Millau Viaduct
FATİH MEHMET TAYLI130204102
Location
The Viaduck locatedsouth of France,valley of the River Tarn near Millau in southern France
Specifications
Reasons
Traffic on the route from Paris to Spain
Travel Time Reduced Between Spain & France.
Materials The bridge is made of steel and concrete at a cost of 390 million
Euros (520 million dollars). The project required about 127,000 m³ of concrete, 19,000 metric tons of steel for the reinforced concrete, and 5,000 metric tons of pre-stressed steel for the cables and shrouds.
The steel board is made up 36,000 tons of metal frame, 7 times the Eiffel Tower.
Concrete The concrete of the abutments and piles amounted to 85 000 m3
of which more than 50 000 m3 of concrete are high, less than B60, or a total of more than 205 000 tonnes of concrete, 40 times the Eiffel Tower .
Steel wire ropes
Technology Used Advantages of multiple span cable-
stayed bridge Hydraulic system lifts intermediate �
temporary piers Safety barriers � Wind breaking screens � A video surveillance system � � Automatic accident detector system
Hydrolic system
Advatages
“High Solution” �
Less traffic congestion near Millau �
Increased tourism �
Economic boom
Awards
2006 International Association for Bridge and Structural Engineering (IABSE) Outstanding Structure Award.
"Exceptional Recognition for Civil Engineering �Structures" by the International Federation for Structural Concrete (fib)
2005 D&AD Gold Award in Environmental Design and �Architecture
Referances
https://en.wikipedia.org/wiki/Millau_Viaduct
http://en.wikiarquitectura.com/index.php/Millau_Viaduct
http://structurae.net/structures/millau-viaduct
http://www.engineeringcivil.com/millau-viaduct-france-extreme-
engineering.html
Questions ?
Fatih TAYLI