+ All Categories
Home > Documents > Microwave Integrated Retrieval System (MiRS) Version 11.1 ......2 Microwave Integrated Retrieval...

Microwave Integrated Retrieval System (MiRS) Version 11.1 ......2 Microwave Integrated Retrieval...

Date post: 10-Oct-2020
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
10
1 Microwave Integrated Retrieval System (MiRS) Chris Grassotti STAR JPSS Enterprise Algorithms Workshop 30-31 March 2016 (U. MD. ESSIC/CICS) Version 11.1
Transcript
Page 1: Microwave Integrated Retrieval System (MiRS) Version 11.1 ......2 Microwave Integrated Retrieval System - ... N19, MetopA, MetopB, F17, F18, Megha-Tropiques/SAPHIR (initial capability

1

Microwave Integrated Retrieval System (MiRS)

Chris Grassotti

STAR JPSS Enterprise Algorithms Workshop

30-31 March 2016

(U. MD. ESSIC/CICS)

Version 11.1

Page 2: Microwave Integrated Retrieval System (MiRS) Version 11.1 ......2 Microwave Integrated Retrieval System - ... N19, MetopA, MetopB, F17, F18, Megha-Tropiques/SAPHIR (initial capability

• MiRS Products Summary – Simultaneous 1DVAR retrieval of T, WV, Hydrometeor profiles

(ice, rain, cloud), Tskin, Sfc Emissivity, and derived RR, snow water, sea ice concentration and sea ice age, snowfall rate.

– Variational physical retrieval assures final EDRs are consistent to within uncertainty of measurements/fwd model and a priori climatologies.

• Team members – C. Grassotti, Shuyan Liu, Junye Chen, Quanhua Liu (TM)

• Users – Operational and research users (e.g. CSPP/Direct Broadcast,

CPC-Precipitation, Blended TPW, CIRA Hurricane Intensity Analyses/Forecasts)

2

Microwave Integrated Retrieval System -

MiRS

Page 3: Microwave Integrated Retrieval System (MiRS) Version 11.1 ......2 Microwave Integrated Retrieval System - ... N19, MetopA, MetopB, F17, F18, Megha-Tropiques/SAPHIR (initial capability

• At NDE: Currently running on SNPP/ATMS data, and will run on J1/ATMS

in 2017.

• At OSPO: Running on N18, N19, MetopA, MetopB, F17, F18, Megha-

Tropiques/SAPHIR (initial capability delivered in 2007).

• Currently being extended to GPM/GMI and F19

• Experimental versions for: TRMM/TMI, Aqua/AMSRE, GCOM-W1/AMSR2 3

Current Operational Product: Data flow

~ 20 channels (multispectral)

Temp. Profile (100 layers)

Water Vapor Profile (100)

Emissivity Spectrum (~ 20 channels)

Skin Temperature (1)

Cloud Water Profile (100)

Graupel Water Profile (100)

Rain Water Profile (100)

Satellite Microwave (TB) Measurements (INPUTS)

Geophysical State Vector (OUTPUTS)

TB (Channel 1)

TB (Channel 2)

TB (Channel 3)

TB (Channel Ntot)

MiRS Components

Forward RT Model (CRTM): (1) TB= F(Geophysical State Vector) (2) Jacobians (dTB/dX)

A Priori Background: Mean and Covariance of Geophysical State

Basis Functions for State Vector: Reduce degrees of freedom in geophysical profile (~20 EOFs)

Uncertainty of satellite radiances: Instrument noise estimates

Sensor Noise

MiRS 1D

Variational Retrieval

MiRS Postprocessing

RR

CLW

RWP

GWP

TPW

SWE/GS

SIC/SIA

SFR

Derived Products (OUTPUTS)

Page 4: Microwave Integrated Retrieval System (MiRS) Version 11.1 ......2 Microwave Integrated Retrieval System - ... N19, MetopA, MetopB, F17, F18, Megha-Tropiques/SAPHIR (initial capability

Typhoon Soudelor 3-Dimensional Structure

● MiRS simultaneous retrieval of temperature profile and hydrometeors allows depiction of storm structure

RR (mm/h) Rain Water w/Retrieved T profile

Typhoon Soudelor 6 August 2015 0445 UTC MiRS SNPP/ATMS

Graupel Water w/Retrieved T profile

Cross-Section of RW and GW along 21N latitude

S. Korea

Japan

Core Region

Isosurfaces: GW=0.05 mm, RW=0.01 mm

Page 5: Microwave Integrated Retrieval System (MiRS) Version 11.1 ......2 Microwave Integrated Retrieval System - ... N19, MetopA, MetopB, F17, F18, Megha-Tropiques/SAPHIR (initial capability

Sea Ice Concentration and Ice Age: MiRS Compared with European (OSI-SAF) analysis

● Sea Ice Age added as official product in v11 (2015) MIRS Total SIC MIRS FY SIC MIRS MY SIC

OSI-SAF Total SIC OSI-SAF Dominant Ice Type MIRS Dominant Ice Type (>50%)

Page 6: Microwave Integrated Retrieval System (MiRS) Version 11.1 ......2 Microwave Integrated Retrieval System - ... N19, MetopA, MetopB, F17, F18, Megha-Tropiques/SAPHIR (initial capability

MiRS GPM/GMI Rainfall Retrieval: Comparison with Ground-based Validation

● MiRS Extension to GPM/GMI. Delivery to operations planned in 2016.

Page 7: Microwave Integrated Retrieval System (MiRS) Version 11.1 ......2 Microwave Integrated Retrieval System - ... N19, MetopA, MetopB, F17, F18, Megha-Tropiques/SAPHIR (initial capability

Outside User: U. Colorado/CIRA Hurricane Analyses/Forecasts

● Use of MiRS N19 AMSU/MHS Rainy T soundings to analyze TC MSLP.

H. Edouard (15 Sept 2014): N19 FOVs Original Rainy bias corrections (Generic Statistical)

Updated bias corrections (collocated dropsondes) GFS Analysis Courtesy of J. Dostalek/CIRA

Page 8: Microwave Integrated Retrieval System (MiRS) Version 11.1 ......2 Microwave Integrated Retrieval System - ... N19, MetopA, MetopB, F17, F18, Megha-Tropiques/SAPHIR (initial capability

• To date: 2 versions of MiRS have been delivered to NDE (originally v9.2 in 2012, and v11.1 in Sept 2015)

– Plus several intermediate patches (e.g. filename conventions, nc metadata, leap second, miscellaneous bug fixes).

– D. Powell has helped make updates relatively painless!

– No interdependence with other products/data sets simplifies integration and testing (but future releases will require GFS - needed for SFR algorithm).

– Pre-launch availability of proxy data essential.

| Page 8

MiRS: Lessons Learned

Page 9: Microwave Integrated Retrieval System (MiRS) Version 11.1 ......2 Microwave Integrated Retrieval System - ... N19, MetopA, MetopB, F17, F18, Megha-Tropiques/SAPHIR (initial capability

• (Un)Anticipated developments – Integration of OSPO Snowfall Rate Algorithm for SNPP and JPSS-1 ATMS

– Investigating improvements to snow cover/snow water estimation in vegetated regions (leverage VIIRS forest fraction).

• Upcoming Deliveries/Reviews – June 2016: ARR for GPM/GMI and F19/SSMIS

– Winter 2016/17 CDR for JPSS-1 extension (proxy data)

– Spring 2017 (pre-launch): possible pre-delivery to NDE of MiRS with JPSS-1 extension (no cal/val done)

– Summer/Fall 2017 (post-launch): official DAP delivery to NDE with preliminary cal/val (bias corrections, etc.)

• Risks – Any anticipated impact of J1 product changes from IDPS inputs? Not yet,

but testing will proxy data will help with risk assessment.

| Page 9

Path Forward

Page 10: Microwave Integrated Retrieval System (MiRS) Version 11.1 ......2 Microwave Integrated Retrieval System - ... N19, MetopA, MetopB, F17, F18, Megha-Tropiques/SAPHIR (initial capability

• Outstanding issues

– Future versions of MiRS will have the operational

(OSPO) Snowfall Rate algorithm integrated. This

algorithm requires GFS forecast fields. Coordination

with NDE to ensure that GFS data are available,

unpacked, and placed in the required locations.

• Enterprise algorithm: MiRS architecture/design

makes it feasible to run on other MW sensors

(e.g. FY-4 with GEO MW?) or in combination

with collocated IR measurements (e.g. CrIS)

10

Summary


Recommended