+ All Categories
Home > Documents > Michael Barrucco ASTE527 2 3 4 To the Sun 2. Dock with ISS during sunrise 3. Coast for 2-3 days...

Michael Barrucco ASTE527 2 3 4 To the Sun 2. Dock with ISS during sunrise 3. Coast for 2-3 days...

Date post: 14-Dec-2015
Category:
Upload: dominic-wood
View: 213 times
Download: 0 times
Share this document with a friend
Popular Tags:
16
Transcript

Michael Barrucco ASTE527 Michael Barrucco ASTE527

2

Michael Barrucco ASTE527 Michael Barrucco ASTE527

3

Michael Barrucco ASTE527 Michael Barrucco ASTE527

4

To the SunTo the Sun2. Dock with ISS during sunrise

3. Coast for 2-3 days until next TLI opportunity

1. Launch from Wallops (US), Baikonur launch (Russia), Jiuquan Satellite Launch Center (China)

5. Trajectory correction ~80 m/s

LOI~700 m/s

6. Coast for ~ 7 daysView Starfields, and Heritage Sites

4. TLI-3107 m/s

Michael Barrucco ASTE527 Michael Barrucco ASTE527

5

zz

• TEI Day 11• Moon re-aligned with ISS Orbital Plane

• TLI from ISS

• LOI Day 4• Moon aligned with ISS orbit plane

ISS Nodal Regression 5o

per day

7 day cruise in orbit• Moon at EOI

2

2nd Cycle

Cis-Lunar Cruise

Michael Barrucco ASTE527 Michael Barrucco ASTE527

6

Michael Barrucco ASTE527 Michael Barrucco ASTE527

7

Michael Barrucco ASTE527 Michael Barrucco ASTE527

8

Michael Barrucco ASTE527 Michael Barrucco ASTE527

9

Michael Barrucco ASTE527 Michael Barrucco ASTE527

10

Michael Barrucco ASTE527 Michael Barrucco ASTE527

11

Michael Barrucco ASTE527 Michael Barrucco ASTE527

12

Michael Barrucco ASTE527 Michael Barrucco ASTE527

13

Michael Barrucco ASTE527 Michael Barrucco ASTE527

14

Element of Orbit

Lunar Altitude 1000 KM

Inclination 90 Degrees

Time of Flight 5 Days

DeltaV TLI 3107 m/sec

DeltaV LOI 700 m/s

Michael Barrucco ASTE527 Michael Barrucco ASTE527

15

Michael Barrucco ASTE527 Michael Barrucco ASTE527

16


Recommended