+ All Categories
Home > Documents > MIDANPIRG CNS/ATM/IC Sub-Group (CNS/ATM/IC SG) sg7/WP8.pdf · MIDANPIRG CNS/ATM/IC Sub-Group...

MIDANPIRG CNS/ATM/IC Sub-Group (CNS/ATM/IC SG) sg7/WP8.pdf · MIDANPIRG CNS/ATM/IC Sub-Group...

Date post: 17-Mar-2020
Category:
Upload: others
View: 10 times
Download: 0 times
Share this document with a friend
21
CNS/ATM/IC SG/7-WP/8 28/09/2013 International Civil Aviation Organization MIDANPIRG CNS/ATM/IC Sub-Group (CNS/ATM/IC SG) Seventh Meeting (Cairo, Egypt, 07-09 October 2013) Agenda Item 4: Performance Framework for MID Region Air Navigation Planning and Implementation MEAUSE SURVEYS (Presented by IATA and CANSO) SUMMARY One of the main aims of the Middle East Airspace Users and Stakeholder Engagement Initiative is to gather data and conduct analyses of ANSPs, Airspace Users and stakeholders’ requirements and future plans, through surveys. IATA and CANSO launched regional surveys in 2013 to gauge the current and future ATM/CNS technology capabilities for ANSPs and Users’ requirements and expectations. This working paper outlines the results from the MEAUSE surveys. Action by the meeting is at paragraph 3. 1. INTRODUCTION 1.1 Pursuant to the launched surveys, IATA MENA Office consolidated the responses received from airlines and ANSPs. 1.2 The results were then mapped to ASBU modules. 2. DISCUSSIONS 2.1 Two surveys were launched under the MEAUSE initiative within 2013: 1) The airlines expectations questionnaire 2) ANSPs capabilities questionnaire
Transcript
Page 1: MIDANPIRG CNS/ATM/IC Sub-Group (CNS/ATM/IC SG) sg7/WP8.pdf · MIDANPIRG CNS/ATM/IC Sub-Group (CNS/ATM/IC SG) Seventh Meeting (Cairo, Egypt, 07-09 October 2013) Agenda Item 4: Performance

CNS/ATM/IC SG/7-WP/8 28/09/2013

International Civil Aviation Organization MIDANPIRG CNS/ATM/IC Sub-Group (CNS/ATM/IC SG)

Seventh Meeting (Cairo, Egypt, 07-09 October 2013)

Agenda Item 4: Performance Framework for MID Region Air Navigation Planning and

Implementation

MEAUSE SURVEYS

(Presented by IATA and CANSO)

SUMMARY

One of the main aims of the Middle East Airspace Users and Stakeholder Engagement Initiative is to gather data and conduct analyses of ANSPs, Airspace Users and stakeholders’ requirements and future plans, through surveys. IATA and CANSO launched regional surveys in 2013 to gauge the current and future ATM/CNS technology capabilities for ANSPs and Users’ requirements and expectations. This working paper outlines the results from the MEAUSE surveys. Action by the meeting is at paragraph 3.

1. INTRODUCTION 1.1 Pursuant to the launched surveys, IATA MENA Office consolidated the responses received from airlines and ANSPs.

1.2 The results were then mapped to ASBU modules. 2. DISCUSSIONS 2.1 Two surveys were launched under the MEAUSE initiative within 2013:

1) The airlines expectations questionnaire 2) ANSPs capabilities questionnaire

Page 2: MIDANPIRG CNS/ATM/IC Sub-Group (CNS/ATM/IC SG) sg7/WP8.pdf · MIDANPIRG CNS/ATM/IC Sub-Group (CNS/ATM/IC SG) Seventh Meeting (Cairo, Egypt, 07-09 October 2013) Agenda Item 4: Performance

CNS/ATM/IC SG/7-WP/8 - 2 -

2.2 Analysis of the received responses along with the mapping to ASBU modules is at Appendix A to this working paper.

2.3 Pursuant to the initiative under ICAO MID Office to develop a MID Air Navigation strategy, MEUASE surveys results be were also used to set targets for the Region. 3. ACTION BY THE MEETING 3.1 This meeting is invited to:

a) review the attached analysis document and provide input or comments; b) endorse the attached analysis document as a reference for ANSPs-users gap analysis and

use it as input to the MID Air Navigation Strategy; and c) encourage MID States to attend MEAUSE events, including the MEAUSE Conference in

November 2013.

------------------

Page 3: MIDANPIRG CNS/ATM/IC Sub-Group (CNS/ATM/IC SG) sg7/WP8.pdf · MIDANPIRG CNS/ATM/IC Sub-Group (CNS/ATM/IC SG) Seventh Meeting (Cairo, Egypt, 07-09 October 2013) Agenda Item 4: Performance

I. Introductio

The aviatioAirlines trapassengers transported In the Midd

Recent studgenerates arapidly ove220.4 milliannum over

on

n industry playansport over 2in 2030. Nearlgoods by air r

dle East, air tran

dies by Oxforcross some of r the next 20 yon in 2030. Ar the next 20 ye

AP

ys an essential.6 billion passly 48 million tepresents 35%

nsport support

rd Economicsf the major maryears. PassengeAviation’s direears.

PPENDIX A

l role in econosengers annualtonnes of cargo

% of all internat

ts 1.1 million jo

s have quantifrkets in the Mers’ numbers arect contribution

omic growth, blly. This figureo were carriedtional trade.

obs and contrib

fied significanMiddle East. Mo

re expected to n to GDP is e

CNS/AT

business connee is expected

d by air in 2010

butes nearly $7

nt economic ioreover, this imgrow from 77

expected to in

TM/IC SG/7-APPEND

ectivity, and toto grow to 6 b0. The total va

76 billion to GD

impact that avmpact is set to.1 million in 2

ncrease by 6.3

-WP/8 DIX A

ourism. billion alue of

DP.

viation o grow 2010 to % per

Page 4: MIDANPIRG CNS/ATM/IC Sub-Group (CNS/ATM/IC SG) sg7/WP8.pdf · MIDANPIRG CNS/ATM/IC Sub-Group (CNS/ATM/IC SG) Seventh Meeting (Cairo, Egypt, 07-09 October 2013) Agenda Item 4: Performance

CNS/ATM/IC SG/7-WP/8 APPENDIX A A-2

Supporting such growth will require substantial investment in infrastructure. Furthermore, emerging global standards and requirements dictate accelerated development in infrastructure and investments by airline operators to meet global objectives under the Global Air Navigation Plan (GANP) and ICAO Aviation System Block Up-grades (ASBU). The ICAO Global Air Navigation Capacity & Efficiency Plan (Global Plan) represents the Fourth Edition of the Organization’s Global Air Navigation Plan. It is designed to guide complementary and sector-wide air transport progress over 2013-2028. The ASBU modules present a strategic direction towards Communications, Surveillance, and Navigation to achieve interoperability and harmonization in Air Traffic Management on a global scale. In the MID Region, several initiatives were launched to address airspace congestion and bridge the gaps between airlines and ANSPs. The Middle East Airspace User & Stakeholder Engagement (MEAUSE) Initiative was inaugurated in 2010 in partnership between CANSO, IATA, and regional ANSPs and airlines with the aim to establish a constant and regular engagement mechanism among the various members of the aviation value chain in the Middle East. Under this initiative a survey was launched in 2013 to assess the gaps between investments of ANSPs in technology and aircraft capabilities in fleets of airline operators. The statistics referred to in this document are based on the results of this survey exercise. This document takes into consideration current situation in the MID region, where the MID region should be in reference to the GANP and ASBU Modules and proposed action plans to achieve the set targets and objectives.

II. The Current Situation

i. Investments Plans of MID ANSPs

a) Overview of Survey

• Survey was launched in 2013 • Responses were received from 7 States • Level of response is 47% • The used questionnaire is attached to this document under Appendix A

Page 5: MIDANPIRG CNS/ATM/IC Sub-Group (CNS/ATM/IC SG) sg7/WP8.pdf · MIDANPIRG CNS/ATM/IC Sub-Group (CNS/ATM/IC SG) Seventh Meeting (Cairo, Egypt, 07-09 October 2013) Agenda Item 4: Performance

b)

0

1

2

3

4

5

6A

MH

S

01234567

RN

AV1

0/R

NP1

0

Responses

• Com

• Nav

AID

C

VHF

Voic

e 8.

33 K

Hz

Cha

nnel

Spac

ing

RN

AV5

RN

AV2

mmunication:

vigation:

Cha

nnel

Spa

cing

SatC

om( A

ir-to

–G

roun

d)

VDL

Mod

e 2

RN

AV1

(SID

/STA

R)

RN

AV

<1

Bi

RN

P1

A-3

CPD

LC DC

L

Bas

ic R

NP1

RN

P A

PCH

RN

P A

R A

PCH

D-A

TIS

D-T

AXI

(Dig

ital T

axi

Inst

ruct

ions

)

WG

S-84

GN

SS(N

PA/E

nrou

t)

CNS/AT

Inst

ruct

ions

) ATN

IP N

etw

ork

GN

SSm

onito

ring/

reco

rdin

APV

TM/IC SG/7-APPEND

OLD

ISB

AS

GB

AS

-WP/8 DIX A

Used Tod

Future P

N/A

Used T

Future

N/A

day

lans

Today

Plans

Page 6: MIDANPIRG CNS/ATM/IC Sub-Group (CNS/ATM/IC SG) sg7/WP8.pdf · MIDANPIRG CNS/ATM/IC Sub-Group (CNS/ATM/IC SG) Seventh Meeting (Cairo, Egypt, 07-09 October 2013) Agenda Item 4: Performance

CNS/ATMAPPENDIX

M/IC SG/7-WX A

00.5

11.5

22.5

33.5

44.5

5

Mo

0

1

2

3

4

5

6

7

Aut

omat

ed A

TM c

ontr

olle

r Situ

atio

n D

ispl

ay

Shor

tTer

mC

onfli

ctD

etec

tion

WP/8

Surveillance

• AT

ode S ADS-BOUT

Shor

t Ter

m C

onfli

ct D

etec

tion

Med

ium

Ter

m C

onfli

ct D

etec

tion

Elec

tron

ic v

isua

lizat

ion

of fl

ight

traj

ecto

ries

e:

TM Operation:

ADS-BIN

ADS

Elec

tron

ic fl

ight

str

ips

Arr

ival

Man

ager

Dep

artu

re M

anag

er

A-4

S-C TIS-B

Aut

omat

ed in

ter c

ontr

olle

r coo

rdin

atio

n…

Aut

omat

ed in

ter c

ontr

olle

r coo

rdin

atio

n…

Aut

omat

ed in

ter c

ontr

olle

r coo

rdin

atio

n…

FIS-B ML

Aut

omat

ed in

ter c

ontr

olle

r coo

rdin

atio

n…

Elec

tron

ic P

re D

epar

ture

Cle

aran

ces

Col

labo

rativ

e D

ecis

ion

Mak

ing

[str

ateg

ic]

LAT WAM

Col

labo

rativ

e D

ecis

ion

Mak

ing

[pre

-tact

ical

]

Col

labo

rativ

e D

ecis

ion

Mak

ing

[tact

ical

]

Proc

edur

alA

TC

1090ES

Proc

edur

al A

TC

Surv

eilla

nce-

base

d A

TC

A-S

MG

CS

Used To

Future P

N/A

Used To

Future P

N/A

day

lans

day

lans

Page 7: MIDANPIRG CNS/ATM/IC Sub-Group (CNS/ATM/IC SG) sg7/WP8.pdf · MIDANPIRG CNS/ATM/IC Sub-Group (CNS/ATM/IC SG) Seventh Meeting (Cairo, Egypt, 07-09 October 2013) Agenda Item 4: Performance

• CO

0

1

2

3

4

0

1

2

OM/SUR Cover

00.5

11.5

22.5

33.5

44.5

5

P

0

0.5

1

1.5

2

2.5

3

0% 40%

A-5

rage:

Percenta

% 50% 60%

Percenta

age VHF

70% 80%

age HF V

CNS/AT

voice Co

90% 100%

Voice Co

TM/IC SG/7-APPEND

overage

PercentagCoverage

overage

PercentaCoverage

-WP/8 DIX A

ge VHF voice

age HF Voicee

Page 8: MIDANPIRG CNS/ATM/IC Sub-Group (CNS/ATM/IC SG) sg7/WP8.pdf · MIDANPIRG CNS/ATM/IC Sub-Group (CNS/ATM/IC SG) Seventh Meeting (Cairo, Egypt, 07-09 October 2013) Agenda Item 4: Performance

CNS/ATMAPPENDIX

M/IC SG/7-WX A

WP/8

0

0000

0

00.5

11.5

22.5

33.5

4

0%Le

ss th

an 4

0% 40%

00.20.40.60.8

11.21.41.61.8

2

0%Le

ss th

an 4

0% 40%

00.5

11.5

22.5

33.5

4

0%Le

ss th

an 4

0% 40%

A-6

40%

45%

50%

55%

60%

Percen

40%

45%

50%

55%

60%

Percen

40%

45%

50%

55%

60%

Percen

60%

65%

70%

75%

80%

ntage DC

%65

%70

%75

%80

%

ntage Ra65

%70

%75

%80

%

tage AD

85%

90%

95%

100%

CPC Cove

85%

90%

95%

100%

dar Cov

85%

90%

95%

100%

DS-B Cov

erage

PerceCove

erage

PerceCover

verage

PercenCover

entage DCPCrage

ntage Radarrage

ntage ADS-Bage

Page 9: MIDANPIRG CNS/ATM/IC Sub-Group (CNS/ATM/IC SG) sg7/WP8.pdf · MIDANPIRG CNS/ATM/IC Sub-Group (CNS/ATM/IC SG) Seventh Meeting (Cairo, Egypt, 07-09 October 2013) Agenda Item 4: Performance

0

4

0123456

0%Le

ss th

an 4

0% 40%

00.5

11.5

22.5

33.5

44.5

5

0%Le

ss th

an 4

0% 40%

A-7

45%

50%

55%

60%

Percen

40%

45%

50%

55%

60%

Percen65

%70

%75

%80

%

tage AD

60%

65%

70%

75%

80%

ntage ML

CNS/AT

85%

90%

95%

100%

DS-C Cov

85%

90%

95%

100%

LAT Cove

TM/IC SG/7-APPEND

verage

PercenCover

erage

PerceCover

-WP/8 DIX A

ntage ADS-Cage

entage MLATrage

Page 10: MIDANPIRG CNS/ATM/IC Sub-Group (CNS/ATM/IC SG) sg7/WP8.pdf · MIDANPIRG CNS/ATM/IC Sub-Group (CNS/ATM/IC SG) Seventh Meeting (Cairo, Egypt, 07-09 October 2013) Agenda Item 4: Performance

CNS/ATMAPPENDIX

M/IC SG/7-WX A

ii. Airline

a)

b)

0123456789

10

ATN VDL

Mode

WP/8

e Requirements

Overview of

• Sur• Res• Lev• The

Responses

• Air

0

1

2

-Le 2

HFDL C

s for CNS/ATM

f Survey

rvey was launcsponses were rvel of responsee used question

r to Ground Co

0

0.5

1

1.5

2

2.5

3

Pe

PDLC ACARS

A-8

M

ched in 2013 eceived from 1

e is 40% nnaire is attach

ommunication:

ercentag

VHF8.33KHZ

Satc

11 airlines

hed to this docu

ge Surve

com N/A

ument under A

illance C

Prefercomm

Preferin the the re

Preferin the in the

Appendix B

Coverage

Percentage Coverage

rred primary mmunication (Dat

rred datalink imshort term (wgion

rred datalink imlong term proregion

e

Surveillance

means oftalink)

mplementationwithin 1 year) in

mplementationject (3-5 years

nn

n)

Page 11: MIDANPIRG CNS/ATM/IC Sub-Group (CNS/ATM/IC SG) sg7/WP8.pdf · MIDANPIRG CNS/ATM/IC Sub-Group (CNS/ATM/IC SG) Seventh Meeting (Cairo, Egypt, 07-09 October 2013) Agenda Item 4: Performance

0

2

4

6

8

10

12

CA

0

1

2

3

4

5

6

7

AB

PBN:

• GN

APABLE TODAY

BAS G

NSS:

Y PLA

GBAS

A-9

ANNED

SBAS

N/A

N/A

CNS/AT

Augmavaila

PreferGNSS

Augmbe im

TM/IC SG/7-APPEND

Capabi

Capabi

mentation systeble today

rred and most augmentation

mentation systeplemented by

-WP/8 DIX A

ility for RNAV5

ility for RNAV 1

em capability

cost-benefician

em that should2016

5

1

l

Page 12: MIDANPIRG CNS/ATM/IC Sub-Group (CNS/ATM/IC SG) sg7/WP8.pdf · MIDANPIRG CNS/ATM/IC Sub-Group (CNS/ATM/IC SG) Seventh Meeting (Cairo, Egypt, 07-09 October 2013) Agenda Item 4: Performance

CNS/ATMAPPENDIX

III.

M/IC SG/7-WX A

Surveys Ga

0

1

2

3

4

5

6

7

8

PSR

WP/8

Surveillance

aps Analysis:

• Com

SSR M

e:

mmunication:

CP - 72%

link CPD

- OnlyCPDone impl

V

- 18%dataindicshor

- OnlyModModnot i

Co

- All

diffi 1.2.3.4.

MLAT PAR

A-10

PDLC:

% of airline resin the short

DLC as the prey 29% of the

DLC today, anof the ANS

lement or have

DL Mode 2:

% of airline resa link in the Mcated that VDLrt term. y 29% of the Ade 2today, andde 2. 43% of timplement or h

ommunication

airline responiculties in the f

Iraq Libya Sudan Saudi Arabia –

ADS-C AD

spondents inditerm, and 8

ferred data linke ANSPs respnd 57% have pSPs respondene no current pla

spondents indicMID Region, L Mode 2 shou

ANSPs respond another 29%the ANSPs rehave no curren

n Difficulties Id

ndents indicatefollowing locat

– the Empty Q

DS-B N/A

icated CPDLC1% of the rek in the long tepondents are plans to implents indicated ans for CPDLC

cated VDL Mand only 9%

uld be impleme

ndents are capa% have plans espondents indnt plans for VD

dentified by Ai

ed that they ftions in the MI

Quarter

Airlineffec

Survwouwere

C as a preferreespondents inderm. capable of of

ement CPDLCthat they wi

C.

ode 2 as a pre of the responented and used

able of offeringto implement

icated that theDL Mode 2.

irlines:

face communiID Region:

ne preferred active surveillan

veillance technld enhance pee implemented

ed data dicated

ffering . Only ill not

eferred ndents

d in the

g VDL t VDL ey will

ication

nd most costnce technology

ology thatrformance if it

d by 2016

y

t

Page 13: MIDANPIRG CNS/ATM/IC Sub-Group (CNS/ATM/IC SG) sg7/WP8.pdf · MIDANPIRG CNS/ATM/IC Sub-Group (CNS/ATM/IC SG) Seventh Meeting (Cairo, Egypt, 07-09 October 2013) Agenda Item 4: Performance

CNS/ATM/IC SG/7-WP/8 APPENDIX A

A-11

Summary of Finding: Implementation of CPDLC is a user preferred technology, while ANSPs are not all planning on using or having CPDLC implemented in the short term. States with Communications difficulties can overcome such problems by implementing CPDLC. Lack of adequate communication infrastructure is causing safety incidents that are continuously being reported by air crew. Therefore, addressing communication difficulties is a safety requirement in addition to being an efficiency requirement.

• Navigation:

RNAV 5 Capability: - 100% of airline respondents indicated that are RNAV 5 capable

today. - 100% of the ANSPs respondents indicated that are RNAV 5

capable today.

RNAV 1 Capability: - 82% of airline respondents indicated that are RNAV 1 capable

today, and 18% indicated that they plan on becoming RNAV 1 capable.

- 71% of the ANSPs respondents indicated that are RNAV1 (SID/STAR) capable today, and 29% indicated that they have plans to become RNAV1 (SID/STAR) capable.

- At the moment, the only published RNAV 1 routes are between UAE and Bahrain which will be available end of May 2013.

Summary of Finding: Although the survey results show PBN capabilities on both ANSPs and airlines side, but the actual use and benefit of PBN is still limited in the MID Region. Some of the airline respondents highlighted that difficulties and challenges still hinder an accelerated wide spread of PBN implementation, including training, awareness, communication and coordination, and the need for PBN implementation mandate to ensure commitment on regional and national level .

GNSS:

- 45% of airline respondents indicated that they are GBAS capable

today, while 27% of the respondents indicated that they are ABAS capable today.

- 45% of airline respondents indicated that GBAS is the most cost-beneficial GNSS augmentation, while 36% indicated that ABAS is the most cost beneficial augmentation.

- 55% of airline respondents indicated that they would like to see GBAS implemented by 2016, while 27% preferred to see ABAS implemented by 2016.

- Only one airline out of the 11 supported SBAS implementation by 2016.

Page 14: MIDANPIRG CNS/ATM/IC Sub-Group (CNS/ATM/IC SG) sg7/WP8.pdf · MIDANPIRG CNS/ATM/IC Sub-Group (CNS/ATM/IC SG) Seventh Meeting (Cairo, Egypt, 07-09 October 2013) Agenda Item 4: Performance

CNS/ATMAPPENDIX

IV.

M/IC SG/7-WX A

GANP and

a)

WP/8

• Sur

d ASBU Overv

ICAO Block

The core of tperformance 1) Airport 2) Globally3) Optimum4) Efficien

- 57%GBA

SummarAlthoughregion a

rveillance:

A - 64%

costrespimpl

- 43%capaIN.

SummarAlthoughRegion s

view:

k Upgrades Me

the Block Up-ge areas;

Operations y-interoperablem capacity and

nt flight paths

A-12

% of the ANSAS implementa

ry of Finding: h airlines see mre more lookin

DS-B:

% of airline rest effective survpondents indiclemented by 20

% of the ANSable today, whi

ry of Finding: h ADs-B is astill does not h

ethodology:

grade concept

e systems and dd flexible fligh

SPs respondenation.

most benefit inng into GBAS

spondents indicveillance techncated that th016. SPs respondenile another 43%

a technology thhave a region-w

is linked to fou

data hts

nts indicated t

n GBAS and Aand SBAS.

cated that theirnology is ADShey would lik

nts indicated t% have plans t

that can be uswide spread of

ur specific inte

that have plan

ABAS, ANSPs

r preferred andS-B, and 55% ke to see A

that are ADSo implement A

sed today, thef use of ADS-B

errelated aviatio

ns for

in the

d most of the

ADS-B

-B IN ADS-B

e MID B.

on

Page 15: MIDANPIRG CNS/ATM/IC Sub-Group (CNS/ATM/IC SG) sg7/WP8.pdf · MIDANPIRG CNS/ATM/IC Sub-Group (CNS/ATM/IC SG) Seventh Meeting (Cairo, Egypt, 07-09 October 2013) Agenda Item 4: Performance

CNS/ATM/IC SG/7-WP/8 APPENDIX A

A-13

V. Mapping ASBU Modules applicable to the MID region:

The following ASBU Modules have selected as a priority for the MID region under the auspices of ICAO MIDANPIRG;

1) B0 – APTA: Optimization of Approach Procedures including vertical guidance 2) B0 – SURF: Safety and Efficiency of Surface Operations (A-SMGCS Level 1-2) 3) B0 – FICE: Increased Interoperability, Efficiency and Capacity through Ground-

Ground Integration 4) B0 – DATM: Service Improvement through Digital Aeronautical Information

Management 5) B0 – MET: Meteorological information supporting enhanced operational efficiency

and safety 6) B0 – FRTO: Improved Operations through enhanced en-route trajectories 7) B0 – CDO: Improved flexibility and efficiency in descent profiles (CDO) 8) B0 – CCO: Improved flexibility and efficiency departure profiles – Continuous

Climb Operations (CCO) The following ASBU Modules still remain as a requirement for the MID Region from the perspective of the airlines and ANSPs;

1) B0 – ACDM: Improved Airport Operations through Airport‐CDM 2) B0 – ASUR: Initial capability for ground surveillance 3) B0 – TBO: Improved Safety and Efficiency through the initial application of Data

Link En-Route 4) B0 – WAKE: Increased Runway Throughput through Optimized Wake Turbulence

Separation 5) B0 – RSEQ: Improve Traffic flow through Runway Sequencing (AMAN/DMAN)

Modules under Blocks 2 and 3 will be re-visited after Blocks 0 and 1 are addressed in the region. To identify gaps between current status based on MEAUSE surveys and strategic targets set for the region in accordance with the GANP and ASBU modules, the following represents a mapping between MEAUSE results and aforementioned ASBU Modules. Block 0 (2013):

• B0 – APTA: Optimization of Approach Procedures including vertical guidance 29% of ANSPs respondents to the MEAUSE survey indicated that they can use APV today.

While, 43% of the respondents indicated that have plans to use APV in the future. 55% of airlines respondents indicated that their preferred augmentation by 2016 is GBAS.

• B0 – SURF: Safety and Efficiency of Surface Operations (A-SMGCS Level 1-2) 43% of ANSPs respondents to the MEAUSE survey indicated that they use A-SMGCS

today. While, 43% of the respondents indicated that have plans to use A-SMGCS in the future. Only one ANSP indicated that they have no plans for A-SMGCSA use.

• B0 – FICE: Increased Interoperability, Efficiency and Capacity through Ground-Ground

Integration 29% of ANSPs respondents to the MEAUSE survey indicated that they have AIDC today.

43% of the respondents indicated that plan to have AIDC implemented.

Page 16: MIDANPIRG CNS/ATM/IC Sub-Group (CNS/ATM/IC SG) sg7/WP8.pdf · MIDANPIRG CNS/ATM/IC Sub-Group (CNS/ATM/IC SG) Seventh Meeting (Cairo, Egypt, 07-09 October 2013) Agenda Item 4: Performance

CNS/ATM/IC SG/7-WP/8 APPENDIX A A-14

71% of ANSPs respondents to the MEAUSE survey indicated that they have OLDI implemented today, while only one ANSP indicated that it has plans for OLDI implementation in the future.

• B0 – DATM: Service Improvement through Digital Aeronautical Information Management Work under this module will be based on work progress under MIDAD. Therefore, it will

not be addressed under this document.

• B0 – MET: Meteorological information supporting enhanced operational efficiency and safety Work under this module will be mainly addressed under the ICAO MET SG. Therefore, it

will not be addressed under this document.

• B0 – FRTO: Improved Operations through enhanced en-route trajectories The use of airspace which would otherwise be segregated (i.e. special use airspace) along

with flexible routing (Off-Airways & point-to-point) adjusted for specific traffic patterns. This will allow greater routing possibilities, reducing potential congestion on trunk routes and busy crossing points, resulting in reduced flight length and fuel burn.

• B0 – CDO: Improved flexibility and efficiency in descent profiles (CDO)

All airlines respondents to the MEAUSE Survey indicated that they are capable for RNAV

5. 82% indicated that they are capable for RNAV 1. 100% of ANSPs respondents to the MEAUSE survey indicated they are capable for RNAV

5 today. 71% of ANSPs respondents to the MEAUSE survey indicated they have RNAV1

(SID/STAR) 71% of ANSPs respondents to the MEAUSE survey indicated that they have plans to

implement Basic RNP 1 29% of ANSPs respondents to the MEAUSE survey indicated that they have RNP APCH

today, while 43% indicated that they have future plans to implement RNP APCH 43% of ANSPs respondents to the MEAUSE survey indicated that they have future plans to

implement RNP AR APCH Work is required in Terminal airspace to implement RNAV STARs, then Air Traffic needs to work on allowing the aircraft to continue its descent unimpeded by ATC. This will require ATC training & perhaps the implementation of Sequencing Tools & CPDLC to support this in real operations.

• B0 – CCO: Improved flexibility and efficiency departure profiles – Continuous Climb

Operations (CCO)

All airlines respondents to the MEAUSE Survey indicated that they are capable for RNAV 5. 82% indicated that they are capable for RNAV 1.

100% of ANSPs respondents to the MEAUSE survey indicated they are capable for RNAV 5 today.

71% of ANSPs respondents to the MEAUSE survey indicated they have RNAV1 (SID/STAR)

71% of ANSPs respondents to the MEAUSE survey indicated that they have plans to implement Basic RNP 1

Page 17: MIDANPIRG CNS/ATM/IC Sub-Group (CNS/ATM/IC SG) sg7/WP8.pdf · MIDANPIRG CNS/ATM/IC Sub-Group (CNS/ATM/IC SG) Seventh Meeting (Cairo, Egypt, 07-09 October 2013) Agenda Item 4: Performance

CNS/ATM/IC SG/7-WP/8 APPENDIX A

A-15

VI. Air Navigation Objectives and Targets for MID Region: The MID Region air navigation objectives and targets are detailed in the table below;

B0 – APTA: Optimization of Approach Procedures including vertical guidance Applicability: Aerodromes Metrics KPI Target Actions LNAV Approaches Number of airports with LNAV

approaches PBN and APV operations (Approaches with Vertical guidance) regional operator implementation to be complete:

- 30% by Dec 2015 - 70% by Dec 2018

- 100% by Dec 2020 The following Runway ends in the MID Region have been identified where APV with Vertical guidance are a priority: - Najaf ORNI/NJF Rwy 10 - Alexandria HEBA/HBE – Rwy 14 - Tripoli HLLT/TIP – Rwy 09 - Amman OJAI/AMM – Rwy 08R - Benghazi HLBN/BEN - Rwy 15L, 15R, 33R

1) Consultation meetings jointly driven by IATA, CANSO, and ICAO in conjunction with MEAUSE

2) PBN Workshops in 2014 3) MPST Go-Team visits

LNAV/VNAV Approaches

Number of airports with LNAV/VNAV approaches

Precision Approach Number of airports with precision approaches

GNSS Augmentation

- Number of ANSPs implementing GNSS

ANSPs/States to implement GBAS in a phased approach as follows;

- 30% implementation by 2014 - 60% implementation by 2016 - 100% implementation by 2018

1) Consultation meetings jointly driven by IATA, CANSO, and ICAO in conjunction with MEAUSE

2) GNSS/GBAS Workshop in 2014

3) Pilot projects and trials

Page 18: MIDANPIRG CNS/ATM/IC Sub-Group (CNS/ATM/IC SG) sg7/WP8.pdf · MIDANPIRG CNS/ATM/IC Sub-Group (CNS/ATM/IC SG) Seventh Meeting (Cairo, Egypt, 07-09 October 2013) Agenda Item 4: Performance

CNS/ATM/IC SG/7-WP/8 APPENDIX A A-16

B0 – SURF: Safety & Efficiency of Surface Operations (A-SMGCS Level 1-2) Applicability: Aerodromes Metrics KPI Target Actions Number of airports with Level I A-SMGCS implementation

1) Improve the control of runway

and taxiing operations by implementing incursion alerts and tools to predict, detect and resolve conflicts

1) Non-visual Aids:

- All airports in the MID region to be equipped with functional and reliable ILS by 2014

2) Visual Aids: All airports in the MID region to comply with Annex 14 photometric requirements by 2013 including:

- Markings - Lights - Signs

1) Airport technical missions jointly driven by IATA, CANSO, and ICAO

2) Airport infrastructure surveys

3) consultation meetings jointly driven by IATA, CANSO, and ICAO in conjunction with MEAUSE

Number of airports with Level II A-SMGCS implementation

1) Enhance the surveillance function at all MID aerodromes to ensure that controllers receive all necessary information on all aircraft and vehicles on the movement area down to the AVOL

2) Enhance the situation

awareness of pilots, particularly in low visibility conditions — when the “see and be seen” principle is not applicable

3) Develop routing facilities in

order to make full use of aerodrome capacity

1) Use of primary and secondary radar with Human Machine Interface (HMI) to complement SMR image by 2018

2) Use of CPDLC data link to complement radiotelephony by 2018

3) Non-visual Aids:

- All airports in the MID region to be CAT II capable by 2016

- All airports in the MID region to be CAT III capable by 2018

-

B0 - FICE: Increased Interoperability, Efficiency and Capacity through Ground-Ground Integration Applicability: States/ACCs Metrics KPI Target Actions Use of AIDC to replace ATS Messages under Annex 3 of Doc 4444

Number of ANSPs implementing AIDC - 100% AIDC implementation in the MID region by 2014.

Use of OLDI to replace ATS Messages under Annex 3 of Doc 4444

Number of ANSPs implementing OLDI OLDI implementation in a phased approach as follows;

- 50% of all Mid States by 2015 - 100% of all MID States by 2016

Page 19: MIDANPIRG CNS/ATM/IC Sub-Group (CNS/ATM/IC SG) sg7/WP8.pdf · MIDANPIRG CNS/ATM/IC Sub-Group (CNS/ATM/IC SG) Seventh Meeting (Cairo, Egypt, 07-09 October 2013) Agenda Item 4: Performance

CNS/ATM/IC SG/7-WP/8 APPENDIX A

A-17

B0 - FRTO: Improved Operations through enhanced en-route trajectories Applicability: States/ACCs Metrics KPI Target Flexible Use of Airspace

Level of access to restricted airspace:

1) Percentage of airspace accessed 2) Duration of accessibility of

airspace

1) Reduce military restricted airspace in the MID region by 10% by 2014, through:

- Allowing timed routes to be available through military restricted airspace; or

- Reducing portion of airspace restricted

2) Reduce military restricted airspace in the MID region by an additional 10% by 2016, through:

- Allowing timed routes to be available through military restricted airspace; or

- Reducing portion of airspace restricted

3) Reduce military restricted airspace in the MID region by an additional 10% by 2018, through:

- Allowing timed routes to be available through military restricted airspace; or

- Reducing portion of airspace restricted

1) Civil-Military Go-Team visits

Point-to-Point Navigation

Number of Stated implementing off-airways point-to-point navigation

Implement off-airways point-to-point navigation in a phased approach as follows;

- 10% by 2014 - 50% by 2016 - 100% by 2018

1) Consultation meetings jointly driven by IATA, CANSO, and ICAO in conjunction with MEAUSE

2) Workshops 3) Pilot projects and trials

Number of States implementing free route airspace

Implement off-airways point-to-point navigation in a phased approach as follows;

- 10% by 2014 - 50% by 2016 - 100% by 2018

1) Consultation meetings jointly driven by IATA, CANSO, and ICAO in conjunction with MEAUSE

2) Workshops 3) Pilot projects and trials

Page 20: MIDANPIRG CNS/ATM/IC Sub-Group (CNS/ATM/IC SG) sg7/WP8.pdf · MIDANPIRG CNS/ATM/IC Sub-Group (CNS/ATM/IC SG) Seventh Meeting (Cairo, Egypt, 07-09 October 2013) Agenda Item 4: Performance

CNS/ATM/IC SG/7-WP/8 APPENDIX A A-18

B0 - CDO: Improved flexibility and efficiency in descent profiles (CDO) Applicability: States/ACCs Metrics KPI Target Actions Continuous Descent Operations (CDO)

Number of airports supporting CDO operations

Phased implementation of CDO in the MID region;

- 10% implementation by 2014 - 50% implementation by 2016 - 100% implementation by 2018

1) Pilot projects 2) PBN Workshops

B0 - CCO: Improved flexibility and efficiency departure profiles – Continuous Climb Operations (CCO) Applicability: States/ACCs Metrics KPI Target Actions Continuous Climb Operations (CCO)

Number of airports with revised departure routings in support of continuous climb operations

Phased implementation of CCO in the MID region;

- 10% implementation by 2014 - 50% implementation by 2016 - 100% implementation by 2018

1) Pilot projects 2) PBN Workshops

Page 21: MIDANPIRG CNS/ATM/IC Sub-Group (CNS/ATM/IC SG) sg7/WP8.pdf · MIDANPIRG CNS/ATM/IC Sub-Group (CNS/ATM/IC SG) Seventh Meeting (Cairo, Egypt, 07-09 October 2013) Agenda Item 4: Performance

CNS/ATM/IC SG/7-WP/8 APPENDIX A

A-19

Additional Targets and Priorities Metrics KPI Target Actions Ground-to-Air Communication in conjunction with B0 - TBO

- Number of ANSPs using data link communication

1) ANSPs/States to ensure 100% VHF coverage within their airspace by 2013

2) ANSPs/States to implement

CPDLC (using Satcom or VDL Mode 2) in a phased approach as follows;

- 30% implementation by 2014 - 60% implementation by 2016 - 100% implementation by 2018

Technical and operational support for datalink trials

Surveillance in conjunction with B0 - ASUR

- Number of ANSPs utilizing new aircraft technology to enhance surveillance

1) ANSPs/States to implement ADS-B OUT (aircraft out) as follows;

- 30% implementation by 2014 - 60% implementation by 2015 - 100% implementation by 2016

2) ANSPs/States to implement

MLAT as follows;

- 30% implementation by 2015 - 60% implementation by 2016 - 100% implementation by 2017

1) ADS-B/MLAT Workshop in 2014

-END-


Recommended