+ All Categories
Home > Technology > Minimum Viable Product - Initial Concept to First Build

Minimum Viable Product - Initial Concept to First Build

Date post: 15-Jan-2015
Category:
Upload: unhinnovation
View: 498 times
Download: 1 times
Share this document with a friend
Description:
Doug Henderson, founder of FrostHub, reviews the best way to approach building your MVP, including the process of achieving the maximum amount of validating learning.
Popular Tags:
13
Minimum Viable Product Doug Henderson - FrostHub Friday, October 25, 13
Transcript
Page 1: Minimum Viable Product - Initial Concept to First Build

Minimum Viable Product

Doug Henderson - FrostHub

Friday, October 25, 13

Page 2: Minimum Viable Product - Initial Concept to First Build

Lessons Learned

• Difficult to figure out MVP

• We have built some functionality that is not valuable to the users

• Shorten the build-measure-learn cycle

Friday, October 25, 13

Page 3: Minimum Viable Product - Initial Concept to First Build

Lessons Learned

• Test with people you didn’t know before

• Users will always think they need something more

• Finding the right early adopters

• Continuing the conversations

Friday, October 25, 13

Page 4: Minimum Viable Product - Initial Concept to First Build

Don’t build this

Friday, October 25, 13

Page 5: Minimum Viable Product - Initial Concept to First Build

Build

Friday, October 25, 13

Page 6: Minimum Viable Product - Initial Concept to First Build

Sketching

Friday, October 25, 13

Page 7: Minimum Viable Product - Initial Concept to First Build

Concept Rev. 1

Friday, October 25, 13

Page 8: Minimum Viable Product - Initial Concept to First Build

Concept Rev. 2

Friday, October 25, 13

Page 9: Minimum Viable Product - Initial Concept to First Build

Detailed Design Rev. 1

Friday, October 25, 13

Page 10: Minimum Viable Product - Initial Concept to First Build

Detailed Design Rev. 4

Friday, October 25, 13

Page 11: Minimum Viable Product - Initial Concept to First Build

Build

Friday, October 25, 13

Page 12: Minimum Viable Product - Initial Concept to First Build

Next Steps

• Test with 10 companies

• Measure value

• Learn - tweak existing, add another feature

Friday, October 25, 13

Page 13: Minimum Viable Product - Initial Concept to First Build

Tools

• Lean Launch Lab

• Lean Startup Machine

• www.startuplessonslearned.com

• www.theleanstartup.com

Friday, October 25, 13


Recommended