+ All Categories
Home > Documents > Mid-Town Orlando’s Newest Industrial...

Mid-Town Orlando’s Newest Industrial...

Date post: 27-Apr-2020
Category:
Upload: others
View: 2 times
Download: 0 times
Share this document with a friend
8
Mid-Town Orlando’s Newest Industrial Park
Transcript
Page 1: Mid-Town Orlando’s Newest Industrial Parkimages2.loopnet.com/d2/pJSj55TmNSQxCvT-kiY7jkr5...Lighting High Efficiency T-5 - Interior, Exterior LED Sprinkler ESFR Fire Protection ...

Mid - Town O r l ando ’s Newes t I ndu s t r i a l Pa r k

Page 2: Mid-Town Orlando’s Newest Industrial Parkimages2.loopnet.com/d2/pJSj55TmNSQxCvT-kiY7jkr5...Lighting High Efficiency T-5 - Interior, Exterior LED Sprinkler ESFR Fire Protection ...

BUILDING SPECIFICATIONS

Total Square Feet 100 - 111,134200 - 119,514

Clear Height 24’- Building 100, 30’ 6”- Building 200

Building Type Rear loading, dock-high doors

Column Spacing Typical: 50’x40’ - 60’ Speed bay

Lighting High Efficiency T-5 - Interior, Exterior LED

Sprinkler ESFR Fire Protection

Construction Tilt Wall

PRINCETON OAKS HIGHLIGHTS

Beneficial Occupancy: November 2017

CO: December 2017

15,502 - 119,514 SF

PRINCETON OAKS SITE CLEARING AS OF JUNE 21, 2017

Page 3: Mid-Town Orlando’s Newest Industrial Parkimages2.loopnet.com/d2/pJSj55TmNSQxCvT-kiY7jkr5...Lighting High Efficiency T-5 - Interior, Exterior LED Sprinkler ESFR Fire Protection ...

PATH OF PROGRESS$5.5 billion of new development in West Downtown by 2020

TRANSACTION ACTIVITY46k businesses within 10 miles

PROPERTY SPECIFIC FUNDAMENTALSOnly new industrial development in 25M SF north-west sub-market

INFILL LOCATIONLast mile delivery provides convenient population access and in established business region

ALTERNATE PRIMARY ROAD ACCESSBenefits from I-4 project congestion with JYP front-age and one mile from 408

STREAMLINED SERVICESOne team: leasing / development / management / project management

Page 4: Mid-Town Orlando’s Newest Industrial Parkimages2.loopnet.com/d2/pJSj55TmNSQxCvT-kiY7jkr5...Lighting High Efficiency T-5 - Interior, Exterior LED Sprinkler ESFR Fire Protection ...

28953 SF

TENANT1

180' -

0"

650' - 0"

A B C D E F G H I J K L M N

1

2

3

4

5

50' - 0" 50' - 0" 50' - 0" 50' - 0" 50' - 0" 50' - 0" 50' - 0" 50' - 0" 50' - 0" 50' - 0" 50' - 0" 50' - 0" 50' - 0"

40' -

0"40

' - 0"

40' -

0"60

' - 0"

A100

23A100

32' -

0"20

' - 0"

RAMP

12' x 16' OVERHEADDOOR

RAMP

20' -

0"32

' - 0"

12' x 16' OVERHEADDOOR

(9) 9' x 10' OVERHEADDOOR (TYP.)

OVERHANG

162' - 10" 162' - 2" 162' - 2" 162' - 10"

(8) 9' x 10' OVERHEADDOOR (TYP.)

(9) 9' x 10' OVERHEADDOOR (TYP.)

(8) 9' x 10' OVERHEADDOOR (TYP.)

28896 SF

TENANT2

28896 SF

TENANT3

28953 SF

TENANT4

A B C D E F G H I J K L M N

FIRST FLOOR100' - 0"

TOP OF PARAPET138' - 7"

ALUM. STOREFRONTWINDOW SYSTEM

ALUM. STOREFRONTWINDOW SYSTEM

ALUM. STOREFRONTWINDOW SYSTEM

CONCRETE TILT WALLCONCRETE TILT WALL

OVERHANG,TYP

OVERHANG,TYP

OVERHANG,TYP

3A100

1 2 3 4 5

FIRST FLOOR100' - 0"

JT. BEARING - HIGH PT.136' - 0"

JT. BEARING - LOW PT.132' - 3"

TOP OF PARAPET138' - 7"

TOP OF PARAPET138' - 7"

A1004 MECHANICALLY ATTACHED .45 MIL.

TPO WITH R-9 INSULATION ON METALROOF DECK ON STRUCTURAL STEELJOISTS.

TO BO

TT. O

F STR

UCT.

30' - 6

" CL

EAR H

EIGHT

OVERHANG, TYP

TO BO

TT. O

F STR

UCT.

34' - 2

" CL

EAR H

EIGHT

RAMP BEYOND

OVERHANG

1

FIRST FLOOR100' - 0"

JT. BEARING - HIGH PT.136' - 0"

TOP OF PARAPET138' - 7"

TOP OF FOOTING98' - 8"

STRUCTURAL FOOTING;REFER TO STRUCTURALDRAWINGS

COMPACTED TERMITETREATED FILL

CONCRETE TILT WALL

EXTEND FLASHING SHEET UP ANDOVER WOOD BLOCKING, TURNDOWN AND FACE NAIL.

MECHANICALLY ATTACHED .45 MIL.TPO WITH R-9 INSULATION ON METALROOF DECK ON STRUCTURAL STEELJOISTS.

CURTAIN WALL SYSTEM

CONCRETE TILT WALLPILASTER BEYOND

STEEL JOISTS, SEE STRUCT.

ROOF DECK, SEE STRUCT.

6" THICK, SLAB ONGRADE

OVERHANG, TYP

36' -

0"2' -

7"

TO BO

TT. O

F STR

UCT.

34' - 2

" CL

EAR H

EIGHT

comm no.:

checked:

drawn

ARCHITECTURAL

CONFIDENTIAL COPYRIGHT 2014 SCHENKEL & SHULTZ INC.SEE WWW.SCHENKELSHULTZ.COM/COPYRIGHT FOR POLICY AND INFORMATION

A

114 2345678910111213

B

C

D

E

F

G

H

I

J

K

L

SEAL

114 234567891011121315

M

15

Issue Date:Submittal:

161718

N

O

P

161718

SS Lic. No. -schenkelshultz.comfaxvoice

SCHENKELSHULTZA R C H I T E C T U R E

NOT

RELE

ASED

FOR

CON

STRU

CTIO

NRE

LEAS

ED F

OR C

ONST

RUCT

ION

C:\U

sers\

musz

ynsk

i\Doc

umen

ts\CN

L_Pr

inceto

n Oak

s_mu

szyn

ski.rv

t6/1

/2015

11:48

:37 A

M

CheckerAuthor 05-28-2015

FLOOR PLAN, EXTERIORELEVATION, BUILDINGSECTION

A100CONCEPTION 05-28-2015

Revision Schedule

No. Description Date

1/32" = 1'-0"

1 FLOOR PLAN

1/32" = 1'-0"

2 FRONT EXTERIOR ELEVATION

1/16" = 1'-0"

3 BUILDING SECTION 1/4" = 1'-0"

4 WALL SECTION

CNLPRINCETONOAKS

Governing Municipality Power / Water Sewer Connectivity

Phase 1A

30-Acre Preserve

Phase II

(Future Access to John Young Pkwy)

(Subject to Phase II)

(Subject to Phase II)(Future Access to Princeton St)

Phase 1B

Future AccessCar Access

Truck Access

Page 5: Mid-Town Orlando’s Newest Industrial Parkimages2.loopnet.com/d2/pJSj55TmNSQxCvT-kiY7jkr5...Lighting High Efficiency T-5 - Interior, Exterior LED Sprinkler ESFR Fire Protection ...

Total SF:

Available:

Office SF:

Clear:

Column Spacing:

Building Dimensions:

Parking Ratio:

Fire Protection:

Lighting:

111,134

15,502 - 111,134 SF

B-T-S

24’ Minimum

50’ x 50’ (typical)

160’ x 690’

1.3 / 1,000

ESFR

High efficiency T-5

Concrete Slab:

Truck Ct. Depth:

Overhead doors:

Other:

6” Slab (4,000 PSI)

180’ shared, (60’ concrete apron)

41 rear-loading dock high (9’ x 10’)

Two ramp access 12’ x 14’

Preserve view from offices

Class A High-Bay Design

Building 100

Page 6: Mid-Town Orlando’s Newest Industrial Parkimages2.loopnet.com/d2/pJSj55TmNSQxCvT-kiY7jkr5...Lighting High Efficiency T-5 - Interior, Exterior LED Sprinkler ESFR Fire Protection ...

Building 200Building 200

Total SF:

Available:

Office SF:

Clear:

Column Spacing:

Staging Bay

Building Dimensions:

Parking Ratio:

Fire Protective:

119,514

19,202 - 119,514 SF

B-T-S

30’6” minimum

50’ x 50’ (typical)

50’ x 60’ (typical)

660’ x 180’

1.3 / 1,000

ESFR

Lighting:

Concrete Slab:

Truck Ct. Depth:

Overhead doors:

Other:

Class A High-Bay DesignHigh efficiency T-5

6” slab (4,000 PSI)

180’ 60 concrete apron

39 rear-loading dock high (9’ x 10’)

Two ramp access 12’ x 14’

Frontage building (Judge Rd.)

Building 200

Page 7: Mid-Town Orlando’s Newest Industrial Parkimages2.loopnet.com/d2/pJSj55TmNSQxCvT-kiY7jkr5...Lighting High Efficiency T-5 - Interior, Exterior LED Sprinkler ESFR Fire Protection ...

PROXIMITY

– Less than 2 miles from over $5.5 Billion in new development by 2020

– 25M SF submarket with established industrial business base

AVAILABIL ITY

– Phase I, 5 buildings, 510,000 SF Total

– Phase Ia, Building 100 and 200 first spec buildings

ALTERNATE ACCESS

– I-4 construction through 2023 adds importance to alternate roadway

– New buildings create “flight to quality” inventory in “seasoned” submarket

T IMING

– Preleasing now!

– Delivery December 2017

Princeton OaksMidtown Orlando’s Premier Industrial Park

Page 8: Mid-Town Orlando’s Newest Industrial Parkimages2.loopnet.com/d2/pJSj55TmNSQxCvT-kiY7jkr5...Lighting High Efficiency T-5 - Interior, Exterior LED Sprinkler ESFR Fire Protection ...

FOR MORE INFORMATION:

JUSTIN RUBYLeasing

[email protected]

PrincetonOaksIndustrial.com

A DEVELOPMENT BY:

JAMES BAKERLeasing

[email protected]


Recommended