+ All Categories
Home > Documents > Milwaukee II Levee Project - Govlink

Milwaukee II Levee Project - Govlink

Date post: 14-Mar-2022
Category:
Upload: others
View: 2 times
Download: 0 times
Share this document with a friend
7
Milwaukee II Levee WRIA 9 ITC March 20, 2019
Transcript

Milwaukee II Levee

WRIA 9 ITCMarch 20, 2019

Project Overview

Project Area

Earthen Levee and Flood Wall Levee Examples

Flood Wall Levee - Briscoe Reach 4 - Constructed in 2016

New Flood Wall Levee

New Earthen Levee

Earthen Levee – South Reach Levee -Constructed in 2016

Unique to Milwaukee II Levee

S. 259th Street Roadway Underpass at the Union Pacific Railroad

Green River Trail Missing Link between Foster Park and Horseshoe Bend Levee

Public Works CommitteeMarch 6, 2017

Breda Levee


Recommended