Overview of G3G and Aberdare Cables S/4HANA Stories
A Practical guide for conversion to S/4HANA
Introductions and ObjectivesNameAndrew Borresen (CTO @G3G)
• 20 years global SAP experience • Key focus – SAP Architecture and
Roadmap Advisory• G3G is a SAP customer and partner
(running SAP since 2010)
Questions
Speaker Brief Agenda
© Copyright 2019 G3G Limited. All rights reserved
S/4HANA Migration Options
New Implementation
System Conversion
Landscape Transformation
On-Premise
Cloud
On-Premise
Cloud
On-Premise
S/4HANA
ERP System
Non-SAP System
ERP System
ERP System- Region A -
ERP System- Region B -
ERP System- Region C -
New Implementation
System Conversion
Landscape Transformation
▪ Longer timeline▪ Large investment for existing SAP customer▪ Faster adoption of innovations and best
practices (move away from customisation)▪ Opportunity to clean data
▪ Quicker migration realisation▪ Suitable for most customers who have a
single SAP instance▪ Transaction history is retained ▪ Minimal Change Management▪ Custom remediation effort could be high▪ Slower adoption of new innovations
© Copyright 2019 G3G Limited. All rights reserved
G3G MigrationMigration from ECC 6.0 EHP 5 to S/4HANA Finance 1503Go-live: January 2016 (6 months)
Drivers▪ Become early adoption SAP Partner▪ Build confidence in HANA product▪ More efficient planning process (BPC embedded)
Takeaways▪ Low risk approach for new software is possible▪ Suitable for multiple short innovation cycles
EHP5
EHP7 on SQL
EHP7 on HANA (SoH)
S/4HANA Finance 1503
Continuous Improvement
1
2
3
4
5
© Copyright 2019 G3G Limited. All rights reserved
Aberdare Cables MigrationConversion from ECC 6.0 EHP 7 to S/4 HANA 1709 Estimated Go-live: Nov 2019
Carve out
DB6/Linux SuseECC 6.0 EHP5No Unicode
ECC 6.0 EHP7 (SOH)Unicode
1709 HANA 2.0
Continuous Improvement
1
2
3
4
5
Infrastructure changeHANA custom code
adaptations
Platform change
Unicode change
Software Upgrade
Mandatory features
Configuration of optional features
More Fiori apps
Best Practices
© Copyright 2019 G3G Limited. All rights reserved
Methodology Overview
Start with POC rehearsal (s)▪ Determine S/4HANA conversion compatibility and
approach, determine likely effort and ‘play book’ for production landscape.
▪ Mandatory functional adaptations only (Technical conversion)
▪ Iterate until success achieved
Migration approach decision point:▪ Conversion▪ New implementation with migration (S/4 Best
Practice Solution)
POC rehearsal(s) Technical Conversion (Production Landscape) Continuous Improvement
© Copyright 2019 G3G Limited. All rights reserved
Prepare PhaseReadiness Check
▪ Which adds on are supported/conflicting?
▪ Which Business Functions are supported/conflicting?
▪ What Custom code needs to be checked / changed?
▪ What data needs to be migrated?
▪ What functional changes are mandatory?
▪ Simplification items (Principle of 1)
▪ What infrastructure sizing requirements will I have?
▪ Which Fiori apps are recommended?
© Copyright 2019 G3G Limited. All rights reserved
© Copyright 2019 G3G Limited. All rights reserved
Prepare PhaseLogistics
▪ Business Partner approach
▪ Customer/Vendor integration(CVI)
▪ MRP areas (Principle of 1)
▪ MATNR extension
© Copyright 2019 G3G Limited. All rights reserved
Prepare Phase
GL to Sub Ledger
Ledger Comparison
Inventory to GL
Asset Period Closed
New Assets Activate
Finance
▪ Financial configuration and data consistency checks
▪ Reconciliation
▪ Period-end closing activities
▪ Document posting data (‘Before’ recon reports)
© Copyright 2019 G3G Limited. All rights reserved
Realization PhaseTechnical Conversion with SUM (DMO)
▪ Complete uptime phases
▪ Execute full down time
▪ Post activities
© Copyright 2019 G3G Limited. All rights reserved
Realization PhaseFinance Conversion
▪ Customizing migration
▪ Credit management, General Ledger, Material Ledger, House Banks
▪ Finance data migration
▪ Universal Journal
Analyse errors, clean in production, perform 2nd iteration of conversion POC
© Copyright 2019 G3G Limited. All rights reserved
Realization PhasePost Conversion Activities
▪ Output Management
▪ PP/DS
▪ SAP Fiori activation (embedded versus hub)
▪ SAP Fiori Launchpad & application configuration
▪ Expose system to internet
© Copyright 2019 G3G Limited. All rights reserved
Summary
▪ Establish a low risk plan by executing a POC
▪ Establish technical feasibility of conversion (approach decision point)
▪ Identify and resolve issues
▪ Establish well documented repeatable process - ‘Play Book’
▪ Identify change management considerations
▪ Reduce time to value
▪ Technical Conversion
▪ Mandatory functional adaptations
▪ Continuous improvement later (code optimization and functional enhancement)
Write your S/4 Story now…
© Copyright 2019 G3G Limited. All rights reserved
UK Head OfficeQuatro HouseFrimley RoadCamberleySurrey GU16 7ER
+44 (0)370 620 1111
South Africa Head OfficeBuilding 1Ashlea Gardens Office ParkCnr. Garstfontein Rdand Matroosberg StreetPretoria 0081
+27 (0)12 947 9620
UK Daresbury OfficeTechspace TwoSci TechKeckwick LaneDaresbury WA4 4FS
+44 (0)370 620 1112
company/g3g
@G3Gnews
www.g3g.com
Follow us
Contact us
+27 (0)60 757 8635
Andrew. [email protected]
Andrew BorresenCTO