+ All Categories
Home > Documents > MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the...

MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the...

Date post: 08-Sep-2019
Category:
Upload: others
View: 3 times
Download: 0 times
Share this document with a friend
109
THE REPUBLIC OF UGANDA MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN 2011/12-2015/16 FEBRUARY 2012
Transcript
Page 1: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

THE REPUBLIC OF UGANDA

MINISTRY OF WORKS AND TRANSPORT

STRATEGIC PLAN 2011/12-2015/16

FEBRUARY 2012

Page 2: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for
Page 3: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for
Page 4: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

___________________________________________________________________________ Vision - To provide reliable and safe works, transport infrastructure and services.

Table of Content FOREWORD .............................................................................................................................. i LIST OF ACRONYMS ............................................................................................................... iii LIST OF TABLES ........................................................................................................................v EXECUTIVE SUMMARY ....................................................................................................... vi CHAPTER ONE .......................................................................................................................1 1.0 INTRODUCTION ...........................................................................................................1 1.1.1 Overview .........................................................................................................................1 1.1.2 Structure of the Strategic Plan..........................................................................................2 1.1.3 Significance and Purpose of the Strategic Plan .................................................................2 1.1.4 Process of Developing a Strategic Plan ...........................................................................2 1.2 Mandate, Vision and Mission of the Ministry ..................................................................2 1.2.1 Mandate ..........................................................................................................................2 1.2.2 Vision ..............................................................................................................................3 1.2.3 Mission............................................................................................................................3 1.3 Key Functions of the Ministry .........................................................................................3 1.4 Values and Principles ......................................................................................................3 CHAPTER TWO ......................................................................................................................5 2.0 CONTEXTUAL ANALYSIS ..........................................................................................5 2.1 Works and Transport Sector Agencies .............................................................................5 2.1.1 Uganda National Roads Authority ...................................................................................5 2.1.2 Civil Aviation Authority ..................................................................................................5 2.1.3 Uganda Road Fund ..........................................................................................................6 2.1.4 Uganda Railways Cooperation .........................................................................................6 2.1.5 Transport Licensing Board (TLB) ....................................................................................6 2.1.6 National Road Safety Council (NRSC) ............................................................................6 2.1.7 Engineers Registration Board (ERB) ...............................................................................7 2.1.8 Uganda Institution of Professional Engineers (UIPE) .......................................................7 2.2 The Works/Construction Industry ....................................................................................7 2.3 Transport Modes..............................................................................................................7 2.3.1 Road Transport ................................................................................................................7 2.3.2 Rail Transport ..................................................................................................................8 2.3.3 Inland Water Transport .................................................................................................. 10 2.3.4 Pipeline Transport ......................................................................................................... 10 2.3.5 Air Transport ................................................................................................................. 11 2.4 Policies and Legislations ............................................................................................... 11 2.5 Strength, Weaknesses, Opportunities and Threats Analysis ............................................ 13 2.6 Strategies to address the weaknesses and threats ............................................................ 14 2.7 Structure of the Ministry of Works and Transport ............. ............................................ 15 2.8 Staffing Levels .............................................................................................................. 16 CHAPTER THREE ................................................................................................................ 17 3.0 OBJECTIVES, OUTPUTS, IMPLEMENTATION STRATEGY AND FINANCING ... 17 3.1 Sector Objectives ........................................................................................................... 17

3.3 Key Assumptions ........................................................................................................... 17 3.2 Key Outputs of the Ministry .......................................................................................... 17

3.4 Implementation Strategy ................................................................................................ 18 3.5 Financing....................................................................................................................... 18

Page 5: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

___________________________________________________________________________ Vision - To provide reliable and safe works, transport infrastructure and services.

CHAPTER FOUR ................................................................................................................... 20 4.0 MONITORING, EVALUATION AND RISK ANALYSIS ........................................... 20 4.1 Monitoring and Evaluation ............................................................................................ 20 4.2 Key Performance Indicators........................................................................................... 20 4.3 Risk Analysis ...................................................................................................................... 26 Annex 1: Annual Outputs and Budget ....................................................................................... 29 Annex 2: CLIENT CHARTER .................................................................................................. 89

Page 6: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

___________________________________________________________________________ Vision- To provide reliable and safe works, transport infrastructure and services.

iii

LIST OF ACRONYMS

ARB Architects Registration Board CAA Civil Aviation Authority CMAP Change Management Action Plan CMT Change Management Team CSR Corporate Social Responsibility DEW Director of Engineering and Works DFA Department of Finance and Administration DPP Department of Policy and Planning DOT Director of Transport DUCAR District, Urban and Community Access Roads EAC East Africa Community ERB Engineers Registration Board FUCO Federation of Uganda Consulting Organizations IAU Internal Audit Unit ISU Institution of Surveyors of Uganda LG Local Government MEACA Ministry of East African Community Affairs MDAs Ministries, Departments and Agencies MDGs Millennium Development Goals MELTC Mt. Elgon Labour-based Training & Centre MFPED Ministry of Finance, Planning and Economic Development MLHUD Ministry of Lands, Housing and Urban Development MoLG Ministry of Local Government MoPS Ministry of Public Service MoU Memorandum of Understanding MoWT Ministry of Works and Transport MWE Ministry of Water and Environment NCI National Construction Industry NCIP National Construction Industry Policy NDP National Development Plan NRSC National Road Safety Council NRSA National Road Safety Authority NTMP National Transport Master Plan PPDA Public Procurement and Assets Disposal Act PS Permanent Secretary PSV Public Service Vehicle RC Resource Centre

Page 7: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

___________________________________________________________________________ Vision- To provide reliable and safe works, transport infrastructure and services.

iv

SRB Surveyors Registration Board SWG Sector Working Group TLB Transport Licensing Board TMT Top Management Team TSIMS Transport Sector Information Management System TSWG Transport Sector Working Group UACE Uganda Association of Consulting Engineers UBOA Uganda Bus Owners Association UCICO Uganda Construction Industry Commission UCTA Uganda Commercial Transporters Association UIPE Uganda Institute of Professional Engineers UIPP Uganda Institute of Physical Planners UPTA Uganda Pick-Up Truckers Association UNABCEC Uganda National Association of Building and Civil Engineering Contractors UNRA Uganda National Roads Authority URC Uganda railways Corporation URF Uganda Road Fund US Under Secretary UTODA Uganda Taxi Operators Association WTS Works and Transport Sector

Page 8: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

___________________________________________________________________________ Vision - To provide reliable and safe works, transport infrastructure and services.

v

LIST OF TABLES Table 1: Rail Sub-Sector Performance Table 2: Medium-Term Expenditure Framework (MTEF) 2011/12-2015/16 Table 3: Ministry Budget Estimates (UGX. bn) 2011/12-2015/16 Table 4: Transport Sector Performance Indicators Table 5: Alignment of Golden Indicators with NDP Objectives Table 6: Risk Analysis

Page 9: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

___________________________________________________________________________ Vision- To provide reliable and safe works, transport infrastructure and services.

vi

EXECUTIVE SUMMARY The Strategic Plan sets out a roadmap for executing the functions of the Ministry in the next Five years (2011-2016). The Plan aims to competitively meet the expectations of the diverse stakeholders, build capacity of the selected sector players, inform the annual budgeting process and foster strategic alliance and partnerships to attract funding to the Sector. The Strategic Plan presents the mandate, vision, and mission of the Ministry. It includes the organizational structure of the Ministry, the Situation Analysis, Staffing Levels, Transport Agencies, Key Functions and Modes of Transport, status of the existing Policies and Legislation governing the Works and Transport Sector. The Plan presents the Sector Strategic Objectives, Key Outputs, the Implementation Strategy, Financing Plan and the Monitoring and Evaluation Strategy. To achieve the mission, the Ministry has well trained human resource, physical assets, staff development plan, essential sector policies and a clear mandate. On the other hand, there are issues which constrain effective service delivery such as limited teamwork, low levels of confidence among the staff, scattered offices and inadequate contract management skills. The Ministry benefits from a team of committed Development Partners, prioritization of the sector by government, functional Transport Agencies and East African Community initiatives in the Transport Sector as avenues which can be used to improve service delivery. Conversely, there are few threats which affect the Ministry in pursuance of its mandate. These include staff turn-over, unplanned/emergency intervention on the road network ravaged by rains/floods, frequent external audits and procurement reviews. The Strategic Plan was premised on the National Development Plan and the National Transport Master Plan including the Master Plan for GKMA. In line with the Ministry and departmental mandates, Interventions, strategies and outputs to address the Sector objectives were developed. The Ministry will require input of other Sector players in the fulfillment of the seven strategic objectives. Departmental budgets to make up the total budget that covers five years were developed. Equally, the overall budget was guided by MTEF ceilings.

Monitoring and Evaluation of the Plan was based on the Indicators earmarked in the Sector Monitoring and Evaluation Framework. The indicators will measure the progress of the interventions and outputs. The indicators measure the sector-wide performance aimed at informing overall strategic management including review sector policies. The key assumptions made in the Strategic Plan are that; Ministry will retain its structure and mandate, the GoU budget and donor support will be sufficiently maintained to finance the

Page 10: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

___________________________________________________________________________ Vision- To provide reliable and safe works, transport infrastructure and services.

vii

departmental activities and top management assumes ownership of the Plan. The Plan identifies key possible risks and these include unpredictable funding, budget cuts, declining Donor confidence, poor collaboration among sector agencies, attracting committed and competent staff turnover, staff indiscipline, weak and unprofessional private sector.

Page 11: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

___________________________________________________________________________ Vision- To provide reliable and safe works, transport infrastructure and services.

1

CHAPTER ONE

1.0 INTRODUCTION

1.1 Overview The Strategic Plan of the Ministry of Works and Transport was formulated to determine the direction and destination of the Ministry for the next five years and how it is going to get there. The Plan sets out an implementation framework for undertaking the key functions of the Ministry for the period 2011-2016. The Strategic Plan was formulated in line with the National Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for Greater Kampala Metropolitan Area (TMP/GKMA) (2008-2023). The Plan is a product of a Change Management Process undertaken to re-focus the Ministry after a restructuring process carried out in 2008. The restructuring and reforms in the Sector resulted into:

a) Creation of the Uganda National Roads Authority (UNRA), entrusted with responsibility of planning, constructing and maintaining of national roads;

b) Creation of the Uganda Road Fund (URF), entrusted with responsibility of determining, receiving, and directly transferring the fuel levy and other road user taxes directly to UNRA and Local Governments for road maintenance.

c) A downsizing and transforming the functions of the Ministry of Works and Transport. The restructuring was meant to spin off and devolve the Ministry functions that were inconsistent with its role, such as road construction and maintenance, road development, plant management, ferry services management, axle load control management etc. These functions were included in the portfolio of the Uganda National Roads Authority which is an implementing agency. Likewise, other modes of transport such as air and railway transport are shouldered by the Civil Aviation Authority and Uganda Railways Corporation/Rift Valley Railways respectively. The Ministry of Works and Transport retained the key functions of policy formulation, planning, Regulation, Setting Standards, Advocacy Monitoring and Evaluation. The Ministry is the Sector leader with the overall responsibility of determining the strategic direction for the development of the Transport Sector.

Page 12: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

___________________________________________________________________________ Vision - To provide reliable and safe works, transport infrastructure and services.

2

1.1.2 Structure of the Strategic Plan The plan is comprised of four Chapters; Chapter One presents the overview, mandate, vision and mission, key functions and Values/Principles. Chapter two presents the contextual analysis, Sector Agencies and modes of transport and lastly an analysis of the SWOT (Strength, Weaknesses, Opportunities and Threats); Chapter Three covers objectives, outputs, Key assumptions implementation strategy and financingthe Plan and Chapter Four presents the monitoring and evaluation plus the risk analysis. Departmental action plans and activity budgets are annexes at the end.

1.1.3 Significance and Purpose of the Strategic Plan The Strategic Plan for the MoWT charts out strategies towards attainment of the vision. Specifically, the plan aims to position the Ministry effectively to;

a) Meet the expectations of diverse stakeholders b) Be a one stop reference for the activities to deliver the Ministry’s mandate c) Build capacity for the Ministry and selected sector players d) Inform the annual budgeting process e) Strengthen professionalism in the Sector f) Forge strategic alliances and partnerships so as to attract funding to develop the Sector.

1.1.4 Process of Developing a Strategic Plan The Strategic Plan was developed through a consultative and participatory process within the Ministry and with key transport stakeholders. Towards the end of 2010, the Senior Management Team of MoWT engaged in a brain-storming session in Jinja and carried out a SWOT analysis of the Ministry taking cognizance of the restructuring and the revision of the Ministry’s mandate. A Task Team was formed to engage departments to formulate action plans and cost the Strategic Plan. A workshop for Senior Officers to discuss the first Draft Strategic Plan was held in July 2011, A Senior Management meeting was held in December to review the second draft and the Strategic Plan was finally approved by the Top Management Team of the Ministry in February 2012. The involvement of the different stakeholders was important in order to ensure ownership of the plan. 1.2 Mandate, Vision and Mission of the Ministry 1.2.1 Mandate

The Ministry’s Mandate is to:

Page 13: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

___________________________________________________________________________ Vision - To provide reliable and safe works, transport infrastructure and services.

3

a) Plan, develop and maintain an economic, efficient and effective transport infrastructure;

b) Plan, develop and maintain economic, efficient and effective transport services by road, rail, water, air and pipeline;

c) Manage Public works including government structures and; d) Promote good standards in the construction industry

1.2.2 Vision

To provide reliable and safe works, transport infrastructure and services.

1.2.3 Mission

To promote adequate, safe and well maintained Works and Transport Infrastructure and Services for Social Economic Development of Uganda.

1.3 Key Functions of the Ministry a) Initiate, formulate and develop National Policies, Plans and Programmes for safe

and efficient Public Transport Infrastructure and Services. b) Monitor and Evaluate the Implementation of National Policies, Plans and

Programmes for safe and efficient Works, Public Transport Physical Infrastructure and Services.

c) Initiate new and review existing Laws and Regulations on Works and Transport Infrastructure and Services.

d) Set standards for the construction industry, transport infrastructure and services. e) Enforce compliance to national policies, laws regulations and guidelines on works

transport ways infrastructure and services. f) Monitoring and Evaluation of the performance of Transport Agencies. g) Inspect and license Public Transport Vehicles (PSVs). h) Provide technical support for contract works, including construction and

maintenance undertaken by other Government Ministries, Departments and Agencies (MDAs).

i) Initiate and formulate plans and policies for management of public buildings. j) Set and monitor national standards on public buildings. k) Carry out research and develop local materials and technology for construction

industry.

Page 14: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

___________________________________________________________________________ Vision - To provide reliable and safe works, transport infrastructure and services.

4

The values and principles that guide and consign the staff and Political leadership of the Ministry of Works and Transport to the above Mandate, Vision and Mission in providing services are enlisted below: a) Professionalism: adherence to the defined rules, standards and guidelines of the

respective disciplines, exhibiting professionalism, competence and honesty.

b) Integrity: highest standards of integrity, MoWT shall not place its self under any financial or other obligations to individuals or organizations that might seek to compromise our professional behavior in performance of our duties.

c) Quality Assurance: We shall put in place measures and mechanisms that will ensure our clients deliver/receive quality services and works within budget and time.

d) Selflessness: We shall put public interest above personal interest without consideration of any financial or material benefit and gain.

e) Objectivity: We shall make decisions based on merit, researched information, professional codes and other codes of good practice.

f) Customer/Client focus: We shall put the interests of our customers/clients as our first priority. We shall always seek to meet our customers’ needs and expectations.

g) Partnership: We shall engage our partners in planning, designing, implementing, monitoring and evaluating our programmes and Projects.

h) Optimal use of resources: We shall optimally use resources in the attainment of the Ministry objectives and targets.

i) Transparency and Accountability: We shall be transparent and accountable for our decisions, actions and inactions.

j) Responsiveness: We shall respond to our clients effectively and efficiently when called upon.

k) Impartiality: We shall provide services to all clients without discrimination on the basis of gender, race, colour and religion or creed or ideological orientation or social status.

1.4 Values and Principles

Page 15: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

___________________________________________________________________________ Vision- To provide reliable and safe works, transport infrastructure and services.

5

CHAPTER TWO

2.0 CONTEXTUAL ANALYSIS The Strategic Plan was developed in line with the National Development Plan (NDP). This chapter presents the environment in which the Ministry operates. It specifically presents the Transport and Works Sector Agencies, Modes of Transport, Policies and Legislations, the Situational Analysis, the Organization Structure and Staffing Levels. The National Development Plan The National Development Plan (NDP), a new development framework for the GoU for the period 2009/10-2013/14, highlights the strategic agenda for development and further details priority interventions in all sectors of the economy including health nutrition. The overall goal of the NDP is to accelerate economic growth to reduce poverty. The NDP seeks to achieve 7 development objectives as follows: a) Increasing household incomes; b) Enhancing the quality and availability of gainful employment; c) Improving the stock and quality of economic and trade infrastructure; d) Increasing availability and access to quality social services; e) Promoting innovation and competitive industries; f) Harnessing natural resources and the environment for sustainable development; and g) Strengthening good governance and improving human security

The NDP therefore acknowledges that development of the Works and Transport Sector is a critical component of economic development.

2.1 Works and Transport Sector Agencies

2.1.1 Uganda National Roads Authority UNRA was established by the Uganda National Roads Authority Act, 2006, to manage, maintain and develop the national road network. The Authority became operational in July 2008. The Authority is gradually building its capacity to deliver its mandate to construct and maintain national roads. The Ministry exercises its policy guidance and oversight over UNRA based on an annual Performance Agreement.

2.1.2 Civil Aviation Authority CAA exercises both regulatory and operational authority over Entebbe international airport and the other airfields located around the country. CAA also designates domestic and international air carriers.

Page 16: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

___________________________________________________________________________ Vision- To provide reliable and safe works, transport infrastructure and services.

6

The Authority monitors air safety regulations and standards management in collaboration with the Civil Aviation Safety and Security Oversight Agency (CASSOA) that was recently established by the EAC Partner States. The Ministry exercises its policy guidance and oversight over CAA based on a Memorandum of Understanding.

2.1.3 Uganda Road Fund URF was established in 2008 by an Act of Parliament to carry out the following functions: a) To finance the routine and periodic maintenance of public roads in Uganda b) To ensure that public roads are maintained at all times; and c) To advise the Minister on:-

i. Preparation and effective implementation of the Annual Road Maintenance Program; and ii. Control of overloading of vehicles on public roads.

The Ministry, in collaboration with the Ministry of Finance, Planning and Economic Development, exercises its policy guidance and oversight responsibility to URF based on a Performance Agreement.

2.1.4 Uganda Railways Cooperation The Government strategy for the rail sub-sector is through long-term concessioning of infrastructure maintenance and rail services to the private sector while retaining responsibility for regulation. URC, however, remains responsible for regulation and oversight of the rail sub-sector as well as management of railway stock and assets that are excluded from the concession. The Corporation is also responsible for management of the Inland Water Ports. The Ministry exercises its policy guidance and oversight responsibility for railway operations based on a memorandum of understanding.

2.1.5 Transport Licensing Board (TLB) Transport Licensing Board (TLB) is a Statutory Body established by an Act of Parliament, under the Traffic and Road Safety Act, 1998. The main functions of the Board are to regulate the use of public Transport vehicles; private omnibuses; goods transport vehicles throughout Uganda in accordance with the provisions of the traffic and Road Safety Act, (1998) through granting routes for bus operations inspect and licensing Inland Water Transport Vessels.

2.1.6 National Road Safety Council (NRSC) The National roads Safety Council promotes road safety education and conducts public awareness campaigns to ensure safety on the road network.

Page 17: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

___________________________________________________________________________ Vision- To provide reliable and safe works, transport infrastructure and services.

7

2.1.7 Engineers Registration Board (ERB) ERB was established by an Act of Parliament, under the Engineers’ registration Act 1969 (Chapter 271). The board regulates and controls Engineers and their activities within Uganda and to advise the Government in relation to those functions.

2.1.8 Uganda Institution of Professional Engineers (UIPE) The UIPE was established as an Association of Professional Engineers of Uganda in 1972, as a successor to the defunct East Africa Institution of Engineers (EAIE) which had started in 1945. The objectives and purposes of the Uganda Institution of Professional Engineers are to promote the general advancement of the science and practice of engineering and its applications, and to facilitate the exchange of information and ideas on those subjects amongst the members of the Institution.

2.2 The Works/Construction Industry Government adopted a Policy for Development and Strengthening the National Construction Industry (NCIP). The main objective of the NCI Policy is to improve regulation and development of the NCI thereby addressing the constraints associated with the Industry. The Policy notes that the National Construction Industry (NCI), comprising both the building and civil engineering sub sectors, performs an indispensable role in building the economy. The NCI delivers the physical infrastructure that is central to the country’s economic development. Its activities create business to suppliers, manufacturers and offer employment to professionals, skilled and unskilled labour. It transforms private and public plans for capital formation.

2.3 Transport Modes The sector is composed of five transport modes, namely: road, railway, inland water transport, air and pipeline transport.

2.3.1 Road Transport Road transport in Uganda is by far the most dominant mode. It plays an essential role in facilitating the realization of economic and social development programmes. Over 95 percent of the country's passenger and freight traffic is transported by Road, and provides almost all the access to rural communities. The road network is categorized as follows: a) National roads that connect major urban and/or major regional commercial and

administrative centers; b) District roads that connect the rural population to District administration headquarters,

major towns and trading centers; and major social amenities like hospitals and schools in the rural areas;

Page 18: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

___________________________________________________________________________ Vision- To provide reliable and safe works, transport infrastructure and services.

8

c) Urban roads that lie within the boundaries of urban authorities connecting the urban population to various facilities within the urban area; and

d) Community Access roads which provide rural communities with access to administrative and social services, economic activities; and finally link them to the District road network

The road network is interfaced with some ferry landing sites that link roads, on opposite sides of water-ways. Uganda is part of the northern and central transport corridors that convey both exports and imports, via the coastal neighbors, Kenya and Tanzania respectively. The country’s road network also provides transit corridors for the other more landlocked neighbours namely, Rwanda, Burundi, eastern Democratic Republic of Congo (DRC) and Southern Sudan. The road network serves national, regional and international economies. The strategic importance of maintaining and developing the road network in good condition cannot therefore be over-emphasized. The Uganda road network totals 81,329km. Of this 20,000km, are categorized as National Roads, of which 3000km are paved and the remaining 17,800km are gravel. District Roads total to 22,750km and are virtually all unpaved, 3,579km, of the total are urban roads, and 35,000km is Community Access roads; which are all earth. The motorized vehicle fleet in 2008, including motorcycles, is estimated at 470,488 vehicles. The total fleet, excluding motorcycles, is 234,036 vehicles; and of this, 60% are passenger vehicles (buses, minibuses and cars), 25% light goods vehicles (pickup vans and 4-wheel drives), and 12% are heavy vehicles.

2.3.2 Rail Transport The operation of railways in Uganda was up to 2006 under the management of Uganda Railways Corporation, a Government statutory body. In line with the Government Policy of divestiture, management of the railways was from 2006 concessioned to a private company, Rift Valley Railways (RVR). The adjoining Kenya Railways was also jointly concessioned to RVR; thus having an integral railway operation from Kampala to the sea port of Mombasa, Kenya. The railway network in Uganda totals to 1,244.4km, of which only 258.6km (21%) are operational. Passenger services have since been withdrawn. The routes largely offer freight services for imports and exports. The operational routes are: Kampala – Jinja- Tororo 249 km Kampala – Port Bell 9.6 km Total 258.6 km

Page 19: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

___________________________________________________________________________ Vision- To provide reliable and safe works, transport infrastructure and services.

9

URC progressively withdrew its services from a number of routes culminating into a total of 985.8km, 79% of the network, being closed. The non-operational routes are: Kampala – Kasese (western extension) 333 km Jinja – Mbulamuti - Busembatia (Busoga loop) 146 km Tororo – Mbale– Soroti–Lira– Gulu– Pakwach (northern line) 506.8 km Total 985.8 km

Within Uganda RVR operates services from Kampala to Tororo/Malaba (border with Kenya) and a spur line from Kampala to Port Bell pier on Lake Victoria. From Tororo/Malaba, the Kenya railway network joins the Uganda network connecting to the Port of Mombasa. The railway service in Uganda is also responsible for wagon ferries and ferry routes across Lake Victoria. From the Port Bell pier, wagon-ferries connect to the Tanzania railway network at Mwanza on Lake Victoria; and onward to Dar-es-Salaam. The wagon ferries also join the Kenya railway network at Kisumu and proceed to Mombasa seaport. Uganda’s hitherto fleet of 3 wagon ferries is currently non-functional; with two wagon ferries having collided, and one of them sunk as a result. The remaining two are grounded pending possible repair. Table 1 shows value addition for Uganda Railways Corporation (URC). With the exception of the year 2003/4 when it achieved a value addition growth rate of 2.7%, the rail sub-sector performance declined throughout the period 2002/03 to 2006/07. Table 1: Rail Sub-Sector Performance Variable 2002/03 2003/04 2004/05 2005/06 2006/07 Rail Sub-sector value Addition (Million Ushs) at constant 1997/98 prices

13,600 14,020 13,098 11,601 11,266

Rail Sub-sector Value Addition Percentage Growth

-1.6 2.8 -6.6 -11.4 -2.9

Source: UBOS Statistical Abstract 2007 and Background to the Budget The sub-sector had substantial negative value addition growth rates of -1.6%,-6.6%. -11.4% and -2.9% in 2002/03, 2004/05, 2005/06 and 2006/07 respectively. This is a reflection of the decline in the role of railway in the haulage of heavy bulk traffic, especially imports and exports. Most of the traffic is taken on by road, increasing the number of Equivalent Standard Axles (ESAs) on the roads and hence the rate of pavement deterioration.

Page 20: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

___________________________________________________________________________ Vision- To provide reliable and safe works, transport infrastructure and services.

10

2.3.3 Inland Water Transport Uganda is endowed with an expanse of water resources in the form of lakes and rivers. Inland Water Transport has great potential. It plays an important role in the provision of low-cost access to remote islands and shoreline locations on the lakes and connecting desired destinations along banks of navigable rivers. It further enhances agricultural production and the fast-growing fishing industry by facilitating movement of agricultural produce and fish to markets and processing facilities. Short distance ferry services that are essentially road bridges are provided between two road systems separated by water. The ferry services currently in operation are: a) Bukakata (Masaka) – Luuku (Ssese Islands) on Lake Victoria; b) Kiyindi (Mukono) – Kirongo (Buvuma Island) on Lake Victoria; c) Nakiwogo (Mpigi) – Kyanvumbu (Mpigi) on Lake Victoria; d) Wanseko (Masindi) – Panyimur (Nebbi) on Lake Albert; e) Masindi Port (Masindi) – Kungu (Apac) on Victoria Nile; f) Umi (Adjumani) – Laropi (Moyo) on Albert Nile; and g) Murchison Falls National Park (the Uganda Wildlife Authority (UWA) operates commercial

ferry services at Paraa on Victoria Nile). With the exception of the recently acquired Kalangala Ship, plying between the mainland and Kalangala islands, the inland water transport in Uganda is characterized by obsolete water vessels which are in a state of disrepair; poor landing infrastructure and facilities, disjointed laws and regulations; and inadequate planning and monitoring. In addition, private operators provide informal services on waterways, mainly using open canoes with onboard or outboard engines. The canoes carry passengers, goods and livestock. The vessels are often overloaded, with the attendant risk of capsizing. As a result of the above situation, inland water transport continues to experience frequent accidents.

2.3.4 Pipeline Transport The bulk of the country’s white oil products are transported by pipeline from Mombasa oil refinery to Eldoret and Kisumu, in Kenya. From Eldoret and Kisumu the oil products are transported to Kampala by road through Malaba or Busia or by rail through Malaba or rail wagon ferry from Kisumu to Port Bell. The governments of Kenya and Uganda agreed to extend the Mombasa-Eldoret pipeline by 320 km to Kampala. As per the National Transport Master Plan 2009, construction of the pipeline that is expected to take 12 months, is about to start. Meanwhile, the on-going Oil exploration along Lake Albert indicates that Uganda is set to produce commercial quantities of Oil.

Page 21: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

___________________________________________________________________________ Vision- To provide reliable and safe works, transport infrastructure and services.

11

This may call for construction of an Oil pipeline to transport either the crude or refined oil, depending on the decisions that will be taken in regard to the location of the refinery.

2.3.5 Air Transport The aviation industry in Uganda is regulated by the Civil Aviation Authority (CAA), an autonomous statutory body established in 1994. Uganda has one International Airport at Entebbe and airfields distributed across the country namely: Kidepo (private), Arua, Gulu, Moroto, Pakuba, Lira, Soroti, Masindi, Tororo, Jinja, Kasese, Mbarara, and Kisoro. Entebbe International Airport is Uganda’s main gateway for passengers and cargo; as well as a domestic hub for the upcountry airfields. Uganda being a land-locked country, an efficient air transport system is of immense strategic value for the movement of international passengers, perishable exports such as vegetables, fish, fruits and flowers and evacuations of emergency nature. There has been considerable increase in international passenger traffic, growing by 149,722 passengers (an increase of 87.2%) from 171,656 in 2000 to 321,378 in 2006. The country has no national carrier and continues to be served by various international carriers.

2.4 Policies and Legislations The existing policies, laws and bilateral agreements governing the Sector and the new ones being formulated in the Sector are discussed below.

Existing Policies, Laws and Bilateral Agreements a) The Roads Act, 1964 and Access to Roads Act, 1964 are being amended to include changes

in the development, maintenance and management of roads; b) Traffic and Road Safety Act, 1998 provides for establishment of the National Road Safety

Council and the Transport Licensing Board. The Act also prescribes revised penalties in relation to road traffic offences and for other purposes connected with road traffic and road safety;

c) The Uganda National Roads Authority Act, 2006 provides for establishment and operation of the Uganda National Roads Authority (UNRA) and managing the provision and maintenance of the national roads network;

d) The Uganda railway freight services were concessioned to the Rift Valley Railways consortium (RVR) for a term of 25 years with effect from November 1, 2006;

e) The Uganda Road Fund Act, 2008 provides for establishment the Uganda Road Fund to fund routine and periodic maintenance of public roads;

f) Kenya and Uganda signed a bilateral agreement for the joint development and operation of the Mombasa-Kampala standard gauge railway, 2009;

Page 22: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

___________________________________________________________________________ Vision- To provide reliable and safe works, transport infrastructure and services.

12

g) The National Construction Industry (NCI) Policy, 2010, to improve coordination, regulation and development of the construction industry and establish a Uganda Construction Industry Commission (UCICO);

h) Re-introduction of Force Account for rehabilitation and maintenance of district roads, 2010; i) National Transport Master Plan / Greater Kampala Metropolitan Area provides a

comprehensive 15-year sector investment plan, covering roads, railways, air, water, pipeline including urban transport in GKMA and non-motorized transport (NMT), 2010;

j) Kenya and Uganda signed a bilateral agreement for the joint development and operation of a One Stop Boarder Post at Malaba and Busia border crossing.

2.4.1 Key regional policies currently shaping the aviation industry: a) The Yamoussoukro Decision spearheaded by the African Union (AU), the East African

Community Air Transport liberalization Programme under the East African Community (EAC);

b) Common Market for Eastern and Southern Africa (COMESA) Legal Notice No. 2 on Liberalization of Air Transport; and

c) The Communication, Navigation, Surveillance/Air Traffic Management (CNS/ATM) Master Plan.

2.4.2 Policies and Laws in Formulation: The Policies, strategies and laws being drafted are: a) Communication strategy to develop programmes that will help the ministry to build and

maintain a good corporate image. b) Road Safety Policy to improve road safety in the country and establish a National Road

Safety Agency to manage road safety; c) Inland water transport policy; d) National Air Transport Policy yet to be harmonized with those of other States at the

continental level; e) Building Control Bill to provide for consolidation, harmonization and amendment of the law

relating to the erection of buildings; f) Building standards; and establishment of a National Building Review Board and Building

Committees; g) DUCAR Agency to enhance the status and performance of the Divisions of District and

Community Access and Urban Roads; h) Axle Load Control Policy to regulate the overloading of vehicles on roads; and i) Non Motorized Transport Policy in Urban Centers j) The National Transport Policy and Strategy k) The Uganda Railways Bill, 2007.

Page 23: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

___________________________________________________________________________ Vision- To provide reliable and safe works, transport infrastructure and services.

13

2.5 Strength, Weaknesses, Opportunities and Threats Analysis The section presents the Strength, Weaknesses, Opportunities and Threats (SWOT) analysis for the Ministry of Works and Transport. 2.5.1 Strength:

a) The Ministry has physical assets i.e. equipment, buildings and plant that are essential in Service delivery.

b) Human Resource (Professional and qualified personnel) to implement the Ministry mandate.

c) Transport is regarded as one of the priority sectors by Government. d) The Ministry has a Staff Development Plan to improve the skill of Officers and

professionalize staff. e) The Ministry has a National Transport Master Plan and Strategic Plan to guide the Sector

in long and medium term planning. f) The National Construction Industry Policy aimed promoting an effective, efficient and

sustainable construction industry.

2.5.2 Weaknesses: a) Limited team work amongst staff and departments hence negatively impacting the overall

productivity and responsibility of outcomes. b) Lack of confidence amongst staff thus leading to indecisiveness in decision making. c) Scattered offices leading to poor coordination and time wastage. d) Lack of a staff succession plan that promotes promotional predictability. e) Inadequate contract management skills leading projects overruns among others. f) Nonexistent communication system both internally and externally that subsequently

depicts Ministry negative image before the public g) Unfilled organizational structure leading to untimely completion of assignments. h) Lack of clear mechanisms for monitoring the Transport Agencies within the Ministry.

2.5.3 Opportunities:

a) Donor support (WB, EU, DANIDA etc) to compliment Government efforts in the financing of the Sector activities.

b) Transport infrastructure and services is a key feature in the economic development of Uganda. This makes the Sector one of the core priorities for the Country.

c) Functional Transport Agencies able to execute Sector mandate. d) East African Community initiative enables regional planning of transport infrastructure

and facilities. 2.5.4 Threats:

Page 24: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

___________________________________________________________________________ Vision - To provide reliable and safe works, transport infrastructure and services.

14

a) Prolonged rains/floods which destroy roads and drainage structures. b) Frequent restructuring of the Ministry disrupts long-term planning. c) Staff turnover compounding the problem of understaffing d) Mandate grabbing by other MDAs.

2.6 Strategies to address the Weaknesses and Threats

a) Motivation of Staff through retooling /training and provision of work facilities/tools. b) Construction of MoWT headquarters to reduce on the wastage of time commuting and

moving around physically as a result of scattered offices. c) Development of a Communication strategy to improve internal and external

communication systems. d) Signing of Performance Agreements /Memorandum of Understanding with the Transport

Agencies (UNRA, URF, CAA and URC) to facilitate performance assessment monitoring of their work.

e) Implementation of the Staff Development Plan to enable professionalization of the Staff. f) Formulation of project proposals to attract funding from GoU and Development Partners. g) Capacity assessment for MoWT including strategic options for improving capacity. h) Development of a system of performance indicators (as supplement to the Golden

Indicators) aimed at monitoring the implementing agencies.

Page 25: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

___________________________________________________________________________ Vision- To provide reliable and safe works, transport infrastructure and services.

15

2.7 Structure of the Ministry of Works and Transport

OFFICE OF THE MINISTER

PERMANENT SECRETARY

Directorate of Transport

Directorate of Engineering and Works

Policy and Planning

Finance and Administration

Transport Regulation

Construction Standards & Quality

Roads and Bridges

Public Structures

Mechanical Services

Transport Services and Infrastructure

-Internal Audit Unit -Procurement & Disposal Unit

Civil Aviation Authority Uganda Railways Corporation

National Roads Safety Council

Engineers Registration Board Transport Licensing Board

Uganda National Roads Authority

Page 26: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

___________________________________________________________________________ Vision- To provide reliable and safe works, transport infrastructure and services.

16

2.8 Staffing Levels The Ministry is headed by the Minister and deputized by two (2) Ministers; the Minister of State for Works and the Minister of State for Transport. The Permanent Secretary/ Accounting Officer is responsible for the overall administration of the Ministry. The Ministry has two Directorates (Transport, and Engineering & Works) with eight departments as shown below: No. Department Approved Staffing

Level Unfilled Vacancies

1 Transport Regulation 46 21 2 Transport Services and Infrastructure 25 10 3 Construction Standards & Quality 103 57 4 Roads and Bridges 71 21 5 Public Structures 37 09 6 Mechanical Services 167 43 7 Policy and Planning 28 05 8 Finance and Administration 96 08 The approved staff structure is 582 positions. The current staffing position is at 499 filled while 192 are vacant. The current staffing position is more than the establishment because a number of secretarial staff are yet to be re-designated.

Page 27: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

___________________________________________________________________________ Vision- To provide reliable and safe works, transport infrastructure and services.

17

CHAPTER THREE

3.0 OBJECTIVES, OUTPUTS, IMPLEMENTATION STRATEGY AND FINANCING The Strategic Plan is guided by the NTMP/GKMA and the NDP. The Sector objectives in the NDP form a basis for the Ministry’s Action Plans.

3.1 Sector Objectives a) Improve the stock and quality of road infrastructure b) Improve traffic flow within Greater Kampala Metropolitan Area c) Increase volume of passenger and freight cargo conveyed on rail network d) Increase volume of passenger and cargo traffic by air transport e) Increase volume of passenger traffic and cargo freight by marine transport f) Increase efficiency and improve effectiveness in service delivery of transport

infrastructure and provision of transport services. g) Strengthen the National Construction Industry.

3.2 Key Outputs of the Ministry a) Appropriate works and Transport Services and Infrastructure policies initiated, developed

and implemented b) Research for improvement and development of Works and Transport infrastructure and

services undertaken c) Works and Transport infrastructure and services polices, plans, designs developed and

standards set in the construction industry including Public buildings d) Usage of highways, water ways and aerodromes monitored, evaluated and regulated for

the safe use by the service consumers e) Collaboration mechanisms and working linkages with other institutions that are charged

with similar responsibilities promoted f) Develop the MOWT capacity to effectively achieve its objectives.

3.3 Key Assumptions During the implementation of the Strategic Plan, things may happen that can affect the successful implementation of the Plan itself. For the outputs to be met, a number of assumptions were made. These include: a) The Ministry will retain its mandate b) Continued political stability. c) Continued political support at national level

d) Continued economic growth and consequently an increase in Government allocation to the Ministry

Page 28: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

___________________________________________________________________________ Vision - To provide reliable and safe works, transport infrastructure and services.

18

e) Prudent financial management, accountability and transparency shall be key in order to attract financial and other resources to the Ministry.

f) Availability of an effective legal and policy environment g) The general budget and donor support will be sufficient to execute the strategic plan h) Departments and top Management to own the plan

3.4 Implementation Strategy The Implementation Strategy was guided by sector objectives, departmental interventions, a five-year activity schedule and budget estimates were developed. The Works and Transport Sector has seven objectives in the NDP. To contribute towards the achievement of the objectives, appropriate interventions and outputs were designed by departments. See Annex 1.

3.5 Financing The Ministry of Works and Transport will be funded by the Government of Uganda and Development Partners. Development partner assistance is likely to be required to support high level technical/feasibility studies and designs involving improvement of works and transport infrastructure. GOU funding will be adequately required to support development of policy and legal instruments, capacity building and acquisition of working tools and facilities. The resource projection as per the current MTEF are shown in the table below. Table 2: Medium Term Expenditure Framework (MTEF) 2011/12-2015/16 (UGX. bn) Budget Item 2011/12 2012/13 2013/14 2014/15 2015/16

Wage 4.26 4.26 4.94 5.81 6.86 Non Wage Recurrent 15.01 15.01 16.67 18.33 23.01

Domestic Development 75.57 75.57 83.12 91.44 109.72

Donor Project 25.5 - - - - Total Excl. Donor Project 94.84 94.84 104.73 115.58 139.59

Total Incl. Donor Project 120.34 94.84 104.73 115.58 139.59 Source: MoFPED Budget Call Circular November, 2011

The Ministry will explore possibilities of mobilizing additional resources from non traditional sources.

Page 29: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

___________________________________________________________________________ Vision - To provide reliable and safe works, transport infrastructure and services.

19

S/No Department 2011/12 2012/13 2013/14 2014/15 2015/16 1 Transport Regulation 1.280 12.93 11.470 10.520 11.170 2 Transport Services and

Infrastructure 9.0 100.44 81.04 62.79 64.345

3 Construction Standards and Quality Management

10.080 9.404 9.382 6.391 6.182

4 Roads and Bridges 34.255 78.260 103.360 99.760 100.760 5 Mechanical Engineering Services 6.805 22.604 25.335 28.792 29.665 6 Finance and Administration 10.576 13.165 13.447 13.308 13.085 7 Policy and Planning 6.95 8.25 6.95 6.5 6.35 8 Public Structures 3.3 3.65 3.67 3.7 3.7 Total 82.246 248.703 254.654 231.761 235.257

Table 3: Ministry Budget Estimates (UGX. Bn) 2011/12-2015/16

Page 30: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

___________________________________________________________________________ Vision- To provide reliable and safe works, transport infrastructure and services.

20

CHAPTER FOUR

4.0 MONITORING, EVALUATION AND RISK ANALYSIS

4.1 Monitoring and Evaluation Monitoring and Evaluation is a prerequisite for measuring performance. A mid-term review will be carried out after two and a half (2.5) years of plan implementation. This will be done to ensure that resources allocated towards the implementation of the plan are translated into a long-term impact in the Sector. A set of Key Performance Indicators developed in the Sector Monitoring and Evaluation framework will be largely used to measure attainment of the objectives. A mid-term review will be undertaken in the FY 2013/14 and the final evaluation at the end of the implementation period. Key lessons learnt will be documented and these will form a basis for future improvement. Evaluation will be conducted under two categories; a) Departmental assessments on the basis of the work plans as indicated in Annexes 1. b) The Ministry will be evaluated on the basis of the overall performance under the 17 Golden

indicators contained in the sector M&E framework.

4.2 Key Performance Indicators Monitoring and Evaluation will be undertaken to ensure successful implementation of the Plan. An M&E Framework was formulated. It consists of 17 key sector performance indicators- the Golden Indicators. These summarize the transport situation in the road, rail, air and water transport sub-sectors, thereby enabling results-based management of the Sector. The Golden Indicators are related to the mandate and functions of the Ministry and its Agencies. The indicators complement other sets of indicators, notably those used in the Annual Government Performance Report and the JAF.

Page 31: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

___________________________________________________________________________ Vision- To provide reliable and safe works, transport infrastructure and services.

21

Table 4: Transport Sector Performance - Golden Indicators

No Indicator Unit Included in JAF 3

1 Road network Condition - National roads (paved) – fair to good % - National roads (unpaved) – fair to good % - District roads – fair to good % Yes - Urban roads (paved) – fair to good % - Urban roads (unpaved) – fair to good %

2 Paved road network - National roads Km - Urban roads Km

3 Road safety - Fatalities per 10,000 vehicles No. - Total fatalities No. - Total registered vehicles No.

4 Road service level – travel time - On national roads Minutes/ km - On district roads Minutes/ km - In Kampala Minutes/ km

5 Road construction/ maintenance cost - National roads – New construction USD/km - National roads – Re-construction USD/km - National roads – Rehabilitation USD/km - National roads – Periodic maintenance USD/km - National roads – Mechanized routine

maintenance USD/km

- District roads – Rehabilitation USD/km - District roads - Periodic maintenance USD/km - District roads - Routine maintenance USD/km - Urban roads – Rehabilitation USD/km - Urban roads - Periodic maintenance USD/km - Urban roads - Routine maintenance USD/km - Community Access Roads - Routine

maintenance USD/km

6 Rural accessibility - Rural population living within 2 km of all % Yes

Page 32: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

___________________________________________________________________________ Vision- To provide reliable and safe works, transport infrastructure and services.

22

No Indicator Unit Included in JAF 3

weather road (Note 5)

- All year motorable Community Access Road network Km

7 Road maintenance needs met Maintenance budget relative to requirement - National roads % Yes - District roads % - Urban roads % Maintenance spending relative to release - National roads % - District roads % - Urban roads % - Community Access Roads %

8 Compliance with axle load regulation - Overloaded vehicles % Yes - Average overload per axle Tons - Number of weighed vehicles No. - Number of overloaded vehicles No.

9 Rail freight volume Total freight carried Tonne-km

10 Rail modal share at Malaba and Port Bell border points

- Total freight crossing the two borders Million tones - % freight that crosses the two borders by rail %

11 Rail modal share on Lake Victoria ferries - % freight transported on ferries by rail,

registered at Port Bell. (For total freight registered at Port Bell refer Indicator 16)

%

Rail efficiency 12 Locomotive productivity Km/ loco/ day 13 Wagon utilization - Wagon transit time Days - Wagon turn-round time Days

14 International aircraft movements - - Commercial No.

Page 33: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

___________________________________________________________________________ Vision- To provide reliable and safe works, transport infrastructure and services.

23

No Indicator Unit Included in JAF 3

- - Non commercial No. 15 Passenger traffic International passengers - Embarking No. (´000) - Disembarking No. (´000) - Transit No. (´000) Domestic passengers - Embarking No. (´000) - Disembarking No. (´000)

16 Freight on Lake Victoria - Total freight on ferries (as registered at Port Bell

border post) Million tones

17 Passenger traffic - Entebbe - Kalangala No, (´000) - Port Bell - Mwanza No. (´000) - Jinja-Muzoma No. (´000)

Notes: Measurements will have effect at the end of the FY. USD Exchange Rate at the end of the FY to be recorded

a) Reliability of data to be defined.

b) Includes motorcycles. Reliability of data to be defined.

c) UNRA will identify suitable system for annual implementation, starting 2012 with data

available August 2012 and following years.

d) Definition of work categories required.

e) UBOS has been requested to include relevant question in 2011/12 (and following years’)

survey. Computed data will be ready as from August 2013. Usefulness of computed data to

be evaluated before use as indicator.

f) MOWT Transport Services and Infrastructure Department will identify suitable survey

system for annual implementation, starting next year with data available for reporting August

2012 and following years. 3 initial routes have been identified as representing total.

Page 34: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

___________________________________________________________________________ Vision- To provide reliable and safe works, transport infrastructure and services.

24

Table 5: Alignment of Golden Indicators with Works and Transport Sector Objectives in the NDP The seven transport sector objectives of

the NDP Golden indicator

No. Measures directly aligned Indirect measures Improve the stock and quality of road infrastructure

2 a) Paved road stock 1 b) Road condition 6 c) Rural accessibility 7 d) Road maintenance needs met 4 e) Road service level: Travel time 8 f) Compliance with axle load regulation

Improve the traffic flow within the Greater Kampala Metropolitan Area

4 g) Road service level: Travel time

Increase the volume of passengers and freight conveyed on the rail network

8 h) Compliance with axle load regulation

9 i) Rail freight volume 10 j) Rail modal share at Malaba and Port

Bell 11 k) Rail modal share at Lake Victoria 12 l) Locomotive productivity 13 m) Wagon utilization

Increase the volume of passenger and cargo traffic by air transport

14 n) Aircraft movements 15 o) Passenger traffic

Increase the volume of passenger traffic and freight by marine transport

16 p) Freight on ferries 17 q) Passenger traffic

Increase efficiency and improve effectiveness in service delivery of transport infrastructure and provision of transport services

7 r) Road maintenance needs met: 1) approved budget to need, and 2) expenditure to approved budget

12 s) Locomotive productivity

Page 35: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

___________________________________________________________________________ Vision- To provide reliable and safe works, transport infrastructure and services.

25

The seven transport sector objectives of the NDP

Golden indicator No. Measures directly aligned Indirect measures

13 t) Wagon utilization 5 u) Road construction/ maintenance cost 3 v) Road safety: Fatalities

Strengthen the national construction industry 5 w) Road construction/ maintenance cost

Page 36: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

___________________________________________________________________________ Vision- To provide reliable and safe works, transport infrastructure and services.

26

4.3 Risk Analysis The risk analysis is summarized in the table below: Table 6: Risk Analysis Risk No.

Risk Mitigation Measure

Risk A

Funding: i. Late release of funds

ii. Budget cuts iii. Low Absorption Capacity iv. Unplanned activity

a) Prioritize our activities b) Procure early c) Strengthen Contract Management d) Improve Ministry Efficiency e) Ensure sufficient manpower

Risk B

Declining Donor confidence in the performance of the Sector

a) Improved reporting and timely accountability

b) Conduct regular integrity surveys. c) Pursue result oriented performance d) Talk shows on radios and television

stations Risk C

Poor collaboration among the various Sector Agencies (UNRA, URF, CAA, URC, KCCA)

a) Prepare clear MoUs between the Agencies.

b) Agreements, laws and regulations should be put clearly in place.

c) Set up joint REGULAR meetings, and share plans, budgets and reports with line Agencies.

Risk D

Attracting committed and competent staff

a) Implement inbuilt public service motivational incentives

b) Develop and implement a Ministry proactive communication strategy

Risk E

Staff Turnover

a) Lobby MoPS to increase performance incentives

b) Provide relevant training c) Ministry should implement Human

Resource Development Plan d) Implementing the schedule of duties e) Team building

Page 37: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

___________________________________________________________________________ Vision- To provide reliable and safe works, transport infrastructure and services.

27

Risk No.

Risk Mitigation Measure

Risk F

Adjust and adopt to new MoWT restructuring demands and obligations

a) Setting up change management team to champion the change. Management system

b) Staff Re-Orientation retreat c) Team building retreat d) Refresher courses e) Promote/reward innovation/research

Risk F

Adjust and adopt to new MoWT restructuring demands and obligations

a) Setting up change management team to champion the change. Management system

b) Staff Re-Orientation retreat c) Team building retreat d) Refresher courses e) Promote/reward innovation/research

Risk G

Insufficient knowledge regarding Procurement laws and regulations

a) Conduct regular/continuous procurement training and mentoring

b) Pursue the accreditation of the form of contract by PPDA

c) Administrative measures taken especially on those that have intentional reasons

Risk H

Indiscipline and slowness of staff performance

a) Conduct refresher trainings on discipline and disciplinary procedures in the Public Service including the appeal mechanisms.

b) General training of staff on the relevant laws and regulations governing the service(Public Service Standing Orders, Code of Ethics etc

c) Conduct periodic staff performance appraisals and take appropriate action

Risk I

Lack of confidence, decision making

a) Empowerment b) Mentoring and training c) Proper delegation

Page 38: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

___________________________________________________________________________ Vision- To provide reliable and safe works, transport infrastructure and services.

28

Risk No.

Risk Mitigation Measure

Risk J

Weak unprofessional private sector

a) Identify weaknesses b) Develop guidelines c) Training and mentoring d) Operationalize and strengthen the

regulating bodies (ERB, UIPE, Proposed UCICO etc)

Risk K

Continuous restructuring of the Ministry/Ministries

a) Keep reviewing the Ministry Structure b) Setting up change management team to

champion the change. Management system

c) Staff Orientation retreat d) Team building retreat e) Refresher courses f) Promote/reward/innovation/research.

Page 39: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

29 | P a g e

Annex 1: Annual Outputs and Budget Transport Regulations Objective Intervention Output Budget (bn UGX) / Annual Milestones

2011/12 2012/13 2013/14 2014/15 2015/16 Improve the stock and quality of road infrastructure

Monitor compliance and carry out an inventory of road signs on the paved National roads.

Inventory of road signs on national roads carried out

- 0.4 0.44 0.48 0.52 - Report on the

3200km of Km of paved roads covered

Report on the 3200km of Km of paved roads covered

Report on the 3200km of Km of paved roads covered

Report on the 3200km of Km of paved roads covered

Disseminate road furniture standards to Contractors and other stakeholders

40 stakeholder sensitization workshops conducted

0.03 0.04 0.05 0.06 0.06

Report for 8 workshops produced

Report for 8 workshops held produced

Report for 8 workshops held produced

Report for 8 workshops held produced

Report for 8 workshops held produced

Improve the traffic flow within the Greater Kampala Metropolitan Area

Initiate qualitative economic regulation of passenger transport

Qualitative economic regulations developed

- 0.2 0.2 0.2 0.2 - Copy of

regulations developed

Copy of regulations developed

Copy of regulations developed

Copy of regulations developed

Campaigns on passenger transport regulation and safety carried out

- - 0.4 0.45 0.50 - - Report on the

eight campaigns conducted produced

Report on the eight campaigns conducted produced

Report on the eight campaigns conducted produced

Develop regulations to govern Bus Rapid Transport system along other transport modes

A set of regulations developed

- 0.5 0.3 - -

- Draft Copy of regulations developed

Final Draft copy of regulations presented to Parliament

- -

Page 40: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

30 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Objective Intervention Output Budget (bn UGX) / Annual Milestones

2011/12 2012/13 2013/14 2014/15 2015/16 Increase the volume of passenger and freight cargo conveyed on the rail network

Review and update policies, laws and regulations regarding rail transport

Policies, laws and regulations governing railway transport reviewed and disseminated

- 0.5 0.6 0.2 0.2 - Draft copy of

the up-to-date policies, laws and regulations

Draft copy of the up-to-date policies, laws and regulations

Report on dissemination workshop produced

Report on dissemination workshop produced

Develop safety standards for railway transport

A set of safety standards formulated

- - 0.3 0.35 - - - Draft copy for

safety standards formulated

A set of safety standards produced

-

Disseminate the policy, laws, regulations and safety standards for railways

- 0.5 0.5 0.6 0.65 - 8 workshops

conducted and report produced

8 workshops conducted and report produced

8 workshops conducted and report produced

8 workshops conducted and report produced

Monitor compliance to the railway transport safety standards

Locomotives, rolling stock and railway line monitored

- 0.5 0.55 0.6 0.65 90% of

locomotives, rolling stock and 1032Km of railway line monitored.

90% of locomotives, rolling stock and 1032Km of railway line monitored.

90% of locomotives, rolling stock and 1032Km of railway line monitored.

90% of locomotives, rolling stock and 1032Km of railway line monitored.

Page 41: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

31 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Objective Intervention Output Budget (bn UGX) / Annual Milestones

2011/12 2012/13 2013/14 2014/15 2015/16 Disseminate the

policy, laws and regulations of inland water transport

Eight dissemination workshops held per year

- 0.5 0.5 0.6 0.7 - 8 workshops

conducted. 8 workshops conducted.

8 workshops conducted.

8 workshops conducted.

Develop safety standards for inland water transport

Inland water transport safety standards formulated

- 0.7 0.7 0.75 0.86 - A set of inland

water transport safety standards formulated

A set of inland water transport safety standards formulated

Inland water transport safety standards disseminated.

Inland water transport safety standards disseminated.

Monitor safety compliance of ports, landing sites and vessels.

Two Ports and 20 landing sites monitored

0.1 0.15 0.15 0.15 0.15 Monitoring reports produced

Monitoring reports produced

Monitoring reports produced

Monitoring reports produced

Monitoring reports produced

Enhancement of inland water transport safety

Inland water transport vessels inspected and licensed. Sensitization campaigns carried out.

0.05 0.4 0.5 0.6 0.75 400 vessels inspected and licensed. Report on the eight sensitization campaigns carried out.

400 vessels inspected and licensed. Report on the eight sensitization campaigns carried out..

400 vessels inspected and licensed. Report on the eight sensitization campaigns carried out..

400 vessels inspected and licensed. Report on the eight sensitization campaigns carried out.

400 vessels inspected and licensed. Report on the eight sensitization campaigns carried out..

Objective Intervention Output Budget (bn UGX) / Annual Milestones

Page 42: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

32 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

2011/12 2012/13 2013/14 2014/15 2015/16 Increase efficiency and improve effectiveness in the service delivery of transport infrastructure and provision of transport services.

Develop a road safety policy

Concessioner for Privatizing motor vehicle inspection procured.

0.1 0.4 - - - Concessioner procured.

Concessioner procured.

- - -

Vehicle Master Testing Center established

- 0.5 1.0 - - - Setting up a

Vehicle Master Testing Center Commenced

Vehicle Master Testing Center established

- -

Private Vehicle inspection Centers Monitored

- - 0.2 0.3 0.4 - - Quarterly

monitoring reports prepared

Quarterly monitoring reports prepared

Quarterly monitoring reports prepared

Establish National Road Safety Authority (NRSA) established

- 0.48 - - - - NRSA

established - - -

Crash Data base established

- 0.8 0.8 0.8 0.8 - Crash Data

base established

Updated the data base in place.

Updated the data base in place.

Updated the data base in place.

Driving schools/instructors licensed and monitored

- 0.25 0.25 0.25 0.25 - 50 Driving

Schools and 100 Instructors licensed and monitored.

50 Driving Schools and 100 Instructors licensed and monitored

50 Driving Schools and 100 Instructors licensed and monitored

50 Driving Schools and 100 Instructors licensed and monitored

Regulations for - 0.4 - - -

Page 43: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

33 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Objective Intervention Output Budget (bn UGX) / Annual Milestones 2011/12 2012/13 2013/14 2014/15 2015/16

Traffic and Road Safety Act 1998 reviewed, updated and formulated.

- Regulations for Traffic and Road Safety Act 1998 reviewed, updated and formulated.

- - -

MTRA established.

- 0.65 - - - - MTRA

established. - - -

Performance of Authorities formed and concessioned monitored

- - 0.3 0.3 0.4 - - Monitoring

reports compiled Monitoring reports compiled

Monitoring reports compiled

Widen the legal and regulatory framework

Laws and regulations on Pipeline transport reviewed and updated

- 0.1 0.12 - - - Draft up-to-

date laws and regulations for pipeline transport

Up-to-date laws and regulations for pipeline transport

- -

Develop an Axle load Policy

Draft Axle Load Policy in formulated

- 0.5 0.3 0.3 0.3 - A draft Axle

Load Policy submitted to cabinet.

Policy approved by Parliament

Reports on policy implementation

Reports on policy implementation

Procurement Monitoring - 0.6 0.2 0.25 0.3

Page 44: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

34 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Objective Intervention Output Budget (bn UGX) / Annual Milestones 2011/12 2012/13 2013/14 2014/15 2015/16

of Monitoring equipment

equipment procured.

- A set of equipment procured and maintained.

Monitoring reports

Monitoring reports

Monitoring reports

Enhancement of Inspection and Licensing of PSVs.

Inspection and licensing of PSVs enhanced

1.0 1.1 1.2 1.3 1.4

18000 No. of PSVs inspected and licensed.

19000 No. of PSVs inspected and licensed.

20000 No. of PSVs inspected and licensed.

21000 No. of PSVs inspected and licensed.

22000 No. of PSVs inspected and licensed.

National Road Safety awareness programmes conduction.

National Road Safety awareness programmes Conducted.

- 0.3 0.3 0.3 0.3 - 8 awareness

campaigns done and reports produced

8 awareness campaigns done and reports produced

8 awareness campaigns done and reports produced

8 awareness campaigns done and reports produced

Objective Intervention Output Budget (bn UGX) / Annual Milestones

2011/12 2012/13 2013/14 2014/15 2015/16

Capacity Building - 0.2 0.2 0.2 0.2

Page 45: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

35 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Objective Intervention Output Budget (bn UGX) / Annual Milestones

2011/12 2012/13 2013/14 2014/15 2015/16

CB) carried out for the railway transport

Reports on CB Carried out produced

Reports on CB Carried out produced

Reports on CB Carried out produced

Reports on CB Carried out produced

Increase the volume of passenger and cargo traffic by air transport

Review the existing BASA’s annually

All existing BASA’s reviewed.

- 0.3 0.4 0.4 0.4 - 40 BASA’s

reviewed and quarterly reports produced.

40 BASA’s reviewed and quarterly reports produced.

40 BASA’s reviewed and quarterly reports produced.

40 BASA’s reviewed and quarterly reports produced.

Operationalise Aviation Accident Investigation Body

Activities of the Aviation Accident Investigation Body operationalised.

- 0.2 0.2 0.2 0.25

- 10 activities carried out.

10 activities carried out.

10 activities carried out.

10 activities carried out.

Operationalise the National search and rescue body

National Search and Rescue institution operationalised

- 0.10 0.25 0. 28 0.28 10 activities

carried out and reports repared

10 activities carried out and reports prepared

10 activities carried out and reports prepared

10 activities carried out and reports prepared

Improve coordination of EAC and National Air

Programmes effectively coordinated and facilitation

- 0.30 0.35 0.30 0.30

Page 46: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

36 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Objective Intervention Output Budget (bn UGX) / Annual Milestones

2011/12 2012/13 2013/14 2014/15 2015/16

transport facilitation programmes

meetings held - 12 coordination programs and facilitation meetings held

12 coordination programs and facilitation meetings held

12 coordination programs and facilitation meetings held

12 coordination programs and facilitation meetings held

Develop a policy on Entebbe International airport as a regional hub

Policy on Entebbe as a regional hub developed

- 0.20 0.30 - -

- Draft policy in place

Approved policy - -

Develop a policy to re- establish national Airline

Policy for a National Airline developed

- 0.2 0.3 - -

Draft policy in place

Approved policy - -

Page 47: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

37 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Objective Intervention Output Budget (bn UGX) / Annual Milestones

2011/12 2012/13 2013/14 2014/15 2015/16

Increase the volume of passenger and cargo traffic by marine transport

Formulate a policy for inland water transport and Review the laws and regulations of inland water transport

Consultants to formulate a policy, review the laws and regulations of Inland Water Transport (IWT) engaged.

- 0.5 0.5 0.2 0.2

- IWT draft policy -up-to-date IWT laws & regulations

- IWT draft policy -up-to-date IWT laws & regulations

Reports for dissemination of Policy, laws and regulations prepared

Reports for dissemination of Policy, laws and regulations prepared

Stock of IWT vessels and landing sites on all navigable water bodies undertaken

- 0.25 0.25 - -

Inventory report

Inventory report - -

Concessioner for privatizing IWT survey and

- 0.010 0.01 0.3 0.3

Page 48: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

38 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Objective Intervention Output Budget (bn UGX) / Annual Milestones

2011/12 2012/13 2013/14 2014/15 2015/16

inspection procured.

- Concessioner procured.

Concessioner procured.

Vessels Inspection reports

Vessels Inspection reports

Capacity Building (CB) for IWT carried out

- 0.2 0.2 0.2 0.2

- Reports on CB Carried out produced

Reports on CB Carried out produced

Reports on CB Carried out produced

Reports on CB Carried out produced

Page 49: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

39 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Transport Services and Infrastructure Objective Intervention Output Budget (bn UGX) / Annual Milestones

2011/12 2012/13 2013/14 2014/15 2015/16 Improve the stock and quality of road infrastructure

Carry out socio-economic studies to assess the Impact of the rehabilitated National roads

Reports on socio-economic assessment studies compiled

0.8 0.8 0.8 0.8 0.8 Reports on four Socio-economic impact studies compiled

Reports on four Socio-economic impact studies compiled

Reports on four Socio-economic impact studies compiled

Reports on four Socio-economic impact studies compiled

Reports on four Socio-economic impact studies compiled

Design and Implementation of OSBP strategy at national entry points

Land compensated

1 - - - Katuna, Mutukula and Mirama hills

- - -

OSBP designed and constructed at border posts

0.8 20 20 0.01 0.015 Busia and Malaba border posts designed and constructed

Busia and Malaba border posts constructed

Busia and Malaba border posts constructed

Reports on OSBP operations

Reports on OSBP operations

0.58 10 10 0.01 0.015 Mutukula border post designed

Mutukula border post constructed

Mutukula border post constructed

Reports on OSBP operations

Reports on OSBP operations

Katuna and Mirama hills border posts designed

Katuna and Mirama hills border posts constructed

Katuna and Mirama hills border posts constructed

Reports on OSBP operations

Reports on OSBP operations

- - 1.5 1.5 1.5

Page 50: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

40 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Objective Intervention Output Budget (bn UGX) / Annual Milestones 2011/12 2012/13 2013/14 2014/15 2015/16 - - Arua border

post designed and constructed

Mpondwe border post designed and constructed

Koboko border post designed and constructed

Carry out route strategy study for different national roads network

6 route studies conducted.

- 0.5 0.5 0.2 0.2 - Report on two

route strategy studies compiled (Kampala-Jinja and Kampala - Masaka road.)

Report on two route strategy studies compiled (Kampala-Karuma and Kampala– Hoima)

Report on a route strategy study compiled (Busega-Mityana)

Report on a route strategy study compiled (Kampla-Gayaza-Zirobwe)

Carry out Socio-economic studies on the impact of the rehabilitated DUCAR roads.

Socio-economic impact assessment study reports compiled

- 0.6 0.6 0.6 0.6 - Report on

socio-economic impact assessment compiled

Report on socio-economic impact assessment compiled

Report on socio-economic impact assessment compiled

Report on socio-economic impact assessment compiled

Page 51: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

41 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Objective Intervention Output Budget (bn UGX) / Annual Milestones 2011/12 2012/13 2013/14 2014/15 2015/16

Improve the traffic flow within the Greater Kampala Metropolitan Area

Implement selected Transport Master Plan recommendations

Create a separate Agency to manage Transport in GKMA

- 0.7 0.2 0.5 0.3 - MATA bill

prepared MATA bill submitted to cabinet

MATA established

MATA established

BRT Feasibility and design report prepared

- 9 2 10 5 - BRT

Feasibility study and design report compiled

Land compassion to the affected areas

BRT Pilot terminals constructed

BRT Pilot roads constructed

Carry out feasibility studies for establishment of alternative airports in GKMA.

Feasibility study carried out

- 0.8 1.0 - - - Kajansi

feasibility study report compiled

Namanve feasibility study report compiled

- -

Carry out feasibility study for establishment of general parking areas in the GKMA

Feasibility study carried out

- 0.15 1.0 - - - Feasibility

study report compiled

Detailed design report for parking areas

- -

Page 52: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

42 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Objective Intervention Output Budget (bn UGX) / Annual Milestones 2011/12 2012/13 2013/14 2014/15 2015/16

Implementation of Non Motorized Transport (NMT) Policy recommendation

NMT Policy implemented.

0.1 0.5 1.0 1.0 1.5

Policy for NMT developed

Detailed design report on NMT within GKMA

Implement NMT on selected GKMA Roads

Implement NMT on selected GKMA Roads

Implement NMT on selected GKMA Roads

Study to improve transport services and infrastructure in GKMA

Research study undertaken

- 0.2 0.2 - -

- Draft research study report

Research study report

- -

Feasibility study for improvement of public water transport from Entebbe to Kampala.

Feasibility study report submitted

- 0.05 0.7 1.0 1.0 - TORs drafted Feasibility study

report completed

Selected study recommendations Implemented

Selected study recommendations Implemented

Carry out feasibility study to revive railway passenger transport in the GKMA

Feasibility study report submitted

- 0.7 1.0 1.0 1.0 - Feasibility

study report prepared

Implementation report on study recommendation compiled

Implementation report on study recommendation compiled

Implementation report on study recommendation compiled

Feasibility study for establishing a rapid radial Railway transit system from

Feasibility study and design report submitted

- - 1.8 6.0 - - - Feasibility study

report prepared Design prepared -

Page 53: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

43 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Objective Intervention Output Budget (bn UGX) / Annual Milestones 2011/12 2012/13 2013/14 2014/15 2015/16

Kyengera, Mukono, Entebbe and Nansana to central station

Increase the volume of passenger and freight cargo conveyed on the rail network

Carry out preliminary and detailed design to Standard gauge of Kampala - Malaba Railway Line (250km)

Preliminary and detailed design report

prepared

- 8.4

1.0 0.5 -

Feasibility study and design commenced

Feasibility study and design report compiled

Report on dissemination of feasibility study design findings compiled

Land for the affected areas compensated

Land for the affected areas compensated

Carry out preliminary and detailed design of Kampala – Kasese Railway line (333km)

Preliminary and detailed design report submitted

- 8.0 1.7 6.0 - Final draft report completed

Draft preliminary design report prepared

Detailed design report prepared

Land compensated

-

20% of the railway line upgraded

- - - - 1.8 - - - - 20% of the

railway line upgraded

Carry out preliminary and detailed design of Tororo-Pakwach Railway line (501km)

Preliminary and detailed design report submitted

- 5.0 2.0 - - - Preliminary

design report prepared

Detailed design report prepared

- -

- - - 6.0 12 - - - Land

compensated 20% of the railway line upgraded

Page 54: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

44 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Objective Intervention Output Budget (bn UGX) / Annual Milestones 2011/12 2012/13 2013/14 2014/15 2015/16

Feasibility Study to construct Gulu-Atiak-Nimule railway line

Feasibility study report prepared

- 2.8 - - - - Feasibility

Study Report prepared

- - -

Feasibility study to link Pakwach-Kaiso Tonya – Kasese railway line (400km)

Feasibility study report prepared

- 2.8 - - - - Feasibility

study report prepared

- - -

Carry out feasibility study for extension of Kasese-Kabatoro-Bwera to Kisangani Railway

Feasibility study report prepared

- - 2.9 - - - - Feasibility

study report prepared

- -

Carry out feasibility study for extension of Bihanga-Kigali Railway line

Feasibility study report prepared

- - 2.9 - - - - Feasibility

study report prepared

- -

Page 55: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

45 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Objective Intervention Output Budget (bn UGX) / Annual Milestones 2011/12 2012/13 2013/14 2014/15 2015/16

Feasibility study for extension of railway line from Mityana-to oil fields

Feasibility study report prepared

- - 2.0 - - - - Feasibility

study report prepared

- -

Carry out feasibility study to construct Nimule-Juba railway line (300km)

Feasibility study report prepared

- - 2.5 - - - - Feasibility

study report prepared

- -

Carryout studies to assess the socio-economic impact of rehabilitated railway lines (as basis for future projects)

Socio-economic impact assessment study reports submitted

0.02 0.8 0.8 0.8 0.8 Socio-economic study reports prepared

Socio-economic study reports prepared

Socio-economic study reports prepared

Socio-economic study reports prepared

Socio-economic study reports prepared

Monitor and evaluate the performance of railways

Monitoring and evaluation surveys of operational railway lines conducted

0.01 0.8 0.6 0.6 0.6

Monitoring reports compiled

Monitoring reports compiled

Monitoring reports compiled

Monitoring reports compiled

Monitoring reports compiled

URAHC Bill and Concession Agreement amended

- 0.2 - - - - URAHC Bill

2007 approved by Parliament

- - -

- 0.5 - - - - Concession - - -

Page 56: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

46 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Objective Intervention Output Budget (bn UGX) / Annual Milestones 2011/12 2012/13 2013/14 2014/15 2015/16

agreement to allow passenger railway transport services prepared

Increase the volume of passenger and cargo traffic by air transport

Routine aerodrome inspections at upcountry aerodromes to increase accessibility by air

Four quarterly supervision and inspections visits done

0.2 0.2 0.2 0.1 0.1 Quarterly supervision/ inspections reports prepared

Quarterly supervision/ inspections reports prepared

Quarterly supervision/ inspections reports prepared

Quarterly supervision/ inspections reports prepared

Quarterly supervision/ inspections reports prepared

Monitoring of development projects to upgrade upcountry aerodromes at Arua and Kasese

Quarterly supervision and inspections visits done

0.6 0.6 0.6 0.8 0.9 Quarterly supervision/ inspections reports prepared

Quarterly supervision/ inspections reports prepared

Quarterly supervision/ inspections reports prepared

Quarterly supervision/ inspections reports prepared

Quarterly supervision/ inspections reports prepared

Carry out feasibility study for establishment of other upcountry airports (Yumbe, Rukungiri, Pader, Apac, Ntungamo/ Rwentobo, Rakai Nakasongola, Kiboga, Sembabule)

Feasibility study report prepared

- - 2.2 1.1 - - - Draft

feasibility report

Final draft feasibility report

-

Carry out feasibility Feasibility - 1 1 0.5 -

Page 57: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

47 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Objective Intervention Output Budget (bn UGX) / Annual Milestones 2011/12 2012/13 2013/14 2014/15 2015/16

study for establishment of an airport near oil fields in Albertine Graben region

study report prepared

- Aerodrome constructed (40% equivalent) in the Albertine region

Aerodrome constructed (40% equivalent) in the Albertine region

Aerodrome constructed (20% equivalent) in the Albertine region

-

Carryout studies to assess the socio-economic impact of rehabilitated/established airports

Socio-economic impact assessment study reports prepared

0.2 0.2 0.2 0.2 0.2

Four socio-economic survey reports prepared

Four socio-economic survey reports prepared

Four socio-economic survey reports prepared

Four socio-economic survey reports prepared

Four socio-economic survey reports prepared

Promote collaboration linkages with Regional and International organizations in provision of air transport services and infrastructure

Regional and International collaboration linkages established

- - - 0.17 0.2

- - - Recommendations of EAC resolutions to promote trade along the trade corridor prepared

Reports on implementation of recommendations of EAC resolutions prepared

Monitor and evaluate the operations of CAA

M&E study for CAA activities carried out

0.04 0.04 0.04 0.02 0.02 M&E study report prepared

M&E study report prepared

M&E study report prepared

M&E study report prepared

M&E study report prepared

Master Plan - 0.5 - - -

Page 58: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

48 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Objective Intervention Output Budget (bn UGX) / Annual Milestones 2011/12 2012/13 2013/14 2014/15 2015/16

for Kasese Air Port report prepared

- Master Plan for Kasese Air port finalized

- - -

Entebbe International Airport Investment Plan report prepared

- 0.5 - - - - Review of

Entebbe International Airport Investment Plan finalized

- - -

Increase the volume of passenger and cargo traffic by marine transport

Conduct Feasibility Study to assess traffic volume on Uganda inland water ways

Feasibility Study report prepared

0.2 0.3 Draft

feasibility study report

Final draft feasibility Study report

Procure 2 marine vessels for potential landing sites

10.8 9.0 - - - Marine vessel

procured Marine vessel procured

Re-open the central corridor through Lake Victoria

Feasibility study report to develop Tanga-Arusha-Musoma-Bukasa Port report

- 1 - - - - Feasibility

Study report prepared

- - -

Page 59: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

49 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Objective Intervention Output Budget (bn UGX) / Annual Milestones 2011/12 2012/13 2013/14 2014/15 2015/16

prepared

MV Kaawa rehabilitated

2.5 4.0 - - - MV Kaawa rehabilitated

MV Kaawa rehabilitated

- - -

MV Pamba rehabilitated

- 1 2.5 - -

- MV Pamba rehabilitated

MV Pamba rehabilitated

- -

New vessel to replace MV Kabalega and Port bell and Jinja piers designed

- - - 3.0 5.0 - - - Designs

commenced Designs completed

Feasibility study for introduction of modern cargo boats for roll-on roll-off and container cargo on Lakes Victoria, Albert and Kyoga

Feasibility study report prepared

- - 2.8 - - - - Feasibility

study report prepared

- -

- - - 0.5 0.75

- - - Modern cargo boats procured

Modern cargo boats procured

Carry out feasibility Feasibility - - 1.5 - -

Page 60: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

50 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Objective Intervention Output Budget (bn UGX) / Annual Milestones 2011/12 2012/13 2013/14 2014/15 2015/16

study for introduction of first furious passenger boats on Lakes Victoria, Albert and Victoria Nile

study report prepared

- - Feasibility study report prepared

- -

- - - 0.5 0.75 - - - Furious passenger

boats procured Furious passenger boats procured

Undertake socio-economic impact studies on rehabilitated/established water transport and infrastructure

Socio-economic impact surveys reports prepared

0.05 0.80 0.80 0.80 0.80 Socio-economic impact surveys reports prepared

Socio-economic impact surveys reports prepared

Socio-economic impact surveys reports prepared

Socio-economic impact surveys reports prepared

Socio-economic impact surveys reports prepared

Carry out Feasibility study to operate a second ship between Nakiwogo and Lutoboka landing sites

Feasibility study report prepared

- - 1.2 - - - - Feasibility

study report produced

- -

Concept paper on Inland Water Transport Development Plan for Lake Victoria prepared

Concept paper on Inland Water Transport Development Plan for Lake Victoria prepared

- 0.50 - - - - Concept

paper prepared

- - -

Strategy and Investment Strategy and - 0.7 - - -

Page 61: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

51 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Objective Intervention Output Budget (bn UGX) / Annual Milestones 2011/12 2012/13 2013/14 2014/15 2015/16

plan for ferry services prepared

Investment plan for ferry services prepared

- Strategy and Investment plan for ferry services prepared

- - -

Carry out feasibility study for provision of transport to connect the 84 Ssesse islands to main land

Feasibility study report to link Ssesse islands to main land prepared

- 0.7 - - - - Feasibility

study report prepared

- - -

Update the inland water study (1998)

In land water study updated

- 0.5 - - - - Updated

IWT study report

- - -

Increase efficiency and improve effectiveness in the service delivery of transport infrastructure and provision of transport services.

Participate in strengthening the coordination mechanisms within the sector and establishment of the National Transport Databank

Reports on traffic flow for the various modes of transport prepared

0.05 0.60 0.50 0.50 0.50 Reports on traffic flow for the various modes of transport prepared and disseminated

Reports on traffic flow for the various modes of transport prepared and disseminated

Reports on traffic flow for the various modes of transport prepared and disseminated

Reports on traffic flow for the various modes of transport prepared and disseminated

Reports on traffic flow for the various modes of transport prepared and disseminated

Page 62: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

52 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Quality Assurance and Construction Standards Objective Intervention Output Budget (bn UGX) / Annual Milestones

2011/12 2012/13 2013/14 2014/15 2015/16 Improve the stock and quality of road infrastructure

Provide Construction Standards. Monitor Quality Assurance Systems and Compliance to standards and Specifications

A set of Construction standards provided.

0.1 0.11 0.12 0.13 0.15 10 Construction standards reviewed and re-produced

10 Construction standards reviewed and re-produced

10 Construction standards reviewed and re-produced

10 Construction standards reviewed and re-produced

10 Construction standards reviewed and re-produced

Compliance reports prepared

0.313 0.313 0.313 0.313 0.313 Reports (two) fieldwork visits prepared

Reports (two) fieldwork visits prepared

Reports (two) fieldwork visits prepared

Reports (two) fieldwork visits prepared

Reports (two) fieldwork visits prepared

Undertake Innovative Research in Construction Materials

Research reports on construction materials prepared.

0.072 0.105 0.11 0.115 0.12 2 reports prepared

2 reports prepared

2 reports prepared

2 reports prepared

2 reports prepared

Monitor compliance to environmental and social standards

Environmental and social compliance reports prepared

0.1 0.021 0.079 0.023 0.024 Report prepared

Fieldwork conducted and four reports prepared

Fieldwork conducted and reports prepared

Fieldwork conducted and reports prepared

Fieldwork conducted and reports prepared

Undertake capacity building on innovative technologies.

Training workshop conducted and report prepared

0.02 0.21 0.22 0.23 0.6 Two work-shops held and report prepared

Two work-shops held and report prepared

Two work-shops held and report prepared

Two work-shops held and report prepared

Two work-shops held and report prepared

Objective Intervention Output Budget (bn UGX) / Annual Milestones

2011/12 2012/13 2013/14 2014/15 2015/16

Page 63: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

53 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Objective Intervention Output Budget (bn UGX) / Annual Milestones 2011/12 2012/13 2013/14 2014/15 2015/16

Review standards for conditions of Roads (National roads and DUCAR)

Standards for condition of Roads (National roads and DUCAR) established

0.2 - - - 0.3 Report on two training workshops prepared

- - - Standards disseminated; workshop reports prepared

Create a Data base for the Conditions of Roads

Data base for the Conditions of Roads created

0.5 0.3 - 0.25 - Five sets finalized

Five sets of standards for road conditions printed and disseminated

- Functioning data base for road condition in place

-

Carry out capacity Building on the application of Low Cost Sealing Engineering Standards

Low Cost Sealing Engineering Standards developed and disseminated

0.5 0.45 0.6 0.6 0.6 Database established

Low Cost Sealing Engineering Standards for Tourism roads developed

Report on two training work- shops for stakeholders conducted

2 training workshops for Stakeholders conducted

2 training workshops for Stakeholders conducted

Carry out pavement evaluation

Report on pavement evaluated

0.105 0.11 0.1 0.12 Report

Pavement evaluation for 100km conducted

Report Pavement evaluation for 100km conducted

Report Pavement evaluation for 100km conducted

Report Pavement evaluation for 100km conducted

Carry out Technical Audits

Districts local government audited

0.115 0.105 0.11 0.115 0.120 100 Km per financial year.

40 Local Government

40 Local Government

40 Local Government

40 Local Government

Page 64: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

54 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Objective Intervention Output Budget (bn UGX) / Annual Milestones 2011/12 2012/13 2013/14 2014/15 2015/16

Audit reports prepared

Audit reports prepared

Audit reports prepared

Audit reports prepared

Carry out Environmental and social Impact Assessments in the GKMA

Environmental and social Impact Assessment (ESIA) carried out in GKMA

0.15 - - - - Impact Statements prepared and submitted to NEMA

- - - -

Undertake resettlement Action Plans (GKMA)

Resettlement Action Plan prepared for GKMA

0.1 - 0.1 - 0.1 Resettlement Action Plan produced for selected areas.

- Resettlement Action Plan produced for selected areas.

- Resettlement Action Plan produced for selected areas.

Carry out Geotechnical Investigations

Geotechnical Investigations carried out.

0.05 - 0.05 - - Report on Geotechnical Investigations prepared

- Report on Geotechnical Investigations prepared

- -

Undertake Material Testing

Material test exercise conducted.

0.1 - - - 0.12 Material test reports produced

- - - Material test reports produced

Undertake Capacity building for use of Low Cost Seals to Stake holders

Report on training workshops held

0.06 0.06 0.065 0.065 0.07 Reports on training workshops held

Reports on training workshops held

Reports on training workshops held

Reports on training workshops held

Reports on training workshops held

Improve the traffic flow

Review railway Engineering

Standards developed and

- 0.25 - - 0.25 - Standards - - Standards

Page 65: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

55 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Objective Intervention Output Budget (bn UGX) / Annual Milestones 2011/12 2012/13 2013/14 2014/15 2015/16

within the GKMA

Standards printed finalized and printed

finalized and printed

Carry out Geotechnical Investigations

Three Geotechnical Investigations carried out.

- 0.105 0.11 0.115 -

- Report on Geotechnical Investigations

Report on Geotechnical Investigations

Report on Geotechnical Investigations

-

Undertake Material Testing

Materials tested - 0.105 0.11 0.115 0.115 - Materials test

reports produced

Materials test reports produced

Materials test reports produced

Materials test reports produced

Page 66: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

56 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Objective Intervention Output Budget (bn UGX) / Annual Milestones 2011/12 2012/13 2013/14 2014/15 2015/16

Increase the volume of passenger and freight cargo conveyed on the rail network

Environmental and Social Impact assessment and Resettlement Action for landing sites prepared

Environmental and Social Impact Assessments, Resettlement Action reports prepared

0.15 0.15 - - Three environmental and Social Impact statement reports prepared

- Three environmental and Social Impact statement reports prepared

- -

Undertake Geotechnical Investigations on ferry landing sites

Two Geotechnical Investigations reports prepared

- 0.2 - 0.2 - - Geotechnical

Investigations reports prepared

- Geotechnical Investigations reports prepared

-

Formulate Resettlement Action Plans (RAP)

RAP formulated for selected affected people

0.2 - 0.2 - 0.2 RAP prepared - RAP prepared - RAP prepared

Increase the volume of passenger and cargo traffic by air transport

Carry out periodic Reviews of Engineering Standards for runways and Airport facilities

Engineering Standards for runways and Airport facilities reviewed

0.35 - - - Two sets of

engineering Standards done

- - -

Page 67: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

57 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Objective Intervention Output Budget (bn UGX) / Annual Milestones 2011/12 2012/13 2013/14 2014/15 2015/16

Increase the volume of passenger and cargo traffic by marine transport

In collaboration with other line Agencies, carry out Environmental and Social Impact assessment and Resettlement Action Planning

Environmental and Social Impact Assessments (EIA) conducted

0.2 0.15 0.15 0.15 0.15 Environmental and Social Impact statement prepared and submitted to NEMA

Compliance monitoring reports prepared

Compliance monitoring reports prepared

Compliance monitoring reports prepared

Compliance monitoring reports prepared

Develop guidelines for oil spill control on Water bodies

Guidelines for oil spill control on Water bodies developed

- 0.2 0.1 0.1 0.1 - Guidelines for

oil spill control on Water bodies produced

Compliance monitoring reports prepared

Compliance monitoring reports prepared

Compliance monitoring reports prepared

Develop Engineering Standards for ferry Landing Sites

Engineering standards developed.

0.2 0.25 0.25 0.25 0.25 Sets of Engineering standards printed

Report on dissemination workshops prepared

Report on dissemination workshops prepared

Report on dissemination workshops prepared

Report on dissemination workshops prepared

Carry out Geotechnical Investigations on ferry landing sites

Geotechnical Investigations carried out.

0.2 0.1 0.11 0.115 0.12

Geotechnical Investigations reports done

Geotechnical Investigations reports done

Geotechnical Investigations reports

Geotechnical Investigations reports done

Geotechnical Investigations reports done

Mainstream Cross cutting Issues in the Transport Sector policies and

Guidelines for mainstreaming crosscutting issues developed

0.3 0.315 0.33 0.345 0.36 M&E indicators for crosscutting

Reports on dissemination workshops

Reports on training of Stakeholders

Reports on training of Stakeholders

Reports on training of Stakeholders

Page 68: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

58 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Objective Intervention Output Budget (bn UGX) / Annual Milestones 2011/12 2012/13 2013/14 2014/15 2015/16

regulatory framework and disseminated

issues developed

prepared in mainstreaming crosscutting prepared

in mainstreaming crosscutting prepared

in mainstreaming crosscutting prepared

Strengthen the National Construction Industry

Operationalise and Establish Drafting bill for UCICO

Drafting Bill established.

0.5 - - - - UCICO bill produced and printed

- - - -

Review and Disseminate the NCI Policy

NCI policy reviewed and established.

0.3 0.315 0.33 0.36 - NCI Policy printed and disseminated and reports compiled

NCI Policy disseminated and reports compiled

NCI Policy disseminated and reports compiled

NCI Policy disseminated and reports compiled

-

Study, review and approve all road design and Parking areas/Pavements

Standards and designs approved.

0.1 0.105 - - - Standards and designs produced

Standards and designs produced

- - -

Page 69: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

59 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Objective Intervention Output Budget (bn UGX) / Annual Milestones 2011/12 2012/13 2013/14 2014/15 2015/16

Carry out Environmental and social Impact Assessments

An Environmental and social Impact Assessment (ESIA) carried out proposed project

0.25 0.25 0.25 0.25 0.25 Impact Statements prepared and submitted to NEMA

Impact Statements prepared and submitted to NEMA

Impact Statements prepared and submitted to NEMA

Impact Statements prepared and submitted to NEMA

Impact Statements prepared and submitted to NEMA

Undertake training for professionals in the sector and equip them with up to date practices in planning, design, construction

Training workshops organized.

0.6 0.6 0.6 0.6 0.6 Reports on the training workshops held

Reports on the training workshops held

Reports on the training workshops held

Reports on the training workshops held

Reports on the training workshops held

Facilitate Research and material testing centers

Research and material testing centers supported

0.2 0.21 0.23 0.25 0.25 Renovations carried out and equipment procured

Renovations carried out and eqpmt procured

Research and material testing reports

Research and material testing reports

Research and material testing reports

Establish Construction guarantee fund

Construction guarantee fund established

3.21 3.735 3.735 1.425 1.425 Functional guarantee fund in place

Functional guarantee fund in place

Functional guarantee fund in place

Functional guarantee fund in place

Functional guarantee fund in place

Page 70: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

60 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Roads and Bridges Objective Intervention Output Budget (bn UGX) / Annual Milestones

2011/12 2012/13 2013/14 2014/15 2015/16 Improve the stock and quality of road infrastructure

Collect data on National roads, District, Urban and Community Access roads

Data base for National roads, District, Urban and Community Access roads established

2.6 5.2 5.2 2.6 2.6 -Data base designed -Staff trained and roads mapped.

Data collected and roads mapped.

Data base for National roads and DUCAR Established

Data base for National roads and DUCAR updated

Data base for National roads and DUCAR updated

Determine the national roads to be upgraded from gravel to class I & II bitumen standards and DUCAR to be worked on

Plan for national roads and DUCAR reviewed and updated

0.1 0.1 0.1 0.1 0.1 Annual plan for national roads and DUCAR

Annual plan for national roads and DUCAR

Annual plan for national roads and DUCAR

Annual plan for national roads and DUCAR

Annual plan for national roads and DUCAR

Determine the length of roads that require improvement from fair to good condition

Plans for roads that require improvement from fair to good condition reviewed

0.2 0.1 0.1 0.1 0.1 Annual plan for roads’ improvement

Annual plan for roads’ improvement

Annual plan for roads’ improvement

Annual plan for roads’ improvement

Annual plan for roads’ improvement

Determine, plan and construct strategic roads leading to major tourism sites, mining areas, oil and gas exploration and production areas, urban and rural industrial areas

230km roads leading to major tourism sites rehabilitated

1.1 1.0 2.5 2.5 2.5 60km roads leading to major tourism sites rehabilitated

20km roads leading to major tourism sites rehabilitated

50km roads leading to major tourism sites rehabilitated

50km roads leading to major tourism sites rehabilitated

50km roads leading to major tourism sites rehabilitated

Page 71: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

61 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Objective Intervention Output Budget (bn UGX) / Annual Milestones 2011/12 2012/13 2013/14 2014/15 2015/16

192km roads leading to mining and oil exploration areas rehabilitated

1.0 1.0 2.5 2.5 2.5 22km roads leading to oil exploration and mining areas rehabilitated

20km roads leading to mining and oil exploration areas rehabilitated

50km roads leading to mining and oil exploration areas rehabilitated

50km roads leading to mining and oil exploration areas rehabilitated

50km roads leading to mining and oil exploration areas rehabilitated

Rehabilitate selected District, Urban, Community Access Roads and Bridges

456km of District roads rehabilitated

2.8 5.0 5.0 5.5 5.5

56km District roads rehabilitated

100km District roads rehabilitated

100km District roads rehabilitated

100km District roads rehabilitated

100km District roads rehabilitated

27km Urban roads rehabilitated under urban resealing unit by force account and Urban councils monitored

1.04 3.96 3.96 3.96 3.96 3km Urban roads rehabilitated under urban resealing unit by force account and monitoring reports prepared

6km Urban roads rehabilitated under urban resealing unit by force account and monitoring reports prepared

6km Urban roads rehabilitated under urban resealing unit by force account and monitoring reports prepared

6km Urban roads rehabilitated under urban resealing unit by force account and monitoring reports prepared

6km Urban roads rehabilitated under urban resealing unit by force account and monitoring reports prepared

25km of urban 0.4 4.8 4.8 4.8 4.8

Page 72: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

62 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Objective Intervention Output Budget (bn UGX) / Annual Milestones 2011/12 2012/13 2013/14 2014/15 2015/16

roads rehabilitated under directives and pledges by contracting

1km of urban roads rehabilitated

6km of urban roads rehabilitated

6km of urban roads rehabilitated

6km of urban roads rehabilitated

6km of urban roads

1200km of community access roads rehabilitated

- 4.5 6.0 6.0 6.0 - 150km of

community access roads rehabilitated

200km of community access roads rehabilitated

200km of community access roads rehabilitated

200km of community access roads rehabilitated

18 Bridges Rehabilitated

2.25 4.0 6.0 6.0 6.0 3 Bridges Rehabilitated

3 Bridges Rehabilitated

4 Bridges Rehabilitated

4 Bridges Rehabilitated

4 Bridges Rehabilitated

Rehabilitate selected roads under Interconnectivity Programme

1100km of roads rehabilitated

8.2 8.8 8.8 9.0 9.0

300 km of roads rehabilitated

320km of roads rehabilitated

320km of roads rehabilitated

320km of roads rehabilitated

320km of roads rehabilitated

Monitor selected roads under Community Agriculture infrastructure Improvement Programme (CAIIP)

1000km of CAIIP roads monitored per FY

2.5 2.5 2.5 2.5 2.5 Reports on 1000km of CAIIP roads supervised and monitored

Reports on 1000km of CAIIP roads supervised and monitored

Reports on 1000km of CAIIP roads supervised and monitored

Reports on 1000km of CAIIP roads supervised and monitored

Reports on 1000km of CAIIP roads supervised and monitored

Page 73: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

63 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Objective Intervention Output Budget (bn UGX) / Annual Milestones 2011/12 2012/13 2013/14 2014/15 2015/16

Rehabilitate selected roads under Karamoja Special Security Programme

450km of roads rehabilitated under IDA

2.635 17.0 17.0 17.0 16.0

450km of roads designed

90km of roads rehabilitated

125km of roads rehabilitated

125km of roads rehabilitated

110km of roads rehabilitated

Purchase road equipment for the Urban resealing Unit and emergencies

Road equipment purchased for urban resealing unit and emergencies

1.0 3.0 3.0 1.5 1.5 1Motor grader and 1 wheel loader

1bull dozer 1 vibro roller 1 bitumen distributor and 1 excavator 1 crane (40t)

2 tippers 1 vibro roller 1pneumatic roller 1chip spreader 1 cargo truck 1 self loading truck

1water bowzer 2 tippers 1crane self loading truck 3 forklifts (5t,10t,20t) 1wheel loader

1 water bowzer 1 pneumatic roller 1chip spreader 1 bitumen distributer

Repair of all heavy equipment

Equipment serviced, repaired and maintained

0.1 2.0 2.0 0.7 0.7 All equipment serviced, repaired and maintained

All equipment serviced, repaired and maintained

All equipment serviced, repaired and maintained

All equipment serviced, repaired and maintained

All equipment serviced, repaired and maintained

Support MELTC activities Train students in labor based activities

125 No. of contractors trained. 60 Engineers trained. 120 district non engineering staff

3.48 4.0 4.0 4.0 4.0

-25 Contractors

-25 Contractors

-25 Contractors

-25 Contractors

-25 Contractors

Page 74: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

64 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Objective Intervention Output Budget (bn UGX) / Annual Milestones 2011/12 2012/13 2013/14 2014/15 2015/16

trained.

and 12 Engineers trained -24 District Non Engineering Staff trained

and 12 Engineers trained -24 District Non Engineering Staff trained

and 12 Engineers trained -24 District Non Engineering Staff trained

and 12 Engineers trained -24 District Non Engineering Staff trained

and 12 Engineers trained -24 District Non Engineering Staff trained

Increase efficiency and improve effectiveness in service delivery of transport infrastructure and provision of transport services.

Creation of a DUCAR Agency

DUCAR agency created

0.5 0.1 0.2 - - ToR for the creation of the DUCAR agency

Drafting principles for the creation of the DUCAR agency

DUCAR agency approved by Parliament

- -

Page 75: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

65 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Mechanical Engineering Services Objective Intervention Output Budget (bn UGX) / Annual Milestones

2011/12 2012/13 2013/14 2014/15 2015/16 Improve the stock and quality of road infrastructure

Support management of road maintenance and construction equipment (Zonal and Regional Mechanical Workshops).

District road equipment maintained.

1.4 7.0 10.5 12.0 12.5 Equipment kept at 10% availability

Equipment kept at 70% availability

Equipment kept at 70% availability

Equipment kept at 70% availability

Equipment kept at 70% availability

Develop guidelines on specifications for road equipment and vehicles.

A set of guidelines on specifications for a basic road unit developed

- 0.016 0.11 0.4 0.4 - Draft

guidelines developed

External consultations carried out and final draft produced

Guidelines launched and disseminated

Quarterly monitoring reports on the usage of guidelines

Develop guidelines and standards for garages that provide repair/maintenance services.

A set of guidelines and classification of garages developed

- 0.016 0.21 0.4 0.4 - Draft

guidelines developed

External consultations and final draft produced

Guidelines launched and disseminated

Quarterly monitoring reports on the usage of guidelines

Provide technical advice on vehicular waste management.

Improved management practices of waste products in mechanical w/shops.

- 0.1 - - - - Report on two

stakeholder workshops held

- - -

Page 76: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

66 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Objective Intervention Output Budget (bn UGX) / Annual Milestones 2011/12 2012/13 2013/14 2014/15 2015/16

Provide technical advice on appropriate disposal methods.

Improved management practices of waste products in mechanical w/shops.

- - 0.1 0.3 0.3 - - Report on

waste oil management carried out.

Report on two campaigns for MDAs & general public done

Report on two campaigns for MDAs & general public done

Support management of road maintenance and construction equipment.

Assessment of resource requirements done.

- 0.3 0.2 0.3 0.3 - Resource

assessment report complied

Resource assessment report complied

Resource assessment report complied

Resource assessment report complied

Monitor performance of road equipment.

Usage, utilization and operation of road equipment monitored.

- 0.2 0.22 0.3 0.3 - Report on the

two LGs monitored prepared

Report on the two LGs monitored prepared

Report on the two LGs monitored prepared

Report on the two LGs monitored prepared

Increase the volume of passenger and cargo traffic by marine transport

Carryout delegated procurement of marine vessels.

Ferry for Lake Bisina procured.

0.188 0.04 0.3 0.2 0.2 Assembling of Lake Bisina ferry commenced

Ferry for L. Bisina commissioned.

Ferry for L. Bisina maintained and kept at 80% availability

Quarterly progress reports on initial ferry operations prepared

Quarterly progress reports on initial ferry operations prepared

Ferries and ship procured

- - - - 6.0 - - - - 2 vessels

procured Study and design 1.287 - - - -

Page 77: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

67 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Objective Intervention Output Budget (bn UGX) / Annual Milestones 2011/12 2012/13 2013/14 2014/15 2015/16

for lake Kyoga ferry completed.

Study report produced

- - - -

Operate and maintain MV Kalangala ship.

MV Kalangala effectively operated and maintained.

2.0 3.5 4.0 4.2 4.5 345 days availability/ operational

345 days availability/ operational

345 days availability/ operational

345 days availability/ operational

345 days availability/ operational

Provide technical support on marine infrastructure matters.

Support supervision marine rehabilitation and/or construction works done.

- 0.06 - - 0.09 - Four

supervision reports prepared

- - Four supervision reports prepared

Increase efficiency and improve effectiveness in the service delivery of transport infrastructure and provision of transport services.

Strengthen management of government vehicle fleet

Policy on government vehicle fleet management

0.01 0.02 0.2 0.3 0.3 Policy submitted to Cabinet

Policy approved by Cabinet

Policy disseminated

Monitoring report on Gov't vehicle fleet management policy

Monitoring report on Gov't vehicle fleet management policy

Spearhead the deployment and supervision of Transport Officers.

Technically competent Transport Officers (TOs) deployed to MDAs.

- 0.006 0.1 0.03 0.04

- Concept note to Ministry of Public Service. formulated

Transport Officers recruited and deployed to 50% MDAs

Minutes of two management meetings

Minutes of two management meetings

Provide technical support in fleet management and operation.

Management of transport during National & International Functions carried

0.04 0.05 0.05 0.05 0.06 80% of transport provided and

80% of transport provided and managed for

80% of transport provided and managed for

80% of transport provided & managed for

80% of transport provided and managed for

Page 78: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

68 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Objective Intervention Output Budget (bn UGX) / Annual Milestones 2011/12 2012/13 2013/14 2014/15 2015/16

out. managed for national and international functions

national and international functions

national and international functions

national and international functions

national and international functions

Drivers tested and certified.

0.015 0.02 0.025 0.035 0.045 100% of applicants tested

100% of applicants tested

100% of applicants tested

100% of applicants tested

100% of applicants tested

Fleet management workshop with Transport Officers held.

- 0.05 0.05 0.06 0.07 - Workshop

report Workshop report

Workshop report

Workshop report

Page 79: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

69 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Objective Intervention Output Budget (bn UGX) / Annual Milestones 2011/12 2012/13 2013/14 2014/15 2015/16

Inspection / valuation of vehicles, plant and machinery carried out.

Valuations/ Assessments carried out for MDAs

0.05 0.06 0.065 0.08 0.1

100% of required inspections and valuation reports prepared

100% of required inspections and valuation reports prepared

100% of required inspections and valuation reports prepared

100% of required inspections & valuation reports prepared

100% of required inspections and valuation reports prepared

Assess the status and performance of government fleet.

Government vehicle condition register annually updated.

0.06 0.3 0.3 0.3 0.45 Annual status report

Update Gov't vehicle condition rating and register.

Update Gov't vehicle condition rating and register.

Update Gov't vehicle condition rating and register.

Update Gov't vehicle condition rating and register.

Conduct a census of government vehicle fleet.

Census of government vehicles coordinated.

0.565 - - 0.6 - Vehicle census report

- - Vehicle census report

-

Support capacity building activities in fleet management and general engineering issues

Equipment operators and technicians trained.

0.2 0.02 0.2 0.2 0.3 Report on 30 Equipment operators and technicians trained

Training needs assessment report

Report on two training workshops for MDAs prepared

Report on two training workshops for MDAs prepared

Report on two training workshops for MDAs prepared

Apprentices and interns trained.

0.03 0.03 0.03 0.03 0.04 Report on 30-50

Report on 30-50 trainees

Report on 30-50

Report on 70-100

Report on 100 -150 trainees

Page 80: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

70 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Objective Intervention Output Budget (bn UGX) / Annual Milestones 2011/12 2012/13 2013/14 2014/15 2015/16 trainees trained

trained trainees trained

trainees trained

trained

Mechanical engineering computer research laboratory set up.

- - 0.1 - 0.85

- - Assessment requirement report produced

- Mechanical engineering research laboratory established.

Operation and maintenance of Ministry vehicles and government Protocol fleet.

Ministry vehicles and government Protocol fleet effectively maintained.

0.421 1.0 1.2 1.4 1.4 50% availability of Ministry vehicle fleet

70% availability of Ministry vehicle fleet

70% availability of Ministry vehicle fleet

70% availability of Ministry vehicle fleet

70% availability of Ministry vehicle fleet

0.149 0.5 0.5 0.8 0.9

55% availability of protocol vehicle fleet

80% availability of protocol vehicle fleet

80% availability of protocol vehicle fleet

80% availability of protocol vehicle fleet

95% availability of protocol vehicle fleet

Upgrade existing workshop technology.

New workshop equipment procured.

0.293 0.5 0.35 0.5 1.0 Contract to upgrade the vehicle servicing/tyre centre signed

10% of workshop equipment upgraded

15% of workshop equipment upgraded

25% of workshop equipment upgraded

45% of workshop equipment upgraded

Improve occupation, safety and health practices in mechanical workshops.

Protective wear for staff procured.

0.097 0.12 - 0.15 Protective wear materials

Protective wear materials

- Protective wear materials

Page 81: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

71 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Objective Intervention Output Budget (bn UGX) / Annual Milestones 2011/12 2012/13 2013/14 2014/15 2015/16 procured procured procured

Procurement of Ministry vehicles and equipment.

Supervision and/or pool vehicles procured.

- 0.2 0.5 0.2 0.22 - Two vehicles

procured Five vehicles procured

Two vehicles procured

Two vehicles procured

Procurement of vehicles for MoWT Departments done.

- - - - - - 100%

Contracts signed and MVs supplied.

100% Contracts signed and MVs supplied.

100% Contracts signed & MVs supplied.

100% Contracts signed and MVs supplied.

Emergency / specialized equipment procured.

- 1.0 1.0 1.5 1.1 - 2 equipment

procured 2 equipment procured

3 equipment procured

2 equipment procured

Page 82: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

72 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Finance and Administration Objective Intervention Output Budget (bn UGX) / Annual Milestones

2011/12 2012/13 2013/14 2014/15 2015/16 Administration Increase efficiency and improve effectiveness in the service delivery of transport infrastructure and provision of transport services.

Strengthen institutional and administrative services

Administrative expenses and operational costs cleared.

2.66 2.92 3.22 3.55 3.9 Security, cleaning, stationery, furniture, office equipment and consumables, utilities, Fuel, oil & Lubricants provided

Security, cleaning, stationery, furniture, office equipment and consumables, utilities, Fuel, oil & Lubricants provided

Security, cleaning, stationery, furniture, office equipment and consumables, utilities, Fuel, oil & Lubricants provided

Security, cleaning, stationery, furniture, office equipment and consumables, utilities, Fuel, oil & Lubricants provided

Security, cleaning, stationery, furniture, office equipment and consumables, utilities, Fuel, oil & Lubricants provided

1.8 1.93 2.13 2.34 2.57 Non procurable administrative inputs provided

Non procurable administrative inputs provided

Non procurable administrative inputs provided

Non procurable administrative inputs provided

Non procurable administrative inputs provided

Formulate a client charter

Client charter developed and disseminated

0.20 - Disseminate

Client Charter - - -

Finance Strengthen Financial management practices

Payments effected on time

0.3 0.3 0.3 0.3 0.3 All approved claims and tax invoices paid

All approved claims and tax invoices paid

All approved claims and tax invoices paid

All approved claims and tax invoices paid

All approved claims and tax invoices paid

Reports prepared and submitted to

0.15 0.15 0.15 0.15 0.15 Weekly, monthly, bi-

Weekly, monthly, bi-

Weekly, monthly, bi-

Weekly, monthly, bi-

Weekly, monthly, bi-

Page 83: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

73 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Objective Intervention Output Budget (bn UGX) / Annual Milestones 2011/12 2012/13 2013/14 2014/15 2015/16

MoFPED (monthly, quarterly and annually)

annual and annual reports prepared.

annual and annual reports prepared.

annual and annual reports prepared.

annual and annual reports prepared.

annual and annual reports prepared.

All Funds Accounted for within the quarter of issue

0.2 0.2 0.2 0.2 0.2 Accountabilities done within the quarter.

Accountabilities done within the quarter.

Accountabilities done within the quarter.

Accountabilities done within the quarter.

Accountabilities done within the quarter.

Budget ceilings effected and funds utilized as budgeted

0.1 0.1 0.1 0.1 0.1 Quarterly cash limits prepared

Quarterly cash limits prepared

Quarterly cash limits prepared

Quarterly cash limits prepared

Quarterly cash limits prepared

Human Resource Management Ministry

Performance reviewed

Monthly meetings held

0.05 0.05 0.05 0.05 0.05 Minutes produced

Minutes produced

Minutes produced

Minutes produced

Minutes produced

Quarterly monitoring carried out.

0.15 0.15 0.15 0.15 0.15 Quarterly reports prepared

Quarterly reports prepared

Quarterly reports prepared

Quarterly reports prepared

Quarterly reports prepared

Strengthen Human Resources Management

Staff recruited 0.035 0.035 0.02 0.02 0.025 No. of staff recruited

No. of staff recruited

No. of staff recruited

No. of staff recruited

No. of staff recruited

Staff salaries paid by 28th of every month

4.26 4.9 5.56 5.82 6.11 All staff on payroll paid by 28th of the month

All staff on payroll paid by 28th of the month

All staff on payroll paid by 28th of the month

All staff on payroll paid by 28th of the month

All staff on payroll paid by 28th of the month

Ministry 0.2 0.25 0.25 0.25 0.25

Page 84: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

74 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Objective Intervention Output Budget (bn UGX) / Annual Milestones 2011/12 2012/13 2013/14 2014/15 2015/16

Performance reviewed

Minutes of the Quarterly performance review meetings held

Minutes of the Quarterly performance review meetings held

Minutes of the Quarterly performance review meetings held

Minutes of the Quarterly performance review meetings held

Minutes of the Quarterly performance review meetings held

Staff performance appraisal conducted

0.1 0.1 0.1 0.1 0.1 95 % of staff appraised

95 % of staff appraised

95 % of staff appraised

95 % of staff appraised

95 % of staff appraised

Staff trained 75% of planned staff trained

75% of planned staff trained

75% of planned staff trained

75% of planned staff trained

75% of planned staff trained

Staff professionalism facilitated

35% of staff professionalized

35% of staff professionalized

35% of staff professionalized

35% of staff professionalized

35% of staff professionalized

Staff welfare managed

0.1 0.1 0.2 0.15 0.15 100% of HIV/AIDS infected staff (who open up) offered medical assistance

100% of HIV/AIDS infected staff (who open up) offered medical assistance

100% of HIV/AIDS infected staff (who open up) offered medical assistance

100% of HIV/AIDS infected staff (who open up) offered medical assistance

100% of HIV/AIDS infected staff (who open up) offered medical assistance

Page 85: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

75 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Objective Intervention Output Budget (bn UGX) / Annual Milestones 2011/12 2012/13 2013/14 2014/15 2015/16

Staff records and other records managed

0.04 0.04 0.025 0.025 0.025

90% of all records managed according to the Basic Registry Procedure Manual

90% of all records managed according to the Basic Registry Procedure Manual

90% of all records managed according to the Basic Registry Procedure Manual

90% of all records managed according to the Basic Registry Procedure Manual

90% of all records managed according to the Basic Registry Procedure Manual

Staff deployed to meet manpower demands

0.02 0.02 0.03 0.035 0.05 Offices appropriately staffed

Offices appropriately staffed

Offices appropriately staffed

Offices appropriately staffed

Offices appropriately staffed

Staff disciplinary matters handled

0.025 0.025 0.025 0.025 0.025 All errant officers disciplined; Disciplinary Committee reports

All errant officers disciplined; Disciplinary Committee reports

All errant officers disciplined; Disciplinary Committee reports

All errant officers disciplined; Disciplinary Committee reports

All errant officers disciplined; Disciplinary Committee reports

Staff reward system implemented

0.2 0.2 0.2 0.2 0.2 All deserving officers rewarded

All deserving officers rewarded

All deserving officers rewarded

All deserving officers rewarded

All deserving officers rewarded

Information and Public Relations

Development Ministry of 0.06 0.1 0.1 0.1 0.1

Page 86: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

76 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Objective Intervention Output Budget (bn UGX) / Annual Milestones 2011/12 2012/13 2013/14 2014/15 2015/16

of a Communication Strategy to boost the Ministry’s image

Works and Transport Communication Strategy (CS) developed to improve the image of the Ministry

Communication strategy in place by May 2012

Strategy disseminated

Annual implementation report for the CS produced

Annual implementation report for the CS produced

Annual implementation report for the CS produced

Increased public awareness about the Ministry’s work and mandate

0.3 0.4 0.5 0.5 0.5 Communication products put in local media

Communication products put in local media

Communication products put in local media

Communication products put in local media

Communication products put in local media

Designing a monitoring and evaluation framework for media and public relation management

Monitoring and evaluation framework for public relations and media management

- 0.1 - - - - Monitoring and

evaluation framework developed

- - -

Page 87: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

77 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Objective Intervention Output Budget (bn UGX) / Annual Milestones 2011/12 2012/13 2013/14 2014/15 2015/16

Design a social corporate responsibility plan for the Ministry

Ministry Social Corporate Responsibility Plan developed

- 0.04 0.3 0.2 0.2 - Draft Plan

produced Approved Plan in place

Reports on Plan implementation

Reports on Plan implementation

Design, install, maintaining an Interactive Voice Response System for Customer care

Operational Interactive Voice Response System installed

- - 0.3 0.1 0.1

- - Interactive Voice Response System in place designed and operational

Interactive Voice Response System maintained

Interactive Voice Response System maintained

Information and Communication Technology

Strengthen information management

ICT implementation strategy prepared

0.2 0.25 - - -

ICT implementation Strategy prepared

Strategic Plan for ICT prepared and approved

- - -

Voice/Data network built and LAN assessment and optimization for different branches

- 2.32 1.282 0.888 0.587 - ICT soft ware

and hard ware procured

Disaster recovery solutions developed

Service level agreements prepared and servers virtualized

MoWT network implemented

Procurement and Disposal Unit Strengthen Consolidated 0.02 0.02 0.025 0.025 0.025

Page 88: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

78 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Objective Intervention Output Budget (bn UGX) / Annual Milestones 2011/12 2012/13 2013/14 2014/15 2015/16

procurement management

Procurement Plan prepared and submitted to PPDA and MoFPED

2011/12 Procurement plan prepared

2012/13 Procurement plan prepared

2013/12 Procurement plan prepared

2014/15 Procurement plan prepared

2015/16 Procurement plan prepared

Bidding documents prepared and approved by Contracts Committee

0.02 0.02 0.025 0.025 0.025 Approved Bid documents

Approved Bid documents

Approved Bid documents

Approved Bid documents

Approved Bid documents

Bid opportunities advertised or invitations issued

0.05 0.055 0.06 0.065 0.07

Number of Contracts awarded

Number of Contracts awarded

Number of Contracts awarded

Number of Contracts awarded

Number of Contracts awarded

User departments and bidders informed of Contracts Committee decisions

0.04 0.04 0.04 0.045 0.045 Reports on Contracts Committee decisions issued

Reports on Contracts Committee decisions issued

Reports on Contracts Committee decisions issued

Reports on Contracts Committee decisions issued

Reports on Contracts Committee decisions issued

Page 89: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

79 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Objective Intervention Output Budget (bn UGX) / Annual Milestones 2011/12 2012/13 2013/14 2014/15 2015/16

All Notification of Award Letters, Draft Contract Agreements prepared and endorsed

0.03 0.03 0.03 0.03 0.03

Award Letters, Draft Contract Agreements endorsed

Award Letters, Draft Contract Agreements endorsed

Award Letters, Draft Contract Agreements endorsed

Award Letters, Draft Contract Agreements endorsed

Award Letters, Draft Contract Agreements endorsed

Monthly, Quarterly and Annual procurement reports prepared and submitted to users

0.03 0.03 0.03 0.03 0.03

Procurement reports prepared

Procurement reports prepared

Procurement reports prepared

Procurement reports prepared

Procurement reports prepared

All procurements recorded, referenced, archived.

0.04 0.04 0.04 0.04 0.04 A functional records management system in place

A functional records management system in place

A functional records management system in place

A functional records management system in place

A functional records management system in place

All procurement documents are verified before submission to Contracts Committee.

0.03 0.03 0.03 0.03 0.03 Verified procurement documents

Verified procurement documents

Verified procurement documents

Verified procurement documents

Verified procurement documents

All Local Purchase Orders prepared in accordance to the

0.04 0.04 0.045 0.045 0.045

Local Purchase Orders cleared

Local Purchase Orders cleared

Local Purchase Orders cleared

Local Purchase Orders cleared

Local Purchase Orders cleared

Page 90: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

80 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Objective Intervention Output Budget (bn UGX) / Annual Milestones 2011/12 2012/13 2013/14 2014/15 2015/16

availability of funds.

PPDA consulted on procurement issues and information requested by PPDA submitted.

0.01 0.01 0.01 0.01 0.01 Functional PDU

Functional PDU Functional PDU Functional PDU Functional PDU

Public Structures Objective Intervention Output Budget (bn UGX) / Annual Milestones

2011/12 2012/13 2013/14 2014/15 2015/16 Increase efficiency Improve delivery MoWT l office

Page 91: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

81 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Objective Intervention Output Budget (bn UGX) / Annual Milestones 2011/12 2012/13 2013/14 2014/15 2015/16

and improve effectiveness in the service delivery of transport infrastructure and provision of transport services.

and coordination of services in the Sector

headquarters constructed

MoWT office headquarters constructed

MoWT office headquarters constructed

MoWT office headquarters constructed

MoWT office headquarters completed

Strengthen the National Construction Industry

Operationalize the National Construction Industry Policy

UCICO law formulated and disseminated

0.3 0.2 0.2 0.2 0.2

UCICO law formulated

UCICO law approved by Parliament

Reports prepared on dissemination of UCICO law

Reports prepared on dissemination of UCICO law

Reports prepared on dissemination of UCICO law

Review the National Construction standards and disseminate them effectively

Updated Standards disseminated

0.1 0.1 0.1 0.1 0.1 Updated Standards

Updated Standards

Reports on Standards disseminated

Reports on Standards disseminated

Reports on Standards disseminated

Expedite the formulation and enactment of building laws

Building control laws formulated and disseminated

0.3 0.2 0.2 0.2 0.2 Building control laws formulated

Building control laws disseminated

Building control laws disseminated

Building control laws disseminated

Building control laws disseminated

Objective Intervention Output Budget (bn UGX) / Annual Milestones

2011/12 2012/13 2013/14 2014/15 2015/16 Formulate and Building Regulation, 0.1 0.1 0.1 0.1 0.1

Page 92: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

82 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Objective Intervention Output Budget (bn UGX) / Annual Milestones 2011/12 2012/13 2013/14 2014/15 2015/16

disseminate building regulation, codes and guidelines

Codes and Guidelines formulated and disseminated

Building Regulation, Codes and Guidelines formulated

Reports on Building Regulation, Codes and Guidelines disseminated

Reports on Building Regulation, Codes and Guidelines disseminated

Reports on Building Regulation, Codes and Guidelines disseminated

Reports on Building Regulation, Codes and Guidelines disseminated

Strengthen the enforcement mechanism of approvals of Plans, quality assurance and inspection in the building industry

150 Annual assessment and investigative reports issued out

0.15 0.15 0.15 0.15 0.15 30 Annual assessment and investigative reports issued out

30 Annual assessment and investigative reports issued

30 Annual assessment and investigative reports issued

30 Annual assessment and investigative reports issued

30 Annual assessment and investigative reports issued

Promote certification and adherence to building regulation and codes

70% of public buildings with approved plans

0.2 0.25 0.28 0.3 0.3 70% of public buildings with approved plans

70% of public buildings with approved plans

70% of public buildings with approved plans

70% of public buildings with approved plans

70% of public buildings with approved plans

Initiate and support leasing mechanism for contractors

Annual grant provided to UCICO

- 0.5 0.5 0.5 0.5 - Annual

grant provided to UCICO

Annual grant provided to UCICO

Annual grant provided to UCICO

Annual grant provided to UCICO

Page 93: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

83 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Objective Intervention Output Budget (bn UGX) / Annual Milestones 2011/12 2012/13 2013/14 2014/15 2015/16

Ensure availability of Technical data for planning, design, construction and maintenance purposes

Reviewed Technical specifications disseminated annually

0.3 0.3 0.3 0.3 0.3 Report on stakeholder dissemination workshops

Report on stakeholder dissemination workshops

Report on stakeholder dissemination workshops

Report on stakeholder dissemination workshops

Report on stakeholder dissemination workshops

Undertake training for all professionals in the sector and equip them with up to date practices in planning, design, construction and maintenance

a) 30 persons annually trained

b) In-service workshops conducted

0.15 0.15 0.15 0.15 0.15 Report on 30 persons annually trained

Report on 30 persons annually trained

Report on 30 persons annually trained

Report on 30 persons annually trained

Report on 30 persons annually trained

0.5 0.5 0.5 0.5 0.5 Reports on In-service workshops conducted

Reports on In-service workshops conducted

Reports on In-service workshops conducted

Reports on In-service workshops conducted

Reports on In-service workshops conducted

Provide regular technical advise to the public/private sector players

50 building works assessment reports issued out annually

0.5 0.5 0.5 0.5 0.5 50 building works assessment reports issued

50 building works assessment reports issued

50 building works assessment reports issued

50 building works assessment reports issued

50 building works assessment reports issued

Ensure efficient and safe working environment for public and private sector

50% public buildings supervised and reports prepared

0.2 0.2 0.2 0.2 0.2 Supervision reports prepared

Supervision reports prepared

Supervision reports prepared

Supervision reports prepared

Supervision reports prepared

Page 94: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

84 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Objective Intervention Output Budget (bn UGX) / Annual Milestones 2011/12 2012/13 2013/14 2014/15 2015/16

Provide technical advice to Ministries, Departments, Agencies (MDAs), and the private sector in planning, design, construction and maintenance of public structures

i) Client sensitization on the Ministry’s services carried out

ii) Venues for national functions prepared

iii) Assessment / technical advisory reports prepared and issued

0.5 0.5 0.5 0.5 0.5 -Client Charter disseminated to MDAs and the public -12 venues -Quarterly reports prepared

-Client Charter disseminated to MDAs and the public -12 venues -Quarterly reports prepared

-Client Charter disseminated to MDAs and the public -12 venues -Quarterly reports prepared

-Client Charter disseminated to MDAs and the public -12 venues -Quarterly reports prepared

-Client Charter disseminated to MDAs and the public -12 venues -Quarterly reports prepared

Policy and Planning

Page 95: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

85 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Objective Intervention Output Budget (bn UGX) / Annual Milestones 2011/12 2012/13 2013/14 2014/15 2015/16

Increase efficiency and improve effectiveness in the service delivery of transport infrastructure and provision of transport services.

Strengthen the coordination mechanism within the sector and establish a national transport databank

Transport sector data management system established and implemented

4.0 4.5 3.5 3 2.8

Sector statistical plan, M&E policy and framework finalized TSDMS Hardware/software procured

TSDMS operationalised. National vehicle census undertaken

Joint M&E surveys undertaken TSDMS maintained

Joint M&E surveys undertaken Year book published

Joint M&E surveys undertaken Year book published

Improve coordination of institution planning through informing the SWG to incorporate key Sector affected and those that contribute to the transport sector.

Sector Working Group (SWG) and Technical Working Group (TWG) meetings held

0.3 0.5 0.5 0.5 0.5 -Minutes of 10 SWG meetings held - Minutes of 12 TWGs meetings held

-Minutes of 8 SWG meetings held - Minutes of 48 TWGs meetings held

-Minutes of 10 SWG meetings held - Minutes of 48 TWGs meetings held

-Minutes of 10 SWG meetings held - Minutes of 48 TWGs meetings held

-Minutes of 10 SWG meetings held - Minutes of 48 TWGs meetings held

Sector Coordination Strengthened

JTSR and the Midterm Review organized

0.55 0.6 0.65 0.7 0.75 JTSR and the Midterm Review organized

JTSR and the Midterm Review organized

JTSR and the Midterm Review organized

JTSR and the Midterm Review organized

JTSR and the Midterm Review organized

Page 96: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

86 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Objective Intervention Output Budget (bn UGX) / Annual Milestones

2011/12 2012/13 2013/14 2014/15 2015/16 Key Policy documents produced

Policy papers prepared including BFP, MPS.

0.4 0.45 0.5 0.5 0.5 Policy papers prepared including BFP, MPS.

Policy papers prepared including BFP, MPS.

Policy papers prepared including BFP, MPS.

Policy papers prepared including BFP, MPS.

Policy papers prepared including BFP, MPS.

Sector contribution to the H.E President’s State of the Nation Address and Budget Speech

Sector contribution to the H.E President’s State of the Nation Address and Budget Speech

Sector contribution to the H.E President’s State of the Nation Address and Budget Speech

Sector contribution to the H.E President’s State of the Nation Address and Budget Speech

Sector contribution to the H.E President’s State of the Nation Address and Budget Speech

Sector contribution to the H.E President’s State of the Nation Address and Budget Speech

National Transport Policy and Strategy developed

0.6 0.7 0.5 0.5 0.5 National Transport Policy and Strategy developed

Policy launched and disseminated

Policy recommendation implemented

Policy recommendation implemented

Policy recommendation implemented

Page 97: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

87 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Objective Intervention Output Budget (bn UGX) / Annual Milestones 2011/12 2012/13 2013/14 2014/15 2015/16

Preparation of other Policy documents backstopped.

0.1 0.1 0.1 0.1 0.1 Preparation of other Policy documents backstopped.

Preparation of other Policy documents backstopped.

Preparation of other Policy documents backstopped.

Preparation of other Policy documents backstopped.

Preparation of other Policy documents backstopped.

- 0.1 0.1 - - - Rural

Transport Policy prepared

Rural Transport Policy formulated

- -

Coordination office for NTMP Setup. NTMP M&E framework developed.

0.85 0.85 1.5 0.1 0.1

Implementation of NTMP activities monitored

Implementation of NTMP activities monitored

NTMP midterm review undertaken

Implementation of NTMP activities monitored

Implementation of NTMP activities monitored

MoWT Five year Strategic Plan formulated.

0.2 0.3 0.3 0.3 0.3 Annual review of MoWT Five year Strategic Plan carried out

Annual review of MoWT Five year Strategic Plan carried out

Midterm review of MoWT 5yr Strategic Plan carried out

Annual review of MoWT Five year Strategic Plan done

Final evaluation and formulation of a new S/Plan

Page 98: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

88 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

Objective Intervention Output Budget (bn UGX) / Annual Milestones

2011/12 2011/12 2011/12 2011/12 2011/12

Sector performance reports produced

Performance reports availed (Quarterly, Midyear and Annual)

0.3 0.3 0.3 0.3 0.3 Performance reports availed (Quarterly, Midyear and Annual)

Performance reports availed (Quarterly, Midyear and Annual).

Performance reports availed (Quarterly, Midyear and Annual).

Performance reports availed (Quarterly, Midyear and Annual).

Performance reports availed (Quarterly, Midyear and Annual).

Page 99: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

89 | P a g e

Annex 2: CLIENT CHARTER

1.0 INTRODUCTION

This Client Charter presents the Commitments of the Ministry of Works and Transport in delivery of services to its clients and the public. It provides the Ministry’s mandate, vision, mission, principle services, key result areas and commitments. The Charter outlines its clients, accountability framework, procedures to be followed in handling complaints and feedback mechanisms. The Ministry’s Mandate is to:

a) Plan, develop and maintain an economic, efficient and effective transport

infrastructure; b) Plan, develop and maintain economic, efficient and effective transport services by

road, rail, water, air and pipeline; c) Manage Public works including government structures and; d) Promote good standards in the construction industry

Vision

To provide reliable and safe works, transport infrastructure and services.

Mission

To promote adequate, safe and well maintained Works and Transport Infrastructure and Services for Social Economic Development of Uganda. Our Mission is, “To provide effective leadership, policy guidance, quality assurance, regulation and oversight by adhering to professionalism and integrity for socio-economic development of the country”.

2.0 VALUES AND PRINCIPLES

The values and principles that guide and commit the staff of the Ministry of Works and Transport to the above Mandate, Vision and Mission in providing services are as stated below.

Page 100: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

90 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

l) Professionalism: We shall adhere to the defined rules, standards and guidelines of the respective disciplines, exhibiting professionalism, competence and honesty.

m) Integrity: We shall show the highest standards of integrity and shall not place ourselves under any financial or other obligations to individuals or organizations that might seek to compromise our professional behaviour in performance of our duties.

n) Quality Assurance: We shall put in place measures and mechanisms that will ensure our clients deliver/receive quality services and works within budget and time.

o) Selflessness: We shall put public interest above personal interest without consideration of any financial or material benefit and gain.

p) Objectivity: We shall make decisions based on merit, researched information, professional codes and other codes of good practice.

q) Customer/Client focus: We shall put the interests of our customers/clients as our first priority. We shall always seek to meet our customers’ needs and expectations.

r) Partnership: We shall engage our partners in planning, designing, implementing, monitoring and evaluating our programmes and Projects.

s) Optimal use of resources: We shall optimally use resources in the attainment of the Ministry objectives and targets.

t) Transparency and Accountability: We shall be transparent and accountable for our decisions, actions and inactions.

u) Responsiveness: We shall respond to our clients effectively and efficiently when called upon.

Page 101: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

91 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

v) Impartiality: We shall provide services to all clients without discrimination on the basis of gender, race, colour and religion or creed or ideological orientation or social status.

3.0 KEY RESULT AREAS AND COMMITMENTS

3.1 Key Results Areas

The Ministry’s Key Result Areas are: a) National Policies, Plans, Standards, Laws and Regulations formulated; b) National Policies, Standards, Laws and Regulations enforced; c) National Transport Data disseminated ; d) Safety of public transport service vehicles and inland water vessels improved e) Performance of agencies monitored and evaluated; f) Technical support to Ministries, Departments and Agencies provided; and g) Research on local construction materials and technologies undertaken

3.2. Commitments

The Ministry of Works and Transport commits itself to the following:

a) Finance and Administration

We shall: i) Build Staff Capacity and professionalism; ii) Prepare and implement the ministry’s communication strategy iii) Ensure safe custody, proper utilization and accountability for all Public funds

and assets; iv) Provide Management Support Services; v) Ensure goods and services are procured, and ministry assets disposed of in

accordance with the law and good practices; and vi) Ensure bills/Invoice/Certificates are paid/ settled within 30 days after

submission of full verification and certification.

Page 102: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

92 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

b) Policy and Planning

We shall: i) Coordinate and analyze strategic policy options to guide the Ministry

programmes and projects; ii) Liaise with other Government Ministries in developing and analyzing cross-

sectoral policies and issues for guidance in the Ministry; iii) Coordinate the preparation of the major policy statements namely: Medium

Term Expenditure Framework and Ministerial Budget Policy statement; iv) Monitor and evaluate the implementation and carry out regulatory impact

assessment of major policies in the Ministry; v) Coordinate and monitor Works and Transport sub-sector performance; and vi) Collect, process, analyze, interpret store and disseminate data on all modes of

transport for strategic planning.

c) Public Structures We shall: i) Plan, monitor and evaluate Building Construction Projects within budget and

time; ii) Check and approve Tender and Contract documents for adoption within 30

calendar days; iii) Formulate, review, enforce and monitor building construction Laws, Policies,

Standards and Regulations to ensure observance of quality, safety and standards; and

iv) Supervise and manage Consultancy Services contracts and building works contracts under MDAs to ensure quality, safety and standards.

d) Construction Standards and Quality Management

We shall: i) Undertake research and materials testing

Page 103: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

93 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

ii) Develop adequate engineering specifications and standards; iii) Promote good standards in the construction industry; and iv) Promote integration of crosscutting issues namely; Environment, Gender,

HIV/AIDS, Occupational Health and Safety and Disability in the sector. e) Roads and Bridges

We shall: i) Monitor and evaluate performance of agencies, authorities, local governments

involved in the development and maintenance of road infrastructure; ii) Formulate policies and guidelines for the development and maintenance of

road infrastructure; iii) Regulate agencies, authorities, local governments involved in the

development and maintenance of road infrastructure; iv) Collaborate with agencies, authorities, local governments involved in the

development and maintenance of road infrastructure; and v) Monitor and evaluate surveys, demarcation, and acquisition of land titles,

marking and protection of road reserves for transport projects for existing and future Road Infrastructure to avoid large amounts of compensations.

f) Mechanical Engineering Services

We shall: i) Inspect Government vehicles and equipment for condition assessment and

onward advice as to future usage; ii) Maintain and manage Government vehicle/equipment inventory database; iii) Evaluate equipment and vehicles for procurement, arbitration or disposal

purposes; iv) Guide in setting policies and standards for models/makes of vehicles for

government usage; v) Set standards and requirements for private garages/workshops that repair

government vehicles and equipment; and

Page 104: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

94 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

vi) Assist the Districts in procurement planning and managing the maintenance of their road equipment.

g) Transport Regulation

We shall: i) Initiate and develop transport policies, strategies and regulations to ensure

effective, efficient and safe transport services; ii) Monitor and advise on effective enforcement of transport legislation; iii) Oversee investigations into causes of accidents and advise on mitigation

measures; iv) Oversee sensitization programmes of the public about safety and discipline in

the transport industry; v) Oversee performance of CAA ,TLB, NRSC so as to ensure compliance with

the legislation; and vi) Co-ordinate formulation and implementation of bilateral, regional and

international agreements to enhance safety of transport in liaison with other respective countries and organizations.

h) Transport Services and Infrastructure

We shall: i) Undertake studies and engineering designs for rail, water and air transport

modes; ii) Implement plans for transport services and infrastructure for all modes of

transport (Road, Rail, Water and Air); iii) Carry out research to identify requirements for development and

improvement of transport services and Infrastructure; iv) Assess the impact of modes of transport in respect to socio-economic

development and poverty eradication in the country; v) Formulate, Assess and evaluate the cost of transport services in terms of

tariffs and user charges in the Transport Sector;

Page 105: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

95 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

vi) Monitor and evaluate the performance of Public Corporations in the Sub-sector (Uganda Railways Corporation, Rift Valley Railways and Civil Aviation Authority) to ensure efficiency and adherence to standards; and

vii) Promote collaboration linkages and liaising with Regional and International Organizations concerned with provision of transport services and Infrastructure.

4.0 CLIENT RIGHTS, EXPECTATIONS AND OBLIGATIONS

4.1 The Clients

Our Clients include but are not limited to the following: a) The Parliament; b) Development Partners; c) Staff of the Ministry; d) Ministries, Departments, Parastatals, Authorities Agencies and Local Governments; e) Professional bodies; f) Suppliers of Goods and Providers of Services/ Works; g) Investors and Private Sector Operators; h) Institutions of Learning; i) Non Governmental Organizations/ Civil Society Organizations; and j) Media; and k) General Public;

4.2 Client Rights

Our Clients have a right to: a) Services in accordance with the existing contractual obligations, regulations and

guidelines; b) Timely response to issues raised; c) Technical guidance and advise;

Page 106: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

96 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

d) Access to information, regular reporting and accountability within the prescribed law;

e) Confidentiality of information; f) Participation or representation in development of policies, systems and programs;

and g) Know the user fees as per the fees structure.

4.3 Client Expectations

Our Clients shall expect the following from us:- a) to be treated with respect and courtesy; b) timely payment for goods supplied, services provided and works executed; c) adequate and timely attention and response to issues and concerns raised; d) confidentiality of information that relate to specific transactions in line with the

law; e) timely, accurate and well presented policy advice; and f) easy access by authorized persons to entitled information within the agreed

guidelines. We shall serve our clients from Monday to Friday (Except on designated Public Holidays) during the normal working hours as indicated below:- Time: 8.00 am -12.45 pm.

2.00 pm – 5.00 pm.

4.4 Client Obligations

Our Clients shall have the following obligations: a) Comply with the Laws, Regulations, Policies and Guidelines; b) Provide correct and timely Information as may be required by the Ministry; c) Be knowledgeable on regulations and laws relating to the Services they require;

Page 107: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

97 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

d) Participate in scheduled policy fora and workshops; e) Mutual respect for staff and orderliness in offices; f) Participate in the formulation, implementation, evaluation and sustainability of

programs; and g) Provide goods and services that conform to set standards.

5.0 FEEDBACK AND COMPLAINTS PROCEDURES

5.1 Feedback Mechanisms

Clients shall provide feedback on our services through the following mechanisms: a) Stakeholder meetings or conferences and technical review meetings; b) Supervision and monitoring visits; c) Periodic Performance Reports; d) Telephone , e-mail and the Ministry Website; e) The Ministry Public Relations Office; and f) Writing to us through the following address;

Ministry of Works and Transport, P.O. Box 10, Telephone: 256-41-320101/9 Fax: 256-41-320135 E-Mail: [email protected]

5.2 Complaints Procedures

The Ministry of Works and Transport is accountable to the Public for the Services it offers, and has put in place the following procedure for handling complaints and obtaining feedback from the clients: a) Raise the complaint with the officer concerned; b) Consult the Public Relations Office;

Page 108: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

98 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

c) If no satisfactory response is obtained through (a) and (b) above, consult the Client Charter Officer (Principal Personnel Officer) who will guide you on the next course of action;

d) Write to us using the address given at the end of this document; e) Call or fax on the numbers given at the end of this document; and f) Use our website.

5.3 Appeal Mechanism

If you are not satisfied with the response from the action officer attending to you, or with the way your complaint is handled, you may refer to: a) The Head of Department; b) The Director; and c) The Permanent Secretary. In case you are not satisfied with the appeal process at the Ministry of Works and Transport, you may seek redress from the Head of Public Service and Secretary to Cabinet, Office of the President.

6.0 ACCOUNTABILITY FRAMEWORK

6.1 Performance Reporting

We shall report our performance to our clients through various mechanisms listed here below: a) Stakeholders meetings or conferences; b) Annual Ministerial Policy Statements; c) Periodic Performance Reports; and d) Releases in the mass media (electronic and print).

Page 109: MINISTRY OF WORKS AND TRANSPORT STRATEGIC PLAN … · Development Plan (2010/11 -2014/15) and the National Transport Master Plan (NTMP) which includes a Transport Master Plan for

MoWT Strategic Plan - 2011/12 - 2015/16 ______________________________________________________________________________

99 ______________________________________________________________________________

Vision- To provide reliable and safe works, transport infrastructure and services.

6.2 Performance Improvement

In collaboration with our clients, we shall continuously improve on the quality of service delivery, periodically reports on our performance and commit ourselves to the above principals and service standards.


Recommended