REMINDER Check in on the COLLABORATE mobile app Migrating from Instantis 8.0 to EnterpriseTrack 8.7 Prepared by: Thomas Cutting Volantic, Inc John Aragon & George Van Der Veen - BBCN BBCN’s Customer Story Session ID#: 200960 @volantic
Transcript

REMINDER

Check in on the

COLLABORATE mobile app

Migrating from Instantis 8.0 to EnterpriseTrack 8.7

Prepared by:

Thomas Cutting – Volantic, Inc

John Aragon & George Van Der Veen - BBCN

BBCN’s Customer Story

Session ID#: 200960

@volantic

Introductions

■ John Aragon

▪ SVP Implementations Manager, BBCN

▪ Project Sponsor

■ George Van Der Veen

▪ PM, Technology Advancement Group, BBCN

▪ Administrator

■ Thomas Cutting, PMP

▪ Project & Process Lead, Volantic, Inc.

▪ Configuration & Migration

Agenda

■ Background

■ Upgrade Decision Process

■ Delivery Plan

■ Implementation Reality

■ Migration Migraine

■ Lessons Learned

Background

BBCN Bank was formed in 2012 through the merger of two similar

sized banks. The new Bank found itself with a large number of

complex technology projects and a strategic plan that held out the

possibility future bank acquisitions.

Solution needed to address:

■ Over 100 projects to be tracked – range in size and complexity

■ Organization growth requires improved project management

methodology

■ Monitoring and reporting project status using Excel spreadsheets – ▪ Difficulty sharing spreadsheets on complex projects with multiple

managers

▪ Ineffective for tracking time and progress for complex projects

▪ Periodic management status reporting of all projects very time

consuming

■ Corporate objective to implement a standardized portfolio/project

management process in line with the FFIEC IT Examination

Handbook

Background

Vendor evaluation and selection:

■ Q4 2012 – 3 EPPM offerings considered, Instantis hosted Version

8.0 selected

■ Q1 2013 – configuration, on-boarding, training, testing and

implementation

Production configuration designed to support project management

methodology:

■ Large, Medium and Small projects supported

■ Four-phase waterfall project structure with milestones and tollgates

■ Standard activity templates built into Instantis

■ Standard project document templates created

■ Consolidated status reporting and dashboards created

■ Project initiation information captured in Instantis

■ Project workflow (Charter -> Proposal -> Project) implemented

Upgrade Decision Process

■ Performance

■ Update ―Slippage‖

■ Workflow Simplification

■ Re-author of templates and roadmaps

Delivery Process

Design • Review current Environment

• Document To Be

Build • Alpha in Sandbox

• Verification

• Beta on SaaS

Deploy • Training

• Production Move

• Migration

• Turn Over

Implementation Reality

■ Design

▪ Mirrored 8.0 in Sandbox

▪ Identified changes to incorporate

▪ Idea and Proposal functionality

■ Build

▪ 8.0 through 8.6 error messages a challenge

▪ 8.0 could not be exported / imported to later releases

▪ Oracle upgrade SaaS new environments to 8.7 mid-build

▪ LDAP unable to use multiple directories

▪ Changes in design for Activities, Roadmaps and Resources

Implementation Reality

■ Deploy

▪ Move to Production Mode limited UDF options

▪ Oracle Data Center Migration

— Delayed roll out slightly

— Smooth transition, good communication

▪ Transfer projects via MS Project

Migration Migraine - Resources

■ Simple concept

■ Changes to resource types, roles, etc. made it more challenging

■ Do-able, just time consuming

Migration Migraine – Projects

■ Transfer projects via MS Project

▪ Required MS Project 2007

▪ Created MS Project enabled template to align with old project

▪ Match Text26 to Text29 to 8.7

▪ Clear Text 30 for all Activities leaving WBS structure values

Migration Migraine – Projects

■ Simplified most

▪ One phase for Small Projects

▪ Stripped entire project and kept only project level security code

(text30)

Lessons Learned

■ Get on Oracle’s radar early and communicate dates

■ Design for simplicity and grow

▪ Original environment designed well but overkill for what was

actually used

▪ Ensure the pieces are activated for future use

Reconfigure Mode Capabilities

Volantic Consulting Services

Strategic

Consulting

• Assessments

• Requirements

• Roadmap

Training

• On site

• Virtual

• On Demand

Implementation

• Processes

Optimization

• Change

Management

• Installation

Technical • Integration • Cloud

Management • Custom Apps

We see the world in three colors: Black, White and Oracle®

Please complete the session evaluation We appreciate your feedback and insight

You may complete the session evaluation either

on paper or online via the mobile app

■ Our purpose is to inform and educate our members on current and future

functionality of Oracle Primavera products, while offering a forum for peers to

share their experience and knowledge in the use of Primavera.

■ Educational opportunities across the Primavera product suite

■ Online Learning Series August 17th – September 4th

■ Call for presentation opening April 27th

■ Monthly Community Calls

■ 3rd Thursday of the month at 1:00 pm ET

■ Networking with other users within the Primavera community

■ Partnering with Oracle Primavera to meet the needs of our diverse

membership.

■ Membership is open to anyone with an interest in the Oracle Primavera products,

with no dues for membership. All members can vote on matters brought before

the OPSIG. Membership requests may be reviewed by the OPSIG board.

OPSIG is the home for

Primavera Users


Recommended