
NORTH 134
PASADENA
HO~~YWOOD405
270
t-70: Carpool Lanesi-405: NB Carpool Lane ExpressLanes ' (Puente Av to Citrus Av)(7-10 to US-701) EL MONTE
__.__._.~ a ~o
~~ ~-10: Carpool Lanes ~~
SANTA ICitrusAvtoSR-57)
MONICA
ExpressLanes 60..
605
_ 5 1-5 Carpool and Mixed Ftow Lanes-~i-710 Earty (t-605 to Orange County Line1
LAX Action Projects
105 f-5: Carmenita Rd.Interchange Improvement S'
NO ALK
110
~O N8 ~ 9~SAN BEACHPEDRO v
... 405
{
..
Two Ha boys LONG
BEACHCATALINA ~gvaton SAN
PEDRO sa: ;.
piGUREP
• •~~
Highway
Existing Carpool Lanes
~- - Express Lanes
SRTP Constrained Highway Projects (2014-2024)
SRTP Constrained Freeway Interchanges (2014-2024)
Attachment D Page 2
SUBREGIONS/COGSApril 15, 2014, SamLas Virgenes/Malibu -COG6165 Spring Valley Rd.Hidden Hills, CA 91302
ATTACHMENT ~E
Summary of Public Outreach Meetings
April 30, 2014, 10amGoverning Board North County Transportation Coalition
Santa Clarita City Hall23920 Valencia BI.Santa Clarita, CA
April 16, 2014, 11:30amSouth Bay Cities - Infrastructure Working GroupBlue Water Grill655 N. Harbor Dr.Redondo Beach, CA 90277
April 17, 2014, 4:OOpmSan Gabriel Valley COG - Transportation CommitteeUpper San Gabriel Valley MWD602 E. Huntington Dr. Suite BMonrovia, CA 91016
April 21, 2014, 12pmSan Gabriel Valley COG - Public Works TACEmbassy Suites211 E. Huntington Dr.Arcadia, CA 91006
April 24, 2014, 12pmSan Gabriel Valley COG - Planning Directors TACMonrovia Community Center119 W. Palm Ave.Monrovia, CA 91016
April 28, 2014, 11amNorthern Corridor Cities300 North Buena VistaBurbank, CA 91505
COMMUNITY MEETINGS
April 23, 2014, 6pmSan Fernando ValleyMarvin Braude Constituent Service Center6262 Van Nuys BIVan Nuys, CA 91401
April 29, 2014, 6:30pCentral/Metro Los AngelesMetro Headquarters Board Room - 3`d fl.One Gateway PlazaLos Angeles, CA 90012
April 30, 2014, 6:30pmNorth Los Angeles CountyAmerican Heroes Park -Community Building642 W. Jackman St.Lancaster, CA 93534
May 1, 2014, 6:30pmWestside CitiesPlummer Park Community Center7377 Santa Monica BIWest Hollywood, CA 90046
May 7, 2014, 4pmGateway Cities COG - Transportation Committee16401 ParamountParamount, CA 90723
May 7, 2014, 6pmGateway Cities COG - Governing Board16401 ParamountParamount, CA 90723
May 15, 2014, 12pmWestside Cities COG - Governing BoardMunicipal Gallery, 2"d fl455 N. Rexford Dr.Beverly Hiiis, CA 90210
June 17, 2014, 4:OOpmSan Gabriel Valley COG - Transportation CommitteeUpper San Gabriel Valley MWD602 E. Huntington Dr. Suite BMonrovia, CA 91016
July 7, 2014, gamArroyo Verdugo COG - Governing Board1327 Foothill BI.La Canada Flintridge, CA 91011
May 6, 2014, 6:30pmSan Gabriel ValleyEI Monte Metro Bus Station - 3~a fl3449 Santa Anita Ave.EI Monte, CA 91731
May 7, 2014, 6:30pmGateway CitesSalt Lake Park -Recreation Center Lounge3401 E Florence Ave.Huntington Park, CA 90255
May 8, 2014; 6:30pmSouth Bay CitiesHawthorne Memorial Center3901 W EI Segundo BIHawthorne, CA 90250
2014 Draft Short Range Transportation Plan Attachment ~E Page 1
ATTACHMENT ~E
Summary of Public Outreach Meetings
April 2, 2014, 9:30am April 21, 2014, 10:30amMTA Technical Advisory Committee Los Angeles County Jobs and Labor SummitOne Gateway Plaza Sheraton Los Angeles Downtown HotelLos Angeles, CA 90012 711 S. Hope St.
Los Angeles, CA. 90017April 15, 2014, 9:30amBus Operators Subcommittee April 30, 2014, 2:OOpmOne Gateway Plaza Regional Service CouncilLos Angeles, CA 90012 One Gateway Plaza
Los Angeles, CA 90012April 17, 2014, 9:30amStreets and Freeways May 14, 2014, 10:OOamOne Gateway Plaza General Manager GroupLos Angeles, CA 90012 One Gateway Plaza
Los Angeles, CA 90012April 17, 2014, 1:30pmLocal Transit Systems Subcommittee June 18, 2014, 10:OOamOne Gateway Plaza TDM/Air Quality SubcommitteeLos Angeles, CA 90012 One Gateway Plaza
Los Angeles, CA 90012
2014 Draft Short Range Transportation Plan Attachment ~E Page 2
Attachment ~F
PUBLIC COMMENT INDEX
WRITTEN COMMENTS FROM ELECTED OFFICIALS ....
....
....
....
....
WRITTEN COMMENTS FROM CITIES ..
.............
..............................
WRITTEN COMMENTS FROM ORGANIZATIONS ..
........................
WRITTEN COMMENTS FROM MEMBERS OF THE PUBLIC ..
....
...
EMAIL COMMENTS FROM CITIES ..
....
....
....
....
................................
EMAIL COMMENTS FROM MEMBERS OF THE PUBLIC ..
....
....
....
COMMENT CARDS FROM CITIES ....
....
....
....
.....
..............................
COMMENT CARDS FROM ORGANIZATIONS ..
..............................
COMMENT CARDS FROM MEMBERS OF THE PUBLIC ..
.............
~F-1
~F-10
~F-12
~F-30
~F-3
1
~F-32
~F-3
5
~F-36
~F-3
7
ATTACHMENT ~F
RESPONSES TO COMMENTS RECEIVED ON THE
DRAFT 2014 SHORT RANGE TRANSPORTATION PLAN
NOTE: The Draft 2014 SRTP was distributed for
review and comment bet
ween
April 12, 2014 and June 18,
201
4. The following reflects
staf
f responses to
wri
tten
comments rec
eive
d on the
Draft SRTP thr
ough
let
ters
.
-.
..
- -. •
Chris Holden, Ca
lifo
rnia
Assemblymember
05/2
9/20
14Forty-First Di
stri
ct
The plan ignores the co
mple
tion
of th
e Gold Line Fo
othi
ll Ext
ensi
on to
Cons
iste
nt with Bo
ard
poli
cy, Metro continues to
exp
lore
add
itio
nal
Claremont. The Measure R Statute and Ord
inance specifies Cla
remo
nt fu
ndin
g so
urce
s th
at could be
util
ized
to fu
nd Phase 2B of the
Foot
hill
as an end
poin
t and the
Met
ro Board ide
ntif
ied
it, alo
ng with the
Extension. The map on page 9 of the Pl
an will be rev
ised
to re
flec
t th
eCrenshaw Line, as fi
rst i
n li
ne for
any new funding sou
rces
. Neither the
Gold Line Fo
othi
ll Phase 2B project to Claremont as wel
l as other
cost
, no
r th
e go
al, of the
Gold Line project to Cl
arem
ont is
inc
lude
d.
unfunded strategic projects.
As the
purpose of the SRTP is to
ide
ntif
y pr
ojec
ts and programs over
the ne
xt ten yea
rs (2014-2024) in
acc
orda
nce with the
2009 LRTP's
project priorities and fun
ding
plan, the SRTP does not propose new
fund
ing or to re
dist
ribu
te LRTP funds. The SRTP does ack
nowl
edge
the need for
add
itio
nal funds and potential fun
ding
strategies. A
paragraph
will
be added to page 5 of the Pl
an to cl
arif
y th
is int
enti
on.
~F-1
'.
Paul M. Eat
on, Mayor
06/0
2/20
14City of Mo
ntcl
air
Although the Cit
y of
Mon
tcla
ir is
not par
t of Los Angeles Cou
nty,
or
elig
ible
for
Measure R funds, the Gold Lin
e from Azusa to Claremont
and Mon
tcla
ir is im
port
ant to
us.
Update the
SRTP to in
clud
e the Azusa
to Cla
remo
nt segment in
pla
nnin
g, maps, project li
st, assumed new
funding sources, and fun
ding
assumptions.
Elizabeth Re
illy
, Mayor
06/03/2014
City
of Du
arte
Update the SRTP to in
clud
e co
mple
tion
of th
e Gold Lin
e to
Claremont
within the
70-year tim
e frame, in the "F
utur
e Projects" p
roje
ct li
st and
map, in
assumed new fun
ding
sources, and in fu
ndin
g assumptions.
•.
-• •
Cons
iste
nt with Bo
ard
poli
cy, Metro continues to exp
lore
add
itio
nal
funding sources th
at could be uti
lize
d to
fund Phase 2B of th
e Fo
othi
llExtension. The map on page 9 of th
e Pl
an will be rev
ised
to re
flec
t th
eGold Line Fo
othi
ll Phase 2B project to Claremont as wel
l as other
unfunded strategic pro
ject
s.
As the
purpose of the SRTP is to
ide
ntif
y pr
ojec
ts and programs over
the ne
xt ten
yea
rs (2014-2024) in
acc
orda
nce with the 2009 LRTP's
project priorities and fun
ding
plan, the SRTP does not
propose new
funding or to redistribute LRTP fun
ds. The SRTP does ack
nowl
edge
the need for
additional fu
nds and potential fun
ding
strategies. A
paragraph
will
be added to page 5 of the Pl
an to cl
arif
y th
is int
enti
on.
Cons
iste
nt with Bo
ard
poli
cy, Metro continues to
exp
lore
add
itio
nal
fund
ing sources th
at could be
util
ized
to fund Phase 2B of the Foothill
Extension. The map on page 9 of th
e Pl
an wil
l be rev
ised
to re
flec
t the
Gold Lin
e Fo
othi
ll Phase 2B project to Claremont as wel
l as other
unfunded strategic pro
ject
s.
As the purpose of the SRTP is to
ide
ntif
y pr
ojec
ts and programs over
the next ten
yea
rs (2014-2024) in
acc
orda
nce with the 2009 LRTP's
project priorities and
fun
ding
plan, the SRTP does not
propose new
fund
ing or to redistribute LRTP funds. The SRTP does ack
nowl
edge
the ne
ed for
additional funds and potential fun
ding
strategies. A
para
grap
h wi
ll be added to page 5 of the Pl
an to cl
arif
y th
is intention.
~F-2
'.
Don Kendrick, Mayor
06/03/2014
City of La Verne
Upda
te the SRTP to include co
mple
tion
of th
e Gold Line to
Cla
remo
ntwithin the 10-year tim
e fr
ame,
in the "Future Projects" pr
oject list and
map, in
assumed new funding sou
rces
, and in funding as
sump
tion
s.
Jose
ph M. Lyo
ns, Mayor
06/0
4/20
14City of Cl
arem
ont
Upda
te the SRTP to include co
mple
tion
of th
e Gold Line to
Cla
remo
ntwithin the
70-year tim
e fr
ame,
in the "Future Projects" pr
oject list and
map, in
assumed new funding sou
rces
, and in funding assumptions.
•.
-. •
Cons
iste
nt with Bo
ard
poli
cy, Metro continues to
exp
lore
add
itio
nal
fund
ing so
urce
s th
at could be
util
ized
to fu
nd Phase 2B of th
e Fo
othi
llExtension. The map on page 9 of th
e Pl
an wil
l be rev
ised
to re
flec
t the
Gold Lin
e Fo
othi
ll Phase 2B project to Cl
arem
ont as wel
l as oth
erunfunded strategic pro
ject
s.
As the
purpose of the SRTP is to
ide
ntif
y projects and
programs over
the ne
xt ten
yea
rs (2014-20
24) in acc
orda
nce with the
2009 LRTP's
project priorities and fun
ding
plan, the SRTP does not propose new
fund
ing or to re
dist
ribu
te LRTP funds. The SRTP does ack
nowl
edge
the ne
ed for
add
itio
nal funds an
d potential fu
ndin
g strategies. A
paragraph
will
be added to page 5 of th
e Pl
an to cl
arif
y th
is intention.
Cons
iste
nt with Bo
ard
poli
cy, Metro continues to
exp
lore
add
itio
nal
fund
ing so
urce
s th
at could be
util
ized
to fu
nd Phase 2B of th
e Fo
othi
llExtension. The map on page 9 of th
e Pl
an wil
l be rev
ised
to re
flec
t th
eGold Line Fo
othi
ll Phase 2B project to Cl
arem
ont as wel
l as other
unfunded strategic projects.
As the purpose of the SRTP is to
ide
ntif
y pr
ojec
ts and programs over
the next ten
yea
rs (2014-20
24) in acc
orda
nce with the
2009 LRTP's
project priorities and fun
ding
plan, the SRTP does not pro
pose
new
fund
ing or to redistribute LRTP funds. The SRTP does ack
nowl
edge
the need for
additional funds an
d potential fu
ndin
g strategies. A
para
grap
h wi
ll be added to page 5 of th
e Pl
an to cl
arif
y th
is int
enti
on.
~F-3
•.
Ed Her
nand
ez, California State Senator
06/06/2014
Twen
ty-Fourth Se
nate
Dis
tric
t
The cos
t and goa
l of extending the
Foo
thil
l Gold Line to
Cla
remo
nt is
not in
clud
ed in th
e Dr
aft SRTP, nor
is it
ide
ntif
ied in
assumed new
funding so
urce
s. Please include as a priority.
Bill Bog
aard
, Mayor
06/0
9/20
74City of Pasadena
Upda
te the SRTP to include co
mple
tion
of th
e Go
ld Line to
Cla
remo
ntwi
thin
the 10-year tim
e fr
ame,
in the "F
utur
e Projects" p
roject li
st and
map, in
assumed new funding sou
rces
, and in funding as
sump
tion
s.
•.
-. •
Cons
iste
nt with Board
poli
cy, Me
tro continues to
exp
lore
add
itio
nal
fund
ing so
urce
s th
at could be
util
ized
to fund Phase 2B of th
e Fo
othi
llExtension. The map on page 9 of the Pl
an wil
l be rev
ised
to re
flec
t th
eGold Lin
e Fo
othi
ll Phase 2B project to Claremont as wel
l as oth
erunfunded str
ateg
ic projects.
As the
purpose of the SRTP is to
ide
ntif
y pr
ojec
ts and programs over
the next ten
yea
rs (2014-2024) in acc
orda
nce with the
2009 LRTP's
project priorities and fun
ding
plan, the SRTP does not
propose new
fund
ing or to redistribute LRTP fun
ds. The SRTP does ack
nowl
edge
the need for
add
itio
nal funds and potential fun
ding
strategies. A
paragraph
will
be added to pa
ge 5 of th
e Pl
an to cl
arif
y th
is int
enti
on.
Cons
iste
nt with Bo
ard
poli
cy, Metro continues to
exp
lore
add
itio
nal
fund
ing so
urce
s th
at could be uti
lize
d to
fund Phase 2B of the Fo
othi
llExtension. The map on page 9 of th
e Pl
an wil
l be rev
ised
to re
flec
t th
eGold Lin
e Fo
othi
ll Phase 26 project to Claremont as wel
l as other
unfunded strategic pro
ject
s.
As the
purpose of th
e SRTP is to
ide
ntif
y pr
ojec
ts and
programs over
the ne
xt ten
yea
rs (2014-2024) in acc
orda
nce with the
2009 LRTP's
project priorities and fun
ding
plan, the SRTP does not
propose new
fund
ing or to redistribute LRTP funds. The SRTP does ack
nowl
edge
the need for add
itio
nal funds an
d potential fu
ndin
g strategies. A
para
grap
h wi
ll be added to page 5 of the Pl
an to cl
arif
y th
is int
enti
on.
~F-4
Joseph R. Ro
cha,
Mayor
City
of Az
usa
06/0
9/20
14
Upda
te the SRTP to include co
mple
tion
of the Gold Line to
Cla
remo
ntwi
thin
the 10-year tim
e frame, in the "Future Projects" p
roject li
st and
map, in
assumed new fun
ding
sou
rces
, and in fu
ndin
g assumptions.
Bob Huf
f, Cal
ifor
nia State Se
nato
rTwenty
-Ninth District
06/1
0/20
74
The pla
n ignores the completion of the Gold Line Fo
othi
ll Extension to
Clar
emon
t. The
Mea
sure
R Sta
tute
and Ord
inan
ce specifies Cla
remo
ntas an end
poin
t and the Metro Board identified
it, alo
ng wit
h the
Crenshaw Lin
e, as fi
rsf i
n li
ne for any new fun
ding
sou
rces
. Ne
ithe
r the
cost
, no
r the go
al, of th
e Gold Line project to Cla
remo
nt is
inc
lude
d.
L. Den
nis Michael, Mayor
City
of Rancho Cucamonga
06/7 0/20
7 4
Upda
te the SRTP to include co
mple
tion
of the Gold Line to
Claremont
with
in the 10-year tim
e frame, in the "Future Pr
ojec
ts" p
roject li
st and
map, in
assumed new fun
ding
sou
rces
, and in fu
ndin
g as
sump
tion
s.
Consistent wit
h Bo
ard
policy, Metro continues to exp
lore
additional
funding so
urce
s th
at cou
ld be
util
ized
to fu
nd Phase 2B of th
e Foothill
Exte
nsio
n. The map on pa
ge 9 of the Pl
an will be revised to reflect th
eGold Lin
e Fo
othi
ll Phase 2B project to Cl
arem
ont as
well as
other
unfu
nded
str
ateg
ic projects.
As the
purpose of the SRTP is to ide
ntif
y pr
ojec
ts and pro
gram
s ov
erthe ne
xt ten
years (2014-2024) in
accordance wi
th the
2009 LRT
P's
proj
ect pr
iori
ties
and funding plan, the SRTP doe
s no
t propose new
funding or
to re
dist
ribu
te LRTP funds. The SRTP doe
s ac
know
ledg
ethe need for additional funds and
potential funding st
rate
gies
. A
para
grap
h wi
ll be ad
ded to page 5 of th
e Pl
an to cl
arif
y th
is intention.
Consistent wit
h Bo
ard
policy, Metro co
ntin
ues to exp
lore
additional
funding so
urce
s th
at could be
util
ized
to fu
nd Phase 2B of th
e Foothill
Exte
nsio
n. The map on pa
ge 9 of th
e Pl
an wil
l be revised to reflect t
heGold Lin
e Foothill Phase 2B pro
ject
to Cl
arem
ont as well as other
unfu
nded
strategic projects.
As the
pur
pose
of the SRTP is to identify pr
ojec
ts and pro
gram
s ov
erthe ne
xt ten yea
rs (2014-2024) in
accordance wi
th the
2009 LRT
P's
proj
ect pr
iori
ties
and funding plan, the
SRTP doe
s no
t propose new
funding or to redistribute LRTP funds. The SRTP doe
s ac
know
ledg
eth
e need for additional fu
nds and
pote
ntia
l funding st
rate
gies
. A
para
grap
h wi
ll be ad
ded to page 5 of th
e Pl
an to cl
arif
y th
is int
enti
on.
Cons
iste
nt wit
h Bo
ard
policy, Metro continues to exp
lore
additional
funding so
urce
s th
at cou
ld be
util
ized
to fu
nd Phase 2B of th
e Foothill
Extension. The map on pa
ge 9 of th
e Pl
an wil
l be revised to reflect t
heGold Lin
e Foothill Phase 2B pro
ject
to Cl
arem
ont as well as other
unfunded strategic projects.
As the
purpose of the SRTP is to ide
ntif
y pr
ojec
ts and pro
gram
s ov
erth
e ne
xt ten years (2014-2024) in
accordance wi
th the
2009 LRT
P's
~F-5
'•
Mari
na Khubesrian, M.D
., Mayor
06/17/2014
City of So
uth Pasadena
Upda
te the SRTP to include co
mple
tion
of th
e Gold Line to
Cla
remo
ntwi
thin
the 10-year tim
e fr
ame,
in the
"Future Projects" pr
oject list and
map, in
assumed new funding sou
rces
, and in funding assumptions.
John Wuo, Mayor
06/17/2014
City of Ar
cadi
a
Upda
te the
SRTP to include co
mple
tion
of th
e Gold Line to
Cla
remo
ntwi
thin
the 70-year tim
e fr
ame,
in the "F
utur
e Projects" p
roject li
st and
map, in
assumed new fun
ding
sou
rces
, and in funding assumptions.
•.
-• •
project priorities and fun
ding
plan, the
SRTP does not
propose new
funding or to redistribute LRTP funds. The SRTP does ack
nowl
edge
the ne
ed for
add
itio
nal funds and potential fun
ding
strategies. A
paragraph
will
be added to page 5 of the Pl
an to cl
arif
y th
is int
enti
on.
Cons
iste
nt with Bo
ard
poli
cy, Metro continues to
exp
lore
add
itio
nal
fund
ing sources th
at could be
util
ized
to fund Phase 2B of th
e Foothill
Extension. The map on page 9 of th
e Pl
an wil
l be rev
ised
to re
flec
t th
eGold Lin
e Fo
othi
ll Phase 2B project to Claremont as wel
l as other
unfunded strategic projects.
As the purpose of the SRTP is to
ide
ntif
y pr
ojec
ts and programs over
the ne
xt ten
yea
rs (2014-2024) in acc
orda
nce with the 2009 LRTP's
project priorities and fun
ding
plan, the SRTP does not
propose new
fund
ing or to redistribute LRTP fun
ds. The SRTP does ack
nowl
edge
the ne
ed for
add
itio
nal funds and potential fun
ding
strategies. A
paragraph
will
be added to page 5 of the Pl
an to cl
arif
y th
is int
enti
on.
Cons
iste
nt with Bo
ard
poli
cy, Metro continues to
exp
lore
add
itio
nal
fund
ing sources th
at could be
util
ized
to fu
nd Phase 2B of th
e Fo
othi
llExtension. The map on page 9 of th
e Pl
an wil
l be rev
ised
to re
flec
t th
eGold Line Fo
othi
ll Phase 2B project to Claremont as wel
l as other
unfunded strategic projects.
As the
purpose of th
e SRTP is to
ide
ntif
y pr
ojec
ts and programs over
the ne
xt ten
yea
rs (2014-2024) in acc
orda
nce with the
2009 LRTP's
project priorities and fun
ding
plan, the SRTP does not
propose new
fund
ing or to re
dist
ribu
te LRTP funds. The SRTP does ack
nowl
edge
the ne
ed for
add
itio
nal funds and potential fun
ding
strategies. A
para
grap
h wi
ll be added to page 5 of the Pl
an to cl
arif
y th
is int
enti
on.
~F-6
Ed Chau, California Assemblymember
06/16/2014
Forty-Ni
nth District
The plan ignores th
e co
mple
tion
of th
e Gold Line Fo
othi
ll Ext
ensi
on to
Claremont. The Measure R Statute and Ord
inan
ce specifies Cla
remo
ntas an end
poin
t and the Metro Board ide
ntif
ied
it, alo
ng with the
Crenshaw Line, as fi
rst i
n li
ne for any new funding sou
rces
. Ne
ithe
r th
eco
st, no
r the go
al, of the Gold Line project to Cl
arem
ont is
inc
lude
d.
Tim Spohn, Mayor
City of In
dust
ry06/16/2074
Include the SR-57/SR-60 Mixed Flo
w In
terc
hang
e due to project
readiness, emi
nent
job creation, and rel
ief t
o th
e re
gion
, national goods
movement, and Congressional support.
Curt
is Mor
ris,
Mayor
City of San Dimas
06/1
6/20
7 4
The SRTP must be upd
ated
to include co
mple
tion
of the Fo
othi
ll Gol
dLine to Cl
arem
ont,
as summarized by the Foo
thil
l Go
ld Line
organization and its
member age
ncie
s.
Cons
iste
nt with Bo
ard
poli
cy, Metro continues to
exp
lore
add
itio
nal
fund
ing sources th
at could be uti
lize
d to
fun
d Phase 2B of th
e Fo
othi
llExtension. The map on page 9 of th
e Pl
an will be rev
ised
to re
flec
t th
eGold Lin
e Fo
othi
ll Phase 2B project to Claremont as wel
l as oth
erunfunded strategic pro
ject
s.
As the
pur
pose
of th
e SRTP is to
ide
ntif
y pr
ojec
ts and
programs over
the ne
xt ten yea
rs (2014-2024) in acc
orda
nce with the
2009 LRTP's
project priorities and fun
ding
plan, the SRTP does not
propose new
funding or to re
dist
ribu
te LRTP funds. The SRTP does ack
nowl
edge
the need for
add
itio
nal fu
nds and potential fun
ding
strategies. A
paragraph
will
be added to page 5 of th
e Pl
an to cl
arif
y th
is int
enti
on.
As the
pur
pose
of th
e SRTP is to
ide
ntif
y pr
ojec
ts and
programs over
the ne
xt ten
yea
rs (2014-2024) in acc
orda
nce with the
2009 LRTP's
project priorities and
fun
ding
plan, the SRTP does not
propose new
funding or to redistribute LRTP fun
ds. Since th
e LRTP ide
ntif
ies th
eSR-57/SR-60
Mix
ed Flow In
terc
hang
e Pr
ojec
t opening
in 202
9, it
is
outs
ide of
the
timeframe of the SRTP.
The SRTP does ack
nowl
edge
the
nee
d fo
r additional fun
ds and
pote
ntia
l fu
ndin
g strategies. A par
agra
ph wil
l be added to page 5 of th
ePl
an to cl
arif
y th
is int
enti
on.
Cons
iste
nt with Bo
ard
poli
cy, Metro continues to
explore add
itio
nal
fund
ing sources th
at could be
util
ized
to fu
nd Phase 2B of th
e Fo
othi
llExtension. The map on page 9 of the Pl
an wil
l be rev
ised
to re
flec
t th
eGold Lin
e Fo
othi
ll Phase 2B project to Claremont as wel
l as oth
erunfunded strategic projects.
As the
purpose of the SRTP is to
ide
ntif
y pr
ojec
ts and programs over
the next ten
yea
rs (2014-2024) in acc
orda
nce with the 2009 LRTP's
project priorities and
fun
ding
plan, the SRTP does not
propose new
fund
ing or to re
dist
ribu
te LRTP funds. The SRTP does ack
nowl
edge
~F-7
'.
Elliott Rothman, Mayor
06/7
7/20
74City of Pomona
The Pomona Cit
y Council un
anim
ousl
y vo
ted to
include com
plet
ion of
the Gold Lin
e to
Claremont wit
hin the SRTP, in
the
"Fu
ture
Pro
ject
s"pr
ojec
t list and map, in assumed new fun
ding
sources, and in fu
ndin
gassumptions.
Michael T.
Dav
itt,
Mayor
06/7
8/20
14Ci
ty of La Canada Fli
ntri
dge
The SRTP sho
uld include the Gold Lin
e Phase 28 to Cl
arem
ont fo
rpo
tent
ial funding.
•.
- -• •
the need for additional fu
nds and
potential funding strategies. A
para
grap
h will be ad
ded to page 5 of the Pl
an to clarify th
is int
enti
on.
Consistent wit
h Bo
ard
poli
cy, Metro continues to exp
lore
additional
funding so
urce
s th
at could be
util
ized
to fu
nd Phase 2B of the
Foothill
Exte
nsio
n. The map on page 9 of th
e Pl
an will be revised to reflect th
eGold Lin
e Foothill Phase 2B project to Cl
arem
ont as well as other
unfu
nded
str
ateg
ic projects.
As the
purpose of th
e SRTP is t
o identify pro
ject
s and pr
ogra
ms ove
rthe ne
xt ten
yea
rs (2014-2024) in
accordance wi
th the
2009 LRT
P's
proj
ect pr
iori
ties
and funding plan, the SRTP doe
s no
t propose new
funding or
to re
dist
ribu
te LRTP funds. The SRTP doe
s ac
know
ledg
eth
e ne
ed for additional fu
nds and
pote
ntia
l funding strategies. A
para
grap
h wi
ll be ad
ded to page 5 of th
e Pl
an to cl
arif
y th
is int
enti
on.
Cons
iste
nt wit
h Bo
ard
policy, Metro continues to exp
lore
additional
funding so
urce
s th
at could be
util
ized
to fu
nd Phase 2B of th
e Foothill
Extension. The map on pa
ge 9 of the Pl
an wil
l be revised to reflect th
eGold Lin
e Foothill Phase 2B project to Claremont as well as other
unfu
nded
str
ateg
ic projects.
As the
pur
pose
of the SRTP is to identify pr
ojec
ts and pro
gram
s ov
erthe ne
xt ten yea
rs (2014-20
24) in
accordance wi
th the
2009 LRT
P's
proj
ect pr
iori
ties
and funding plan, the
SRTP doe
s no
t propose new
funding or
to re
dist
ribu
te LRTP funds. The SRTP doe
s ac
know
ledg
eth
e ne
ed for additional fu
nds and
pote
ntia
l funding strategies. A
para
grap
h wi
ll be ad
ded to page 5 of th
e Pl
an to cl
arif
y th
is int
enti
on.
~F-8
'.
Mike Gatto, Ca
lifo
rnia
Assemblymember
06/1
8/20
14Forty-Third District
The Los Ang
eles
Cou
nty Metropolitan Transportation Au
thor
ity should
reconsider it
s Short Range Transportation Plan by including the
Foothill Gol
d Line Pro
ject
as pr
iority for fun
ding
and to renew its
comm
itme
nt to constructing the sec
ond segment of the Fo
othi
ll Gold
Line fro
m Az
usa to Cla
remo
nt.
Caro
l Liu, Cal
ifor
nia State Se
nato
r 06
/09/
2014
Twen
ty-Fifth District
The pl
an ignores the com
plet
ion of th
e Gold Line Foothill Ext
ensi
on to
Clar
emon
t. The Mea
sure
R Statute and Ord
inan
ce specifies Claremont
as an end
poin
t and the Metro Board ide
ntif
ied
it, alo
ng wit
h the
Crenshaw Lin
e, as fi
rst i
n li
ne for any new fun
ding
sources. Neither the
cost
, no
r the go
al, of th
e Gold Line project to
Cla
remo
nt is
inc
lude
d.
•.
. •
Cons
iste
nt with Bo
ard
poli
cy, Metro continues to
exp
lore
add
itio
nal
fund
ing sources th
at could be
util
ized
to fu
nd Phase 2B of the
Foot
hill
Extension. The map on page 9 of th
e Pl
an wil
l be rev
ised
to re
flec
t th
eGold Lin
e Fo
othi
ll Phase 2B project to Claremont as wel
l as other
unfunded strategic projects.
As the
purpose of the SRTP is to
ide
ntif
y pr
ojec
ts and
programs over
the next ten
yea
rs (2014-2024) in acc
orda
nce with the
2009 LRTP's
project priorities and fun
ding
plan, the SRTP does not
propose new
fund
ing or to re
dist
ribu
te LRTP funds. The SRTP does ack
nowl
edge
the ne
ed for
add
itio
nal funds and potential fun
ding
strategies. A
paragraph
will
be added to page 5 of th
e Pl
an to cl
arif
y th
is int
enti
on.
Cons
iste
nt with Bo
ard
poli
cy, Metro continues to
exp
lore
add
itio
nal
fund
ing so
urce
s th
at could be
util
ized
to fu
nd Phase 2B of th
e Fo
othi
llExtension. The map on page 9 of th
e Pl
an wil
l be rev
ised
to re
flec
t th
eGold Line Fo
othi
ll Phase 2B project to Claremont as wel
l as other
unfunded strategic projects.
As the
purpose of the SRTP is to
ide
ntif
y pr
ojec
ts and
programs over
the ne
xt ten
yea
rs (2014-2024) in acc
orda
nce with the
2009 LRTP's
project priorities and
fun
ding
plan, the
SRTP does not
propose new
fund
ing or to re
dist
ribu
te LRTP funds. The SRTP does ack
nowl
edge
the need for additional funds and potential fun
ding
strategies. A
para
grap
h wi
ll be added to page 5 of th
e Pl
an to clarify th
is int
enti
on.
~F-9
Claire Bowin, Senior City Planner
05/01/2074
Los Angeles Department of City Pl
anni
ng, Policy Planning Division
The Plan aligns very st
rong
ly with th
e City's long range vi
sion
for
transportation in the
city. We hope tha
t Me
tro considers the specific
poli
cies
in the Ci
ty's
Gen
eral
Pla
n when prioritiz
ing future
transportation improvements throughout the
cit
y.
Metr
o projects will p
rovi
de tremendous transportation, ec
onom
ic and
envi
ronm
enta
l benefits to the Ci
ty's
residents and to th
e region as a
whol
e.
Chri
s Je
ffer
s, City Manager
City of Glendora
06/0
3/20
14
Upda
te the SRTP to include co
mple
tion
of th
e Gold Line to
Cla
remo
ntwi
thin
the
10-year tim
e fr
ame,
in th
e "Future Projects" p
roject li
st and
map, in
assumed new funding sources, and in fu
ndin
g assumptions.
John Davidson, City Manager
06/0
4/20
74City of Irwindale
Upda
te the SRTP to include co
mple
tion
of th
e Gold Line to
Cla
remo
ntwi
thin
the
70-year tim
e fr
ame,
in th
e "F
utur
e Projects" p
roject li
st and
map, in
assumed new funding sou
rces
, and in fu
ndin
g as
sump
tion
s.
We are pleased that th
e SRTP ali
gns st
rong
ly with th
e Ci
ty's
vis
ion and
will
continue to
work co
oper
ativ
ely with the City on transportation
improvements.
Comment noted.
Cons
iste
nt with Bo
ard
poli
cy, Metro continues to
explore add
itio
nal
fund
ing so
urce
s th
at could be
util
ized
to fund Phase 2B of th
e Fo
othi
llExtension. The map on page 9 of th
e Pl
an wil
l be rev
ised
to re
flec
t th
eGold Lin
e Fo
othi
ll Phase 2B project to Claremont as wel
l as other
unfunded strategic projects.
As the
purpose of the SRTP is to
ide
ntif
y pr
ojec
ts and programs over
the next ten
yea
rs (2014-2024) in acc
orda
nce with the 2009 LRTP's
project priorities and
fun
ding
plan, the SRTP does not
propose new
fund
ing or to redistribute LRTP fun
ds. The SRTP does ack
nowl
edge
the need for
add
itio
nal funds and potential fun
ding
strategies. A
paragraph
will
be added to page 5 of th
e Pl
an to cl
arif
y th
is int
enti
on.
Cons
iste
nt with Bo
ard
poli
cy, Metro continues to
exp
lore
add
itio
nal
fund
ing so
urce
s th
at could be
util
ized
to fu
nd Phase 2B of th
e Fo
othi
llExtension. The map on page 9 of th
e Pl
an will be rev
ised
to re
flec
t th
eGold Lin
e Fo
othi
ll Phase 2B project to Claremont as wel
l as other
unfunded strategic projects.
As the purpose of the SRTP is to
ide
ntif
y pr
ojec
ts and programs over
~F-10
'•
Steve Si
zemo
re, Acting City Manager
06/0
4/20
14City of Monrovia
Upda
te the
SRTP to include co
mple
tion
of the Go
ld Line to Cla
remo
ntwi
thin
the 70-year tim
e fr
ame,
in th
e "F
utur
e Projects" p
roject li
st and
map, in
assumed new fun
ding
sou
rces
, and in funding as
sump
tion
s.
Tomas Car
ranz
a, Sen
ior Tr
ansp
orta
tion
Engineer
06/0
4/20
74City of Los Angeles Dep
artm
ent of Tra
nspo
rtat
ion
Ongoing col
labo
rati
on between the City and Metro is es
sent
ial.
The
allocation of future funding sho
uld be better aligned with Cit
y, Cou
nty
and State goa
ls and policies relative to Co
mple
te Streets. The goa
lsand improvements id
enti
fied
in Mobility Element of the Ge
nera
l Pl
anar
e consistent with Metro's po
lici
es and programs. The SRTP sho
uld
highlight th
e Integrated Mobility Hubs pro
gram
.
••
the ne
xt ten
yea
rs (2014-2024) in acc
orda
nce with the
2009 LRTP's
project priorities and fun
ding
plan, the SRTP does not
propose new
fund
ing or to redistribute LRTP funds. The SRTP does ack
nowl
edge
the need for
add
itio
nal fu
nds an
d po
tent
ial fu
ndin
g strategies. A
paragraph
will
be added to page 5 of th
e Pl
an to cl
arif
y th
is int
enti
on.
Cons
iste
nt with Bo
ard
poli
cy, Metro continues to
exp
lore
add
itio
nal
fund
ing sources th
at could be
util
ized
to fu
nd Phase 2B of th
e Fo
othi
llExtension. The map on page 9 of th
e Pl
an wil
l be rev
ised
to re
flec
t th
eGold Line Fo
othi
ll Phase 2B project to Claremont as wel
l as other
unfunded strategic projects.
As the
purpose of the SRTP is to
ide
ntif
y pr
ojec
ts and
programs over
the ne
xt ten yea
rs (2014-2024) in acc
orda
nce with the
2009 LRTP's
project priorities and fun
ding
plan, the SRTP does not propose new
fund
ing or to redistribute LRTP funds. The SRTP does ack
nowl
edge
the need for additional fu
nds an
d potential fu
ndin
g strategies. A
para
grap
h wi
ll be added to page 5 of th
e Pl
an to cl
arif
y th
is int
enti
on.
We concur with the imp
orta
nce of
collaboration between the City an
dMetro and not
e th
at col
labo
rati
on occ
urs on many programs and
proj
ects
. Wh
ile the SRTP does not
propose new fun
ding
or to
redi
stri
bute
LRTP fun
ds, we con
cur with supporting complete str
eets
.For instance, the Re
gion
al Surface Tra
nspo
rtat
ion Improvement (RSTI)
cate
gory
of the Call for
Pro
ject
s en
cour
ages
com
plet
e street projects.
In the
2013 Call fo
r Pr
ojec
ts process, 100 per
cent
of RSTI pro
ject
swere complete st
reet
s. The Sus
tain
abil
ity se
ctio
n of the SRTP wil
l al
sobe upd
ated
to re
flec
t mobility hub pro
gram
s.
~F-11
•
'.
Denny Zane, Executive Dir
ecto
r 05/18/2074
Move LA
Whil
e th
e plan is pr
inci
pall
y about tr
ansi
t and highway inv
estm
ents
,there
is little discussion about oth
er infrastructure
Inve
stme
nt opportunities such as bik
e an
d pe
dest
rian
imp
rove
ment
s,expansion of
tra
nsit
ser
vice
s, mobility im
prov
emen
ts on arterials,
enhancing and modernizing Metrolink, and eff
icie
ncy,
ser
vice
, an
dsafety upgrades to
the rail sy
stem
.
The SRTP should assume a bro
ader
mix
of fu
nds beyond tra
diti
onal
sour
ces
is "reasonably foreseeable" and should be con
side
red
"con
stra
ined
fun
ding
". Funds could be used for
an expanded
transportation program inc
ludi
ng bicycle and pedestrian in
vest
ment
s,cr
eati
ng a "gr
and boulevard ne
twor
k", en
hanc
ing Metrolink, and add
ing
stations to existing Metrorail ser
vice
.
Would lik
e to
see more information abo
ut per
form
ance
measures and
what is ne
cess
ary to
meet greenhouse gas goa
ls.
It would be
important to
note whether the SRTP puts us on cou
rse to
meet SCAG's
greenhouse gas goals.
••
~ • •.
~
The pur
pose
of th
e SRTP is to
provide a "sn
apsh
ot" of
pro
ject
s and
programs implemented ove
r the ne
xt ten
yea
rs (2014-2024) in
acco
rdan
ce with the 2009 LRTP's project priorities and fun
ding
plan.
The plan references many mul
ti-modal programs throughout the
docu
ment
. The Call fo
r Pr
ojec
ts program is di
scus
sed on pag
e 8 and
fund
s are identified on page 12.
The Call is
the
fun
ding
source fo
rbi
cycl
e, pedestrian an
d ar
teri
al projects. Me
trol
ink is
bri
efly
ref
eren
ced
on page 8 and fun
ding
is included in th
e fu
ndin
g ch
art on page 10.
Pages 14 -17 and
the
Technical Document reference Sta
te of Good
Repa
ir eff
orts
nec
essa
ry to maintain our
existing bu
s an
d rail sys
tem.
The plan al
so ack
nowl
edge
s th
e need for
additional funding. The
assessment of transportation needs that would re
quir
e ad
diti
onal
fund
ing
will
be con
side
red as part of
the LRTP update pr
oces
s.
The SRTP foc
uses
on ide
ntif
ying
how Met
ro is meeting
its commitment
to implement nea
r te
rm LRTP pro
ject
s, including tho
se pro
ject
s funded
with Measure R, an
d is
based on con
serv
ativ
e as
sump
tion
s ab
out
fund
ing from exp
ecte
d so
urce
s. Thi
s is
con
sist
ent with fed
eral
prog
ramm
ing requirements for
Transportation Im
prov
emen
t Programs,
whic
h use a res
tric
tive
definition of
"reasonably available" fu
ndin
g fo
rth
e short te
rm pro
gram
ming
per
iod.
As the SRTP not
es the
nee
d fo
rad
diti
onal
res
ourc
es, we hope tha
t th
e SRTP beg
ins th
e discussion of
unfunded needs and how additional fu
ndin
g could be sou
ght.
The SRTP incorporates performance measures whi
ch assess th
ePl
an's
system
benefit in
terms of mobility, air qu
alit
y, greenhouse
gases, access to
transit for
minority and transit dependent rid
ers,
and
economic ben
efit
. More inf
orma
tion
on the
se measures is included in
the Technical Document. A
ll 2009 LRTP pro
ject
s an
d programs were
incorporated int
o the 2012 RTP/SCS. SCAG has ack
nowl
edge
d th
at
~F-12
-.
•.
• ..
•
the LRTP, with th
e pa
ssag
e of
Measure R, was essential in me
etin
ggreenhouse gas red
ucti
on tar
gets
not
just for
Los
Ang
eles
County, but
for th
e entire SCAG reg
ion.
As the
SRTP is a sub
set of
the
LRTP, the
SRTP is essential to
meeting SCAG's RTP/SCS greenhouse gas
redu
ctio
n co
mmit
ment
s.
A ful
ler discussion of the context in
which Met
ro's
fun
ding
dec
isio
ns are
The Technical Document Financial Cha
pter
wil
l be updated to describe
made cou
ld help the Board and the
pub
lic be
tter
understand
the cu
rren
t fu
ndin
g situation unique to Lo
s Angeles as a result of
local
transportation choices and inv
estm
ents
moving ah
ead.
fund
ing,
and the
changing challenges and opportunities for
federal,
stat
e, and oth
er funding.
Habi
b L. Bal
ian,
Chief Executive Off
icer
05
/30/
2014
Metr
o Gold Line Fo
othi
ll Ext
ensi
onCo
nsis
tent
with Bo
ard
poli
cy, Metro continues to
exp
lore
add
itio
nal
The com
plet
ion of the
Foo
thil
l Gold Line project to its
sta
tute-defined
fund
ing so
urce
s th
at could be
util
ized
to fu
nd Phase 2B of th
e Fo
othi
ll
endp
oint
of Cl
arem
ont is
absent from the
SRTP. I
t is the on
ly Measure
Extension. The map on page 9 of th
e Pl
an will be rev
ised
to re
flec
t th
e
R transit
capital project with a funding gap not
inc
lude
d in
the plan for
Gold Line Fo
othi
ll Phase 2B project to Claremont as wel
l as other
completion.
unfunded strategic pro
ject
s.
The Construction Authority Board of Di
rect
ors requests the following
As the
purpose of th
e SRTP is to
ide
ntif
y pr
ojec
ts and
pro
gram
s over
chan
ges:
the next ten
yea
rs (2014-2024) in acc
orda
nce with the
2009 LRTP's
1. Include co
mple
tion
of Fo
othi
ll Gold Line to Cl
arem
ont in
the
10-
project priorities and
fun
ding
plan, the SRTP does not propose new
year
timeframe.
fund
ing or to re
dist
ribu
te LRTP fun
ds. The SRTP does acknowledge
2. Include the Azusa to Claremont segment with the "F
utur
eth
e ne
ed for
add
itio
nal funds and potential fun
ding
strategies. A
Projects-T
ransit and Hig
hway
s" pr
oject list and map.
paragraph
will
be added to page 5 of the Pl
an to cl
arif
y th
is int
enti
on.
3. Include th
e Azusa to Cl
arem
ont segment for
full fun
ding
the
port
ion of the SRTP tha
t assumes new fun
ding
sou
rces
.
4. Up
date
the
funding ass
umpt
ions
to reflect statue-defined
endp
oint
of Cl
arem
ont.
The cos
t estimate to complete the
Foothill Gold Line is $1.86
bill
ion,
with a com
plet
ion ye
ar of
2022.
5. Page 26 of th
e plan ref
erri
ng to new fun
ding, does not
include
Figure M, "P
ossible Transit Pr
ojec
t Acceleration" on page 26,
will
be
deleted to
avoid confusion.
~F-13
ment
ion of the second segment of th
e Fo
othi
ll Gol
d li
ne
Amanda Eak
en, De
puty
Dir
ecto
r 06
/10/
2074
Natural Resources De
fens
e Council
Bill Sadler, Con
sult
ant
Urba
n Solutions, Nat
ural
Res
ourc
es Defense Cou
ncil
Autumn Ber
nste
in, Director, ClimatePlan
Chanell Fletcher, Policy Coordinator, Cl
imat
ePla
nLa
ura Ba
ker,
Policy Associate, Coalition for
Clean Air
The SRTP sho
uld be ali
gned
with the 2072 RTP/SCS and Joi
nt-Work
Prog
ram.
More fun
ding
sho
uld be provided for ac
tive
transportation to
meet regional greenhouse gas targets.
The SRTP app
ears
to in
crea
se greenhouse gases by 15 per
cent
from
2074 to 2024.
This increase does not
ali
gn with th
e 9 per
cent
GHG
redu
ctio
n target of the 2072 RTP/SCS.
Metro has wor
ked very closely with SCAG in developing our
res
pect
ive
long range plans and
in the SCS development pro
cess
from
its
begi
nnin
g. A
ll pro
ject
s an
d programs included
in our
2009 Long Range
Tran
spor
tati
on Pla
n are included in SCAG's 2012 RTP/SCS. They
prov
ided
the
transportation framework up
on whi
ch the
SCS was
deve
lope
d, and the bas
is of SCS lan
d use analysis. Metro pr
ogra
msand projects were ins
trum
enta
l to
SCAG in attaining th
eir gr
eenh
ouse
gas red
ucti
on targets. SCAG has ack
nowl
edge
d the im
port
ance
of
Metro's LRPT/SRTP programs an
d pr
ojec
ts in achieving greenhouse
gas red
ucti
on targets for the
ent
ire region. Bo
th SCAG and Metro
ackn
owle
dge th
e need to seek additional fu
ndin
g for ac
tive
transportation. Wh
ile the SRTP is co
nstr
aine
d by
existing funding, the
SRTP also points toward th
e need for
additional funding.
A summary of ou
r work with SCAG on the
Joint-Work Pla
n wi
ll be
added to th
e Sustainability section of th
e Pl
an and
the
Sustainability
Chapter of
the
Technical Document to be
tter
ref
lect
the
se activities.
Metro defers to SCAG's methodology for
calculating greenhouse gases
for th
e region, as the
ir methodology was dev
elop
ed in ac
cord
ance
with
SB 375 and Cal
ifor
nia Air Re
sour
ces Bo
ard re
quir
emen
ts. SCAG's
2012 RTP/SCS greenhouse gas red
ucti
on analysis di
d, however,
inco
rpor
ate
all of
Met
ro's
2009 LRTP pro
ject
s an
d programs, including
all projects and
programs in
the
SRTP. The discussion on greenhouse
~F-14
'•
•
The SRTP does not
adequately invest in
act
ive tr
ansp
orta
tion
, shared
use mobility and oth
er alt
erna
tive
transportation options.
There is
very
litt
le men
tion
of ridesharing, bik
e sh
arin
g, car sha
ring
and
othe
r new and eme
rgin
g mobility opt
ions
.
••
• • •.
~
gas performance on page 30 of th
e SRTP and in the Technical
Document, whi
ch was based on a previous sketch planning
methodology an
d not SCAG's SB 375 met
hodo
logy
. Discussion of
greenhouse gas reductions
will
be co
rrec
ted
in the SRTP and
Technical Document to pr
oper
ly ref
lect
SCAG's met
hodo
logy
and
greenhouse gas reduction target achievement.
The purpose of the SRTP is to
ide
ntif
y pr
ojec
ts and
programs over the
next
ten
yea
rs (2014-2024) in acc
orda
nce with the
2009 LRTP's project
priorities and fun
ding
plan. The SRTP does not pro
pose
new funding
or to re
dist
ribu
te LRTP fun
ds. The SRTP does ack
nowl
edge
the need
for ad
diti
onal
fun
ds and pot
enti
al fun
ding
strategies. A par
agra
ph wil
lbe added to page 5 of the Pl
an to cl
arif
y th
is int
enti
on.
The SRTP's Act
ive Tr
ansp
orta
tion
Funding Str
ateg
y in
clud
es $500
mill
ion for bicycle an
d pedestrian linkages and oth
er active
transportation projects. The SRTP als
o id
enti
fies
an ad
diti
onal
$35
3.5
mill
ion fo
r th
e Re
gion
al Surface Tra
nspo
rtat
ion Improvement (RSTI)
Call cat
egor
y, whi
ch enc
oura
ges complete street projects. Future Cal
lswi
ll also en
cour
age
Firs
t/Last Mil
e strategies in
all ap
plic
able
cate
gori
es.
The new State and
regional Active Tra
nspo
rtat
ion programs pro
vide
afurther fu
ndin
g opportunity for Sa
fe Routes to
Schools and
other Act
ive
Tran
spor
tati
on projects. F
inal
ly,
it should be not
ed tha
t cities are
esti
mate
d to
receive over $10 bil
lion
in Local Re
turn
funds (P
ropo
siti
onC, Measure R, STP-L
funds) over the
next te
n ye
ars wh
ich ca
n be used
for local mobility nee
ds, including Active Tra
nspo
rtat
ion
priorities.
We wil
l update our
Sustainability Chapter (pages 18-19) to
fur
ther
disc
uss Metro's very suc
cess
ful ri
desh
arin
g and vanpooling programs,
as wel
l as the pot
enti
al for
oth
er eme
rgin
g mobility opt
ions
.
~F-15
Mark Hardyment, Director
06/71/14
Transportation &En
viro
nmen
tal Programs
Burb
ank Glendale Pasadena Airport Authority
Ther
e are a number of maps contained in th
e draft plan showing the
Metr
o multi-modal transportation sys
tem al
ong with major
transportation centers/h
ubs.
The final plan sh
ould
include Bob Hope
Airport al
ong with the
Cit
ies of Burbank and Glendale on all sys
tem
maps.
Metro is
pursuing a robust Regional Rail Program inc
ludi
ng a ran
ge of
commuter and int
erci
ty rai
l improvements. Key elements of the
Program sho
uld be inc
lude
d in
the narrative and sys
tem maps.
Bob Hope Air
port
, Metro, and other agencies are engaged in
development of a ground access plan and pro
gram
to pr
omot
eco
nnec
tivi
ty between the
air
port
and the reg
ional transportation
system. Re
ques
ts inc
ludi
ng or referencing program el
emen
ts inc
ludi
ngthe Regional Int
ermo
dal Tr
ansp
orta
tion
Center, Empire Pedestrian
Bridge, Physical Imp
rove
ment
s to
Exi
stin
g Station, and Hollywood Way
Metrolink Station.
Rona
ld Whi
ttem
ore,
Ass
ista
nt Executive Director
06/1
2/20
14In
dust
ry Manufacturers Cou
ncil
The Azusa to Cl
arem
ont ex
tens
ion is
env
iron
ment
ally
cleared and will
be ready for des
ign/build in
207 7.
The sys
tem maps are conceptual and ref
lect
the
reg
iona
l transit and
highway system. We will add Bob Hope Airport and
oth
er Los Ang
eles
Coun
ty com
merc
ial airports to ou
r system maps to re
flec
t th
eim
port
ance
of Bob Hope and
oth
er commercial airports as par
ts of th
ere
gion
al transportation sy
stem
. Se
vera
l locations on the map are als
oshown to id
enti
fy points of
geo
grap
hic or
ient
atio
n, mos
tly related to
the
orig
in and destination points of
the
fix
ed gui
dewa
y sy
stem
. Pasadena
is listed because of
the cur
rent
ter
mina
tion
of th
e Gold Lin
e.
We will include re
gion
al rail as one of th
e components of the re
gion
altransportation system
in par
agra
ph one on page 8. Regional rail lines
are included on system maps.
Metro ac
know
ledg
es our
clo
se wor
king
relationship with Bob Hope
Airport and oth
er age
ncie
s on air
port
gro
und ac
cess
/ co
nnec
tivi
typr
ojec
ts. The SRTP identifies on
ly tho
se pro
ject
s funded in th
e ne
arterm from 2009 LRTP.
Cons
iste
nt with Bo
ard
policy, Metro continues to exp
lore
add
itio
nal
funding so
urce
s th
at could be
util
ized
to fu
nd Phase 2B of the Foothill
Extension. The map on page 9 of th
e Pl
an wil
l be rev
ised
to re
flec
t th
eGold Lin
e Fo
othi
ll Phase 2B project to Claremont as wel
l as other
unfunded strategic projects.
Amend the SRTP to include the co
mple
tion
of th
e Azusa to Cl
arem
ont
I As the
purpose of the SRTP is to
ide
ntif
y pr
ojec
ts and
programs over
portion.
the ne
xt ten
yea
rs (2014-2024) in acc
orda
nce with the
2009 LRTP's
~F-16
•
'.
•
Dan Med
ina,
Chair
06/13/2014
South Bay Cities Council of Governments
City
of Gardena, Councilman
Notes that the pu
rpos
e of the
SRTP is to
identify short te
rm cha
llen
ges,
fund
ing,
and inv
estm
ents
. Encourages Met
ro not to add new projects
beyond the
LRTP fun
ding
pla
n. New projects sh
ould
come through the
Mobi
lity
Matrix planning pro
cess
.
Andre Col
aiac
e, Deputy Exe
cuti
ve Off
icer
06
/17/
2014
Access Ser
vice
s
Metro sh
ould
pre
pare
for
the
inc
reas
ed demand for
par
atra
nsit
services. The SRTP commits to fu
ndin
g of $1.78 billion over ten ye
ars,
but Access estimates cos
ts (based on HDR Engineering Inc.
estimates) of $1.97 bi
llion over the next ten ye
ars.
•.
~ • ..
•
project priorities and
fun
ding
plan, the SRTP does not
pro
pose
new
fund
ing or to redistribute LRTP fun
ds. The SRTP does ack
nowl
edge
'the
need fo
r ad
diti
onal
funds and potential fun
ding
strategies. A
paragraph
will
be added to page 5 of th
e Pl
an to cl
arif
y th
is int
enti
on.
The recommendations for the
final SRTP do not
pro
pose
new fun
ding
or add
itio
nal projects. Me
tro intends to
work with the
sub-regions
thro
ugh the Mo
bili
ty Mat
rix pr
oces
s.
American's with
Disa
bili
ties
Act
(ADA) se
rvice re
quir
emen
ts wil
l be a
national challenge as trans
it operators nationwide are compelled to
bala
nce th
e needs of th
e tr
ansi
t de
pend
ent with ADA service
requ
irem
ents
. Metro is
no exception to th
is national tr
end:
The
anti
cipa
ted ADA service shortfall is understood to ex
ist,
but the
combination of
service efficiencies and add
itio
nal fu
ndin
g resources
nece
ssar
y to
clo
se the
gap has not yet
been
iden
tifi
ed. The SRTP
actually ide
ntif
ies a tot
al of $1.27
bill
ion for Access Services, including
$655 mil
lion
in fe
dera
l an
d $615 mil
lion
in local funding (w
hich
als
oin
clud
es fares and oth
er fun
ds).
As Met
ro wor
ks with
its national and
regi
onal
par
tner
s to
add
ress
fut
ure ADA service nee
ds,
it will be
important to
rec
ogni
ze the need fo
r re
gion
al coo
rdin
atio
n in
both th
eid
enti
fica
tion
of service efficiencies and add
itio
nal fu
ndin
g re
sour
ces
through ongoing planning pro
cess
es.
~F-17
'•
Paul Sim
on, M.
D., M. P. H
06/18/2014
Dire
ctor
and Hea
lth Officer
Los Angeles Cou
nty De
part
ment
of Public Health
Incr
ease
the allocation fo
r ac
tive
transportation fu
ndin
g in
the SRTP.
The SRTP sho
uld include aten-
year
investment plan for act
ive
transportation projects ov
er and above the biennial Call for
Projects
and sho
uld include first and last mi
le improvements at tra
nsit
stations
••
• • •.
~
The purpose of the SRTP is to ide
ntif
y projects and pro
gram
s ov
er the
next
ten years (2014-20
24) in
accordance wi
th the 2009 LRT
P's pr
ojec
tpr
iori
ties
and funding pla
n. The SRTP doe
s no
t propose new fun
ding
or to re
dist
ribu
te LRTP funds. The SRTP doe
s ac
know
ledg
e th
e need
for additional funds and pot
enti
al funding strategies. A par
agra
ph will
be add
ed to page 5 of the Pl
an to cl
arif
y this int
enti
on.
The SRTP's Act
ive Tr
ansp
orta
tion
Funding Str
ateg
y in
clud
es $500
million for bi
cycl
e and
pede
stri
an lin
kage
s and other ac
tive
transportation projects. The SRTP also identifies an
additional $353.5
million for th
e Regional Surface Tra
nspo
rtat
ion Improvement (RS
TI)
Call cat
egor
y, which encourages complete str
eet projects. Fu
ture
Cal
lswi
ll also en
cour
age
Firs
t/Last Mil
e st
rate
gies
in
all applicable
cate
gori
es.
The new State and reg
iona
l Ac
tive
Tra
nspo
rtat
ion pr
ogra
ms provide a
furt
her funding op
port
unit
y for Sa
fe Routes to Sch
ools
and other Active
Tran
spor
tati
on projects. F
inally,
it sh
ould
be noted th
at cities ar
ees
tima
ted to rec
eive
ove
r $10 bil
lion
in Local Re
turn
fun
ds (P
ropo
siti
onC, Mea
sure
R, STP-L funds) ov
er the
nex
t te
n years wh
ich ca
n be used
for local mobility nee
ds, including Ac
tive
Tra
nspo
rtat
ion
priorities.
Clar
ific
atio
n of the
se Act
ive Tr
ansp
orta
tion
funding opportunities wil
l be
adde
d to the
Sustainability Se
ctio
n of the
SRTP.
The SRTP rec
ogni
zes th
at more funding is ne
eded
for many mul
ti-
modal transportation nee
ds, and
identifies str
ateg
ies th
at cou
ld be us
edto see
k ad
diti
onal
funding.
~F-18
'.
•
Rye Baerg and Jessica Meaney
06/17/2074
Safe
Rou
tes to
Sch
ool Na
tion
al Partnership
(add
itio
na15
7 organizations, age
ncie
s, bus
ines
ses,
and individuals
sign
ed the letter)
The SRTP does not pro
vide
a cle
ar Act
ive Tr
ansp
orta
tion
Fin
ance
Stra
tegy
to address the Fi
rst/
Last
Mile Plan, th
e up
comi
ng Com
plet
eStreets Po
licy
, the upcoming Cou
ntyw
ide Safe Rou
tes to
School Pl
anor the
upc
omin
g Co
unty
wide
Act
ive Tr
ansp
orta
tion
Pla
n.
•.
• • •.
•
The purpose of th
e SRTP is to
identify pr
ojec
ts and
programs over the
next
ten
yea
rs (2014-2024) in acc
orda
nce with the 2009 LRTP's project
priorities and
fun
ding
plan. The SRTP does not pro
pose
new fun
ding
or to redistribute LRTP fun
ds. The SRTP does ack
nowl
edge
the
need
for ad
diti
onal
fun
ds and
potential funding strategies. A paragraph wil
lbe added to page 5 of the Pl
an to cl
arif
y th
is int
enti
on.
The SRTP's Act
ive Tr
ansp
orta
tion
Funding Str
ateg
y in
clud
es $500
mill
ion for bicycle and pedestrian linkages and
oth
er act
ive
transportation projects. The SRTP als
o identifies an
addi
tion
al $35
3.5
mill
ion fo
r th
e Re
gion
al SurFace Tra
nspo
rtat
ion Improvement (RSTI)
Call cat
egor
y, whi
ch enc
oura
ges complete street pr
ojec
ts. Future Calls
will
also en
cour
age
Firs
t/Last Mile strategies in
all ap
plic
able
cate
gori
es.
The new State and regional Active Tra
nspo
rtat
ion programs pro
vide
afurther fu
ndin
g opportunity for Sa
fe Routes to
Schools and other Active
Tran
spor
tati
on projects. F
inally,
it should be not
ed tha
t cities are
esti
mate
d to
receive over $10 bil
lion
in Local Re
turn
fun
ds (P
ropo
siti
onC, Measure R, STP-L funds) over the
next ten years wh
ich can be used
for local mobility nee
ds, including Active Tra
nspo
rtat
ion
priorities.
Clar
ific
atio
n of
the
se Act
ive Tr
ansp
orta
tion
fun
ding
opportunities wil
l be
added to th
e Sustainability Section of the SRTP.
~F-19
The SRTP proposes to
spend onl
y $500 million of th
e $88.2 billion, or
The SRTP recognizes th
at more fun
ding
is ne
eded
for
many multi-
appr
oxim
atel
y .6 per
cent
. More fun
ds sho
uld be spent on act
ive
moda
l transportation nee
ds, and ide
ntif
ies strategies tha
t could be used
transportation giv
en 39 per
cent
of roadway fa
talities and tha
t 19
to seek add
itio
nal funding. But we question wh
ethe
r the statistics
perc
ent of tr
ips are made by the
se modes.
mentioned are meaningful in helping Metro de
term
ine appropriate
Acti
ve Tra
nspo
rtat
ion fu
ndin
g amounts for fut
ure ne
eds.
For example, the
2009 National Household Travel Sur
vey re
flec
ts 19%
of al
l da
ily trips in Los
Angeles Cou
nty are bicycle (
1 %) and walking
(18%), whereas dur
ing the commute per
iod 5% of commute trips are
bicycle (2 %) and wa
lkin
g (3%) in Los
Angeles Cou
nty.
Thi
s in
form
atio
nis
a very ge
nera
l description of existing us
e, not
fut
ure ne
eds.
It does
not
tell
us th
e ma
gnit
ude of
local and
rec
reat
iona
l uses tha
t are th
ere
spon
sibi
lity
of cities or the magnitude of
reg
iona
lly si
gnif
ican
t uses
that
are eli
gibl
e fo
r Metro funding. SCAG has par
tici
pate
d with
Calt
rans
in a 201
1 Ca
lifo
rnia
Household Travel Su
rvey
and pre
sent
edits results as part of
its 2016 RTP /SCS update pr
oces
s. We will work
with SCAG to see if
more inf
orma
tion
can
be gleaned from th
is new
surv
ey to determine local and reg
iona
l bi
ke and
walk characteristics
and how tha
t relates to
fut
ure re
gion
ally
sig
nifi
cant
nee
ds.
This comment does not
fully describe Metro's investment in act
ive
transportation in the SRTP. Page 20 of the SRTP notes tha
t $500
million, or .9% of th
e $56.7
bill
ion th
at Met
ro controls are allocated to
bicycle and pedestrian projects. Th
is is a con
serv
ativ
e es
tima
te, as it
does not include act
ive transportation components funded
in oth
ermo
dal categories of th
e Call (i
.e. RSTI complete st
reet
s, TDM, si
gnal
synchronization, and
tra
nsit
capital). We not
e th
at the ent
ire Call wil
lon
ly rec
eive
$1.6
bill
ion in
the SRTP, or 2.8% per
cent
of Metro
cont
roll
ed fun
ds. The Board, however, has made a dra
mati
c in
crea
sein Act
ive Tr
ansp
orta
tion
inv
estm
ents
in re
cent
yea
rs.
In fact, Metro's
Acti
ve Tra
nspo
rtat
ion in
vest
ment
thr
ough
the Call has in
crea
sed from
9.7% of th
e 1995 Call to
55.6% of the 2013 Cal
l. The Sus
tain
abil
ity
Chapter
will
be re
vise
d to more fully ref
lect
Metro's investment in
act
ive
transportation pro
ject
s an
d pr
ogra
ms.
Opportunities fo
r ad
diti
onal
fund
ing
will
be co
nsid
ered
thr
ough
the
LRTP update pr
oces
s.
~F-20
'.
•.
• ..
The SRTP pro
vide
s a poo
r nexus to Me
tro'
s Countywide Sustainability
Metro has wo
rked
very cl
osel
y with SCAG in developing our
res
pect
ive
Plan
ning
Policy and SCAG's 2012 RTP /SCS or la
nd use and
long range plans and in the SCS development pro
cess
from
its
transportation integration
begi
nnin
g. A
ll pro
ject
s an
d programs included
in Metro's 2009 Long
Range Tra
nspo
rtat
ion Pl
an are included
in SCAG's 2012 RTP/SCS.
The 2009 LRTP pro
vide
d the transportation framework upo
n wh
ich th
eSCS was dev
elop
ed, an
d th
e basis of
SCS lan
d use analysis. Metro
programs and
projects were ins
trum
enta
l to
SCAG in attaining their
greenhouse gas red
ucti
on targets. SCAG has ack
nowl
edge
d the
impo
rtan
ce of Me
tro'
s LRTP/SRTP programs and pro
ject
s in ach
ievi
nggreenhouse gas targets for the
ent
ire region.
The SRTP als
o supports Metro's Countywide Su
stai
nabi
lity
Planning
Poli
cy (CSPP) by providing th
e transportation framework for
sust
aina
bili
ty efforts. The CSPP ack
nowl
edge
s su
ppor
t fo
r SCAG's
effo
rts to
imp
leme
nt reg
iona
lly adopted transportation str
ateg
ies,
in
part
, th
roug
h "continued inv
estm
ents
to im
prov
e the transportation
system through 2035 as reflected in th
e plans of
the
Cou
nty
Tran
spor
tati
on Commissions"
. Given th
at 87 per
cent
of SRTP funding
promotes alternatives to
the sin
gle occupant aut
omob
ile,
the nex
usbetween the SRTP, Metro's CSPP, and the SCAG 2012 RTP is st
rong
.
The SRTP poorly incorporates the
preliminary per
form
ance
measures
As the
SRTP is a sub-
set of
the
2009 LRTP, the
SRTP incorporates th
edr
afte
d in
the
CSPP and Met
ro has yet to de
velo
p a cou
ntyw
ide sy
stem
system wide pe
rfor
manc
e measures of the 2009 LRTP. These
of performance measures through any for
mal pr
oces
s.performance measures assess th
e Plan's sys
tem
benefit in terms of
mobility, air qu
alit
y, greenhouse gases, access to
transit for
minority
and
tran
sit de
pend
ent ri
ders
, and eco
nomi
c be
nefi
t. D
iscussion of the
performance measures used
in the
SRTP can be found on pages 28-
31 and in the SRTP Technical Document. These measures have be
endeveloped over tim
e consistent with best pla
nnin
g practice. They are
also
consistent with the
performance measures used by
SCAG in the
2012 RTP/SCS. Our performance measures hav
e gone thr
ough
pub
lic
review and Board rev
iew
in the
dev
elop
ment
of the 2009 LRTP. They
are al
so part of
the public review process for
the
SRTP. Per
form
ance
~F-21
'.
•
The four step transportation model does not
accurately reflect the full
spectrum of transportation as it
does not
acc
ount
for act
ive
transportation trips.
Paul Li
ttle, President and CEO
06/7
8/20
14Pasadena Chamber of Commerce
The Board of Directors of the Pasadena Chamber of Commerce
strongly supports co
mple
tion
of th
e Gold Line Fo
othi
ll Ext
ensi
on to
Claremont. The Board is disappointed the
project is
not
inc
lude
d in the
Draf
t Short Range Tra
nspo
rtat
ion Pl
an (SRTP) as it
is currently written.
..
• • ..
•
measure use and practice continues to
evo
lve to
meet a variety of
need
s, including sustainability. Metro will continue to review and update
performance measures for
future plans, programs, and
projects as the
stat
e of
the
art
of performance measures continues to be dev
elop
ed.
Metro's four step transportation mod
el has been developed to
com
ply
with federal transportation mo
deli
ng req
uire
ment
s ne
cess
ary to
obt
ain
fede
ral funding ap
prov
al, in
clud
ing FTA New Sta
rts gr
ants
. Our tra
vel
demand mod
el has bee
n ex
tens
ivel
y re
view
ed by FTA and has
received high ma
rks as one of the na
tion
's leading mod
elin
g efforts. I
norder to
address act
ive tr
ansp
orta
tion
, th
e Bo
ard has di
rect
ed sta
ff to
deve
lop an Act
ive Transportation mod
elin
g component. Thi
s ef
fort
is
currently un
derw
ay. The fi
rst ph
ase of th
is effort, whi
ch is a sketch
planning tool, is now com
plet
e an
d is
being sha
red with cit
ies.
The
seco
nd pha
se of th
is effort wi
ll cre
ate an Act
ive Tr
ansp
orta
tion
component of th
e Metro tr
avel
demand mod
el and wil
l be complete
in20
15.
Cons
iste
nt with Bo
ard
poli
cy, Metro continues to
exp
lore
add
itio
nal
fund
ing so
urce
s th
at could be
util
ized
to fu
nd Phase 2B of th
e Fo
othi
llExtension. The map on page 9 of the Pl
an wil
l be rev
ised
to re
flec
t th
eGold Line Fo
othi
ll Phase 2B project to Claremont as wel
l as other
unfunded strategic pro
ject
s.
As the
purpose of the SRTP is to
ide
ntif
y projects and programs over
the ne
xt ten
yea
rs (2014-2024) in acc
orda
nce with the
2009 LRTP's
project priorities and fun
ding
plan, the
SRTP does not
propose new
fund
ing or to redistribute LRTP funds. The SRTP does ack
nowl
edge
the need for
add
itio
nal funds and potential funding strategies. A
paragraph
will
be added to page 5 of the Pl
an to cl
arif
y th
is int
enti
on.
~F-22
•
'•
Luis H. Marquez, Cha
irma
n 06/78/2014
ECO-RAPID Transit Authority
The SRTP sho
uld discuss th
e benefits of project ac
cele
rati
on.
Metr
o is
pursuing a robust Re
gion
al Rail Program inc
ludi
ng a ran
ge of
commuter and int
erci
ty ra
il imp
rove
ment
s. Key ele
ment
s of th
eProgram sho
uld be inc
lude
d in
the
nar
rati
ve and sys
tem maps.
Bob Hope Air
port
, Metro, and other agencies are engaged in
development of a ground access plan and pro
gram
to pr
omot
eco
nnec
tivi
ty between the
air
port
and the regional transportation
syst
em. Re
ques
ts inc
ludi
ng or referencing program el
emen
ts including
the Regional Int
ermo
dal Tr
ansp
orta
tion
Center, Empire Pe
dest
rian
Bridge, Physical Imp
rove
ment
s to
Exi
stin
g Station, and Hollywood Way
Metr
olin
k Station.
Cynthia J. Kurtz, Pr
esid
ent &CEO
06/18/2014
San Gabriel Val
ley Economic Partnership and 14 Other Member
Agencies
The San Gabriel Val
ley Economic Partnership and Chambers from
across the region are very con
cern
ed tha
t Me
tro
will not
keep its
prom
ise to
the vot
ers who app
rove
d Measure R to complete the Gol
dLine to Cl
arem
ont.
••
~ • •.
•
The new fun
ding
cha
pter
broadly dis
cuss
es the
ben
efit
s of
project
acce
lera
tion
if a
ddit
iona
l fu
ndin
g becomes available. The Plan,
however, wi
ll not dis
cuss
project acc
eler
atio
n fo
r specific pro
ject
s.
We wil
l in
clud
e Regional Rail as one of the components of th
e re
gion
altransportation system
in par
agra
ph one on page 8.
Regional rail li
nes
are included on system maps.
Metro ac
know
ledg
es our
close wor
king
relationship with Bob Hope
Airport and oth
er age
ncie
s on air
port
ground ac
cess
/ co
nnec
tivi
typrojects. The SRTP ide
ntif
ies on
ly tho
se pro
ject
s funded in th
e near
term from the 2009 LRTP.
Cons
iste
nt with Bo
ard
poli
cy, Metro continues to
exp
lore
add
itio
nal
fund
ing sources th
at could be
util
ized
to fu
nd Phase 2B of th
e Fo
othi
llExtension. The map on page 9 of th
e Pl
an will be rev
ised
to re
flec
t th
eGold Line Fo
othi
ll Phase 2B project to Claremont as wel
l as other
unfunded strategic pro
ject
s.
As the
pur
pose
of th
e SRTP is to
identify pr
ojec
ts and programs over
the next ten
yea
rs (2014-2024) in
acc
orda
nce with the
2009 LRTP's
project priorities and
fun
ding
plan, the SRTP does not
propose new
fund
ing or to redistribute LRTP funds. The SRTP does ack
nowl
edge
the ne
ed for additional funds and potential fun
ding
strategies. A
para
grap
h wi
ll be added to page 5 of the Pl
an to cl
arif
y th
is int
enti
on
~F-23
'.
•.
• ..
Tony Lima, Pre
side
nt
06/78/2074
Gateway Cit
ies Council of Governments
The Dra
ft SRTP and acc
ompa
nyin
g Technical Document are the
Comment noted.
roadmap for how transportation funds are al
loca
ted throughout the
coun
ty in the next ten yea
rs. The GCCOG has an int
eres
t in
the most
effe
ctiv
e and efficient dev
elop
ment
of the county's transportation
infr
astr
uctu
re.
Ther
e is
discontinuity bet
ween
the
SRTP Plan Document and the
dat
aThe SRTP highway project lis
t footnotes tho
se pro
ject
s th
at "assume
in the Technical Document. Highway pro
ject
s are li
sted
in th
e Pl
another local, Sta
te and
fed
eral
funding, in
clud
ing opportunities to
fun
dwith funding targets and opening yea
rs; however the
Technical
with fees, public-
private partnerships or to
lls.
" Th
is is consistent with
Document reveals tha
t th
e majority of f
unding for
hig
hway
ini
tiat
ives
is
the Technical Document, whi
ch provides greater detail. The fin
anci
alunfunded and unk
nown
. The phrases "In
vest
ment
Plan" and "large
fore
cast
ref
lect
s th
e best available estimate of
rev
enue
s and cos
ts and
scale ITS implementation" are vague.
is con
stra
ined
to th
e fi
nanc
ial resources reasonably exp
ecte
d to
be
avai
labl
e. The SRTP fin
anci
al for
ecas
t provides a fiscally sound
base
line
for
decision-making and
is a key strategic financial planning
element of
the 2009 LRTP.
The Sustainability se
ctio
n is
wel
l wr
itte
n and thought out, however, the
The SRTP does not propose an Ac
tive
Tra
nspo
rtat
ion network. Active
sugg
esti
on for
an expanded net
work
of alternative transportation
transportation pro
ject
s are funded primarily thr
ough
the Cal
l fo
rmodes is no
t clearly defined. I
s th
is network outside of th
e freeway
Proj
ects
process and
can
als
o be funded by
cities th
roug
h local return
and transit networks? Needs more exp
lana
tion
of th
is network and how
funds.
it is capable of re
duci
ng fue
l consumption and auto us
age.
The MTA is no
t th
e proper agency for set
ting
pub
lic he
alth
goals. MTA
Comment noted.
shou
ld dis
cuss
engaging with pub
lic he
alth
ent
itie
s to
enhance public
heal
th benefits from Metro transportation initiatives.
Will
the "traffic safety imp
rove
ment
s" be financed through Lo
cal Return
MTA does not
have a specific tr
affi
c sa
fety
imp
rove
ment
fun
ding
Funds or will MTA create a pro
gram
with fu
ndin
g fo
r th
is act
ivit
y?program. T
raffic saf
ety im
prov
emen
ts are typically funded by
the
owner/operator at the State, reg
iona
l and local level.
~F-24
'•
•
Is the "Urban Greening Program" se
para
te from Measure R and other
LRTP inf
rast
ruct
ure co
nstr
ucti
on? Wi
ll it
be incorporated in
MTA
programs or cr
eate
d, ope
rate
d and funded se
para
tely
?
Ther
e is
no men
tion
of "Smart" hi
ghwa
y possibilities su
ch as tru
ckpl
atoo
ning
, ad
apti
ve ramp metering, connected corridors, zero
emission trucks, smart park and rid
e, and tra
in travel ti
me sig
nage
.These technologies are readily available and can be demonstrated
within the SRTP tim
efra
me. Zero emission dr
ayag
e is
not
men
tion
ed,
yet has large, quantifiable improvements in GHG reduction, bu
t they
are no
t mentioned.
The Technical Document does not
detail th
e lo
ss of Measure R
revenue due to th
e recession.
The impending los
s of the
Fed
eral
Highway Trust Fund and hig
hway
funding sh
ould
be rec
ogni
zed as a threat to
the Cou
nty'
s mobility
program.
New urb
an rai
l does not
make manufacturing or ot
her employment
cent
ers more attractive to bus
ines
ses which re
ly on on-
time
del
iver
y of
mate
rial
s and shi
pmen
ts.
•.
~ • •.
Urba
n gr
eeni
ng is referenced in the Technical Document Sus
tain
abil
ity
Chapter as a principle of th
e Countywide Sus
tain
abil
ity Planning Policy.
It is no
t a specific funded program, but a principle guiding sus
tain
abil
ity
policy and planning throughout our
pro
gram
.
Whil
e we would con
cur with the potential benefit of various smart
highway st
rate
gies
, no funds are com
mitt
ed in the SRTP or LRTP for
smart highway purposes. The opportunities for
smart highway
strategies wil
l be con
side
red through th
e LRTP update pr
oces
s.
The SRTP does not
detail the loss of Measure R revenue due to th
eeconomic recession because we bel
ieve
such in
form
atio
n wo
uld be out
of dat
e and irrelevant. For
exa
mple
, th
e Technical Document
references the
mos
t cu
rren
t LRTP Fin
anci
al Forecast prepared in
supp
ort of
the
SRTP pro
cess
. The LRTP Fin
anci
al For
ecas
t, in
tur
n,re
lies
on the
most up -
to-d
ate UCLA And
erso
n School for
ecas
t of
Measure R rev
enue
s, whi
ch have included the
reductions ex
peri
ence
din
the
las
t ec
onom
ic rec
essi
on for
several yea
rs.
We agree. A discussion of
the
threat of
a Fed
eral
Highway Tru
st Fund
shor
tfal
l wi
ll be included
in the Technical Document Financial Chapter
in the
Fin
al Pla
n re
leas
ed in Fa
ll 201
4. We believe, however, tha
t th
ePl
an sho
uld be based on Metro's already con
serv
ativ
e as
sump
tion
s of
fede
ral funding. Using a dra
mati
call
y reduced forecast consistent with a
Fede
ral Highway Tru
st Fund sho
rtfa
ll exp
oses
us to
low
ered
expe
ctat
ions
tha
t we have found ca
n le
ad, in tur
n, to lo
wer re
venu
es.
Comment noted.
~F-25
'.
Do the add
itio
nal 88
, 400 Revenue Service Hours for bus ser
vice
repr
esen
t ad
diti
onal
service on exi
stin
g li
nes or new ser
vice
s su
ch as
addi
tion
al BRT cor
rido
rs?
Is the
add
itio
nal bus division mentioned in
the
Tech Doc in 2020 to
2023 a new bus div
isio
n beyond Division 13 cur
rent
ly und
erco
nstr
ucti
on?
The East San Fernando
Vall
ey Transit Cor
rido
r is
shown as opening in
2078 buf mode, pla
ceme
nt or funding is
not
iden
tifi
ed, th
is is
problematic.
The Plan assumes tha
t ar
ticu
late
d and extended length buses will be
phased out
. That any increase in
operating cos
ts from
this
action
will
be off
set by a reduction in acquisition and mai
nten
ance
costs.
This
requ
ires
more explanation as maintenance is a component of operating
costs. There has been a substantial investment in
inf
rast
ruct
ure to
accommodate the art
icul
ated
buses (i
. e.,
3-post hoists); what is
the
cost
of re
plac
ing th
ese fa
cili
ties
? Is
it assumed tha
t the Orange Line
will continue to
utilize articulated units or will it
be con
vert
ed to 40
'units?
..
• • ..
•
The SRTP forecast of
rev
enue
service hou
rs relates to th
e existing
Metro system.
The Pla
n identifies a new Bus Division
in the
2020 to 2023 timeframe.
It is no
t Division 13 currently und
er con
stru
ctio
n.
Metro is
currently in the ea
rly ph
ase of pre
pari
ng the
Dra
ftEn
viro
nmen
tal An
alys
is for the Eas
t San Fernando Valley Transit
Corr
idor
. During the transit corridor study planning process, specific
righ
t-of-way ali
gnme
nts an
d modes are considered. The Board has
taken no act
ion on selecting the
Locally Pre
ferr
ed Alt
erna
tive
.
Metro's high capacity buses in
clud
e both 60 fo
ot Articulated and 45 foot
Compo Bus
es. Metro currently has over 1,0
00 hig
h capacity buses in
its op
erat
iona
l fl
eet.
Metro wil
l continue to op
erat
e hi
gh capacity buses
for an extended pe
riod
of ti
me. The cur
rent
60 fo
ot art
icul
ated
buses
have between five an
d seven years' service lif
e re
main
ing and wil
l be
used throughout their planned service
life.
The art
icul
ated
buses ser
ving
the
Orange Line
will
be replaced with
high capacity buses at the end of th
eir service
life
in or
der to
maintain
and meet the
Orange Line op
erat
iona
l service re
quir
emen
ts. Metro
isevaluating improved technology (a
ll ele
ctri
c) art
icul
ated
buses as
Orange Lin
e re
plac
emen
t ve
hicl
es in th
e ne
ar fut
ure.
As Metro continues to de
velo
p and imp
leme
nt it
s Light and Heavy Rai
lsystems, some of th
e service currently op
erat
ed by hi
gh capacity buses
will
shift to co
mple
ment
ary
rail service and
the
tot
al number of hi
ghcapacity buses in Metro's fl
eet will adj
ust over tim
e. How
ever
, Metro
will
continue to
use hig
h ca
paci
ty buses to meet the
ser
vice
demands
of our
customers.
~F-26
'.
•.
• • ..
The Pla
n and Technical Document lac
ks descriptive ana
lysi
s or
The Call for Pr
ojec
ts is the primary source for fun
ding
goods movement
fore
cast
ing fo
r goods movement pla
nnin
g, act
ivit
ies or pro
ject
s.projects and thi
s is
identified in the
SRTP. A full discussion of Goods
Movement ana
lysi
s is
found in th
e 2009 LRTP and
wil
l be considered
ina fut
ure LRTP update.
The Plan and Technical Document lac
ks description of ac
tive
The fed
eral
Act
ive Tr
ansp
orta
tion
Pro
gram
is ad
mini
ster
ed by the
transportation programs or pro
ject
s or funding available thr
ough
the
California Tra
nspo
rtat
ion Co
mmis
sion
, with a por
tion
of fu
ndin
gfederal government's Act
ive Tr
ansp
orta
tion
Pro
gram
.administered by SCAG. C
lari
fica
tion
of th
ese Ac
tive
Transportation
fund
ing opportunities
will be added to th
e Su
stai
nabi
lity
Sec
tion
of the
SRTP.
Ther
e sh
ould
be an explanation in th
e Technical Document of th
eThe SRTP does not
pro
pose
a fun
ding
plan fo
r project acceleration, but
impa
cts of pr
oject ac
cele
rati
on. For exa
mple
, if the West San
ta Ana
only
hig
hlig
hts the op
port
unit
y to
accelerate pr
ojec
ts if
fun
ds are
Branch (Eco-Rapid Transit Line) or Met
ro Gol
d Line Eas
tsid
eavailable.
Extension Phase 11
are to be completed in 2025, j
ust outside the SRTP
time
fra
me, th
en there needs to be discussion on fun
ding
the
irplanning/design and con
stru
ctio
n wi
thin
the
SRTP period.
The Plan re
fers
to $35 bi
llio
n for "highways, roa
dway
s, sig
nal and
This
cat
egor
y fu
nds th
e major highway capital pr
ojec
ts identified in the
bicycle and pedestrian programs" wi
thou
t any specifics as to th
ePlan, th
e Ca
ll for
Pro
ject
s modes, and local return funds.
fina
ncia
l modal sp
lit or all
ocat
ion process ot
her th
an the Call fo
rPr
ojec
ts.
Barbara Messina, President
06/20/2014
San Gabriel Val
ley Council of Governments
We support the changes to the SRTP as li
sted
in th
e June 17t" letter
We ack
nowl
edge
tha
t the changes identified in CEO Art
Lea
hy's
let
ter
from Metro CEO Art Leahy to Metro Board of Di
rect
or John Fasana.
to Dir
ecto
r Jo
hn Fasana wil
l be incorporated in
to the SRTP.
~F-27
•
'.
•.
~ • • ..
~
Jerard Wright and Dar
rell
Clarke, Co-C
hairs
06/18/2014
Sier
ra Club Angeles Chapter Tr
ansp
orta
tion
Committee
Recommends Fir
st-M
ile/La
st Mile co
nnec
tion
with bicycle and
The Boa
rd adopted the
Fir
st/Last Mile Str
ateg
ic Pla
n at
the
Apr
il 2014
pedestrian fun
ding
as wel
l as enhanced bus service which better f
eeds
Bo
ard Meeting and als
o adopted a series of motions to further di
rect
Measure R investments.
staf
f regarding implementation of the Plan. We als
o no
te tha
t first/last
mile str
ateg
ies wi
ll als
o be enc
oura
ged
in a
ll mod
al categories of fu
ture
Call
for
Pro
ject
s pr
oces
ses.
Enhance customer ex
peri
ence
with TAP by increasing ca
rd sales,
There are about 22 million transactions pe
r month on TAP. TAP use
distribu
tion
and usa
ge, and mak
ing TAP car
ds and mul
ti-d
ay passes
on bus
com
pris
es about 64% of Metro's tr
ansa
ctio
ns. In
comparison
more acc
essi
ble by allowing ca
rds to be sol
d at supermarkets and
abou
t 28% of Metro's cu
stom
ers use cash (8%tr
ansf
ers and
drugstores
acco
mpan
ied
children). Of cou
rse on r
ail only TAP is accepted.
Metro
continues to
act
ivel
y im
plem
ent an
d improve th
e TAP program, through
stra
tegi
es including website imp
rove
ment
s, exp
andi
ng card sa
les
loca
tion
s, and use of sa
les by
mobile phones. There are currently over
400 locations in Lo
s An
gele
s Co
unty
tha
t se
ll TAP car
ds and far
eproducts.
In add
itio
nal th
ere are 80 ra
il and
Orange Lin
e stations tha
tse
ll TAP. Metro is pilot testing a mobile phone application and have
made many imp
rove
ment
s to
the
TAPTOGo.net web site. We are in
the pr
elim
inar
y st
ages
of re
sear
chin
g how to of
fer TAP car
ds and
products sim
ilar
to gift car
ds now sol
d at
dru
g, and
grocery
stor
es. Recently Metro welcomed Lon
g Beach Tra
nsit
as its new
est
TAP par
tner
. Th
is yea
r 16 municipal transit age
ncie
s wi
ll join TAP
including Sa
nta Mo
nica
and Pasadena.
Cons
ider
str
ateg
ic planning of mobility hubs at key exi
stin
g and future
The City of
Los Angeles has included
mobility hub
s in the
ir Mob
ilit
yMe
tro ra
il stops.
Elem
ent.
Given tha
t cities are responsible for dev
elop
ment
around
stat
ions
, Metro
will
coo
rdin
ate with cities where appropriate on
deve
lopm
ent around stations. C
urrently, Metro
is wor
king
with both the
City of Los Ang
eles
and
the City of Lon
g Beach with a needs
assessment for
var
ious
rail and bus
sta
tion
s to
det
ermi
ne the location
of fut
ure mobility hub
s. Thi
s work is funded th
roug
h th
e FTA Jobs
Access and Reverse Commute Pro
gram
(JARC) to facilitate j
obaccessibility fo
r lo
w income individuals. The project als
o functions to
prov
ide new Fir
st Mile/Last Mile tr
ansp
orta
tion
s op
tion
s at
designated
mobility hub
s.
Supp
orts
ana
lysi
s and future planning of en
hanc
ing and exp
andi
ng
As the SRTP is a sub
set of
pro
ject
s funded in th
e 2009 LRTP, studying
capacity alo
ng the Orange Lin
e. Find
it perplexing th
at Metro is
the ex
pans
ion of
the
Orange Line
is beyond th
e sc
ope of
the
SRTP.
anticipating red
ucin
g th
e need and demand for
the
60 foot ar
ticu
late
d Metro
is pro
posi
ng to continue to use ar
ticu
late
d buses on the
Orange
buses of th
is cor
rido
r.
Line
.
~F-29
'.
•.
•-
Lawrence Sob
el
04/26/2014
Private Citizen
Requ
ests
tha
t se
rvic
e fo
r Me
tro Bus Line #761 rem
ain un
chan
ged.
Comment wi
ll be forwarded to
Met
ro Tra
nsit
Service Planning
Staf
f.
Anne Chesterman
05/04/2014
Private Citizen
Fast
Trak
generates revenue and benefits th
ose th
at use FastTrak, but
Comment noted.
it does not
reduce
traffic. Removing trucks at rus
h ho
ur wou
ld reduce
traffic.
~F-30
•
'.
•.
•
Mike Behen, Tra
nspo
rtat
ion /GIS Manager
05/79/2014
Publ
ic Works, City of Palmdale
Plea
se include all
of th
e No
rth L.
A. Cou
nty Measure R projects in
the
All LRTP and Measure R pro
ject
s and programs to be opened by 2024
SRTP.
are included in th
e SRTP.
Why are
n't th
e AV Met
roli
nk Line Im
prov
emen
ts represented in th
e Al
l Bo
ard-approved Ant
elop
e Va
lley
Met
roli
nk pro
ject
s to
be opened by
Cons
trai
ned Plan?
2024 are included
in the
SRTP Con
stra
ined
Plan.
Clarify proposed funding strategies.
The pro
pose
d fu
ndin
g st
rate
gies
will accelerate existing pr
ojec
ts and
programs or fund additional projects and
pro
gram
s. These str
ateg
ies
may be further defined by
a fut
ure Me
tro Bo
ard action.
~F-31
'.
•.
.- .
~ •
John McCready
04/14/2014
Priv
ate Citizen
Millions are
inv
este
d in
lig
ht-rail, the
Plan does not
inc
lude
bus
The SRTP ide
ntif
ies al
most
$25.5 bil
lion
for
bus
capital and operations.
expa
nsio
n.
Dan Wentzel
04/1
7/20
14Pr
ivat
e Citizen
Metr
o sh
ould
plan to
build the lig
ht-rail subway to/through West
Comment noted.
Hollywood as men
tion
ed in the Westside Subway Extension final
report.
If the
Crenshaw/LAX is
extended north to Hollywood it
sho
uld be
Comment noted.
exte
nded
nor
th through West Hollywood via
Fairfax or La Cie
nega
and
not La Bre
a.
Morl
ey Hel
fand
04
/25/
2014
Private Citizen
Metr
o sh
ould
invest in
plastic-fab
rica
ted fencing al
ong pl
atfo
rms wh
ere
Comment noted. Th
is wil
l be for
ward
ed to the Op
erat
ions
Dep
artm
ent.
the trains stop fo
r loading and discharging of passengers.
Alexander Fr
iedm
an
05/0
1/20
14Private Citizen
Metr
o sh
ould
continue op
erat
ing 60 -
foot articulated bus
es. Replacing
Metro is
pro
posi
ng to pr
ovid
e more frequent service so the
reduction of
60-
foot
buses with 40- foo
ters
will r
esult in
immediate and severe
60 foot ar
ticu
late
d buses
will
not
result in over-cr
owdi
ng.
over
crow
ding
, and wil
l no
t save Metro money.
~F-32
'.
Tim Bu
resh
05/12/2014
Private Citizen
The Plan overstates the
financial resources available and understates
the expenses.
All of the available fun
ding
will go to im
plem
enti
ng the Los Angeles
City- centric rai
l program.
The vas
t majority of hi
ghwa
y improvements are pass-through programs
funded locally or by Cal
tran
s.
The Plan overstates the
benefits to
the loc
al are
a of it
s en
tire
tra
nsit
program and hid
es the
subsidies tha
t ar
e re
quir
ed to operate, mai
ntai
n,and build bus and rai
l sys
tems
.
Alex
ande
r Fr
iedm
an
05/19/2014
Priv
ate Citizen
The Plan sh
ould
con
side
r in
corp
orat
ing el
ectr
ic tro
lley
bus
es.
Rena Ga/v
ez
06/0
7/20
14Private Citizen
Plea
se continue th
e fu
ndin
g as promised fo
r th
e Go
ld Line from Azusa
to Montclair.
•.
.-
The fin
anci
al forecasts are based on Metro's technical analyses us
ing
its f
orecasting model.
The SRTP funds a multimodal countywide transportation program.
Comment noted.
The SRTP ide
ntif
ies more tha
n 45 sources of federal, state and local
reve
nue,
anticipated over th
e ne
xt ten yea
rs.
Comment noted.
Cons
iste
nt with Bo
ard
poli
cy, Metro continues to
exp
lore
add
itio
nal
fund
ing sources th
at could be
util
ized
to fund Phase 2B of th
e Fo
othi
llExtension. The map on page 9 of the Pl
an wil
l be rev
ised
to re
flec
t th
eGold Lin
e Fo
othi
ll Phase 2B project to Claremont as wel
l as other
unfunded strategic projects.
As the
purpose of the SRTP is to
ide
ntif
y pr
ojec
ts and
programs over
~F-33
~F-34
~F-35
•
'.
•
~
Jackson Lam
05/06/2074
Bike
San Gabriel Val
ley
San Gabriel Valley Community Mee
ting
More ded
icat
ed bicycle and ped
estr
ian funding is
needed. With 47% of
trips 2 miles or le
ss, we need to make it
eas
ier fo
r pe
ople
to choose
walk
ing and biking as their fi
rst c
hoic
e.
Andrew Yip
05/06/2014
Bike
San Gabriel Val
ley
San Gabriel Val
ley Community Mee
ting
More funds need to be allocated to bicycle and pedestrian
infr
astr
uctu
re. More eff
ort sh
ould
be made in making it
more eff
icie
ntfo
r pe
ople
to walk and bik
e to
tra
nsit
stations.
•.
• • •.
~
The Pla
n su
ppor
ts Bic
ycle
and Pedestrian im
prov
emen
ts as part of
amu
lti-mo
dal transportation sys
tem.
The SRTP's Act
ive Tr
ansp
orta
tion
Funding Str
ateg
y includes $500
mill
ion for bicycle and pedestrian li
nkag
es and
oth
er active
transportation projects. The SRTP als
o identifies an
addi
tion
al $35
3.5
mill
ion fo
r th
e Re
gion
al Surface Tra
nspo
rtat
ion Im
prov
emen
t (RSTI)
Call cat
egor
y, whi
ch enc
oura
ges co
mple
te street projects. Fu
ture
Calls
will
als
o en
cour
age
Firs
t/Last Mil
e st
rate
gies
in
all ap
plic
able
cate
gori
es.
The Pla
n supports Bic
ycle
and
Pedestrian im
prov
emen
ts as part of a
mult
i-mo
dal transportation system.
The SRTP's Act
ive Tr
ansp
orta
tion
Funding Str
ateg
y in
clud
es $500
mill
ion fo
r bicycle and pedestrian linkages and oth
er act
ive
transportation projects. The SRTP als
o id
enti
fies
an
additional $353.5
mill
ion fo
r th
e Re
gion
al Sur
Face
Tra
nspo
rtat
ion Improvement (RSTI)
Call cat
egor
y, whi
ch enc
oura
ges complete street pr
ojec
ts. Future Cal
lswi
ll als
o en
cour
age
Firs
t/Last Mil
e st
rate
gies
in
all ap
plic
able
cate
gori
es.
~F-36
'.
•.
.-
Nate
Zab
len
04/23/2074
Private Ci
tize
nSan Fernando
Vall
ey Community Mee
ting
There is
an urgent need for
improvement in
tra
nsit
mobility and
Comment noted. Th
is wil
l be for
ward
ed to the Op
erat
ions
Department.
accessibility in
the San Fernando
Vall
ey region. Fre
quen
cy sho
uld be
impr
oved
to bus lin
es on Woodman, Balboa and Tampa.
There needs to be better bus connectivity from the San Fernando
Valley to
Griffith Par
k, Gle
ndal
e, and Burbank.
Comment noted. This wil
l be forwarded to th
e Op
erat
ions
Dep
artm
ent.
Soni
a E. McIntosh
04/29/2014
Private Citizen
Cent
ral Los Ang
eles
Community Mee
ting
Want to see more bus ser
vice
improvements in
Alhambra and
Comment noted. Th
is wil
l be for
ward
ed to the Op
erat
ions
Department.
Pasadena, esp
ecia
lly after 10:00 p.
m. and on wee
kend
s.
Ther
e is
no end to the projects, fu
ndin
g, and construction bu
t Me
tro
Comment noted.
shou
ld be in the transportation business on
ly and also fu
nd gre
enin
gpl
ants
alo
ng all roadways.
Don't increase our
far
es or pass cha
rges
.Comment noted.
Andrew Wang
05/06/2074
Private Citizen
San Gabriel Val
ley Community Mee
ting
This
is a dream come true and I loo
k forward to
the
pro
ject
s.Comment noted.
~F-37