Team Members Arduino Programming Circuit Design Web Design Robbie Lundine Computer Engineering Arduino Programming Circuit Design Web Design Mark McConnell Electrical Engineering Team Leader Pic Programming Circuit Design Mechanical Design / Construction Chance Sistrunk Electrical Engineering Pic Programming Circuit Design Mechanical Design / Construction Justin Gilmer Computer Engineering Arduino Programming Circuit Design Web Design Mark
44
MSU ROV Team Mid-Semester Review Senior Design 2 October 8, 2013
Transcript
Page 1: Mid-Semester Review Senior Design 2 October 8, 2013

MSU ROV Team

Mid-Semester Review

Senior Design 2

October 8, 2013

Page 2: Mid-Semester Review Senior Design 2 October 8, 2013

Team Members

Justin GilmerComputer

Engineering

Arduino Programming Circuit DesignWeb Design

Robbie LundineComputer

Engineering

Arduino ProgrammingCircuit DesignWeb Design

Mark McConnellElectrical

Engineering

Team LeaderPic ProgrammingCircuit Design Mechanical Design / Construction

Chance SistrunkElectrical

Engineering

Pic ProgrammingCircuit Design Mechanical Design / Construction

Page 3: Mid-Semester Review Senior Design 2 October 8, 2013

Faculty Advisor

Jane MoorheadProfessor

Page 4: Mid-Semester Review Senior Design 2 October 8, 2013

Overview• Competition Overview• Technical Constraints• PCB• Manipulator Arm• Packaging

Page 5: Mid-Semester Review Senior Design 2 October 8, 2013

Competition Overview• Course layout

Operators Station

BIA

Thermal Vent

Floating Array

StationaryArray

Page 6: Mid-Semester Review Senior Design 2 October 8, 2013

Competition Overview• Mission 1 Part 1

Operators Station

BIA

Thermal Vent

Floating Array

StationaryArray

Page 7: Mid-Semester Review Senior Design 2 October 8, 2013

Competition Overview• Mission 1 Part 2

Operators Station

BIA

Thermal Vent

Floating Array

StationaryArray

Page 8: Mid-Semester Review Senior Design 2 October 8, 2013

Competition Overview• Mission 2

Operators Station

BIA

Thermal Vent

Floating Array

StationaryArray

Page 9: Mid-Semester Review Senior Design 2 October 8, 2013

Competition Overview• Mission 3

Operators Station

BIA

Thermal Vent

Floating Array

StationaryArray

Page 10: Mid-Semester Review Senior Design 2 October 8, 2013

Competition Overview• Mission 4

Operators Station

BIA

Thermal Vent

Floating Array

StationaryArray

Page 11: Mid-Semester Review Senior Design 2 October 8, 2013

Technical ConstraintsName Description

Operating Depth

The ROV Must Operate at depths up to 3.2 meters

Operating Power

The ROV must operate from a 12.7V +/- 0.3V voltage source and draw less than 25 amps of current

Maneuverability The ROV must maneuver effectively enough to make it competitive

Video Capability

The ROV must have a minimum of one camera with a 3 meter range to

allow it to compete effectively

ManipulatorArm

The ROV must have a manipulator arm capable of lifting 2 Newtons

Page 12: Mid-Semester Review Senior Design 2 October 8, 2013

Operating Depth• Sank pressure canister to approximately 3.2

meters

Page 13: Mid-Semester Review Senior Design 2 October 8, 2013

Operating Power• MATE current limit is 25A• With all components in operation, total

current draw was less than 13A

Page 14: Mid-Semester Review Senior Design 2 October 8, 2013

Maneuverability

• Front and rear vertical motors work independently of one another

Page 15: Mid-Semester Review Senior Design 2 October 8, 2013

Maneuverability

• Horizontal motors work independently to allow for a tighter turning radius.

Page 16: Mid-Semester Review Senior Design 2 October 8, 2013

Video Capability• Camera 1 gives view of end of arm

1

3 meters

Page 17: Mid-Semester Review Senior Design 2 October 8, 2013

Video Capability• Camera 2 gives general view of space under ROV

2

Page 18: Mid-Semester Review Senior Design 2 October 8, 2013

PCB• Schematic Design

Page 19: Mid-Semester Review Senior Design 2 October 8, 2013

PCB• Board Layout

Page 20: Mid-Semester Review Senior Design 2 October 8, 2013

PCB• Component Verification

Page 21: Mid-Semester Review Senior Design 2 October 8, 2013

PCB• Actual PCB

Page 22: Mid-Semester Review Senior Design 2 October 8, 2013

PCB• Continuity Testing

Page 23: Mid-Semester Review Senior Design 2 October 8, 2013

PCB• Populating the PCB

Page 24: Mid-Semester Review Senior Design 2 October 8, 2013

Manipulator Arm90 degrees of

movement from left to right

The claw will rotate.

The claw will clamp closed and open

again.

Top of ROV

Page 25: Mid-Semester Review Senior Design 2 October 8, 2013

Manipulator Arm

Page 26: Mid-Semester Review Senior Design 2 October 8, 2013

Manipulator Arm

Page 27: Mid-Semester Review Senior Design 2 October 8, 2013

Manipulator Arm

Page 28: Mid-Semester Review Senior Design 2 October 8, 2013

Manipulator Arm

Page 29: Mid-Semester Review Senior Design 2 October 8, 2013

Manipulator Arm

Page 30: Mid-Semester Review Senior Design 2 October 8, 2013

Manipulator Arm

Page 31: Mid-Semester Review Senior Design 2 October 8, 2013

Manipulator Arm

Page 32: Mid-Semester Review Senior Design 2 October 8, 2013

Manipulator Arm

Page 33: Mid-Semester Review Senior Design 2 October 8, 2013

Manipulator Arm

Page 34: Mid-Semester Review Senior Design 2 October 8, 2013

Manipulator Arm

Page 35: Mid-Semester Review Senior Design 2 October 8, 2013

Manipulator Arm

Page 36: Mid-Semester Review Senior Design 2 October 8, 2013

Manipulator Arm

Page 37: Mid-Semester Review Senior Design 2 October 8, 2013

Manipulator Arm

Page 38: Mid-Semester Review Senior Design 2 October 8, 2013

Manipulator Arm

Page 39: Mid-Semester Review Senior Design 2 October 8, 2013

Packaging - Housing• PVC Frame

– Light weight and customizable• PVC Pressure Canisters

– Waterproof end cap for easy repairs• Custom Paint Job

Page 40: Mid-Semester Review Senior Design 2 October 8, 2013

Packaging - Arm• Manipulator Arm

– Custom components– Higher manufacturing cost

Page 41: Mid-Semester Review Senior Design 2 October 8, 2013

Packaging – Motors• Motor Shrouds

– Maneuver faster – Safety

Page 42: Mid-Semester Review Senior Design 2 October 8, 2013

Packaging - Interface• USB Connected

– Compatibility • Easy Setup

– Open source camera software– Xbox Controller

Page 43: Mid-Semester Review Senior Design 2 October 8, 2013

References[1] S. W. Moore, H. Bohm, and V. Jensen. Underwater Robotics: Science Design & Fabrication. Monterey, Ca: Marine Advanced Technology Edu, 2010. Print (used for the physical design of the Rov)

[2] Observer 3.1. (2013, Feb 7). [Online]. Available: http://www.allboatsavenue.com/mini-robot-sous-marin-observer-3-1-de-subsea-tech

[3] Marine Advanced Technology Education (MATE) Center. [Online]. Available: http://www.marinetech.org/about/

[4] Arduino. [Online]. Available: www.arduino.cc

[5] Circuits At Home. [Online]. Available: www.circuitsathome.com

[6] Sparkfun. [Online]. Available: www.sparkfun.com

Page 44: Mid-Semester Review Senior Design 2 October 8, 2013

MSU ROV Team

Mid Semester Presentation

Senior Design 1

February 21, 2013


Recommended