Date post: | 07-May-2015 |
Category: |
Documents |
Upload: | smps-columbus |
View: | 851 times |
Download: | 0 times |
Combat Airmen - Supporting, Fighting, Winning!
88th Civil Engineer Directorate
“Base Civil Engineer Outlook”19 JAN 2011
Michael L. Howe, PEChief, Program Development88 ABW/CEPD(937) 257-1107
Combat Airmen - Supporting, Fighting, Winning!
Agenda
• Base Overview• Organization Structure• Construction Programs
– MILCON– BRAC– Operations and Maintenance (O&M)
• Design Awards
Combat Airmen - Supporting, Fighting, Winning!
• Land Area 8,145 Acres
• Buildings 16.1M SQ FT 595 Facilities
• Housing 100 Units1536 Privatized Units
• Paved Roads 120 Miles
• Airfield Pavements 530 Acres12,600 FT runway
• Utilities 1,200 miles of mains
• Work Force 27,000 Military/Civilian/Contractor
Base Overview - Statistics
Combat Airmen - Supporting, Fighting, Winning!
Air ForceResearch Laboratory
Air ForceInstitute of Technology
National Museum of the USAF
Air ForceMateriel Command
National Air & SpaceIntelligence Center
445th Airlift Wing
554th Electronic Systems Group
Wright-Patterson AFB Tenants
Aeronautical Systems Center
70+ Tenant Organizations
Air ForceSecurity Assistance
Center
Combat Airmen - Supporting, Fighting, Winning!
Colonel Amanda Gladney
Organization Structure88th Air Base Wing
WingStaff
Civil Eng Directorate
Mission Support Group
88th Air Base Wing
Ops Support Squadron
Medical Group
Comptroller Squadron
Comm Group
Combat Airmen - Supporting, Fighting, Winning!
Mr. David Perkins
88th Civil Engineer Directorate
Asset Mgt Division
Emergency Mgt Division
Organization Structure88th Civil Engineer Directorate
Explosive Ordnance Division
Fire Emergency Services Division
Operations Division
Programs Division
Resources Division
Combat Airmen - Supporting, Fighting, Winning!
Construction Programs
• Military Construction (MILCON) Program– Congressional Line Item Appropriation– Primarily New Construction– Corps of Engineers Managed
• Operations & Maintenance (O&M) Program– Non-Project Specific Appropriation– Primarily Maintenance, Repair & Renovation– Air Force Managed
Combat Airmen - Supporting, Fighting, Winning!
MILCON - Execution Trends
• Declining MILCON Program– BRAC Obligations FY07-09
• Congressional Inserts• Design-Build ‘Partnerships’
Add/Alter Signature Technology Laboratory (AFRL)
Marine Corps Reserve Center (USMC)
Combat Airmen - Supporting, Fighting, Winning!
Current MILCON
FY10 MILCON Projects
Project PA (~$M)Conversion for Advanced Power Research Lab 21.0Information Technology Complex, Phase 1 27.0West Ramp, Phase 2 (Congressional Insert) 10.6
FY 11 MILCON Projects
No Current Mission Projects being considered
Combat Airmen - Supporting, Fighting, Winning!
FY10 WPAFB MILCON Program
Facility 20023
SIXTH STREET
SEVEN TH STREET
19
23
SU B
STA.
D S
TR
EE
T
"E"
S
TR
EE
T 62
23
20
20
21
18
31
18A18D
18G
18E
18B
435
71
18F 252
250
32
STREETFIFTH
Conversion for Advanced Power Research Lab AFRL $21.0M
Combat Airmen - Supporting, Fighting, Winning!
FY10 WPAFB MILCON Program
ITC Master Plan
Information Technology Complex, Ph 1 ASC $27.0M
Ph 3
Ph 4Ph 5
Ph 1Ph 2
Combat Airmen - Supporting, Fighting, Winning!
TAXIWAY A
TO 23R
RUNWAY
Replace West Ramp, Ph 2 ASC $10.6M
FY10 WPAFB MILCON Program
Combat Airmen - Supporting, Fighting, Winning!
Future MILCON
High Interest Candidates
Pri Project PA ($M)
1 Acquisition Management Complex, Phase 5 70.0
2 Replace Entry Control Point (1A) 12.4
3 Chapel Activity and Religious Facility 6.2
4 Repair Fuel Farm S 12.0
5 AFIT Research Laboratory (AETC) 18.3
6 Replace Gate 26A 12.8
Combat Airmen - Supporting, Fighting, Winning!
Completed BRAC Projects
Pipeline Dormitory77th AESG (Building 12)
Combat Airmen - Supporting, Fighting, Winning!
Construction Programs
• Military Construction (MILCON) Program– Congressional Line Item Appropriation– Primarily New Construction– Corps of Engineers Managed
• Operations & Maintenance (O&M) Program– Non-Project Specific Appropriation– Primarily Maintenance, Repair & Renovation– Air Force Managed
Combat Airmen - Supporting, Fighting, Winning!
Design AccomplishmentNon-MILCON
FY06 FY07 FY08 FY09 FY100
5
10
15
20
25
30
35
40
In House A-E
$ M
ILL
ION
Combat Airmen - Supporting, Fighting, Winning!
O&M – A-E Contracts
• Average 6-10 Ongoing Contracts– Mechanical/Electrical (1)– Civil/Structural (1)– Multi-Discipline (5)– Two Small Business Firms represented above
• Current Limits– Base Year and Four Options Years – Contract amount; varies from $500K to $7.5M– Contract limit per individual task; varies from $250K to
unlimited
• Status– 6 New Contracts to be awarded in FY11 resulting from
Jan 10 advertisement– 3 Contracts to expire by Dec 11; 1 to expire by Apr 12
Combat Airmen - Supporting, Fighting, Winning!
A-E Contract Procurement
• Next call for design services not anticipated until Nov 2011 at the earliest
• Advertisement– “Federal Business Opportunities” Website
• www.fedbizopps.gov
• Selection Limited to Respondees– SF 330, Architect-Engineer Qualifications
• Selection Based on Weighted Total Score• Indefinite Delivery/Indefinite Quantity
Combat Airmen - Supporting, Fighting, Winning!
A-E Contract Procurement
• Capability Package Tips– Show flexibility and wide experience of a variety
of project types– Indicate who the project manager will be– If using consultants, show team’s experience– Respond to all evaluation factors listed in
solicitation– Briefly support SF 330 with additional information
• Recommend photographs
Combat Airmen - Supporting, Fighting, Winning!
O&M - Construction Contracts
• On-Call Contracts (IDIQ)• SABER & CE Support Contracts• Firm Fixed Price Contracts
Combat Airmen - Supporting, Fighting, Winning!
O&M - On-Call Contracts
• Pavements– One contract– Multiple year (3)– $6.0M– Expires: Dec 11
• Airfield Pavement– One contract– Multiple year (3)– $4.5M– Expires: Dec 12
• Roofing (Tentative award Feb 11)– One contract– Multiple year (3)– $9.9M– Expires: Feb 14 (estimated)
Combat Airmen - Supporting, Fighting, Winning!
O&M - On-Call Contracts
• Carpet Installation (Tentative Award Apr 11)– One contract– Multiple year (5)– $6.6M– Expires: Apr 16 (estimated)
• Furniture Maintenance– One contract– Multiple year (4)– $7.5M– Expires: Sept 14
Combat Airmen - Supporting, Fighting, Winning!
O&M - On-Call Contracts
• Emergency Spill & Compliance– One contract– Multiple year (5)– $250K– Expires: Sep 11
• Environmental Services– Two contracts
• One large business• One small business
– Multiple year (5)– $10.0M– Expires: FY15
• Laboratory Services– Two contracts (Hazardous Waste & Water analysis)– Multiple years – Expires Mar 15 (Hazardous Waste) & Nov 15 (Water)
Combat Airmen - Supporting, Fighting, Winning!
O&M - SABER & CE Support
• SABER (Advertised)– One contract– Multiple year (5)– $75M– Expires: Jun 16 (estimated)
• CE Support Contract– One contract– Multiple year (5)– $49M– Expires: Dec 15
Combat Airmen - Supporting, Fighting, Winning!
O&M - Firm Fixed Price Contracts
• Small Business Program– 8a Minority Set Aside– 8a Competitive– HUBZone Set Aside– Service Disabled Veterans
• Full and Open– Advertised in Federal Business Opportunities
Website– Copies sent to Dodge Reports– Base Bid and Options
Combat Airmen - Supporting, Fighting, Winning!
Business Resources
• Federal Business Opportunities– https://www.fbo.gov/
• Central Contractor Registration– http://www.bpn.gov/ccr
• Federal Technical Data Solutions (FedTeDS)– www.fedteds.gov
Combat Airmen - Supporting, Fighting, Winning!
Non-MILCON Construction
FY06 FY07 FY08 FY09 FY10 FY11 (Pro-
jected)
0
10
20
30
40
50
60
70
80
90
User AFMC
ARRA:FY09 – 20.0MFY10 – 2.9M
$ M
ILL
ION
Combat Airmen - Supporting, Fighting, Winning!
Design Awards – 2010 USAF
• AF Honor Award for Concept Design Award– Human Performance Wing & Complex
• A-E: KZF & BWSC, Inc
Combat Airmen - Supporting, Fighting, Winning!
Design Awards – 2010 USAF
• AF Merit Award for Concept Design – Information Technology Complex, Phase 1
• A-E: CH2MHill/Emersion
Combat Airmen - Supporting, Fighting, Winning!
Design Awards – 2010 USAF
• AF Merit Award for Concept Design – Alter Acquisition Management Facility, Bldg 12
• A-E: Edge & Tinney/Aztec/Butt Construction
Combat Airmen - Supporting, Fighting, Winning!
Design Awards – 2010 USAF
• AF Citation Award for Concept Design – Security Forces Operations Center
• A-E: Emersion Design
Combat Airmen - Supporting, Fighting, Winning!
Design Awards – 2010 USAF
• AF Citation Award for Facility Design – AFIT Addition
• A-E: Edge & Tinney/Butt/Contech
Combat Airmen - Supporting, Fighting, Winning!
Design Awards – 2010 USAF
• AF Citation Award for Interior Design – Sarris Auditorium
• A-E: 88th Civil Engineer Directorate
Combat Airmen - Supporting, Fighting, Winning!
Design Awards - 2011 AFMC
• DVQ Conversion, Charles E. Taylor House• Entrance Canopies & Security Improvements• Alter Acquisition Management Facility• HQ AFMC Situation Room• Student Activity Center• AFIT Academic Building• Marines Reserve Center• BRAC Pipeline Dormitory• Advanced Power & Thermal Research Lab