Middle East Hire Fleet
AC - 5KW to 1000KW Resistive LOADBANKS
DC - 12V to 600V LOADBANKS upto 2000A
Rack Load Banks (Server Simulators)
• Hillstone have manufactured and rented load banks for 25 years
• Hillstone are Based in Bury, Lancashire
• Hillstone have supplied load banks to
• Hillstone cross hire load banks only from
• Site surveys, Risk Assessments, Method Statements
• Full UK coverage for delivery & collections
• Load bank technicians with CSCS cards & full PPE
• Road tow trailers, vans fitted with digital tachographs
• Based at Dubai , UAE with Rental depot • In Saudi Arabia with With Partner at Jubail and Hillstone Rep
based at Riyadh • Full GCC Coverage for delivery & collections • Site surveys, Risk Assessments, Method Statements for Load
Bank Testing for Generators and UPS Systems and Battery Discharge Testing.
• Largest fleet of Rack Load Banks(Server Simulators) in Kingdom of Saudi Arabia (3 Megawatts)
DC Load banks
• Connection direct to battery terminals
Battery & UPS testing procedures
Hillstone provide full technical support
• UPS autonomy testing
• Connection to the output of the UPS
• Battery Capacity Test
AC Load banks
Voltage ranges from 12V to 600V
Current available from 100A to 5000A solutions
DC Load Banks
Small portable designs
Hillstone provide full technical support
For DC load bank enquiries answers to the following questions will provide
sufficient information to allow a quotation to be issued
DC enquiry check list
• What is the required test?
Battery capacity test
Battery charger test
Fuel Cell load test
• For battery testing:
What is the battery type? Lead Acid or Ni-Cad?
What is the battery capacity
How many cells does the battery have ( connected in series per string )
How many parallel strings does the battery have?
• What is the test voltage?
( also what is the maximum voltage?)
• What is the required current?
Single & 3 phase designs
AC Load Banks
30KW
100KW
200KW
300KW
500KW
1000KW*
For AC load bank enquiries answers to the following questions will
provide sufficient information to allow a quotation to be issued
AC enquiry check list
• What is the required test?
Generator load test
UPS autonomy test
• What is the test voltage?
( also what is the maximum voltage?)
• What is the required current or power?
• Is a re-active load test required?
• How many meters of cable are required?
• Where is the site located? & How long is the hire for?
• Are we providing delivery, cable laying, removal etc?
• Is an operator required with the load bank
Oil & Gas Sector
Battery testing
UPS System testing
Generator testing
Telecom Sector
Battery Testing - 48V DC high current discharges
Server Rooms
UPS System - Autonomy testing
Datacentre Sector
Standby Power testing
Cooling
Integrated System Tests testing
Electrical power systems - such as:
Heat Ventilation Air-Conditioning equipment such as:
Power Distribution Units,
UPS systems,
Gen-sets
Chillers
Compressors
Air Handling units
Integrated System Tests
Stage 1- IST testing
Portable 100KW, 200KW, 300KW 3 phase load banks
provide data hall testing of power
• UPS systems autonomy testing
• Generator black start testing
• Possible HVAC testing subject to data
hall design
• Power Distribution Unit testing
Stage 2- IST testing
Proving your data hall power & cooling infrastructure
• Data hall cabling verification
• Uniformed Air-Con heat testing
• 1KW to 20KW switched load steps
• Single phase 230V 50Hz
• 3 phase 415V 50Hz
20KW portable Mini Tower load banks
Stage 2- IST testing
Stage 3- IST testing
4U modules fitted into 19” racks
1.1KW to 6.66KW loads
Containment Pod Server Simulator