Date post: | 24-Dec-2015 |
Category: |
Documents |
Upload: | buddy-hamilton |
View: | 214 times |
Download: | 1 times |
MGTO 324
Workshop 4: Reliability
Activity 1
Use the data management concepts discussed in the last lesson to input all the data provided on the given sheets.
This is a General Self-efficacy scale (a Chinese Version) and the data are real.
SPSS: Assessing reliability
Split-half reliability
SPSS: Assessing reliability
Split-half reliability
SPSS: Assessing reliability
Split-half reliability
Reliability Statistics
.9082a
-.016b
2c
4.629.772.772
.769
ValueN of Items
Part 1
ValueN of Items
Part 2
Total N of Items
Cronbach's Alpha
Correlation Between FormsEqual LengthUnequal Length
Spearman-Brown Coefficient
Guttman Split-Half Coefficient
The items are: var00005, var00006.a. The value is negative due to a negative average covariance among items. This violatesreliability model assumptions. You may want to check item codings.
b.
The items are: var00007, var00008.c.
Activity 2
1. Calculate the Split-half reliability of your data
Correlation = ?
Spearman-Brown coefficient = ?
2. Interpret your findings
SPSS: Assessing reliability
Cronbach’s Alpha
SPSS: Assessing reliability
Cronbach’s Alpha
Reliability Statistics
.717 4
Cronbach'sAlpha N of Items
Activity 3
1. Calculate the Cronbach’s alpha of your data
2. Interpret your findings
SPSS: Item screening
Cronbach’s Alpha
Inter-Item Correlation Matrix
1.000 .884 .926 .002.884 1.000 .885 -.026.926 .885 1.000 -.008.002 -.026 -.008 1.000
var00005var00006var00007var00008
var00005 var00006 var00007 var00008
The covariance matrix is calculated and used in the analysis.
SPSS: Item screening
Cronbach’s Alpha
SPSS: Item screening
Cronbach’s Alpha
Item-Total Statistics
25.5273 4.551 .823 .52624.6890 3.697 .746 .49025.3840 3.544 .778 .46325.0957 6.358 -.012 .950
var00005var00006var00007var00008
Scale Mean ifItem Deleted
Scale Varianceif Item Deleted
CorrectedItem-TotalCorrelation
Cronbach'sAlpha if
Item Deleted
Activity 4
1. Run the screening item procedure
2. Any items you think we have to delete in order to increase the reliability of the test?
Assignment
1. Complete Activities 1 to 4. Please include the relevant SPSS outputs.
2. Submit the hardcopy to me with less than TWO A4 pages.