95
This project has received funding from the European Union’s Horizon 2020 research and innovation programme under the Marie Skłodowska-Curie grant agreement No 676139 Innovation and Networking for Fatigue and Reliability Analysis of Structures Training for Assessment of Risk Mid-Term Review Meeting Odile ABRAHAM (project coordinator) Hakim FERRIA (project manager) Mid-Term Review Meeting, Aalborg University 06/06/2018 French institute of science and technology for transport, development and networks
Transcript
Page 1: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

This project has received funding from the

European Union’s Horizon 2020 research and

innovation programme under the Marie

Skłodowska-Curie grant agreement No 676139

Innovation and Networking for Fatigue and

Reliability Analysis of Structures – Training for

Assessment of Risk

Mid-Term Review Meeting

Odile ABRAHAM (project coordinator)

Hakim FERRIA (project manager)

Mid-Term Review Meeting, Aalborg University06/06/2018

French institute of science and technology for transport, development and networks

Page 2: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Overview

2

• Scientific

– Context, objectives, main results, network synergy

• Training

– Programme, complementary skills, secondments, open training events

• Networking

– Interaction, dissemination, outreach activities

• Management

– Recruitment, management, budget

06/06/2018 Mid-Term Review Meeting, Aalborg University

Page 3: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Context

3Mid-Term Review Meeting, Aalborg University

Civil infrastructures are the basis of socio-economic wealth

for modern societies.

06/06/2018

Page 4: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Context

4Mid-Term Review Meeting, Aalborg University

Civil infrastructures are the basis of socio-economic wealth

for modern societies.

06/06/2018

Page 5: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Context

• Traffic increase

• Climate change

• CO2 emission

• Increasing demand for housing, water, energy,

mobility

5Mid-Term Review Meeting, Aalborg University06/06/2018

Page 6: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Context

6Mid-Term Review Meeting, Aalborg University

Civil infrastructures are the basis of socio-economic wealth

for modern societies.

Limitations:

#1 Concrete structures are subjected to fatigue.

#2 Current technological means to measure fatigue are outdated, imprecise, and inappropriate.

#3 There is a lack of theoretical and practical developments of probabilistic methods.

06/06/2018

Page 7: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

• 3 major challenges:

– To develop new relevant auscultation and monitoring systems.

– To reduce and optimize the safety margin encountered in wind

turbine and bridge design in the assessment of remaining

strength.

– To optimize design and life cycle costs.

Objectives

7Mid-Term Review Meeting, Aalborg University

Develop knowledge, expertise and skills for optimal and reliable management of structures.

06/06/2018

Page 8: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Strategy

• 3 scientific Work Packages– WP1: Monitoring and auscultation

– WP2: Structural and action models

– WP3: Reliability approaches for decision-making

• WP4: Recruitment and training policy

• WP5: Management, dissemination, outreach and business opportunities

8

Innovation and Networking for Fatigue and Reliability

Analysis of Structures – Training for Assessment of Risk

Mid-Term Review Meeting, Aalborg University06/06/2018

Page 9: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

The network

9

8 beneficiaries

• 4 academic institutions

• 4 industries

Mid-Term Review Meeting, Aalborg University06/06/2018

Page 10: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

The network

10Mid-Term Review Meeting, Aalborg University

8 beneficiaries

• 4 academic institutions

• 4 industries

06/06/2018

Page 11: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

The network

11Mid-Term Review Meeting, Aalborg University

3 partner organisations

8 beneficiaries

• 4 academic institutions

• 4 industries

06/06/2018

Page 12: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

The network

12Mid-Term Review Meeting, Aalborg University

3 partner organisations

8 beneficiaries

• 4 academic institutions

• 4 industries

1 advisory board with 7 members

06/06/2018

Page 13: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

ESRs of WP1

13Mid-Term Review Meeting, Aalborg University

ESR1 Xin Wang

@

06/06/2018

Page 14: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

ESRs of WP1

14Mid-Term Review Meeting, Aalborg University

ESR2 Antoine Bassil

@

ESR1 Xin Wang

@

06/06/2018

Page 15: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

ESRs of WP1

15Mid-Term Review Meeting, Aalborg University

ESR2 Antoine Bassil

@

ESR1 Xin Wang

@

ESR3 Joyraj Chakraborty

@

06/06/2018

Page 16: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

ESRs of WP1

16Mid-Term Review Meeting, Aalborg University

ESR2 Antoine Bassil

@

ESR1 Xin Wang

@

ESR3 Joyraj Chakraborty

@

ESR4 Imane Bayane

@

06/06/2018

Page 17: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

ESRs of WP2

17Mid-Term Review Meeting, Aalborg University

ESR5 Bartek Sawicki

@

06/06/2018

Page 18: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

ESRs of WP2

18Mid-Term Review Meeting, Aalborg University

ESR6 Mariia Nesterova

@

ESR5 Bartek Sawicki

@

06/06/2018

Page 19: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

ESRs of WP2

19Mid-Term Review Meeting, Aalborg University

ESR6 Mariia Nesterova

@

ESR5 Bartek Sawicki

@

ESR7 Gianluca Zorzi

@

06/06/2018

Page 20: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

ESRs of WP2

20Mid-Term Review Meeting, Aalborg University

ESR6 Mariia Nesterova

@

ESR5 Bartek Sawicki

@

ESR7 Gianluca Zorzi

@

ESR8 Joey Velarde

@

06/06/2018

Page 21: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

ESRs of WP3

21Mid-Term Review Meeting, Aalborg University

ESR9 Amol Mankar

@

06/06/2018

Page 22: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

ESRs of WP3

22Mid-Term Review Meeting, Aalborg University

ESR10 Morteza Ahmadivala

@

ESR9 Amol Mankar

@

06/06/2018

Page 23: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

ESRs of WP3

23Mid-Term Review Meeting, Aalborg University

ESR10 Morteza Ahmadivala

@

ESR9 Amol Mankar

@

ESR11 Sima Rastayesh

@

06/06/2018

Page 24: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

ESRs of WP3

24Mid-Term Review Meeting, Aalborg University

ESR10 Morteza Ahmadivala

@

ESR9 Amol Mankar

@

ESR11 Sima Rastayesh

@

ESR 12 Lijia Long

@

06/06/2018

Page 25: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Overview

25

• Scientific

– Context, objectives, main results, network synergy

• Training

– Programme, complementary skills, secondments, open training events

• Networking

– Interaction, dissemination, outreach activities

• Management

– Recruitment, management, budget

Mid-Term Review Meeting, Aalborg University06/06/2018

Page 26: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

WP1

Monitoring and auscultation

26Mid-Term Review Meeting, Aalborg University

Embedded

ultrasonics

NDT parameters ↔

fatigue

Fibre Optics

Data fusion

To smarten the structures.

06/06/2018

Page 27: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

WP1

Monitoring and auscultation

What was done? What are the results?

– State of the art

– Throughout review of Non Destructive Testing for fatigue damage assessment

– Practical hands-on on Non Destructive Evaluation methods (extra skills)

– Joint implementation of Fibre Optics and Embedded ultrasonic sensors in several meter size test specimen specially designed

– Processing of data, sharing of data (BLEIB specimen, Crêt de l'Anneau)

– Modelling of Fibre Optics coating transfer function

– Crack monitoring and sizing

31Mid-Term Review Meeting, Aalborg University06/06/2018

Page 28: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

WP2

Structural and action models

32Mid-Term Review Meeting, Aalborg University

Reinforced Concrete

and UHPFRC

Soil cyclic

behaviour

Extreme Actions

(traffic, wind)

Ground Base

Foundation WT

To improve structural and fatigue

loading models.

06/06/2018

Page 29: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

What was done? What are the results?

– State of the art

– Structures : Bridge, WT foundation, soil, Reinforced concrete and UHPFRC

– Actions : Wind, traffic, waves

– Data collection (monitoring), data extrapolation

– Fatigue resistance models (from literature data)

– Fatigue loading models (including case studies)

37Mid-Term Review Meeting, Aalborg University

WP2

Structural and action models

06/06/2018

Page 30: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

WP3

Reliability approaches for decision-making

38Mid-Term Review Meeting, Aalborg University

Reliability Analysis

Risk Analysis

Maintenance

Optimisation

Value of

Information

To improve the risk assessment for

decision-making.

06/06/2018

Page 31: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

What was done? What are the results?

– State of the art

– Probabilistic framework for reliability assessment

– Statistical analyses and stochastic models (based on data from

literature) for fatigue of concrete and fatigue of steel rebars

– Stochastic models for action effects (1st attempt on Crêt de l'Anneau

viaduct)

– Time variant reliability problems (Surrogate models, Bayesian approach)

– Bayesian decision theory

– Risk based approaches (1st implementation on icing event in wind turbine)

– Value of Information (1st implementation on a truss bridge girder)

43Mid-Term Review Meeting, Aalborg University

WP3

Reliability approaches for decision-making

06/06/2018

Page 32: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

WP1 WP2 WP3

Next scientific steps

For each ESR: to make a personal

contribution to knowledge

For each of them in INFRASTAR: to benefit of a

multi-disciplinarity breeding ground to amplify

their contribution

→ How: the shared objects

44Mid-Term Review Meeting, Aalborg University06/06/2018

Page 33: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Co-operation

45Mid-Term Review Meeting, Aalborg University

What is a

shared object?

What is it for?

06/06/2018

Page 34: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Shared objects

46Mid-Term Review Meeting, Aalborg University

• Aims:

– To promote collaboration between WPs

– To boost ESRs collaboration

– To exemplify the inter-sectoral approach

• Nature:

– On site structures

– Reduced scale lab specimen

– Models

– Data sets

– etc

06/06/2018

Page 35: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Shared objects / Bridges

47Mid-Term Review Meeting, Aalborg University

Millau viaduct

Chillon viaduct

Kwidzyń bridge

Bridge over Kłodnica river

Crêt de l’Anneau viaduct

Rędziński bridge

06/06/2018

Page 36: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Shared objects / Wind Turbines

48Mid-Term Review Meeting, Aalborg University

Onshore wind turbine

Onshore wind turbine

06/06/2018

Page 37: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Shared objects / Lab specimen

49Mid-Term Review Meeting, Aalborg University

BLEIB reference structure

Onshore wind turbine

06/06/2018

Page 38: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Co-operation

50Mid-Term Review Meeting, Aalborg University06/06/2018

Page 39: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Co-operation: Ex. 1

51Mid-Term Review Meeting, Aalborg University06/06/2018

Page 40: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Co-operation: Ex. 2

52Mid-Term Review Meeting, Aalborg University

Crêt de l’Anneau viaduct

06/06/2018

Page 41: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Co-operation: Ex. 3

53Mid-Term Review Meeting, Aalborg University

Millau viaduct

06/06/2018

Page 42: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Co-operation

54Mid-Term Review Meeting, Aalborg University06/06/2018

Page 43: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Overview

55

• Scientific

– Context, objectives, main results, network synergy

• Training

– Programme, complementary skills, secondments, open training events

• Networking

– Interaction, dissemination, outreach activities

• Management

– Recruitment, management, budget

Mid-Term Review Meeting, Aalborg University06/06/2018

Page 44: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Training programme

56Mid-Term Review Meeting, Aalborg University

To enhance employability of ESRs.

To provide individual, collective training courses and

complementary skills.

To expose them to different cultural, scientific and

organisational environment.

To help them to understand the scope of their

work in an industrial context.

06/06/2018

Page 45: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Training programme

57Mid-Term Review Meeting, Aalborg University

To enhance employability of ESRs.

To provide individual, collective training courses and

complementary skills.

To expose them to different cultural, scientific and

organisational environment.

To help them to understand the scope of their

work in an industrial context.

06/06/2018

Page 46: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Training programme

Three training weeks:

• Scientific lectures (43 hours).

• Lecturers from academia and industries.

• Technical visits (8 hours).

• Teamworks on shared objects (5 hours).

• Presentation/discussion (60’ / ESR).

58Mid-Term Review Meeting, Aalborg University

To enhance employability of ESRs.

06/06/2018

Page 47: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Training programme

59Mid-Term Review Meeting, Aalborg University06/06/2018

Page 48: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Training programme

60Mid-Term Review Meeting, Aalborg University06/06/2018

Page 49: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Training programme

61Mid-Term Review Meeting, Aalborg University06/06/2018

Page 50: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Training programme

62Mid-Term Review Meeting, Aalborg University06/06/2018

Page 51: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Training programme

63Mid-Term Review Meeting, Aalborg University06/06/2018

Page 52: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Training programme

64Mid-Term Review Meeting, Aalborg University06/06/2018

Page 53: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Training programme

65Mid-Term Review Meeting, Aalborg University06/06/2018

Page 54: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Training programme

66Mid-Term Review Meeting, Aalborg University06/06/2018

Page 55: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Training programme

67Mid-Term Review Meeting, Aalborg University06/06/2018

Page 56: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Training programme

68Mid-Term Review Meeting, Aalborg University06/06/2018

Page 57: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Training programme

69Mid-Term Review Meeting, Aalborg University06/06/2018

Page 58: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Training programme

70Mid-Term Review Meeting, Aalborg University06/06/2018

Page 59: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Training programme

71Mid-Term Review Meeting, Aalborg University06/06/2018

Page 60: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Training programme

72Mid-Term Review Meeting, Aalborg University06/06/2018

Page 61: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Training programme

73Mid-Term Review Meeting, Aalborg University06/06/2018

Page 62: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Training programme

74Mid-Term Review Meeting, Aalborg University06/06/2018

Page 63: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Complementary skills

75Mid-Term Review Meeting, Aalborg University

• Ethics in research

• Open access, open data

• Teamwork

• Career development

• Entrepreneurship

• Intellectual property

Personal Career Development Plan

67h

06/06/2018

Page 64: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Secondments

• Mobility (country and/or sector).

• Partnership of academic and non-academic institutions.

• Joint supervision.

• Secondment agreement, work programme.

76Mid-Term Review Meeting, Aalborg University

To experience different organisations,

environment and cultures.

34 months performed 33 months remaining

06/06/2018

Page 65: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Open training events

• Winter school @

– March 2019

– Advanced and practical courses

– Poster session

• Final workshop in Brussels

– February 2020

– Towards the industries

– Widely open

77Mid-Term Review Meeting, Aalborg University06/06/2018

Page 66: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Overview

78

• Scientific

– Context, objectives, main results, network synergy

• Training

– Programme, complementary skills, secondments, open training events

• Networking

– Interaction, dissemination, outreach activities

• Management

– Recruitment, management, budget

Mid-Term Review Meeting, Aalborg University06/06/2018

Page 67: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Interaction with private sector

• ImpDay#01 @

• ImpDay#02 @

• ImpDay#03 @

79Mid-Term Review Meeting, Aalborg University

To boost networking opportunities.

Save the date:

Friday 12

October 2018

Save the date:

June 2019

06/06/2018

Page 68: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Interaction with private sector

80Mid-Term Review Meeting, Aalborg University06/06/2018

Page 69: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Dissemination

81Mid-Term Review Meeting, Aalborg University

Communication to the scientific community.

2016

2017

2018

20192020

06/06/2018

Page 70: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Dissemination

82Mid-Term Review Meeting, Aalborg University

Communication to the scientific community.

2016

2017

2018

201920203 conference papers

06/06/2018

Page 71: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Dissemination

83Mid-Term Review Meeting, Aalborg University

Communication to the scientific community.

2016

2017

2018

2019202013 conference papers

3 journal papers

1 poster

06/06/2018

Page 72: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

2016

2017

2018

20192020

Dissemination

84Mid-Term Review Meeting, Aalborg University

Communication to the scientific community.

22 conference papers

15 journal papers

06/06/2018

Page 73: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Outreach activities

• Blog

• Three minutes thesis

• Fête de la science

• PhD days

• Videos

85Mid-Term Review Meeting, Aalborg University

Communication to the public.

06/06/2018

Page 74: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Outreach activities

• Blog

• Three minutes thesis

• Fête de la science

• PhD days

• Videos

86Mid-Term Review Meeting, Aalborg University

Communication to the public.

06/06/2018

Page 75: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Outreach activities

• Blog

• Three minutes thesis

• Fête de la science

• PhD days

• Videos

87Mid-Term Review Meeting, Aalborg University

Communication to the public.

06/06/2018

Page 76: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Outreach activities

• Blog

• Three minutes thesis

• Fête de la science

• PhD days

• Videos

88Mid-Term Review Meeting, Aalborg University

Communication to the public.

06/06/2018

Page 77: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Outreach activities

• Blog

• Three minutes thesis

• Fête de la science

• PhD days

• Videos

89Mid-Term Review Meeting, Aalborg University

Communication to the public.

06/06/2018

Page 78: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Outreach activities

• Blog

• Three minutes thesis

• Fête de la science

• PhD days

• Videos

90Mid-Term Review Meeting, Aalborg University

Communication to the public.

06/06/2018

Page 79: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Outreach activities

• Blog

• Three minutes thesis

• Fête de la science

• PhD days

• Videos

91Mid-Term Review Meeting, Aalborg University

Communication to the public.

06/06/2018

Page 80: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Outreach activities

• Blog

• Three minutes thesis

• Fête de la science

• PhD days

• Videos

92Mid-Term Review Meeting, Aalborg University

Communication to the public.

06/06/2018

Page 81: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Outreach activities

• Blog

• Three minutes thesis

• Fête de la science

• PhD days

• Videos

93Mid-Term Review Meeting, Aalborg University

Communication to the public.

06/06/2018

Page 82: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Communication

• Website

• Templates, logo

• Social networks:

– Facebook (230 posts, 90)

– Twitter (260 posts, 108 followers)

• Blog 78 posts

• Videos

• Newsletter (2 issues), brochure, etc.

94Mid-Term Review Meeting, Aalborg University06/06/2018

Page 83: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Overview

95

• Scientific

– Context, objectives, main results, network synergy

• Training

– Programme, complementary skills, secondments, open training events

• Networking

– Interaction, dissemination, outreach activities

• Management

– Recruitment, management, budget

Mid-Term Review Meeting, Aalborg University06/06/2018

Page 84: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Recruitment

96Mid-Term Review Meeting, Aalborg University

232

applications

received

Open, transparent, impartial, equitable and merit-based

06/06/2018

Page 85: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Recruitment

97Mid-Term Review Meeting, Aalborg University

189

43

female

male

06/06/2018

Page 86: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Recruitment

98Mid-Term Review Meeting, Aalborg University

13Unknown

Non-EU198

21EU

06/06/2018

Page 87: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Recruitment

99Mid-Term Review Meeting, Aalborg University

37

candidates

interviewed

06/06/2018

Page 88: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Recruitment

100Mid-Term Review Meeting, Aalborg University

37

candidates

interviewed

9

female

male

28

06/06/2018

Page 89: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Recruitment

101Mid-Term Review Meeting, Aalborg University

12 ESRs recruited under employment contract

06/06/2018

Page 90: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Management

102Mid-Term Review Meeting, Aalborg University

Partner organisations

Beneficiaries

12 ESRs

06/06/2018

Page 91: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Management

103Mid-Term Review Meeting, Aalborg University

Executive Committee (ExCo)

• 1 person / beneficiary, including:

– Recruitment Coordinator (IFSTTAR)

– Training Coordinator (PHIMECA)

– Mobility Coordinator (EPFL)

– Industrial Coordinator (BAM)

– Dissemination Coordinator (COWI)

• 1 person / partner organisationBASt, EIFFAGE, VALEMO

• 1 ESR representative

Project

Management

Team

(IFSTTAR)

End-User

Advisory

Board

(EUAB)

Research

Executive

Agency (REA)

European

Commission (EC)

DECISIONS REPORTS

REPORTS

ADVISES

CRITICAL

ASSESSMENT

ANNUAL

REPORT

General Assembly (GA)

(1 representative per beneficiary)

Ultimate decision-making body

06/06/2018

Page 92: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Management

104Mid-Term Review Meeting, Aalborg University

Executive Committee (ExCo)

• 1 person / beneficiary, including:

– Recruitment Coordinator (IFSTTAR)

– Training Coordinator (PHIMECA)

– Mobility Coordinator (EPFL)

– Industrial Coordinator (BAM)

– Dissemination Coordinator (COWI)

• 1 person / partner organisationBASt, EIFFAGE, VALEMO

• 1 ESR representative

Project

Management

Team

(IFSTTAR)

End-User

Advisory

Board

(EUAB)

Research

Executive

Agency (REA)

European

Commission (EC)

DECISIONS REPORTS

REPORTS

ADVISES

CRITICAL

ASSESSMENT

ANNUAL

REPORT

General Assembly (GA)

(1 representative per beneficiary)

Ultimate decision-making body

06/06/2018

Page 93: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

Budget

105Mid-Term Review Meeting, Aalborg University

Pre-financing

60%

Interim payment

25%Payment of

the balance

15%

Grant Agreement

signature

1st periodic report

30th June 2018Final

report

1st May

2016

30th April

2020

Mid-term meeting

Financial

report

Financial

report

06/06/2018

Page 94: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

June 2018

Next steps

106Mid-Term Review Meeting, Aalborg University

May

2016

EUAB

TW#1

TW#2 TW#3

MTR

ImpDay#1

EUAB

ImpDay#2

EUAB

Winter

school

ImpDay#3

Final

workshop

April

2020KoM

To be submitted:

First periodic report

1 training activity report

2 implementation-day reports

2 EUAB reports

Peer-reviewed papers

12 scientific reports

1 outreach activity report

1 dissemination plan

Final report

Deliverables submitted:

1 Project and 1 ESR handbook

1 recruitment report

3 State of the arts

2 training activity reports

1 implementation-day report

2 EUAB reports

Website, newsletter, diss. material

Draft periodic report

06/06/2018

Page 95: Mid-Term Review Meeting - Infrastar · –Risk based approaches (1st implementation on icing event in wind turbine) –Value of Information (1st implementation on a truss bridge girder)

This project has received funding from

the European Union’s Horizon 2020

research and innovation programme

under the Marie Skłodowska-Curie grant

agreement No 676139

Stay tuned http://infrastar.eu

Innovation and Networking for Fatigue and Reliability

Analysis of Structures – Training for Assessment of Risk

Thank you for your attention

[email protected] institute of science and

technology for transport,

development and networks


Recommended