LIBERATION, SEPARATION,
EXTRACTION
STAGE 1 - Blasting
STAGE 2 - Primary CrushingSTAGE 3 - Secondary Crushing
STAGE 4 - Grinding
STAGE 5 - Separation by sizeSTAGE 6 - Separation by values
STAGE 7 - Extraction of values
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
2/100
What is an Ore?
Mineralized rock that can be mined/processed
At a time (temporal)
At a place (spatial)
At a profit (economic)
Waste rock can become an ore
Tailings can become an ore
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
3/100
Drilling and Blasting
Create a top size suitable for transportation
Begin the process of Liberation
Factors
Drill hole diameter
Drill hole spacing and pattern
Explosive type
Delay system
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
4/100
Drilling and Blasting
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
5/100
Influence of Blasting Practices
S. Morrell and W. Valery, 2001. Influence of Feed Size on AG/SAG Mill Performance. SAG
2001, Vancouver, Canada, pp203-214
Morrell, S., 2003. The Influence of Feed Size on Autogenous and Semiautogenous Grinding and the
Role of Blasting in its Manipulation, Proc. 22nd International Mineral Processing Congress,
Eds.: L.Lorenzen and D.J. Bradshaw, p.526-533.
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
6/100
Influence of Blasting Practices
S. Morrell and W. Valery, 2001. Influence of Feed Size on AG/SAG Mill Performance. SAG
2001, Vancouver, Canada, pp203-214
Morrell, S., 2003. The Influence of Feed Size on Autogenous and Semiautogenous Grinding and the
Role of Blasting in its Manipulation, Proc. 22nd International Mineral Processing Congress,
Eds.: L.Lorenzen and D.J. Bradshaw, p.526-533.
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
7/100
Order of Processing
Blasting
Primary Crushing
Secondary Crushing
Grinding
Regrinding
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
8/100
Crushing Machines
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
9/100
Crushing Machines
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
10/100
HPGRhigh-pressure grinding rolls
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
11/100
High-Pressure Grinding Rolls
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
12/100
Jaw Crusher
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
13/100
Gyratory Crusher
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
14/100
Symons Cone Crusher
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
15/100
Cone Crusher Liners
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
16/100
Vibrating Screen
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
17/100
Secondary Crushing Plant
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
18/100
Alternate Secondary Crushing Plant Design
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
19/100
Open Circuit Crushing
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
20/100
Grinding Mills
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
21/100
Grinding Mills
Rod Millopened up for maintenance Ball Milloverflow type
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
22/100
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
23/100
Grinding Mills
Bingham Canyon Grinding Mills
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
24/100
Tube Mill
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
25/100
Rod-Mill Central Peripheral Discharge
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
26/100
Rod-Mill End Peripheral Discharge
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
27/100
Rod-Mill Overflow Discharge
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
28/100
Grinding and Cyanide LeachingMusslewhite Mine, Ontario
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
29/100
Cyclo-Paks
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
30/100
Spiral and Rake Classifiers
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
31/100
Rake Classifier
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
32/100
Rake Classifier
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
33/100
Spiral Classifiers
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
34/100
Cyclone and Particle Recovery
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
35/100
Size Distribution of Soils
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
36/100
Size Distribution Curves
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
37/100
Bimodal Size Distribution
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
38/100
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
39/100
Hydrocyclone
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
40/100
Separator Partition Curves
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
41/100
Stokes Law
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
42/100
ABC Grinding Circuit
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
43/100
Bond Work Index Formula
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
44/100
Size Ranges in Separators
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
45/100
Electronic Sorting
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
46/100
Electrostatic Separation
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
47/100
Cross-Belt Magnetic Separator
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
48/100
Drum Magnetic Separator
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
49/100
2-stage Drum Magnetic Separator
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
50/100
Pinched Sluice
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
51/100
Riffles in a Sluice
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
52/100
Humphrey Spiraliron ore
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
53/100
Particle Distribution in Spiral Trough
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
54/100
Reichert Cone separator
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
55/100
Fluid (pulp) Flow in a Cone Separator
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
56/100
Shaking Table
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
57/100
Statification on a Shaking Table
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
58/100
Gold on a Shaking Table
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
59/100
Jigging - stratification
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
60/100
Centrifugal Concentrator
the Falcon
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
61/100
Flotation Cell
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
62/100
Flotation Cell Agitator Design
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
63/100
Flotation Cell - Rotors
Separation Circ it
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
64/100
Separation Circuit
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
65/100
Copper Flotation Circuit
Downstream Processing
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
66/100
Downstream Processing
Copper
Oxide copper treatment
Heap Leach Operation
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
67/100
Heap Leach Operation
Installing a Plastic Membrane Liner
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
68/100
Zaldivar Copper Heap Leach
Copper Downstream Processing
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
69/100
CopperDownstream Processing
Kidd-Creek Smelter flowsheet
Copper Ores Concentrating
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
70/100
Copper OresConcentrating
Simplest Copper Flotation Circuit
Copper Ores Concentrating
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
71/100
Copper OresConcentrating
Copper/Gold Flotation Circuit
Copper/Moly Ores Concentrating
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
72/100
Copper/Moly OresConcentrating
Copper/Moly Flotation Circuit
Copper Ores Concentrating
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
73/100
Copper OresConcentrating
Multiple Sulfide Differential Flotation Circuit
Copper Ores Concentrating
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
74/100
Copper OresConcentrating
Mixed Oxide/Sulfide Copper Flotation Circuit
Copper Ores Concentrating
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
75/100
Copper OresConcentrating
Copper Oxide Processing to final metal
Copper Ores Concentrating
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
76/100
Copper OresConcentrating
Copper Oxide Processing - LPF
Copper Ores Concentrating
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
77/100
Copper OresConcentrating
T.O.R.C.O. Processing of Copper Ores
C A d C i h l
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
78/100
Copper Anode Casting Wheel
Thickener tailings
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
79/100
Thickener - tailings
Thickeners zones
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
80/100
Thickeners - zones
Thickener Area Calculation
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
81/100
ThickenerArea Calculation
where
A = thickener area (m2)
W= dry solids mass flow (tph)
F= liquid:solid ratio of feedD = liquid:solid ratio of discharge
R= settling rate (m/hr)
S= liquid S.G. (kg/L)
RS
)DF(W2A
Marine Tailing Disposal
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
82/100
Marine Tailing Disposal
D Filt
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
83/100
Drum Filters
Di k Fil
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
84/100
Disk Filter
Pressure Filter Larox
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
85/100
Pressure Filter - Larox
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
86/100
Rotary Dryers
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
87/100
Rotary Kiln
Mill Control Room
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
88/100
Mill Control Room
Carlin Mine, Nevada
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
89/100
Questions?
Dissolution of Gold in Cyanide
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
90/100
Dissolution of Gold in Cyanide
Elsner's Equation
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
91/100
Precipitation of Au from Solution
Downstream Processing
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
92/100
g
Gold processing options
Downstream Processing
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
93/100
g
Nickel
Typical Mine/Mill Treatment
Downstream Processing
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
94/100
g
Nickel
Matte Separation processing
Downstream Processing
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
95/100
g
Uranium Ore processing
Downstream Processing
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
96/100
g
Coal processing
Downstream Processing
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
97/100
g
Coal processing
Downstream Processing
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
98/100
g
Coal processing
Downstream Processing
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
99/100
g
Coal processing
Downstream Processing
7/30/2019 MINE292-Lecture3-LiberationSeparationExtraction-2013
100/100
Coal processing